Loading...
HomeMy WebLinkAbout20210513Comments.pdfMATT HI-INTER DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-007 4 (208) 334-0318 IDAHO BAR NO. 10655 -'-F-f' l1;f,:':.-''\. l.-1 !'',. -:-:. U1=- I i', i'l: Dtl l.' l?. lrr.i Ir; ! i: -' lk Street Address for Express Mail: 1 I331 W CHINDEN BLVD, BLDG 8, SUITE 2OI-A BOISE, TD 83714 Attorney for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF ROCKY MOUNTAIN POWER'S APPLICATION REQUESTING APPROVAL OF $16.1 MILLION NET POWER COST DEFERRAL (ECAM) CASE NO. PAC-8.21-09 COMMENTS OF THE COMMISSION STAFF STAFF OF the Idaho Public Utilities Commission, by and through its Attorney of record, Matt Hunter, Deputy Attorney General, submits the following comments. BACKGROUND On March 37,2021, PacifiCorp dba Rocky Mountain Power ("Company") applied for Commission authorization to adjust its rates under the Energy Cost Adjustment Mechanism ("ECAM"). The ECAM allows the Company to adjust its rates each year to capture the difference between the Company's actual power supply expenses and the power expenses embedded in base rates. The adjustment is a separate line item on customer bills that increases if power supply costs are higher than the amount already included in base rates or decreases if power supply costs are lower. The ECAM does not affect the Company's earnings. The Company also seeks Commission approval of about $16.1 million of deferred costs. The Commission approved the ECAM in2009. Order No. 30904. The ECAM allows the Company to increase or decrease its rates each year to reflect changes in the Company's ) ) ) ) ) ) ) STAFF COMMENTS MAY t3,2021 power supply costs. These costs vary by year with changes in the Company's fuel (gas and coal) costs, surplus power sales, power purchases, and associated transmission. Each month, the Company tracks the difference between the actual net power costs ("NPC") it incurred to serve customers, and the embedded (or base) NPC it collected from customers through base rates. The Company defers the difference between actualNPC and base NPC into a balancing account for later disposition at the end of the yearly deferral period. At that time, the ECAM allows the Company to credit or collect the difference between actual NPC and base NPC through a decrease or increase in customer rates. This year, the deferred NPC difference was about $14.3 million. Besides the NPC difTerence, this year's ECAM includes: (l) the Load Change Adjustment Revenues ("LCAR"); (2) an adjustment for coal stripping costs; (3) a true-up of 100% of the incremental Renewable Energy Credit revenues; (4) Production Tax Credits; (5) the Lake Side 2 generation resource adder; and (6) a resource tracking mechanism. The ECAM includes a"90ll0 sharing band" in which customers paylreceive 90Yo of the increase/decrease in the difference between actual NPC and base NPC, LCAR, and the coal stripping costs; and the Company incurs/retains the remaining 10%. The Company's Application includes the testimony of witnesses who explain each of these items in detail. With this ECAM Application, the Company ultimately seeks an order approving the Company's: (l) defenal, for later recovery through rates, of $16.1 million in costs; and (2) revised Electric Service Schedule 94,Energy Cost Adjustment, which would reflect the ECAM adjustment and decrease the Company's Schedule 94 revenues by approximately $3.1 million. As noted above, the Company states that if its proposal is approved, prices for customer classes would decrease as follows: o Residential Customers - (0.8%) . Residential Schedule 36, Optional Time-of-Day Service - (0.9%) o General Service Schedule 6 - (1.1%) o General Service Schedule 9 - (1.2%) o Irrigation Customers - (1.0%) . Commercial or Industrial Heating Schedule 19 - (1.0%) . General Service Schedule 23 - (0.9%) . General Service Schedule 35 - (1.3%) o Public Street Lighting - (0.4%) . Industrial Customer, Schedule 400 - (1.3%) o Industrial Customer, Schedule 401 - (1.3%) 2STAFF COMMENTS MAY 13,2021 Application, Meredith Direct, Exhibit No. 2. The Company asks that its proposed Schedule 94 take effect on June 1,2021. STAFF'ANALYSIS Deferral Analysis Staff believes the Company's overall methodology complies with previous Commission orders. However, Staff discovered an anomaly in data caused by a faulty meter between the Idaho and Utah jurisdiction that inflated the amount of energy used to allocate net power costs to Idaho used for net power costs. This inflated the amount of total Company net power costs allocated to Idaho, and thus inflated the ECAM balance to be recovered from rate payers. As requested, the Company provided a revised Exhibit l, Exhibit 2, and Tariffs to Staff on May 11,2021. See Attachment A. Staffincludes the Company's revisions in our analysis below. With limited time to review these revisions, Staff requests the opportunity to provide supplemental comments no later than May 18,2021should any additional issues be discovered. Staff also has concerns about the method used to allocate cost to Idaho for the ECAM, which is discussed further below. Other than the faulty meter error, Staff believes that the Company used accurate actual loads and prudently incurred actual costs and revenues. With the adjustment mentioned above Staff recommends that the Commission authorize the 2020ECAM deferral as shown below: JSTAFF COMMENTS MAY 13,2021 Table I Asaual ECAl't Calculation Calendar Year 2020 ECAif't Deferral NPC D$erential EITF 04-6 Adjustrrcnt I.CAR Total Dderral Bdore Shaing Sharing Basd Customer Reponsibrlity I"ake Sifu 2 Resoruce Adder ProdrctioaTa:r Credits RTM.Adjr:shent REC Dd€rral Iaterest on Dderratr Annual Deferral (Jan - Dec 2020) 4,330,859 (127=46"$) (1,076=r70) $ 1.t27.225 9Pr6 $ 2,814,502 5.431,705 (100,83u 4,431,885 8,557 482,919 s 13.068"738 s s The meter error dates to July 2019. Therefore, Staff believes that it is appropriate to adjust the beginning2}Z} deferral balance for the change in load attributed to Idaho and therefore the NPC allocated to ldaho. This would reduce the beginning balance from $27.3 million to $24.4 million. This reduction of approximately $2.9 million as well as a summary of other changes due to this revision is shown on Table No. 2 below: 4STAFF COMMENTS MAY 13,2021 EC-{-\I Deferra I Balance Deferral Balance - Dec 31= l0l9 Annual Dderral (Jan - Dec 2030) Interest ECd\{ Reyenue Collection - Schedr:le 9-l Activitl' Through Deceuber 31, 2020 Deceurber 31, 2020 Balance For Collection S 13,060.567 s13,t11,078 s 19.050,133 s (4.160,8-+5) 0 (0) 0 s 18.899,711 s (1.160.816) ( S 0s (150,511)s (150"s12) As Filed s 17,186,181 13"778.459 562.667 ( 18_4 r 6_410) Reriserl s 11.39;.925 11,585.818 483,919 (18,416=430) Difference s (2,888"457) (r,192.il1) (79.748) 0 s (?6.878) 2.019.E00 (r.1 13.131) 5 (76,878) l=039.800 (1.113,{r-l) s0 (l 7,366) S (,l,I7S,2lU Schedule 9-l Collection - Jan - \{a-v l0l1 Interest Expected Balance as ofJune 1,2021 s (6,991,766) 81.i45 s 16,147,146 s (6,991.766) 6_1.919 s lI,96Sp35 Depreciation Regulatoq. lsset Balance Beginning Balance fuinual Deferral (Jan - Dec ?020) ECA\,{ Revetrue Collection - Schedule 94 Activitl- Through Deceruber 3I, 1020 Table 2 Balauc Arcount Staff reviewed the Company's external audit reports, journal entries, invoices, contracts, and bills to customers. Staff also reviewed the Company's adjustment to actual costs. Staff reconciled the general ledger amounts to the NPC provided in Exhibit No. I of Mr. Painter's testimony. Staff reviewed the Company's hedge contracts and policies and believes they reasonably safeguard price and fuel stability. Staff also reviewed the transactions and invoices for the Energy Imbalance Market revenues. Additionally, Staff verified the calculations of the RTM adjustment, which is included in the ECAM. Staff concludes that the ECAM deferral shown in Attachment A revising Exhibit No. I is accurate and complies with ECAM orders. Net Power Cost Deferual The NPC adjustment within the ECAM allows the Company to collect or credit the difference between NPC incurred to serve customers in Idaho and the NPC collected from Idaho customers through base rates. Staff believes that with the adjustments correcting for the faulty meter the calculations and the methodology the Company used to determine the NPC defenal meet the intent of the ECAM and Commission orders and the deferral is calculated correctly. For the 2020 deferral year, the NPC embedded in rates was set in Order No. 33668, Case No. PAC-E-16-12, at $26.90 per MWh. The revenue collected through base rates is calculated 5STAFF COMMENTS MAY 13,2021 by multiplying $26.90 by 3,522,347 MWh of actual Idaho sales, for a total of $94.7 million. The difference between base rate revenue and Idaho's share of actlal2020 NPC of $99.0 million, is an under-collected balance of $4.3 million. This is approximately $ I .3 million less than the Company had filed in its Application. The under collected balance is subject to a 90/10 customer sharing band, with the Company paying 10% of the NPC balance. After removing that l}Yo,the amount to be collected through Schedule 94 rates is $3.9 million. Emerging Issues Task Force ("EITF") 04-6 Adjustment The EITF 04-6 adjustment is the difference between coal stripping costs the Company incurred and recorded as stated in the accounting pronouncement EITF 04-6 and the amortization approved by Order No. 30987 in Case No. PAC-E-09-08. The Company uses this account to "undo" the effects of EITF 04-6 that requires the Company to expense coal stripping costs as opposed to amortizing it over the coal produced from the section of open mines. The adjustment decreases the deferralby $127,464. Staff reviewed the adjustment and believes it is accurately calculated. Load Change Adjustment Revenues Staff believes the Company's LCAR adjustment complies with Order No. 33440. The LCAR adjusts for the under- or over- recovery of fixed energy-classified production cost (excluding NPC) because of the difference between sales used to determine base rates and the Idaho sales from the deferral year. The LCAR of $5.54 per MWh was set in Case No. PAC-E-16-12 and adjusted due to changes in the corporate tax rate in Case No. GNR-U-18-01. Multiplying the LCAR by the actual Idaho sales of 3,522,347 MWh shows that the Company collected $19.5 million of energy-classified fixed production costs through base rates. The amount in base rates is greater than the actual amount of energy-classified fixed production costs, $18.4 million, which is a benefit of $l.1 million to customers. Production Tax Credit ("PTC") The Commission approved a settlement in Case No. PAC-E-15-09 that moved the PTC true-up to the ECAM, with a $1.99 per MWh benefit to customers included in base rates. In 6STAFF COMMENTS MAY t3,2021 2020, base rates included a $7.0 million benefit from PTCs. However, the Company's actual PTCs in 2020 allocated $7.1 million to Idaho customers. The $0.1 million difference between the PTCs in base rates and the actual PTCs is a benefit to customers. Compared to last year's PTCs this is a significant increase to the amount of PTCs the Company received. This difference is explained by several new and repowered wind projects coming online in late 2019 and 2020. Renewable Energy Credit ("REC") In Case No. PAC-E-16-12, the Commission approved a $0.09 per MWh benefit to customers for the REC revenues included in base rates. The difference between the embedded amount and actual REC revenue is trued-up in the ECAM. Ln2020, base rates included $316,068 in benefits from REC revenues. Idaho's share of the Company's actual REC revenues was $307,510. The difference of $8,557 is added to the defenal balance. Lake Side 2 Resource Adder In Order No. 32910, the Commission approved a settlement that allows the Company to recover its investment in the Lake Side 2 generation facility through the ECAM until its investment is included in base rates in a future rate case. The adder allows the Company to recover $1.99 per MWh of generation at Lake Side 2, up to $5.43 million per year. In2020,the Company generated over 2.7 million MWh at Lake Side 2, allowing the Company to include the maximum of $5.43 million in the deferral balance. RTM Adjustment In Order No. 33954, the Commission approved a settlement allowing the Company to recover costs related to wind repowering projects through the ECAM. In2020, all of these projects were online and generating electricity. The RTM adjustment properly reflects cost that offset the repowering projects' benefits to customers found elsewhere in the ECAM, PTC benefits, and NPC benefits. Based on the tefins of the RTM settlement, the Company included $4.4 million in the deferral. Staff agrees with this number. 7STAFF COMMENTS MAY 13,2021 Tax Savings The 2018 and 2019 ECAMs included a credit to the deferral balance from the Tax Cuts and Jobs Act ("TCJA"). In Case No. PAC-E-20-03 the Commission approved a settlement to modify the order for the treatment of the TCJA tax benefits. The remaining benefits will be used to offset the plant balance and closing costs of the Cholla 4 coal generating plant, and to offset the next rate increase. Therefore, there are no direct tax benefits included in the 2020 ECAM. NPC Method Analysis Staff evaluated the methods and inputs used to determine the base-to-actual deferral amounts for NPC-related costs. As a result of its analysis, Staff identified a significant discrepancy in Idaho's share of line losses that will require a total reduction of $4,178,211 in the deferral amounts for the 2019 and 2020 ECAM years. In addition, Staff has concerns regarding the Company's method for determining the amount of Actual Load at Input allocated to Idaho and the resulting line losses allocated to Idaho customers for calculating the ECAM. Faulty Meter Adjustments Staff compared the difference between the amount of Idaho Actual Sales at Meter used to determine the Company's recovery of NPC through base rates and the amount of Idaho Actual Load at Input used to determine the unit cost of actual NPC, both of which are integral in calculating the NPC-related base-to-actual deferral amounts. See Application, Painter Direct, Exhibit 1 . The difference between these two amounts of load provides the amount of line loss that the Company reflects in the ECAM as a necessary cost of delivering energy to Idaho ratepayers. In this case, Staff determined that the amount of line loss was not reasonable and required further investi gation. Actual Sales at Meter is the amount of energy included in Idaho customer's bills, while Actual Load at Input is the amount of energy that is metered into the State of Idaho at its borders that is assumed to be consumed by Idaho customers. The difference between the two amounts is the amount of line loss that occurs between energy provided to Idaho across its borders and the amount of energy consumed at the customer's meter. The amount of line loss in this year's filing was about 9.8 percent, which Staff did not believe was reasonable. By looking at the same data over the past five years, Staff noticed that line losses increased from about 7Yo to about l0% 8STAFF COMMENTS MAY 13,2021 starting in2019, indicating that something had changed. Staff s analysis is illustrated in Figure No. I below. Figure No. l: 5-Year Historical Comparison ofldaho's Loads and Line Losses PACIFICORP IDAHO - ECAM Energy Comparison t2.a% rc.0% 8.0% 6.0% 4.0% 2.A% 0.a% 3,900,000 3,800,000 3,700,000 ; 3,600,000 5 3,500,000 3,400.000 3,300,000 3,200,000 -- oI 0)6- 201"6 2017 2018 2A$ lD Actual Sales @ Meter (MWh) r lD Actual Annual Load @ lnput (MWh) o e {vsp6ge System Percentage Losses Attributed to ldaho 2020 Staff notified the Company of the issue and as a result of its root cause analysis, the Company determined that: A meter on the line between the Treasureton, Idaho and Wheelon, Utah substations had apartial failure on one phase of the three phases in July of 2019. Initially the failure occurred intermittently and continued to increase until ultimately the meter was only registering approximately 68 percent of the actual energy. The line flow on this line is typically from Idaho to Utah, resulting in the meter registering too little power leaving Idaho overstating Idaho load at input.l Along with results of its root cause analysis, the Company provided Staff with recalculated exhibits for both this year's filing and last year's filing adjusting for the discrepancy in Idaho's Actual Load at Input caused by the faulty meter. With the adjustment, the end result is a $4,178,211 reduction in the deferral for both the 2019 and2020 ECAM deferral years and is $2,888,457 and $1,289,754, respectively. I Email from Company Representative, Ted Weston, dated 5llll202l 9STAFF COMMENTS MAY 13,202t Idaho's Share of Line Loss The Company uses a border method of allocation to determine each jurisdiction's share of Actual Load at Input. At the most basic level, the amount of actual load allocated to a jurisdiction is calculated by netting energy flow into and out of each jurisdiction while accounting for the amount of energy generated within its borders over the same time period. The Company's method can be depicted by the following equation: Actual Load at Input : Input at borders -t Generation within borders - Output at borders Although the Company can account for 100% of the load for the whole system using this method, Staff is concerned that the energy flowing into and then out of the State to be consumed by customers in other jurisdictions may be unfairly allocating line-loss-related actual costs to Idaho for energy flowing through the State not consumed by Idaho customers. Staff re-created Figure No. 1 with the adjustments due to the faulty meter as shown in Figure No. 2 below. The line losses for the Company's entire system have been added to show a comparison between system and Idaho line losses. Figure No. 2: Revised S-Year Historical Comparison ofldaho's Loads and Line Losses REVISED PACIFICORP IDAHO - ECAM Energy Comparison 3,900,000 3,800,000 3,700.000 3,600,000 3,500,000 3,400,000 3,300,000 3,200,000 c o)oBa L2.O% LO.0% 8.0% 6.0% 4.0% 0.o% 20L6 2077 2018 2419 lD Actual Sales @ Meter (MWh) n lD Actual Annual Load @ lnput (MWh) o r {vsv6ge System Percentage Losses Attributed to ldaho - [ys16ge Systern Perce ntage Losses 2020 STAFF COMMENTS l0 MAY t3,2021 Although the faulty meter has reduced line losses in Idaho from about 9.8%o to about 8.3% in2020, Staff believes that Idaho customers may still be receiving an unfair allocation of system line loss-related cost due to energy flowing through the State not consumed by Idaho customers. Staff has identified three possible inter-related reasons. First, Idaho is uniquely positioned in the Company's system where a significant amount of its energy flows through the State in comparison to the amount of energy actually consumed in Idaho.2 Second, Staff compared Idaho's line losses with the Company's line losses for its entire system. As can be seen in Figure No. 2, system line loss in2020 was approximately 7 .ZYo with Idaho's line loss being larger at about 8.3% (includes adjustments due to the faulty meter). Third, Staff expects that Idaho's line losses should be consistently below system line losses due to the amount of load being consumed at transmission level voltages. Approximately 40%o of Idaho's load comes from a single industrial customer that takes service at transmission level voltages, which typically have line losses between 3%o and 4o/o. Staff plans to conduct a review of the Company's border method for allocating actual loads in the ECAM to determine if Idaho is being charged an unfair amount of system line loss. Any concerns found will be discussed with the Company with any agreed adjustments included in the deferrals. If the treatment remains at issue, Staff recommends the Commission allow this adjustment to be made for 2021in the next ECAM filing. NPC Analysis Staff analyzedthe Company's actual NPC to identi$, differences between base NPC and actual NPC driving base-to-actual deferral amounts in this year's ECAM. The results of Staff s analysis are reflected in the table below. 2ldaho's allocation of system energy is about 7%. STAFF COMMENTS 11 MAY t3,2021 Source Adjusted Actual Base NPC Base-to-Actual Difference Percentage Difference Wholesale Sales (revenue)($ 173,806,710)($334,520,634)$160,713,9233 -48.0% Purchased Power / Net Interchange (cost)$644,1 83,1 57 $604,970,83 I $39,212,326 6.5% Coal(cost)s631,640,957 9780,404,471 ($ 148,763,514)-19.1% Gas (cost)9263,097,477 $284,628,008 ($21,530,532)-7.6% Other - Primarily Wind (cost)$ 146,968,316 $ 149,96s,098 ($2,996,782)-2.0o/o Total System $1,512,083,197 st,485,447,775 s26,635,422 l.8o/o During the deferral period, the amount of generation cost from its coal and natural gas- fueled generation resources has declined from quantities assumed in base rates (see Case No. PAC-E-16-12), which can be attributed to reduced generation output. Staff believes that these reductions are a major cause of reductions in the amount of wholesale sales revenue and an increase in the amount of purchased power used to serve the Company's load. Proposed Rates The Company provided Staff a revised Exhibit No. 2, showing the calculation of the new rates based on the adjustments discussed above. The revised Exhibit No. 2 is included in Attachment A to these comments. Staff verified that the rates in the Company's revised Schedule 94,Energy Cost Adjustment, are calculated using the methodology approved in Order No. 33440. The ending deferral balance is allocated on an equal cents per kilowatt-hour basis and then fuither allocated for line losses based on the voltage level at which each customer class receives service. This ensures that customers that take service at higher voltages (i.e., transmission) do not get charged for line losses that are lower than for primary and secondary distribution customers whose line losses are higher due to taking service at lower voltages. Using this method, the proposed rates in Schedule 94 are voltage-level specific: 0.354 cents per kWh for secondary service, 0.342 cents per kWh for primary service, and 0.333 cents per kWh for transmission service. 3 The positive amount for the wholesale sales base-to-actual difference represents a reduction in revenue from the total actual amount of sales relative to the base amounts; whereas positive amounts for base-to-actual cost components represent increases in actual cost as compared to base amounts. STAFF COMMENTS t2 MAY 13,2021 The Company's provided Staff with revisions to Schedule 94, also included in Attachment A to these comments, decreasing Company revenue by approximately 2.2%. However, revenue decreases to specific classes will vary because of differences in rate design among the classes. The overall revenue decrease for residential customers is just under 2%. A typical residential customer using an average of 800 kWh per month would pay $1.74 less per month or $20.88 less annually under the proposed rates. CUSTOMER NOTICE AND PRESS RELEASE The Company's press release and customer notice were included with its Application. Staff reviewed the documents and determined that both meet the requirements of Rule 125 of the Commission's Rules of Procedure. The notice was included with bills mailed to customers between April2, 2021 and May 3, 2021, providing customers with a reasonable opportunity to file timely comments with the Commission by the May 13, 2021 deadline. As of May 12,202I, the Commission has received no comments from customers. STAFF RECOMMENDATION If the potential additional Staff comments do not provide any adjustments to the deferral, Staff recommends the Commission: . Approve the deferral amount of $12.0 million for recovery. . Approve the rates as described in Attachment A, the revised Exhibit No. 2. . Approve the revised Tariffs. Respectfully submitted this 13rH day of May 2021. M,I Matt Hunter Deputy Attorney General Technical Staff: Joe Terry Rick Keller Kevin Keyt Curtis Thaden STAFF COMMENTS 13 MAY 13,2021 I3 E a B g b E $ r 5Ie l ! ,ir EI T: T tsI e I 3-l3l ;l =l :l -l 3l 'l ,E^49TE .t€ 991iliiP E'!99i [lE ET I<:<:r g rtr ;t!6. < 6 EtErEEl IEM{E -3E3E5! 6t ta:! 5 r&FEsgI ! 86 33 X -5 I t Ea I^t: 5! r, E EcEH ,$; tI*E&aEi: ;tEtlitSl-rztr6a!E:llE363*PFtsn!5 ;tI3 ETI* BIE'ncEO Ets ots ttE6 {!a!ag P, a 6E E €I Iaa8!T= a{ta5r 99H 3 n a;I 3t E q q. I ig T. t I. 3 t EEI 8l sl Ft:t 11 ? 3sT;EI!o E* oB ee 38 a !t I*EI =&LA B 3 .E 2! € 6d a!;E.ri-E;83 IaLee9 t: 39 tf t-t. td t' l ! !; T E I! I rI OE aza t E :3 tEsl;I3t slpilB t^ t" t::IE €ls "l= 8t3 t: tl* l- ek cla t: ;le clB t: -t-&t? 9IR t: 8ls t: Et& "t: -t- PIB l* EI; &ta t: :,i 4 I :-l::3tsE9t =31!t --t^: -qlRa9t:31;1. E EIE fr El-B6l;1. s Eli ;t- a R.l3 E $t" ;I- I Rt3 sqtNrl E elp ;l- o ol* ! f;1"idl;l-_-t- * Elil !t s al*P SIN:'l ;,1;s ElNg'l e alp sEl!t a slp Nrl-l ; -l; ;r5:i:qq "tg "t I t8 EIR 'l- l*alpiI "t" lB els 8lt- l* elpJol t; #'l- I' elnit't- l*elxiitrl t-l3 t- I' EIE t; ela-l- I' elB3t"l- I' elPlt 'l- ! r 5-8E g8i! a8A$ = oa8Eti Fi - errgE$tAEERAEB g;88SPe 39S!3"8. E*EEsiee gbsBEgB $- 89 fis OB oE $c.33 8a s3 E O N CE AAeeg8R89EsAibBRg B Ss I E B E B86g98e 339s8:: 83gEP!; & 88P83S8 &3REE:E ltttl I I I 8 8 H H 6 I 38 ig3- uE t8 t r6' rB 88 s6 :8' !8 Tt.t^ l^Elr 3lERlii EIE l. l.8.t0 Btr.El8 gs t-t_t^^t:t9 9tP Rlgt-t- nlr'l:t-t_t^^lFIE 8IEcld -lE t-t-t^^l fl13 gls t-t-l_t Hld sl$ t-t_t^^t^ ele' elxi"[ t:t^ -J-filB HisPld SIB' l"t- 3lB gc.uln l'El'EIF $I; Als 6l* t"l- a E I I 5 I I s I 3 I 3 E 3tc *ts - t:t:^ t^ ^t-! EIE FII t l, -1, -t"-t-^t^^t - glE glS - l:l_^ t^ ^l1 TIE FIF - t-t-^t^^lq flg 6tE - t"t-^t^^tI313 RIE- fllE fi|3 " t:t_^t^^t = Eli. $ls' -t-t_^t^^l^E 3t8 $tS , l,].E 3t^. ;lE NIS gE:l:l: _8 31f; SIB - t-t:^ t^ ^l^I 8t9 gt3 - 318 3lr"il- 'sl :1" , *1,ata "t" s ll$plB r nl, R t9 -t-. *1, n-1, s slr "t- ndc-"1: " nl, EIE "1"e els--l: o nl, -t- o nlo3 tr -t-* *1.g tts l: : i : ig g - t I ,g I [lh 8lE-t: r slaal9I' : -l:3 &lN Rlq-t; * rl" Rt$ "t; g EIE -t-, *l= gt3 t" ;J; flIE-t: * el: Htg-t: s els l' iJi -t: t' ial* 0t9 "t; : : : : j : 3 : "6ts € :3 s i : P : e 3. d E ,e a R. R I 3 B3 B.I 8. flI NE 9 TI 3 B 3' 8. 3 8 E; i a 3 s B 3 n a Z ts s N 3I ; gE 8* 6 E EEE E !6 8qf, I 5 ftE rls 3l e,t' -t- als t: ,l* El8 t: ;l; t: cla 5l& l: el*gIR"t: "l*f;li t: 'l*BlI l- :.t:.&li t: sls flH =l;*t9 t: ale t: q q {A'Ir als 'lifl: iE.l a E9!€ ePE Elg"ifEEA EE"3lcI l>!e 3E!E! :19:9 ^?:E a_{rte 5:EF: + ;?E!E;; cfrt4cgEE 6o9 ? r_? tdtEOB*E e3 ae e ei*8att 5O XTI; E€ $? E E' I? is ErETggtOo3 'i.€t e3iEqI:i E;B c I EbE; +.3?rr & i-i 3sE 4aEsl *.iegH 3 {x R1 ! E R 91+.9 3sq N !EI I E p za = E N ! 5 5 Attachment A Case No. PAC-E-21-09 Staff Comments 05ll3l2l Page I of 3 \, NruafrRiluoo o\<f,!1 r FI o-l $ll 3il il il I Bll 3ll 6ll qlt 6 $ q r nI Bll il il I 3ll 6 6lr *il 3ll qil $ll .t" r il I I I I ;l 'l \o \o \o \o\onnN-i -i -i -'$l I I I I 5l 6l c.l to ro ro \o \o \o \o \o \6 \o \o \ogn6qdt=i.:q{-q-Snlqqqq$199n 6'6s=6'=G.6rCGG.6 \O ^: <l O- 6 r i< tA r -'o (, .a e{ ma m 4 + v € ol!3-tt 2-:" !1-te 6f!1-(r-6 o 6 h rt oo. € - c - c{ a.lN r d $ rt6l r 6 \^ - € rr - oi \o $99 € - .< 6 € h_.t6j-6d 66= rj6eqeA66G \o€oh6m nhGoO\t-NhnO-N O; \O Nr- - a.l ci € € \O1 \ d ..) €..o" $. €. ^i o. q d) Ol O ri h 6h O\ \O 6' el h -66u( N\o \om(< o\-6 .i -\o ,\ <..- s5 s x3o" qqorN SO r\oh\o\c)6o\oGmr$6ro - ei e{ -m - r; a..l \o \o r\O \O ^: \O O<f or. m ^: - O\ a.l {r;6i;Fjdta+ri*:6.d.d(,(\€'9.itrh-6-:&Aaei@e4qea -O\-€-6O66\O\O- O = O €n <i'h d O' N €O^ to^ ro o- q-i €^ R" ^i €" q <J: O O h' - c\n 6 o N' - 6 rOoFiNOno6$O \O t G r 0.6 S $ 6 O - -6 -; - \OO m - \;o^ N ^i q- \o" d) o\.j t .O a'i oO I g I I I $l o\ \o+t- ooF.i 6i \o-o\h a'- a.)(\ <f(\- .1 .1 a.l a.l qrloo +<' .1 n \o a.l\OOh€ o\o h^ o-F- O,€hstN -ls ^lol ^Olhq= J.ol-al-l ,-lo "lo .,la ^lol^Olo -l =l =l' ..1. "lu -1. ^t E]' -t =13=l El. ;l^;lo a, d Q oz o z QLl I od & Eo 6lL EI.E E - & b0 CE I & U o G o -OOh a.l-O<f c/)lo FI o.l al oo66dd st stoo oooorA (h 6GooFF o o dF F srnoo|\-or\rN- .O^ a,l o €:::^' NNN6I$rt$tf,nqrtq <fd$$ndlnn -oOO\ nndl at<fno a? r 6m6666mo-mN fld] I N 6l a.t al N a]+s+$+m6666:;:: ^' $ rt *d- .+ .n-6nhhq.1 c).,1 n ..) r€hma{6<f€h\O O N' O O- t - Fio - - <. -6 n - \-j€a.J(,6i (,(,96qe4e + sf -h6 6 ro-slv'l 6 n\oo.<\-i :: a..l a'l$+qdl <tt .1 11oo z Qfr] z I !l 6 =l 6;t 6 -t el$€l 6 -l 991 ttt nol 6:l d -l o F1a 2tCa*L=Vie==R'Az=; <?.zerlJ-tl)s*6OirJY "raElf..-\LrHOA:rEt!zo=QatL aQh Zl-avr-rEJ -vL- =r,n??ir.=id-ao?><-0a=euaz<=!i6l )irJv;v--.-\-/ =l(o-ITJLL =>ceSOaEE =4a!i Nd! o\ c EI El rrrt€o€NN- $^N r O N €- $ O.a 6roN-n€o^iO'$"'o" S =r;1 =f. €" -i a. - O -' Nn N N d -hoil o nmei \o F.F-r-s.\oo€N.{- q N 6\Or<O\666 c.l (\do\oood<to(, 6N -l€n $l6-rlNhrl$m F=l+N \Ol I ^o-olO69O\l€s oloi 6i N"l<f c.l rl46 Gl I $ oi H F AT E =El,E 5 s ; .El E ? 9.=HHE&E!l € € - -'al ;;;\solq ov o!ld, d < t- -N6+ O\ 6l€hn"ac{n $ a'l cl\ \th€o"n\o6<._ qc. t:Ic.l (.l ,,t, -^ oTEgP<Y C)o- =^- tr o.EE O9T -c, A \-l );o,rG'lg EE;(Orno dF,o -9 UE] =-v, :(o 6vEo z&o- o.tro,o =o,:- F-2o- odtro.r=o'"oov EE>F N<-N.=1Rfi-\o .o$ ?o 9r3P>; .E'u^s*;EE H *5EI.E.EEE 5 E:flEE,qq E ==!l:: P s E.i s !il 9 E:= 6! sZtllFS:',E EE =l :iEEs= EE=l uutSvo -o,oLlaoqo<l- FF <>-c\m$6\or€ol N N a.l o1 c.l a.l (\ N Ut S oo e E=,X& g ,H 8 E6l ir - O = El $i ; + a-E E€l Qiof 8 d.i: dElT"i,ti E t-e5;i Epl oJS o a a a, EI;; $ ; =:j ;; $ ; E E H E EIE E S S CS E E s EEEq E a o h \o r - a 3= S I = :9 = = Io .lE 6l =zl .1 ..) ..] (\ : .f ..1 O\O-a.loNmo66 ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP I.P.U.C. No. I Tenth Revision of Sheet No. 94.1 Canceling Ninth Revision of Sheet No. 94.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.94 STATE OF IDAHO Energy Cost Adjustment AVAILABILITY: At any point on the Company's interconnected system. APPLICATION: This Schedule shall be applicable to all retail tariff Customers taking service under the Company's electric service schedules. ENERGY COST ADJUSTMENT: The Energy Cost Adjustment is calculated to collect the accumulated difference between total Company Base Net Power Cost and total Company Actual Net Power Cost calculated on a cents per kWh basis. MONTHLY BILL: In addition to the Monthly Charges contained in the Customer's applicable schedule, all monthly bills shall have applied the following cents per kilowatt-hour rate by delivery voltage. Delivery Voltage Schedule Schedule Schedule Schedule Schedule Schedule Schedule Schedule Schedule Schedule Schedule Schedule Schedule Schedule Schedule Schedule Schedule Schedule I 6 6A 7 7A 9 l0il l2 l9 23 23A 24 35 35A 36 400 401 Secondary 0.1:4s+p per kWh 0.154+ll per kWh 0.111s7-1p per kWh O.ll[sPp per kWh 0.lll+Pp per kWh Primary 0.j4lr49p per kWh 0.i+:5*ep per kWh 0.){2.*190 per kWh 0.1!254e1, per kWh 0.i425+si, per kWh 0.i12s1et per kWh 0.3!t2*9F per kWh Transmission 0.1-jj533l perkWh 0.3335?4O per kWh 03335€tsA perkWh 0.ji4'>"?'l p per kWh 0.i515++l per kWh 0.lJ:is7+l per kWh 0.i.54#|p per kWh 0.i54r}+f per kWh O..jLt:?+l per kWh O.i-VS7r p per kWh O.l.l4>7l I per kWh 0.1"!57lp per kWh 0..if4.i++P per kWh Attachment A Case No. PAC-E-21-09 Staff Comments 05/13121 Page 3 of 3 Submitted Under Case No. PAC-E-20-02 ISSUED: April 1,2020 EFFECTM: June 1,2020 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS I3TH DAY OF MAY 2021, SERVED THE FOREGOING COMMENTS OF THE COMMISSION STAFF, IN CASE NO. PAC-E-21.09, BY E-MAILING A COPY THEREOF, TO THE FOLLOWING: TED WESTON ROCKY MOUNTAIN POWER 1407 WEST NORTH TEMPLE STE 330 SALT LAKE CITY UT 84I16 E-MAIL: ted.weston@pacificor?.com DATA REQUEST RESPONSE CENTER E-MAIL ONLY: datareq uest@pac i fi corp.com ELECTRONIC ONLY BRADLEY MULLINS MW ANALYTICS ENERGY & UTILITIES E-MAIL : brmullins@mwanalytics.com RANDALL C BUDGE THOMAS J BUDGE RACINE OLSON PLLP PO BOX l39l POCATELLO TD 83204 E-MAIL: randy@racineolson.com tj@racineolson.com EMILY WEGENET\ ROCKY MOLINTAIN POWER 1407 WN TEMPLE STE 320 SALT LAKE CITY UT 84I 16 E-MAIL: emily.weeener@nacificorp.corn RONALD L WILLIAMS WILLIAMS BRADBURY PC PO BOX 388 BOISE ID 8370I E-MAIL: ron@williamsbradbury.com ELECTRONIC ONLY Val. ste iner@itafos. com williamsk@byui.edu agardner@idahoan.com BRUBAKER & ASSOCIATES BRIAN C COLLINS MAURICE BRUBAKER 16690 SWINGLEY RIDGE RD #I4O CHESTERFIELD MO 63017 E-MAIL: bcollins@,consultbai.com mbrubaker@consultbai.com SECRET CERTTFICATE OF SERVICE