HomeMy WebLinkAbout20090615Proposed Rate Schedule.pdfEXHIBIT NO.1
CASE NO. INT-G-09-01
INTERMOUNTAIN GAS COMPANY
Proposed Rate Schedule
(3 pages)
RECEIVED
2099 JUH r 5 PM 3= 37
IDAHO 0U r ;it~r p,,,UTILITIES CO ISSlON
I.P.U.C. Gas Tariff
Second Revised Volume No.1
(Supersedes First Revised Volume No.1)Original Sheet No. 01
Name
of Utiliy
Exhibit No.1
Case No. INT-G-09-01
Intermountain Gas Company
Amended Page 1 of 3
Intermountain Gas Company RECEiVED
illq JUt 24 PH \2: '8
Rate Schedule lfiil~Rté§Oi ""¡'ŠS\QN
KETCHUM/SUN VALLEY AREA HOOK-UP FEE
(Page 1 of 3)
APPLICABILITY:
Applicable to any new customer requesting new natural gas service, or to any existing customer
requesting incremental natural gas service, on the Company's distribution system within the Ketchum/Sun
Valley Impact Area, as described on page 2 of this Rate Schedule H-1, where such service would cause the
Company to provide, or to rely upon, incremental capacity upgrades to its distribution system in order to
serve the Customer's excess peak-day demand. Any charges hereunder shall not replace, but shall be in
addition to, any and all other charges as may be applicable under any other approved Tariffs.
Any and all applicable requests for such new or incremental service, for which the customer's Estimated
Peak-Day usage ("EPD") exceeds the Ketchum/Sun Valley Average Peak-Day ("APD") usage, wil be
subject to this Hook-up Fee ("HF"). The HF is calculated by multiplying the Customer's peak therm excess
(any positive result of the EPD minus the APD) by the Ketchum/Sun Valley Incremental Distribution System
Capacity Cost ("ICC") of $40.00 per therm as more fully delineated below.
HOOK-UP FEE:
The Ketchum/Sun Valley Area Hook-up Fee is calculated as follows:
Any excess in Customer's EPD over and above the APD multiplied by the iCC.
Where:
EPD is calculated as the summation of all peak hourly equipment ratings - not including any
equipment rating for snowmelt - for installed equipment at customer's premise times 50% times 20
hours.
APD is 15.5 therms.
ICC is calculated by dividing the total estimated cost of the 2009 8" Ketchum distribution system
uprate project ($640,000) by the incremental peak-day capacity provided (16,000 therms) or $40.00
pertherm.
Examp/e:
An applicable customer requesting new or incremental load that would result in a total estimated
peak-day usage of 36 therms would pay the following HF:
An EPD of 36 therms minus the APD 15.5 therms equals 20.5 excess peak therms which, when
multiplied by the ICC of $40.00, yields a Hook-up Fee of $820.00.
Issued by: Intermountain Gas Company
By: Michael P. McGrath Title: Director - Gas Supply & Regulatory Affairs
Effective: July 15, 2009
I.P.U.C. Gas Tariff
Second Revised Volume NO.1
(Supersedes First Revised Volume No.1)
Original Sheet No. 01 (Page 2 of 3)
Nameof Utilty Intermountain Gas Company
Exhibit NO.1
Case No. INT-G-09-01
Intermountain Gas Company
Page 2 of 3
Rate Schedule H-1
KETCHUM/SUN VALLEY AREA HOOK-UP FEE (Continued)
PRE-CONDITIONS:
1. Customer shall provide to Company a complete listing of all natural gas equipment and related Btu per
hour ratings to be installed at Customer's premise. The Company wil exclude any rating for snowmelt
equipment in its calculation of Customer's EPD.
2. Any gas-fired equipment installed subsequent to the Customer's initial service line extension must be
promptly reported to the Company and shall be subject to all pre-conditions and requirements of Rate
Schedule H-1 to calculate any applicable Hook-up Fee. Any customer in violation of this requirement
may be subject to termination of service (see Company's General Service Provisions Section B, 3.3 (c))
as well as any other course of action afforded the Company under any IPUC rule or Idaho state law.
3. Any Hook-up Fee calculated hereunder for any new Customer shall be paid to the Company prior to the
installation of the Customer's meter set. Any existing Customer requesting incremental service shall pay
a Hook-up Fee prior to the operation of any incremental equipment.
PHYISICAL DESCRIPTION OF THE KETCHUM/SUN VALLEY IMPACT AREA SUBJECT TO THE HOOK-UP
FEE:
The area subject to this Rate Schedule H-1 is that region of Intermountain's service territory north of the
"Boundary Line" shown on the map on page 3 of 3.
Issued by: Intermountain Gas Company
By: Michael P. McGrath Title: Director - Gas Supply & Regulatory Affairs
Effective: July 15, 2009
I.P.U.C. Gas Tariff
Second Revised Volume No. 1
(Supersedes First Revised Volume No.1)Original Sheet No. 01 (Page 3 of 3)
Nameof Utiliy Intermountain Gas Company
Exhibit NO.1
Case No. INT-G-09-01
Intermountain Gas Company
Page 3 of 3
Rate Schedule H-1
KETCHUM/SUN VALLEY AREA HOOK-UP FEE (Continued)
Impact Area
iC009 Google - Map Data
Issued by: Intermountain Gas Company
By: Michael P. McGrath Title: Director - Gas Supply & Regulatory Affairs
Effective: July 15, 2009