HomeMy WebLinkAbout20210527Vail Exhibit 24.pdfCase No. PAC-E-21-07 Exhibit No. 24 Witress: Richard A. Vail BEFORE TI{E IDAHO PUBLIC UTILITIES COMMISSION ROCKY MOUNTAIN POWER Exhibit Accompanying Direct Testimony of Richard A. Vail Aeolus to Bridger Anticline May 2O2l Rocky Mountain Power Exhibit No. 24Page 1 ot 6 Case No. PAC-E-21-07 Witness: Richard A. Vail Energy Vision 2020 Wind Neturork lmprovements D.2 Projec't Facil ities: D.2 Proiect Transmission Facilities:. Addition of the Aeolus 500/230 kV autotransformer . Addition of the Aeolus - Anticline 500 kV line (-138 miles) o Addition of the Anticline 500/345 kV autotransformer o Addition of the Anticline - Bridger 345 kV line (5 miles) Southeast Wyoming - Network Upgrades . Loop the Shirley Basin - Freezeout 230 kV line into Aeolus 230 kV o Add the Aeolus - Shirley Basin 230 kV #2 line (-15 miles) [OOZOZIo Rebuild the Aeolus - Shirley Basin 230 kV #1 line (-16 miles) [40712]o Rebuild the Aeolus - Freezeout - Standpipe 230 kV line (-t5 miles) [Q0712]o Add Latham SVC A drawing depicting all new D.2 Project network transmission facilities east of Jim Bridger Power Plant is provided below: Gateway West - Subsegment D.2 Southeast Wyoming Confi guration Difficulty Line Rebuild Basin Dunlap 111 MW Line Rebuild @ (Future) @ res uw @ 7 Mile Hill 118.5 MW Latham To Bridger/ Anticline Plafte \- Line Rebuild 'r37.8 Mires < 230 kV Existing 230 kV Existing 230 kV Future 345 kV Existing 500 kV Future High Plains 99 MW McFadden Ridge 28.5 MW Foote @ Existing wind Gen l-il Prooosed Wind GenLLI 1 Rod<y Mountain Polver E:dribit No. 24 Page 2 dl 6 Case No. PAC-E-21-07 Witress: Richard A Vail At the Aeolus substation to support the Ekola Flats wind project the following neh^/ork upgrades are required: o Add one (1) 230 kV 4O0O ampere circuit breaker and one line position with associated switches. o lnclude the project in the Aeolus RAS generation dropping scheme. 230 kV #1 to Shirley Basin Aeohs qD kV Sub s0o/2:p kv 11 230 kv Aeolus 230 kV Substation 230 kv to Freezeout - 7 mlles Q0706 Ekola Flats :5I # Energy Vision 2020 Scope of Work 2 Rocky Mountain Power "HIJ,i;'li3:;#li At shirley Basin substation to support the inclusion of TB Flats r wind projects, tne rorltliif: Richard A' vail upgrades are required: o Add one new bay and rebuild existing bays to 4000 amperes, seven (7) new 4OOO ampere 230 kV circuit breakers, two line terminations with associated switches o Construct a new approximately 15.5-mile Shirley Basin - Aeolus 230 kV #2 line. At Aeolus substation the following network improvements are required: o Add one (1) new 40(X) ampere 230 kV circuit breaker, one line termination and associated switches o lnclude the project in the Aeolus RAS generation dropping scheme. The TB Flats I and ll were combined into a single point of interconnection. As such, to support inclusion of the TB Flats ll wind the following network upgrades are required: o tnclude the project in the Aeolus RAS generation dropping scheme. 3 Rod(yffuunerin Powcr E:drhlNo.24 Page4 dG Cre tb. PrC-e-21-07 llYltncs: RLfiardA Vail Anrpa.a Shirley Basin Subataton Ounhp oai6 d T t I t T 6.t =od Aeolus Substation 4 EnerryVision2020 Scope of Work PoHd Upgr.d.b.|{)00 Ar".rc Bry3 q0707100708 TB Ftrb l& lt 230kvo07(n Rocky Mountain Power Exhibit No. 24 Page 5 ot 6 Case No. PAC-E-21-OT Witness: Richard A. Vail At Windstar substation to support the inclusion of Cedar Springs I wind project the following network upgrades are required: o Add one (1) 230 kV 3000 ampere circuit breakers and one line termination At Freezeout substation to support the inclusion of Cedar Springs I wind project the following network upgrades are required: o Add three (3) 230 kV 4000 ampere circuit breakers along with associated switches for re- termination of lines associated with the Aeolus-Freezeout-Standpipe 230 kV line rebuild o Upgrade two bays to zlo00 amperes o Rebuild the Aeolus - Freezeout - Standpipe 230 kV line -15 miles o Rebuild the Shirley Basin - Aeolus 230 kV #1 line -16 miles Windstar Substation Poant of lnterconn€ction Change of Ownership 230 kv 9rA_.,=utf.JD Q0712 New Collector Substation (120 MW) !4.51V F^l Q0712 Collector Substation North (200 MW) 34.5W Q0712 Collector Substation South (200 MW) FAts 21.6 Mil6 Co06tdckd FAh Energy Vision 2020 Scope of Work: Rebuild Aeolus - Freezeout - Standpipe 230 kV line -15 miles Rebuild Aeolus - Shirley Basin #l 230 kV tine -16 miles 5 Rodty Monntah Povrer E:drbit No. 2,[ Pagc 6 d6 Cre t{o. PAC€-21-07 Wltelg: RidrardAVaf Freezeout 230 kV Upgrade Bays b4000 230 kV Lineto Seven Mile Hill Subotation B$ bAeolrc Rehlffi 230 kV lineto Retuild KV 6