Loading...
HomeMy WebLinkAbout20120126Revised Application with Attachments.pdfBrian Water Corp 5120 Overland Rd Ste C #228 Boise, ID 83704 869-9199 RECEIVED 2012 JAN 26 AM 9: 09 IDAHO PU8UG UTILITIES COMMISSION Januar 24,2012 Public Utilities Commission RE: Request to raise base rate $12.50/mo. Sirs:\3R~-\V-\~-D\ Curently, the water rates for the Brian Water Corp. are $17.50 per month base for the first 4000 gallons and $1.51 per 1000 gallons per month above the 4000 gallons. I am requesting that the base rate be raised another $ 12.50/month. The purose of this increase is to pay for 'Nitrate Mitigation' as ordered by the EPAIEQ. The nitrate levels in the wells of the Brian Water Corporation this past year have risen above the EPA's maximum contamination level (MCL) of 1O.0/mg/. The most recent water sample showed levels of 12.2 mg/L but have been as high as 15.0 mg/. Consequently, I am ordered to star the process to solve the issue. The first step is to hire an engineer to do an analysis and make recommendations to the DEQ. (One engineers price quote was up to $20,000) We already know that a new, deeper well is the only viable solution. Estimated cost for one well with pump is $30,000. The base rate add-on with be used solely for payments to an engineer and payments on a loan for the welL. I'm asking for an effective date of April 2012. Sincerely,--òY/~ TonyB~ar Brian Water Corp. Mountain Home Office 1240 N W Beaman 8t Mountain Home, 10 83647 208-587 -9055 fax 208-587-9816 \)ûLESh~ O~Boise Office5932W~E D Boise, 10 83709 fa;~.~6 AM 9= 09 IDAHO PUBLiC: UTIUTIES COMMISSION DRILLING & PUMP CO. ww.hiddlestondrilling.com ESTIMATE Date: March 8, 2011 Tony Bower 5120 Overland Rd. suite 228 Boise, ID. 83705 Phone: 869-9199 Fax: Email: RE: 1- 8" x 200' Community well for Brain Water Corp. Warm Springs Ave. DRILLING DESCRIPTIONI QUANTITY I UNITS1 Each60 Feet140 Feet200 Feet1 Each1 Each I QUANTITY I1 LOS.UNITS 1 loS. Community Well Drillng Permit 12" Diameter Borehole 8" Diameter Borehole 8" Casing 8" x 10' SS Screen Assembly State of Idaho required Surface Seal UNIT PRICE I $225.00 $95.00 $24.00 $29.86 $1,647.00 $750.00 EXTENDED I $225.00 $5,700.00 $3,360.00 $5,972.00 $1,647.00 $750.00 $17,654.00 EXTENDED I $12,079.99 $14,990.63 Drilling & Standard Pump Total OR Drilling & Variable Fleq Pump Thank you for the opportunity to bid this project Dril Subtotal PUMP SET AT 147 FEET DESCRIPTION 10 HP 110 GPM Standard Pump System OR 10 HP 110 GPM VFD Pump System (Variable Frequency Drive) UNIT PRICE I $12,079.99 $14,990.63 .... .-- -. -, PUMP TOTAl INCLUDES PUMP,MOTOR,CONTRÖLLER,l)RÖ"l"PE,SUBWlRE,PltLESS,CHECKVALVE, ASSYTEl:,PRESSURE TANK,Wl:LL SEAL, HYDRANT. 8lS1G la,EGTRIGAl PARTS, BASIC PLUMBING PARtS, 100FEET OF UNOERGROUNO pIPE AND WIRE, PERMITS, TAXESANDFREiGtlT. ANY l.NFORSEENWlRING OR PLUMBING IS EXTRA. $90.00 PER HOUR FOR TRENCHING. . . ..' Gary Oyler Hiddleston Drilling and Pump Co. Accepted By Date: Estimate good for 30 days 3/8/2011 ßriM,W -\") -0 \