HomeMy WebLinkAbout20050825Application.pdfMolly O'leary
Richardson & O'leary, P.LC.
O. Box 7218
Boise, ID 83707
Tel: 208-938-7900
Fax: 208-938-7904
Molly~richard sonandoleary. com
Idaho State Bar No. 4996
::ECE\\fED fJj
;L,E:D
?\'ws ,ilt tf; Pit1 4: L..IU" ",~,
f\ f; JBLiC
.' i "
\ L
'" "
v ,
" ,..,; ';~'~' '
t A~~J":IIL!ilt.) ",unCi ') lUj~
Attorneys for Eagle Water Company, Inc.
BEFORE THE
IDAHO PUBLIC UTiliTIES COMMISSION
IN THE MATTER OF THE INVESTIGATION)
OF lOW WATER PRESSURE IN A PORTION OF EAGLE WATER
COMPANY'S SERVICE AREA
CASE NO. EAG-05-;K elL
EAGLE WATER COMPANY, INC.
APPLICATION FOR AN
EMERGENCY SURCHARGE
COMES NOW, Eagle Water Company, Inc. ("Eagle Water" or "the Company
and hereby requests that the Idaho Public Utilities Commission ("the Commission
issue an order granting an emergency surcharge to cover certain necessary expenses
already incurred and expenses it proposes to incur for improvements to its water system
to alleviate pressure problems in the Eagle Springs Estates subdivision ("Eagle
Springs ) area of its system. These expenses are proper expenses to be duly
recovered from its ratepayers.
EAGLE WATER COMPANY, INC.
APPLICATION FOR EMERGENCY SURCHARGE
Eagle Water s request is based on the following:
As the Commission knows , Eagle Water customers in the highest
elevation of Eagle Springs experienced low water pressure problems in late July of this
year.
Eagle Water worked to alleviate the low water pressure problem by
replacing the eight-inch mainline that was connected to the booster pump serving Eagle
Springs with a 12-inch mainline. (The eight-inch mainline was installed last summer as
a temporary solution to the undermining of the 12-inch line that had been serving the
booster pump by the operator of the adjacent gravel pit.) The new 12-inch mainline was
fully operational as of August 5, 2005. The 12-inch line could not be replaced earlier
because the gravel operator was still mining gravel from that area. See Exhibit
attached.
The cost of replacing the eight-inch mainline with a 12-inch mainline was
$40,027.00 dollars. See Exhibit , attached.
The replacement of the eight-inch mainline has addressed the immediate
low water pressure problems in Eagle Springs. Nevertheless, the potential for
occasional drops in water pressure remains, especially in light of the continued wasting
of water that has been observed in Eagle Springs , despite water conservation
suggestions from Eagle Water. See Exhibit , attached.
Eagle Water engineer, James M. Rees, P., MTC, Inc., has identified
additional measures that may further alleviate water pressure problems in the Eagle
EAGLE WATER COMPANY, INC. - 2
APPLICATION FOR EMERGENCY SURCHARGE
Springs area. Those measures can be summed up as follows: (1) increase the power
of the current Booster Pump from 60 horse power (HP) to 75HP or 100 HP ("Option 1 "
(2) add an additional booster pump station under Big Springs Street at the 2 700-foot
elevation to ensure the 51 Eagle Water customers at the highest' elevation in Eagle
Springs have 40 pounds per square-inch of pressure ("PSI") consistently at the meter
regardless of the water wasting by their lower elevation neighbors and the homeowners
association. ("Option 2"); or (3) add a new well to the Eagle Water system ("Option 3).
The estimated cost of Option 1 is $87 075.00. Mr. Rees estimates that it
would take a minimum of 38 days with a three-man crew to fully implement Option
however it would take an additional two weeks to complete engineering design before
work could begin. This would put the solution well past the current irrigation season.
See Exhibit , attached. The estimated cost of Option 2 is $81 607., or $1 600.
per affected service. Similar to Option 1 , this option would take approximately six
weeks to fully implement, well past the current irrigation season. Id.
In order to develop a long-term solution for pressure problems in the Eagle
Springs area, as well as develop a long-term plan for its overall system, the
Commission has ordered Eagle Water to produce an engineering report for its entire
system. The estimated cost of this report is $79 894.75. See Exhibit 4.
In analyzing the relative cost-benefit of Option 1 or Option 2, Mr. Rees has
concluded that the addition of a new well on the Eagle Water system (Option 3) would
be a more cost-effective and , therefore, more prudent resolution to the Eagle Springs
water pressure problems. See Exhibit 4.
EAGLE WATER COMPANY, INC. - 3
APPLICATION FOR EMERGENCY SURCHARGE
The east portion of the Company s water system includes all customers
located east of Old Highway 55 and North of Hill Road.Based on a lot count, there
are approximately 275 customers in this area, which includes Eagle Springs.
10.On August 15, 2004, Eagle Water pumped 4 763 000 gallons of water to
meet customer demand. On July 17, 2005, Eagle Water pumped 5,156 000 gallons to
meet customer demand. The Eagle Springs subdivision accounts for 13 percent (130/0)
of Eagle Water s peak demand for 2004 and 2005, even though it only represents 9
percent (90/0) of its overall customers.
11.Based on DEQ criteria for estimating system demand for metered public
water systems, the peak demand anticipated for the Eagle Springs area is
approximately 2 000 gallons per minute (gpm). In addition to normal peak demands
fire flow requirements for public safety are 1 500 gpm. Thus, under a worst-case
scenario, peak hour demand could exceed 3,500 gpm. See Exhibit 4.
12.Eagle Water Company has four fully operating wells in its system (Well
Nos. 1 , 2, 4 & 6). Well No.3 is only used as a back-up supply source due to problems
with sand. Well No.5 has never been developed.
13.Based on the maximum pumping rates of Eagle Water s current system
wells (Well No.1 - 600 gpm; Well No.2 - 400 gpm; Well. No.4 - 2 000 gpm; Well No.
- 2 000 gpm), the maximum the existing wells can supply is 7 , 138 000 gallons. Thus, if
either Well No.4 or Well No.6 should temporarily fail , there would not be adequate
quantity or pressure for the system. See Exhibit 4.
EAGLE WATER COMPANY, INC. - 4
APPLICATION FOR EMERGENCY SURCHARGE
14.Eagle Water has a permit from the Idaho Department of Water Resources
to develop this resource. That permit is set to expire on March 1 , 2006. See Exhibit 4.
15.The addition of this well has previously been approved by the Idaho
Department of Environmental Quality ("DEQ") and the Idaho Department of Water
Resources. See Exhibit 4.
16.Due to the fast-paced growth in the Eagle area , well drillers have to be 60
to 90 days in advance. Consequently, Eagle Water needs to execute a drilling contract
for this well in September of 2005.
17.The estim~ted cost for bringing this well online in the Eagle Water system
is $390 305.00. See Exhibit 4.
18.Because Eagle Water is a small company, the cost of preparing and
processing an interim surcharge request will represent a significant extraordinary
expense. Eagle Water estimates that the legal and accounting expenses associated
with implementing the proposed improvements and applying to the Commission for
approval to recover the investments through an interim surcharge will be approximately
250.00. See attached Exhibits 5 and 6.
19.The Company proposes to borrow the necessary funds to cover these
proposed capital investment expenses. The total estimated cost for the expenditures
identified in Exhibits 2 , 5 and 6, as well as the system-wide Engineering Study, and
either Option 1 or Option 2, is $214 246.75. Under the terms of a financing proposal
EAGLE WATER COMPANY, INC. - 5
APPLICATION FOR EMERGENCY SURCHARGE
from Idaho Banking Company, the cost of the loan would be the WSJ Prime plus 2
percent (currently, 8.50/0) spread over three years. See Exhibit , attached.
20.Certified Public Accountant Geneva Trent has calculated the necessary
surcharge to repay the loan identified in Exhibit 7 , as shown in Exhibit 8. Ms. Trent has
prepared draft Revised Tariffs based on this alternative. Those draft Revised Tariffs are
attached hereto as Exhibit 9.
21.The total estimated cost for the expenditures identified in Exhibits 2 , 5 and
, as well as the system-wide Engineering Study and Option 3 is $517 476.75. Based
on the proposed financing terms outlined in Exhibit 7, Ms. Trent has tentatively
calculated the necessary surcharge to cover these costs as shown on the attached
Exhibit 10. Draft Revised Tariffs, reflecting this alternate proposed surcharge are
attached as Exhibit 11.
22.Based on the foregoing, and because the expenses incurred to date and
the proposed expenditures would be in the public interest, Eagle Water requests that
the Commission authorize the expenditures identified in Exhibits 2, 5 and 6, as well as
the proposed expenditure for a system-wide Engineering Study, and the proposed
expenditure for Option 3 as prudent capital investments, the costs of which are proper
expenses to be duly recovered from ratepayers with an Emergency Surcharge.
23.The Company further requests the Commission issue its order approving
the scheduled surcharge shown on the attached Exhibits 10 and as a fair, just and
reasonable method for recovery of its costs associated with the capital investments
referenced above.
EAGLE WATER COMPANY, INC. - 6
APPLICATION FOR EMERGENCY SURCHARGE
24.The Company will maintain a separate balancing account on its books
with all transactions related to this Application flowing through the account on a monthly
basis as transactions occur. None of the expenditures proposed in this Application and
approved by the Commission for recovery will be recorded to the Company s plant
accounts and the Company will not seek to add these costs to its rate base for rate-
making purposes. Quarterly status reports will be provided to the Commission, in
writing, to apprise the Commission of moneys expended, construction progress , and
testing results, if any. Eagle Water proposes to borrow the funds necessary for this
capital investment expenditure. Eagle Water has not, however, obtained a formal
financing proposal from Idaho Banking Company for this expenditure, pending the
Commission s decision.
25.Communications with reference to this request should be sent to the
following:
Molly O'Leary
Richardson & O'Leary, P.LC.
O. Box 7218
Boise, 10 83707
Robert V. DeShazo., Jr., President
Eagle Water Company, Inc.
O. Box 455
Eagle , ID 83616
26.Because the issues presented by this request are limited in scope, Eagle
Water requests that this request be processed without the need for a hearing, under
Commission Rule of Procedure 202 , Modified Procedure.
EAGLE WATER COMPANY, INC. - 7
APPLICATION FOR EMERGENCY SURCHARGE
RESPECTFULLY SUBMITTED this 24th day of August, 2005.
Molly
EAGLE WATER COMPANY, INC. - 8
APPLICATION FOR EMERGENCY SURCHARGE
er Company,
EAGLE WATER COMPANY, INC.
APPLICATION FOR EMERGENCY SURCHARGE
UU! ~41 ~005 11: 22 '3::: 'j 0 2 t. 7 EAGLE WATER CO I PAGE EI5
(208) 939--0242
FAX (208) 9~267
O- BOX -4155
EAGLE. 'DAHO 83&16
August 24 , 2005
Molly,
The 12" could. not be reconnected last year (2004) because they were still
mining gravel frolD that area.
The 8'~ installed in 2004 came off of an existing 8" main line as shown onthe enclosed. drawing.
Any questions or comments ple-ase call me at 939-0242.
Robert DeShazo, Jr.
President
0:=:/' 24 / 2005 11: 22 3::: '3 02 E. 7 EAGLE WATER CO I NC PAGE ~j :::\) (j)~ ~
c:::
ft1
~ CJ
r. 11
(t1
...--------- ..;.------------
0/""
..."" .."...,..."'-""".""""",
L:.,
..,~....,.".---,:."
"__...n_
.........,..""""",~--.".,...~' ----- .
Cop.. \-..1 L...
'-.. ~_w,
"~"-" "..,.;."...,----""'~"-~~"'~"-""~,..,-~"-_._
e, t' \- \ \,1 e:....
---,-'~' ."""',,- ,-..., ~,..""" ' '-"
0/
...,.----
rrt
1ft
Jj\
($)
t:.
ft1
Ii'
" ......,...............--~~"...........'...........
" L
""",',
...:.u,
-"-~--~,
OLD H \v Y -
._.-~''-;'-:,, ;""..."";..,;;,..- ..:';',......~., ':';"";";;~"~~"~"'-""'~-"-- ..
-0'
f1I
.......-...
12 II Llue.
J , ...
:~-........_""~...........-----
... 10"
'" ,....,.. ...- _.,--~..-
~\S""'t.Ga B)) L\U~
~'-"-"-~-"'--'--"'--..&
EAGLE WATER COMPANY, INC.
APPLICATION FOR EMERGENCY SURCHARGE
08/19/2005 08: 24 :3:::'3021:,EAGLE WATER CO INC-,."-'-----.--._--- '.--." H--___'--".'.,.
August 18 2005
Re: Booster Pump
Replacement of 12" Water Main
Labor
Equipment
Materials
Legal
Engineering
Total Due
$ 4.334.
, 7 324.
$ 18 388.
$ 21 511.
$ 40,27.
Any questions or comments please call me at 939-0242.
Robert DeShazo, Jr.
President
F'AI3E 02
(208) 939-0242
FAX (208) 939..0267
O. 8OX 4~5
EAGLE. 'OAHO 83616
MTC INC.
CONSUL TING ENGINEERS, SURVEYORS , AND PLANNERS
707 N. 27TH ST.
Boise, ID 83702-3113
(208) 345-0780 Fax (208) 343-8967
FOR PROFESSIONAL ENGINEERING SERVICES FEDERAL ill No. 82-0398542
ACCOUNT OF :
EAGLE WATER COMPo
O. BOX 455
EAGLE, ID 83616
. JOB NUMBER:
#05-846
AUGUST 18, 2005
JOB # 05-846
12" Line replacement
EAGLE, ID
Meetings with PUC &.DEQ
Inspection of 12" line .
, Preparing for the Study
. Engineer (Jim Rees)
63 Hrs. ~ $85.00/Hr.
Engineer
8 Hrs. ~ $70.00/Hr.
Sr. Engineering Technician
26 Hrs. ~ $45.00/Hr.
Draftsman
14 Hrs. ~ $27.50/Hr.
355.
$ 560.
$ 1 170.
$ 385.
TOTAL DUE 8-18-$7,,470.
EAGLE WATER COMPANY, INC.
APPLICATION FOR EMERGENCY SURCHARGE
1::1;:;/ L":;/ LtlfJ~1 1 to: .3:1 j::: 'j IJ ~ b 7 EAGLE WATER CO INC A(3E H.1, /: ,, '.':.
~a~g3
~,,
O242
' "
FAX (2
9~) ,
9~9'O267
PJQ. aOX455
, "
I; , ,,
, EAGlE'
rHO63616
'" ,
I" 't""
, "" "" '-, ", ,
h~h~-WAflit
M '
, y:"
N \
~ / ' "' ", ": j"
" fanllary.21 -2005 '
I '
" ,. ,, '.. ,,,," ' /;.. ". "' /, '~..' "' , ~, '
, Frank~PasS~UQ
, ,
lO574,Cay'u~
B.oisf(~lda11:o 8371,4" \
" ", ": ", "
I \
" ,
.I '
" \,
:. r:~
: ; ":','" ,;, "',,, ,, "" '".." ,
'il
" ,.. " ,, ', ,, ,, ".. \," ",,
, J)ea.cFraJ1k
" \ , \" '' ':"" ' ",,- , .. ' ; .. '' , " , \'".." , ', '.' "' ',~
r", '
Encl?s~d ate son~e ideas th~i:"nligl~tll~li),,~ith watel:J)r.~SStlre jn ypui ~su~~i:"jsi9J
, , ' -','" ,,,,,
"i'
-: '::" '' '" ':::':' , ,,
The biggest use,of water i~i yoiii~ -subdivisiqn: is: t11~~ coii:ll11on aJ~~~s.
" "" ,~: .'\ '" ': "
: L '" "
' " \" "' "' "" "\,,::\.'~' ,,' '.,," "
\" lristall~ddl? $yst~nlS ~1~"isra\1~~Hl~iid"othef areas,ih'~tjt'.c~l ;ld:~!e u e~f;
'" ..'" , \...~"",, " ".. ", ,,.. " "' , ," '" '
"., r
. """ "
Check. al1."sprihkler h~ads to insuJ,~e th~y' arethe: right gauge"and ~i,
, : '" ,'\ .. ,,'-' '' "" ': '" ::: "; :;'" ""~~""
\IV
,/,,~ "~,,::
Dul~ing th~ irrigation seasoil~:,checkfbrby,e,r:. ~,,~teJ ing ,ili. sol!i~J\r~as
, ", "" ,.. ", ", \"" ,
f ~
'" "" ", ,
'f:
" "" "::,,\~,,::'"-", "::,,
Most.hiiportantly se(:colillJion~~Hrea.$pl-iulder tiiJl~i's ";to"watcl- behye"CIl ~:OO"ani
, ", '
to:"9:00 ~9:30 "rtIU; ~ij:"tben~~i;~:~t.~~qu~~te iJr~$s'~i:e h~,tJ)~ ,sys'iei~l.
" ," \'" "" '. ",,:" , "" ':(,;, "., , ~ ,," ", :. /' \." ::.., "" "" ,:;:',,'\.. "'~, ,., ;
Wh~ri cuttipg lawl1"lt~ave the'g;r~l~s cliprjli~gs of Jnli~ph 6':t1l~:tp build h~lifus,tC?,re~Nn 111o,st~.e:'
, "" ,,, \.... '" ," "" ",, ~." ", '" ," ",' ", "" "'/" ( ",:,
" Do" annual ~')ll1ggiJ)~foflawns a.pd,~"oqHl1o.tl,,~reas.
\ "" ,:: "" ' "" ", , ' ," ,:" ," '':""
,, c
~:::,.. ", ', .."' ,,
" " 1"in4 a)andscap~r to work::,~iql yotlr'a~sociati~n,~ii id~~~:~9 impr~ve;~" ~nd col1.serve~your,
: ..,\ '" "
Water needs:"
, '\, ,~" "" "~ "
" t..I'" "-
,, ,' ".."" ,, ,,' '\., ",, "" "'.., ", ', '" ':-", ' "
r" ,
' - ' ", ~, ~' -" ': ' ," ' ." \ . ", ' "\' .
' 1 ' " ,
'" , . ,, "... .. , '.. ,, . ,,(" "'.' " "
' J
" "" "' "; , "" , ""' . "" "
I..
~ ,~ ' ", " " , "", ' ', ', "!, '" "" \ ", "~ :", '' ," ', ," ," , , "..", " ': ",, '.. , ,,- ,- ':, , ,,' '; ,, , .., , " '' ,' ,','" "" '" ""
" J
" ..
.' i'
' , ~:.'
r-."
; ,: ,...." ", .,
7 ,
", ,.. ,, ' '; ," ~ .'~', "
'1--"
" ,, ") "
r \
, "
, l
':-\~''..' ~', "...,, , , ,:\:
, ':0
.. '" ':.., ', ,,.., , '
lZppert I)eShaz;~ Jr.
, Presi9"el~,t'
,,'..,"..\ '
;Y"
, ,
i' '
:,,' ," '
f' ..
I., ..
, ",
t:~,
" .', '., ,,, '\ '....: ', ,," , '",,, ,, ", ,, ,, ~ ": ".! "' \:~'.."'" ", "
If' '
, '
1 :'
.. :.. ". '....,,, ~,. ~::'?, ~"
08/23/2005 15: 35 j:::'
j02f. 7 EAGLE WATER CO I AI3E 11
January 21
:/
2005
Dear Frank
I aut" dealing with Idaho Rural Water R,esource and the Department of
Environmental Quality to get you SOlne :Hiers for you and your subdivision.
I aO1 trying to have them fOT you on Monday before your l-Io\TIeowner
' &
lneet111g.
Thank you
TOln Gilbe
~.
~ /1
At-t
",...,\ j .::~_
08/23/2005 1 1:.: 35 '33'3021:. 7 EAGLE WATER CO I NC PAGE 12
(208) 939-D242
FAX (208) 939-D267
O. BOX 455
EAGLE. IDAHO 83616
Eit
Exhibit 2
Someb.1ne in nlid February of this year, Frank Passaro called llJC about the
Eagle Springs Sttbdivision water system. He and I talked about son1e ideas
that I had .about conserving water usage in this subdivision.
I wrote these ideas down and sent them to Frank Passaro on February 21
2005 for their 'Homeowners llleeting,
. '. .
, Tom Gilbelt, an Eagl~ Water Co. Inc. etnployee als'o ~ent a letter on
February 21 2005 to Frank Passaro .about some jnformationhe wasobtaining.
Enclosed you will find these letters.
Robert DeShazo ' Jr.
President
. August 23, 2005
08/24/2005 11: 22 3::: '302E, 7 EAGLE WATER CO I NC F'A(;iE E14
(208) 939-02-42
FAX (208) Q3~267
O, BOX 455
EAGle. IDAHO 83616
I ~ Tom Gilbert, an employee of Eagle Water Co., Inc., an
Operations Assistant, have gotten up before 5 a.m. many
times to observe common area usage around our water
system, and asked customers not to' use common areas
during 5 a.m. to 9 a.m. for several years. This summer the
community has cooperated a lot more than in the past.
Wh.en I go to the Eagle Springs Subdivision this year, thete
have been times that they were still watering during the off
periods.
Respectfully,
d/J-
Tom Gilbert
Operations Assistant
August 24, 2005
EAGLE WATER COMPANY, INC.
APPLICATION FOR EMERGENCY SURCHARGE
MYC, INC.
CONSULTING ENGINEE RS, SURVEYORS, AND PLANNERS
707 N. 27TH ST. BOISE, IDAHO 83702-3113 (208) 345-0780 FAX (208) 343-8967
August 24, 2005
Molly O'Leary
Richardson & O'Leary PLLC
515 N. 27th Street
Boise, ID 83702
Re: Eagle Water Company: Pressure
Dear Molly;
The initial pressure loss in the Eagle Springs Subdivision occurred last summer when the
I operator of the gravel pit between Old Horseshoe Bend Road and New Highway 55
removed the 12-inch C-900 water main. This was without adequate notice to the Eagle
Water Company. An 8-inchline was installed last summer to provide emergency service
to the area. The original 12-inch line was the feeder to a 60 HP booster pump that serves
the Eagle Springs and Brenson subdivisions. The 8-inch temporary line did not supply
enough water to the booster pump for the amount of irrigation the Eagle Springs and
Brenson homeowners and Eagle Springs Homeowners Association, Inc. were using
during the peak of the 2005 irrigation season. This resulted in a pressure below 40 psi
(pounds per square inch) in the main lines serving above elevation 2 700 in Eagle
Springs.
The 12-inch line has now been reinstalled and the pressure. has increased. If the
excessive irrigation demand is reduced and the peak demand is spread over a longer time
period, pursuant to the Commission s directive to Eagle Springs customers, then the
pressure should be above the required minimum.
The 12-inch pipe installation, however, is only a short term fix. Consequently, the Idaho
Department of Environmental Quality ("DEQ") has requested assurance from Eagle
Water that water pressure in the Eagle Springs area would not drop below 20 psi at the
I meter. _As a result, we have looked at alternate methods .to ensure pressure would remain
above the required DEQ minimums. Those options are discussed below.
OPTION
The first option we evaluated was changing out the existing booster pump from the
current 60 H.P. to a 100 H.P. pump with enough pressure to maintain a pressure of 40 psi
at 9658 Big Springs (the highest residential service elevation in Eagle Springs). During
the hi gh d em an d-time,this-W0111d-inGfeaS e-the-pf0sS11fe-at-th e-pllmp-en-th e-di-s G hafge-sid
from the existing 90-plus psi to the 120-125 psi range. The increased pressure would be
even worse in normal demand times. To do this it would require Pressure Reducing
Valves ("PRVs ) to be installed on 141 homes on the lower side of the system serving
Brenson Subdivision. In addition, a new meter box would be required for every two of
the 141 homes and 5 Common Areas to accommodate the PR V s.
T-he meter at each home would have to be moved onto the property and the new meter
box installed with thePRV. This reconstruction will require repair of the lawns and
sidewalks at each home.
The construction cost for Option 1 is estimated to be:
Pump
Material
Labor
25% profit
Miss.! 0%
500.
000.
000.
125.
450.
TOT AL $ 87,,075.
This cost is approximately $364.00 per house. This station would have to be designed by
a professional Engineer, approved by DEQ, and constructed. The estimated time frame
for the construction would be 38 days for a 3 man crew with equipment of a backhoe and
truck. Including the time needed for engineering design and DEQ approval time, this
option would take six (6) weeks at a minimum, well past the current irrigation season.
OPTION 2
We also evaluated adding another booster pump to serve the 51 highest elevation
customers in Eagle Springs. The cost estimate and details are as follows.
To be sure there is 40 psi in the mainline serving the highest home in Eagle Springs, a
booster station would be required in Big Springs Street at approximately elevation 2700.
I This booster facility would have two pumps in accordance with DEQ requirements
unless a waiver could be obtained. If a waiver could be obtained this price could besignificantly reduced.
Again this station would have to be designed by a professional Engineer, approved by
DEQ, and constructed... This would take approximately six (6) week at a minimum, once
again putting the solution well past the current irrigation season.
An estimated cost for this duplex-pump booster station would be as follows:
2 Pumps ~ $4200.
2 VFD'~ $2050.
1 Electrical Service Concrete Structure
$ 8,400.
$ 4 100.
t"i
Est 14500.
Piping
Pressure Sustaining ValveStreet Repair
Engineering Design & Inspections
Misc. Minor items
Total
Contractor Overhead & Profit
Contingency
~25%
~10%
Grand Total
$14 500.
$ 5 000.
$ 4 125.
$14 000.
$ 6 025.
$ 4 000.
$60,,450.
$15 112.
$ 6 045.
$81,,607.
This would result in a cost of approximately $1600.00 per affected service.
OPTION 3
While evaluating the potential short-tenn fixes it became evident that another well is
essential. .
The evaluation of Option 1 and Option 2 were based on the assumption that adequate
water is available. However, if one of the two main wells were to break down or fail, for
any reason, then there would not be adequate supply to either of the booster pumps. This
potential supply problem was previously noted by this Engineer and discussed with the
Eagle Water Company. Eagle Water directed us to prepare a set of specifications and a
design for a well capable of producing a minimum of 2000 gallons per minute (gpm).
These specifications and design were completed, a pennit was obtained from the Idaho
Department of Water Resources, and approval was obtained from the DEQ. These
specifications and approval letters are enclosed.
The wells serving Eagle Water customers pumped 4 763 00 gallon on 15 August 2004.
On 17 July 2005, 5 156 000 gallons was pumped. Using the pumping rate timed on
August 5, 2005 as the maximum the existing wells can supply, the daily rate would be
138 00 gallons per day. This rate was based on a short interval observation of the two
biggest producing wells on August 5th. This observed rate was approximately 2 000 gpm
on either well. If either one of these 2000 gpm wells failed, then the maximum pumping
rate would not produce the required quantity and, consequently, pressure.
A cost estimate to bring a new well online is as follows:
Well Lot Cost 100'xl00'Lot
Well Drilling, Test Pumping Etc.Pump House 384 sq. ft.
I..P. Co. Electricity to Pump House
$ 40 000.
$110 000.
$ 25 500.
$ 5 000.
Pump, Column, Strainer, Etc. installed
300 HP Electric Motor
300 HP Frequency Drive
Electrical Installation
I Piping, Valves, Air Vac., etc. installed
600 feet of mainline, installed
Engineering
Legal
$ 54 000.
$ 18 000.
$ 18 000.
$ 15 000.
$ 20 100.
$ 60 000.
$ 21 205.
$ 3 500.
TOT AL $390,305.
There was not sufficient time to consider other methods to satisfy the Eagle Springs
pressure problem. But in accordance with the Idaho Public Utilities Commission s recent
order, we are submitting an estimate to prepare a master plan and system evaluation to
I include computer based simulation of the existing system and a model of needed
improvements. Considering the fast-paced growth of Eagle over the last two or three
years, and projecting future demand accordingly, we expect this Engineering Study to
demonstrate the need for yet another new supply source to meet this growing demand.
Estimate for detailed Engineering Report of Eagle Water Co. System
$ 4 995.Tax $ 249.
Install program time 8 Hrs.
(g)
$60.00/Hr
Up grade Map of existing system
80 Hrs. (iY $60.00/Hr
Date entry of system into computer program
320 Hrs. (iY $60.00/Hr. $19 200.
Collecting System Data, Elevations, Pump curves Pressures, flows
240 Hrs. (iY $70.00/Hr. $16 800.
Computer Runs
80 Hrs. (iY $85.00/Hrs.
Changing computer data for System, analysis i.e. to show where
Lines are ne~ded-how much additional source and location of
these wells. Evaluate Storage Reg
160 Hrs. (iY $85.00/Hr.
. Recording Pressure Meters 4 (iY $480/each
Data from Compass Population estimates & Maps
Write Report and Exhibits
80 Hrs. (iY $85.00/Hr.
Up grade Computer Program
Software Upgrade
Total
$ 5 244.
$ 480.
$ 4 800.
$ 6 800.
$13 600.
$ 1 920.
$ 4 250.
$ 6 800.
$79,894.
CONCLUSION
Based on the short study time and the length of time to construct either Option 1 or
Option 2, it is our professional conclusion that the best short term solution is to continue
withaltemate-dayand staggered-hour iITigation in the Eagle Springs and Brenson
subdivisions for the remainder of the current iITigation season. In addition, it is our
professional opinion that a new well should be drilled as soon as possible and a complete
study of the system conducted that will outline global solutions and system planning for
the next three to five years. We anticipat~ such a study will take a minimum of three
months to complete.
Enclosures
" u
STATE OF IDAHO
DEPARTMENT OF
ENVIRONMENTAL QUALITY
"'-"~'~'" '"""""'~'--_."_.~-~'~''-~"."'."~'-'~_._'.'~.._~. -------..-..."-., ""'- -~"~'._--
_'._"n~. m_._.
"..~....._...-_._....",--.
"",-P-
"__'-""-'-""_~--,.._--._--_..---_._.~..._... --.--..--...., --..-.------,.,--.--..--...-,.....--. "".'-
1410 North Hilton. Boise, Idaho 83706-1255 . (208) 373-0502 Dirk Kempthorne, Governor
C. Stephen Allred, Director
TSCEE-51/2004
February 27, 2004
James M. Rees, PE
MTC. Inc.
707 N. 27th Street
Boise, Idaho 83702-3113
RE:Eagle Municipal Well #7, Well Construction Design
Dear Mr. Rees:
DEQ staff has completed evaluation of the Well Construction specification. The well construction is determined to
be acceptable following incorporation of the changes listed below. Staff will convey this position to IDWR.
1) Clay seals may only be used in wells with annular gaps greater than six inches. (RSWW 3., 2003Edition. Clay Seals "Where an annular opening greater than six inches is available a clay seal of clean local
clay mixed with at least 10 per cent swelling bentonite may be used when approved by the reviewing
authority. "
2) Test pumping shall adhere to the requirements stated in the 1 0 States Standards (a), and IDAP A rules forduration of testing with respect to drawdown (b).
a) RSWW 3.2.4., 2003 Edition: "The test shall provide, as a minimum, for continuous pumping for at least24 hours at the design pumping rate or until stabilized drawdown has continued for at least six hours when
test pumped at 1.5 times the design pumping rate, or as required by the reviewing authority.
b) IDAPA 58.01.08.550.03.f.i states: "The well shall be test pumped at the desired yield (design capacity) of
the well for at least twenty-four (24) consecutive hours after the drawdown has stabilized. Alternatively, the
well may be pumped at a rate of one hundred fifty percent (150%) of the desired yield for at least six (6)
continuous hours after the drawdown has stabilized. In either case, jfthe drawdowM does nots~abilize~ the
.. ..
pumping must continue for at least seventy-two (72) consecutive hours. The 'field pumping equipment mustbe capable of maintaining a constant rate of discharge during the test. Discharge water must be piped anadequate distance to prevent recharge of the well during the test. If the well fails the test protocol, the welldesign shall be re-evaluated and submitted to the Department for approval. (5-03)"
, .
3) Add the following data to the test pumping data submittal per RSWW 3.2.4., 2003 Edition.a) Test pump capacity-head characteristics, . b) depth of test pump setting,
c) time of starting and ending each test cycle, andd) the zone of influence for the well.
James M. Rees, PE
February 27 2004
Page 2
4) Add the following information requirements per RSWW 3.2.4.1.g, 2003 Edition. "A report shall be submittedwhich provides recordings and graphic evaluation of the following at one hour intervals or less as may be
required by the reviewing authority:
a) pumping rate
b) pumping water level
c) drawdown, andd) water recovery rate and levels.
This encompasses DEQ's requirements and expectations for the design and construction of this community public
-drinking water well. If you have any questions, or comments concerning issues addressed in this letter, pleasecontact me at 208-373-0140, or at amaupin~qeq.sta e.id.
Sincerely,
~(~):'c~
:~,., '._,.. "".'
AJ. Maupin, PE
Staff Engineer
AJM:sjt
Chas Ariss, PE, IDEQ Boise Regional Office
Robert Whitney, Idaho Department of Water Resources
Robert Deshazo, President, Eagle Water CompanyTSCEE Reading File
BRO Source File - Engineering, Reading File
03/08/2004 15:52 9390267 EAGLE WATER CO I NC PAGE 02
State of Idaho
DEPARTMENT OF WATER RESOURCES
1301 North Orchard Street, Boise, m 83706 - P.O. Box 83720, Boise, ID 83710-0098
Phone: (208) 327-7900 Fax: (208) 327-7866 Web Site: www.idwr.state.id.
DIH.K KEMI','..ORNE
Gover-Jor
l'l-~ L J
March 5, 2004 KARL J. DREHER
Diree tor
EAGLE WATER CO INC
PO BOX 455
EAGLE 10 83616
RE:PERMIT NO. 63-12559
Dear Permit Holder:
Enclosed is a copy of the approved request for extension of time submitted
connection with the above referenced permit that extends the time within which to submit
proof of beneficial use to March 1, 2006. The department has granted this extension
based on governmental agency delay- It is important that you work diligently toward the
completion of the development during the construction period allowed since the
department ma~ not be able to grant additional extensions in connection with this permit.
Section 42-248. Idaho Code, requires you or the owner of this water right to
maintain current ownership and address records on file with the department. Please
contact any office of the department for the proper form to file a change of ownership of a
water right and/or a change in the address of the owner.
Please contact me directly at (208) 327-7953 if you have any questions or
information.
Sincerely,
,.
k--
Deborah J. Gibson
Administrative Assistant
Water Allocation Bu reau
Enclosurec: IDWR - Regional Office
EAGLE WATER CO INC PAGE 03EAGl..k. WAIU! ~
..... =
""0nIY
' ......... -=:...-"...
Ha,
STATE OF IDAHO
DEP ARTMENT OF WATER RESOURCES
REQUEST FOR EXTENSION OF TIMIBECel.VED
TO PROV
~~~:~~:~~~:i ;:E~~~~~C: R
~g:"U::~~OOF OF
FEB
~ ;
200~
The Idaho Department of Water Resources waf consider this 'arm ,$ a request that the permit P\
~-~
W'8tftd_e~additionl' period of time under !he pro'lt~lons 0' S~tion 42,204. Idaho in wtlich to complete develOpment or I water nght.
03/08/2004 15: 52
~2/24/26e4 1&; 03~O"" No. 204
"'"
FILING FEE S 5O.
9390267
433902& 7
Pl!rm;, No. 63 12559
Narne(s) Of Permit Holder. Eagle Water Co., Inc.
Address: 1 72, W., State Un! t; DIp..,; 0 ~ .Box 455 'tttv Eagle sea.. ID Zip 83616
Tel.phon- No. 028-939-0242 081e proof it ,.- March 1, 2004
Describe what work has been completed toward the development of thl8 waler right:
(This must be filled outf ,t no work h.s been compte'ed, shaw "no...
Please see attached letter.
COIting S
The permit holder(s) has begn unable to complete the rem8lnder of the WOtk for the fOIlO*-ing ,."anl:
....--
--Mll
Please see attached letter.
Permit holder(s) reque.t an extension to
...
(Slgnat",e)
,(
Of h., fhanpetmlt hold.r. Power of All",.".)'auppllflfl.
ACTION OF THE DEPARTMENT OF WATER RESOURCES
IT tS HEREBY ORDERED that the IiIbo'ie request for extension of time be
APPROVED and the time within which to submit proof of beneficial use 16 extended
to March 1. 2006.
Signed this
~('!!
day of March . 20 80:.
GARY SPACKMAN
03/08/2004 15: 52 9390267 EAGLE WATER CO INC PAGE
crt; &, 2..-
DILE W A TEll lit, IICa
o. BOX 455 . EAGLE, 10.83616 (208) 939-0242
FAX (208) 939-0267
ICII.ILI: eUVER SHaT
DAtL ( 0
'fila '3", IN\
..IIIY ~L.
roil.
...
~do~ ~~\..7.f):Ie
SUMe, \4
..
PIID 3
IlOl'11
- -- --:.......
, r, o
---" .
- ,
STATE OF IDAHO
DEPARTMENT OF
ENVIRONMENTAL QUALITY
"~-"""-_'_"'"~"'~-~'~'~-~"""',
H"
-"-'~""""
'-""-"-n,_,_
~~..,
'_m_,,_,~__
'-~'.'---""'~-'~--"."""'-"" - ----,, -,,-, ---"".,..---""---_,,,,,
1410 North Hilton. Boise, Idaho 83706-1255. (208) 373-0502 Dirk Kempthorne, Governor
C. Stephen Allred, Director
TSCEE-I02/2004
April 14, 2004
James M. Rees, PE
MTC, Inc.
707 N. 2ih Street
Boise, Idaho 83702-3113
RE:Eagle Municipal Well #7, Special Conditions Document
Dear Mr. Rees:
DEQ staff has received and reviewed the Special Conditions specification submitted for Eagle Water Company
well #7. This document, in combination with the cover letter, addresses the conditions presented in DEQ letternumber TSCEE-51/2004, dated February 27 2004.
The well construction is determined to be acceptable, based upon the changes identified in these documents. Staffwill convey this position to IDWR. If you have any questions, or comments concerning issues addressed in this
letter, please contact me at 208-373-0140, or at amaupin(g1deq.ate.id.
Sincerely,
'" ".'.""""'";""
/'1
..... """
' ir
" ? ~??- .
J. Maupin, PE
Staff Engineer
AJM:sjt
Chas Ariss, PE, IDEQ Boise Regional Office
Robert Whitney, Idaho Department of Water Resources
Robert Deshazo, President, Eagle Water Company
TSCEE Reading File
BRa Source File - Engineering, Reading File
SPECIFICATIONS FOR DRILLING
EAGLE WATER COMPANY, INC.
WELL NUMBER 7
(Revised J an , 2004)
GENERAL INFORMATION, PROPOSAL
CONTRACT AGREEJ\1ENT, GENERAL CONDITIONS
SPECIAL SPECIFICATIONS, AND WELL SKETCHES
~-"' .
z ./',. i
~#
1'.
jJjJ
;1;
/~/ ~\~",,-, "
~l' .1/1 ,f!(.
\ :=-.:' : .
f"'"
; \~\ \:r~:~~l. L.~~ftJ "l1"". I~~'
'~~~~~
!r
EAGLE WATER COMPANY, INC.
O. Box 455
Eagle, Idaho 83616
TABLE OF CONTENTS
SECTION (A) - CONTRACT DOCUMENTS ........................................... PAGE
SECTION (B) - GENERAL CONDITIONS ............................................... PAGE
SECTION (C) - SPECIAL CONDITIONS .................................................. PAGE
PROPOSAL - SCHEDULE OF ITEMS AND PRICES.............................. PAGE
SECTION (A)
CONTRACT DOCUMENTS
EAGLE WATER COMPANY, INC. WELLS
GENERAL INFORMATION
General : The work contemplated under this Contract comprises the drilling of one water
supply well using a rotary drill rig including but not limited to drilling, installation of casingand screens, well development, and all testing required by the State of Idaho including
bacterial, chemical, yield and draw-down. It is estimated that the well will
approximately 450 feet in final depth. It is the intent of these Specifications that the
Contractor shall furnish all necessary labor, equipment, and materials as not provided by the
Owner, and he shall perform all operations required for the completed water supply well.
Specifications: The Specifications under which it is proposed to execute this work consists
of all the information bound or referenced herewith and is intended to be mutuallycooperative and to provide the details reasonably required for the execution of the proposed
work. Any interpretation as to the meaning or the intent of the Specifications should be
directed to the Engineer in writing. Any interpretation or change in the Specifications shall
be made only in writing and a copy of such interpretation or change shall be mailed or
delivered to each Bidder. The Owner will not be responsible for any other explanations or
interpretations of the Specifications.
Type of Proposal: Proposals for the work contemplated are to be submitted on a unit price
basis unless a lump sum basis is specifically designated for certain items.
Estimated Quantities: The estimate of quantities of work to be done is approxima~e only
and is solely for the basis of calculation upon which the contract award shall be based.
~aration of Proposals: All blank spaces in the Schedule of Items and Prices for the well
being bid upon must be filled in with ink or typewriter. No changes shall be made in any of
the items within the Proposal. Where the word "none" is applicable, it should be inserted.
Submission of Proposal: Proposals must be made on the prescribed forms bound herewith
and submitted to the Owner, intact with the complete Specifications, within 30 days after
receipt by the Bidder. There will be no public opening of bid proposals. The Owner will
open and review bid proposals at his option. Any proposal shall be deemed informal which
contains omissions, erasures, alterations or additions, or items not called for or which in any
other manner shall fail to conform to the conditions of these Specifications. The Bidder
shall sign the Proposal in the space provided therefore.
Withdrawal of Proposal : No proposal may be withdrawn after the time scheduled for
submission of said proposal until a period of thirty (30) days after the date of submission
shall have elapsed.
Conditions of Work: Each bidder must inform himself of the conditions relating to the
work and it is assumed that he has inspected the site of the work and has made himself
familiar with the Specifications. Failure to do so will not relieve the successful bidder of
his obligation to enter into a contract and complete the work in accordance with the
Specifications. Each bidder must also inform himself on all laws and statutes relative to the
execution of the work employment of labor, protection of public safety and private
property, right-of-way and access to the work, and similar requirements;
Award of Contract:The Owner reserves the right to accept or reject any or all proposals.
The acceptance of any proposal will be made in writing, together with a notice to proceed
mailed to or delivered to the office designated in the successful Bidder s proposal. The
successful Bidder shall, within seven (7) days after receiving the written acceptance of
award and notice to proceed from the Owner, execute the Contract Agreement attached
hereto with the Owner for the performance of the work.
10.Performance and Payment Bond: The successful Bidder shall be required to furnish the
Owner at the time of execution of the Contract Agreement, a performance and payment
bond in full amount of the contract price which bond shall be in force for one year after the
date of final payment for the work to insure payment of all claims made against the
Contractor for the payment of labor, materials, and other services in accordance with the
laws of the State, and cover all guarantees against defective workmanship and materials.
The Surety Company furnishing this performance bond shall be acceptable to the Owner
and shall be further authorized to do business in Idaho. The Contractor shall pay the cost of
the bond.
11.Time for Completion: The successful Bidder shall commence the work included under this
Contract within sixteen (16) days after execution of the Contract and prosecute said work
diligently until completed in all respects. Completion date for this Contract shall be within
120 days after execution of this Contract.
12.Licenses : All Bidders shall be dilly licensed well drilling contractors within the existing
provisions of Idaho State laws.
EAGLE WATER COJ\1P ANY, INC. WELLS
PROPOSAL
TO: EAGLE WATERCOJ\1PANY, INC.
The undersigned, hereinafter called the Bidder, declares that the only persons or parties interested in
this Proposal are those named herein and that this Proposal is in all respects fair and without fraud;
that it is made without collusion with any official or employee of the Eagle Water Company, Inc.
hereinafter called Owner, and that the Proposal is made without any connection or collusion with
any other person or f1ffi1 making another proposal on this same Contract.
The Bidder agrees that if this Proposal is accepted by the Owner, he will within seven (7) days after
notification of the acceptance, execute the Contract with Owner in the form attached hereto and will
at the time of execution of the Contract deliver a performance and payment bond, and will to the
extent of this Proposal, furnish all machinery, tools, and other means of construction and do all the
work and furnish all materials as not provided by the Owner which are necessary to complete the
work in the manner covered by the Specifications. Contractor shall pay for the bond.
The bidder further agrees to begin work within sixteen (16) days after execution of the Contract and
to prosecute the work diligently until completed in all respects. Completion date for this Contract
shall be within 120 days after execution of this Contract.
The Bidder further agrees to accept as full payment for the work proposed herein the amount
computed under the provisions of the Specifications and based on the unit price or lump sum
amounts as set forth herein under the appropriate Schedule for Items and Prices. It shall be
expressly understood that the unit prices are independent of the exact quantities involved and that
the unit prices stated herein represent a true measure of the labor and materials required for the
work including any and all allowance for overhead or profit.
If the Bidder is awarded a Contract based upon this Proposal, the surety who will provide the
performance and payment bond will be whose
address is
The Bidder further certifies that he has carefully examined the Specifications for the work; that he
has personally inspected the sites; that he has satisfied himself as to the quantities of materials
items of equipment and conditions of work involved; that this Proposal is made according to the
provisions and terms of the Specifications; and that he is aware and has taken into consideration all
factors which may affect this Proposal.
SECTION (B)
GENERAL CONDITIONS
EAGLE WATER CO11P ANY, INC. WELLS
GENERAL CONDITIONS
Owner: Wherever the word "Owner" appears, it shall signify Eagle Water Company, Inc.
O Box 455 , Eagle, Idaho 83616, acting through its duly authorized officers.
Contractor: Wherever the word "Contractor" appears, it shall signify the party or parties
contracting with the Owner to perform the work outlined and contemplated herein.
Engineer: Wherever the word "Engineer" appears in these Contract Documents, it shall
signify the representative ofMTC, Inc., 707 N. 27th Street, Boise, Idaho 83702.
Written Notice: Wherever the term "Written Notice" appears,. it shall signify a written
communication delivered in person to the individual or to a member of the firm for whom it
is intended, or is delivered or sent by registered or certified mail, to the last business address
known to him who gives such notice.
Work:Wherever the term "Work" appears, it shall signify all materials, labor, tools and all
other appliances, machinery and appurtenances necessary to perform and complete
everything covered in the Specification and such additional items of labor, material and
equipment not specifically indicated or described but which can be reasonably inferred as
belonging to the item described or indicated and as required by good practice to provide a
complete and satisfactory well.
Bidder: Wherever the term "Bidder" appears, it shall signify any person, fIrm, partnership
or corporation submitting a proposal on this project.
Days Wherever the term "Days" appears, it shall refer to consecutive calendar days.
Alterations : The owner, without invalidating the Contract, may order extra work or 11lay
make changes in the specifications by altering, adding to, or deducting from the work
originally planned. All such work shall be executed l.U1der the conditions of the original
contract except that claims for extension of time for completion and payment for extra work
occasioned by such changes shall be adjusted at the time of making the change. The
Engineer shall have authority to make minor changes in the work not involving extra cost
and not inconsistent with the purpose of the Contract. In other cases, however, except in an
emergency endangering life and property, extra work or deductions from the work shall be
made only upon a written order from the Owner stating that the Owner has authorized the
change. No claim for additional payment shall be valid unless so ordered in writing.
Any changes or alterations, which reduce the quantity of work to be done, shall not
constitute a claim for damages for any anticipated profit on the work that is thus dispensed
with.
Inconsistencies and Omissions: The Specifications are complementary, and what is called
for by anyone shall be as binding as if called for by all. The intent of the Specifications is
to include all labor and -material (except any specific items to be furnished by the Owner),
equipment, machinery, and transportation necessary for the proper execution of the work.
Materials or work described in words, which so applied have a well known technical and
trade meaning shall be held to refer to such recognized standards. Should any discrepancies
occur or any misunderstanding arise as to the import of anything contained in the
Specifications, the explanations and decisions of the Engineer shall be fmal and conclusive
on the Contractor, and all directions and explanations required to complete any of the
provisions will be given by the Engineer. Where inconsistencies exist between the Special
Conditions and any other portion of these Specifications, the Special Conditions shall
govern.
10.Authority of the Owner: The owner shall have general supervision and direction of the
work. He has authority to stop the work whenever such stoppage may be necessary to
insure the proper execution of the Contract. He shall also have authority to reject all work
and materials which do not conform to the contract, to direct the application of forces to any
portion of the work as in his judgment is required, to order the force increased or
diminished, and to decide questions which arise in the execution of the work. To prevent
disputes and litigations, the Owner shall, within a reasonable time after their presentation to
him, make decisions, in writing, on all claims of the Contractor and on all' other matters
relating to the execution and progress of the work or the interpretation of the Specifications;
his estimate and decision shall be fmal and conclusive. The Owner shall not have authority
to order changes in the work or extra work except as provided. The Owner shall have at all
. times full access to all parts of the work. The inspection of the work done shall not relieve
the Contractor of his obligations to furnish proper materials, certifications and perform
sound and reliable work.
11.Reception of Owner s Directions: The superintendent or other authorized representative of
the Contractor shall represent the Contractor in his absence from the job site and all
directions given to him shall be binding as if given to the Contractor. Important directions
shall be confirmed ,in writing to the Contractor and other directions shall be likewise
confirmed in writing upon request of the Contractor.
12.Right to Retain Imperfect Work If any part or portion of the work done or material
furnished under the Contract shall prove defective and not in accordance with the
Specifications, and if the imperfection in the same shall not be of sufficient magnitude or
importance as to make the work dangerous or undesirable, or if the removal of such work
will create conditions which are dangerous or undesirable, the Owner shall have the right
and authority to retain such work but shall make such deduction in the final payment
therefore as may be just and reasonable.
13.Insurance: The Contractor shall not commence any work until he has provided insurance
coverage, as evidence by an Insurance Certificate or Certificates on a form supplied by the
Owner. The required coverage shall be indicated below.
TYPE INSURANCE
Workmen s Compensation
Comprehensive General
Liability, Including
Contractors Liability Each Person $250 000 Each Accident $250 000
Each Accident 500 000 Aggregate 500 000
Each Person $250 000 Each Accident $250 000
Each Accident 500 000 Aggregate 500 000
Each Person $250 000 Each Accident $250 000
Each Accident 500 000 Aggregate 500 000
Each Person $250 000 Each Accident $250 000
Each Accident 500 000 Aggregate 500 000
Each Person $250 000 Each Accident $100 000
Each Accident 500 000
The Contractor shall pay the premiums thereon and maintain such insurance in effect until the
completion of the work hereunder. Notice of expiration of any such insurance must be forwarded
to the Owner ten (10) days before expiration.
XCD hazards of explo-
sion, blasting, collapse
& undergrotU1d
Contractual Liability
The Contractor shall agree to indemnify, hold harmless and defend the Company :from and against
any and all liability for loss, damage or expense which the Owner may suffer or for which the
Owner may be held liable by reason of injury (including death) to any person or damage to any
property arising out of or in any manner connected with the work under this Contract whether or
not due in whole or in part to any act, omission or negligence of the Owner or any of its
representatives or employees together with any and all attorneys fees incUITed by the Owner on
account thereof.
Contractors Protective
Liability
Comprehensive Auto
Liability, including
owned vehicles, hired
vehicles and other
non-owned vehicles
Maintenance Guarantee: The Contractor agrees to make any repairs or replacements
necessary at his own expense for defects in materials or workmanship supplied by him that
become evident within one (1) year after the date of final payment. The Contractor shall
make all repairs and replacements promptly upon receipt of written order :from the Owner
and if he fails to make such repair or replacement promptly, the Owner may then do the
work and the Contractor and his surety shall be liable for the cost thereof.
14.
15.Superintendence: The Contractor shall keep on the work, during its progress, a competent
superintendent and necessary assistants, all satisfactory to the Owner. The .Contractor shall
give efficient supervision to the work, using his best skill and attention.
16.Employees: The Contractor shall employ only competent, skillful personnel to do the work;
and whenever any person shall appear to the Owner to be incompetent or to act in a
disorderly or improper manner, such persons shall be removed from the work immediately
upon notification from the Owner and shall not be employed on the work again, except by
consent of the Owner. The Contractor shall at all times enforce strict discipline and good
order among his employees. The Contractor shall comply with all labor rules, wage scales
and regulations of the Government of the United States, and the State, City or Town and
County in which the work is to be done, including nondiscriminatory laws.
17.Materials and Workmanship : The Contractor shall provide any pay for all materials, all
labor, tools, equipment, light, power, transportation, and other facilities necessary for the
execution and completion of the work.
Unless otherwise specified, all materials shall be new, and both workmanship and materials
shall be of a good quality. The Contractor shall, if required, furnish satisfactory evidence as
to the kind and quality of materials.
18.Release: The fmal payment shall not become due until the Contractor shall submit to the
Owner a complete release of all liens arising out of this Contract, or receipts in full in lien
thereof, and an affidavit that so far as he has lmowledge or information, the releases and
receipts include all the labor and materials for which a lien could be filed; but the
Contractor may, if he is unable to furnish a release or receipt in full as provided above
furnish a bond satisfactory to the Owner to indemnify him. against any lien. If any lien
remains unsatisfied after all payments are made, the Contractor shall refund to the Owner all
monies that the latter may be compelled to pay in discharging such a lien, including all costs
and a reasonable attorney s fee.
19.Subcontracting: The Contractor shall, as soon as practicable after the execution of the
Contract, notify the Owner, in writing, of the names of any subcontractors which he plans to
use on this Contract and shall not employ any that the Owner may within a reasonable time
object to as incompetent or unfit.
20.Progress of the Work:The Contractor shall commence the work contemplated under these
Contract Documents within sixteen (16) days after the date of execution of the Contract and
receipt of the Owner s notification to begin work; it being expressly understood and agreed
that the time of beginning, rate of progress, and time of completion of the work are of the
essence of this Contract. All work included under this Contract shall be completed within
120 days after execution of this Contract.
21.
22.
Assignment:Neither party to the Contract shall assign the Contract or sublet it as a whole
without the written consent of the other; nor shall the Contractor assign any monies due or
to become due to him hereunder without the previous written consent of the Owner.
Owner s Right to Tenninate Contract:If the Contractor should be adjudged a bankrupt, or if
he should make a general assignment for the benefit of his creditors; or if he should
persistently or repeatedly refuse or should fail, except in cases for which extension of time
is provided, to supply enough properly skilled workers or proper materials, or if he should
fail to make prompt payment to subcontractors or for material or labor, or persistently
disregard laws, ordinances, or the instruction of the Owner; or otherwise be guilty of a
substantial violation of any provision of the Contract or any laws or ordinance, then the
Owner, when sufficient cause exists to justify such action, may, without prejudice to any
other right or remedy, and after giving the Contractor and Surety seven (7) days written
notice, transfer the employment for said work from the Contractor to the Surety. Upon
receipt of such notice, the Surety shall enter upon the premises and take possession of all
materials, tools, and appliances thereon for the purpose of completing the work included
under this Contract and employ, by contract or otherwise, any person or persons to fInish
the work and provide the materials therefore without termination of the continuing full force
and effect of this Contract. In case of such transfer of employment to such Surety, the
Surety shall be paid in its own name on estimates according to the terms hereof without any
right of the Contractor to make any claim for the same or any part thereof. In lieu of the
foregoing, if the Owner so elects, he may terminate the employment of the Contractor and
take possession of the premises and of all materials, tools, and appliances thereon and fInish
the work by whatever method he may deem expedient. In such case, the Contractor shall
not be entitled to receive any further payment until the work is fInished. If the expense of
completing the Contract including compensation for additional managerial and
administrative services, shall exceed such unpaid balance, the Contractor shall pay the
difference to the Owner.
23.Basis of Payment:In consideration of the faithful performance of all the covenants
stipulations, and agreements in this Contract to be kept and performed by the Contractor
the Owner covenants and agrees to pay the Contractor, the amount bid in the Contractor
Proposal for the work actually performed as determined by the final estimate, together with
any amounts due for extra work not classified under the items listed in the Contractor
Proposal as provided in these General Conditions less any deductions for claims and
damages paid by the Owner due to acts or omissions of the Contractor and for which he is
liable under this Contract.
24.Extra Work:Any work necessary or required to carry out the intent of these Specifications
by changes clearly not indicated or which cannot reasonably be implied from the intent and
meaning thereof shall be paid for at the unit price agreed to in the Specifications. If this
extra work cannot be classified under any of the items for which unit prices are listed in the
Contractor s Proposal, it shall be paid for as extra work at the rate agreed to in writing
between the Contractor and the Owner prior to the time of commencing such extra work.
such method payment cannot be agreed upon prior to the beginning of the work, then such
25.
26.
27.
28.
29.
30.
work shall be perfonned by the Contractor on the basis of furnishing labor and material at
costs and labor rates in effect at the time the work is accomplished.
Final Payment: Upon completion of the work, the Contractor shall notify the Owner in
writing that he has completed the Contract and shall request fmal payment. Upon approval
of this final estimate by the Owner and receipt by the Owner of the release required under
these General Conditions and within ten (10) days after the time limit for the filing of all
liens shall have expired, the Owner shall pay to the Contractor all monies due him under the
provisions of the Specifications, including any retained percentages.
Protection of Pro~: The Contractor shall maintain adequate protection of all of his work
from damage and shall protect the Owner s property from injury or loss arising in
connection with the work.
Safety Precautions The Contractor shall take all necessary precautions for the safety of the
employees and shall comply with all applicable regulations and laws to prevent accidents or
injury to persons on or adjacent to the job site. He shall erect and properly maintain at all
times the necessary safeguards for the protection of workers and the public and shall post
danger or warning signs against hazards created by the construction. Said work is to be
conducted that no liability will accrue under the Employers' Act of Idaho.
Minimum Wage Rate: The prevailing wage rates for Ada County, Idaho which are to
paid employees engaged in this work, in accordance with Section 44-100 (c) of the Idaho
Code are prescribed by the Commission of Labor for Idaho and are published periodically.
The Contractor shall conform to this Section of the Idaho Code.
Permits, Certificates, Laws and Ordinances: The Contractor shall, at his own expense
procure all permits, certificates and licenses required of him by law for the execution of his
work. He shall comply with all Federal, State or local laws, ordinances or rules and
regulations relating to the perfonnance of the work.
Materials Furnished by the Contractor Where the tenn "furnishing" is used herein, it shall
include handling, transporting, unloading, storing, protecting from the elements and
vandalism, and distribution to the construction site. The Contractor is responsible for the
care and protection of all materials until incorporated into the system and accepted.
Payment in all cases shall constitute full compensation for all transportation, handling and
incidentals; no additional payments will be made on any item over and above the prices as
stated in the Contractor s Proposal, except as otherwise provided herein.
SECTION (C)
SPECIAL CONDITIONS
. .
EAGLE WATER COMP ANY, INC. WELLS
SPECIAL CONDITIONS
SECTION C-GENERAL:
Scope: This Specification covers the complete drilling, casing, screening, development, andtesting of the water supply well for Eagle Water Company, Inc. As stated herein, theestimated quantities are only approximate. The Owner reserves the right to increase or
decrease individual items in such amount as may be, in his sole judgment, to his bestinterest, depending upon conditions encountered or observed during drilling.
Location: The general location of the well is as follows:
The well site is located in the SEl/4 NEl/4 SWl/4, Section 15, TAN., R.1E., B., EagleAda County, Idaho. Said location is approximately 0.25 miles southwest of the intersection
of State Highway 44 and State Highway 55. The exact location of the well will be staked inthe field prior to the award of the Contract.
Minimum Well Construction Standards: The contractor shall be required to confonn to the
applicable portions of the Minimum Well Construction Standards established by the Idaho
Department of Water Resources. All construction equipment, holes, pits and chemicalstorage and use shall comply fully with all requirements of OSHA.
The Engineer and ill WR Representative must be notified 24 hours before drilling andbefore the seal is placed and must be on site to observe the sealing. Any seal placed withoutthe Engineer and IDWR Representative being on site will not be accepted.
Mobilization: The contractor shall move in all necessary tools, equipment and suppliesrequired for the work, and upon completion of the work shall remove all such itemsincluding rubbish, drilling debris and cuttings from the premises promptly and leave the site
in a neat and orderly fashion as close to original condition as feasible. Payment for any
work under this paragraph shall be at the lump sum price bid in the bid schedule.
Testing Upon completion of the development of this well, the Contractor shall test said
well in the presence of the engineer to detennine the yield and draw-down in accordance
with requirements of Recommended Standards for Water Works and the State of Idaho
Rilles for Public Drinking Water. The well shall be test pumped at the desired yield for the
well for at least twenty-four (24) consecutive hours after the drawdown has stabilized.
Alternatively, the well may be pumped at a rate of one hundred fifty percent of the desired
yield for at least six (6) continuous hours after the drawdown has stabilized. In either case
if the drawdown does not stabilize, the pumping must continue for at least seventy-twoconsecutive hours. The field pumping equipment must be capable of maintaining a constant
rate of discharge during the test. Discharge must be piped an adequate distance to prevent
recharge of the well during the test.
The contractor s submittal to the state shall contain the following (items e though f shall be
documented on one hour intervals unless other wise directed in writing by the state):
Test pump capacity-head characteristics
Depth of test pump setting
Time of starting and ending each test cycle
The zone of influence for the well
Pumping rate
Pumping water level
Drawdown
Water recovery rate and levels
Contractor shall document all test results as required by the State of Idaho. Testingequipment shall be capable of delivering a continuous supply of at least 3500 GPM from a
depth of 450 feet. All testing discharges shall be piped to a suitable waste site a minimum
of 250 feet from the well and be disposed of in an environmentally acceptable manner.Testing shall be with a standard turbine pump. The Contractor shall furnish and install all
necessary equipment for the testing including a suitable means for accurately measuring the
discharge from the well and the water level in the well during the testing operation The
Contractor shall be responsible for providing a means for safe refueling during' operation, toprevent even brief shutdowns during the test. The Contractor shall be responsible for
making arrangements with the Owner for satisfactory disposal of water during the test
period. Payment for furnishing, installing and removing the testing equipment shall be at
the applicable lump sum price bid in the bid schedule. Payment for operating test-pumping
equipment shall be at the hourly rate bid for conducting pumping test.
Flow measuring Equipment: The Contractor shall provide flow measuring
equipment capable of detennining discharges of up to 3500 GPM at
intervals of 25 GPM.
Well level Measurement Equipment: Contractor shall provide a means
accurately measuring water levels in the well before, during and after
pumping tests. Electric water level probe or and airline is acceptable. If an
airline method is used provide an airline, draw down gauge and air pressure
source. The pressure gauge must be accurate to 0.5 psi. The airline shall be
securely fastened to the pump unit and shall tenninate approximately 2 feet
above the pump. If the electric level probe is used it shall be accurately
calibrated and be inserted between the pump column and the well casing.
preliminary capacity test will be run prior to the pumping test.
Preliminary test shall last approximately 1 hour to check pumping
equipment and to estimate production capacity of the well.
Records: Make accurate written records of water levels, pumping rates, time
intervals and other pertinent details of the pumping test as required by the
State of Idaho.
Sand Measurements: The sand content of a new well shall not be more than five (5) parts
per million fifteen (15) minutes after the start of test pumping. Sand testing and
measurement shall be done in accordance with Idaho Rules for Public Drinking Water
Systems, Section 58.01.05.550.03.d.iii.
Plumbness and Alignment:The wells shall be drilled straight and plumb in accordance with
the provisions of this paragraph. The casing, upon completion of development, shall be
sufficiently straight to a depth of 400 feet. Plumbness and alignment of the well casing
shall be tested in accordance with A WW A Standards A-IOO. It shall be the responsibility of
the Contractor to see that the wells are being constructed straight and plumb within these
limits at all times. The Owner may at any time make request for Contractor to conduct test
or tests as necessary to determine whether these limitations are being met. Any additional
work required by the Contractor in redrilling or straightening the well shall be at no cost to
the Owner.
Abandonment:In the event that the Contractor fails to complete the well or wells to the
depths specified or to a greater depth as may be determined during the actual drilling or
should he abandon any well because of loss of tools or equipment or for any other cause, or
if any well shall fail to meet the requirements for plumbness and alignment as previously set
forth, the Contractor, if requested and as directed by the Engineer, shall fill the abandoned
well with clay or cuttings and salvage and remove such casing as can be salvaged. The
materials furnished by the Contractor shall remain his property. The cost of abandonment
of the well, including the filling and casing, shall be borne solely by the Contractor and no
allowance or payment shall be made for the drilling or other work performed by the
Contractor on any abandoned well. Any partial payments already made to the Contractor on
an abandoned well will be applied to a subsequent well which will meet the provisions of
the Specifications.
Disposal of Materials: It is anticipated drilling mud will be recirculated with a loss of no
more than two cubic yards. Arrangements for the disposal of all drill cutting, sludge and
other materials from the drilling shall be made by the Contractor in accordance with
Minimum Well Construction Standards for the State of Idaho, and regulations by ill WR
and DEQ. Disposal will be in an approved sanitary landfill or at another site approved in
writing by the Engineer that meets all environmental regulations.
Utilities: The Contractor shall be responsible for :furnishing or arranging for electricity,
water, or other utilities required in the drilling of the well.
Recovery of Tools: In the event of loss of tools or equipment during any phase of the work
the Contractor shall not be entitled to any payment for time spent or expense incurred in an
attempt to fish or recover the tools or equipment prior to possible abandonment of any well.
Protection of Water Quality: The contractor shall take all necessary precautions to prevent
contamination of the water in the well by the introduction of any foreign substances
including contaminated water, gasoline, oil, etc. The Contractor shall disinfect all down
hole materials (gravel filter, packer, etc) and equipment as required by A WW A B-100
Section 3 , Recommended Standards for Water Works or the State of Idaho.
Completion and Clean-: Upon acceptance of the well by the Owner, the Contractor shall
cut off the 16-inch casing at a point not less than 24 inches above ground level or as
designated by the Engineer. The casing shall be further protected by covering with a 1f4- inch
thick steel plate tack welded to the casing, or by other means satisfactory to the Engineer.
The well site shall be cleaned up by removing all equipment, materials, and supplies,
including the filling of any pits or excavations, and the site left in a neat and orderly fashion.
No payment shall be made for any work under this paragraph and the cost of all such work
shall be included in the amount bid for other items of work.
SECTION C-2 ROTARY DRILLING:
Sealing:The well shall be sealed from the water producing aquifer to the surface with
Bentonite slurry to prevent cross contamination of aquifers and to prevent surface water
from entering any aquifers. The annular space between the well casing and the bore
opening shall be filled by pumping Bentonite slurry into the annular space from the bottom
to the surface. When the Bentonite slurry reaches the surface the contractor shall pump in
sufficient cement grout to form a secure cement seal around the bottom of the well casing.
Following consolidation of the Bentonite slurry additional Bentonite shall be added to the
top of the annular opening. As Bentonite is added to the top the temporary surface casing
. shall be removed as part of the grouting process. Bentonite slurry shall be mixed in
accordance with manufacturer s recommendation and requirements of the State of Idaho.
Cement grout will be a mixture of 94 pounds of cement and 5.2 gallons of water or as
required by Idaho Well Construction Standard Rules 37.03.09.010.12.
Payment will be made for work under this paragraph in accordance with the lump sum price
for providing surface seal as listed in the bid schedule. The lump sum price shall be
considered as full compensation to the Contractor for furnishing and installing the seal to
include all labor, materials, and equipment required to complete the work. No seal may be
placed without a minimum of 150% of estimated seal materials being on site. A minimum
of 12 hours shall elapse between the placement of cement grout seal and the resumption of
drilling.
Drilling: The well shall contain a 28-inch temporary oversize surface casing as required by
Idaho Well Construction Standards and the attached plans. The temporary casing shall
extend from the surface into an impervious layer. After the oversize temporary surface
casing has been set in place the well shall be drilled to an estimated total depth of 450 feet
below ground surface. The well shall be drilled a minimum of 24-inch diameter
accommodate a 16-inch diameter casing, along with a telescoping screen sized-for a 16 inch
casing and required gravel filter. It is estimated that all drilling will be in sediments such as
clay, silt, sand, or gravel. The Contractor shall provide the well drilling rig and well tools as
required, and all other equipment, materials, and supplies required for drilling and
completing the well. All such equipment shall be in good condition and properly
maintained. Measurement for payment for drilling shall be the depth below ground surface
of the hole actually drilled. No classification of materials will be made and payment for
drilling will be at the unit price listed in the bid schedule regardless of the type of materials
encountered. Only NSF approved drilling materials and mud products will be used in
drilling.
Drilling Method: The Contractor shall drill an 8" pilot hole, collect soil samples in
accordance with Section C- 2. g of Special Conditions and conduct electronic logging of the
different soil strata. This information shall be used to determine how the well will be
completed. The contractor will provide soil samples for design of screen and gravel
packing in the water strata that will be developed. Screen design shall include length and
slot size. Following determination the well will be developed further, the pilot hole will be
increased to 24" diameter to an estimated depth of 450 feet.
Casing:It is contemplated that the well, when completed, shall be cased with a 16-inch
diameter casing which shall extend from 2 feet above the ground surface to approximately
450 feet The screens shall consist of telescoping sections for commercial well screen as set
forth elsewhere in these Specifications and drawings and be sized for a 16-inch casing. The
16-inch casing shall have minimum wall thickness of 0.375 inches and confonn to ASTM-
A53 Grade B - Domestic Prime Specifications. All casings shall be joined with full
penetration welds made by properly qualified operators conform. to AISC Standards.
Measurement for payment for the permanent casing shall consist of the actual length in
linear feet of blank casing installed in the well, not including the lengths of screens.
Screens: The Contractor shall furnish and install the appropriate screens. Screens shall be
of the continuous wire-wound type (UOP-Johnson manufacturer or equal) in stainless steel
suitable for installation in a l6-inch diameter well casing. The screen assembly shall consist
of a stainless steel screen along with a minimum 15 foot blank above the screen and 10 foot
minimum blank below the screen. The lower blank shall be closed at the bottom with a
welded steel plate of 3/8-inch minimum thickness. The manufacturer shall determine the
length of screen, depth of screen placement and size of screen slots after the drilling of the
well and samples of water-bearing fonnations have been properly analyzed. The Engineer
shall review manufactures recomi11endations for screen length, placement and slot sizing
and approve for installation. Screen sizing, length and depths shall be determined by
material analysis, logs and other information supplied by the contractor.
Measurement for payment for screens shall be of the actual lengths of slotted screen
installed. Payment for screens shall include all costs of the materials, equipment, and labor
required for installation including the packers and blanks above and below the slotted
screen.
Filter After the screen assembly has been installed in the well the Contractor shall
introduce a graded filter into the annular space surrounding the well screen. The graded
filter shall be designed by the screen manufacturer based on material samples supplied by
the 90ntractor. The engineer will review the graded filter design and approve for
installation. A detailed plan showing how filter materials will be placed and measured in
place shall be determined by the contractor and be presented to the engineer. The engineer
and Idaho Department of water Resources will review and approved the installation plan
prior to beginning filter material placement. Measurement for payment shall be of the
actual number of cubic yards used. Payment shall be at the unit price bid in the bid
schedule and shall include all costs of furnishing and installing graded filter materials.
Development:Upon completion of the drilling, installation of the casing and screens and
installation of the gravel filter, the Contractor shall develop the well or wells by compressed
air, or other method approved in advance by the Engineer. Development shall continue
until no appreciable amounts of material are brought into the well after 30 minutes of
vigorous surging. Upon completion of development, all materials shall be thoroughly
cleaned from inside the casing and screen. If clay, bentonite or other similar substance has
been added to the well during construction, the Contractor may be required to use dispersant
and/or mud removing chemicals to remove the clayey materials from the well.
Measurement for payment for development shall be of the actual hours spent in developing
the well and shall not include time spent in installation or removal of equipment or for any
repairs or maintenance work.
Records and Samples: An accurate, detailed log or record shall be kept by the Contractor
driller on a form suitable to the Engineer which shall indicate for each shift worked the
general character, thickness and type of material encountered, the depth at which the water
level stands in the well at the beginning and end of each shift, and the nature and extent of
all other work performed including time spent on each item of work. The log shall be kept
carefully and accurately at the time the work is being done; a copy of the log shall be
maintained at all times at the job site and shall be available at any time for inspection by the
Owner. Upon completion of the work, a complete copy shall be furnished the Owner and
the Contractor shall further file with the State Department of Water Resources the necessary
log and record on forms obtainable from the department.
Samples of all materials penetrated during drilling shall be taken at every formation change
and every 10 feet above 200 feet and every 5 feet below 200 feet. These samples shall be
saved and maintained on the job site by the Contractor. These samples shall be at least one
pint in volume and shall be kept in transparent waterproof containers to be provided by the
Contractor. All samples shall be clearly labeled to show the depth from which they were
collected. Cloth bags and used oil cans are not acceptable containers.
. .
Samples shall be taken from a split sampler on the drill pump discharge and caught in a
container of not less than 50-gallon capacity. When possible aquifer materials are
encountered, the Contractor shall reduce his drilling speed sufficiently to permit accurate
logging and sampling of the hole. Every effort shall be made by the Contractor to insure
that samples are representative of the materials penetrated. No payment will be made to the
Contractor for keeping the prescribed records or collecting samples and the cost of all such
work shall be included in the amount bid for drilling in the proposal.
SCHEDULE A
ITEM NO.DESCRIPTION TOTAL FOR ITEM
Mobilization on site for the lump sum price of
do lIars
and cent.
1 Lump Sum at $complete.
Install surface seal for the
lump sum price of
dollars
and cents.
1 Lump Sum at $complete.
Drill 8" pilot hole, collect soil samples & conduct electronic log,
450 linear feet at the unit price of
and
dollars
cents.
450 L.F. at $Per linear foot.
Drilling 24" hole, complete, 450 linear feet at
the unit price of
and
do lIars
cents.
450 L.F. at $Per linear foot.
Installation of 16-inch casing in place, 420
linear feet at the unit price of
and
dollars
cents.
420 L.F. at $Per linear foot.
Furnish and install 16- inch well screen in
place, 50 linear feet at the unit price of
and
do lIars
cents.
50L.F. at$Per linear foot.
10.
11.
TOTAL BID
Furnish and install gravel filter, 5 cubic
yards at the unit price of
and
5 C.Y. at $
dollars
cents.
Per Cubic Yard
Well Development, complete, 24 hours at the unit
price of
and
dollars
cents.
24 Hours at $Per hour.
Furnish, install and remove temporary test pump,
complete, for the lump sum price of
and
do lIars
cents.
1 Lump Sum at $complete.
Conduct pump test, complete (24) hours at the
unit price of
and
dollars
cents.
24 Hours at $per hour.
Miscellaneous Work Items, complete 20 hours
at the unit price of
dollars
cents.
20 Hours at $per hour.
Signature
Idaho License No.
Title
Address
Dated this day of
Drilling to start
200
days after award.
WUlUJUJWLJJ0: a: 0: 0:0:0:-td;-t-t-t-t::J::J::J::J::J::J000000II) "HI) UH"'I)II) """"""'1)
t.!Lt.UJLJJj~~~iiu: uJ !.i.IIU :;;:
;;:
g!~iUiUfiJfiJLJJClJClJCJJ..J..J
~ffi~ffi~~CJJJ::J:J:!d!dgCIJCJJCJJO:O:II)
g~~~~
N~NO""cn ~
~~!?!?~~ ~
"""1"1"1"1"1 "
~..,..,..,....... '"
'"tI
~I~
II \t'4 PL~\E CA.p
,; 'I
\",
"Z. \.I,.. Sc:.R.~e\:)
. '
Cet.s/AJG. V~1
z.S S~R.F~c.E' c.~~/NGt
TeNt. P a (1..1\
J..\ ((.,I~~c..e. SEAL
IMreQvlDI.A-~ Lh,'1~
A't)t=Q.ItATI: DIS-7' AA.t:.e
H(2. u.;41'~ 1"', Grf T
cl\
N eo.p /'2.. e N t: Dou e i...e
II~ 9 A.c." e- R
To B~ G~,-t..~~fA)
T24" #\'IoJ.
I'\I-t \. '- "v
" "
I+-0 -
/!;Je/oJ-rO/I.J/T7E SL..IAM
CeMc:NT G-lloIJ.TA-r Bb~O""V z.+
' Bou
~- 51 ;-;. J3.'L.A.IJ"'-'
, ~k CeNf~r ~1\.I1 b"",
j.
So I :t ~$Clles.J;hOI2;. i
I" .. CASltJC:; t.U I T~ C,~"t~~ G.IHtHr.s
Pi e-L-n \J ~(;f I..f-
. L~"GTH
~ S ;)1 N~
VJ! DfL'I-\..\,;.JG SA "'1 t'Jee-s
IO~ I6\..AQ:~WrTPsCAP;
N\A-r(..ij . sc.~_~/r€
EAGLE WELL
( N T-s. )
4S"'o f -:
'! WG't..L c.A~fNG
.31-T~I '\(.1o.)e'"5S
~/(~N'7 ~e.IN() (; l-t 1t:lE'S
' ,
G (2/\ UlY\. P 11\(;.
IF IZ,EQ\A 'f'2.e'\)
, ,~- '. ,.
'O"EPART4i~
, ". ;;..., .
i"' .. r';
::::
l;; .;C~ ~r'
.;::~ ', -'" ~
4r41~NT~\-
STATE OF IDAHO
DEPARTMENT OF
ENVIRONMENTAL QUALITY
-.--------.---------.--
1410 North Hilton. Boise, Idaho 83706-1255 . (208) 373-0502 Dirk Kernpthorne, Governor
C. Stephen Allred, Director
TSCEE-I02/2004
Apri I 14, 2004
James M. Rees, PE
MTC, Inc.
707 N. 27th Street
Boise, Idaho 83702-3113.
RE:Eagle Municipal Well #7, Special Conditions Document
Dear Mr. Rees:
DEQ staff has received and reviewed the Special Conditions specification submitted for Eagle Water Companywell #7, This document, in combination with the cover letter, addresses the conditions presented in DEQ letternumber TSCEE-51/2004, dated February 27, 2004.
The well construction is determined to be acceptable, based upon the changes identified in these documents. Staffwill convey this position to IDWR. If you have any questions, or comments concerning issues addressed in this
letter, please contact me at 208-373-0140, or at amau in de .state.id.us.
Sincerely,
.i.':~~"""
- __. -~~ /j' ~---
AJ. Maupin PE
'- .
Staff Engineer
AJM:sjt
Chas Ariss, PE, IDEQ Boise Regional Office
RobertWh itney, Idaho Department of Water Resources
Robert Deshazo, President~ Eagle WaterCompany
TSCEEReading File. "
. . '. '. '
BRO Source File - Engineering, Reading File
.. -. ., ' . .. ..
EAGLE WATER COMPANY, INC.
APPLICATION FOR EMERGENCY SURCHARGE
;.j
;I?'i.\.t
.'.'
I))
""''~""
IJtt..'.t I."
~~..
";,j;Jj;lAt\~.,LL~:'!,"~4r~! qiX "i!':J~'m
~~,
~2::m"M.AfATTORNEYS AT I.A.
~1olly O'Leary
Tel: 208.938.7900 fax: 208.938.7904
moUycP fie h (I fd .son a nd 01 ca ry. com
O. Box 7218 Boise ID. 83707 - )is N. 27th St. Boise, lD. 83702
24 August 2005
Robert V. DeShazo, Jr. - President
Eagle Water Company, Inc.
172 W. State Street
Eagle, Idaho 83616
Re:1076/15 - Emergency Surcharge
Dear Robert:
I have estimated my legal fees for the handling of Eagle Water Company s Emergency
Surcharge Application as follows:
20 HOURS
(q)
$175.00 per hour = $3,500.
, PLLC
EAGLE WATER COMPANY, INC.
APPLICATION FOR EMERGENCY SURCHARGE
geneva 71. 7ren~ ryJj
c5o/ulions for small businesses
August 19,2005
Estimate to calculate required s~rcharge and prepare revised tariffs
for Eagle Water Company s Request for Emergency Surcharge:
5 hours at $100.00 per hour $500.
Estimate to set up accounting records to track surcharge revenues
and related loan payments, and monitor them:
15 hours at $100.00 per hour $1500.
Total estimated accounting fees for Request for Emergency Surcharge:
$2000.
942 Preakness Dr. . Eagle , 10 83616 . (208) 939-8206
EAGLE WATER COMPANY, INC.
APPLICATION FOR EMERGENCY SURCHARGE
00! 241 ~005 11: 22
'DADO
BANKINGt,....~"NV
fR.c. AAt
. Eagle
402 S.Eagle Rd.
Eagle, Idaho 83616
208~939- 7040
" Falrvl8w
6010 Fairview Ave.
Boise, Idaho 83704
208-472~4700
. Meridian
1875 S. Eagle Rd.
Meridian. Idaho 83642
208-955-0686
. ParkCenter
449 Eo Parkcenter Blvd.
Botfie, Idaho 83706
208-395-1505
. Mortgage
2965 E. Tarpon Dr., Ste. 150
Meridian, Idaho 83642
208-378-1013
. Comrtruction
2965 E. Ta,rpon Dr., Ste. 150
Meridian, Idaho 83642
208~94 7 -5588
. -'33'30257 F'AGEEAGLE WATER CO I NC t12
August 24, 2005
Eagle Water Co
Attn: Robert DeShazo, Jr.
Dear Robert
Pursuant to our recent conversation, here js an estimate of anticipated loan
costs associated with your request.
Loan Amount:$214 246.
Tenn/ Amortization:3 Years
Variable Interest Rate:WSJ Prime + 000
(today s r~te;:::: 8.50%)
Starting Payment:764.00/month
Loan Fee:1010 of Loan A.mount
Please note that this is not to be considered a commitm,ent to finance by
Idaho Banking Company, but simply for discussion purposes only.
If you should have any further questions please call me at (208) 939-0554.
Sincerely,
i~/0-
Becky Fowers
Asst. Vice President
Idaho Banking Company
EAGLE WATER COMPANY, INC.
APPLICATION FOR EMERGENCY SURCHARGE
Eagle Water Company
Calculation of Surcharge Amount - Proposed
August 2005
2004 Customers:
Residential
Commercial
Total
Revenues
$ 491 998.
124 031.
$ 616 029.
79.87%
20.13%
100.00%
Annual Payments of
Multiplied by Gross-up (from below)
Annual Surcharge Total
$ 81 168.
127.88%
$103 797.
Annual Surcharge Amount
Divided by Total Annual Revenue
$103 797.
$ 616 029.
Surcharge to be added to each billing 16.85%
Calculation of Tax Rate:
(1) 100.00% taxable
(2) 8.00%State Tax Rate
(3) 92.00% Federal Taxable
(4) 13.80% Effective Federal Tax Rate 15%
(5) 21.80% Composite Tax Rate (2) + (4)
(6) 78.20% Net Aftr Tax Income
(7) 127.88% Gross-up Factor
Eagle Water Company
Capital Investment Loan Amortization - Proposed
August 2005
Principal Loan Amount $ 214 246.
Term
nterest Rate
Monthly Payment
Annual Cash Required
3 years
50%
$ 6 764.
$ 81 168.
Amortization Schedule
Month Interest Principal Balance Month Interest Principal Balance
517.$ 5 246.42 $ 208 999.806.$ 5 957.$ 107 946.
$ 1,480.$ 5 283.$ 203 715.764.$ 5,999.$101 947.
$ 1,442.$ 5 321.$ 198 394.722.$ 6 041.$ 95 905.
$ 1,405.$ 5 358.$ 193 036.679.$ 6,084.$ 89,820.
367.$ 5 396.$ 187 639.636.$ 6 127.$ 83 693.
$ 1 329.$ 5,434.$182 204.592.$ 6 171.$ 77 521.
$ 1 290.5,4 73.$176,731.549.$ 6,214.$ 71 307.
251.$ 5 512.$171 219.505.$ 6 258.$ 65 048.
212.$ 5 551.$ 165 668.460.$ 6 303.$ 58 744.
173.$ 5 590.$160 077.48 416.$ 6 347.$ 52 396.
133.$ 5 630.$154,447.371.$ 6,392.$ 46,004.
$ 1 094.$ 5 670.$148 777.325.$ 6,438.$ 39 565.
$ 1 053.$ 5 710.$ 143 067.280.$ 6,483.$ 33 082.
013.$ 5,750.$137 316.234.$ 6,529.$ 26,552.
972.$ 5 791.$131 525.188.$ 6,575.$ 19 976.
931.$ 5 832.$ 125 692.141.$ 6 622.$ 13 354.
890.$ 5 873.$119 819.94.$ 6 669.41 684.
848.$ 5 915.$ 113,903.47.$ 6,684.(0.00)
EAGLE WATER COMPANY, INC.
APPLICATION FOR EMERGENCY SURCHARGE
Tariff No.PageSheet 29
4th RevisedC. No.
Canceling
Name of Utility
EAGLE WATER CO (Approval Stamp)
RATE SCHEDULE No.
Small Volume Unmetered Service
A V AILIBILlTY:
Service under this Rate Schedule is available for each service connection of 1 - 1/4 inch
or smaller which is not metered.
RATES:
(a) For the months of November through April, inclusive, a flat rate of $11.75 per month.
(b) For the months of May through October, inclusive, a flat rate of $19.75 per month.
(c) A surcharge of 16.85 % will be added from September 2005 through August 2008
per IPUC Order Number
SERVICE CONDITIONS:
(a) All water service under this Rate Schedule is subject to the General Service Provisions
of the Company s tariff, of which this Rate Schedule is a part.
(b) The Company, at its option, may meter service otherwise qualifying under this rate
schedule, in which case such service shall be governed by Rate Schedule No.
Issued 2005:Effecti ve 200~
Issued by
EAGLE WATER COMPANY, INC. Title
Tariff No.PageSheet 30
3rd RevisedC. No.
Cancel ing
Name of Utility
RATE SCHEDULE No.
Residential Metered Service
A V AILIBILlTY:
To all metered customers.
RATES:
First 600 cu. ft. or less
All over 600 cu. ft. per 100 cu. ft.
MINIMUM CHARGES:
3/41t and smaller
1 It
1 1/41t and 1 1/21t
21t
31t or multilpe meters of equivalent capacity
41t or multiple meters of equivalent capacity
61t or multiple meters of equivalent capacity
81t or multiple meters of equivalent capacity
10" or multiple meters of equivalent capacity
SURCHARGE:
(Approval Stamp)
Cubic Ft.
Allowed
600
000
000
200
6,400
600
000
000
000
Monthly
Per Meter
$7.
0.451
Monthly
Per Meter
Charge
14.
19.
34.
52.
99.
149.
208.
A surcharge of 16.85% will be added from September 2005 through August 2008
per IPUC Order Number
CONDITIONS OF CONTRACT:
The customer shall pay the minimum charge only when the amount resulting from
applying the rates to the quantity of water used is less than the minimum charge.
A minimum bill will be prorated whenever the customer had not been a customer
for the entire billing period and if the same customer has used less than the minimumallowance.
Issued 200!;""Effecti ve
Issued by
EAGLE WATER COMPANY INC.Ti tIe
20 oJ"
Tariff No.PageSheet
2nd RevisedC. No.
Cancel ing Sheet 31 1st Revised
Name of Utility
EAGLE WATER COMPANY. INC.(Approval Stamp)
RATE SCHEDULE No.
NON-RECURRING CHARGES
RECONNECTION CHARGE:
CONDITION: When it becomes necessary to disconnect service for failure
of the customer to comply with the Company s rules and regulations under this
tariff including default (non-payment) as defined in this tariff, a charge will be
made to restore service.
CHARGE:$15.00 Regular business hours Monday through Friday
$30.00 After business hours Weekends and Holidays
SURCHARGE:A surcharge of 16.85% will be added from September 2005 through August 2008
per IPUC Order Number
Issued 200~
..;
Effecti ve 200~
Issued by
EAGLE WATER COMPANY INC.Title
Tariff No.Page Sheet 32
1 st RevisedC. No.
Cancel ing
Name of Utility
(Approval Stamp)
RATE SCHEDULE No.
RATES FOR PRIVATE FIRE SPRINKLER AND HOSE SERVICE
A V AILIBILlTY:
To all customers who have sprinkler systems and/or inside hose connections for fire.
fighting purposes.
RATES:
For service through a separate line for fire fighting purposes.
For 3" service or smaller
For 4" service
For 6" service
For 8" service
For 10" service
Monthly$ 6.
10.
25.
42.
65.
SURCHARGE:A surcharge of 16.85% will be added from September 2005 through August 2008
per IPUC Order Number
MISCELLANEOUS:
Provided that if the installation of a private fire service shall require an extension
of the existing mains of the company, the cost of such extension shall be borne by
the customer.
All private fire services shall be equipped with an approved backflow device or assembly
and sealed gate valves or thermal automatic openings.
Meters may be placed on fire services by the utility at any time, however, metered rates
will not apply unless imprpoer use of water is disclosed, and if such be the case, usage
will be billed to the customer under Rate Schedule No.
Issued 200~Effecti ve 200~
Issued by
EAGLE WATER COMPANY, INC. Title
EAGLE WATER COMPANY, INC.
APPLICATION FOR EMERGENCY SURCHARGE
Eagle Water Company
Calculation of Surcharge Amount - Alternate Proposal
August 2005
2004 Customers:
Residential
Commercial
Total
Revenues
$ 491 998.
124 031.
$ 616 029.
79.87%
20.13%
100.00%
Annual Payments of
Multiplied by Gross-up (from below)
Annual Surcharge Total
$196 800.
127.88%
$ 251 667.
Annual Surcharge Amount
Divided by Total Annual Revenue
$ 251 667.
$ 616 029.
Surcharge to be added to each billing 40.85%
Calculation of Tax Rate:
(1) 100.00% taxable
(2) 8.00%State Tax Rate
(3) 92.00% Federal Taxable
(4) 13.80% Effective Federal Tax Rate 15%
(5) 21.80% Composite Tax Rate (2) + (4)
(6) 78.20% Net Aftr Tax Income
(7) 127.88% Gross-up Factor
Eagle Water Company
Capital Investment Loan Amortization - Alternate Proposal
August 2005
Principal Loan Amount $ 517,476.
Term
nterest Rate
Monthly Payment
Annual Cash Required
3 years
50%
$ 16,400.00 (approximate)
$196,800.
Amortization Schedule
Month Interest Principal Balance Month Interest Principal Balance
$ 3 665.46 $ 12 734.$ 504 742.940.$14,459.$ 259,458.
$ 3 575.26 $12 824.$ 491 917.47 837.$14 562.$ 244 896.
$ 3,484.42 $12 915.$ 479 001.734.$ 14 665.$ 230 231.
$ 3 392.$13 007.$ 465,994.630.$14 769.$ 215,462.
$ 3 300.$ 13 099.$ 452 895.526.$ 14 873.$ 200 588.
$ 3,208.$13 191.$ 439 703.1 ,420.$14 979.$ 185,609.
114.$13,285.$426,418.314.$ 15 085.$170 523.
$ 3 020.46 $ 13 379.$ 413 038.207.$15 192.$155 331.
$ 2 925.$13,474.$ 399 564.100.$15 299.$ 140 031.
$ 2 830.$13 569.$ 385 994.991.$15,408.$ 124 623.
$ 2 734.$ 13,665.$ 372 328.882.$15,517.$109 106.
$ 2 637.$ 13 762.$ 358 566.772.$15 627.$ 93,479.
$ 2 539.$13 860.$ 344 705.662.$15 737.$ 77 741.
$ 2,441.$13 958.$ 330 747.550.$ 15 849.$ 61 892.
$ 2 342.$14 057.$ 316,690.438.$ 15 961.$ 45 930.
$ 2 243.$14 156.$ 302 533.325.$16 074.$ 29 856.
$ 2 142.$ 14 257.$ 288 276.211.$16 188.$ 13,667.48
$ 2 041.$ 14 358.$ 273,918.96.$13 667.48 (0.00)
EAGLE WATER COMPANY, INC.
APPLICATION FOR EMERGENCY SURCHARGE
Tariff No.PagCSheet 29
4th RevisedC. No.
Canceling
Name of Utility
(Approval Stamp)
RATE SCHEDULE No.
Small Volume Unmetered Service
A V AILIBILlTY:
Service under this Rate Schedule is available for each service connection of 1 - 1/4 inch
or smaller which is not metered.
RATES:
(a) For the months of November through April, inclusive, a flat rate of $11.75 per month.
(b) For the months of May through October, inclusive, a flat rate of $19.75 per month.
(c) A surcharge of 40.85 % will be added from September 2005 through August 2008
per IPUC Order Number
SERVICE CONDITIONS:
(a) All water service under this Rate Schedule is subject to the General Service Provisions
of the Company s tariff, of which this Rate Schedule is a part.
(b) The Company, at its option, may meter service otherwise qualifying under this rate
schedule, in which case such service shall be governed by Rate Schedule No.
Issued 200~Effecti ve 200~
Issued by
EAGLE WATER COMPANY INC.Title
Tariff No.PagESheet 30
3rd RevisedC. No.
Cancel ing
Name of Utility
RATE SCHEDULE No.
Residential Metered Service
A V AILIBILlTY:
To all metered customers.
RATES:
First 600 cu. ft. or less
All over 600 cu. ft. per 100 cu. ft.
MINIMUM CHARGES:
3/4U and smaller
1/4" and 1 1/2"
3" or multilpe meters of equivalent capacity
4.' or multiple meters of equivalent capacity
6" or multiple meters of equivalent capacity
8" or multiple meters of equivalent capacity
10u or multiple meters of equivalent capacity
SURCHARGE:
(Approval Stamp)
Cubic Ft.
Allowed
600
000
000
200
6,400
600
000
000
45,000
Monthly
Per Meter
$7.
0.451
Monthly
Per Meter
Charge
14.
19.
34.
52.
99.
149.45
208.
A surcharge of 40.85% will be added from September 2005 through August 2008
per IPUC Order Number
CONDITIONS OF CONTRACT:
The customer shall pay the minimum charge only when the amount resulting from
applying the rates to the quantity of water used is less than the minimum charge.
A minimum bill will be prorated whenever the customer had not been a customer
for the entire billing period and if the same customer has used less than the minimumallowance.
Issued 200~Effecti ve
Issued by
EAGLE WATER COMPANY, INC.Title
200~
Tariff No.PagESheet 31
2nd RevisedC. No.
Cancel ing
Name of Utility
. PANY INC.(Approval Stamp)
RATE SCHEDULE No.
NON-RECURRING CHARGES
RECONNECTION CHARGE:
CONDITION: When it becomes necessary to disconnect service for failure
of the customer to comply with the Company s rules and regulations under this
tariff including default (non-payment) as defined in this tariff, a charge will be
made to restore service.
CHARGE:$15.00 Regular business hours Monday through Friday
$30.00 After business hours, Weekends and Holidays
SURCHARGE:A surcharge of 40.85% will be added from September 2005 through August 2008
per IPUC Order Number
Issued 200~Effecti ve 200~
Issued by
EAGLE WATER COMPANY INC.Title
Tariff No.Pagesheet 32
1 st RevisedC. No.
Cancel ing
Name of Utility
(Approval Stamp)
RATE SCHEDULE No.
RATES FOR PRIVATE FIRE SPRINKLER AND HOSE SERVICE
A V AILIBILlTY:
To all customers who have sprinkler systems and/or inside hose connections for fire.
fighting purposes.
RATES:
For service through a separate line for fire fighting purposes.
For 3" service or smaller
For 4" service
For 6" service
For 8" service
For 10" service
Monthly
$ 6.
10.
25.
42.
65.
SURCHARGE:A surcharge of 40.85% will be added from September 2005 through August 2008
per IPUC Order Number
MISCELLANEOUS:
Provided that if the installation of a private fire service shall require an extension
of the existing mains of the company, the cost of such extension shall be borne by
the customer.
All private fire services shall be equipped with an approved backflow device or assembly
and sealed gate valves or thermal automatic openings.
Meters may be placed on fire services by the utility at any time, however, metered rates
will not apply unless imprpoer use of water is disclosed , and if such be the case, usage
will be billed to the customer under Rate Schedule No.
. .
Issued 20 A!'Effecti ve 20 oJ'
Issued by
EAGLE WATER COMPANY, INC.Title