HomeMy WebLinkAbout20160624order_no_33547.pdfOffice of the Secretary
Service Date
June 24,2016
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF DIAMOND BAR )
ESTATES WATER COMPANY’S )CASE NO.DIA-W-15-O1
APPLICATION FOR AUTHORITY TO )
INCREASE ITS RATES AND CHARGES FOR )
WATER SERVICE IN THE STATE OF )ORDER NO.33547
IDAHO )
In December 2015,Diamond Bar Estates Water Company filed a general rate case
Application to increase its rates for water service by about 79%,which would produce about
$20,910 more in annual revenue than the prior year.The Commission issued a Notice of
Application,Notice of Modified Procedure,and Order suspending the effective date until July 1,
2016.Order No.33452.In keeping with the Commission’s Order,Staff conducted a public
workshop for customers,performed an investigation and audit,and filed written comments.
Diamond Bar filed a timely reply.On June 7,2016,the Commission held a public hearing at
which about 10 customers appeared —6 of whom testified.The Commission received more than
18 written comments.
COMMISSION FINDINGS
After reviewing the record and on its own Motion,the Commission will further
suspend the effective date of Diamond Bar’s Application to increase rates.Under Idaho Code §
61-622(4),the Commission may suspend the effective date of such Application an additional 60
days for good cause shown.In light of comments and questions raised by customers,we find
good cause to extend suspension of the effective date in order to more fully develop the record.
To this end,we direct the Company to provide responses to the following:
1.The AEI engineering report states that Kootenai Electric rules require a
soft start on all motors larger than 20 hp.Prior to this report,was
Diamond Bar ever made aware of this rule by Kootenai Electric or pump
contractors working on prior pump motor failures?Please explain.
2.The AEI engineering report recommends that a soft start be installed at the
pump,yet no such equipment has been installed to date.What is Diamond
Bar’s understanding with respect to the need for soft start equipment at the
pump to prevent additional motor failures?Is it Diamond Bar’s belief that
soft start equipment at the pump for 2002 forward would not have
prevented motor failure?Please explain.
ORDER NO.33547
3.Did Diamond Bar or its pump contractor ever inform Kootenai Electric of
the increase in pump size from 50 hp to 60 hp in 2004?Please explain.
4.Prior to the AEI report in 2015,did Diamond Bar ever hire a certified
electrician to assess the electrical equipment at the pump,including
grounding,transformer adequacy,surge protection and conductors as a
result of motor failure?If so,please list service providers and any reports
provided.If not,why not?
5.Based on available information,what does Diamond Bar believe was the
root cause of the multiple pump motor failures between 2002 and 2015?
Please provide support for the Company’s position with references to any
written repair recommendations,investigative reports or other written
analysis.
6.Please provide a schedule showing all dates when there was contamination
at either well.Please provide an explanation of the type of notice
provided to all customers.Please provide copies of any written notices.
The Company’s responses shall be provided by no later than July 8,2016.Staff shall
have until July 22,2016,to file an addendum to its comments,if any,addressing the Company’s
responses.The Company will then have until July 29,2016,to file a reply,if any.Upon that
date,the matter will be fully submitted,and the Commission will deliberate and issue its final
Order on or before the new effective date of August 30,2016.
ORDER
IT IS HEREBY ORDERED that the effective date of the Company’s Application is
suspended an additional 60 days,until August 30,2016.
IT IS FURTHER ORDERED that Diamond Bar shall provide responses to the
Commission’s questions set forth in the body of this Order by no later than July 8,2016.
IT IS FURTHER ORDERED that Staff shall file an addendum to comments
addressing the Company’s responses,if any,by no later than July 22,2016.
IT IS FURTHER ORDERED that the Company shall file a reply to Staff’s
addendum,if any,by no later than July 29,2016.
ORDER NO.33547 2
DONE by Order of the Idaho Public Utilities Commission at Boise,Idaho this
day of June 2016.
PAUL JELL R,PRESIDENT
KRI [NE RAPER,COM TONER
ERIC ANDERSON,COMMISSIONER
ATTEST:
A
I
fdan D.Jewel/I
commission Secretary
O:DIA-W-1 5-OIdjh2
ORDER NO.33547 3