Exhibit Accompanying Direct Testimony of Richard A. Vail
Aeolus to Bridger Anticline
May 2O2l
Rocky Mountain Power
Exhibit No. 24Page 1 ot 6
Case No. PAC-E-21-07
Witness: Richard A. Vail
Energy Vision 2020 Wind Neturork lmprovements
D.2 Projec't Facil ities:
D.2 Proiect Transmission Facilities:. Addition of the Aeolus 500/230 kV autotransformer
. Addition of the Aeolus - Anticline 500 kV line (-138 miles)
o Addition of the Anticline 500/345 kV autotransformer
o Addition of the Anticline - Bridger 345 kV line (5 miles)
Southeast Wyoming - Network Upgrades
. Loop the Shirley Basin - Freezeout 230 kV line into Aeolus 230 kV
o Add the Aeolus - Shirley Basin 230 kV #2 line (-15 miles) [OOZOZIo Rebuild the Aeolus - Shirley Basin 230 kV #1 line (-16 miles) [40712]o Rebuild the Aeolus - Freezeout - Standpipe 230 kV line (-t5 miles) [Q0712]o Add Latham SVC
A drawing depicting all new D.2 Project network transmission facilities east of Jim Bridger Power Plant is
provided below:
Gateway West - Subsegment D.2
Southeast Wyoming Confi guration Difficulty
Line Rebuild
Basin
Dunlap 111 MW
Line Rebuild
@
(Future)
@ res uw
@
7 Mile Hill 118.5 MW
Latham
To Bridger/
Anticline
Plafte
\-
Line Rebuild
'r37.8 Mires
< 230 kV Existing
230 kV Existing
230 kV Future
345 kV Existing
500 kV Future
High Plains 99 MW
McFadden Ridge 28.5 MW
Foote
@ Existing wind Gen
l-il Prooosed Wind GenLLI
1
Rod<y Mountain Polver
E:dribit No. 24 Page 2 dl 6
Case No. PAC-E-21-07
Witress: Richard A Vail
At the Aeolus substation to support the Ekola Flats wind project the following neh^/ork upgrades are
required:
o Add one (1) 230 kV 4O0O ampere circuit breaker and one line position with associated switches.
o lnclude the project in the Aeolus RAS generation dropping scheme.
230 kV #1 to
Shirley Basin
Aeohs qD kV
Sub
s0o/2:p kv 11
230 kv
Aeolus 230 kV
Substation
230 kv to
Freezeout
- 7 mlles
Q0706
Ekola Flats
:5I
#
Energy Vision 2020
Scope of Work
2
Rocky Mountain Power
"HIJ,i;'li3:;#li
At shirley Basin substation to support the inclusion of TB Flats r wind projects, tne rorltliif: Richard A' vail
upgrades are required:
o Add one new bay and rebuild existing bays to 4000 amperes, seven (7) new 4OOO ampere 230 kV
circuit breakers, two line terminations with associated switches
o Construct a new approximately 15.5-mile Shirley Basin - Aeolus 230 kV #2 line.
At Aeolus substation the following network improvements are required:
o Add one (1) new 40(X) ampere 230 kV circuit breaker, one line termination and associated
switches
o lnclude the project in the Aeolus RAS generation dropping scheme.
The TB Flats I and ll were combined into a single point of interconnection. As such, to support inclusion
of the TB Flats ll wind the following network upgrades are required:
o tnclude the project in the Aeolus RAS generation dropping scheme.
3
Rod(yffuunerin Powcr
E:drhlNo.24 Page4 dG
Cre tb. PrC-e-21-07
llYltncs: RLfiardA Vail
Anrpa.a
Shirley Basin
Subataton
Ounhp
oai6
d
T
t
I
t
T
6.t
=od
Aeolus
Substation
4
EnerryVision2020
Scope of Work
PoHd
Upgr.d.b.|{)00
Ar".rc Bry3
q0707100708
TB Ftrb l& lt
230kvo07(n
Rocky Mountain Power
Exhibit No. 24 Page 5 ot 6
Case No. PAC-E-21-OT
Witness: Richard A. Vail
At Windstar substation to support the inclusion of Cedar Springs I wind project the following network
upgrades are required:
o Add one (1) 230 kV 3000 ampere circuit breakers and one line termination
At Freezeout substation to support the inclusion of Cedar Springs I wind project the following network
upgrades are required:
o Add three (3) 230 kV 4000 ampere circuit breakers along with associated switches for re-
termination of lines associated with the Aeolus-Freezeout-Standpipe 230 kV line rebuild
o Upgrade two bays to zlo00 amperes
o Rebuild the Aeolus - Freezeout - Standpipe 230 kV line -15 miles
o Rebuild the Shirley Basin - Aeolus 230 kV #1 line -16 miles
Windstar Substation
Poant of
lnterconn€ction
Change of Ownership
230 kv
9rA_.,=utf.JD
Q0712 New Collector
Substation (120 MW)
!4.51V
F^l
Q0712 Collector Substation
North (200 MW)
34.5W
Q0712 Collector Substation
South (200 MW)
FAts
21.6 Mil6
Co06tdckd
FAh
Energy Vision 2020 Scope of Work:
Rebuild Aeolus - Freezeout - Standpipe
230 kV line -15 miles
Rebuild Aeolus - Shirley Basin #l 230 kV
tine -16 miles
5
Rodty Monntah Povrer
E:drbit No. 2,[ Pagc 6 d6
Cre t{o. PAC€-21-07
Wltelg: RidrardAVaf
Freezeout 230 kV
Upgrade Bays
b4000
230 kV Lineto
Seven Mile Hill
Subotation
B$
bAeolrc
Rehlffi 230
kV lineto
Retuild
KV
6