Loading...
HomeMy WebLinkAbout20230706Reply Comments.pdfGEM STATE WATER’S REPLY TO THE COMMENTS OF THE COMMISSION STAFF PAGE 1 OF 6 Preston N. Carter, ISB No. 8462 Rebecca M. Fitz, ISB No. 11874 Givens Pursley LLP 601 W. Bannock St. Boise, Idaho 83702 Telephone: (208) 388-1200 Facsimile: (208) 388-1300 prestoncarter@givenspursley.com beccafitz@givenspursley.com 13988.14[16820629_7.docx] Attorneys for Gem State Water Company, LLC BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF GEM STATE WATER COMPANY, LLC FOR APPROVAL OF ACQUISITION OF THE ASSETS OF THE WATER BUSINESS OF VALIANT IDAHO, LLC Case No. GSW-W-2301 GEM STATE WATER’S REPLY TO THE COMMENTS OF THE COMMISSION STAFF Gem State Water Company, LLC (“Gem State Water” or “Company”), provides the following reply to the Comments of the Commission Staff of the Idaho Public Utilities Commission (“Staff Comments”). BACKGROUND Gem State Water recognizes and appreciates the efforts of Staff in reviewing the proposed acquisition. As described in the Application, in this transaction Gem State Water proposes to acquire an approximately 148-customer water system (collectively, “System”), which is currently unregulated, owned by Valiant Idaho, LLC and TIC Utilities, LLC. Like other small water systems, recordkeeping and other operational activities have been less than ideal for this System. Staff makes several recommendations to address these issues. Gem State Water believes that the majority of these recommendations are achievable and should fill in informational gaps that currently exist. Gem State Water is concerned, however, about the RECEIVED 2023 JULY 6, 2023 4:49PM IDAHO PUBLIC UTILITIES COMMISSION GEM STATE WATER’S REPLY TO THE COMMENTS OF THE COMMISSION STAFF PAGE 2 OF 6 economic viability of the transaction if the System were to be determined to have no rate base and has provided additional information related to the Commission’s consideration of this issue. Each of Staff’s recommendations is addressed in more detail below. REPLY TO STAFF PROPOSALS 1. Requiring additional information before issuance of a new CPCN. Staff recommended that the Commission approve the acquisition, but not issue a new CPCN until the Company 1) receives written acknowledgement from the Idaho Department of Environmental Quality within six months of the Commission’s final order approving the Transaction that the System meets required physical-separation requirements; and 2) submits a legal description of the System’s service area within six months of the Commission’s final order, which confirms that the service area to be included in the new CPCN does not overlap with other water systems; and that 3) the Commission order the Company to provide complete design documentation and installation drawings for the System within six months of the final order approving the acquisition.1 Id. Gem State Water does not disagree with these recommendations. Based on information known at this time, Gem State Water believes these conditions can be met, though it cannot be confirmed with certainty at this time. Gem State Water requests that the Commission clearly set forth in its Order any conditions to its approval of the acquisition, and the conditions that must be met before Gem State Water can lawfully provide service to customers of the System. 2. Issuance of a separate CPCN, tariff and billing documents, and customer notification. Staff recommends that the Commission issue a separate, new CPCN for the System. Staff Comments at 3. Gem State Water submits that it will be logistically more streamlined to amend 1 Capitalized terms have the same meaning as in the Application, if not separately defined here. GEM STATE WATER’S REPLY TO THE COMMENTS OF THE COMMISSION STAFF PAGE 3 OF 6 CPCN No. 293 to include the service area for the System, and requests that the Commission amend CPCN No. 293 rather than issue a new, separate CPCN. Staff recommends a new tariff that contains a separate rate schedule for the System, rather than a rate schedule combined with Gem State Water’s other systems, Staff Comments at 8; that the Company provide another direct notice to the customers if the Commission approves the acquisition and the Transaction closes, Staff Comments at 8; and that Gem State Water works with Staff to reflect changes brought about by the sale, Staff Comments at 8-9. Gem State Water agrees with these comments and looks forward to working with Staff. Gem State Water would like to clarify, however, that these next steps would occur after closing of the Transaction rather than after Commission’s approval. This certainly appears to be the intent behind the recommendations; Gem State Water would just like to note that, while the Commission’s approval of the Transaction is a condition precedent to closing, it is not a guarantee that the Transaction will in fact close, or that closing will occur on any particular timeline. 3. Plant in service and rate base Based upon the difficulty of differentiating between plant in service for the sewer system and the wastewater system, Staff refers to the presumption that plant in service for small water companies is contributed capital and recommends excluding all current plant in service from rate base. Staff Comments at 5, 9. Gem State Water recognizes the existence of the presumption set forth in the Commission’s rules. See IDAPA 31.36.01.102. However, Gem State Water respectfully requests that the Commission determine that the presumption has been rebutted in this case. Attached is a spreadsheet with a proposed calculation of plant in service for the water System, together with GEM STATE WATER’S REPLY TO THE COMMENTS OF THE COMMISSION STAFF PAGE 4 OF 6 invoices demonstrating certain capital investments associated with the water System.2 Gem State Water submits that this information is sufficient to support an amount of $1,160,869 for plant in service associated with the water System, made for the benefits of customers of the System, that should be included within rate base. Recognizing this amount plant in service within rate base balances the long-term needs of the System’s customers. Taking into account all the circumstances, including the small size of the System, the regulatory issues it faces, the expenditures required in diligence and anticipated to meet conditions on approval, and other facts, excluding all plant in service from rate base places into some doubt the economic viability of the acquisition moving forward. If the acquisition were not to move forward, it would remove from customers the clearest path towards long-term viability of the System. Gem State Water submits that inclusion of this amount of plant in service in rate base is supported in the record and it furthers the customers’ interests in a path towards long-term viability of a System operated in conformity with the Commission’s jurisdiction. Gem State respectfully requests, in the alternative and at a minimum, that the Commission determine that the presumption of contributed capital is rebutted to the extent supported by invoices showing their value, and that the value of plant-in-service proven by this information will be included within rate base during the next rate case that includes the System. CONCLUSION For these reasons, Gem State Water respectfully requests that the Commission approve the acquisition as proposed in the Application. If the Commission imposes conditions upon the acquisition, the Company respectfully requests that these conditions be identified with specificity 2 Gem State has provided the invoices available as of the time of filing, and will promptly supplement with additional invoices when they become available. GEM STATE WATER’S REPLY TO THE COMMENTS OF THE COMMISSION STAFF PAGE 5 OF 6 in the Order. Finally, the Company respectfully requests that the Commission’s Order determine that plant in service in the amount of $1,160,869 is not excluded from rate base, or in the alternative that the Commission determine that the presumption of contributed capital is rebutted to the extent supported by invoices indicating that the investments were made in the water System and that such amount will be included within rate base during the next rate case that includes the System. DATED July 6, 2023. GIVENS PURSLEY LLP By Preston N. Carter Rebecca M. Fitz Givens Pursley LLP Attorneys for Gem State Water Company LLC GEM STATE WATER’S REPLY TO THE COMMENTS OF THE COMMISSION STAFF PAGE 6 OF 6 CERTIFICATE OF SERVICE I certify that on July 6, 2023, a true and correct copy of the foregoing was served upon all parties of record in this proceeding via electronic mail as indicated below: Commission Staff Via Electronic Mail Jan Noriyuki, Commission Secretary Idaho Public Utilities Commission 11331 W. Chinden Blvd., Bldg. 8, Suite 201-A Boise, ID 83714 jan.noriyuki@puc.idaho.gov Preston N. Carter Gem State Water Company Case No. GSW-W-23-01 Preliminary Rate Base for Assets Acquired from the Water Business of Valiant Idaho, LLC 2023 Proforma Plant in Service As of 6/24/2022 Filtration Total Notes 1 304 - Well Structures & Improvements 203,577 203,577 2 307 - Wells 123,780 123,780 3 311 - Pumps & Accessories 181,232 181,232 4 320 - Purification Systems 402,895 402,895 see "Filtration" tab for invoices related to filtration plant in services in 2023 5 330 - Distribution Reserviors and Tanks 303,574 303,574 6 Total Plant in Service 812,163 1,215,058 - 7 Less Accumulated Depreciation (54,189) (54,189) 8 Net Plant in Service 757,974 1,160,869 9 Less Contributions in Ad of Construction 10 Gross Contributions (FY 2022)- - 11 Less Accumulated Amortization (FY 2022)- - 12 Net Contributions in Aid of Construction - - 13 Plus Deferred Income Tax Not calculated at this time 14 Net Plant in Service 757,974 1,160,869 15 Working Capital (1/8 of Operation and Maintenance Expense)Not calculated at this time 16 Total Rate Base 757,974 1,160,869 6/24/2022 Entity Asset Descrpition In Service date Asset Cost Annual Depreciation Years In Service Accumulated Depreciation NBV Depreciation Method Useful Life Water WELL ** 1/01/18 1/1/2018 118,030 4,721 4.48 21,151 96,879 SL 25 Water WELL PUMP ** 1/01/18 1/1/2018 31,459 2,097 4.48 9,396 22,063 SL 15 Water WELL ** 10/10/19 10/10/2019 5,750 230 2.71 623 5,127 SL 25 Water WELL PUMP HOUSE ** 7/14/20 7/14/2020 203,577 5,089 1.94 9,873 193,704 SL 40 Water RESERVOIR ** 6/30/21 6/30/2021 303,574 5,060 0.98 4,958 298,616 SL 60 Water WELL PUMP ** 8/31/21 8/31/2021 149,773 9,985 0.82 8,188 141,585 SL 15 812,163 27,182 54,189 757,974 GEM STATE WATER COMPANY CASE NO.GSW-W-23-01 FILTRATION SYSTEM INVOICES Invoice DATE 10/27/2022 INVOICE No. 2244 BILL TO TIC Utilities, LLC Attn: William Haberman, Manager 151 Clubhouse Way Sandpoint, ID 83864 SHIP TO P. O. Box 10329 Seattle, WA 98110-0329 P.O. NUMBER Letter Prop... TERMS Net 30 REP SHIP DATE 10/27/2022 VIA C & A Truc... F.O.B. Hollister, CA PROJECT Fe/Mn Removal Total Telephone: 360-414-9223 Facsimile: 360-397-0375 ITEM DESCRIPTIONQUANTITY UNIT PRICE AMOUNT 48-60-06 ATEC Model 48-60-03 Iron and Manganese Removal System, Complete 1 151,566.00 151,566.00 Freight Freight from Hollister, CA to Sandpoint, ID 1 5,500.00 5,500.00T Customer De... Customer Deposit, Received 10/19/2022 1 -20,000.00 -20,000.00T Out-of-state sale, exempt from sales tax 0.00% 0.00 FEIN: 91-1918395 UBI: 601-839-692 $137,066.00 GEM STATE WATER COMPANY CASE NO.GSW-W-23-01 RESERVOIR INVOICES Date Transaction Type Num Adj Name PDF File Name Split Amount 02/10/2021 Bill 44026000-035 No Welch-Comer Reservoir A Accounts Payable (A/P)1,961.12 03/17/2021 Bill 44026000-036 No Welch-Comer Reservoir B Accounts Payable (A/P)4,776.65 04/08/2021 Bill 44026000-037 No Welch-Comer Reservoir C Accounts Payable (A/P)8,883.63 05/11/2021 Check No Consolidated Supply Reservoir D Business Advantage Chk (6963)30,000.00 05/18/2021 Bill 44026000-038 No Welch-Comer Reservoir E Accounts Payable (A/P)7,315.83 06/03/2021 Check No Consolidated Supply Reservoir D Business Advantage Chk (6963)24,134.62 07/13/2021 Bill 57265-CD99144172 No Barnhart Reservoir F Accounts Payable (A/P)31,255.35 07/19/2021 Bill 40015 No CDA Redi Mix Precast Inc.Reservoir G Accounts Payable (A/P)37,609.00 07/20/2021 Bill 11 No Advanced Dirt Works And Development L.L.C.Reservoir H Accounts Payable (A/P)64,701.46 07/29/2021 Bill 1026 No Prestige Worldwide Technologies LLC Reservoir I Accounts Payable (A/P)4,600.25 08/09/2021 Bill 39255 No Woods Crushing Hauling Inc.Reservoir J Accounts Payable (A/P)33,320.00 08/09/2021 Bill 39256 No Woods Crushing Hauling Inc.Reservoir K Accounts Payable (A/P)1,425.00 08/20/2021 Bill 21 No Advanced Dirt Works And Development L.L.C.Reservoir L Accounts Payable (A/P)31,649.92 08/30/2021 Bill 5228 No Bigfoot Technical Services Reservoir M Accounts Payable (A/P)18,086.68 10/14/2021 Bill 44026000-042 No Welch-Comer Reservoir N Accounts Payable (A/P)1,648.00 11/15/2021 Bill 44026000-043 No Welch-Comer Reservoir O Accounts Payable (A/P)2,206.03 $ 303,573.54 Invoice Valiant Idaho, LLC. 310 Charleston Place Celebration, FL 34747 February 4, 2021 Project No:44026.00.0 Invoice No:44026000-035 330 E. Lakeside Ave, Suite 101 Coeur d'Alene, ID 83814 P: 208-664-9382 / F: 208-664-5946 Project 44026.00.0 Valiant Idaho Professional Services from December 20, 2020 to January 23, 2021 Phase 001 Technical Assistance Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 12/21/2020 .25 190.00 47.50 Comm w/ Attorney re: Reservoir Cordes, Steven 12/22/2020 .25 190.00 47.50 Comm re: Reservoir Cordes, Steven 12/28/2020 .75 190.00 142.50 Comm re: Olympic Res Hydraulics Cordes, Steven 12/30/2020 .25 190.00 47.50 Comm re: Olympic Res Cordes, Steven 1/13/2021 1.00 190.00 190.00 Water/Sewer Record Drawings Project Manager Williams, Ashley 1/15/2021 .25 155.00 38.75 Locating submitted RR application for Trestle Creek North Sr. Project Administrator Turner, Evangelina 1/14/2021 .25 86.00 21.50 Search for Phase 1 record drawings and forward to S. Cordes; forward Phase 1 record drawings to Bil Haberman; Totals 3.00 535.25 Total Labor 535.25 Unit Billing Ledger Size Copies 1/23/2021 Copies 7.0 Copies @ 0.20 1.40 Letter/Legal Size Copies 1/23/2021 Copies 2.0 Copies @ 0.10 .20 Total Units 1.60 1.60 $536.85Total this Phase We have moved! Please update your records with our new physical and mailing address: 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Phase 015 Forest Highland Water Sewer Mains Task 002 Water/Sewer Design Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 12/22/2020 1.50 190.00 285.00 Design Cordes, Steven 12/23/2020 1.00 190.00 190.00 Forest Ridge Water/Sewer Design Cordes, Steven 12/28/2020 .50 190.00 95.00 Design Comm. CAD Technician III Lockhart, Julie 12/23/2020 2.00 103.00 206.00 Drafted Design Edits Totals 5.00 776.00 Total Labor 776.00 Billing Limits Current Prior To-Date Total Billings 776.00 1,275.00 2,051.00 Limit 5,000.00 Remaining 2,949.00 $776.00Total this Task $776.00Total this Phase Phase 016 Olympic Drive Reservoir Professional Personnel Hours Rate Amount Survey Manager Hathaway, Mike 12/21/2020 .50 162.00 81.00 Data processing Hathaway, Mike 12/22/2020 3.00 162.00 486.00 Survey processing, map creation Totals 3.50 567.00 Total Labor 567.00 Unit Billing Ledger Size Copies 1/23/2021 Copies 2.0 Copies @ 0.20 .40 Letter/Legal Size Copies 1/23/2021 Copies 4.0 Copies @ 0.10 .40 Letter/Legal/CardStock Size Color Prints 1/23/2021 Copies 3.0 Color Copy @ 0.99 2.97 Total Units 3.77 3.77 $570.77Total this Phase Phase 017 2020 Annual Report Professional Personnel Hours Rate Amount Project Manager Williams, Ashley 1/5/2021 .25 155.00 38.75 Page 2We have moved! Please update your records with our new physical and mailing address: 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Project 44026000-03544026.00.0 Valiant Idaho Invoice Reviewing annual report with C. Hodgson Williams, Ashley 1/19/2021 .25 155.00 38.75 Comms w/ J. Wereley RE data Totals .50 77.50 Total Labor 77.50 $77.50Total this Phase $1,961.12Total this Invoice Page 3We have moved! Please update your records with our new physical and mailing address: 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Project 44026000-03544026.00.0 Valiant Idaho Invoice Invoice Valiant Idaho, LLC. 310 Charleston Place Celebration, FL 34747 March 9, 2021 Project No:44026.00.0 Invoice No:44026000-036 330 E. Lakeside Ave, Suite 101 Coeur d'Alene, ID 83814 P: 208-664-9382 / F: 208-664-5946 Project 44026.00.0 Valiant Idaho Professional Services from January 24, 2021 to February 20, 2021 Phase 001 Technical Assistance Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 2/2/2021 .25 190.00 47.50 Review Reservoir Declaration Cordes, Steven 2/11/2021 1.50 190.00 285.00 Comm w/ Bill, Reservoir Size Analysis Cordes, Steven 2/12/2021 1.00 190.00 190.00 Reservoir Analysis Cordes, Steven 2/15/2021 .50 190.00 95.00 Reservoir Analysis/comm. Cordes, Steven 2/17/2021 1.00 190.00 190.00 Reservoir Analysis Principal Engineer Maiani, Necia 2/11/2021 .50 175.00 87.50 Pull Idaho Club PER Maiani, Necia 2/18/2021 .50 175.00 87.50 Pull Idaho Club Storage Sizing Totals 5.25 982.50 Total Labor 982.50 Unit Billing Ledger Size Copies 2/20/2021 Copies 4.0 Copies @ 0.20 .80 Letter/Legal Size Copies 2/20/2021 Copies 6.0 Copies @ 0.10 .60 Total Units 1.40 1.40 $983.90Total this Phase Phase 015 Forest Highland Water Sewer Mains Task 001 Topo/Mon Search Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Unit Billing Letter/Legal Size Copies 2/20/2021 Copies 1.0 Copy @ 0.10 .10 Total Units .10 .10 Billing Limits Current Prior To-Date Total Billings .10 5,620.18 5,620.28 Limit 8,300.00 Remaining 2,679.72 $.10Total this Task Task 002 Water/Sewer Design Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 2/4/2021 1.00 190.00 190.00 Design Cordes, Steven 2/5/2021 3.00 190.00 570.00 Hydraulic Analysis Cordes, Steven 2/8/2021 .25 190.00 47.50 Design Cordes, Steven 2/9/2021 1.00 190.00 190.00 Pipe Size Analysis Cordes, Steven 2/10/2021 1.00 190.00 190.00 Pipe Size Analysis Cordes, Steven 2/15/2021 .50 190.00 95.00 Pipe Size Analysis Cordes, Steven 2/16/2021 1.00 190.00 190.00 Water/Sewer Design Engineer II Huff, Derek 2/15/2021 .75 125.00 93.75 Model support for Cody Engineer I Hodgson, Cody 2/15/2021 2.50 113.00 282.50 Entering in WaterCAD geometry and troubleshooting with Derek. Totals 11.00 1,848.75 Total Labor 1,848.75 Unit Billing Ledger Size Copies 2/20/2021 Copies 2.0 Copies @ 0.20 .40 Total Units .40 .40 Billing Limits Current Prior To-Date Total Billings 1,849.15 2,051.00 3,900.15 Limit 5,000.00 Remaining 1,099.85 $1,849.15Total this Task $1,849.25Total this Phase Phase 016 Olympic Drive Reservoir Page 2Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Project 44026000-03644026.00.0 Valiant Idaho Invoice Unit Billing 2020 Reimbursable Mileage 12/15/2020 Mileage 116.0 miles @ 0.575 66.70 Total Units 66.70 66.70 $66.70Total this Phase Phase 017 2020 Annual Report Professional Personnel Hours Rate Amount Project Manager Williams, Ashley 1/25/2021 .25 155.00 38.75 Status update with J. Wereley Williams, Ashley 2/3/2021 .25 155.00 38.75 Reviewing data with C. Hodgson Williams, Ashley 2/8/2021 .25 155.00 38.75 Coordinating with Cody on data Williams, Ashley 2/11/2021 .25 155.00 38.75 Coordinating data with C. Hodgson Williams, Ashley 2/12/2021 .50 155.00 77.50 Reviewing report Williams, Ashley 2/15/2021 .25 155.00 38.75 Reviewing status with C. Hodgson Engineer I Hodgson, Cody 1/25/2021 .50 113.00 56.50 Downloading the data. Getting the report tables and word document set up. Hodgson, Cody 2/2/2021 3.25 113.00 367.25 Downloading idaho club data. Entering in testing data, typing in the meter reading data. Making list of needed information. Hodgson, Cody 2/3/2021 .50 113.00 56.50 Scan through of missing data to ask Anne for. Sending Anne an email of missing data needed for analysis. Hodgson, Cody 2/8/2021 2.25 113.00 254.25 Inputting in the data from Tim's Report into the analysis spreadsheet. Hodgson, Cody 2/9/2021 2.00 113.00 226.00 Populating the report with current analysis numbers. Hodgson, Cody 2/10/2021 .50 113.00 56.50 Working on Annual Report. Hodgson, Cody 2/11/2021 1.00 113.00 113.00 Checking on report non conformance events, talking with Ashley, calling Jason and Anne for more data. Hodgson, Cody 2/12/2021 2.75 113.00 310.75 Talking with Jason and inputting in Influent data. Finalizing report, printing out appendices, piecing together, reiviewing, coordinating with Lina and Ashley to send out to Bill. Sr. Project Administrator Turner, Evangelina 2/12/2021 1.25 86.00 107.50 Format & finalize 2020 Annual Report and forward to A. Willaims & C. Hodgson for review; process reviewed 2020 Annual Report and forward to B. Haberman for review and certification; Project Administrator Patterson, Mindy 2/16/2021 .75 76.00 57.00 Page 3Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Project 44026000-03644026.00.0 Valiant Idaho Invoice Finalize annual report; process A. Williams signature page; forward to Client for signature; process signature; prepare DEQ transmittal and submit; Totals 16.50 1,876.50 Total Labor 1,876.50 Unit Billing Letter/Legal Size Copies 2/20/2021 Copies 3.0 Copies @ 0.10 .30 Total Units .30 .30 $1,876.80Total this Phase $4,776.65Total this Invoice Page 4Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Project 44026000-03644026.00.0 Valiant Idaho Invoice Invoice Valiant Idaho, LLC. 310 Charleston Place Celebration, FL 34747 April 6, 2021 Project No:44026.00.0 Invoice No:44026000-037 330 E. Lakeside Ave, Suite 101 Coeur d'Alene, ID 83814 P: 208-664-9382 / F: 208-664-5946 Project 44026.00.0 Valiant Idaho Professional Services from February 21, 2021 to March 20, 2021 Phase 001 Technical Assistance Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 2/22/2021 .50 190.00 95.00 Pick up Hydrant Meter Cordes, Steven 2/23/2021 4.50 190.00 855.00 Flow Test Hydrants, Look at new Res site Cordes, Steven 2/24/2021 .50 190.00 95.00 Comm re: Res Site Cordes, Steven 2/25/2021 .25 190.00 47.50 Clubhouse Fire Flow Cordes, Steven 2/26/2021 .25 190.00 47.50 Reservoir Siting Comm. Cordes, Steven 3/2/2021 3.50 190.00 665.00 Site Visit re: New Reservoir Site Principal Engineer Maiani, Necia 2/23/2021 .50 175.00 87.50 Confirm Water Right Quantity Maiani, Necia 2/25/2021 .50 175.00 87.50 Comm RE: Idaho Club Storage Memo Maiani, Necia 2/28/2021 .50 175.00 87.50 REview Storage Memo Update Maiani, Necia 3/3/2021 .50 175.00 87.50 Comm RE: PER Maiani, Necia 3/15/2021 .50 175.00 87.50 Comm RE: New REservoir Maiani, Necia 3/19/2021 .50 175.00 87.50 Comm RE: Model Totals 12.50 2,330.00 Total Labor 2,330.00 Unit Billing Ledger Size Color Prints 3/20/2021 Copies 6.0 Color Copy @ 1.98 11.88 Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Ledger Size Copies 3/20/2021 Copies 4.0 Copies @ 0.20 .80 Letter/Legal Size Copies 3/20/2021 Copies 31.0 Copies @ 0.10 3.10 Letter/Legal/CardStock Size Color Prints 3/20/2021 Copies 4.0 Color Copy @ 0.99 3.96 Total Units 19.74 19.74 $2,349.74Total this Phase Phase 015 Forest Highland Water Sewer Mains Task 001 Topo/Mon Search Professional Personnel Hours Rate Amount Survey Manager Hathaway, Mike 3/4/2021 1.50 162.00 243.00 Map adjacent property, review easements, prepare easement proposed easement map Totals 1.50 243.00 Total Labor 243.00 Billing Limits Current Prior To-Date Total Billings 243.00 5,620.28 5,863.28 Limit 8,300.00 Remaining 2,436.72 $243.00Total this Task Task 002 Water/Sewer Design Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 2/24/2021 .50 190.00 95.00 Hydraulic Analysis Cordes, Steven 2/26/2021 .50 190.00 95.00 Plans Cordes, Steven 3/1/2021 .25 190.00 47.50 Design Cordes, Steven 3/3/2021 .50 190.00 95.00 Design Cordes, Steven 3/10/2021 1.00 190.00 190.00 Site visit, Comm. Engineer I Hodgson, Cody 2/24/2021 .50 113.00 56.50 Calibrating water model and running test. Hodgson, Cody 2/25/2021 .50 113.00 56.50 Getting briefed by Steve and Necia on amending a memo. Hodgson, Cody 2/26/2021 3.50 113.00 395.50 Drafting up the amendment memo to submit to DEQ. Hodgson, Cody 3/1/2021 .50 113.00 56.50 Making edits on the memo and addressing Necia's comments. Hodgson, Cody 3/3/2021 .25 113.00 28.25 Addressing Steve's edits on memo. CAD Technician III Lockhart, Julie 2/26/2021 3.00 103.00 309.00 Drafted Design Edits Page 2Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Project 44026000-03744026.00.0 Valiant Idaho Invoice Sr. Project Administrator Turner, Evangelina 3/1/2021 .75 86.00 64.50 Edit/format 030121 DEQ Memo re: Public Water System and forward to N. Maiani for review; Turner, Evangelina 3/3/2021 .25 86.00 21.50 Finalize 030321 DEQ Memo re: Public Water System and forward to N. Maiani/C. Hodgson for review and distribution; Totals 12.00 1,510.75 Total Labor 1,510.75 $1,510.75Total this Task $1,753.75Total this Phase Phase 018 New Reservoir Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 3/10/2021 3.00 190.00 570.00 Site visit,Comm re: New Reservoir Lot Cordes, Steven 3/11/2021 .25 190.00 47.50 Comm w/ DEQ Cordes, Steven 3/12/2021 1.00 190.00 190.00 Comm re: Reservoir Costs/Location Cordes, Steven 3/15/2021 1.00 190.00 190.00 Comm w/ Bill, Evalute Reservoir Options Cordes, Steven 3/16/2021 .50 190.00 95.00 Hydraulic Analysis of 9200 gallon Res Cordes, Steven 3/17/2021 3.50 190.00 665.00 Review Existing Water System Drawings, Comm w/ Attorney Cordes, Steven 3/19/2021 .75 190.00 142.50 Comm re: New Res Site Engineer I Hodgson, Cody 3/16/2021 2.00 113.00 226.00 Setting up watercad model to determine the fire flow with abandonment of tank and change of HGL on existing PRV. Hodgson, Cody 3/19/2021 2.00 113.00 226.00 Reviewing over the watercad model with Ashley to troubleshoot issues and errors. Reviewing with Steve and Necia to see if results make sense and trying to work out if there are any faults in the water system. Survey Manager Hathaway, Mike 3/3/2021 1.00 162.00 162.00 Research and cost estimate for Idaho Club reservoir topo. Hathaway, Mike 3/5/2021 1.00 162.00 162.00 Prep for survey crew Hathaway, Mike 3/9/2021 1.25 162.00 202.50 Prep for survey crew Hathaway, Mike 3/16/2021 .50 162.00 81.00 Topo and ROW prep and review Hathaway, Mike 3/18/2021 .75 162.00 121.50 Topo and ROW review Crew Chief I Tucker, Thomas 3/9/2021 .50 105.00 52.50 Prep for field work tomorrow Tucker, Thomas 3/10/2021 10.00 105.00 1,050.00 Topo and Mon Search Page 3Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Project 44026000-03744026.00.0 Valiant Idaho Invoice Crew Chief II Rojas, Ronald 3/5/2021 1.50 110.00 165.00 Cogo map Survey Technician I Tucker, Thomas 3/16/2021 2.25 102.00 229.50 Processed Topo Totals 32.75 4,578.00 Total Labor 4,578.00 Unit Billing 3/10/2021 Robotics Hourly Billing-2 Man 4.0 Hours @ 35.00 140.00 2021 Reimbursable Mileage 3/10/2021 Mileage 109.0 miles @ 0.56 61.04 Ledger Size Copies 3/20/2021 Copies 2.0 Copies @ 0.20 .40 Letter/Legal Size Copies 3/20/2021 Copies 7.0 Copies @ 0.10 .70 Total Units 202.14 202.14 $4,780.14Total this Phase $8,883.63Total this Invoice Page 4Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Project 44026000-03744026.00.0 Valiant Idaho Invoice Invoice Valiant Idaho, LLC. 310 Charleston Place Celebration, FL 34747 May 18, 2021 Project No:44026.00.0 Invoice No:44026000-038 330 E. Lakeside Ave, Suite 101 Coeur d'Alene, ID 83814 P: 208-664-9382 / F: 208-664-5946 Project 44026.00.0 Valiant Idaho Professional Services from March 21, 2021 to April 24, 2021 Phase 001 Technical Assistance Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 4/2/2021 .25 190.00 47.50 Comm w/ Jason re: Sewer Locates Project Manager Williams, Ashley 3/24/2021 .25 155.00 38.75 Locating info on Trestle Creek North well Totals .50 86.25 Total Labor 86.25 Unit Billing Ledger Size Color Prints 4/24/2021 Copies 6.0 Color Copy @ 1.98 11.88 Ledger Size Copies 4/24/2021 Copies 52.0 Copies @ 0.20 10.40 Letter/Legal Size Copies 4/24/2021 Copies 96.0 Copies @ 0.10 9.60 Letter/Legal/CardStock Size Color Prints 4/24/2021 Copies 1.0 Color Copy @ 0.99 .99 Total Units 32.87 32.87 $119.12Total this Phase Phase 015 Forest Highland Water Sewer Mains Task 002 Water/Sewer Design Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 3/22/2021 .50 190.00 95.00 Design Cordes, Steven 3/23/2021 .50 190.00 95.00 Design Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Cordes, Steven 3/24/2021 .50 190.00 95.00 Gather Emails Cordes, Steven 4/22/2021 1.00 190.00 190.00 Design water/sewer Project Manager Williams, Ashley 3/19/2021 .25 155.00 38.75 Assisting C. Hodgson with water model CAD Technician III Lockhart, Julie 4/20/2021 6.00 103.00 618.00 Drafted Design Edits Lockhart, Julie 4/21/2021 7.00 103.00 721.00 Drafted Design Edits Totals 15.75 1,852.75 Total Labor 1,852.75 Unit Billing Ledger Size Copies 4/24/2021 Copies 26.0 Copies @ 0.20 5.20 Total Units 5.20 5.20 $1,857.95Total this Task $1,857.95Total this Phase Phase 018 New Reservoir Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 3/23/2021 .25 190.00 47.50 Comm re: New Res Site Cordes, Steven 3/24/2021 .25 190.00 47.50 Comm re: Res Location Cordes, Steven 3/25/2021 .25 190.00 47.50 Comm re: Res Site, Easement Cordes, Steven 3/26/2021 .25 190.00 47.50 Comm re: New Res Site Cordes, Steven 3/31/2021 .25 190.00 47.50 Comm w/ Contractor re: REs Cordes, Steven 4/2/2021 .50 190.00 95.00 Reservoir Siting Cordes, Steven 4/5/2021 .25 190.00 47.50 Comm w/ Mark re: Res Site Cordes, Steven 4/6/2021 .75 190.00 142.50 Comm re: Reservoir Site and Easements Cordes, Steven 4/7/2021 1.00 190.00 190.00 New Reservoir Design Cordes, Steven 4/8/2021 .25 190.00 47.50 Comm re: Res Easement Cordes, Steven 4/9/2021 .50 190.00 95.00 Comm re: Res Easement, Design Cordes, Steven 4/19/2021 .50 190.00 95.00 Design Cordes, Steven 4/21/2021 1.00 190.00 190.00 Reservoir Design/Comm Cordes, Steven 4/22/2021 1.50 190.00 285.00 Design New Tank Location Page 2Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Project 44026000-03844026.00.0 Valiant Idaho Invoice Survey Manager Hathaway, Mike 3/25/2021 .50 162.00 81.00 Review new tank site, prep for survey crew, coordination Hathaway, Mike 4/2/2021 3.00 162.00 486.00 Topo and boundary processing Hathaway, Mike 4/5/2021 .50 162.00 81.00 Easement map updates and coordination Hathaway, Mike 4/6/2021 .50 162.00 81.00 Easement map updates and coordination Crew Chief I Tucker, Thomas 3/30/2021 9.75 105.00 1,023.75 Topo for Reservoir Tucker, Thomas 4/15/2021 3.75 105.00 393.75 Tied locates and proposed WL, staked tank locations and bldg env Tucker, Thomas 4/15/2021 Ovt .75 157.50 118.13 Survey Technician I Tucker, Thomas 3/25/2021 1.00 102.00 102.00 Prepared files for field crew Tucker, Thomas 4/13/2021 1.50 102.00 153.00 Prepared files for field crew Tucker, Thomas 4/19/2021 1.25 102.00 127.50 Processed new topo and staking Totals 30.00 4,072.13 Total Labor 4,072.13 Unit Billing 3/30/2021 Robotics Hourly Billing-2 Man 7.5 Hours @ 35.00 262.50 2021 Reimbursable Mileage 3/30/2021 Mileage 107.0 miles @ 0.56 59.92 4/15/2021 Mileage 61.0 miles @ 0.56 34.16 Ledger Size Color Prints 4/24/2021 Copies 1.0 Color Copy @ 1.98 1.98 Ledger Size Copies 4/24/2021 Copies 5.0 Copies @ 0.20 1.00 Letter/Legal Size Copies 4/24/2021 Copies 16.0 Copies @ 0.10 1.60 Letter/Legal/CardStock Size Color Prints 4/24/2021 Copies 3.0 Color Copy @ 0.99 2.97 Total Units 364.13 364.13 $4,436.26Total this Phase Phase 019 Water System Litigation Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 3/19/2021 .50 190.00 95.00 Comm w/ Attorney Cordes, Steven 3/22/2021 .25 190.00 47.50 Comm w/ Attorney Cordes, Steven 3/29/2021 .50 190.00 95.00 Comm w/ Attorneys Cordes, Steven 4/1/2021 1.50 190.00 285.00 Sort Emails for Valiant Cordes, Steven 4/2/2021 .50 190.00 95.00 Comm w/ Bill re: Subpeona Page 3Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Project 44026000-03844026.00.0 Valiant Idaho Invoice Cordes, Steven 4/5/2021 1.50 190.00 285.00 Review Bill's Edits to Subpeona List Totals 4.75 902.50 Total Labor 902.50 $902.50Total this Phase $7,315.83Total this Invoice Page 4Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Project 44026000-03844026.00.0 Valiant Idaho Invoice Work Performed:Transload 6 Precast Tanks Pieces & Set abcdDate Description Qty Unit Meas Price Tax % Total (Excl Tax) 07/12/21 - 07/12/21 175 TON CRANE - Hourly Hook Service 12 Hour $ 495.00 0 % $ 5,940.00 07/12/21 - 07/12/21 RIGGER - Certified Rigger/Signalman 12 Hour $ 105.00 0 % $ 1,260.00 07/12/21 - 07/12/21 100 TON CRANE - Hourly Hook Service 12 Hour $ 395.00 0 % $ 4,740.00 07/12/21 - 07/12/21 RIGGER - Certified Rigger/Signalman 12 Hour $ 105.00 0 % $ 1,260.00 07/12/21 - 07/12/21 OVERTIME - 4 Hrs. Overtime x 4 Men 16 Hour $ 35.00 0 % $ 560.00 07/12/21 - 07/12/21 PER DIEM - Per Diem x 4 Men 4 EA $ 150.00 0 % $ 600.00 07/13/21 - 07/13/21 175 TON CRANE - Hourly Hook Service 12 Hour $ 495.00 0 % $ 5,940.00 07/13/21 - 07/13/21 RIGGER - Certified Rigger/Signalman 12 Hour $ 105.00 0 % $ 1,260.00 07/13/21 - 07/13/21 100 TON CRANE - Hourly Hook Service 12 Hour $ 395.00 0 % $ 4,740.00 07/13/21 - 07/13/21 RIGGER - Certified Rigger/Signalman 12 Hour $ 105.00 0 % $ 1,260.00 07/13/21 - 07/13/21 OVERTIME - 4 Hrs. Overtime x 4 Men 16 Hour $ 35.00 0 % $ 560.00 07/13/21 - 07/13/21 PER DIEM - Per DIem x 4 Men 4 EA $ 150.00 0 % $ 600.00 07/12/21 - 07/13/21 Additional Rigging Precaster Unable 1 EA $ 1,625.00 0 % $ 1,625.00 Dept. 1906, P.O. Box 2153 Birmingham, AL 35287-1906 Phone: (509) 939-7060 Fax: (901) 775-2992 Remit To Address: Invoice: Tuesday, July 13, 2021 57265 - CD99144172 PR47013 1 Lower Pack River Rd Sandpoint ID 83864 TIC Utilities 151 Clubhouse Way Sandpoint, ID 83864 UNITED STATES Salesperson:Daniel Zimmerman Terms: Customer P.O. No: Invoice Date: Customer: Project No: Project Site: Net Due in 30 Days TIC Utilities Order No:C133250 08/12/21Due Date: Page 1 (2) Date Description Qty Unit Meas Price Tax % Total (Excl Tax) To Provide 07/12/21 - 07/13/21 3% Environmental Fee 1 EA $ 910.35 0 % $ 910.35 abcd Sub Total Amount $ 31,255.35 abcd Total Exclusive Tax $ 31,255.35 Total Tax $ 0.00 Invoice Amount to Pay $ 31,255.35 abcd Total Invoice Amount to Pay $ 31,255.35 abcd THANK YOU FOR YOUR BUSINESS Invoice: Tuesday, July 13, 2021 CD99144172 - 57265 Invoice Date: Page 2 (2)                                         Advanced Dirt Works and Development, L.L.C. 11 Bill To: Bill Haberman Idaho Club Item Number Description Price Quantity Amount 407-973-7875 ADW 325 Excavator 158 136.5 21567 ADW 305.5 Mini Ex 100 69.5 6950 ADW Pipe Truck and Tools 170 20 3400 ADW Dump Truck-Hauling 110 13.5 1485 Woods 3/4 inch minus-grade rock 10 112 1120 ADW Water Truck 100 4 400 Ship To:ADW Compaction Equipment 100 16.75 1675 Bill Haberman J.A. Sewell Compaction Testing 87.5 4 350 Idaho Club Kootenai Excavators Rock Hammer 1000 1 1000 407-973-7875 ADW Pipe Layer 55 281.5 15482.5 ADW Foreman 53 60 3180 Consolidated Supply Conduit-Misc. Parts 8091.96 1 8091.96 0 0 Total items: 12 Subtotal $ 64,701.46 Sales Tax Rate:Sales Tax $ - Less Deposit Received $ - Make all checks payable to:Invoice Total $ 64,701.46 Advanced Dirt Works and Development, L.L.C. Harvey Rutherford 208-290-6779 Harvey@advanceddirtworks.com 07.20.2021 Invoice # Idaho Club Booster Site 1 Due Upon Receipt Thank you for your business! June 16, 2021 through July 20, 2021 0.0% Physical: 1437 Jewel Lake Road Sagle, Idaho 83860 Mailing: 931 Woodland Drive Sandpoint, Idaho 83864 If you have any questions concerning this invoice, contact: Advanced Dirt Works and Development, L.L.C. PO Box 1738 Mount Pleasant, TX 75456 (214) 227-6555 brianna@prestigewwt.com Invoice DATE 07/29/2021 INVOICE#1026 TERMS Cash On Delivery BILL TO Idaho Club (208) 659-5471 SERVICE LOCATION Idaho Club (208) 659-5471 JOB#DATE PO/REF#DESCRIPTION 58313367 07/27/2021 jason wereley Completion Notes: Job Charges Qty Rate Total 6" 100-01 Hytrol Main Valve Repair Kit 2.00 $331.10 $662.20 CRD Repair Kit CP 15 3.00 $160.00 $480.00 CRL Repair Kit CP16 3.00 $170.00 $510.00 Restriction Fitting 3.00 $57.00 $171.00 Belleville Washer 3.00 $25.00 $75.00 Y Strainer 3.00 $60.00 $180.00 1/4" Ball Valve 9.00 $29.95 $269.55 Quick Disconnect Fittings 15.00 $19.55 $293.25 Plastic Tubing 3.00 $17.25 $51.75 Misc SST Fittings 24.00 $5.00 $120.00 2" 100-01 Hytrol Main Valve Repair Kit 1.00 $137.50 $137.50 Labor 2 5.50 $300.00 $1,650.00 Job Subtotal $4,600.25 Job Total $4,600.25 PRE-WORK SIGNATURE Signed By: POST-WORK SIGNATURE Signed By: CUSTOMER MESSAGE Invoice Total:$4,600.25 Deposits (-):$0.00 Payments (-):$0.00 Total Due:$4,600.25 1 Invoice Date 8/9/2021 Invoice # 39255 Bill To Valiant Idaho, LLC Bill Haberman 216 Clubhouse Drive Sandpoint, Idaho 83864 Wood's Crushing & Hauling, Inc. 933 Woodside Road Sandpoint, Idaho 83864 P.O. No. 19062 Terms Net 30 THANK YOU !!Total Balance Due Payments/Credits 208-263-4800 DescriptionU/MQuantity Rate Amount IDAHO CLUB ROCK AND PAVING 2019 MobilizationLS1 1,500.00 1,500.00 Place and Compact 3/4" MinusTons80 22.50 1,800.00 Place and Compact 2" Hot Mix AsphaltTons380 79.00 30,020.00 Sales Tax 6.00% 0.00 UNPAID BALANCE OVER 30 DAYS SUBJECT TO A CHARGE OF 1% PER MONTH WHICH IS AN ANNUAL RATE OF 12%. IF PAYING BY CREDIT CARD A FEE OF 3% WILL BE ADDED. $33,320.00 $33,320.00 $0.00 Invoice Date 8/9/2021 Invoice # 39256 Bill To Valiant Idaho, LLC Bill Haberman 216 Clubhouse Drive Sandpoint, Idaho 83864 Wood's Crushing & Hauling, Inc. 933 Woodside Road Sandpoint, Idaho 83864 P.O. No.Terms Net 30 HAVE A GREAT SUMMER !!Total Balance Due Payments/Credits 208-263-4800 DescriptionU/MQuantity Rate Amount WATER TANK PATCH LABOR AND EQUIPMENTLS1 600.00 600.00 Hot Mix AsphaltTons11 75.00 825.00 Sales Tax 6.00% 0.00 UNPAID BALANCE OVER 30 DAYS SUBJECT TO A CHARGE OF 1% PER MONTH WHICH IS AN ANNUAL RATE OF 12%. IF PAYING BY CREDIT CARD A FEE OF 3% WILL BE ADDED. $1,425.00 $1,425.00 $0.00 Advanced Dirt Works and Development, L.L.C. 21 Bill To: Bill Haberman Idaho Club Item Number Description Price Quantity Amount 407-973-7875 ADW 325 CAT Ex 158 93.5 14773 ADW Truck and Tools 170 12 2040 ADW Pipe Layer 55 194.5 10697.5 ADW Dump Truck 21 110 10 1100 ADW H2O Truck 100 10 1000 True Cut Core Drilling 907.5 1 907.5 Ship To: Consolidated Supply Parts and Conduit 934.13 1 934.13 Bill Haberman SBS Concrete Emulsion 110.61 1 110.61 Idaho Club Aarow Supply Concrete Emulsion 87.18 1 87.18 407-973-7875 0 0 0 0 0 Total items: 9 Subtotal $ 31,649.92 Sales Tax Rate:Sales Tax $ - Less Deposit Received $ - Make all checks payable to:Invoice Total $ 31,649.92 Advanced Dirt Works and Development, L.L.C. Harvey Rutherford 208-290-6779 Harvey@advanceddirtworks.com Physical: 1437 Jewel Lake Road Sagle, Idaho 83860 Mailing: 931 Woodland Drive Sandpoint, Idaho 83864 If you have any questions concerning this invoice, contact: Advanced Dirt Works and Development, L.L.C. 08.20.2021 Invoice # Idaho Club Booster Site 1 Due Upon Receipt Thank you for your business! July 21, 2021 through August 9, 2021 0.0% Invoice Date 08/30/2021 Invoice # 5228 Bill To Valiant Idaho LLC Terms Due on receipt Job # 185-2 Total Balance Due Subtotal Sales Tax (6.0%) Payments/Credits Make all checks payable to: PO Box 656 Post Falls, ID 83877-0656 billing@bigfootts.com (208) 981-0304 Bigfoot Technical Services Description Amount Moose Mountain Panel Relocation Project BigfootTS conducted a site survey in regards to relocating the control panel from old reservoir to new booster station. New conduit and boxes were installed at the new booster station, (1) transducer in each new tank, and (3) floats in Tank # 1. Radio and antenna was relocated with the panel, and needed to be calibrated to establish communication. The programs on relocated panel, well house panel, and well house touch screen were updated to reflect the changes. Labor: 165.5 Man Hours Billed at Normal Rate 16,550.00 Materials: Conduit, boxes, assessories, and consumables. 1,536.68 $18,086.68 $18,086.68 $18,086.68 $0.00 $0.00 Invoice Valiant Idaho, LLC. 310 Charleston Place Celebration, FL 34747 October 14, 2021 Project No:44026.00.0 Invoice No:44026000-042 330 E. Lakeside Ave, Suite 101 Coeur d'Alene, ID 83814 P: 208-664-9382 / F: 208-664-5946 Project 44026.00.0 Valiant Idaho Professional Services from August 22, 2021 to September 18, 2021 Phase 001 Technical Assistance Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 8/30/2021 .50 190.00 95.00 Comm re: Sewell Questions Cordes, Steven 8/31/2021 .50 190.00 95.00 Wastewater Information for Engineers Cordes, Steven 9/1/2021 1.00 190.00 190.00 Comm re: Water/Sewerto S& T lots Cordes, Steven 9/2/2021 .75 190.00 142.50 Comm w/ Jason re: WW Treatment Cordes, Steven 9/13/2021 .50 190.00 95.00 Comm w/ DEQ re: Seperating Systems Principal Engineer Maiani, Necia 9/8/2021 1.00 175.00 175.00 Pull Plan and Amendment for SC Totals 4.25 792.50 Total Labor 792.50 $792.50Total this Phase Phase 018 New Reservoir Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 8/25/2021 .25 190.00 47.50 Comm w/ Contractor Cordes, Steven 8/31/2021 .50 190.00 95.00 Comm re: Leaking Tank Cordes, Steven 9/1/2021 1.00 190.00 190.00 Comm re: tank Leak Cordes, Steven 9/2/2021 .75 190.00 142.50 Comm re: Res Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Cordes, Steven 9/7/2021 1.00 190.00 190.00 Conf Call, Comm w/ DEQ Cordes, Steven 9/8/2021 .25 190.00 47.50 Comm w/ DEQ Cordes, Steven 9/13/2021 .25 190.00 47.50 Proj Comm. Cordes, Steven 9/14/2021 .25 190.00 47.50 Comm re: Tanks Cordes, Steven 9/16/2021 .25 190.00 47.50 Comm re: Reservoir Totals 4.50 855.00 Total Labor 855.00 Unit Billing Letter/Legal Size Copies 9/18/2021 Copies 5.0 Copies @ 0.10 .50 Total Units .50 .50 $855.50Total this Phase $1,648.00Total this Invoice Page 2Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Project 44026000-04244026.00.0 Valiant Idaho Invoice Invoice Valiant Idaho, LLC. 310 Charleston Place Celebration, FL 34747 November 15, 2021 Project No:44026.00.0 Invoice No:44026000-043 330 E. Lakeside Ave, Suite 101 Coeur d'Alene, ID 83814 P: 208-664-9382 / F: 208-664-5946 Project 44026.00.0 Valiant Idaho Professional Services from September 19, 2021 to October 23, 2021 Phase 001 Technical Assistance Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 9/21/2021 1.00 190.00 190.00 Comm w/ DEQ, Review system separation Cordes, Steven 9/23/2021 .50 190.00 95.00 Coordinate Site Meeting re: water system Cordes, Steven 9/24/2021 3.50 190.00 665.00 Site Visit re: Water System Cordes, Steven 10/11/2021 1.50 190.00 285.00 comm re iron in water Cordes, Steven 10/12/2021 2.00 190.00 380.00 comm re water system Cordes, Steven 10/13/2021 1.00 190.00 190.00 comm re iron,chlorination Cordes, Steven 10/18/2021 1.00 190.00 190.00 comm re iron treatment/vendors Cordes, Steven 10/19/2021 .50 190.00 95.00 chlorination report Project Manager Williams, Ashley 10/21/2021 .25 155.00 38.75 Searching files for Trestle Creek north drainfield concept Totals 11.25 2,128.75 Total Labor 2,128.75 Reimbursable Expenses Reimbursable Mileage 9/23/2021 Cordes, Steven Mileage 77.28 Total Reimbursables 77.28 77.28 $2,206.03Total this Phase Phase 007 Seepage Testing Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Unit Billing Letter/Legal Size Copies 10/23/2021 Copies 7.0 Copies @ 0.10 .70 Total Units .70 .70 $.70Total this Phase Phase 015 Forest Highland Water Sewer Mains Task 002 Water/Sewer Design Professional Personnel Hours Rate Amount Survey Manager Hathaway, Mike 9/20/2021 1.00 162.00 162.00 Staking calc and prep Project Administrator Patterson, Mindy 9/20/2021 .25 76.00 19.00 Print and bind plans for survey; Totals 1.25 181.00 Total Labor 181.00 Unit Billing Ledger Size Color Prints 10/23/2021 Copies 2.0 Color Copy @ 1.98 3.96 Ledger Size Copies 10/23/2021 Copies 38.0 Copies @ 0.20 7.60 Letter/Legal Size Copies 10/23/2021 Copies 2.0 Copies @ 0.10 .20 Total Units 11.76 11.76 $192.76Total this Task Task 003 Construction Phase Services Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 9/21/2021 .75 190.00 142.50 Comm re: Staking and Dry Utilities Crew Chief II Rojas, Ronald 9/22/2021 1.00 110.00 110.00 Review plans and cutsheets Rojas, Ronald 9/29/2021 10.00 110.00 1,100.00 Stake Water Survey Technician II George, Gregory 9/20/2021 3.75 108.00 405.00 Calc's for projet construction. Water and Sewer Calcs. George, Gregory 9/21/2021 5.50 108.00 594.00 Calc's for projet construction. Water and Sewer Calcs. Totals 21.00 2,351.50 Total Labor 2,351.50 Unit Billing 2021 Reimbursable Mileage 9/29/2021 Mileage 168.0 miles @ 0.56 94.08 GPS Per Hour Billing - Base and Rover 9/29/2021 Trimble R12I Base and Rover 4.5 hours @ 60.00 270.00 Ledger Size Color Prints 10/23/2021 Copies 1.0 Color Copy @ 1.98 1.98 Page 2Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Project 44026000-04344026.00.0 Valiant Idaho Invoice Letter/Legal Size Copies 10/23/2021 Copies 7.0 Copies @ 0.10 .70 Pix4D Software 9/20/2021 Aerial data processing using P4D 1.0 Use @ 200.00 200.00 Total Units 566.76 566.76 $2,918.26Total this Task $3,111.02Total this Phase Phase 018 New Reservoir Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 9/20/2021 .25 190.00 47.50 Comm re: REs Cordes, Steven 9/24/2021 .75 190.00 142.50 Draft Information to send to DEQ re: Reservoir Cordes, Steven 10/8/2021 2.00 190.00 380.00 comm w jaqson and bill re water system Project Administrator Patterson, Mindy 9/27/2021 .50 76.00 38.00 Format and finalized memo to DEQ and forwarded to S. Cordes for review; Patterson, Mindy 9/28/2021 .50 76.00 38.00 Processed and finalized DEQ memo, prepared DEQ transmittal and forwarded to DEQ; Totals 4.00 646.00 Total Labor 646.00 Unit Billing Ledger Size Color Prints 10/23/2021 Copies 1.0 Color Copy @ 1.98 1.98 Ledger Size Copies 10/23/2021 Copies 18.0 Copies @ 0.20 3.60 Letter/Legal Size Copies 10/23/2021 Copies 4.0 Copies @ 0.10 .40 Total Units 5.98 5.98 $651.98Total this Phase Phase 019 Water System Litigation Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 9/27/2021 1.00 190.00 190.00 Review Rpt, Comm w/ Rik S. Cordes, Steven 9/29/2021 1.00 190.00 190.00 comm Survey Manager Hathaway, Mike 9/23/2021 .25 162.00 40.50 Subpeona discussion Hathaway, Mike 9/28/2021 .75 162.00 121.50 Phone calls regarding court. Hathaway, Mike 9/29/2021 1.50 162.00 243.00 Page 3Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Project 44026000-04344026.00.0 Valiant Idaho Invoice Phone calls regarding court. Project review Totals 4.50 785.00 Total Labor 785.00 Unit Billing Letter/Legal Size Copies 10/23/2021 Copies 3.0 Copies @ 0.10 .30 Total Units .30 .30 $785.30Total this Phase Phase 020 Moose Mountain Booster Professional Personnel Hours Rate Amount Principal Engineer I Cordes, Steven 10/18/2021 .25 190.00 47.50 comm w electrical Totals .25 47.50 Total Labor 47.50 $47.50Total this Phase $6,802.53Total this Invoice Page 4Please remit payment to: Welch Comer & Associates, Inc. 330 E. Lakeside Avenue, Suite 101, Coeur d’Alene, ID 83814 Project 44026000-04344026.00.0 Valiant Idaho Invoice GEM STATE WATER COMPANY CASE NO.GSW-W-23-01 WELL PUMP INVOICES Well Pump 06/12/2017 Bill Deposit No R.C. Worst & Company Well Pump A Accounts Payable (A/P)16,012.83 09/05/2017 Bill 268531 No R.C. Worst & Company Well Pump B Accounts Payable (A/P)15,446.18 31,459.01 Well Pump 05/17/2021 Check No R.C. Worst & Company Well Pump C Business Advantage Chk (6963)25,937.33 09/09/2021 Bill 09.09.21 Stmt C302119 No R.C. Worst & Company Well Pump D Accounts Payable (A/P)26,635.97 12/31/2021 Journal Entry 72 No Well Pump E and F -Split-97,200.00 Total for Well Pump $ 149,773.30 August 31, 2017 C302119 DATE ACCOUNT NO. PLEASE REMIT PAYMENT TO: R.C. Worst & Company Inc. 625 Best Avenue Coeur d'Alene, ID 83814-3740 Cash, Check, or Credit Card TERMS TIC Utilities 310 Charleston PL Celebration, FL 34747 Account Activity Post. Date Due Date Ref. No.Transaction Type Reference BalanceDocument Total Deposit/Returns 06/23/201 06/23/2017 53342 Incomin Pa men $-16,012.83$-16,012.83 0.00 08/31/201 08/31/2017 268531 A/R Invoice $31,459.01$31,459.01 0.00 $15,446.18Total Balance Due: Account Aging Balance Due Current 0-30 Days 31-60 Days 61-90 Days 90+Days $31,459.01 $0.00 $-16,012.83 $0.00$15,446.18 0.00 625 Best Avenue Coeur d'Alene, ID 83814-3740 208.664.2133 Phone 208.667.8775 Fax 4101East Broadway Spokane, WA 99202-4530 509.534.5616 Phone 509.535.6539 FaxAll past due balances are subject to SERVICE CHARGES of 1.50% per month TIC Utilities 151 Clubhouse Wa Sandpoint ID 8386 Job Location: SERVICE INVOICE 268531 Bill To: 625 E. Best Avenue Coeur d'Alene, ID 83814 Invoice No.:Invoice Date: 08/31/201 Due Date: 08/31/201 Job No.: 1506 Custom No.: C30211 310 Charleston PL Celebration, FL 34747 TIC Utilities -uoted- Install well um and com lete tes 208.664.2133 Phone Idaho Clu 208.667.8775 Fax Item No.Description Qty Price AmountUOM 1.00 $6,949.80EA $6,949.80Franklin Electric Sub Motor 50HP 6" 460/3 Sandfi hter w/Subtro 2.00 $920.42EA $460.2FLOMATIC- 80DI-VFD Check Valve 4" 1.00 $460.21EA $460.2FLOMATIC- 80DI-VFD Check Valve 4" 294.00 $3,454.50FT $11.7GALV PIPE 4" Sch40 T&C 1.00 $66.95EA $66.9Electrical Permit WEB1707-01468 TIC Utilitie 1.00 $67.98EA $67.9C.I. FLANGE BLIND 4" 1.00 $5,771.00EA $5,771.00Baker Pitless Unit 8" Case 4" Dro Pi e 4" Dischar e 5' Bur 0.50 $43.75H$87.50Labor Job Order - RT - CDA - Joe Follini 1.00 $26.76EA $26.76Galv Bushin 3" x 2" 1.00 $64.75EA $64.75Galv Ni le 4" x 12" *** 07/22/2017 Joe Follini Began loading parts for the job and getting the hoist truck ready. *** 1.50 $126.27H$84.18Labor Job Order - OT - CDA - Joe Follini 7.50 $0.00H$0.00Labor Job Order - RT - CDA - Kass Jone 6.7 $590.63H$87.50Labor Job Order - RT - CDA - Joe Follini 4.7 $0.00H$0.00Labor Job Order - RT - CDA - Joe Follini 1.7 $153.13H$87.50Labor Job Order - RT - CDA - Joe Follini 11.7 $0.00H$0.00Labor Job Order - RT - CDA - Kass Jone 11.7 $0.00H$0.00Labor Job Order - RT - CDA - Richard Ha e 2.00 $175.00H$87.50Labor Job Order - RT - CDA - Joe Follini 11.50 $0.00H$0.00Labor Job Order - OT - CDA - Joe Follini 5.2 $459.38H$87.50Labor Job Order - OT - CDA - Joe Follini *** 07/24/2017 Joe Follini and Kass Jones Installed new pitless on the well head. Returning Wednesday to set the well. *** 107.00 $85.60MIL$0.80EUIPMENT USED -- ON JOB ORDERS 1 of 3C30211268531 R.C. Worst & Company Inc. Item No.Description Qty Price AmountUOM 106.00 $84.80MIL$0.80EUIPMENT USED -- ON JOB ORDERS 8.00 $400.00H$50.00EUIP USE JOB ORDERS - PUMP HOIST UNIT # 0 146.00 $0.00MIL$0.00EUIPMENT USED -- ON JOB ORDERS *** 07/26/2017 Joe Follini, Kass Jones and Richard Hayes Installed a new 50HP 300GPM on 4" pipe with check valves and new wire. Returning tomorrow with a generator to due a 24HR productivity test. *** 146.00 $116.80MIL$0.80EUIPMENT USED -- ON JOB ORDERS *** 07/27/2017 Joe Follini Unload trailor from day before and loaded new parts. Picked up generator is Sandpoint. Set up generator to run pump. Well ran out of water after 10 minutes. Generator shut down. We believe gasoline is in the fuel. *** 141.00 $112.80MIL$0.80EUIPMENT USED -- ON JOB ORDERS 1.00 $15.00EA $15.00Non Stock Includes Sales Tax - 5 GAL Diese 1.00 $18.29EA $18.29Non Stock Includes Sales Tax 2x AA Batterie 1.00 $7.89EA $7.89Non Stock - Diesal 2.63 Ga 7.50 $656.25H$87.50Labor Job Order - RT - CDA - Joe Follini 126.00 $100.80MIL$0.80EUIPMENT USED -- ON JOB ORDERS 1.00 $297.00EA $297.00Non Stock - Diesel Fuel 99 Gallon 8.50 $0.00H$0.00Labor Job Order - RT - CDA - Joe Follini *** 08/10/2017 Joe Follini Broke down the generator and plumbing for the 24HR test. Returning the generator in the morning. *** 220.00 $0.00MIL$0.00EUIPMENT USED -- ON JOB ORDERS 2.2 $196.88H$87.50Labor Job Order - RT - CDA - Joe Follini *** 08/11/2017 Joe Follini Took the generator back to the rental company in Spokane. *** 220.00 $176.00MIL$0.80EUIPMENT USED -- ON JOB ORDERS 1.00 $1,725.00EA $1,725.00Generator- Renta 1.00 $7.75EA $7.7CHLORINE LI UID 12.5% GALLO 4.00 $12.48EA $3.12GASKET FLG FULL RUBBER 1/8 4" 300.00 $180.00FT $0.60PVC PIPE SCH40 BELL END 1" 1.00 $14.73EA $14.7GALV NIPPLE SCH 40 2"X12" 40.00 $40.00EA $1.00NUT HEX FIN NC 5/8" STAINLESS STEEL 4.00 $1.92EA $0.4PVC 40 COUPLING SS 1" 3.00 $86.31EA $28.7PVC 80 FLANGE SCKT VAN STN 4" 3.00 $35.64EA $11.8PVC 40 ELL 90 S 4" 2 of 3C30211268531 R.C. Worst & Company Inc. Item No.Description Qty Price AmountUOM 2.00 $7.00EA $3.50Scotch 700 Vin l Electrical Ta e Commercial Grade 3/4" x 66' 4.00 $46.88EA $11.72DVANCE HEAT SHRINK 3/4"X24" AWG# 6 thru 2 4.00 $26.00EA $6.50ae Rubber S licin 3/4" x 22' 16.00 $80.16EA $5.0BOLT HEX SCREW NC 5/8" X 3" STAINLESS STEEL 2.00 $35.20EA $17.60WELD-ON PRIMER CLEAR PINT 8.00 $30.80FT $3.8PVC PIPE SCH40 BELL END 4" 9.00 $63.00EA $7.00ELECTRICAL WRAP TAPE 2"X 100FT 1.00 $4,018.00EA $4,018.00.Y. McDonald 300S50HP66 Stainless Steel 6" Pum End 300 GPM 50 HP 6" Motor Bracke 4.00 $27.00EA $6.7ILSCO SPLICER 2 SCRW 2-14 WIR 1.00 $7.42EA $7.42PVC 40 CAP S 4" 4.00 $56.00EA $14.00DVANCE HEAT SHRINK 1"X24" AWG# 1/0 thru 4/0 1.00 $5.85EA $5.8PERMATEX SUPER LUBE 3OZ TUB 1.00 $0.55EA $0.5PVC 40 MALE ADAPTER 1" 340.00 $1,849.60EA $5.4CBL SUB H/D JKT PVC CU 4/3 WG 1.00 $6.75EA $6.7PVC 40 FEMALE ADAPTER 4" 2.00 $30.72EA $15.36WELD-ON CEMENT PVC CLEAR PINT 1.00 $2.50EA $2.50MISC SERVICE CONSUMABLES Subtotal: Sales Tax: Total: $1,463.11 $31,459.0 $29,995.90Thank you for choosing R.C. Worst & Company Inc. for your Water and Wastewater needs A finance charge of 1.5% per month, with a minimum of $0.50 will be applied against unpaid balances 30 days after invoice due date. 3 of 3C30211268531 R.C. Worst & Company Inc. R.C. Worst & Company Inc.625 E. Best Avenue Coeur d'Alene, ID 83814 SALES QUOTATION CUSTOMER ADDRESS TIC Utilities 625 Best Avenue Coeur d'Alene, ID 83814-3740 TIC Utilities 310 Charleston PL Celebration, FL 34747 Quote Number:55318 Quote Date:5/14/2021 Quote Valid Date:7/13/2021 Account Number:C302119 Reference:Employee:Scott Jessick Terms:50% Down and 50% Due on Completion Shipping Method:Will Call Description Total AFS TRIPLEX BOOSTER SYSTEM (two pumps installed, provisions for future third pump) - (2) Grundfos CRI 10-6 Pumps, 5 HP, 230V, 3-Phase, 40 GPM @ 210’ TDH - Fabricated Steel Pump Skid - 4-inch Fabricated Steel Suction/Discharge Manifolds, NSF61 Coating - Triplex Alternating Pump Control Panel (ships loose) - NEMA 3R steel enclosure - alternating pump controller - HOA for each pump - indicator lights - alarm light - UL 508 listed - (2) 31-amp VFD, 230V, 3-Phase, NEMA1 Enclosure (ships loose) (sized for single phase input) - Amtrol WX-255 81-Gallon Pressure Tank (ships loose)- Fully Assembled (requires offloading, field plumbing, and field wiring by others) - 1/2 Day Startup Assistance FOB Coeur d'Alene, ID Delivery: 8-10 weeks following written submittal approval Payments Terms: 50% deposit, Net 30 days OAC Quotation valid for 14 days. Subtotal $24276.93 208.664.2133 208.667.8775 info@rcworst.com www.rcworst.com Page 1 of 2 Quote Number:55318 Quote Date:5/14/2021 Account Number:C302119 AFS TRIPLEX BOOSTER SYSTEM (two pumps installed, provisions for future third pump)- (2) Grundfos CRI 20-2 Pumps, 5 HP, 230V, 3-Phase, 110 GPM @ 70’ TDH - Fabricated Steel Pump Skid - 6-inch Fabricated Steel Suction/Discharge Manifolds, NSF61 Coating - Triplex Alternating Pump Control Panel (ships loose) - NEMA 3R steel enclosure - alternating pump controller - HOA for each pump - indicator lights - alarm light - UL 508 listed - (2) 31-amp VFD, 230V, 3-Phase, NEMA1 Enclosure (ships loose) (sized for single phase input) - Amtrol WX-255 81-Gallon Pressure Tank (ships loose) - Fully Assembled (requires offloading, field plumbing, and field wiring by others) - 1/2 Day Startup Assistance FOB Coeur d'Alene, ID Delivery: 8-10 weeks following written submittal approval Payments Terms: 50% deposit, Net 30 days OAC Quotation valid for 14 days. Subtotal $24987.93 Subtotal $49,264.86 Freight $0.00 Sales Tax $2,609.79 Total $51,874.65 208.664.2133 208.667.8775 info@rcworst.com www.rcworst.com Page 2 of 2 STATEMENT September 09, 2021 C302119 DATE ACCOUNT NO. PLEASE REMIT PAYMENT TO: R.C. Worst & Company Inc. 625 Best Avenue Coeur d'Alene, ID 83814-3740 Cash, Check, or Credit Card TERMS TIC Utilities 310 Charleston PL Celebration, FL 34747 Account Activity Post. Date Due Date Ref. No.Transaction Type Reference BalanceDocument Total Deposit/Returns 05/18/2021 05/18/2021 89471 Incoming Payment $-25,937.33$-25,937.33 0.00 06/03/2021 06/03/2021 308697 A/R Invoice $352.55$352.55 0.00 09/09/2021 09/09/2021 312786 A/R Invoice $52,220.75$52,220.75 0.00 $26,635.97Total Balance Due: Account Aging Balance Due Current 0-30 Days 31-60 Days 61-90 Days 90+ Days $52,220.75 $0.00 $0.00 $-25,584.78$26,635.97 0.00 625 Best Avenue Coeur d'Alene, ID 83814-3740 208.664.2133 Phone 208.667.8775 Fax 4101 East Broadway Spokane, WA 99202-4530 509.534.5616 Phone 509.535.6539 FaxAll past due balances are subject to SERVICE CHARGES of 1.50% per month R.C. Worst & Company Inc.625 E. Best Avenue Coeur d'Alene, ID 83814 INVOICE BILL TO SHIP TO TIC Utilities 625 Best Avenue Coeur d'Alene, ID 83814-3740 TIC Utilities 310 Charleston PL Celebration, FL 34747 Invoice Number:312786 Invoice Date:9/9/2021 Due Date:9/9/2021 Customer Number:C302119 Reference:Idaho Club AFS Triplex Booster Systems Employee:Scott Jessick Terms:50% Down and 50% Due on Completion Shipping Method: Item Number Description Quantity Unit Price Total ZZ-A21795-AFS-BS AFS Booster System 3/2 x CRI10-6 5HP 230/3VAC 40GPM@210'TDH 1.00 $24,276.93 $24,276.93 ZZ-A21804-AFS-BS AFS Booster System 3/2 x CRI20-2 5HP 230/3VAC 110GPM@70'TDH 1.00 $24,987.93 $24,987.93 Subtotal $49,264.86 Freight $0.00 Sales Tax $2,955.89 Total $52,220.75 Payments $0.00 Balance Due $52,220.75 208.664.2133 208.667.8775 info@rcworst.com www.rcworst.com Page 1 of 1 PO Box 1738 Mount Pleasant, TX 75456 (214) 227-6555 brianna@prestigewwt.com Invoice DATE 08/23/2021 INVOICE#1075 TERMS NET 15 BILL TO Idaho Club (208) 659-5471 SERVICE LOCATION Idaho Club (208) 659-5471 JOB#DATE PO/REF#DESCRIPTION 59945160 08/23/2021 Completion Notes: Job Charges Qty Rate Total 6" X 3" Packaged PRV Station 2.00 $39,600.00 $79,200.00 Job Subtotal $79,200.00 Job Total $79,200.00 PRE-WORK SIGNATURE Signed By: POST-WORK SIGNATURE Signed By: CUSTOMER MESSAGE Invoice Total:$79,200.00 Deposits (-):$0.00 Payments (-):$0.00 Total Due:$79,200.00 1 PO Box 1738 Mount Pleasant, TX 75456 (214) 227-6555 brianna@prestigewwt.com Invoice DATE 08/23/2021 INVOICE#1074 TERMS NET 15 BILL TO Idaho Club (208) 659-5471 SERVICE LOCATION Idaho Club (208) 659-5471 JOB#DATE PO/REF#DESCRIPTION 59944938 08/23/2021 Completion Notes: Job Charges Qty Rate Total 2" Standard Packaged PRV Station 1.00 $18,000.00 $18,000.00 Job Subtotal $18,000.00 Job Total $18,000.00 PRE-WORK SIGNATURE Signed By: POST-WORK SIGNATURE Signed By: CUSTOMER MESSAGE Invoice Total:$18,000.00 Deposits (-):$0.00 Payments (-):$0.00 Total Due:$18,000.00 1