Loading...
HomeMy WebLinkAbout2005Annual report.pdf;::..: .::; CEiVED i)' ".. Ii! j\ I nFI 8: I 0 ANNUAL REPO J1i'ijrsJ co~j,~/SS!ON t:L-5 -- FALLS WATER COMPANY, IN . NAME 1770 Sabin Dr, Idaho Falls, ID 834 ADDRESS TO THE IDAHO PUBLIC UTiliTIES COMMISSION FOR THE YEAR ENDED December 31 2005 ANNUAL REPORT FOR WATER UTILITIES TO THE IDAHO PUBLIC UTILITIES COMMISSION FOR THE YEAR ENDING December 31 2005 11 Are there any affiliated companies? If yes, attach a list with names, addresses & descriptions. provided to the utility. 12 Contact Information President (Owner) Vice President Secretary General Manager Complaints or Billing Engineering Emergency Service Accounting 13 Were any water systems acquired during the year or any additions/deletions madeto the service area during the year? Yes If yes, attach a list with names, addresses & descriptions. Explain any services provided to the utility. 14 Where are the Company s books and records kept?Street Address 1770 Sabin DriveCity Idaho FallsState IdahoZip 83406 1 Give full name of utility 2 Date of Organization 3 Organized under the laws of the state of 4 Address of Principal Office (number & street) 5 P.O. Box (if applicable) 6 City 7 State 8 Zip Code 9 Organization (proprietor, partnership, corp. 10 Towns, Counties served Rev 3/02 " i 7 r:; (j: i : COMPANY INFORMATION , ,. i , i " -,'-- !' Falls Water Company, Inc. Jan- Idaho 1770 Sabin Drive Idaho Falls Idaho 83406 Not-for-profit Corporation Bonneville County and portions of Ammon, Idaho Explain any services Name Phone No. Kellv D. Howell 208-522-2525 Cindv Howell 208-522-2525 K. Scott Bruce 208-522-1300 K. Scott Bruce 208-522-1300 Tonv Wise 208-522-1300 Tonv Wise 208-522-1300 K. Scott Bruce 208-522-1300 Page 1 NAME:Falls Water Company, Inc. COMPANY INFORMATION (Cont.) For the Year Ended December 31 , 2005 15 Is the system operated or maintained under a service contract? 16 If yes: With whom is the contract? Yes Frontier Property Group Month-to-Month All Labor, both field and office When does the contract expire? What services and rates are included? 17 Is water purchased for resale through the system? Yes, Leased well site within FWC's Service Area 18 If yes: Name of Organization Evan s Grain & Elevator Name of owner or operator Well operated by Falls Water Company, Inc.Mailing Address PO Box 3765City denState UtahZip 84409 Water Purchased 19 Has any system(s) been disapproved by the Idaho Division of Environmental Quality? If yes, attach full explanation 20 Has the Idaho Division of Environmental Quality recommended any improvements? If yes, attach full explanation 21 Number of Complaints received during year concerning: Quality of Service High Bills Disconnection 22 Number of Customers involuntarily disconnected 23 Date customers last received a copy of the Summary of Rules required by IDAPA 31.21.01.701? Attach a copy of the Summary 24 Did significant additions or retirements from the Plant Accounts occur during the year? If yes, attach full explanation and an updated system map Rev 3/02 Page 2 Gallons/CCF $Amount 204 7001$ 1 112. Yes No Record No Record June 2005 NAME:Falls Water Company, Inc. REVENUE & EXPENSE DETAIL For the Year Ended December 31 2005 ACCT #DESCRIPTION 400 REVENUES 460 Unmetered Water Revenue 122 168 461.Metered Sales - Residential 373 867 461.Metered Sales - Commercial , Industrial 884 462 Fire Protection Revenue 464 Other Water Sales Revenue 677 465 Irrigation Sales Revenue 466 Sales for Resale 400 Total Revenue (Add Lines 1 - 7)509 595 (also enter result on Page 4 , line 1) * DEQ Fees Billed separately to customers Booked to Acct # ** Hookup or Connection Fees Collected 205 300 Booked to Acct 271 *** Commission Approved Surcharges Collected Booked to Acct # 401 OPERATING EXPENSES 601.6 Labor - Operation & Maintenance 100 014 601.Labor - Customer Accounts 7,449 601.Labor - Administrative & General 186 603 Salaries, Officers & Directors 824 604 Employee Pensions & Benefits 13,406 610 Purchased Water 112 615-Purchased Power & Fuel for Power 78,469 618 Chemicals 620.6 Materials & Supplies - Operation & Maint.240 620.8 Materials & Supplies - Administrative & General 861 631-34 Contract Services - Professional 002 635 Contract Services - Water Testing 580 636 Contract Services - Other 518 641-Rentals - Property & Equipment 705 650 Transportation Expense 19,478 656-Insurance 9,468 660 Advertising 2,458 666 Rate Case Expense (Amortization) 667 Regulatory Comm. Exp. (Other except taxes)431 670 Bad Debt Expense 296 675 Miscellaneous 684 Total Operating Expenses (Add lines 12 - 32, also enter on Pg 4, line 2)468 183 Rev 3/02 Page 3 Name: ACCT # Falls Water Company, Inc. INCOME STATEMENT For Year Ended DESCRIPTION December 31 , 2005 403 406 407 6 408. 7 408. 8 408. 9A 408. 17 413 18 414 30 427. 31 427. 409. 1 0 409. 410. 410. 411 412 415 416 419 420 421 426 408. 409- Rev 3/02 Revenue (From Page 3, line 8) Operating Expenses (From Page 3, line 33) Depreciation Expense Amortization, Utility Plant Aquisition Adj. Amortization Exp. - Other Regulatory Fees (PUC) Property Taxes Payroll Taxes Other Taxes (list) 468 183 293 320 890 DEQ Fees Federal Income Taxes State Income Taxes Provision for Deferred Income Tax - Federal Provision for Deferred Income Tax - State Provision for Deferred Utility Income Tax Credits Investment Tax Credits - Utility Total Expenses from operations before interest (add lines 2-15) Income From Utility Plant Leased to Others Gains (Losses) From Disposition of Utility Plant Net Operating Income (Add lines 1 , 17 & 18 less line 16) Revenues, Merchandizing Jobbing and Contract Work Expenses, Merchandizing, Jobbing & Contracts Interest & Dividend Income Allowance for Funds used During Construction Miscellaneous Non-Utility Income Miscellaneous Non-Utility Expense Other Taxes, Non-Utility Operations Income Taxes, Non-Utility Operations Net Non-Utility Income (Add lines 20 23 & 24 less lines 21 , & 27) Gross Income (add lines 19 & 28) Interest Exp. on Long-Term Debt Other Interest Charges NET INCOME (Line 29 less lines 30 & 31) (Also Enter on Pg 9, Line 2) Page 4 509 595 519 716 (10 121) 878 883 996 875 127 252) Name:Falls Water Company. Inc. ACCOUNT 101 PLANT IN SERVICE DETAIL For Year Ended December 31 , 2005 SUB ACCT # Balance Beginning of Year Balance End of Year Added During Year Removed During YearDESCRIPTION 301 Organization 302 Franchises and Consents 303 Land & Land Rights 329 150 179 304 Structures and Improvements 707 707 305 Collecting & Impounding Reservoirs 306 Lake, River & Other Intakes 307 Wells 545 6,482 027 308 Infiltration Galleries & Tunnels 309 Supply Mains 310 Power Generation Equipment 693 693 311 Power Pumping Equipment 202 683 506 210 189 320 Purification Systems 603 023 626 330 Distribution Reservoirs & Standpipes 494 494 331 Trans. & Distrib. Mains & Accessories 435 055 108 475 163 333 Services 334 Meters and Meter Installations 223 713.845 304 558 335 Hydrants 5,416 5,416 336 Backflow Prevention Devices 339 Other Plant & Misc. Equipment 340 Office Furniture and Equipment 8,474 083 556. 341 Transportation Equipment 110 769 879. 342 Stores Equipment 328 807 134. 343 Tools, Shop and Garage Equipment 344 Laboratory Equipment 345 Power Operated Equipment 346 Communications Equipment 347 Miscellaneous Equipment 348 Other Tangible Property TOTAL PLANT IN SERVICE 010,734 166 040 150 176 624 (Add lines 1 - 28)Enter beginning & end of year totals on Pg 7, Line 1 Rev 3/02 Page 5 Name:Falls Water Company, Inc. ACCUMULATED DEPRECIATION ACCOUNT 108.1 DETAIL For Year Ended December 31 , 2005 SUB Depreciation Rate Balance Beginning Balance End of Increase ACCT #DESCRIPTION of Year Year (Decrease) 304 Structures and Improvements 305 Collecting & Impounding Reservoirs 306 Lake, River & Other Intakes 307 Wells 342 705 363 308 Infiltration Galleries & Tunnels 309 Supply Mains 310 Power Generation Equipment 947 782 835 311 Power Pumping Equipment 124 785 133 339 554 320 Purification Systems 14,448 747 299 330 Distribution Reservoirs & Standpipes 494 494 331 Trans. & Distrib. Mains & Accessories 70,434 582 148 333 Services 334 Meters and Meter Installations 771 123,457 686 335 Hydrants 116.117 336 Backflow Prevention Devices 339 Other Plant & Misc. Equipment 340 Office Furniture and Equipment 151 370 219 341 Transportation Equipment 344 074 730 342 Stores Equipment 343 Tools, Shop and Garage Equipment 082 369 287 344 Laboratory Equipment 345 Power Operated Equipment 346 Communications Equipment 347 Miscellaneous Equipment 348 Other Tangible Property TOTALS (Add Lines 1 - 25)362 798 419 035 237 Enter beginning & end of year totals on Pg 7, Line 7 Rev 3/02 Page 6 Name:Falls Water Company, Inc. BALANCE SHEET For Year Ended December 31 2005 ASSETS Balance End of IncreaseBalance Beginning ACCT #DESCRIPTION of Year Year (Decrease) 101 Utility Plant in Service (From Pg 5 , Line 29)010 734 176 624 165 890 102 Utility Plant Leased to Others 103 Plant Held for Future Use 105 Construction Work in Progress 114 Utility Plant Aquisition Adjustment Subtotal (Add Lines 1 - 5)010 734 176 624 165 890 108.Accumulated Depreciation (From Pg 6, Line 26)362 798 419 035 237 108.Accum. Depr. - Utility Plant Lease to Others 108.Accum. Depr. - Property Held for Future Use 110.Accum. Amort. - Utility Plant in Service 110.Accum. Amort. - Utility Plant Lease to Others 115 Accumulated Amortization - Aquisition Adj. Net Utility Plant (Line 6 less lines 7 - 12)647 936 757 588 109 652 123 Investment in Subsidiaries 125 Other Investments Total Investments (Add lines 14 & 15) 131 Cash 126,484 271 019 144 535 135 Short Term Investments 141 Accts/Notes Receivable - Customers 629 60,409 780 142 Other Receivables 187 187 145 Receivables from Associated Companies 151 Materials & Supplies Inventory 162 Prepaid Expenses 876 876 173 Unbilled (Accrued) Utility Revenue 143 Provision for Uncollectable Accounts 300 300 Total Current (Add lines 17 -24 less line 25)165 813 390 192 224 379 181 Unamortized Debt Discount & Expense 183 Preliminary Survey & Investigation Charges 184 Deferred Rate Case Expenses 186 Other Deferred Charges Total Assets (Add lines 13, 16 & 26 - 30)813 749 147 780 334 031 Rev 3/02 Page 7 Name:Falls Water Company, Inc. BALANCE SHEET For Year Ended December 31 , 2005 LIABILITIES & CAPITAL IncreaseBalance Beginning Balance End of ACCT #DESCRIPTION of Year Year (Decrease) 201-Common Stock 000 000 204-Preferred Stock 207-Miscellaneous Capital Accounts 214 Appropriated Retained Earnings 215 Unappropriated Retained Earnings 114 717 100 167 (14 550) 216 Reacquired Capital Stock 218 Proprietary Capital Total Equity Capital (Add Lines 1-5+7 less line 6)139 717 125 167 (14 550) 221-Bonds 223 Advances from Associated Companies 115 966 105 378 (10 588) 224 Other Long - Term Debt 232 259 363 182 131 231 Accounts Payable 979 235 (19 744) 232 Notes Payable 233 159 573 (205 586) 233 Accounts Payable - Associated Companies 951 674 723 235 Customer Deposits (Refundable) 236.Accrued Other Taxes Payable 236.Accrued Income Taxes Payable 054 024) 236.Accrued Taxes - Non-Utility 237-Accrued Debt, Interest & Dividends Payable 241 Misc. Current & Accrued Liabilities 251 Unamortized Debt Premium 252 Advances for Construction 253 Other Deferred Liabilities 255.Accumulated Investment Tax Credits - Utility 255.Accum. Investment Tax Credits - Non-Utility 261-Operating Reserves 271 Contributions in Aid of Construction 208 875 622,491 413 616 272 Accum. Amort. of Contrib. in Aid of Const. **827)(19 131)(13 304) 281-Accumulated Deferred Income Taxes Total Liabilities (Add lines 9 - 29 674 389 022 612 348 223 TOTAL LlAB & CAPITAL ( Add lines 8 & 30)814 106 147 779 333 673 ** Only if Commission Approved Rev 3/02 Page 8 Name:Falls Water Company, Inc. STATEMENT OF RETAINED EARNINGS For Year Ended December 31 , 2005 Retained Earnings Balance (Q2 Beginning of Year Amount Added from Current Year Income (From Pg 4, Line 32) Other Credits to Account Dividends Paid or Appropriated Other Distributions of Retained Earnings Retained Earnings Balance (Q2 End of Year 114717 252) 298) 100 167 Description (Class , Par Value etc. COMMON CAPITAL STOCK DETAIL No. Shares Authorized Dividends Paid No. Shares Outstanding 1000 DETAIL OF LONG-TERM DEBT Interest Rate Year-end Balance Interest Paid Interest AccruedDescription Frontier Property Group 109304.6781 . Frontier Property Group (1999 Ford Pickup)6661.47 668. DEQ State Revolving Loan Fund 25%264448.41 4458. Rev 3/02 Page 9 Name:Falls Water Company, Inc. SYSTEM ENGINEERING DATA For Year Ended December 31 , 2005 Provide an updated system map if significant changes have been made to the system during the year. Water Supply: Rated Capacity Type of Treatment: (None, Chlorine Fluoride Annual Production Water Supply Source (Well, Spring, Pump DesiQnation or location (qpm)Filter etc.(OOO's Gal.)Surface Wtr) Well #1 750 SAND SEP 113 691 WELL Well #2 400 100 812 WELL Well #3 200 584 WELL Well #4 1500 SAND SEP 106 665 WELL Well #5 750 SAND SEP 422 390 WELL Well #6 (Pump 6)600 SAND SEP 101 WELL Pump #7 (In Well #6)600 143 WELL Well #8 1500 205 WELL System Storage: Total Capacity OOO' Usable Capacity OOO' Type ofReservoir Construction (Elevated, Pres- (Wood, Steel Storage Designation or Location Gal.Gal.urized, Boosted'Concrete) Well 2/4 Pressurized Steel (Duplicate form and attach if necessary. Asterisk facilities added this year. Rev 3/02 Page 10 Name:Falls Water Company, Inc. SYSTEM ENGINEERING DATA (continued) For Year Ended December 31 , 2005 Pump information for ALL system pumps, including wells and boosters. Designation or Location Horse Rated Capacity Discharge Pressure Energy Used & Type of Pump Power (Qpm)(psi)This Year Well #2, Turbine Pump #2 400 Well #4 , Turbine Pump #4 150 1500 Well #6, Submersible Pump #6 600 Pump #7, Submersible Pump #7 600 SUBTOTAL OF ABOVE The Above are all on one Power Meter Totaling 471 840 Well #1 , VFD Turbine Pump #1 750 221 764 Well #3, Submersible Pump #3 200 189 Well #5, Turbine Pump #5 750 563 635 Well #8, Turbine Pump #8 150 1500 680 ** Submit pump curves unless previously provided or unavailable. Asterisk facilities added this year. Attach additional sheets if inadequate space is available on this page. If Wells are metered: What was the total amount pumped this year? What was the total amount pumped during peak month? What was the total amount pumped on the peak day? 928 591 145 161 221 697 No Record If customers are metered, what was the total amount sold in peak month?117 594 000 Was your system designed to supply fire flows? If Yes: What is current system rating? Yes How many times were meters read this year? During which months?April, May, June, July, August, September, October for Residential. Commercial and Multi-family Residential are read year round. How many additional customers could be served with no system improvements except a service line and meter? How many of those potential additions are vacant lots? 100 100 10 Are backbone plant additions anticipated during the coming year? If Yes, attach an explanation of projects and anticipated costs! Yes In what year do you anticipate that the system capacity (supply, storage or distribution) will have to be expanded?2006 Rev 3/02 Page 11 Name:Falls Water Company, Inc. SYSTEM ENGINEERING DATA (continued) For Year Ended December 31 , 2005 FEET OF MAINS Pipe Size In Use Beginning Of Year Installed During Year Abandoned During Year In Use End of Year 532.532. 262.262. 112 195.842.125 038. 598.539.138. 10"18,459.610.849. 12"543.527.070. CUSTOMER STATISTICS Number of Customers Thousands of Gallons Sold TOTALS (Add lines 2 through 8) This Last This Last Year Year Year Year 259 852 474 385 425 907 017 24,484 573 577 N/A N/A 259 224 N/A N/A 133 688 498,402 450 391 Metered: Residential Commercial Industrial Flat Rate: Residential Commercial Industrial Private Fire Protection Public Fire Protection Street Sprinkling Municipal, Other Other Water Utilities Rev 3/02 Page 12 CERTIFICATE State of Idaho ) ss Countvof Bonneville , the undersigned Paul Johnson , Owner, and K.Scott Bruce , Manager, of the of the Falls Water Company, Inc. utility, on our oath do severally say that the foregoing report has been prepared under our direction, from the original books, papers and records of said utility; that we have carefully examined same, and declare the same to be a correct statement of the business and affairs of said utility for the period covered by the report in respect to each and every matter and thing therin set forth , to the best of our knowledge, information and belief. C::':' :_'-'~=. ::==-I- Chief Officer) Subscribed and Sworn to Before Me this Itfh day Of~\ 1Jj).J)l/J1~~~NOTARY PUBLIC - U My Commission Expires j ULr;g 1- I ?-OU-- Rev 3/02 Page 1 K~~(Officer in Charge of Accounts) \\\,'\111 ""I1II! \,,\, ~ ('j'q III/. .,,"., .....",~,. ! 1/- ;~,:~_..,..:::~j;' '. '~- ,. :T Af.?"" 8- :: ~P . 3--"" :::~ ~" ..", ~ ~~ \. ~ OB\..\V./ ~ ~ ", . ' O$; "'~ ,~ ", .' .~ ~.... ~. rAt , ......., ~ ~/II. '?"r: Or \v \"111111/" II \I'" \\\\: gd kI exce IIi nel so nI a nu I rpls/wtra nnual cpt Attachments for response to page 1 question 13: During 2005, Falls Water Company, Inc.s service area added the following new subdivisions and divisions to existing subdivisions: 1. Ammon - Lincoln Industrial Park Division 2 was added (Legal description is attached to this form). 2. Calico Sky Subdivision Division 2 was added (Legal description is attached to this form). 3. Centennial Ranch Subdivision Division 15 was added (Legal description is attached to this form). 4. Cornerstone Subdivision Divisions 2 and 3 were added (Legal description is attached to this form). 5. Liberty Park Subdivision was added (Legal description is attached to this form). 6. Red Rock Estates Divisions 1 and 2 were added (Legal description is attached to this form). 7. Old Mill Subdivision Division 1 was added (Legal description is attached to this form). 8. Warm Springs Meadows subdivision Division 4 was added (Legal description is attached to this form). 9. Summit Park Subdivision Divisions 7 and 8 were added (Legal description is attached to this form). Attachments for response to page 2 questions 20 and 23: Question 20: In 2006, Falls Water Company, Inc. will submit an application to the Idaho Public Utilities Commission to incur debt in the amount of $1 200 000.00 to construct a new well on a parcel of ground on the northwest comer of the intersection of North Ammon Road and Deloy Drive in Bonneville County, Idaho. The total project cost will be 550 000.00 of which Falls Water Company will provide $350 000.00 from Contributions in Aid of Construction for the project. The cost of the project includes the purchase of 1 500 acre feet of groundwater right for $750 000.00. The expected completion date of the project will be mid-May 2007. See attached cost estimate sheet for Well #9 proj ect. Question 23: Copy of summary of rules is found in The Falls Water Spout (see attached copy). Attachments for response to page 11 question 10: The planned improvement for 2006-2007 is dependent upon our ability to obtain a water right that would enable us to drill Well #9 (on the north end of our water system). The estimated cost for the new well is $800 000.00. In the attached pages are sections 7 and 8 from the draft of the study of Falls Water Company, Inc.' s water system, these sections contain the proposed projects and estimated cost for the projects. The draft has been reviewed by the Department of Environmental Quality and is awaiting final revision and approval by July 2006 as the study of the other water systems involved in this project are completed. Sections 7 and 8 are the proposed upgrades to Falls Water s system to ensure the long- term viability ofthe system. The projects listed in these sections were ranked based on priorities as understood at the time the draft was written. Project #1 was installed in November and December 2004. Final work on project was completed in January 2005. The well projects do not need to be completed with the storage tanks in the same project. The storage tanks and disinfection systems can be phased in when they become necessary Falls Water Company, Inc 1770 Sabin Or Idaho Falls, 10 83406 ()uali !Y~OnTa Phone: (208) 522-1300Fax: (208) 522-4099 Web site: www.faliswater.com Mountain River Engineering 1020 Lincoln Road Idaho Falls, 10 83401 June10, 2004 Water Service for Ammon - Lincoln Industrial Park Division 2 This confirms that Falls Water Company, Inc. has the ability, capacity, and willingness to provide domestic water utility service to the proposed development, Ammon-Lincoln Industrial Park Division No., beginning at a point that is N.00000'19"E. along theSection line 829.00 feet and N.89O52'18"W. 48.00 feet ITom the Southeast Comer of Section 10, Township 2 North, Range 38 East ofthe Boise Meridian, said point being the Northeast comer of Ammon-Lincoln Industrial Park, Bonneville County, Idaho; running thence 89O52' 18"W. 448.22 feet to the Northwest comer of said Ammon-Lincoln Industrial Park; thence N.0000T42"E. 0.42 feet; thence 89O52' 18"W. 456.25 feet to the Southeasterly boundary line of Henderson Subdivision, Division No. I, Bonneville County, Idaho; thence N.31 008'37"E. 312.92 feet to the Northeasterly comer of Lot 2, Block 3 said Henderson Subdivision; thence S.89O52' 18"86.0 I feet; thence N.OooOT 42"E. 161.82 feet; thence S.89O52' 18"E. 656.29 feet; thence S.OooOO' 19"W. 430.42 feet to the POINT OFBEGINNING. Containing 7.51 acres. This is subject to the following conditions: 1. Installation and extension of the water system by the developer in accordance with Falls Water standards both within the development and connecting to the existing Falls Water system. 2. Approval by the Idaho Public Utilities Commission (IPUC). 3. In accordance with IPUC approved Rates and Tariff for Falls Water Company, Inc. 4. Payment by developer or by subsequent builders, homeowners, or lot purchasers of the connection fee in accordance with IPUC approved Rates and Tariffs. 5. System design and installation approved, inspected and accepted by Idaho Department of Health and Welfare, Division of Environmental Quality, Falls Water s designated professional engineer (Schiess and Associates Consulting Engineers), and by Falls Water s own internal staff. 6. Developer shall provide "as built" drawings on paper and computer disks in a format readable by Falls Water as the development progresses. 7. This will serve letter is valid for one year from the date of this letter. 8. In accordance with any other lawfully necessary provisions as agreed between developer and Falls Water. FALLS WATER COMPANY, INC. ~c;(7iht~ K. Scott Bruce Manager FALLS WATER COMPANYiiA,;" ",'",JfC:"" ,.,. 1770 Sabin Dr, Idaho Falls, Idaho 83406-6747 Website: www.faliswater.com Tel.:(208) 522-1300 Fax: (208) 522-4099 Benton Engineering 550 Linden Dr Idaho Falls, ill 83401 February 16 2005 Water Service for Calico Sky Subdivision Division No. This confirms that Falls Water Company, Inc. has the ability, capacity, and willingness to provide domestic water utility service to the proposed development, Calico Sky Subdivision Division No.2. Beginning at a point that is NOoo OO'19"E 675.69 feetalong the section line, N43O42'44"E 189.61 feet, N28O36'01"E 75.52 feet and NI7O35'16"E 360.67 feet from the West 1/4comer of Section 11, Township 2 North, Range 38 East of the Boise Meridian, said point also being the Northwest Comer of Calico Sky Division No. 1, Bonneville County, Idaho as shown on the recorded plat thereof, and running thence NI7O 35'16"90.22 feet; thence N20o23'18"E 222.57 feet; thence NOoo57'58"E 550.96 feet; thence N24O 37'47"E 366.01 feet; thenceN28O08'53"E 220.96 feet; thence NOoo 37'31 "E 32.99 feet to the North Section line of Said Section 11; thence S89O22'29"507.39 feet along the North Section line; thence SOooOO'19"W 1516.24 feet to the Northeast Comer of said Calico Sky Division No.1; thence N89O 59'41 "W 295.00 feet along the North line extended of Lot 8, Block4 of said Division No. 1 to the NorthwestComer of Lot 5, Block 5 of Division No.1; thence NOoo OO'19"E 15.00 feet along the East line of Lot 4, Block 5 of saidDivision No.1 to the Northeast Comer of Lot 4; thence N89O 59'41 "W 253.44 feet to the Northwest Comer of Lot 2; thenceS17O35'16"W 31.07 feet along the West line of Lot 2 to the Northeast Comer of Lot 1 , Block 5; thence N72 0 24'44"W 128.50feet to the Northwest Comer of Lot 1; thence N20o 23'18"E 27.38 feet; thence N72O24'44"W 217.84 feet to the point of beginning, containing 25.28 acres. This is subject to the following conditions: 1. Installation and extension of the water system by the developer in accordance with Falls Water standards both within the development and connecting to the existing Falls Water system.2. Approval by the Idaho Public Utilities Commission (IPUC).3. In accordance with IPUC approved Rates and Tariff for Falls Water Company, Inc. 4. Payment by developer or by subsequent builders, homeowners, or lot purchasers of the connection fee in accordance with IPUC approved Rates and Tariffs.5. System design and installation approved, inspected and accepted by Idaho Department of Health and Welfare, Divisionof Environmental Quality, Falls Water s designated professional engineer (Schiess and Associates Consulting Engineers), and by Falls Water s own internal staff.6. Developer shall provide as-built drawings on paper and computer disks in a format readable by Falls Water as the development progresses.7. This will serve letter is valid for one year from the date of this letter.8. Developer is to pay Falls Water Company a contribution-in-aid of construction of $1850.per acre to bedeveloped with this will serve. The fee is a share of the cost to build a new well site to replace supply capacity taken from existing customers by the addition of new customer from this development. The developer and Falls Water Company must meet prior to construction and complete arrangements for timing and method of payment for this fee.9. In accordance with any other lawfully necessary provisions as agreed between developer and Falls Water. This will serve letter is valid for one year from the date this letter is written. If construction on the division of this sub- development is not started within one year of the date of this letter the developer or his authorized agent will need to seek anew will serve letter. FALLS WATER COMPANY, INe. c.07 .F-. ~. ,,(? O/ ' I. (.=)Av--C-/ K. Scott Bruce Manager Falls Water Company, Inc 1770 Sabin Dr Idaho Falls, ID 83406 ()uali !Y~OnTa Phone: (208) 522-1300Fax: (208) 522-4099 Web site: www.fallswater.com February 6 2004 Benton Engineering 550 Linden Dr Idaho Falls, 10 83401 Water Service for Centennial Ranch Division No. 15 This confirms that Falls Water Company, Inc. has the ability, capacity, and willingness to provide domestic water utility service to the proposed development, Centennial Ranch Division No. 15, beginning at a point that is N89O40'51"W 1335.65 feet and SOooO7'17"E 431.74 feet from the Northeast corner of Section 23, Township 2 North, Range 38 East of the Boise Meridian and running thence SOooO7'17"E 690.42 feet along the West lines or Centennial Ranch Division No.1 & 2 , City of Ammon, Bonneville County, Idaho to the Northeast corner of Centennial Ranch Division No. 16; thence the following five (5) courses along the North line of said Centennial Ranch Division No. 16: (1) S89O52'43"W 195.00 feet; (2) SOooO7'17"E 25.00 feet; (3) S89O52'43"W 656.00 feet (4) NOooO7'17"W 10.00 feet (5) S89O52'43"W 480.37 feet to the Northwest corner of Centennial Ranch Division No. 16; thence NOoo19'59"W 1147.84 feet to the North line of Section 23; thence S89O40'51"E 1147.84 feet along said Section line; thence SOoo06'11 "E 433.13 feet; thence N89O53'49"E 187.94 feet to the point of beginning, containing 32.82 acres. This is subject to the following conditions: 1. Installation and extension of the water system by the developer in accorcjance with Falls Water standards both within the development and connecting to the existing Falls Water system. 2. Approval by the Idaho Public Utilities Commission (IPUC).3. In accordance with IPUC approved Rates and Tariff for Falls Water Company, Inc. 4. Payment by developer or by subsequent builders, homeowners, or lot purchasers of the connection fee in accordance with IPUC approved Rates and Tariffs. 5. System design and installation approved, inspected and accepted by Idaho Department of Health and Welfare Division of Environmental Quality, Falls Water s designated professional engineer (Schiess and Associates Consulting Engineers), and by Falls Water s own internal staff.6. Developer shall provide "as built" drawings on paper and computer disks in a format readable by Falls Water as the development progresses. 7. This will serve letter is valid for one year from the date of this letter.8. In accordance with any other lawfully necessary provisions as agreed between developer and Falls Water. FALLS WATER COMPANY, INC. k~w K. Scott Bruce Manager Oc--~ FALLS WATER !""""'6:a~""mW' ~", ~n~"'""I"i""""1c.im""" ;"";!" .';M COM P ANY 1770 Sabin Dr, Idaho Falls , Idaho 83406-6747 Website: www.fallswater.com Tel.:(208) 522-1300 Fax: (208) 522-4099 Benton Engineering 550 Linden Dr Idaho Falls, ill 83401 September 20, 2005 Water Service for Cornerstone Subdivision Division No. This confmns that Falls Water Company, Inc. has the ability, capacity, and willingness to provide domestic water utility service to the proposed development, Cornerstone Subdivision Division No.2. All oflots 4 and 5, block 4 and all oflots6 and 7, block 5 of Cornerstone Community, Division No., BOlUleville County, Idaho, and a portion of the SWI/4 of theNW1/4 of Section 14, Township 2 North, Range 38, East of the Boise Meridian, more particularly described as follows:Beginningatthesoutheastcomeroflot 1 , block 3 of said Division No. 1, said comer being NOoo02'56"W 508.58 feet along the sectionline and N89 0 57'04"E 641.13 feet along the north line of Lincoln Park Subdivision, Division No. 1, Bonneville COWlty. Idaho, ITom theWest 1/4 comer of said Section 14, and running thence along the boundaries of said Cornerstone Community, Division No.1 thefollowing 4 courses: (1) NOoo02'56"W 236.30 feet (2) N89O57'04"E 115.00 feet (3) SOoo02'56"E 17.00 feet; and (4)N89O57'04"E 60.00 feetto the Southeastcomeroflot4, block 4 of said Division No. 1; thence along the boundaries oflots 4 and 5, block 4of said Division No. 1 the following 4 courses: (1) Nooo 02'56"W 87.00 feet; (2)N44 002'56"E28.28 feet; (3)N89O57'04"E 134.33 feet; (4)Sooo02'56"E 107.00 feet to the southwest comer oflot 6, block 4 of said Division No. 1; thenceN89O57'O4"E212.21 feet along the southline of said Division No. 1 to a pointonacurve on the east line of Stevens Drive said curve having a radius of330.00 feet and a chord thatbears N04 039'O7'E 52.66 feet; thence along the east line of said Stevens Drive the following 2 courses; (1) to the left along said curve52.71 feet through a central angle of9 0 09'05"; (2) Nooo04'33"E 235.87 feet to the southwest comer oflot 8, block 5 of said DivisionNo.1; thence S89O55'27"E 102.50 feetto the southeast comer of said lot 8; thence SOoo04'33"W 312.96 feet along the east lineof said Division No.1 extended; thence S05O 18'13"W 225.37 feet to the northwest comer of lot 3 block 5 of Lincoln ParkSubdivision No.5; thence N87O 19'04"W 217.45 feet to a point on a curve on the west line of said Stevens Drive, said curve havinga radius of 330.00 feet and a chord that bears N06 0 55'28"E 80.13 feet; thence along said east line and to the right along said curve 80.33 feet through a central angle of 13 056'48"; thence N87O 19'W 249.99 feet along the extended north line of theproperty described in instnunents No.937535 and 743318, to the extended east line ofYellowpine Drive; thence SOO 0 02'E 80.00 feetalong said extended east line to the aforementioned north line of Lincoln Park Subdivision; thence N87 0 19'O4"W 170.19 feet along said northline to the point of beginning, containing 4.09 acres. This is subject to the following conditions: 1. Installation and extension of the water system by the developer in accordance with Falls Water standards both within the development and connecting to the existing Falls Water system.2. Approval by the Idaho Public Utilities Commission (IPUC). 3. In accordance with IPUC approved Rates and TarifIfor Falls Water Company, Inc. 4. Payment by developer or by subsequent builders, homeowners, or lot purchasers of the connection fee in accordance with IPUC approved Rates and Tariffs.5. System design and installation approved, inspected and accepted by Idaho Department of Health and Welfare, Divisionof Environmental Quality, Falls Water s designated professional engineer (Schiess and Associates Consulting Engineers), and by Falls Water s own internal staff.6. Developer shall provide as-built drawings on paper and computer disks in a format readable by Falls Water as the development progresses.7. This will serve letter is valid for one year from the date of this letter.8. Developer is to pay Falls Water Company a contribution- in-aid of construction of $1850.per acre to bedeveloped with this will serve. The fee is a share of the cost to build a new well site to replace supply capacity taken from existing customers by the addition of new customer from this development. The developer and Falls Water Company must meet prior to construction and complete arrangements for timing and method of paymentfor this fee. 9. In accordance with any other lawfully necessary provisions as agreed between developer and Falls Water. FALLS WATER mh--~~;::K",:1"".;"C;"i'.:g,B,""~i:l'&":,jJi;j COM P ANY 1770 Sabin Dr, Idaho Falls, Idaho 83406-6747 Website: www .fallswater.com Tel.:(208) 522-1300 Fax: (208) 522-4099 Benton En~neering 550 Linden Dr Idaho Falls, ill 83401 August 23, 2005 Water Service for Cornerstone Subdivision Division No. This COnflfll1S that Falls Water Company, Inc. has the ability, capacity, and willingness to provide domestic water utility service to the proposed development, Cornerstone Subdivision Division No.3. Beginning at a point that is S87O lO'30"E 1814.99 feet along the section line and SOoo04'33"W 2126.65 feet from the Northwest Corner of Section 14, Township 2 North, Range 38 East of the Boise Meridian, Bonneville County, Idaho, said point being the Northeast Corner of the First Amended Plat of Lincoln Park Subdivision Division No. 5, and running thence S87O 19'04"E 246.96 feet; thence SOoo04'33"W 505.74 feet; thence N87O3l'33"W 276.35 feet to the East boundary of Lincoln Park Subdivision Div. No.5; thence NO6O l7'O6"E 163.54 feet along said East boundary; thence NO3 0 05'08"E 223.00 feet along said East boundary to the Southeast Corner of the First Amended Plat of Lincoln Park Subdivision Division No. 5; thence NOoo04'33"E 120.13 feet along the East boundary ofsaidPlatto the point of beginning, containing 2.974 acres. This is subject to the following conditions: 1. Installation and extension of the water system by the developer in accordance with Falls Water standards both within the development and connecting to the existing Falls Water system.2. Approval by the Idaho Public Utilities Commission (IPDC). 3. In accordance with IPDC approved Rates and Tarifffor Falls Water Company, Inc. 4. Payment by developer or by subsequent builders, homeowners, or lot purchasers of the connection fee in accordance with IPUC approved Rates and Tariffs. 5. System design and installation approved, inspected and accepted by Idaho Department of Health and Welfare, Division of Environmental Quality, Falls Water s designated professional engineer (Schiess and Associates Consulting Engineers), and by Falls Water s own internal staff.6. Developer shall provide as-built drawings on paper and computer disks in a format readable by Falls Water as the development progresses.7. This will serve letter is valid for one year from the date of this letter.8. Developer is to pay Falls Water Company a contribution-in-aid of construction of $1850.per acre to be developed with this will serve. The fee is a share of the cost to build a new well site to replace supply capacity taken from existing customers by the addition of new customer from this development. The developer and Falls Water Company must meet prior to construction and complete arrangements for timing and method of payment for this fee. 9. In accordance with any other lawfully necessary provisions as agreed between developer and Falls Water. This will serve letter is valid for one year from the date this letter is written. If construction on the division of this sub- development is not started within one year of the date of this letter the developer or his authorized agent will need to seek a new will serve letter. FALLS WATER COMPANY, INC. ~if) K. Scott Bruce Manager FALLS WATER COMPANY 1770 Sabin Dr, Idaho Falls, Idaho 83406-6747 Website: www.faliswater.com Tel.:(208) 522-1300 Fax: (208) 522-4099 Lloyd Cox 3686 S. Schwieder Ln Idaho Falls, ill 83406 September 3 2004 Water Service for Liberty Park Subdivision This confinns that Falls Water Company, Inc. has the ability, capacity, and willingness to provide domestic water utility service to the proposed development, Liberty Park Subdivision, beginning at a point that is N.88O 18'24" 1316.14 feet along the Section line and S.000 1O'47"W. 60.00 feet from the North 1/4 Comer of Section 16 Township 2 North, Range 38 East of the Boise Meridian; running thence S.00010'47"W. 1261.22 feet; thence 88O49'09"W. 1322.68 feet to the North-South Center Section line of said Section 16; thence N.00028'49" along said North-South Center Section line 786.00 feet to the North line of the vacated portion of Applewood Place, Bonneville County, Idaho, said point also being the Southwest comer of Lot 1 , Block 1 , said Applewood Place; thence along said vacated North line the following six (6) courses: N.89O lO' OO"E. 85.30 feet; thence 81 051 '50"E. 192.09 feet; thence S.70000'00"E. 250.00 feet; thence N.20000'00"E. 298.96 feet; thence 89O10'00"E. 330.87 feet; thence N.00050'00"W. 265.60 feet to the South right-of-way line of Lincoln Road; thence along said South right-of-way line the following three (3) courses: N.88O18'24"E. 167.27 feet; thence 89O02'07"E. 100.08 feet; thence N.89O lO'00"E. 112.92 feet to the POINT OF BEGINNING. Containing 29.63 acres. This is subject to the following conditions: 1. Installation and extension of the water system by the developer in accordance with Falls Water standards both within the development and connecting to the existing Falls Water system. 2. Approval by the Idaho Public Utilities Commission (IPUC). 3. In accordance with IPUC approved Rates and Tariff for Falls Water Company, Inc. 4. Payment by developer or by subsequent builders, homeowners, or lot purchasers of the connection fee in accordance with IPUC approved Rates and Tariffs. 5. System design and installation approved, inspected and accepted by Idaho Department of Health and Welfare, Division of Environmental Quality, Falls Water s designated professional engineer (Schiess and Associates Consulting Engineers), and by Falls Water s own internal staff. 6. Developer shall provide as-built drawings on paper and computer disks in a fonnat readable by Falls Water as the development progresses. 7. This will serve letter is valid for one year ITom the date of this letter. 8. In accordance with any other lawfully necessary provisions as agreed between developer and Falls Water. This will serve letter is valid for one year ITom the date this letter is written. If construction on the division of this sub-development is not started within one year of the date of this letter the developer or his authorized agent will need to seek a new will serve letter. FALLS WATER COMPANY, INe. I /c...-I" .-- ...... C-( )4.-,_ '"...(. K. Scott Bruce Manager FALLS WATER ,)!!':. ';,t"N:' :":. ":N'jH;,();Z!;;h""-!K1:",,)JX,)"'~'t!'I "," "i"IT', COM P ANY 1770 Sabin Dr, Idaho Falls, Idaho 83406-6747 Website: www.faliswater.com Tel.: (208) 522-1300 Fax: (208) 522-4099 Mountain River Engineering 1020 E Lincoln Road Idaho Falls, ill 83401 February 16, 2005 Water Service for Red Rock Estates Division No. This confirms that Falls Water Company, Inc. has the ability, capacity, and willingness to provide domestic water utility service to the proposed development, Red Rock Estates Division No. 1. Beginning at a point that is 00o08'24"E. along the Section line 437.36 feet from the Southwest Comer of Section 2, Township 2 North Range 38 East of the Boise Meridian; running thence N.00o08'24"E. along said Section line 1408.45 feet; thence 89O51 '36"E. 504.90 feet; thence S.77O55'43"E. 149.41 feet; thence S.06O0T 16"W. 134.49 feet; thence 08O42'31"W. 349.35 feet; thence S.07O 14'48"W. 224.48 feet; thence S.0IO51'25"W. 319.76 feet; thence 19O18'02"E. 248.65 feet; thence S.17O56'00"E. 99.37 feet; thence N.89O22'28"W. 190.19 feet; thence 80o01' 13"W. 163.11 feet; thence N.89O51 '36"W. 310.50 feet to the POINT OF BEGINNING. Containing 19.02 acres. This is subject to the following conditions: 1. Installation and extension of the water system by the developer in accordance with Falls Water standards both within the development and connecting to the existing Falls Water system.2. Approval by the Idaho Public Utilities Commission (lPUC). 3. In accordance with lPUC approved Rates and Tarifffor Falls Water Company, Inc. 4. Payment by developer or by subsequent builders, homeowners, or lot purchasers of the connection fee in accordance with IPUC approved Rates and Tariffs. 5. System design and installation approved, inspected and accepted by Idaho Department of Health and Welfare, Division of Environmental Quality, Falls Water s designated professional engineer (Schiess and Associates Consulting Engineers), and by Falls Water s own internal staff.6. Developer shall provide as-built drawings on paper and computer disks in a format readable by Falls Water as the development progresses. 7. This will serve letter is valid for one year from the date of this letter.8. Developer is to pay Falls Water Company a contribution-in-aid of construction of $1850.per acre to be developed with this will serve. The fee is a share of the cost to build a new well site to replace supply capacity taken from existing customers by the addition of new customer from this development. The developer and Falls Water Company must meet prior to construction and complete arrangements for timing and method of payment for this fee.9. Developer will either purchase an valid existing groundwater right or pay Falls Water Company, Inc. for the purchase of a groundwater right to supply the division with both in-house and irrigation of lawn and landscaping. The amount needed for this division is 11.19 AF for domestic (in-house) use and 38.13 AF for irrigation. 10. In accordance with any other lawfully necessary provisions as agreed between developer and Falls Water. This will serve letter is valid for one year from the date this letter is written. If construction on the division of this sub- development is not started within one year of the date of this letter the developer or his authorized agent will need to seek a new will serve letter. FALLS WATER COMPANY, INC. ;( 31~fU? K. Scott Bruce Manager FALLS WATER if"","i:..n!t':"'l;\r,;;. ;"~"\;:;?"":;;. ;B.":W':~;,:::):"",:,;:;;j,,c ,.~",,:,,; COM P ANY 1770 Sabin Dr, Idaho Falls, Idaho 83406.6747 Website: www.faliswater.com Tel.: (208) 522.1300 Fax: (208) 522-4099 Mountain River Engineering 1020 E Lincoln Road Idaho Falls, ill 83401 June 30, 2005 Water Service for Red Rock Estates Division No. This confinns that Falls Water Company, Inc. has the ability, capacity, and willingness to provide domestic water utility service to the proposed development, Red Rock Estates Division No.2. Beginning at a point that 00o08'24"E. along the Section line 1845.81 feet from the Southwest Comer of Section 2, Township 2 North Range 38 East of the Boise Meridian, said point being the Northwest Boundary comer of Red Rock Estates, Division No., Bonneville County, Idaho; running thence N.00o08'24"E along said Section line 776.21 feet to the West 1/4 Comer of said Section 2; thence S.87O35'38"E. along the East-West Center Section line 1031.11 feet; thence 21O46'15"W. 299.28 feet; thence S.20o46'I7"W. 89.16 feet; thence S.31O53'1O"W. 95.98 feet; thence S.41O 19'57"W. 121.20 feet; thence S.34O 13'56"W. 100.44 feet; thence S.20o26'00"W. 141.95 feet; thence 06O0T 16"W. 15.63 feet to the Northeast Boundary comer of said Red Rock Estates, Division No.1; thence 77O55'43"W. along the North Boundary line of said Division No.1 a distance of 149.41 feet; thence 89O51 '36"W. along said North Boundary line 504.90 feet to the POINT OF BEGINNING. Containing 15.018 acres. This is subject to the following conditions: 1. Installation and extension of the water system by the developer in accordance with Falls Water standards both within the development and connecting to the existing Falls Water system.2. Approval by the Idaho Public Utilities Commission (IPUC). 3. In accordance with IPUC approved Rates and Tariff for Falls Water Company, Inc. 4. Payment by developer or by subsequent builders, homeowners, or lot purchasers of the connection fee in accordance with IPUC approved Rates and Tariffs.5. System design and installation approved, inspected and accepted by Idaho Department of Health and Welfare, Division of Environmental Quality, Falls Water s designated professional engineer (Schiess and Associates Consulting Engineers), and by Falls Water s own internal staff.6. Developer shall provide as-built drawings on paper and computer disks in a format readable by Falls Water as the development progresses.7. This will serve letter is valid for one year from the date of this letter.8. Developer is to pay Falls Water Company a contribution-in-aid of construction of $1850.per acre to be developed with this will serve. The fee is a share of the cost to build a new well site to replace supply capacity taken from existing customers by the addition of new customer from this development. The developer and Falls Water Company must meet prior to construction and complete arrangements for timing and method of payment for this fee.9. Developer will either purchase an valid existing groundwater right or pay Falls Water Company, Inc. for the purchase of a groundwater right to supply the division with both in-house and irrigation of lawn and landscaping. The amount needed for this division is 9.72 AF for domestic (in-house) use and 33.11 AF for irrigation. lO. In accordance with any other lawfully necessary provisions as agreed between developer and Falls Water. This will serve letter is valid for one year from the date this letter is written. If construction on the division of this sub- development is not started within one year of the date of this letter the developer or his authorized agent will need to seek a new will serve letter. FALLS WATER COMPANY, INC. K. ~8/2~~ K. Scott Bruce Manager FALLS WATER COMPANY 1770 Sabin Dr, Idaho Falls, Idaho 83406-6747 Website: www.faliswater.com Tel.:(208) 522-1300 Fax: (208) 522-4099 Benton Engineering 550 Linden Dr Idaho Falls, ID 83401 March 21 2005 Water Service for Old Mill Subdivision Division No. This confinns that Falls Water Company, Inc. has the ability, capacity, and willingness to provide domestic water utility service to the proposed development, Old Mill Subdivision Division No.1. Beginning at a point that is S87O 11'03 "E 157.94 feet along the Section line from the South 1/4 Comer of Section 11 , T. 2 N., R 38 E., and running thence NOOOO7'28"E 940.47 feet; thence S89O56'43"E 115.45 feet to a point on a curve having a radius of726.81 feet and a chord that bears N19O56'52"W 54. feet; thence to the left along said curve 54.20 feet through a central angle of4O 16'22"; thence N70o40'34"E 95.15 feet to a point of curve having a radius of239.45 feet and a chord that bears N81 o44'46"E 91.95 feet; thence to the right along said curve 92.53 feetthrough a central angle of22O08'23"; thence S87O11'03"E403.31 feet; thence SOoo03'17"W 1049.69 feetto the South line of Section 11; thence N87O11'03"W 682.43 feet along the South line of said section to the point of beginning, containing 16. acres. This is subject to the following conditions: 1. Installation and extension of the water system by the developer in accordance with Falls Water standards both within the development and connecting to the existing Falls Water system.2. Approval by the Idaho Public Utilities Commission (IPUC).3. In accordance with IPUC approved Rates and Tariff for Falls Water Company, Inc. 4. Payment by developer or by subsequent builders, homeowners, or lot purchasers of the connection fee in accordance with IPUC approved Rates and Tariffs.5. System design and installation approved, inspected and accepted by Idaho Department of Health and Welfare, Division of Environmental Quality, Falls Water s designated professional engineer (Schiess and Associates Consulting Engineers), and by Falls Water s own internal staff.6. Developer shall provide as-built drawings on paper and computer disks in a format readable by Falls Water as the development progresses. 7. This will serve letter is valid for one year from the date of this letter.8. Developer is to pay Falls Water Company a contribution-in-aid of construction of $1850.per acre to be developed with this will serve. The fee is a share of the cost to build a new well site to replace supply capacity taken from existing customers by the addition of new customer from this development. The developer and Falls Water Company must meet prior to construction and complete arrangements for timing and method of payment for this fee. 9. The water service lines to each lot must be set five (5) foot off center of the lot center line and not run along the property lines as shown in the plans submitted to Falls Water Company, Inc. for review. 10. In accordance with any other lawfully necessary provisions as agreed between developer and Falls Water. This will serve letter is valid for one year from the date this letter is written. If construction on the division of this sub- development is not started within one year of the date of this letter the developer or his authorized agent will need to seek a new will serve letter. FALLS WATERC9MPANY, INC. J' , .' ~ 7:") ':;" ~\, , r.:yA..vt,. ("y,..'\. . .,)/ (.. K. Scott Bruce Manager FALLS WATER COMPANY ,"'. ';b.Ci, '"' i""'"i,,:,"C;:;, 1770 Sabin Dr, Idaho Falls, Idaho 83406-6747 Website: www.faliswater.com Tel.:(208) 522-1300 Fax: (208) 522-4099 Benton Engineering 550 Linden Dr Idaho Falls, ID 83401 February 16, 2005 Water Service for Summit Park Subdivision Division No.i;q This confinns that Falls Water Company, Inc. has the ability, capacity, and willingness to provide domestic water utility service to the proposed development, Summit Park Subdivision Division No.7. Beginning at the North 1/4 of Section 10, Township 2 North , Range 38 East of the Boise Meridian, Bonneville County, Idaho and running thence S89O41'31 "E 66.47 feet along the Section line; thence Soo 18'31"W 175.25 feet; thence S89O48'07"E 127.11 feet to the Southwest comer of the Grayson Subdivision; thence S89O 41'31 "E 180.00 feet along said Grayson Subdivision South boundary line to the Northwest comer of Summit Park Division No.5; thence along the West boundary of said Summit park Division No.5 and Division No., then Division No.5 again respectively the following eleven (11) courses: (1) Soo 18'33"W 169.95 feet; (2) N89O41'27"W 29.01 feet; (3) SooOO'19"W 985.01 feet; (4) S89O41'27"E 20.00 feet; (5) SooOO'19"W 120.00 feet; (6) N89O41'27"W 20.75 feet; (7) SOoOO'19"W 550.01 feet; (8) S89O41'27"E 30.75 feet; (9) Soo OO'19"W 270.00 feet; (10) N89O41'27"W 14.33 feet; (11) Soo 12'52"W 262.35 feet; thence N89O 32'47"W 269.65 feet; thence Noo03'18"E 591.67 feet; thence N89O41'27"W 90.00 feet to the North-South centerline of said Section 10; thence NOo 03'18"E 1939.97 feet along said North-South centerline of Section 10 to the Point of Beginning, containing 18.09 acres. This is subject to the following conditions: 1. Installation and extension of the water system by the developer in accordance with Falls Water standards both within the development and connecting to the existing Falls Water system.2. Approval by the Idaho Public Utilities Commission (IPUe). 3. In accordance with IPUC approved Rates and Tariff for Falls Water Company, Inc. 4. Payment by developer or by subsequent builders, homeowners, or lot purchasers of the connection fee in accordance with IPUC approved Rates and Tariffs. 5. System design and installation approved, inspected and accepted by Idaho Department of Health and Welfare, Division of Environmental Quality, Falls Water s designated professional engineer (Schiess and Associates Consulting Engineers), and by Falls Water s own internal staff.6. Developer shall provide as-built drawings on paper and computer disks in a format readable by Falls Water as the development progresses. 7. This will serve letter is valid for one year from the date of this letter.8. Developer is to pay Falls Water Company a contribution-in-aid of construction of $1850.per acre to be developed with this will serve. The fee is a share of the cost to build a new well site to replace supply capacity taken from existing customers by the addition of new customer from this development. The developer and Falls Water Company must meet prior to construction and complete arrangements for timing and method of payment for this fee. 9. In accordance with any other lawfully necessary provisions as agreed between developer and Falls Water. This will serve letter is valid for one year from the date this letter is written. If construction on the division of this sub- development is not started within one year of the date of this letter the developer or his authorized agent will need to seek a new will serve letter. FALLS WATER COMPANY, INe. ' _"--,,. ' V c.l//) 1--1 ~~~(./ /' !,?ll/I/ K. Scott Bruce Manager FALLS WATER :';;;" k,",IT='TI"8!'=l~"WA"""'j!jj COM P ANY 1770 Sabin Dr, Idaho Falls, Idaho 83406-6747 Website: www.faliswater.com Tel.:(208) 522-1300 Fax: (208) 522-4099 Benton Engineering 550 Linden Dr Idaho Falls, ill 83401 July 15 2005 Water Service for Warm Springs Meadows Subdivision Division No. This confmns that Falls Water Company, Inc. has the ability, capacity, and willingness to provide domestic water utility service to the proposed development, Warm Springs Meadows Subdivision Division No.4. Beginning at a point that is S89O39'15"E 1319.00 feet along the North section line, SOo021'26"E 2417.02 feet, N89O38'34"E 50.02 feet, S48O55'09" 327.46 feet and S89O37'32"E 258.35 feet from the Northwest Comer of Section 23, Township 2 North, Range 38 East of the Boise Meridian, said point also being the Southwest Comer of Warm Spring Meadows Division No., Bonneville County, as shown on the Recorded Plat thereof, and running thence the following eleven courses along the East line of said Division No.3 1) NOoo16'18"W 171.06 feet 2) N89O43'42"E 30.62 feet to a point of curve having a radius of 293.84 feet and a chord that bears S88O49'51"E 14.88 feet 3) to the right along said curve 14.88 feet through a central angle of2O54'07" 4) N02O38'26"E 213.65 feet 5) N71 022'OO"E 90.46 feet 6) N44O48'57"E 277.14 feet 7) N35O49'35"W 56.83 feet 8) NOoo 19'44"W 190.00 feet 9) S89O40'16"W 40.68 feet to a point of curve having a radius of 481.81 feet and a chord that bears N88O 17'30"W 34.26 feet 10) to the right along said curve 34.26 feet through a central angle of 04'28" 11) N03O54'27"E 134.15 feet; thence N89O40'16"E 310.00 feet; thence SOoo 19'44"E 79.56 feet; thence N89O53'45"E 130. feet; thence SOoo 19'24"E 907.45 feet to the North line ofBriarwood Subdivision, Division No., City of Ammon, Bonneville County, Idaho as shown on the recorded plat thereof; thence N89O37'32"W 681.92 feet along said North line to the point of beginning, containing 11.35 acres This is subject to the following conditions: 1. Installation and extension of the water system by the developer in accordance with Falls Water standards both within the development and connecting to the existing Falls Water system.2. Approval by the Idaho Public Utilities Commission (IPUC). 3. In accordance with IPUC approved Rates and Tarifffor Falls Water Company, Inc. 4. Payment by developer or by subsequent builders, homeowners, or lot purchasers of the connection fee in accordance with IPUC approved Rates and Tariffs.5. System design and installation approved, inspected and accepted by Idaho Department of Health and Welfare, Division of Environmental Quality, Falls Water s designated professional engineer (Schiess and Associates Consulting Engineers), and by Falls Water s own internal staff.6. Developer shall provide as-built drawings on paper and computer disks in a format readable by Falls Water as the development progresses.7. This will serve letter is valid for one year from the date of this letter.8. Developer is to pay Falls Water Company a contribution-in-aid of construction of $1850.per acre to be developed with this will serve. The fee is a share of the cost to build a new well site to replace supply capacity taken from existing customers by the addition of new customers from this development. The developer and Falls Water Company must meet prior to construction and complete arrangements for timing and method of payment for this fee. 9. In accordance with any other lawfully necessary provisions as agreed between developer and Falls Water. This will serve letter is valid for one year from the date this letter is written. If construction on the division of this sub- development is not started within one year of the date of this letter the developer or his authorized agent will need to seek a new will serve letter. FALLS WATER COMPANY, me.K.~~ K. Scott Bruce Manager Exhibit B - Engineer Opinion of Probable Project Cost Item No. Item Construction Costs Unit Quantitv Unit Cost Total Cost New well, 20" dia. Casing, approximately 350 feet lump sum $223,050 $223 050 deep on future booster station and tank site Building piping including flowmeter, valves, air lump sum $25,000 $25 000 relief, transducer, pressure guage, prelube line future chlorination injection port & visible piping Site piping including pipe, valves, fittings, pump to lump sum $15 000 $15 000 waste , hookup to existing system , etc. Well building expandable for a booster pump square feet 720 $160 $115 200 station and chlorination. 300 Hp deep well pump, column, VFD & controls lump sum $55,000 $55 000 Emergency generator (sized to also operate future lump sum $135 000 $135 000 booster pumps), transfer switch & diesel tank Fencing lineal foot 1050 $15 $15.750 Total estimated probable construction cost $584 000 Soft Costs Water right purchase acre-ftl 15001 $500 $750 000 Property for booster station , tank & well I lump sum!$60 000 $60 000 Engineering, administration & financing (Q2 25% of construction $146 000 Contingency $10.000 Total Estimated Probable Project Cost I $1,550,000 Project Budaet I DEQ loan 200 000 I Local Cash $350.000 Total estimated cost 550,000 FWC Out of Pocket Costs IDWR drilling permit fees Electrical costs that must be paid directly to Utah Power to get power to the site Other utility costs that must be paid to get services to the site Legal services associated with the project Advertisement costs Not Included in Schiess Contract Extensive acquisition assistance for water rights or property Extensive PUC coordination such as for trips to Boise and etc. Future SCADA hookup starting from a termination panel 04192 Falls Water Company Well No.9 and Well House Professional Services Contract Th e F a l l s W a t e r C o m p a n y h a s o p e r a t e d si n c e 1 9 5 9 a n d cu r r e n t l y s e r v e s o v e r 60 0 h o m e s i n t h e fo l l o w i n g a r e a s o f Bo n n e v i l l e C o u n t y : Me m b e r s h i p s Am e r i c a n W a t e r w o r k s A s s o c i a t i o n Id a h o R u r a l W a t e r A s s o c i a t i o n . A m m o n - Li n c o l n I n d u s t r i a l P a r k . C a l i c o S k y . C a r i b o u Me a d o w s . C e n t e n n i a l Ra n c h ( f r o m A s c h l i L n no r t h w a r d ) . C l o v e r d a l e E s t a t e s . C o r n e r s t o n e Co m m u n i t y . C o u n t r y C o r n e r E s t a t e s . C r i m s o n V a l l e y . D e n i s e S u b d i v i s i o n . E a s t P a r k . F a i r m o n t V i l l a g e . F a l l Cr e e k A d d i t i o n . F i r s t S t r e e t Mo b i l e P a r k . G r a y s o n Su b d i v i s i o n ( I o n a R d ) . G r e e n O a k Me a d o w . H e n d e r s o n Su b d i v i s i o n . L a w n d a l e E s t a t e s . L i n c o l n In d u s t r i a l P a r k . L i n c o l n P a r k . L i n c o l n Ro a d ( H i t t t o A m m o n R d ) . L i n c o l n To w n s i t e . M c D o n a l d ' s F a r m . M o b i l e Ho m e E s t a t e s ( F a l l s b r o o k ) . M o n t e V i s t a Su b d i v i s i o n . N o r t h S p r i n g s . O l d Mi l l . R e t t i u s R e t r e a t . S t o n e A r b o r . S u m m e r s e t Su b d i v i s i o n . S u m m i t P a r k . V i c t o r Ha n k s S u b d i v i s i o n Wa r m S p r i n g M e a d o w s . W a s h i n g t o n P a r k Re Q u l a t e d b y Id a h o P u b l i c U t i l i t i e s C o m m i s s i o n Id a h o D e p a r t m e n t o f H e a l t h & W e l f a r e Id a h o D i v i s i o n o f E n v i r o n m e n t a l Q u a l i t y Id a h o D e p a r t m e n t o f W a t e r R e s o u r c e s S. E n v i r o n m e n t a l P r o t e c t i o n A g e n c y ua 1 i ! Y Om C o m b n r o t \! l Q! ! !a p FA L L S W A T E R C O M P A N Y , I N C . 17 7 0 S a b i n O r Id a h o F a l l s , 1 0 8 3 4 0 6 Ph o n e : ( 2 0 8 ) 5 2 2 - 13 0 0 FA X : ( 2 0 8 ) 5 2 2 - 40 9 9 Ch e c k u s o u t o n t h e w e b : ww w . f a l i s w a t e r . co m TH E FA L L S WA T E R sp a Fa l l s W a t e r C o m p a n y In f o r m a t i o n P i p e l i n e FALLS WATER IMPROVEMENT PLAN ALTERNATIVES Capital Improvement Projects and Costs Included in this section is a complete list of identified capital improvement projects and associated costs for the improvements identified on Figure 5- 7. Further explanation isprovided where necessary with each estimate of probable cost. Priority Project No.1 is necessary to aid in alleviating substandard pressures occurring in Caribou Meadows and in the southern reaches of Centennial Ranch. This project was initiated in 2004 by applying for and receiving an SRF loan through DEQ. This projectshould be completed by September 2004. The project will increase pressure in CaribouMeadows by providing a loop through connection to the line extending onto Lincoln Road from North Springs, extending west along Lincoln Road past Crowley Road connecting to the 10- inch line in Crimson Valley, crossing the railroad tracks and connecting to the existing 12-inch dead end line west of the tracks. The future JohnAdams Parkway water line extension will provide a loop for the southern reaches of Centennial Ranch by installing and connecting the two dead-end lines together on each side of the railroad. It will connect 8-inch line on Cordell to 8-inch line on John AdamsParkway in Centennial Ranch. The costs of this project and scope are given on Table 7- Table 7-1. Priority Project No. 02196 Falls Water/ Ammon! Ucon! Regional Water Planning Study Lincoln Road Waterline Extension Item No.Item Unit Quantitv Unit Cost Total CostNew 12" water pipe lineal foot 2300 $30 $69 000New hydrants per each 500 $12 500New 12" tees, crosses, elbows per each 200 800New 12" valves per each 500 000Connection to existing system per each 000 000Railroad crossinQ lineal foot 100 $300 $30 000Traffic control lump sum 500 500Asphalt street repair lineal foot 700 $25 $17 500Estimated probable construction cost $154 300 Future John Adams Parkway Waterline Extension Item No. Item Unit Quantity Unit Cost Total CostNew 8" water pipe lineal foot 900 $15 $13 500New 8" tees, crosses, elbows per each $600 000New 8" valves per each $800 200Connection to existing system per each 000 000Railroad crossina lineal foot $150 $12 000Traffic control lump sum 000 000Asphalt street repair lineal foot 100 $25 500Estimated probable construction cost $37 200 Total estimated probable construction cost $191,500Engineering, administration, legal, & financing (Q2 25% of construction $47 900Total Estimated Probable Project Cost $239 400 August 2004 Schiess and Associates Priority Project No.2 consists of installing a new well along Iona Road to serve Summit Park and the planned subdivisions of Red Rock Estates and Calico Sky. These three subdivisions combined have created a problem similar to that at Caribou Meadows and North Springs. The water system is becoming so spread out on the north end that WellNo.5 along with contributions from surrounding wells further south will not be able to provide the necessary flow and pressure for these subdivisions as early as the summer of 2005. In an effort to plan home construction in this area, we have run several water modelscenarios in this area. The data and conclusions of these water models are given in Appendix B.l in the form of three letters dated May 3, June 25 , and July 19 2004. Theaddition ofthese planned subdivisions to the north end of the system have necessitatedthat this new well move to Priority Project No.2 in order to maintain adequate service.The costs of this well and future storage tank and booster station are given in Table 7- It is expected that development will fund in large measure the well and subdivision distribution pipes and that a general rate increase would be used to fund the booster station and tank. We recommend that the construction of the well be such that overallmaster planning objectives of a booster station and storage tank can be done without any reconstruction. lona Road Well (Future Falls Water Well #10, Storage Tank & BoosterStation) Item No.Item Unit Quantity Unit Cost T otaf CostNew well, 16" dia. Casing,lump sum $125 000 $125 000approximatelv 350 feet deep Building piping & site piping lump sum $60 000 $60 000including flowmeter, valves fittinQs, pump to waste, etc. Water storage tank, assume lump sum $580 800 $580 800000000 qallons Well/booster pump buildinQ square feet 1600 $100 $160 000Pumps & controls including 50 lump sum $60 000 $60 000hp well pump & (2) 60 hp booster pumps wNFD' Chlorination system lump sum $75 000 $75 000EmerQency generator lump sum $120 000 $120 000Fencinalineal foot 600 $15 000Total estimated probable construction cost $1,189,800Engineering, administration legal & financing (Q2 25% of construction $297 500Total Estimated Probable Project Cost 487 300Table 7-2. Priority Project No. Priority Project No.3 consists of constructing a new well in the northeast comer of Cloverdale Estates. The cost breakdown of this project is given in Table 7- 3. There wasa future well site identified and set apart for this location since the origination of Cloverdale Estates in the 1970s. This well site is owned by Falls Water Company. Inkeeping with the plan, we estimate that the capacity of this well needs to be a minimum of 1 000 gallons/minute. Ifmore is obtainable, the need to provide future Well #11 or 02196 Falls Water/ Ammon! Ucon! Regional 81 August 2004Water Planning Study Schiess and Associates future Well #12 could be delayed. In keeping with the plan to provide storage for thewater system, we estimate that with a 1 000 gallon/minute well , there will beapproximately 2 000 gallon/minute booster pump capacity and need , as a minimum, a500000-gallon storage tanle Construction of this well will provide the one and only wellsite on the east side of the railroad tracks. Cloverdale Well (Falls Water Company Well #9 , Storage Tank &Booster Station) Item No.Item Unit Quantity Unit Cost Total CostNew well, 16" dia. Casing,lump sum $125 000 $125 000aDDroximately 350 feet deep Building piping & site piping lump sum $50 000 $50 000including flowmeter, valves fittinas, Dump to waste, etc.500 000 gallon water storage lump sum $321 200 $321 200tank Well/booster DumD buildina square feet 1120 $100 $112 000Pumps & controls including 50 lump sum $49 200 $49 200hp well pump & (2) 60 hp booster pumps wNFD' Chlorination system lump sum $50 000 $50 000Emeraency generator lump sum $100 000 $100 000Fencinalineal foot 500 $15 500Total estimated probable construction cost $814 900Engineering, administration, legal, & financing (Q2 25% of construction $203 700Total Estimated Probable Project Cost 018 600Table 7-3. Priority Project No. This project is long overdue and should be initiated immediately. The long term benefits of this well will ensure that development on the east side of the railroad tracks will have adequate pressure and flow. Specifically, Caribou Meadows and North Springs pressure and flow will be restored to nonnal levels long tenn. An emergency generator andchlorination system should also be included in the design plan as shown. Priority Project No.4 consists of completely metering parts of the system that are currently do not have meters installed (most of Falls brook) and replacement of all old meters in the system that are manual read so that the entire water system is metered with touch-read technology. Most of the cost for this project is to convert Fallsbrook ITomunmetered to metered. There will be yard repair, some concrete flatwork repair, andperhaps some asphalt street repair associated with the conversion. A few touch readmeters have already been installed, but are not allowed to be read by the ruc. Theconstruction of the meters already installed, but not read, were taken into account onTable 7- 02196 Falls Water/ Ammon/ Dcon! RegionalWater Planning Study August 2004 Schiess and Associates Water Meters for Fallsbrook and other Unmetered Services, and ReplaceMany Old Meters with New Item No.Item Unit Quantity Unit Cost Total CostMeter unmetered services each 125 000 $125 000(those with curb stops only) with 3!4" water meters with touch read technology placed in new plastic box including concrete & landscape repairs Install meters in existing boxes each 450 $250 $112 500in Fallsbrook with 3/4" touch read meters, touch read lids and insulation Upgrade two thirds of manual each 540 $250 $135 068read meters with 3/4" touch read meters, touch read lids and insulation Upgrade one third of manual each 271 000 $270 540read meters with touch read meters using 3!4" meters including a new box assembly Total estimated probable construction cost $643 108Total rounded to the nearest hundred $643 100Engineering, administration, legal, & financing (Q2 25% of construction $160,800Total Estimated Probable Project Cost $803 900Table 7-4. Priority Project No. Priority Project No.5 consists of installing several new waterlines including a new water line down 1 sl Street, a new waterline on Monte Vista, and new waterlines on Greenwillowand Crimson Drive in Cloverdale Estates to bring continuity to the water system by eliminating several dead ends and providing large waterlines to move water from location to location as needed. The 1 sl Street waterline project has been needed for some time andwill also serve to improve pressure in the southern reaches of Centennial Ranch. Without the 1 sl Street line, all of the homes currently planned for Centennial Ranch between the existing constructed area and the railroad will likely have substandard water pressure as the area approaches build-out. This area has been annexed by Ammon and should reachbuild-out in the next several years. This line will also assure that adequate water pressurewill be available when Wann Springs is fully developed. This line will also be necessaryto transport water along 1 st Street to additional development east of Crowley Road. Thisline will be necessary to distribute water away from the Central Well House to the southern part of the system upon the completion of Priority Project No. 6. This line isbadly needed and, in our opinion, should have been installed as development in the area occurred. In order to fully utilize the pumping capacity that will be provided with a new central wellhouse tank and booster station project identified in Priority Project No. , theGreenwillow Lane and Crimson Drive water line upsize project, Monte Vista Avenuewater line upsize project, and 1 sl Street waterline project will allow upwards of 5 600 02196 Falls Water! Ammon! Uconl Regional 83 August 2004Water Planning Study Schiess and Associates gallons/minute to be distributed away from the central wellhouse to outlying areas in the east and south of the system. The cost breakdown for these waterlines is given in Table5. With the Monte Vista A venue water line feeding the southern part of the watersystem and the Green Willow Lane project increasing transportability under the tracks from the central part of the water system to the east side toward Crimson Valley and Caribou Meadows, large amounts of water will be able to be transported away from the Central Wellhouse without high pressure losses. This water line project (Priority Project No.5) should be completed with Priority Project No.6. In addition, many meterimprovements need to be made along these streets. The costs for these are included in Priority Project No. Greenwillow Lane and Crimson Drive Waterline Upsize Item No.Item Unit Quantity Unit Cost Total CostNew 12" water pipe lineal foot 1000 $30 $30 000New 10" water pipe lineal foot 1800 $28 $50 400New hydrants per each 500 $12 500New 12" & 1 0" tees, crosses per each 500 500and elbows New 12", 10" and 8" valves per each 400 400Traffic control lump sum 000 000Asphalt street repair lineal foot 2800 $28 $78,400Estimated Probable Construction Cost $187 200 Monte Vista Ave. Waterline Upsize Item No.Item Unit Quantity Unit Cost Total CostNew 12" water pipe lineal foot 1830 $30 $54 900New 12" tees, crosses, elbows per each 200 600New 8" valves per each 500 500Traffic control lump sum 000 000Asphalt street repair lineal foot 1830 $25 $45 750Estimated Probable Construction Cost $107 750 First Street Waterline Connector Item No.Item Unit Quantity Unit Cost Total CostNew 10" water pipe lineal foot 4930 $28 $138 040New 6" water pipe lineal foot 270 $23 210New hydrants per each 500 $17 500New tees, crosses, elbows per each 000 $15 000New valves per each 200 $25 200Connection to existing system per each 000 $24 000Railroad crossino lineal foot $250 $20 000Traffic control lump sum $10 000 $10 000Asphalt street repair lineal foot 1200 $25 $30 000Estimated probable construction cost $285 950 Total estimated probable construction cost $580 900Engineering, administration , legal, & financing (Q2 25% of construction $145,200Total Estimated Probable Project Cost r $726 100Table 7-5. Priority Project No. 02196 Falls Water/ Ammon! Ucon! Regional Water Planning Study August 2004 Schiess and Associates Priority Project No.6 consists of demolishing all current structures on the central well site with the exception of the wells themselves and construction of a new central wellhouse tank and booster station that will consist of a room for control of all well pumps, controls and space for a complete booster pumping station , and a 1.5 milliongallon water storage tank. The costs and detailed work scope is shown in Table 7- Central Well House Storage Tank & Booster Station Item No. Item Unit Quantity Unit Cost Total CostDemolition of existing building &lump sum $20 000 $20 000Ipumps Building piping & site piping lump sum $150 000 $150 000including flowmeters, valves fittings, pump to wastes connections to distribution system, etc. Water storage tank, 1 500 000 lump sum $786 000 $786 000gallons New submersible well pumps lump sum $83 000 $83 00020 hp, 50 hp, 60 hp, drop pipe and pitless units New booster pumps ((4) 100 hp)lump sum $100 000 $100 000with VFD', including manifold and cans Chlorination system lump sum $175 000 $175 000New well and booster pump square feet 2400 $100 $240 000building Emergency generator, transfer lump sum $150 000 $150 000switches & diesel tank to operate all pumps Purchase two lots south of lump sum $30 000 $30 000central well house site for the storage tank Fencing lineal foot 800 $15 $12 000Total estimated probable construction cost 746,000Engineering, administration, legal, & financing (Q2 25% of construction $436 500Total Estimated Probable Project Cost 1$2 182,500Table 7-6. Priority Project No. This wellhouse is centrally located within the water system and has substantial well capacity. As the water system grows, this central well house will be under utilizedwithout the addition of booster pumps and storage. We estimate that a booster pumpingrate at peak flow of 5600 gallons/minute is possible. When this project is completed , thiswellhouse will provide the needs of the entire water system during the wintertime in the short term. The project also includes a 750-kW emergency generator, diesel driven tooperate all pumps. This central wellhouse, the largest pumping system in the system should be developed with the long term in mind. Due to the lowering groundwater trend in the area and the 02196 Falls Water/ Ammon! Dcan! Regional 85 August 2004Water Planning Study Schiess and Associates fact that the wells on this site are rather shallow, and the age of the wells; we recommendthat the wells all be converted to be used with submersible pumps and motors so that each well is accessible in the future for rehabilitation and/or deepening as required. Priority Project No.7 consists of general improvements that will be required to meet electrical codes in the wellhouses not scheduled for improvement a permanent office and maintenance building for Falls Water Company and improvements to the existing SCADA and telemetry system. The current telemetry system monitors pump operations and pressure only. This project will allow monitoring of all systems as noted in Table 7-7. Improvements and costs for this project are outlined. General Water System Improvements Item No.Item Unit Quantity Unit Cost Total CostGeneral improvements to lump sum $23 000 $23 000wellhouse #1 including electrical removal of automatic waste capability, and addition of a VFD New water maintenance shop at square feet 800 $90 $162 000Wellhouse No.1 site Convert manufactured home at lump sum $50 000 $50 000Wellhouse #1 site to be the permanent Falls Water ComQanj' office General electrical improvements lump sum 000 000to wellhouse #3 General improvements in lump sum $21 200 $21 200wellhouse #8 including automatic opening louvers electrical modifications, addition of a VFD, floor drain, and abandonment of water waste line. Upgrade SCADA and telemetry lump sum $100 000 $100 000system to monitor generator operations, flow, door entry, system pressures, tank levels and pump operations at each well house. Estimate includes home base at new office at Wellhouse #1 , remote stations at all current locations (5), and (4) new locations Total estimated probable construction cost $358 200Engineering, administration , legal, & financing (Q2 25% of construction $89 600Total Estimated Probable Project Cost $447 800Table 7-7. Priority Project No. 02196 Falls Water/ Ammon/ Dcon/ Regional Water Planning Study August 2004 Schiess and Associates Falls Water Company should establish a central office and maintenance shop to provide for the long term needs and stability of the water system at the Well No. I site. Locatedthere currently is a manufactured home that could easily be converted to an office without incurring high costs. There is adequate space, also, to construct a maintenance shop thatcould be used for storage of water equipment such as pipe, pipe fittings, valves, metersmeter boxes, and meter bench test equipment. These items are all included in generalwater system improvements and should be initiated with other major improvements to the system, especially the moving of the SCADA computer required as part of Priority Project No.6. Priority Projects 4, 5, 6, and 7 should all be completed simultaneously andwould give a strong, organized and long-term central core to the water system. Priority Project No.8 will allow additional transport of water from new Well # lOwest along lona Road. The costs for this project are given in Table 7- lona Road Waterline Connector Item No.Item Unit Quantity Unit Cost Total CostNew 12" water pipe lineal foot 4700 $30 $141 000New 8" water pipe lineal foot 920 $25 $23 000New hydrants per each 500 $25 000New 12" tees, crosses, elbows per each 200 200New valves per each $1,400 800Connection to existing system per each 000 000Traffic control lump sum $10 000 $10 000Asphalt street repair lineal foot 1800 $25 $45 000Total estimated probable construction cost $269 000Total rounded to the nearest hundred $269 000Engineering, administration, legal, & financing (Q2 25% of construction $67 300Total Estimated Probable Project Cost I $336 300Table 7-8. Priority Project No. This project will be necessary to connect Calico Sky and Red Rock Estates to Summit Park. Most of this project is expected to be funded and installed by developers. There is no way at this time to determine how much and by whom this project and Priority Project No.2 will provide complete redundancy of water supply and conveyance to said subdivisions. Priority Project No.9 will construct a booster station, storage tank and upgrade thegenerator at Well No.5. The system currently only has a single emergency generatorlocated at Well No.5. This is simply inadequate. Ultimately, emergency generationequipment should be provided system wide to meet at least summertime average daily flows. Contained within these priority projects is a generator at the central wellhouse, agenerator on the east side of the tracks at future Well No., generator improvements tobe made at Well No.5 and a generator to be included in the future lona Road well on the north side of the railroad tracks (Priority Project No. 2). These planned generators willdeliver water during power outages and meet summertime average daily flows. 02196 Falls Water/ Ammon! Dcon/ Regional Water Planning Study August 2004 Schiess and Associates Booster Pump Station and Storage Tank at Well #5 Item No. Item Unit Quantity Unit Cost Total CostPump & motor control lump sum 000 000adjustments on existing turbine pump to pump into a tank Building piping & site piping lump sum $50 000 $50 000including flowmeter, valves fittings, pump to waste, etc. 500 000 gallon water storage lump sum $321 200 $321 200tank Expand well building to provide square feet 500 $100 $50 000room for new booster pumps Electrical improvements to lump sum $5,400 $5,400comply with codes Chlorination system lump sum $40 000 $40 000Booster pumps & controls ((2)lump sum $25 000 $25 00060 hp) wNFD' Replace emergency generator lump sum $80 000 $80 000with a 300 KW generator equipped with an auto transfer switch & new fuel tank Fencing lineal foot 500 $15 500Total estimated probable construction cost $587 100Engineering, administration, legal, & financing ~ 25% of construction $146,800Total Estimated Probable Project Cost $733,900Table 7-9. Priority Project No. Priority Project No.1 0 consists of replacing all pipes in Fallsbrook that are upwards of 40 to 55 years old. This pipe is on the west side of Fallsbrook and on Monte Vista. This pipe, as described earlier in the report, should be replaced due to the pressure of known lead laden service connections and age. Most waterline leaks repaired by Falls Watermaintenance staff occur here. The meter work to be done in this area is shown as part ofPriority Project No.4. The water line work needed on Monte Vista is part of Priority Project No.5. The project breakdown and costs for this project are shown on Table 7- 10. 02196 Falls Water/ Ammon! Ucon/ Regional Water Planning Study August 2004 Schiess and Associates Replace 50 Year Old Pipes on West Side of Fallsbrook Item No. Item Unit Quantity Unit Cost Total CostNew 8" water pipe lineal foot 2940 $25 $73 500New 6" water pipe lineal foot 5200 $23 $119 600New hYdrants per each 500 $17 500New tees, crosses, elbows per each 000 $15 000New valves per each 200 $25 200Connection to existing system per each 000 $24 000Replace service lines to property lineal foot 6000 $16 $96 000line/future meter box Traffic control lump sum $10 000 $10 000Concrete flatwork square yard 200 $35 000Asphalt street repair lineal foot 1200 $25 $30 000Total estimated probable construction cost $417 800Total rounded to the nearest hundred $417 800Engineering, administration , legal, & financing (Q2 25% of construction $104 500Total Estimated Probable Project Cost I $522 300Table 7-10. Priority Project No. 10 It is fortunate that part of the old pipe in the system is on Monte Vista , which wasselected to be upsized as part of the plan to convert the Central Wellhouse to a central booster pump station and storage tame It is also fortunate that Greenwillow and CrimsonDrive in Cloverdale are the oldest lines in Cloverdale. These lines have also been identified for upsizing as part of Priority Project No. Priority Project No. 11 consists of extending a line from the north end of the cornerstone community south to connect to the existing lO-inch line in Ammon Road that terminatesin the area of Lawndale to the west and Fallsbrook to the east and construction of a 12- inch line from Well No.5 underneath the railroad going north to the east entrance into Summit Park. The scope and costs for this project are given on Table 7-11. Ammon Road Waterline Connectors Item No.Item Unit Quantity Unit Cost Total CostNew 12" water pipe lineal foot 1430 $30 $42 900New 10" water pipe lineal foot 2410 $28 $67 480New 6" water pipe lineal foot 230 $23 290New hydrants per each 500 $20 000New tees, crosses, elbows per each 200 600New valves per each 300 $11 700Connection to existing system per each 000 $14 000Traffic control lump sum $10 000 $10 000Asphalt street repair lineal foot 1500 $25 $37 500Total estimated probable construction cost $175,570Total rounded to the nearest hundred $175 600Engineering, administration, legal, & financing (Q2 25% of construction $43 900Total Estimated Probable Project Cost I $219 500Table 7-11. Priority Project No. 11 02196 Falls Water/ Ammon! Dcon/ Regional Water Planning Study August 2004 Schiess and Associates The latter water line should be constructed as soon as possible to provide a redundant means of conveyance into Summit Park. Otherwise , Summit Park remains at risk if thesingle conveyance line is ever broken and shut down for repairs. The 10- inch linebetween Cornerstone and Lawndale should be installed to eliminate multiple dead ends provide looping in the area and provide a large conveyance line to transport water back and forth from the wells in the system in the north or the wells in the system to the south in the event that wells typically used to maintain pressure go out of service for maintenance. Priority Project No. 12 consists of a connector line along Crowley Road that would connect future Well No.9 to the areas predominantly served by future Well No. 11 andthe central wellhouse and provide a means of conveyance from well to well in the event that one well was down for service and the other relied upon for supply. The scope and cost of this project is shown on Table 7-12. Crowley Road Waterline Connector Item No.Item Unit Quantity Unit Cost Total CostNew 12" water pipe lineal foot 4325 $30 $129 750New hydrants per each 500 $20 000New 12" tees, crosses, elbows per each 200 000New valves per each 400 $12 600Connection to existing system per each 000 $10 000Traffic control lump sum $10 000 $10 000Asphalt street repair lineal foot 1000 $25 $25 000Total estimated probable construction cost $213 350Total rounded to the nearest hundred $213 400Engineering, administration, legal, & financing (W 25% of construction $53 300Total Estimated Probable Project Cost $266,700Table 7-12. Priority Project No. Priority Projects No s 13 and 14 are for new wells, one in the southeast corner of thesystem and one on Lincoln Road centrally located in the system to meet demand required by projected future development nearby. The locations were selected based on where development is projected to occur. We expect that the construction of these wells will be developer driven and paid for. It is the intention of Falls Water to obtain cash contributions from the developer , then manageconstruction of the wells themselves in order to assure the well construction meets all master planning criteria. 02196 Falls Water/ Ammon! Ucon/ Regional Water Planning Study August 2004 Schiess and Associates Crowley/Centennial Ranch Well (Future Falls Water Well #11, Storage Tank & Booster Station) Item No.Item Unit Quantity Unit Cost Total CostNew well, 16" dia. Casing,lump sum $125 000 $125 000approximately 350 feet deep Building piping & site piping lump sum $50 000 $50 000including flowmeter, valves fittings, pump to waste, etc. Water storage tank, assume lump sum $321 200 $321 200500000 gallons Well/booster pump building square feet 1120 $100 $112 000Pumps & controls including 50 lump sum $49 200 $49 200hp well pump & (2) 60 hp booster pumps wNFD' Chlorination system lump sum $50 000 $50 000Fencinglineal foot 500 $15 500Total estimated probable construction cost $714 900Engineering, administration , legal, & financing (Q2 25% of construction $178 700Total Estimated Prob~ble Project Cost $893 600Table 7-13. Priority Project No. Lincoln Road Well Near Fall Creek (Future Falls Water Well #12,Storage Tank & Booster Station) Item No.Item Unit Quantity Unit Cost Total CostNew well, 16" dia. Casing,lump sum $125 000 $125 000approximately 350 feet deep Building piping & site piping lump sum $50 000 $50 000including fJowmeter, valves fittinQs, pump to waste, etc. Water storage tank, assume lump sum $321 200 $321 200500000 gallons Well/booster pump building square feet 1120 $100 $112 000Pumps & controls including 50 lump sum $49 200 $49 200hp well pump & (2) 60 hp booster pumps wNFD' Chlorination system lump sum $50 000 $50 000Fencinglineal foot 500 $15 500Total estimated probable construction cost $714 900Engineering, administration, legal, & financing (Q2 25% of construction $178,700Total Estimated Probable Project Cost $893,600Table 7-14. Priority Project No. 14 The projects required due to additional and future development are Projects 2 and 12 through 14. Those necessary in the near future consist of Projects No.1 through 11.Priority Project No.1 will be completed in 2004. Priority Projects No.2 through 11amount to a total of $8,478 200. Future Projects No. 12 through 14 amount to a total of053900. Included in the project amounts are expected engineering, administration legal, and financing costs. The costs for new water rights are not included. A summary 02196 Falls Water/ Ammon! Dcan! Regional 91 August 2004Water Planning Study Schiess and Associates of all projects are provided on Table 7-15. The total estimated cost of all identifiedprojects is $10 809 000. Priority Project EstimatedNo.Project Name CostLincoln Road Waterline Extension $239,400Future John Adams Parkway Waterline Extension lona Road Well (Future Falls Water Well #10, Storage Tank $1,487 300& Booster Station) Cfoverdale Well (Falls Water Company Well #9, Storage 018 600Tank & Booster Station) Water Meters for Fallsbrook and other Unmetered Services $803 900and Replace Manv Old Meters with New Greenwillow Lane and Crimson Drive Waterline Upsize $726 100Monte Vista Ave. Waterline Upsize First Street Waterline Connector Central Well House Storace Tank & Booster Station 182 500General Water Svstem Imorovements $447 800lona Road Waterline Connector $336 300Booster Pumo Station and Storace Tank at Well #5 $733 900Replace 50 Year Old Pipes on West Side of Fallsbrook $522 300Ammon Road Waterline Connectors $219 500Crowlev Road Waterline Connector $266 700Crowley/Centennial Ranch Well (Future Falls Water Well $893 600#11 , Storace Tank & Booster Station) Lincoln Road Well Near Fall Creek (Future Falls Water Well $893 600#12, Storace Tank & Booster Station) Total Cost of All Caoitallmorovement Projects $10 771 500Table 7-16. Capital Improvement Projects Summary This section of this report identified 14 projects necessary for Falls Water to serve a population of over 17 000 identified as necessary now and to provide adequate supply and distribution capability for the current population. As indicated the first 11 projectsare required to bring the system to a sustainable service level to meet current needs and to be on par with their neighbors of equivalent size. Projects 12 - 14 will be required asdevelopment continues to enlarge the service area. Implementation of the first 11projects will ensure that Falls Water Company meets current demands , has adequatestorage and adequate back-up generating power to meet current pressure and flow requirements throughout the system. We recommend that Falls Water pursue theseprojects immediately. Operation and Maintenance Costs Implementation of the capital improvement projects proposed and required immediately to increase the level of service and reliability and redundancy of the system should have little effect on operations and maintenance. It is expected that fully metering Fallsbrookwill save the Company thousands of dollars of pumping costs each year. Additional labor savings will be generated by having a fully metered system with touch-read technology. Upon completion of Priority Projects 6 and 9, the practice of wasting water 02196 Falls Water/ Ammon! Ucon! Regional 92 August 2004Water Planning Study Schiess and Associates at the Central Wellhouse, Well #5, Well #1 and Well #8 will be discontinued and save on O&M between $1000 to $2000 every year in pumping costs. With the use of VFDs andwith an improved and upgraded telemetry and SCADA system the pumping systems will effectively run themselves without wasting any water. The new pumping systems could operate at improved efficiencies if fitted with high efficiency motors. Due to the long term nature of the investment, high efficiency motors should probably be warranted.These projects should simplify pump operations and maintenance even though more water will be pumped than in past years due to growth. A daily visit at each wellhouse or booster station should always be made. Salvage Value Approximately one half of the horsepower is necessary for a well pump pumping to a tank versus a well pump that pumps directly to a distribution system at system pressure. At the central wellhouse all of the existing well pumps and motors should be salvageable. In keeping with the design of the new system that will allow maintenance of the existing wells and deepening of the existing wells if it ever becomes necessary, our opinion is that conversion to submersible motors is better. The submersible motor on Pump 6 or 7 may be able to remain in service, although the pump will require bowl modifications to remainefficient. The remaining existing pumps and motors should be salvaged out. In the caseof well #5, the well is already enclosed within a building and should remain. The well pump and motor should continue to be usable. The pump will need to be modified by reducing the number of bowls so that the pump pumps directly to the tank efficiently. Little else was identified as salvageable except for that noted above and the generator at Well #5. Implementability The implementability of the proposed capital improvement projects is dependent on the cooperation and endorsement of the Idaho Public Utilities Commission (IPUC), DEQ, the consumers, and the ability to locate a funding mechanism of local developers, acombination of developer funds, grants and loans or strictly loans. It is expected thatsignificant improvements can be made while keeping rates at a reasonable level when compared to neighboring water utilities. The subject of rates will be addressed further inChapter 8. Cost Escalation Factors for Energy Use It is expected that the recommended projects will not increase power consumption or increase demand charges from current conditions. With additional generators in thesystem, some demand changes may be eliminated with the exercising of well and booster pumps with generators during winter months rather than using the electrical power grid for pump exercising. Final Public Input A subsequent hearing was held on at the Idaho Falls electric building on . Representatives from Falls WaterCompany, ECIPDA, DEQ, Schiess & Associates, and the IPUC were present. The 02196 Falls Water/ Ammon! Ucon! Regional Water Planning Study August 2004 Schiess and Associates comments received and recent news articles are included in Appendix S. From this thecustomers felt that: 02196 Falls Water/ Ammon! Ucon! Regional Water Planning Study August 2004 Schiess and Associates FALLS WATER COMPANY SELECTED PLAN AND IMPLEMENTATION Justification and Description of Selected Plan To correct the deficiencies noted in Section 6.1 of this report and in accordance with theimprovement plan endorsed by the IPUC (IPUC, please determine what you canendorse), the consumer, and approved by DEQ (DEQ, please comment), the selected plan for immediate pursuit of improvements includes projects 1-11 of Table 7-15. These areenumerated again in Table 8-1. Priority Project No.1 will be constructed in the latesummer of2004. The rest are included here in the draft stage of this document as if they were all scheduled and completed between 2005 and 2006. Priority Project EstimatedNo.Project Name CostLincoln Road Waterline Extension $239 400Future John Adams Parkway Waterline Extension lona Road Well (Future Falls Water Well #10, Storage Tank $1,487 300& Booster Station) Cloverdale Well (Falls Water Company Well #9, Storage 018 600Tank & Booster Station) Water Meters for Fallsbrook and other Unmetered Services $803 900and Replace Many Old Meters with New Greenwillow Lane and Crimson Drive Waterline Upsize $726 100Monte Vista Ave. Waterline Upsize First Street Waterline Connector Central Well House Storaqe Tank & Booster Station 182 500General Water System Improvements $447 800lona Road Waterline Connector $336 300Booster Pump Station and Storage Tank at Well #5 $733 900Replace 50 Year Old Pipes on West Side of Fallsbrook $522 300Ammon Road Waterline Connectors $219 500Total Cost of Capital Improvement Projects $8,717 600Table 8-1. Capital Improvement Projects Summary It is our opinion that completion of these projects are necessary immediately to adequately meet short term needs and to ensure the long term viability of the system. These projects will aid in getting water supply ahead of existing demand, and to make thebig jump from a non-storage and non-disinfected system to a water system having theseessentials. Falls Water should pursue inclusion of these essentials into the system andshould be allowed to pursue these essentials by regulators. Preliminary Design of Selected Plan All contemplated distribution system improvements are shown on Figure 8-1. Thedistribution improvements are included in Priority Project Nos. 1 , 10 and 11. Theremaining projects on Figure 8-1 provide for storage, supply, and management. The 02196 Falls Water/ Ammon/ Ucon/ Regional Water Planning Study August 2004 Schiess and Associates preliminary design of the work contemplated at the proposed Well No. 9 site, the CentralWell house, Well No., and Well No.5 are shown on the following Figures 8-2 to 8-It is apparent from study of each one of these preliminary plans that the planned improvements will fit on each site with the modifications shown on each site plan. The general location of the proposed tanks and buildings are shown on each figure. In the case of the Central Wellhouse, two lots south ofthe existing well site will have be replatted to be part of the Central Wellhouse site. At Well Site No., it appears thatthe parking for the office may have to be behind the building. The site will include a drive through payment lane. Environmental Impacts of Selected Plan It is expected that since all construction on this project will occur on private properties properties set aside for improvements or in established public streets, that there will belittle to no environmental impacts. ECIPDA will complete all environmental reviews required by the funding agencies associated with project work. Upon completion , we setaside Appendix A.2 for the environmental work and recommend that the environmental documents be added to Appendix Water Rights Due to the deficiency of water rights, each new well drilled will have to have a waterright attached to it. This is expected to be costly (approx. $20 000/cfs) and take aminimum of 6 months. This is one of the first tasks that should be undertaken. As stated earlier in this report, a total of 10.5 cfs should be obtained to serve present needs, and atotal of 25 cfs to meet future needs. Operation and Maintenance Requirements O&M costs for the years 2002 and 2003 are given in the annual reports in Appendix B.2. We used those costs shown as a basis to estimate O&M costs of an improved system after the recommended improvements of Table 8-1 are in place. Table 8-2 gives theestimated O&M costs which total $358 000 per year. 02196 Falls Water/ Ammon! Dcon/ Regional Water Planning Study August 2004 Schiess and Associates ' ! / ) .. . ,. ; ; ; .' ' OJ :t : :t : I ! :t : - - -~ "" " 1 3 -_ . . --: : - - : ~ -- " -- - - - : - : : - - - f/ ! : - - - . CD 2 J .. . . . . ii i ' " ;~ : = : ~ ~ :: : r : I! ) J , I : i I I i i . i ' I: : I . I I i - ,. . . - - . . . . . - - . . - - . -. . . . . . . - - . - . . . . . . - - - . . . . . . - . - . . . . . . . . . - . 45 3 3 9T H N O R T H . " C~ E 1 It ) It) . ' ! t It) . I t ) a:J I') ,. , '! t a: J ,. , '!t It) / , . ; ' -- . ... .. . . .. - .. . - .." .. . . ... ... . . . . . . . - . . - -- - - - . . . - " ' - " l. . -.. . !8 ,- - i '! t '4 . . J o I! ) L( ) 1" 1 ~9 S . " It ) )5 4 !/ ) :7 : 7 5 ";'6'0 ~ - : - : : , o r or '7 . : ; ' -" " " " " " " " ' -. - - - .. . . - . . . . " " " , -. . . . - - ,- . - HO O Z . . . . . . . , , ' -. . . . . . or . " " Sc h i e s s & A s s o c i a t e s EN G I N N E R I N G ' P l A N N I N G ' l A N D S U R V E Y I N G - - .. . . . . . . FA L L S W A T E R R E G I O N A L WA T E R S T U D Y CL O V E R D A L E W E L L -. . . . . 02 1 9 6 WR I ' . . . . . . . , II / A -. . , , -1 M " " "' " . . . . . . .. . . - . . . , .." WE L L S I T E D E r A I L -. . . . B- 2 _- - - - " -- ' - ' .. / '" " ~O 8 60 0 NO T E : UN D E R G R O U N D P I P I N G CO N A G U R A T I O N U N K N O W N . , ~ .. " -1 : ; : ' . . . . . . , " ,- . ' ~ ' .. ~ " -' - - WE L L 1/ 2 SJ ' O PU M P T O W A S T E H Y D R A N T S EX P A N D C E N T R A L WE L L H O U S E . T A N K , AN D B O O S T E R ST A T I O N S I T E .. . . . . . . . . . . . . / CH L O R I N E I N J E C T I O N 1 4 " "" - . . . . . j / . SY S T E M i~ " " CO N T R O L B U I L D I N G T O B E R E M O V E D . .., RE l O C A T E C O N T R O L B U I L D I N G SC A D A C O M P U T E R T O T H E N E W l Y .I RE M O D E L E D O F F I C E A T W E L L N O . 1; S 1 T E UP G R A D E T O EX I S T I N G M O B I L E H O M E S ~ 12 " TO B E R E M O V E D ~ / .1 ;: : s i .. V ) / / EX I S I l N G C E N T R A L WE L L H O U S E T O B E R E M O V E D / ~ / ~ :: b PG R A D E T O 1 4 " ' ' .s - -. . LJ \ C Sc h i e s s & A s s o c i a t e s EN ! O I N N E R I N G 0 P L A N N I N G 0 L A N D SU R V E Y I N G - - .. . . . . . .s - .s - "" ' . .. . . . . , OV A -8 I ' . L J \ C -. . LJ \ C ! " , :.. , ... . . . "' 1 . : : ~" I h o _ o I -. . - - - ;:" ' I ~ " ' t t . ~ . -. . - HO I O Z . . . . . . . , , ' CI C I o - . -. . "'" FA L L S W A T E R R E G l O N A L WA T E R S T U D Y CE N T R A L W E L L H O U S E -. . . . 02 1 9 6 WE l L S I T E D E T A I L -. . . . () ; ' Q9 - ' ., - " , . . _ , . ,.. . . . . . , . . . . . " . . . . . . . . " , - " . . . " . . , . ,. . " . , . ." . 1" 'r. ! ! ' =- - . : : : . . .. au ; ; _" " " _ 0 1 -. . - - - no t b e " ! ' P l o d . . ... . f o r m -. . . . - - 01 _ " - -- - - - . - - - -. . - : i UT I U 1 Y P A Y M E N T I i DR I V E - T H R U ~i: .s : r 0: : : "', Z , .. . . . J :: : : i ..'. i PA R K I N G I N BA C K S I G N ... . . . . . . . . . , ,. . . . . -. . . . " " WIl T . . . . . . . , _o n u. c -o n IV A -- .. . - - . . . "" " '" EX I S T I N G M O B I L E H O M E , " TO B E R E M O D E L E D T O .. . t . . . - . \ . " FA U S W A T E R OF F I C E ~I ) \~ : ' k ~ CI ~ (3 ' c- - . . . ' . . - - " ' - :d : , \ ~ ~ ~ :\ r j , ~'P \, "\~ ~ ' i.. ; : 21 0 I: i ; 1 1.. " ", ' ", . . . . , ~ I r - " ~: = : : : : G :: : : " " i ~\/ , ' . ,0; .\: \ ' ' ~) ) " :c ' ,; , . I ' : i ' "" , , I i ! ' -- , rj, WE L L /1 1 AI R B R E A K A T W A S T E U N E FO R S A N D S E P A R A T O R CO N T I N U E D F U N C T I O N Sc h i e s s & A s s o c i a t e s EN G I N N E R I N G o P L A N N I N G o L A N D S U R V E Y I N G -- - , . . . "- . . . . . - - - '. \ . \, \ \. " ' *" , , r;' ) ,,: :~ ~ ~~ ~ n ~ ~ ~ ' ~I C ' / , )i/ ;: / / " ;~ / / " ' ' / " rj , r j , ... . " / , / "" " " -. - - - (.. , \ ~~ ) . \( ~ : ~ :: " .'\ rj , 0: ' v4 - T E . 1 2 - , N E w , ( M A f N T E N A N C E BU l r 1 I l N G 18 0 0 S . , . " , . "" " " " ", " " . "" , .." . . . " " . . , . . . . " " , . . . -" - " " :) . -. . . r . . . . FA L L S WA T E R R E G I O N A L WA T E R S T U D Y GE N E R A L W A T E R S Y S T E M I M P R O V E M E N T S 02 1 9 6 -. . . . WE L L S I T E D E T A I L 8- 4 -- ' - ' - , _ . . - 1' - - " - ' T- - " - , , - -, - - - - . , - - - - - -" - - - . - . - - - - - - - ,. - - - -- - - - - , - - ' - '- - - . . - . , - _.. - . - - . - - - ' - - , - - ,.. -' " 11 ? ; - / - "" " " ' - - - - - - - - - - - " " ' - - ' - " - " - - - r' - ' -- - - - - - - - - ' -- - " " - - - ~ ':: : 1 '/ ) (/ ) .. - - - .. - . . . =" ' ~ " ' ... _l i t h o _ " , "" " " - - - .. . . . - . . . . . " " " _t h o _ - .. - . . - .- . _1 M 1 J o C 0t I D C I D 1 M IJ o C Sc h i e s s & A s s o c i a t e s EN G I N N E R I N G o P l A N N I N G o l A N D S U R V E Y I N G -- _ ' 1 M -. . . . \/D I r . "" " " HI ' -1 M IJ o C .. . . . . . . _1 M JC I C -- . . - - . . - - . . . - - . . - . . Q: : : .. . J :: J :~ ' \ '; ' \ ,- r - - - I - - ;- - - - - . _ . . ~- - - " - " -. - . - . - . - . - - ' - ' - - - " - . - -. . - . - ' -- - ' -- . - - - - " " - - - . . - - - . -'- - . . . , - ' - . . - ..-... . . . . . . . . . . ... - . . . . . . . - - - - - - . . - - . . - - . . . - - . . , - . . ,._ , .. ! :. - TO D I S T R I B U T I O N 25 0 0 r,- FA L L S W A T E R R E G I O N A L WA T E R S T U D Y WE L L # 5 -. . . . 02 1 9 6 WE L L S I T E D E T A I L 8- 5 Estimated O&M Costs After Upgrade Project is Complete Ite~ Item Est. Cost/vrSalaries & benefits Power & fuel $93 000Administrative supplies $22 000Repairs & maintenance $21 500Professional services $20 000Water quality testing $7 000Special contract services $15 000Transportation expenses $7 500Insurance $4 00010 Training $3 00011 Equipment rental $2 00012 Advertising $3 000 11 Miscellaneous $10.000Total 358 000Table 8-2. Estimated O&M Costs after Projects 1-10 are Completed $ ""Q,OOo Operation and maintenance requirements will exceed present requirements with the maintenance of storage tanks and booster pumps. We expect the annual maintenance costof the storage tanks included in the project plan to be approximately $1500 per year (annualized) for each tank: for cleaning, leak testing, and inspection. Other costs such aspainting will very depending on the type of tanks selected. Pumping costs should remain the same or diminish if Fallsbrook becomes metered. Pumping costs of $1 000 to $2000will also be saved since water will no longer be wasted to control pressure and prevent freeze-up of waste lines. Financing Plan It is expected that the most likely funding source for Falls Water Company will be the state revolving fund (SRF). The State has developed a revolving loan fund that can be utilized to issue loans to Idaho municipalities and other eligible water systems for the construction and design of both water and wastewater facilities. The loan funds are available at a current interest rate of approximately 3.5% for a 20-year period. Inaddition to the interest and principal payments, a borrower must collect over a five-yearperiod, a reserve account amounting to one year annual payment for the loan. Any loanfunding for either water and/or sewer must meet all DEQ loan requirements. In order to receive funds, a borrower must have a need and establish a priority sufficiently high on the state s priority list in order to be eligible to receive a loan from this fund. It is expected that the IPUC (IPUC, please comment) must approve any project to be financed with long term debt and higher customer rates. Falls Water should develop a strategy with the IPUC and DEQ to finance growth and to get the system back to par. According to our discussions with the IPUC and FaIls Water Company, the available conventional mechanisms to fund the various areas of need are shown in the Table 8- (IPUC, please comment.) 02196 Falls Water! Ammon! Dcon/ Regional Water Planning Study 102 August 2004 Schiess and Associates Funding Mechanisms Areas of Need New Customer Surcharges General RateHook-up Fees Need Technical Increasesor Developer Plan and Finance Granted afterwardsFundsPlanCant include one time expensesWells Transmission Lines Treatment Storace Emergency Power MeterNalve/Hydrant Replacement (Maintenance) Distribution Line Replacement (Maintenance) Studies Table 8-3. Internal Funding Mechanisms for Falls Water Company Using the general outline of Table 8-, we reviewed Projects 2 - 11 of Table 8-1 andestimated what portion ofthe projects wilI ultimately be funded by developers and whatportion will likely be funded with general rate increases. The result of this work is givenon Table 8- Priority Estimated EstimatedProject Estimated Developer Falls WaterNo.Project Name Cost Portion Portionlona Road Well (Future Falls Water Well #10 $1,487 300 $400 000 087 300Storace Tank & Booster Station) Cloverdale Well (Falls Water Company Well #9 018 600 $360 000 $658 600Storage Tank & Booster Station) Water Meters for Fallsbrook and other Unmetered $803 900Services, and Replace Many Old Meters with New $803 900Greenwillow Lane and Crimson Drive Waterline $726 100 $726 100Monte Vista Ave. Waterline Upsize First Street Waterline Connector Central Well House StoraQe Tank & Booster Station 182 500 182 500General Water System Improvements $447 800 $447 800lona Road Waterline Connector $336 300 $250 000 $86 300Booster PumD Station and Storage Tank at Well #5 $733 900 $733 900Replace 50 Year Old Pipes on West Side of $522 300 $522 300Ammon Road Waterline Connectors $219 500 $219 500Total Cost of Capital Improvement Projects $8,478,200 $1.010,000 468,200Table 8-4. Summary of Funding Sources for Projects 2- 02196 Falls Water! Ammon! Ucon! RegionalWater Planning Study 103 August 2004 Schiess and Associates The results ofthis table show that developers will fund portions of projects 2 , 3, and 8totaling approximately $1 010 000 and general rate increases will fund the remainder for a total cost of $7,468 200. Rate Analysis To conduct the rate analysis, we used the simple and understandable method of the Equivalent Domestic User (EDU) that was published in CFR Appendix B of the Federal Register dated 9/27/78. Using the average residential use of metered customers as abasis, we calculated each church, commercial and multi-family equivalency. This gave120 equivalent users for this group. The results of this calculation are given in AppendixB.3. Adding to these 1541 metered customers and 619 flat rate residential customers (each one EDU) gives a total of2284 EDU's. It is important to note that this rate doesnot take into account the steady addition of new services (new EDU's) that will occurafter 2005. For the years 2004 and 2005 , 300 EDU's services above the existing 2284EDU's were added to the calculation. These are used in the simple rate calculation Table 8-5. The table shows the calculations for monthly rate to each homeowner and utilizes the general rate increases that will occur as a result of these projects. The total expected cost to be paid as general rate increase for Table 8-4 of$7 468 200 was used in the calculation. Projects 12 - 14 are not included because the need for them will be purely development driven. However, with that said, the booster stations and storagetanks eventually built as portions of Projects 13 and 14 may result in additional rate increases not shown on Table 8- Total probable project capital cost (Projects 2-10) Estimated grant amount SRF Loan amount administered by DEQ $7,468 200 $7,468 200 Estimated annual debt service (3.5% loan over 20 years) Existing estimated annual debt service with project no. Existing other annual debt service Estimated annual O&M costs Total estimated annual costs $525 500 $17 600 $18 900 .$358.000 $920 000 Estimated number of EDU's served at beginning of loan Estimated monthly O&M costs per EDU Estimated monthly loan payments per EDU Estimated monthly debt reserve per EDU required by DEQ Estimated monthly capital improvements reserve per EDU New monthly rate of each EDU after project completion Table 5. Funding Plan and Rate Analysis 2584 $11. $18. $1. $0. $31. For this analysis, it was assumed that there would be no grant to assist with the costs of the project and that the state SRF program administered by DEQ would provide Falls Water a loan. Falls Water will incur a loan with Project No.1 that will have annual debt02196 Falls Water/ Ammon/ Ucon/ Regional 104 August 2004Water Planning Study Schiess and Associates