2626 Eldorado Boise, Idaho 83704
Telephone 375-0931
Water
TO: IDAHO PUBLIC UTILITIES COMMISSION
472 W. WASHINGTON STREET
BOISE, ID 83702
RE: CASE NO. CAP-02-
ORDER NO, 29035
DATE: MAY 27 2003
Accompanying this letter, as required in the above Order, are (1) the results of the engineering
study; and (2) a schedule showing the adjusting entries to correct the accounting for the
surcharge revenues and expenditures,
Analysis and recommendations by the Commission, as soon as possible, will be appreciated,
Bank of America is anxious to finalize the loan,
The recommendations of Capitol Water s engineer, Terry Scanlan, are also enclosed.
;;~
Jdl
H. Robert Price, President
CAPITOL WATER CORPORATION
. -
Capitol Water Corporation
Surcharge adjustment entry
2002
Depreciation life
Franchises &Land & Land Structure Pumping Water Transport andWellsSupply Mains Treatment Services Meters Tolal
Description Consents Rights Improvements Equipment Equipment Dist Mains
Surcharge 1
1996 450,562.342.355.
1997 500.060.581.108.491.380.488.610.1998 300.42.441.058.086.60.774.811.593.403.49 250 529.
Total 800.441.569.119 667.168.121,828.723.811.081.61 403.49 361,495.
Accumulated Depr
1996 377.00 866.89.332.
1997 673.487.623.528.303.327.40 944.1998 670.595.10.799.41 146.106.'72_401.
Total 720.083.634.193_392.146.Q1 434.72.62,678.45
Current year depr 662.786.1,206.873.68.32.63.16.730.
Current year Interest 623.
Curi-ent year loan prindple 839.
Journal Entry
460.40 Surcharge receipts
460.50 Surcharge" receipts
224.40 Note B of A
215.00 Eamed Surplus
108.00 Accum deprplant
302.00 Franchise & consent
303.00 land and rights
304.00 Structure improve
307.00 Wells
309.00 Supply mains
311.00 Pumping Equipment
320_00 Water treatment equ
331.00 Transportation & dist
333.00 Services
334.00 Meters
403.00 Depredation
427.40 Interest exp B of A
131.40 Cash-surcharge
Other expenses
111'614.
63,151.
113 234.
151 507.
678.
Amounts from trial balance except
Eamed Surplus which is a plug to
the joumal entry for this year. In
the future, Eamed Surplus will
adjust back to prior year ending
number.
800.
441,
569.
119 867.
168.
121 828.
723.
811.
081.
403.49
730.
623.
62,801.
536.
Current Year
Income
Loan Payments
Cash Increase
Interest
174 765.
(60 839.00)
(48767.34)
(25623.00)
39,536.other exp
502,186.502,186.
SCANLAN ENGINEERING~~~~..:::::o.-:::f::ECEIVED
':' ! L. c: D
""-
L~J
Groundwater and Environmental Engineering
2003 r1l~Y 21 AM 10: 58
May 19, 2003
,.'. :, -
- i (; ,-: L i L.
I !"iFC'
....
"A!S"!ON11._l.._,J L 11r.
Bob Price
Capitol Water Corporation
2626 Eldorado
Boise, 10 83704
Subject:Water Distribution System Analysis for Capitol Water Corporation
Dear Bob:
Enclosed is one final copy of the Report for Water Distribution System Analysis prepared for
Capitol Water Corporation by MWH. The report presents the results of numerical modeling of the
CWC water distribution system, The purpose of the analysis was to provide guidance for water
system improvements.
Analysis of model output for peak instantaneous flow and peak-instantaneous flow plus fire flow
scenarios provides the following important conclusions.
Replacement of Well No, 5 in 2002 has solved the low pressure and fire flow problems
for the portion of the water system located east of Esquire Drive. The new well is
equipped with a pump rated to produce up to 1 200 gpm under normal operating
pressures, and up to 1.400 gpm under fire flow conditions. The previous well and pump
produced only 250 gpm. As a result, the extreme eastern portion of the water system
(served by Wells 1 and 5) can now maintain adequate pressure under peak demand
conditions without relying on delivery of significant flows through 4-inch water mains from
wells located west of Esquire Drive.
A 1 500 gpm fire flow cannot be provided from hydrants connected to 4-inch water mains.
As a result, the portions of the CWC service area between Cole Road (on the west) and
Esquire Drive (on the east) with 4-inch mains do not have 1 500 gpm of fire protection.
Approximately 25,000 feet of 4-inch mains are located within this area. Replacement of a
large percentage of these 4-inch mains would be required to provide adequate fire flows
within this area,
Use of Well No, 6 is needed to maintain pressures during peak instantaneous demands.
The well is currently utilized only as a standby well for fire protection purposes because
of high iron content in the water, Utilization of Well No, 6 to meet demand peaks could
provide significant benefits during summer months, Use of Well No.6 will also defer the
need to replace Well No, 2.
---------------------------------- --------- -
600 East River Park Lane, Suite 105
Boise, Idaho 83706
Telephone (208) 383-4140
Facsimile (208) 383-4156
Bob Price May 19, 2003
The water system analysis also notes that CWC lacks standby power at all of its wells, Since the
water system has no storage tanks, the entire system will depressurize in the event of a
sustained power outage, which could allow contaminants to enter the water system.
Depressurization is a particular concern for non-chlorinated water systems such as CWC. The
analysis recommends adding standby power to one or more wells to prevent depressurization
and to provide fire protection during power outages,
The estimated cost to replace only those 4-inch water mains that are equipped with hydrants is
$301 155, based on 8 500 feet at $35.43 per foot This cost far exceeds the approximate
$100 000 budget currently available for water distribution system improvements. There does not
appear to be a significant advantage to replacement of only a few thousand feet of 4-inch mains.
Given that adequate funding is not currently available to replace enough 4-inch main to
immediately improve fire flows throughout the eastern portion of the service area, the following
steps are recommended to implement water system improvements.
Install back-up power at CWC Well No.4 in 2003. This well can produce approximately
2000 gpm under normal system pressures, As such, the well is capable of meeting the
entire average winter demand plus a 1 500 gpm fire flow. Estimated cost to install back-
up power is $75 000.
Initiate aquifer recharge activities in the fall of 2003 at Well No.6 in an effort to improve
water quality for use during summertime demand peaks, High quality water from wells 3
, or 7 could be injected into Well No.6 during fall , winter, and spring months, and then
recovered during peak demand periods in the summer months, Estimated costs for the
recharge project (piping, water quality analysis, permitting, etc.) are $20 000.
Modify the capitol improvement plan from the report, so that remaining improvements can
be implemented over a 1 O-year period, Specifically, the CIP would provide a long-term
plan for upgrade of 4-inch water mains and other distribution system improvements. The
plan should identify the total footage of water mains to be upgraded , the location of the
mains, estimated costs, and the schedule for implementation, The plan should also
include back-up power for at least one additional well (Well 5?) and replacement of Well
No.3 or Well No, 2. Funding for the work will need to be determined based on the
proposed plan.
Please contact me to discuss this report and the subsequent recommendations listed above.
Sincerely,7rr~
Terry M, Scanlan , P.E., P,
Cc:Randy Zollinger - MWH
/\/of-0: 0110; I
or f'hi!.- w,j-u-
:J:;-tvi'Y\..
tA..i-'V.;v jS" /:5 t-J v\.5 Nx 'd .
. '
1/-t. ---i.- i/J! I ~ t--"'/v--f I
/'\..
hl-c. (?JOY1'\.. cv't\.
h~ cA0(.JL c 0"
. )
Capitol Water Corporation
Report for
Water Distribution System Analysis
April 2003
.~""~...~
li,
~..""I I
, i: i; i
i,:
'it
I '
, .
MAPS WERE INCLUDED IN THIS
FILIN G ARE IN THE FILE
RE MAININ G P AGE S
ARE IN THE FILE
UNABLE TO SCAN
BECAUSE OF POOR QUALITY