Loading...
HomeMy WebLinkAboutDE2021 LOC Response.pdf 7/29/2021 Mr. Darrin M. Ulmer Pipeline Safety Program Manager Idaho Public Utility Commission 11331 W. Chinden Blvd, Building 8, Ste 201-A Boise, Idaho, 83714 Dear Mr. Ulmer, Dominion Energy Utah Wyoming Idaho (DEUWI) has received your letter of concern dated July 6, 2021 regarding the onsite inspection of the Integrity Management verification dig and appreciates the opportunity to respond. Your letter stated that a non-compliance item was found and noted: The item(s) listed below are of concern: 1. § 192.605(a) General. Each operator shall prepare and follow for each pipeline, a manual of written procedures for conducting operations and maintenance activities and for emergency response. For transmission lines, the manual must also include procedures for handling abnormal operations. This manual must be reviewed and updated by the operator at intervals not exceeding 15 months, but at least once each calendar year. This manual must be prepared before operations of a pipeline system commence. Appropriate parts of the manual must be kept at locations where operations and maintenance activities are conducted. During the inspection it was noted that the Whitaker Construction crew employed by DEUWI, did not have a calibrated holiday detection device (jeep) to check for coating defects as required by DEUWI Specification 9-11-0112.5.1 Coating Inspection "... Contractor shall ensure holiday detector is properly calibrated. " There was no reference to calibration in SP 4-13-01 Portable Electrical Holiday Detector Operating Procedures. DEUWI took prompt action on the day of discovery and stopped the contractor from using the piece of equipment in question and required them to obtain a properly calibrated unit. Additionally, DEUWI has also taken action to reduce the likelihood of this issue reoccurring. This issue was reviewed with Whitaker Construction and it was identified that there was a gap in their process for tracking equipment calibration. To fill this gap, Whitaker Construction is implementing a software, B2W, to track equipment maintenance and calibration dates. DEUWI has supplied a list of equipment requiring calibration to inspectors observing this work and instructed them to check the calibration dates. Finally, DEUWI is implementing a step to verify equipment calibration in the procedure. Should you have any additional questions regarding our response and corrective actions, please contact me directly. Respectfully, Steve Bursett Supervisor Gas Operations Dominion Energy Utah cc: Matt Bartol Jeff Hansen Reid Hess Richard Kiser Chris Noble Craig Wagstaff