HomeMy WebLinkAbout20110125Collins Sur-reb.pdf. 2811 JAN 25 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION ) IN THE MA TIER OF THE ) APPLICATION OF ROCKY MOUNTAIN ) POWER FOR APPROVAL OF ) CHANGES TO ITS ELECTRIC ) SERVICE SCHEDULES AND A PRICE ) INCREASE OF $27.7 MilLION, OR ) APPROXIMATELY 13.7 PERCENT ) ) CASE NO. PAC-E-10-07 Surrebuttal Testimony of Brian C. Collns (Economic Valuation of Monsanto Interruptible Products) On behalf of Monsanto Company Project 9210 January 24, 2011 BROlll & AsSOClAllS, INC. CHESTERFIELD, MO 63017 r-, PACIFICORP dba ROCKY MOUNTAIN POWER BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NO. PAC-E-10-07 Surrebuttal Testimony of Brian C. Collns 1 Q PLEASE STATE YOUR NAME AND BUSINESS ADDRESS. 2 A Brian C. Collns. My business address is 16690 Swingley Ridge Road, Suite 140, 3 Chesterfield, MO 63017. 4 Q ON WHOSE BEHALF ARE YOU APPEARING IN THIS PROCEEDING? 5 A I am appearing on behalf of Monsanto Company ("Monsanto"), a special contract 6 customer of Rocky Mountain Power ("RMP" or "Company"). RMP is a division of 7 PacifiCorp. 8 Q ARE YOU THE SAME BRIAN C. COLLINS WHO PREVIOUSLY FILED 9 TESTIMONY IN THIS PROCEEDING? 10 A Yes, i am. On November 1, 2010 i provided direct testimony as to the interrptible 11 nature of Monsanto's loads, the treatment of Monsanto by RMP in its Integrated 12 Resource Plan ("I RP"), and the economic benefits to RMP, its customers and the 13 power system as a whole from a long-term interruptible program such as Monsanto's. 14 On December 22,2010 I provided direct testimony regarding the economic valuation 15 of Monsanto interrptible products, and on January 14, 2011 i provided rebuttal 16 testimony on the same issues. 17 Q PLEASE DESCRIBE YOUR EDUCATIONAL BACKGROUND AND EXPERIENCE. 18 A This information was included in my direct testimony filed November 1, 2010. Collns, Di-8ur - 1 Monsanto Company 1 Q WHAT IS THE SUBJECT OF THIS SURREBUTTAL TESTIMONY? 2 A I am responding to the January 2011 rebuttal testimonies of Paul H. Clements and 3 Gregory N. Duvall submitted on behalf of RMP. 4 Q WOULD YOU PLEASE SUMMARIZE YOUR FINDINGS AND CONCLUSIONS? 5 A My findings and conclusions are as follows: 6 1. RMP continues to ignore the capacity resource costs avoided by the 7 interruptibilty of Monsanto's load. 8 2. RMP's valuation methods incorrectly value Monsanto's interrptibilty on a 9 short-term basis, ignoring Monsanto's 60-year history as an interrptible load to 10 RMP and its predecessors, as well as its continued commitment to remain an 11 interruptible customer as long as it takes power from RMP. 12 3. Since simple cycle combustion turbine capacity is the lowest cost and most 13 readily available capacity that could be constructed, the avoided cost of a simple 14 cycle combustion turbine is appropriate to use in a long-term valuation of15 Monsanto's interrptibilty. 16 Response to the Rebuttal Testimony of Paul H. Clements 17 Q WHAT METHOD DOES MR. CLEMENTS ASSERT IS APPROPRIATE FOR 18 DETERMINING A RESOURCE'S VALUE? 19 A At page 3 of his rebuttal testimony, Mr. Clements asserts that resource value is best 20 determined by evaluating the cost one would incur to replace the resource if it were 21 no longer available for use. He further asserts that the Company's methods calculate 22 the cost the Company would incur to replace the interruptible products provided by 23 Monsanto. Collns, Di-8ur - 2 Monsanto Company 1 Q IS MR. CLEMENTS' APPROACH APPROPRIATE FOR DETERMINING THE 2 VALUE OF MONSANTO'S INTERRUPTIBILlTY? 3 A No. The basic premise of Mr. Clements' rebuttal testimony is that short-term 4 replacement costs are appropriate for determining the value of Monsanto's 5 interruptibilty. Mr. Clements' premise is incorrect and his valuation methods based 6 on the GRID and Front Offce Models produce flawed results. 7 The value of Monsanto's interruptibilty has nothing to do with short-term 8 replacement costs. Monsanto has been an interruptible customer since 1951. Since 9 it has adequate ore to be mined for approximately another 40 years, Monsanto plans 10 to remain an interruptible customer as long as it is a customer of RMP. Monsanto's 11 long-term commitment to interrupt has provided long-term value to RMP (and its 12 predecessors) for approximately 60 years, and wil continue to provide long-term 13 value to RMP for decades in the form of avoided generating resource costs. 14 Mr. Clements' valuation methods completely disregard the long-term value of 15 Monsanto's interruptibilty. As a result, his short-term replacement cost methods 16 produce results that are radically different from an appropriate long-term valuation of 17 Monsanto's interruptibilty. 18 Q WHAT EVIDENCE DOES MR. CLEMENTS CLAIM VALIDATES THE COMPANY'S 19 METHODS AND MODELS AS REASONABLE INDICATORS OF VALUE FOR 20 INTERRUPTIBLE PRODUCTS? 21 A Mr. Clements argues that since other industrial customers entered into recent 22 contracts at prices he alleges are supported by the Company's methods and models, 23 the Company's methods and models are reasonable indicators of "value" for 24 interruptible products. Collns, OJ-Sur - 3 Monsanto Company 1 Q DO YOU AGREE WITH MR. CLEMENTS' CLAIM? 2 A No. The specific circumstances under which other industrial customers executed 3 contracts with RMP are unknown, and in any event are irrelevant to a determination 4 of Monsanto's interruptibility value. In addition, as Monsanto witness Ms. Iverson has 5 testified, Monsanto provides interruptibility that is superior to what is provided by 6 these other customers, and it would be reasonable for Monsanto's net rate paid to 7 RMP to be lower than the rates of other interruptible customers. 8 Q MR. CLEMENTS ASSERTS ON PAGES 4AND 5 OF HIS REBUTTAL TESTIMONY 9 THAT A COMBUSTION TURBINE WOULD NOT BE BUILT IF MONSANTO'S 10 INTERRUPTIBLE CONTRACT WERE NOT AVAILABLE. WHAT IS THE BASIS 11 FOR HIS ASSERTION? 12 A Once again, it's a short-term view. He claims that the Company can meet its existing 13 operating reserve obligations with existing resources in the test period used in the 14 2010 general rate case without Monsanto's interruptible contract. Since he asserts 15 that no new resources would be required to replace Monsanto's interrptible contract 16 in the short-run, he argues the Company's GRID and Front Offce Models should be 17 utilzed to determine the value of Monsanto's interruptibility. 18 Q HOW DO YOU RESPOND TO MR. CLEMENTS' ARGUMENTS? 19 A Since Mr. Clements' GRID and Front Offce Model analyses focus solely on the test 20 year used in the rate case, his analyses reflect only short-term considerations. He 21 continues to ignore the long-term resource costs that the Company has avoided, and 22 continues to avoid, due to Monsanto's long-term interruptibilty. If Monsanto's load 23 were not interruptible, RMP would have to acquire long-term resources to serve 24 Monsanto as a firm load. The specific type of long-term resource RMP would acquire Collns, OJ-8ur - 4 Monsanto Company 1 or construct would depend on a resource analysis performed by RMP taking into 2 consideration the resource needs of its entire system. However, since simple cycle 3 combustion turbine capacity is the most readily available and lowest cost capacity 4 available to RMP, the avoided cost of a new simple cycle combustion turbine is 5 appropriate to use in a long-term valuation of Monsanto's interruptibility. 6 Q MR. CLEMENTS CLAIMS AT PAGE 6 OF HIS REBUTTAL TESTIMONY THAT 7 MONSANTO'S INTERRUPTIBLE PRODUCTS DO NOT ALLOW RMP TO AVOID 8 THE CONSTRUCTION OR ACQUISITION OF GENERATING RESOURCES. 9 WHAT IS THE BASIS FOR HIS CLAIM? 10 A Mr. Clements asserts that Monsanto's interruptible products are not equal to the 11 products available to the Company through the construction or acquisition of a 12 generating resource. He argues that generation resources are required to provide 13 these products and for that reason claims that Monsanto's interrptible products do 14 not avoid or defer the acquisition of generating resources. 15 Q DO YOU AGREE WITH MR. CLEMENTS' ASSERTION THAT MONSANTO'S 16 INTERRUPTIBLE PRODUCTS DO NOT AVOID THE CONSTRUCTION OR 17 ACQUISITION OF GENERATING RESOURCES? 18 A No. Mr. Clements is incorrect in asserting that since Monsanto cannot provide all of 19 the products that a generating resource can provide, its interruptible load does not 20 avoid or defer RMP's acquisition of generating resources. He again fails to consider 21 the avoided capacity resource value provided by Monsanto's interrptibilty. 22 Monsanto's inherent interruptibility value results from the capacity resource avoidance 23 it provides to RMP. The fact that Monsanto can provide RMP with operating reserves Collns, OJ-Sur - 5 Monsanto Company 1 in addition to capacity avoidance further enhances its long-term resource value to 2 RMP. 3 Q MR. CLEMENTS CLAIMS AT PAGE 6 OF HIS REBUTTAL TESTIMONY THAT THE 4 COMPANY HAS PERFORMED AN IRP ANALYSIS TO EVALUATE THE 5 REMOVAL OF MONSANTO'S INTERRUPTIBLE PRODUCTS. DID HE PRESENT 6 THIS ANALYSIS OR ITS RESULTS WITH HIS TESTIMONY? 7 A No. Mr. Clements claims that the Company's analysis demonstrates that the removal 8 of Monsanto's interruptible products did not create the need for a new resource. 9 However, Mr. Clements has not identified the analysis to which he is referring, nor 10 has he described how the analysis was performed, nor has he presented the results 11 in his rebuttal testimony. Therefore, his claim is completely unsupported, and entitled 12 to no weight. 13 Q AT PAGES 7.9 OF HIS REBUTTAL TESTIMONY, MR. CLEMENTS CLAIMS THAT 14 COMBUSTION TURBINES ARE UTILIZED DIFFERENTLY AND PROVIDE 15 SIGNIFICANT ADDITIONAL VALUE WHEN COMPARED TO MONSANTO'S 16 INTERRUPTIBLE PRODUCTS. WHAT IS THE BASIS OF HIS CLAIM? 17 A Mr. Clements argues that since combustion turbines can provide other ancilary 18 services besides operating reserves, the full cost of a combustion turbine is not 19 reasonable and should not be considered when establishing value for Monsanto's 20 interruptible products. He also argues that the difference between the total annual 21 operational hours (or utilzation rates) of combustion turbines and the number of 22 interruption hours provided by Monsanto further supports the Company's position that 23 the differences between a combustion turbine and Monsanto's interruptible products 24 are significant. Collns, OJ-Sur - 6 Monsanto Company 1 Q HAS MR. CLEMENTS QUANTIFIED THE VALUE OF THE OTHER PRODUCTS HE 2 ARGUES ARE PROVIDED BY COMBUSTION TURBINES? 3 A No. 4 Q IN HIS ARGUMENTS, DOES MR. CLEMENTS COMPARE MONSANTO'S 5 INTERRUPTIBLE PRODUCTS TO THE OPERATION OF BOTH SIMPLE CYCLE 6 COMBUSTION TURBINES AND COMBINED CYCLE FACILITIES? 7 A Yes. Mr. Clements does not make a distinction between simple cycle combustion 8 turbines and combined cycle facilities in his arguments. For example, in the table at 9 pages 8 and 9 of his testimony, he includes the annual operational hours or utilzation 10 rates for both combined cycle and simple cycle facilties. The Gadsby 4, 5, and 6 11 units are the only combustion turbines in the table that are operated solely as simple 12 cycle combustion turbines. Mixing combustion turbines in combined cycle facilties 13 with simple cycle combustion turbines for comparison to Monsanto's interruptibilty is 14 incorrect. Monsanto's interruptibilty should be compared to a simple cycle 15 combustion turbine. 16 Q ARE THERE DIFFERENCES IN HOW SIMPLE CYCLE COMBUSTION TURBINES 17 AND COMBUSTION TURBINES IN COMBINED CYCLE FACILITIES OPERATE? 18 A Yes. Simple cycle combustion turbines operated independently and not part of a 19 combined cycle plant are typically peaking resources. Combustion turbines in 20 combined cycle facilties are typically operated as base load or load-following units. 21 Simple cycle combustion turbines operated as simple cycle units have higher heat 22 rates as compared to combined cycle units, and as a result, have higher variable fuel 23 costs. Simple cycle combustion turbines typically wil operate fewer hours in a year 24 as compared to combined cycle units because of higher variable operating costs. Collns, Dj-8ur - 7 Monsanto Company 1 Q HAVE YOU USED THE COST OF A COMBINED CYCLE FACILITY IN YOUR 2 AVOIDED PEAKER ANALYSIS? 3 A No. 4 Q WHAT WOULD BE THE VALUE OF MONSANTO'S INTERRUPTIBILITY BASED 5 ON A COMBINED CYCLE FACILITY? 6 A Based on cost data for combined cycle facilties in the Company's 2008 IRP, 7 Monsanto's interruptibility value would be $28.4 millon if the avoided cost of a 8 combined cycle unit was utilized. This is $2.9 millon more than Monsanto's 9 interruptibility value of $25.5 millon based on the avoided cost of a simple cycle 10 combustion turbine, as was presented in my direct testimony. 11 Q DO SIMPLE CYCLE COMBUSTION TURBINES OPERATED SOLELY AS SIMPLE 12 CYCLE UNITS TYPICALLY PROVIDE ALL OF THE ANCILLARY SERVICES 13 MR. CLEMENTS CITES ARE PROVIDED BY COMBUSTION TURBINES? 14 A No. Simple cycle combustion turbines typically provide spinning and non-spinning 15 operating reserves. Some of the ancilary services or products he cites require 16 cycling of generating units. Simple cycle combustion turbines are typically not cycled 17 due to their higher variable operating costs. Because of their quick start capabilties, 18 simple cycle combustion turbines typically are turned on and off providing blocks of 19 power while other generating units are cycled. 20 Q HAS MR. CLEMENTS EXPLAINED HOW RMP SPECIFICALLY OPERATES ITS 21 GADSBY SIMPLE CYCLE COMBUSTION TURBINES TO PROVIDE ANCILLARY 22 SERVICES? 23 A No, he has not. Collns, OJ-8ur - 8 Monsanto Company 1 Q WHAT IS YOUR UNDERSTANDING OF HOW THE COMPANY OPERATES ITS 2 GENERATING UNITS WITH RESPECT TO PROVIDING ANCILLARY SERVICES? 3 A It is my understanding that the Company does not use its thermal generating 4 resources, including combustion turbines, primarily for providing ancilary services. 5 According to its 2009 FERC Form No. 714 filed May 2010, the Company states the 6 following: 7 "At PacifiCorp, demand followjng is NOT primarily performed by 8 thermal generating units, therefore a system lambda is not 9 calculated. PacifiCorp East and West balancing areas are dispatched 10 in a coordinated manner to achieve overall maximum effciency, 11 economy, and reliabilty for the company as a whole, while meeting the 12 performance criteria for each balancing area as established by NERC, 13 WECC, and the NWPP. In this largely base-load thermal system, 14 dispatching is performed to keep the thermal units at a maximum15 efficiency by utilzjng hydro generatjon and hydro-based16 dispatchable purchases to provjde regulatjng margin and 17 spinning reserves. The PacifiCorp West balancing area has the bulk 18 of its regulating margin and reserves in such hydro resources, with 19 occasional limited participation by selected thermal units in the 20 PacifiCorp West balancing area. The PacjfiCorp East balancing area 21 primarily utilzes a dynamic schedule to overlay regulating margin 22 onto available hydro resources jn the PacifiCorp West balancing 23 area, with occasional limited participation by selected thermal 24 unjts in the PacifiCorp East balancing area to provide backup 25 margin and reserves." (Emphasis added) 26 Since it appears the Company relies primarily on its hydro units to provide 27 load-following, regulating margin and spinning reserves, Mr. Clements' criticisms of 28 Monsanto's interruptibilty with respect to ancilary service value are without merit. 29 Mr. Clements' criticisms of Monsanto just as easily apply to the existing combustion 30 turbines on RMP's own system. However, these criticisms do not diminish the 31 resource capacity value of these units. Collns, OJ-5ur - 9 Monsanto Company 1 Q IS MR. CLEMENTS CORRECT TO RELY ON THE TOTAL ANNUAL 2 OPERATIONAL HOURS OF A SIMPLE CYCLE COMBUSTION TURBINE AS THE 3 BASIS FOR COMPARING MONSANTO'S INTERRUPTIBILITY VALUE TO THAT 4 OF A SIMPLE CYCLE COMBUSTION TURBINE? 5 A No. Mr. Clements does not make a distinction in his table for hours when the units 6 were operated as must-run units because of transmission constraints, when the units 7 were operated for specific ancilary services, or when the units were operated to meet 8 the load demands of the Company's system. To compare the total operational hours 9 of a simple cycle combustion turbine to the number of hours of interruptibility 10 Monsanto provides is misleading and incorrect without explaining the circumstances 11 under which the simple cycle combustion turbine operated. 12 Q MR. CLEMENTS ALLEGES AT PAGE 10 OF HIS REBUTTAL TESTIMONY THAT 13 THE COMPANY HAS COMPLETE CONTROL OVER WHEN TO UTILIZE A 14 COMBUSTION TURBINE. IS THIS ACCURATE? 15 A No. Mr. Clements fails to consider that a combustion turbine does not start 100% of 16 the time when called upon. Since Monsanto has never failed to interrupt when called 17 upon, Monsanto has demonstrated greater reliability and dependabilty than a 18 combustion turbine. 19 Q MR. CLEMENTS CLAIMS AT PAGE 11 OF HIS REBUTTAL TESTIMONY THAT 20 THE PRESENCE OF AVAILABILITY GUARANTEES, LIQUIDATED DAMAGES 21 FOR NON-PERFORMANCE, AND OTHER CONTRACT TERMS THAT ARE NOT 22 FOUND IN MONSANTO'S CONTRACT INVALIDATES YOUR QF ANALYSIS. DO 23 YOU AGREE? 24 A No. Monsanto's contract also has penalties for non-performance. Further, Monsanto Collns, OJ-8ur -10 Monsanto Company 1 has also never had an instance where it did not comply with an interrption request 2 from RMP. Mr. Clements' arguments are without merit. 3 Q AT PAGE 12 OF HIS REBUTTAL TESTIMONY, MR. CLEMENTS PROVIDES A 4 CITE TO AN ORDER ISSUED BY THE COMMISSION THAT HE CLAIMS 5 PROVIDES THE COMMISSION'S OPINION ON THE PEAKER METHOD. HOW DO 6 YOU RESPOND? 7 A This citation states that the Commission has not found the avoided peaker resources 8 to be the definitive methodology for valuing the interruptibilty credit. 9 Q DID THE COMMISSION IN THAT SAME ORDER FIND THE COMPANY'S 10 PROPOSED METHOD AND MODEL TO BE THE DEFINITIVE METHOD FOR 11 VALUING MONSANTO'S INTERRUPTIBILITY? 12 A No. 13 Q WITH RESPECT TO SYSTEM INTEGRITY INTERRUPTIONS, MR. CLEMENTS 14 ASSERTS THAT MONSANTO SHOULD NOT RECEIVE ADDITIONAL 15 COMPENSATION FOR VOLTAGE-RELATED INTERRUPTIONS SINCE ALL 16 IDAHO CUSTOMERS ARE SUBJECT TO OCCASIONAL INTERRUPTION 17 PURSUANT TO ELECTRIC SERVICE REGULATIONS. DO YOU AGREE? 18 A No. If Monsanto were to receive only $100,000 in return for being the "first one in the 19 dark," then Monsanto would probably reconsider inclusion of this product in a future 20 Electric Service Agreement. RM P . would then need to locate another large load 21 which could easily and reliably curtail in seconds to avoid the possibilty of curtailng 22 hundreds - perhaps tens of thousands - of other customers. Collns, Dj.Sur - 11 Monsanto Company 1 One example of this occurred in the winter of 2005. On December 6, 2005, 2 RMP lost a line which triggered a power outage. The low temperature that day was 3 9 degrees, and dropped to 19 degrees below zero the next day. A system 4 emergency event was called upon Monsanto and all three furnaces were shut down. 5 As RMP crews worked to resolve the problem, the furnaces were brought back on- 6 line only when the system was stable. The two smaller furnaces were brought back 7 within four to eight hours of the emergency. However, the largest furnace was kept 8 off for 42 hours, with Monsanto incurrng substantial damages due to icing. 9 That curtailment for system integrity purposes provided a direct benefit to the 10 Company's system during this extraordinary event, but it came at substantial cost to 11 Monsanto. Thus, if RMP hopes to retain this provision in any contract with Monsanto, 12 it needs to properly value this option. 13 Q MR. CLEMENTS ALSO ASSERTS SINCE THERE IS AN EQUAL PROBABILITY 14 THAT A DOUBLE CONTINGENCY EVENT CAN OCCUR THROUGHOUT THE 15 YEAR THAT IT IS APPROPRIATE TO USE A VALUE EQUAL TO THE AVERAGE 16 MARKET PRICE. DO YOU AGREE? 17 A No. During a system integrity event, if power is available at all for purchase from the 18 market, scarcity of power wil likely result in high market prices as compared to the 19 average annual market price. For example, when regional resources were stressed 20 on July 25, 2006, RMP was wiling to pay Monsanto $300/MWh. Collns, OJ.Sur-12 Monsanto Company 1 Response to the Rebuttal Testimony of Gregory N. Duvall 2 Q AT PAGE 2 OF HIS REBUTTAL TESTIMONY, MR. DUVALL STATES THAT "THE 3 COMPANY INCLUDES BOTH PEAKERS AND MARKET PURCHASES IN THE 4 EVALUATION OF THE IDAHO IRRIGATION LOAD CONTROL PROGRAM." IS 5 MR. DUVALL CORRECT? 6 A Yes, Mr. Duvall is correct. However, his testimony fails to adequately explain the 7 valuation of the Idaho Irrigation Load Control Program, and how Monsanto's 8 interruptibility should be valued higher. 9 Q PLEASE EXPLAIN HOW THE COMPANY VALUES THE IDAHO IRRIGATION 10 LOAD CONTROL PROGRAM. 11 A According to RMP's Demand Side Management Annual Report - Idaho, dated 12 March 15, 2010, the Irrigation Load Control Program 2009 value is $73.09 per 13 kW-year at site (Le., before the adjustment for line losses) as determined by the 14 agreed upon Valuation Methodology. This Valuation Methodology was described in 15 PacifiCorp's "Proposed Valuation Methodology for the Idaho Irrigation Load Control 16 Program" ("Valuation Methodology Report") provided in late 2007 as a result of the 17 stipulation in the last General Rate Case (Case No. PAC-E-07-05). The methodology 18 conducted two resource deferral scenarios: (1) a peaking resource deferral, and (2) a 19 firm market purchases deferral, also termed "front offce transactions" or FaT. The 20 first scenario was labeled a "Peaking Resource Deferral" and was explained as: 21 "Peaking resource deferral- This scenario was designed to enable the 22 model to defer an intercooled aeroderivative single-cycle combustion 23 turbine (SCCT) resource. This scenario acknowledges that program 24 value comes from capacity deferral potential, and that resource 25 investment plans need to be fluid to account for rapidly changing 26 regulatory and market conditions. Procurement of peaking resources- 27 -although not included in PacifiCorp's latest resource plan -remains28 a viable option in the future." (page 3) Collns, OJ-8ur -13 Monsanto Company 1 Q SO THE COMPANY DOES VALUE THE IRRIGATION LOAD CONTROL 2 PROGRAM ON THE BASIS OF BOTH PEAKER DEFERRAL AS WELL AS 3 "FRONT OFFICE TRANSACTIONS?" 4 A Yes, however, as the report states, "the value of the irrigation load control program 5 comes from a longer-term view of resource deferral potential as opposed to 6 short-term FaT." (page 5). The report concludes by explaining that the Peaking 7 Resource Deferral should be weighted more heavily: 8 In summary, this recommendation accommodates the Company's 9 current resource planning strategy of relying on short-term markets to10 help meet peak load obligations as well as its portolio analysis11 approach for valuing resource additions. However, it also 12 acknowledges the longer-term outlook towards demand-side13 resources and the national trend in the valuation of load control 14 programs. This trend leans on the assumption that over time, if the15 acquired demand-side resource is reliable and sustainable, peaking 16 resource deferral likely exists. (Reliability and sustainabilty are 17 pivotal components of program performance. Growers need to keep 18 this in mind as the Company assumes a contractual obligation that, at 19 a minimum, is 10-years.) Peaking resource deferrl value is thus 20 weighted more heavily than firm market purchase deferral value in the 21 weighted-average calculations summarized above. (page 7, emphasis22 added) 23 Q HOW MUCH MORE DID PACIFICORP WEIGHT THE PEAKING DEFERRAL 24 RESOURCE VALUE THAN THE FRONT OFFICE TRANSACTIONS? 25 A The Valuation Methodology Report recognizes that benefis range from $13 per 26 kW-yr under the short-term FaT to $83 per kW-yr under the Peaking Resource 27 DeferraL. As shown in the following table, the Valuation Methodology weighted the 28 Peaking Resource by 67% and the FaT value by 33%. Thus, the Peaking Resource 29 is given twice the weight of the FaT firm market purchase: Collns, OJ.Sur -14 Monsanto Company TABLE 1 2007 Irrigatjon Load Control Program Benefjt, Levelized NPV ($ per kW-yr) Wejghted 150MW 175MW Average Wejght Average Peaking Resource $80.29 $70.70 $75.50 67%$50.33 Firm Market Purchase (1)$12.41 $12.41 33%$4.14 Total Weighted Average $54.47 Rounded $54.50 (1) The variation in values across participation sizes is small for the firm market purchase deferral scenarios, so the 175-megawatt value is assumed to be reasonable for use in the weighted-average calculation. 1 The $54.50 per kW-year value shown above has been updated to $73.09 per 2 kW-year in the March 15, 2010 Demand Side Management Annual Report - Idaho. 3 Q HOW MANY HOURS OF INTERRUPTION DOES THE IRRIGATION LOAD 4 CONTROL PROGRAM OFFER? 5 A The Irrgation Load Control Program offers only 52 hours of interrption per irrigation 6 season (June 1 - September 15) according to the Valuation Methodology Report. 7 Monsanto offers 1,050 hours of interruption annually, or more than 20 times the hours 8 of the Irrigation Load Control Program with no seasonal limits on when interruptions 9 can occur. Hence, PacifiCorp primarily values the Irrigation Load Control Program on 10 the basis of peaking resource deferral with only 52 hours of interruption, yet refuses 11 to recognize the peaking resource deferral capabilty of Monsanto which clearly offers 12 many more hours of interruption and has proven itself to be both a reliable and Collns, OJ-Sur -15 Monsanto Company 1 sustainable resource over the past 60 years. The Company's unreasonably low value 2 for Monsanto should be rejected. 3 Q AT PAGES 2-3 OF HIS REBUTTAL TESTIMONY, MR. DUVALL ARGUES THAT 4 SINCE THE IRRIGATORS ARE PAID ONLY 41% OF THEIR ESTIMATED VALUE 5 OF $73.09 PER KILOWATT-YEAR, THE RESULTS OF MONSANTO'S PEAKER 6 VALUATION METHOD SHOULD BE DISCOUNTED IN A SIMILAR FASHION. 7 WHAT IS THE BASIS FOR HIS ARGUMENT? 8 A His argument is strictly one of consistency. Mr. Duvall argues that the peaker 9 valuation results "would need to be modified to be consistent with the treatment of the 10 Idaho Irrigation Load Control Program." 11 Q DOES MR. DUVALL EXPLAIN WHY MONSANTO'S PEAKER VALUATION 12 RESULTS SHOULD BE DISCOUNTED CONSISTENT WITH THE IRRIGATORS' 13 LOAD CONTROL PROGRAM VALUATION? 14 A No. 15 Q IS MR. DUVALL'S ARGUMENT FOR CONSISTENT TREATMENT OF BOTH 16 MONSANTO AND THE IRRIGATORS' INTERRUPTIBILTIES CONSISTENT WITH 17 PAST TESTIMONY HE HAS PROVIDED TO THE COMMISSION? 18 A No. In his rebuttal testimony in Case No. PAC-E-07-05, Mr. Duvall discusses how the 19 Monsanto contract and the Idaho Irrigation Load Control Program differ. At page 2 of 20 his rebuttal testimony in that case, Mr. Duvall states the following: 21 "The Idaho irrigation load control program is significantly different22 than the Monsanto contract in that it does not provide ancilary 23 services, it is not contractually as firm, it is not separately metered, and 24 it is integrated into the local Idaho distribution system." (emphasis25 added) Collns, OJ-8ur - 16 Monsanto Company 1 His arguments for discounting Monsanto's peaker valuation results are without merit. 2 Q AT PAGE 3 OF HIS REBUTTAL TESTIMONY, MR. DUVALL ALLEGES THAT 3 MONSANTO'S ASSUMPTION THAT ITS INTERRUPTIBLE PRODUCT WOULD 4 AVOID THE ADDITION OF A PEAKING UNIT HAS NO BASIS IN FACT. DO YOU 5 AGREE? 6 A No. As I stated previously in my testimony, if Monsanto were not an interruptible 7 customer, RMP would have to acquire long-term resources to serve Monsanto's load 8 on a firm basis. The specific type of long-term resource RMP would acquire or 9 construct would depend on a resource analysis performed by RMP taking into 10 consideration the resource needs of its entire system at that time. However, since 11 simple cycle combustion turbine capacity is the most readily available and lowest cost 12 capacity available to RMP, the avoided cost of a new simple cycle combustion turbine 13 is appropriate to use in a long-term valuation of Monsanto's interruptibilty. In fact, as 14 i explained earlier, the avoided cost of a new SeCT is currently used in the valuation 15 of the Irrigation Load Control Program. 16 Q AT PAGES 3 AND 4 OF HIS REBUTTAL TESTIMONY, MR. DUVALL ARGUES 17 THAT YOU MADE UP A FORMULA THAT YOU CLAIM IS IN THE 20081RP. DO 18 YOU AGREE? 19 A No. Mr. Duvall states that the formula found in my testimony is as follows: 20 Net Firm Obligation - Purchases - DSM - Interruptible 21 This formula is not the one found in my testimony nor in the Company's 2008 IRP. 22 Therefore, his arguments are without merit. Collns, OJ-Sur-17 Monsanto Company 1 Q AT PAGE 4 OF HIS REBUTTAL TESTIMONY, MR. DUVALL STATES THAT THE 2 MONSANTO LOAD IS TREATED AS FIRM LOAD IN THE IRP. IS THIS 3 ACCURATE? 4 A No. All of Monsanto's load, both firm and interruptible, is treated as an obligation in 5 the IRP, where obligation is defined as peak load plus firm sales. Then, Monsanto's 6 interruptible load is treated as an existing firm capacity resource in the IRP, thereby 7 offsetting the load. 8 Q HOW DOES THE COMPANY USE ITS CALCULATIONS OF ITS OBLIGATION 9 AND FIRM CAPACITY RESOURCES IN ITS 2008 IRP? 10 A The Company determines its capacity position using the following formula that 11 includes its calculated obligation and existing firm capacity resource amounts: 12 Capacity Position = Existing Resources - Obligation - Reserves 13 Q WHY IS THE CAPACITY POSITION IMPORTANT TO THE COMPANY? 14 A The capacity position indicates whether additional resources might be needed on the 15 Company's system. 16 Q WHAT IS THE COMPANY'S CAPACITY POSITION WITH THE MONSANTO 17 INTERRUPTIBLE LOAD TREATED AS A FIRM CAPACITY RESOURCE IN THE 18 IRP? 19 A According to the Company's 2008 IRP Update, the Company's capacity position for 20 the period 2011 -2013 is as follows: Collns, OJ.Sur-18 Monsanto Company TABLE 2 RMP Capacity Posjtjon wjth Monsanto's Interruptjble Load Recognjzed as a Resource Year Capacity Position 2011 2012 2013 7MW -1,006 MW -1,276 MW 1 A negative value indicates that RMP is short firm capacity resources. 2 Q WHAT WOULD BE THE COMPANY'S CAPACITY POSITION IF MONSANTO'S 3 INTERRUPTIBLE LOAD WERE NOT RECOGNIZED AS A FIRM CAPACITY 4 RESOURCE? 5 A If it were not recognized, the Company's capacity position would be as follows for 6 2011-2013: TABLE 3 RMP Capacity Position if Monsanto's Interruptible Load js Not Recognized as a Resource Year Capacity Position 2011 2012 2013 -169 MW -1,182 MW -1,452 MW Collns, OJ.Sur -19 Monsanto Company 1 Q IF MONSANTO'S INTERRUPTIBLE LOAD WERE REMOVED AS A FIRM 2 CAPACITY RESOURCE IN THE COMPANY'S IRP, IS IT CORRECT THAT 3 ADDITIONAL FIRM CAPACITY RESOURCES WOULD BE NEEDED? 4 A Yes, an additional 176 MW of firm capacity resources would be needed if Monsanto's 5 interruptible load were not to be recognized as a firm capacity resource. For 6 example, the Company's capacity position in 2011 would be reduced from 7 MW to a 7 negative 169 MW. Monsanto's interruptibilty allows the Company to avoid or defer 8 firm capacity resources. 9 Q AT PAGE 5 OF HIS REBUTTAL TESTIMONY, MR. DUVALL STATES THAT 10 MONSANTO'S INTERRUPTIBLE LOAD DOES NOT AVOID PLANNING 11 RESERVES. IS HIS TESTIMONY CONSISTENT WITH THE IRP? 12 A No. At page 87 of the Company's 2008 IRP, the Company states the following: 13 "Interruptible resources directly curtail load and thus planning reserves14 are not held for them." . 15 Further, at page 89 of the 2008 IRP, the formula for determining planning reserves is 16 stated as: 17 Planning Reserves = 18 (Obligation - Purchase - DSM - Interruptible) x Planning Reserve Margin 19 According to the above formula, interruptible load, including the interruptible load of 20 Monsanto, is removed from the Company's peak load obligation when calculating the 21 level of required planning reserves. As a result, the interruptibility of Monsanto's load 22 does allow the Company to avoid planning reserves. Mr. Duvall's rebuttal testimony 23 is inconsistent with the Company's 2008 IRP and his arguments are without merit. Collns, OJ-Sur - 20 Monsanto Company 1 Q DOES THIS CONCLUDE YOUR SURREBUTTAL TESTIMONY REGARDING THE 2 ECONOMIC VALUATION OF MONSANTO INTERRUPTIBLE PRODUCTS? 3 A Yes, it does. IlDoclShareslPolawDocslSDW21 OIT esmony . BA1191675.doc Collns, OJ.Sur - 21 Monsanto Company