Loading...
HomeMy WebLinkAbout20160812Blattner Exhibit 19.pdfRonald L. Williams, ISB No. 3034 Williams Bradbury, P.C. 1015 W. Hays St. Boise, ID 83702 Telephone: (208) 344-6633 Email: ron@williamsbradbury.com Attorneys for Intermountain Gas Company BEFORE THE IDAHO PUBLIC UTILITES COMMISSION IN THE MATTER OF THE APPLICATION OF ) INTERMOUNTAIN GAS COMPANY FOR ) THE AUTHORITY TO CHANGE ITS RATES ) Case No. INT-G-16-02 AND CHARGES FOR NATURAL GAS ) SERVICE TO NATURAL GAS CUSTOMERS ) IN THE ST A TE OF IDAHO ) ________________ ) EXHIBIT 19 1 ZERO SIZE COST 2 PLASTIC 3 4 STEEL 5 6 TOTAL ZERO-SIZE COST (A) 7 SYSTEM COST NEW 8 Plastic 9 Steel INTERMOUNTAIN GAS COMPANY Distribution Plant -Mains Zero-Intercept Method December 31, 2015 $5.50 per foot x 19,067,846 feet $13.17 per foot X 12,594,696 feet 10 TOTAL SYSTEM COST NEW (B) 11 Customer Cost (A/B) 12 Capacity Cost (1.0-Customer Cost) 13 NOTES: 14 1. Used weighted average cost per foot grouped by size classification = $ 104,900,256.18 = $ 165,930,162.68 $ 270,830,418.86 $ 148,571,466.77 425,726,574.01 $ 574,298,040.79 47.16% 52.84% 15 2. Removed low footage, large pipe size (10, 12, 16) and outlier 3.5 inch pipe size data points 2015 Mains Study.xis, Study Notes Exhibit No. 19 Case No. INT-G-16-02 L. Blattner, JGC p. l of l