Loading...
HomeMy WebLinkAbout20060728Application.pdfFALLS WATER COMPANY 1770 Sabin Dr, Idaho Falls, Idaho 83406-6747 Website: www.faliswater.com Tel.: (208) 522-1300 Fax: (208) 522-4099 July 28, 2006 1"..:1r- c:r- Co- )::- c:::c r- c:. "'U 3: ro )::18 ~ ~ ::JC: Cf:K. -, \D en Idaho Public Utilities Commission O. Box 82720 Boise, Idaho 83720-0074 :t=L:S w-o 6 " ATTENTION COMMISSION SECRETARY AND HEAD LEGAL SECRETARY Falls Water Company Inc. requests that the Commission issue an Order approving issuance of these securities on or before August 25 2006. Enclosed with this cover letter is the Company s Application for approval to incur debt of 200 000 through the State Drinking Water Revolving Fund. Also enclosed is our check to the Commission in the amount of $345.00 for payment of the filing fees. Sincerely, K. Scott Bruce General Manager ("') c::: K. Scott Bruce Falls Water Company, Inc. 1770 Sabin Dr. Idaho Falls, ill 83406 Tel. (208) 522-1300 Fax (208) 522-4099 E-mail: scotti ~fallswater.com Representative for Falls Water Company, Inc. RECE\VED 100& JUlZ8 ~M 9: \ 0 IDAHO PUBLIC UTIL\TIES COMMISSION BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION) OFFALLSWATERCOMPANY INc. FOR AUTHORITY TO INCUR DEBT CASE NO. FLS-O6- APPLICATION FALLS WATER COMPANY' INe. (Company or Applicant) is an Idaho Corporation that serves potable water to areas in Bonneville County, Idaho. The Company serves residential and commercial customers within in its service area located north of the City of Ammon and northeast of the City ofIdaho Falls. Application is made to the Commission to authorize Falls Water Company, Inc. to incur debt through the State Drinking Water Revolving Loan Account administered through the Idaho Department of Environrnental Quality (DEQ). Application has been made to DEQ for a loan in the amount of $1 200 000. Terms of the loan will include an annual interest rate of3.25% for a period of twenty (20) years with semiannual payments of interest and principal in the amount of $41 033.67. In addition, the Company will be required to establish within five (5) years of the start of the loan, a reserve account (prepayment) equal to one (1) years payment obligations. Attached Exhibit No.1 shows the loan amortization schedule that will commence after the loan is closed. The loan will not be closed until the project for which the loan is required is completed in approximately one (1) year. The purpose of the loan is to purchase land, construct a new well, well house and purchase the necessary water rights for the well. This new well is necessary to correct low pressure and system capacity deficiencies in the Company s system. Attached Exhibit No.2 is a six (6) page exhibit composed of correspondence from our engineering consultant Schiess & Associates regarding the results of a water model that was run on the water system in 2004. As shown in that exhibit, it is essential that the Company add new water supply capacity to its system. Page 1 of Exhibit No.3 attached to this application is our engineers estimated costs for completing this project. As shown on that exhibit, the total estimated cost exceeds the amount of the DEQ loan request. The Company has been collecting Contributions in Aid of Construction" from land developers. Those contributions will be utilized to fund the remainder of the project costs. Page 2 of Exhibit No.3 is the engineers estimated time-line for completing the project. That schedule shows that the entire project should take approximately one (1) year to complete. Attached Exhibit No.4 is a June 20, 2006 letter from the DEQ Loan Officer with whom the Company has been working regarding this project. That letter, although not a firm commitment, indicates the Company will likely be approved for this loan. Copies of the Company s 2005 Balance Sheet and Income Statement filed with the Commission are attached as Exhibit No. Even though the loan will not be finalized until the project is completed, the Company must have the Commissions approval prior to commencing construction and acquisition of water rights and land. The DEQ will begin funding the project as soon as the Company receives the Commissions approval to incur the debt and when final approval for the loan is received from the DEQ Board. Applicant certifies that a notice regarding this Application will be published in the legal notices section of the Post Register newspaper within seven (7) days of the date this Application is filed with the Commission. Exhibit No.6 is a copy ofthat notice. Falls Water Company Inc. requests that the application be considered by the Commission under the rules of Modified Procedure. Applicant respectfully request expeditious and favorable consideration of this application. Please direct any questions or correspondence regarding this application to the applicant as indicated on page 1. Dated this 28th day of July 2006. Respectfully submitted Falls Water Company Inc. k~~ K. Scott Bruce, General Manager Falls Water Co. Loan Amortization Schedule Beginning Balance $ 1 200 000. Interest Rate 25% Term 20 No. of Pmnts Loan Reserve Toal Payment Pmnt interest Principal Balance Prepay Cash $ 41 ,033.$ 19 500.$ 21 ,533.$ 1 178,466.103.$ 45 137. 033.150.883.156 582.103.137. 033.794.47 239.134 343.103.137. 033.18,433.600.111 742.103.137. 033.065.967.088 775.103.137. 033.692.341.065,434.103.137. 033.313.720.041 713.103.137. 033.927.105.017 607.103.137. 033.536.24,497.993 110.103.137. 033.138.895.968 214.103.137. 033.733.49 300.942 914.49 033. 033.322.711.917 203.033. 41 ,033.904.129.891 074.033. 033.14,479.553.864 520.033. 033.048.46 985.837 535.033. 033.609.27,423.810 111.40 033. 033.164.869.782 242.033. 033.711.43 322.753 919.033. 033.251.782.47 725 137.033. 033.783.48 250.695 887.033. 033.308.725.666 161.033. 033.825.208.635 953.033. 033.334.699.43 605 253.033. 033.835.198.574 055.033. 033.328.40 705.542 350.033. 033.813.220.48 510 129.033. 033.289.744.477 385.033. 033.757.276.444 109.40 033. 033.216.816.410 292.033. 033.667.366.42 375 926.033. 033.108.924.341 001.033. 033.541 .35,492.40 305 508.033. 033.964.069.269,439.033. 033.378.655.232 784.033. 033.782.250.195 533.47 033. 033.177.42 856.157 677.033. 033.562.38,471.42 119 205.033. 41 ,033.937.096.109.033. 033.301.731.377.41 ,033. 033.46 656.377.033.46 Exhibit No. Schiess & Associates ENGINEERING. PLANNING. LAND SURVEYING 7103 SOUTH 45TH WEST, IDAHO FALLS, ID 83402 OFFICE: (208) 522-1244 . FAX: (208) 522-9232 REXBURG, ID OFFICE: (208) 356-6092 . FAX: (208) 356-6468 July 19 2004 Scott Bruce Falls Water Company Inc. 2025 E. First Street Idaho Falls, ill 83401 (208) 522-1300 RE: Acceptable Future Development - Water Model Findings - 04097 Dear Scott Based on our meeting on July 9th, wehave run water models for the current year, 2005 , and 2006. The purpose of these runs was to determine the number and location of acceptable lots which can be added to the Falls Water system. We have based these runs on the model that was developed for the facilities planning study (FPS) as well as recent water connections, locations of unimproved lots, and 8% annual growth as out lined in the FPS. Although demand was added to specific subdivisions, their actual location within an area makes little difference in the model. The subdivisions have been grouped into the following two areas: Subdivision GroupingNorth South Ammon Industrial Centennial Calico Sky Crimson Cornerstone Fairmont Denise Fall Creek Lincoln Industrial Green Oak Summit Park North SprinQs Victor Hanks Stone Arbor Warm Springs The following table shows number oflots added in the model to each area to represent demand in the years indicated. Total Lo Total peak dema North 144 123 South 127 103 ts Added 208 207 225 nd (gpm)630 160 733 352 2003 2004 2005 2006 &h,l- No. fJj i oCto Scott Bruce - Falls Water July 19, 2004 Page 2 When the models were run with the appropriate yearly demands, the following peak pressures (inpsi) were reported: 2004 2005 2006 Calico Sky Caribou Centenf1ial Cloverdale Cornerstone Crimson Falls Brook Henderson Hitt Lawndale Lincoln McDonalds Summit The model was run with the new 12-inch line on Lincoln Road in place. The benefits of this line to help increase supply to North Springs and Caribou Meadows are lessened in part by the strong growth at Summit Park and Calico Sky. Tony Wise of Falls Water indicated that pressures in Caribou Meadows have dropped to only 45 psi in the recent past, instead of 35 as calculated by the model. This difference in pressures is understandable considering the assumptions that were used in preparing the model. The peak for Falls Water was established by finding the highest flow during the summer of2003 which was larger than the average day by a factor of 3.7. The peak factor used in the model was 4.0. The weather for the last few weeks has been cooler and wetter than we usually see this time of year which means that the system has not likely achieved a peak as high as the peak used in the model. If growth occurs at a rate of 8% as reported in the FPS , then by the summer of 2005, pressures will fall below the required level of 40 psi under peak conditions. E)(h;l;-t /JD :; E;J cJ '* Schiess & Associates '" CONSULTING ENGINEERS Scott Bruce - Falls Water July 19, 2004 Page 3 Models were run with future 1 500 gpm wells on Iona Road and Crowley Road. The following peak pressures (in psi) were reported for just one well at Iona Road and for both wells: Calico Sky Carabou Centennial Cloverdale Cornerstone Crimson Falls Brook Henderson Hitt Lawndale Lincoln McDonalds Summit With well on lona2005 2006 With wells on lona and Crowley2005 2006 JI-F- Paul H. Scoresby, PE Chris A. Park fxAt i 11 ))0 :J pg.('& SchIess 8t ~ssoclatesCONSULTING ENGINEERS Schiess & Associates ENGINEERING. PLANNING. LAND SURVEYING 7103 SOUTH 45TH WEST, IDAHO FALLS, ID 83402 OFFICE: (208) 522-1244 . FAX: (208) 522-9232 REXBURG. ID OFFICE: (208) 356-6092 . FAX: (208) 356-6468 June 25 , 2004 Scott Bruce Falls Water Company Inc. 2025 E. First Street Idaho Falls, ID 83401 (208) 522-1300 RE: Calico Sky - Divisions 1 through 7 - Water Model Findings Project No. 04097 Dear Scott As requested, we have updated the water model to include the Calico Sky Subdivision, Divisions 1 through 7 per the attached plan. The water model was run under varying criteria and the minimum pressures in Calico Sky were noted. The fire scenarios were run under peak hour conditions as required by Idaho Rules for Public Drinking Water Standards (IDAP A 58.01.08). The average demand was calculated and evenly distributed to each model node using 50 acres and 1.757 gpm/ac. This average demand was calculated from Falls Water Company s flow records. A peak hour factor of 4 times the average day was used. The minimum Calico Sky pressures are presented in the following table: Average Day Max Day Peak Hour Peak Hour - with 1 000 gpm fire in northwest comer Peak Hour - without well 5 Peak Hour - without Well 5 - with 1 000 gpm fire 83 psi 66 psi 10 psi near 0 psi near 0 psi near 0 psi As this table shows, the existing Falls Water system will not adequately provide water to the proposed Calico Sky additions under peak hour and fire flow conditions when Calico Sky and Summit Park are fully built out. The Calico Sky and Summit Park subdivisions are served primarily by Well #5 which can supply 750 gpm at 80 psi. The combined peak hour demand for Calico and Summit at build out is 1 360 gpm. With the proposed plan, Calico Sky will rely exclusively on one pipe in the southwest comer of the subdivision for all their water supply. If the Calico Sky subdivision is approved, a new well should be constructed in the near future to provide another supply source, preferably on Iona Road. This is also in keeping with the findings of the overall water system study. You will receive a draft copy of this study in approximately two weeks after we receive your comments made from the pre-draft copy. ;; k hlf ).)0 f~ '-I .p Scott Bruce - Falls Water June 25, 2004 Page 2 Future looping should be facilitated by placing an 8-inch line on Azure Drive from Vision Drive to Iona Road. This 8-inch line will decrease head losses and improve pressures. This plan also prepares the system for future tie-in looping to Michelle Street as considered in the previously noted water study for the area. We recommend that a 12-inch line be placed between lots 2 and 3 in Division 1 to tie into the existing 12-inch line coming from Well #5 on Ammon Road. At a minimum, an 8-inch line should be laid from the 12-inch line in the southwest corner to Clear Day Drive and up Ammon Road to Woodside Drive in Summit Park to tie the two subdivisions together. Pipes that are planned to extend to future developments should be extended to the end of the proposed development to facilitate future expansion. Flushing hydrants should be placed on all dead ends (temporary or permanent) and cul-de-sacs. Flush hydrants in dead-ends and cul-de-sacs should be flushed twice each year as per IDAP A 58.01.08. The model was run without the planned 12-inch line north of Calico Sky on Iona Road because the line will not immediately tie into Summit Park. The 12-inch line should be placed to provide.future trunk line looping and to connect to a new well on Iona Road. The Summit Park water model review letter dated May 3, 2004 indicated that the existing Falls Water system will adequately provide water to the Summit Park additions. This conclusion was based on an incorrect assumption in the water model. The model has been corrected and run again to model Summit Park without Calico Sky. The results of this corrected model show that tinder peak hour conditions the water pressure in Summit Park will be 28 psi. This is below the allowed pressure of 40 psi. The system will also not be able to supply water for a 1 000 gpm fire at a minimum 20 psi pressure when combined with peak demands as required by IDAP A 58.01.08. This corrected water model helps explain why the current system cannot provide acceptable pressures under peak hour demand as shown on the table on the previous page. It is also noteworthy to inform you that the latest revision ofIDAPA 58.01.08 modified the water model criteria. The revisions of the past allowed the fire flows to be combined with max day demand. The current revision requires fire flow to be combined with peak hour demand which is significantly higher. The current revision also increased the minimum allowed water pressure at peak hour from 35 psi to 40 psi. These changes force water systems to provide additional well and pump capacities above those required in the past. To enable Calico Sky and the entirety of Summit Park to hookup to your water system, anadditional well should be constructed near Iona Road. The new well was placed in the model in accordance with our study findings. A new well capable of supplying 1 500 gpm (fY 80 psi will support these subdivisions and will produce the following minimum pressures, shown in the table below: Average Day Max Day Peak Hour Peak Hour - with 1 000 gpm fire in northeast corner of Summit Peak Hour - without well 5 Peak Hour - without Well 5 - with 1 000 gpm fire 80 psi 80 psi 61 psi 29 psi 35 psi near 0 psi EJt,klJI AJo fj Scott Bruce - Falls Water June 25, 2004 Page 3 Although a well supplying 1 500 gpm will satisfy the Summit Park and Calico Sky additions future demand in cuITently undeveloped areas nearby will require greater flow. Our water study model for the future scenario was run with a 3 000 gpm supply from the new well location. This increased supply will be possible with a 1 500 gpm well along with a tank and booster pump station. The tank and booster pumps or an additional well, will be required to supply futuredevelopment demand. It is imperative that a new well be planned immediately to supply peak flow and fire flow demands to the Summit Park and Calico Sky subdivisions. In addition, we have learned in the overall water study that your water rights are deficient. Water rights should be obtained for the new well that will serve these subdivisions. Even if Calico Sky is not built right away, a new well should be planned on Iona Road as indicated in the overall water system study. We expect you to return to us the pre-draft copy of chapters 3, and 5-8 ofthe water study by July 2, 2004 so that we can produce a complete draft of chapters 1-8 and submit it to you and DEQ. Weare anxious, as you are, to release the data we have gathered to the regulators so that together we can initiate an improvement plan. Please call if you have any questions. ~/;Z:. Chris A. ParkPaul H. Scoresby, PE Attachment:Calico Sky Subdivision map Water Model Calculations \\Marcia\C\Documents and Settings\marcia\My DocumentsVobs\2002\02l96 Falls Water Facilities Planning Study\CorrespondenceVune 25 2004 Scott Bruce.doc fZk hiLI-)Jd f1 06/15/06 15: 05 FAX 208 356 4544---ECIPDA .i 04: 31p SCHIESS &. ASSOC.(208) 522-82:32 fa! 002p. .. Exhibit B. Engineer Opinion of Probable Project Cost Item No..!!!ml Construction Costs: Unit QuarrtitY Unit Coat Total Cost New well, 20~ dla. Casing, approximately 350 feet lump sum $223,050 5223,050 deep on ftJture booster station and tank site 8uilding piping including flowmeter. valves, air lump sum $25,000 $25,000 relief, transducar. pressure guage.: prelube line. future chlorination injection Dort & visible Dicina Site piping including pipe, valves. fittings, pump to lump sum $15,000 $15,000 waste, hookup to existing system, etc. Well building expandable for a boo$ter pump square feet 720 $160 $115,200 station and chlorination.$6~300 Hp deep WEIll pump, column, VFD & controls lump sum $55 000 Smergency genElrator (sized to also operate future lump sum $135,000 $135,000 booster pump5). transfer switch & diesel tank FencirJa lineal foot 1050 $15 $15 750 Total estimated probable construction cost $584,000 $500 $60,000 $750,000 $60,9.29 $146.000 $10.000 $1,5!;iQ,vOO Project Budaet I DEQ loan $1,200,000 I Local Cash $3.50.000 Total estimated cost $1,550,000 FWC Out of Pocket Costs IDWF\ drilling permit fees . Electrical costs that must be paid directly to Utah !'ower to get power to the site Other utility costs that must be paid to get services to the site Legal services assocIated with.the proJect . Advertisement costs No! Included in Schiess Contract Extansive acquisition assistancQ for water rights or property Extensive PUG coordination such as for trips to BoisEI and etc. FuturEt SCADA hookup starting from e. termination panel 04192 Falls Water Company Well No.9 and Well House Professionai Services Con!i'act ;;'X hi ~il- ;Jo3 13 I tJ Mar 16 06 03: 44p SCH I ESS Be ASSOC.(208) 522 -9232 Funding & Rate Approvals Design Well Bid Well & Award Construct Well Design Well House Bid Well House & Award Construct Well House Project Closeout 04192 Falls Water Company Well No.9 and Well House Exhibit C - Project Schedule ~ ~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ rf .; ~ ':I ~ ~ ~O(; rf. cf~ ~o ' -Q c; , 'f i55 ~'f ~ ~ E:x l"i:J,J JJo flj c9- Professional Services Contract JUN-21-2006 WED 08:37 AM A FAX NO.P. 02 Solse. Idaho 83706'1255 . (208) 373-0502 ---' . --.. ..-.., .-.... ..--.. '---....--... ..-- -_.. ...-.. D;~ Kempthome. Govemor ToFlI Hardesty, Director Scott 'Uce F aIIs . Iter System2025 st J It Street Idaho . aDs. Idaho 83401 This 1 ~ shall serve as a statement ofinteot by the Idaho Department ofEnvironmentaI Quality(Dcp lent) to the Falls Water System (System) to loan the System the sum of approximately2 ,( 00 for COSts reiata! to the construction of a new well. The new wen will be used tosupply d inking water to System custo~ COlTecting low pressure ami system capacitjdeft. lei. The loan approval is contingent upon Priority List approval by the Depat1ment~ s Boord andthe Sy tc m complying with application requirements. Neither of these two qualifications isI :d problematic- Please ' U me with any questions that you might ~ve. I can be reached at (208) 373-0439. Band, cPA ::er :llie Teuscher, DEQ Idaho Falls Regional Office EXhrhf-f Nt' NAME:Falls Water Company, Inc. REVENUE & EXPENSE DETAIL For the Year Ended December 31 2005ACCT #DESCRIPTION 400 REVENUES 460 Unmetered Water Revenue 122 168 461.Metered Sales - Residential 373 867 461.Metered Sales - Commercial , Industrial 884 462 Fire Protection Revenue 464 Other Water Sales Revenue 677 465 Irrigation Sales Revenue 466 Sales for Resale 400 Total Revenue (Add Lines 1 - 7)509 595(also enter result on Page 4, line 1) * DEQ Fees Billed separately to customers Booked to Acct # ** Hookup or Connection Fees Collected 205 300 Booked to Acct 271 *** Commission Approved Surcharges Collected Booked to Acct # 401 OPERATING EXPENSES 601.6 Labor - Operation & Maintenance 100 014 601.Labor - Customer Accounts 7,449 601.Labor - Administrative & General 186 603 Salaries, Officers & Directors 824 604 Employee Pensions & Benefits 13,406 610 Purchased Water 112 615-Purchased Power & Fuel for Power 78,469 618 Chemicals 620.6 Materials & Supplies - Operation & Maint.240 620.8 Materials & Supplies - Administrative & General 861 631-34 Contract Services - Professional 002 635 Contract Services - Water Testing 580 636 Contract Services - Other 518 641-Rentals - Property & Equipment 705 650 Transportation Expense 19,478 656-Insurance 9,468 660 Advertising 2,458 666 Rate Case Expense (Amortization) 667 Regulatory Comm. Exp. (Other except taxes)431 670 Bad Debt Expense 296 675 Miscellaneous 684 Total Operating Expenses (Add lines 12 - 32, also enter on Pg 4, line 2)468 183 Rev 3/02 Page 3 txh;bd 1Jt7 f3 lor Name:Falls Water Company, Inc. INCOME STATEMENT For Year Ended December 31 2005 ACCT #DESCRIPTION Revenue (From Page 3, line 8)509 595 Operating Expenses (From Page 3, line 33)468 183 403 Depreciation Expense 293 406 Amortization, Utility Plant Aquisition Adj. 407 Amortization Exp. - Other 408.Regulatory Fees (PUC)320 408.Property Taxes 890 408.Payroll Taxes 408.Other Taxes (list)DEQ Fees 409.1 0 Federal Income Taxes 409.State Income Taxes 410.Provision for Deferred Income Tax - Federal 410.Provision for Deferred Income Tax - State 411 Provision for Deferred Utility Income Tax Credits 412 Investment Tax Credits - Utility Total Expenses from operations before interest (add lines 2-15)519 716 413 Income From Utility Plant Leased to Others 414 Gains (Losses) From Disposition of Utility Plant Net Operating Income (Add lines 1 , 17 & 18 less line 16) 415 Revenues, Merchandizing Jobbing and Contract Work 416 Expenses, Merchandizing, Jobbing & Contracts 419 Interest & Dividend Income 420 Allowance for Funds used During Construction 421 Miscellaneous Non-Utility Income 878 426 Miscellaneous Non-Utility Expense 883 408.Other Taxes, Non-Utility Operations 409-Income Taxes, Non-Utility Operations Net Non-Utility Income (Add lines 20,23 & 24 less lines 21 , & 27) Gross Income (add lines 19 & 28) 427.Interest Exp. on Long-Term Debt 427.Other Interest Charges NET INCOME (Line 29 less lines 30 & 31) (Also Enter on Pg 9, Line 2) (10 121) 996 875 127 252) Rev 3/02 Page 4 EkA, h, !- /J, .s- ;03 -2 Name:Falls Water Company, Inc. BALANCE SHEET For Year Ended December 31 2005 ASSETS Balance Beginning Balance End of Increase ACCT #DESCRIPTION of Year Year (Decrease) 101 Utility Plant in Service (From Pg 5, Line 29)010 734 176,624 165 890 102 Utility Plant Leased to Others 103 Plant Held for Future Use 105 Construction Work in Progress 114 Utility Plant Aquisition Adjustment Subtotal (Add Lines 1 - 5)010 734 176 624 165 890 108.Accumulated Depreciation (From Pg 6, Line 26)362 798 419,035 237 108.Accum. Depr. - Utility Plant Lease to Others 108.Accum. Depr. - Property Held for Future Use 110.Accum. Amort. - Utility Plant in Service 110.Accum. Amort. - Utility Plant Lease to Others 115 Accumulated Amortization - Aquisition Adj. Net Utility Plant (Line 6 less lines 7 - 12)647 936 757 588 109 652 123 Investment in Subsidiaries 125 Other Investments Total Investments (Add lines 14 & 15) 131 Cash 126,484 271 019 144 535 135 Short Term Investments 141 Accts/Notes Receivable - Customers 629 60,409 780 142 Other Receivables 58,187 187 145 Receivables from Associated Companies 151 Materials & Supplies Inventory 162 Prepaid Expenses 876 876 173 Un billed (Accrued) Utility Revenue 143 Provision for Uncollectable Accounts 300 300 Total Current (Add lines 17 -24 less line 25)165 813 390 192 224 379 181 Unamortized Debt Discount & Expense 183 Preliminary Survey & Investigation Charges 184 Deferred Rate Case Expenses 186 Other Deferred Charges Total Assets (Add lines 13, 16 & 26 - 30)813 749 147 780 334 031 Rev 3/02 E:. -X-h I ~ j '.f .5- ?8 3 ~ '-I Page 7 Name:Falls Water Company, Inc. BALANCE SHEET LIABILITIES & CAPITAL For Year Ended December 31 , 2005 Balance Beginning Balance End of Increase ACCT #DESCRIPTION of Year Year (Decrease) 201-Common Stock 25,000 25,000 204-Preferred Stock 207-Miscellaneous Capital Accounts 214 Appropriated Retained Earnings 215 Unappropriated Retained Earnings 114,717 100 167 (14 550) 216 Reacquired Capital Stock 218 Proprietary Capital Total Equity Capital (Add Lines 1-5+7 less line 6)139,717 125 167 (14 550) 221-Bonds 223 Advances from Associated Companies 115 966 105 378 (10 588) 224 Other Long - Term Debt 232 259 363 182 131 231 Accounts Payable 979 235 (19 744) 232 Notes Payable 233,159 573 (205 586) 233 Accounts Payable - Associated Companies 951 674 723 235 Customer Deposits (Refundable) 236.Accrued Other Taxes Payable 236.Accrued Income Taxes Payable 054 024) 236.Accrued Taxes - Non-Utility 237-40 Accrued Debt, Interest & Dividends Payable 241 Misc. Current & Accrued Liabilities 251 Unamortized Debt Premium 252 Advances for Construction 253 Other Deferred Liabilities 255.Accumulated Investment Tax Credits - Utility 255.Accum. Investment Tax Credits - Non-Utility 261-Operating Reserves 271 Contributions in Aid of Construction 208 875 622,491 413 616 272 Accum. Amort. of Contrib. in Aid of Const. **827)(19 131)(13 304) 281-Accumulated Deferred Income Taxes Total Liabilities (Add lines 9 - 29 674 389 022 612 348 223 TOTAL LlAB & CAPITAL (Add lines 8 & 30)814 106 147 779 333 673 Rev 3/02 ** Only if Commission Approved Page 8 r: b/I- ;Vofj l' uP LEGAL NOTICE Falls Water Company Inc. filed an application with the Idaho Public Utilities Commission (PUC) on July 28th 2006 for authorization to incur debt. The Company is seeking authorization to borrow $1 200 000 from the State Drinking Water Revolving Fund administered through the Idaho Department of Environrnental Quality. The purpose of the loan is to provide funds to acquire land and water rights and construct a new well to meet the demands of the Company s water customers. A copy of the Application is available for inspection at the Idaho Public Utilities Commission, 472 W. Washington St., Boise, Idaho and at the Company s office at 1770 Sabin Dr., Idaho Falls, Idaho. The Application is also available on-line at the PUC web site www.puc.idaho.gov Comments regarding this application should be mailed to the Company and to the PUC at P.O. Box 83720, Boise, Idaho 83720-0074. Comments can also be submitted on the PUC website. Exhibit No.