Loading...
HomeMy WebLinkAbout20231122Notice_of_Application_Order_No_36003.pdf NOTICE OF APPLICATION NOTICE OF MODIFIED PROCEDURE ORDER NO. 36003 1 Office of the Secretary Service Date November 22, 2023 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF ROCKY MOUNTAIN POWER’S APPLICATION TO REVISE ELECTRIC SERVICE REGULATION NO. 3- ELECTRIC SERVICE AGREEMENTS ) ) ) ) ) ) ) ) CASE NOS. PAC-E-23-22 NOTICE OF APPLICATION NOTICE OF MODIFIED PROCEDURE ORDER NO. 36003 On October 24, 2023, PacifiCorp dba Rocky Mountain Power (“Company”) filed an application (“Application”) with the Idaho Public Utilities Commission (“Commission”) requesting authority to update Electric Service Regulation No. 3-Electric Service Agreements (“Rule 3”). The Company requests its Application be processed by Modified Procedure. NOTICE OF APPLICATION YOU ARE HEREBY NOTIFIED that the Company represents that Rule 3 defines the Company’s general rules and regulations for electric service. Application at 1. The Company states that the proposed tariff amendment would update provisions regarding liability for non-economic damages. Id. Specifically, the proposed amendment would: (1) limit damages arising out of the Company’s provision of electric services to actual damages; (2) exclude a-typical damages (including special, noneconomic, punitive, incidental, indirect, or consequential); (3) only apply prospectively, and for actions arising out of the provision of electric service; and (4) would not apply where state law otherwise disallows the limitation. Id. at 1-2. The Company represents that this provision strikes a reasonable balance between enabling actual damages when appropriate, and unreasonable treble damages. Id. at 2. YOU ARE FURTHER NOTIFIED that the Company’s proposed liability language provides: LIMITATION OF LIABILITY In any action between the parties arising out of the provision of electric service, the available damages shall be limited to actual economic damages. Neither party shall be liable to the other party for special, noneconomic, punitive, incidental, indirect, or consequential damages (including, without limitation, lost profits), regardless of whether such action is based in contract, tort (including, without limitation, negligence), strict liability, warranty or otherwise. By receiving electric service, customer agrees to waive and release NOTICE OF APPLICATION NOTICE OF MODIFIED PROCEDURE ORDER NO. 36003 2 Company from any and all claims for special, noneconomic, punitive, incidental, indirect, or consequential damages (including, without limitation, lost profits) as part of any claim against Company related to or arising from Company’s operations or electrical facilities. This provision shall not be binding where state law disallows limitations of liability. Id. at 8. YOU ARE FURTHER NOTIFIED that the Application is available for public inspection during regular business hours at the Commission’s office. The Application is also available on the Commission’s website at www.puc.idaho.gov. Click on the “ELECTRIC” icon, select “Open Cases,” and click on the case number as shown on the front of this document. YOU ARE FURTHER NOTIFIED that all proceedings in this case will be held pursuant to the Commission’s jurisdiction under Title 61 of the Idaho Code, and that all proceedings in this matter will be conducted pursuant to the Commission’s Rules of Procedure, IDAPA 31.01.01.000 et seq. NOTICE OF MODIFIED PROCEDURE YOU ARE HEREBY NOTIFIED that the Commission has determined that the public interest may not require a formal hearing in this matter, and that it will proceed under Modified Procedure pursuant to the Commission’s Rules of Procedure 201-204, IDAPA 31.01.01.201-.204. The Commission notes that Modified Procedure and written comments have proven to be an effective means for obtaining public input and participation. YOU ARE FURTHER NOTIFIED that persons desiring to state a position on this Application may file a written comment explaining why the person supports or opposes the Application. Persons who would like a hearing must specifically request a hearing in their written comments and explain why written comments alone are insufficient. Persons interested in filing written comments must do so by January 23, 2024. Comments must be filed through the Commission’s website or by e-mail unless computer access is unavailable. To comment electronically, please access the Commission’s website at http://www.puc.idaho.gov/. Click the “Case Comment Form” and complete the form using the case number as it appears on the front of this document. To file by e-mail, persons must e-mail the comments to the Commission Secretary and the Parties at the e-mail addresses listed below. Persons submitting a comment by e-mail must provide their name, address, and the Case Number under which they are commenting. Persons submitting NOTICE OF APPLICATION NOTICE OF MODIFIED PROCEDURE ORDER NO. 36003 3 a comment by e-mail also acknowledge that submitting a comment in an open case constitutes a public record under Idaho Code § 74-101 (13), and all information provided by such person is available for public and media inspection. If computer access is unavailable, then comments may be mailed to the Commission and the Parties at the addresses below. Persons submitting a comment by mail must provide their name, address, and the Case Number under which they are commenting. Persons submitting a comment by mail also acknowledge that submitting a comment in an open case constitutes a public record under Idaho Code § 74-101 (13), and all information provided by such person is available for public and media inspection. For the Idaho Public Utilities Commission: Commission Secretary Idaho Public Utilities Commission P.O. Box 83720 Boise, ID 83720-0074 secretary@puc.idaho.gov Street Address for Express Mail: 11331 W. Chinden Blvd. Building 8, Suite 201-A Boise, ID 83714 For the Company: Mark Alder Idaho Regulatory Affairs Manager Rocky Mountain Power 1407 West North Temple, Suite 330 Salt Lake City, UT 84116 mark.alder@pacificorp.com Joe Dallas Carla Scarsella Rocky Mountain Power 825 NE Multnomah, Suite 2000 Portland, OR 97232 joseph.dallas@pacificorp.com carla.scarsella@pacificorp.com YOU ARE FURTHER NOTIFIED that the Company must file any reply comments by February 6, 2024. YOU ARE FURTHER NOTIFIED that if no written comments or protests are received within the time limit set, the Commission will consider this matter on its merits and enter its final order without a formal hearing. If written comments are received within the time limit set, the Commission will consider them and, in its discretion, may set the same for formal hearing. NOTICE OF APPLICATION NOTICE OF MODIFIED PROCEDURE ORDER NO. 36003 4 ORDER IT IS HEREBY ORDERED that the Application be processed by Modified Procedure, Rules 201-204 (IDAPA 31.01.01.201-.204). Persons interested in filing written comments must do so by January 23, 2024. The Company must file any reply comments by February 6, 2024. IT IS FURTHER ORDERED that parties comply with Order No. 35375, issued April 21, 2022. Generally, all pleadings should be filed with the Commission electronically and will be deemed timely filed when received by the Commission Secretary. See Rule 14.02. Service between parties should continue to be accomplished electronically when possible. However, voluminous discovery-related documents may be filed and served on CD-ROM or a USB flash drive. DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho this 22nd day of November 2023. __________________________________________ ERIC ANDERSON, PRESIDENT __________________________________________ JOHN R. HAMMOND JR., COMMISSIONER __________________________________________ EDWARD LODGE, COMMISSIONER ATTEST: ___________________________________ Monica Barrios-Sanchez Interim Commission Secretary I:\Legal\ELECTRIC\PAC-E-23-22_ESAs\orders\PACE2322_Ntc_App_Mod_cb.docx