Loading...
HomeMy WebLinkAbout20191010Application.pdfROCKY MOUNTAIN POWER A OTVTSTON OF PACTFTCORP "^*D RICEIVES ?019 OCT l0 fiil ll: 36 Joelle R. Steward Vice President, Regulation 1407 West North Temple, Suite 330 Salt Lake City, UT 84116 October 10,2019 VIA OVERNIGHT DELIVERY Diane Hanian Commission Secretary Idaho Public Utilities Commission 11331 W Chinden Blvd Building 8 Suite 20lA Boise,Idaho, 83714 Re:CASE NO. PAC.E.19-15 IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER FOR AUTHORITY TO MODIFY ELECTRIC SERIVCE SCHEDULE NO. 31 PARTIAL REQUIREMENTS SERVICE Dear Ms. Hanian: Enclosed for filing in the above referenced matter are an original and seven (7) copies of Rocky Mountain Power's application requesting authority to revise Electric Service Schedule No. 31 - Partial Requirements Service to provide for customers taking distribution service. Please contact Ted Weston, Idaho Regulatory Affairs Manager at (801) 220-2963 if you have any questions. very truly yours, R. Vice President, Regulation Enclosures Daniel E. Solander (ISB#8931) Senior Attorney 1407 W. North Temple, Suite 320 Salt Lake City UT 841l6 Telephone: (801 ) 220-4014 Email : daniel.solander@pacificorp.com ftTC E lVE D iillg 0[f t0 At{ il: 36 Attorneyfor Roclcy Mountain Power BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION )oF ROCKY MOUNTATN POWER FOR ) AUTHORITY TO MODIFY ELECTRIC ) SERIVCE SCHEDULE NO. 31 PARTIAL ) REQUIREMENTS SERVICE ) CASE NO. PAC.E-19.15 APPLICATION COMES NOW, Rocky Mountain Power, (the "Comparry"), and in accordance with RP 052 and RP 201, et. seq., hereby respectfully applies to the Idaho Public Utilities Commission, (the "Commission"), for authority to modiff Electric Service Schedule No. 31 - Partial Requirements Service, ("Schedule 31"), to add options for customers taking service at distribution voltage levels. In support of this Application, the Company states as follows: 1. Rocky Mountain Power is a division of PacifiCorp, &n Oregon corporation, which provides electric service to retail customers through its Rocky Mountain Power division in the states of Idaho, Utah, and Wyoming, and through its Pacific Power division in the states of California, Oregon, and Washington. 2. Rocky Mountain Power is a regulated public utility in the state of Idaho and is subject to the Commission's jurisdiction with respect to its prices and terms of electric service to retail customers in Idaho. APPLICATION OF ROCKY MOUNTAIN POWER - 1 3. This Application is filed pursuant to ldaho Code $$ 61-301 and 61-307. In particular, Idaho Code $ 61-301 requires Idaho retail electric rates to be just and reasonable and ldaho Code $ 6l-307 requires Commission approval prior to any change in rates or servlce. BACKGROUND 4. In August 2012 the Company filed for authorization to cancel Electric Service Schedule No. 17 - Standby Service, and replace it with Electric Service Schedule No. 31 - Partial Requirements Service - High Voltage, for customers taking service at transmission voltage levels. In December 2012 the Commission approvedl the application authorizing implementation of Schedule 31. 5. Partial Requirements Service is designed for customers with on-site generation. It consists of Supplementary, Back-up, Maintenance, or Excess Power service. A customer can contract for Partial Requirements Service for a minimum of one year. 6. Presently, service under Schedule 31 is only available to transmission voltage customers with loads up to 15,000 kW. Rates were based on and aligned with Electric Service Schedule No. 9 - General Service - High Voltage, ("Schedule 9"). This assured consistency between Schedule 3l and the corresponding fulI requirement rates on Schedule 9, under which eligible customers would otherwise take service. I Case No. PAC-E-12-12, Order No. 32704. APPLICATION OF ROCKY MOUNTAIN POWER - 2 PROPOSAL 7. Recently the Company was contacted by a customer taking service at a distribution voltage level, who wanted to self-generate for most of the customer's electricity needs, expressing interest in Partial Requirements Service. Since Schedule 31 is currently only available to customers taking service at transmission voltage levels, the Company determined it was necessary to modifu Schedule 3l to provide service for customers at lower voltages. Approval of the Company's requested revisions to the tariff will enable customers served at distribution voltage to take service on Schedule 31 and will provide more transparency for customers to better evaluate their options as they consider self-generation. 8. The Company respectfully requests authorization to expand Schedule 3l fromtransmission service only to also include distribution service. Two additional rate options would be added: Secondary Service for customers taking service under 2300 volts; and Primary Service for distribution service of 2300 volts or higher. 9. The rates for these two distibution service options were designed based upon the prices for full requirements service under Electric Service Schedule No. 6 - General Service, ("Schedule 6"). The same logic that was used to develop current Schedule 31 prices for transmission voltage customers based upon Schedule 9 was used to develop proposed prices for distribution voltage customers based upon Schedule 6. Attachment A to this application shows the calculation of the proposed prices. 10. Like the transmission voltage rates, the proposed rates for partial requirements services for distribution voltage service are based upon the Company's most recently filed cost of service study in Case No. PAC-E-I1-12 and incorporate the same APPLICATION OF ROCKY MOUNTAIN POWER - 3 seasonal proportions between Summer and Winter as exist with power charges in the corresponding full requirements tariff Schedule 6. 1 1. The rates are designed to ensure consistency with what a customer would pay on Schedule 6. The proposed customer service, supplementary power, supplementary and back-up energy prices are set to the same prices found in Schedule 6. The excess power rate is set at two times supplemental power charges. 12. Clean and legislative copies of Electric Service Schedule No. 3l - Partial Requirements Service are provided as Attachment B to this Application. COMMTINICATIONS 13. Communications regarding this Application should be addressed to: Ted Weston Rocky Mountain Power Manager, Idaho Regulatory Affairs 1407 W. North Temple, Suite 330 Salt Lake City UT 84116 Telephone: (801) 220-2963 E-mail: ted.weston@pacificorp.com Daniel E. Solander Rocky Mountain Power Senior Counsel 1407 W. North Temple, Suite 320 Salt Lake city uT 84116 Telephone: (801) 220-4014 E-mail : daniel. solander@pacifi corp. com Rocky Mountain Power respectfully requests that all data requests regarding this matter be addressed to: By e-mail (preferred)datarequest@f acifi corp. com APPLICATION OF ROCKY MOTINTAIN POWER - 4 By regular mail: PacifiCorp Data Request Response Center 825 NE Multnomah, Suite 2000 Portland, OR 97232 Informal inquires also may be directed to Ted Weston at (801) 220-2963. MODIFIED PROCEDURE 16. Rocky Mountain Power believes that consideration of the proposals contained in this Application do not require an evidentiary proceeding, and accordingly the Company requests that this Application be processed under RP 201 allowing for consideration of issues under Modified Procedure, i.e., by written submissions rather than by an evidentiary hearing. REOUEST FOR RELIEF WHEREFORE, Rocky Mountain Power respectfully requests that the Commission issue an order: (l) authorizing that this matter be processed under Modified Procedure; (2) authorizing the addition of primary and secondary service options to Electric Service Schedule No. 3l - Partial Requirements Service; and (3) approving the Electric Service Schedule No. 31 - Partial Requirements Service tariff sheets provided as Attachment B. DATED this 10ft day of October,2}l9. Respectfully submitted, T/,-,t 4lrlr^ Daniel E. Solander Attorney for PacifiCorp APPLICATION OF ROCKY MOUNTAIN POWER - 5 Rocky Mountain Power State ofldaho Pertial Requircments Seruicc Proposal Full Sch 31Pra"rt Pr"p*"d Tmsmission Seon&ry Primary Tmsmission $370.00 $37.00 $111.00 $370.00 lD PACf-ll-i2 Cort of Srrvicr Oab ,{, PagG 6 - Unit Coct!) Cuilomer S€nie Chrrgc Brck-up Facilitis Rrtc Stms Wintcr Beck-up Porcr Rrte Smr Wintd Erqr Power Rete Smq Wintq Supplmcotery Porcr RrteSws Wints Slpplmentrry [d Brck-[p Enerry Rrte Sms Wints Primtry Voltagc Discowt Sch 6 Sch 9 $37.00/$lll.00 $370.00 Schg Sch6 $5.70 $4.30 $?.e4 s6.49 $7.58 $6.1 3 $s.70 $4.30 TEn&Dcmnd 03.95 93.33Distri-Substation t0.62 G.FD.mnd (13%) $1.05 $0.67 Distri - P&C, TBnsromr t2.,t0 Targ.tBack{p F.ciliti!. S5.00 t7.21Summer $5.70 $7.94VMntlr $,t.30 $6.,19 s0.19 s0.14 $0.26 $0.22 s0.2s $0.21 $0.19 $0.14 s20.52 $15.48 s28.12 sx.a $2'1.42 s22.32 s20.s2 sls.48 Rrdo of Awng! Drlly to ironthly kW Smr 80% 80% Wintff 80% 80% s14.36 $ll.8l s10.26 $7.74 $10.26 $7.'.14 $14.36 $l l.8l $r 3.71 $t l. l6 $10.26 $7.74 Sws 2 2 22 3.9E80 3.9880 ($0.65) 4.18',12 4.18'12 4.18',12 4.1E',12 3.9880 3.9880 3.9880 3.9880 4.18't2 4.t872 Lc,{t tor Drily B.ckup Posr Primry $6.1 3Swa$,1.56 $6.i12 $5.70 $8.02 s7.66 Wintq $,{.30 $6.65 $6.29 SlJms tt.56 $6.42 $6.13Wintn $3.44 $5.32 $5.03 Wirts Attachment B ROCKY MOUNTAIN POWER A OMSION OF PACIFICOBP I.P.U.C. No. 1 First Revision of Sheet No. 31.1 C@-Original Sheet No. 31.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.31 STATE OF IDAHO Partial Requirements Service - AVAILABILITY: At any point on the Company's interconnected system where there are facilities ofadequate capacity. APPLICATION: This Schedule is for alternating current, three phase electric service supplied at Companv's ava'lable voltaqs through a single point of delivery for Supplementary, Back-up, Maintenance Power or Excess Service (partial requirements service) in addition to regular electric requirements obtained from any service other than the Company, including on-site generation. This Schedule is applicable to customers with on-site eeneration of more than 1.000 kW but that does not exceed 15.000 kW. Customers not contracting for Back-up Power shall not be subject to this Schedule and shall receive electric service under . This Schedule is not applicable to service for resale, intermittent or highly fluctuating loads, or seasonal use. This Schedule is not required where on-site generation is used only for emergency supply during times of utility outage. This Schedule is not available to loads in excess of 15,000 kW, a maximum power requirement in excess of 15,000 kW shall be deemed to exist when a Customer's maximum power requirement exceeds 15,000 kW in at least three (3) months of any continuous period of six (6) successive months. MONTHLY BILL: Rate Billins Months May throueh October. Inclusive Billing Months November through April. Inclusive Customer Service Charqe: Secondary Voltase Primary Voltaee Transmission Voltaee per Customer pgr Customer per Customer s37.00 sl r 1.00 s370.00 s37.00 sl l r.00 $370.00 per Customer per Customer per Customer Back-un Facilities Rate: Secondary Voltase Primarv Voltage Transmission Voltaee per kW for all kW per kW for all kW per kW for all kW per kW for all kW per kW for all kW per kW for all kW s7.94 s7.s8 $5.70 $6.49 $6.13 $4.30 Submitted Under Case No. PAC-E-l+pl9-15 ISSUED: (continued) EFFECTM: January l,W Y ROCKY MOUNTAIN POWER A OIVISION OF PACIFEONP I.P.U.C. No. I First Revision of Sheet No. 31.1 Cancelins Original Sheet No.31.2 The Facilities Rate applies to the kW of Back-up Contract Power (€on+inr€d) Submitted Under Case No. PAC-E-I+BI9-15 ISSUED: (continued) EFFECTM: January l,W Y ROCKY MOUNTAIN POWER A D1VISION OF PACIFICORP I.P.U.C. No. I Seeen*Illglnevision of Sheet No. 31.2 Canceling Si+s+Second Revision of Sheet No. 31.2 -MONTHLY BILL: Rate: ELECTRIC SERVICE SCHEDULE NO.31 - Continued Billing Months May throueh October. Inclusive Billing Months November through April. Inclusive $3+0S0 pe+eusgmer €ustemer{'e*iee €lafge+ Back-un Power Rate: Secondarv Voltaee Primarv Voltage Transmission VoltaeeBa€*.rrp Facilities.*a*e+ $+OSe pe+eusrcme+ $0.26 $0.2s s0.1 9$m Excess Power Rate: Secondarv Voltage Primary Voltaee Transmission Voltaee all kW Day all kW Dav all kW Dayp€rffi€ll+l# oer kW for all kW per kW for all kW per kW for all kW all kW Day all kW Dav all kW Day per*qf+erall-*t# per kW for all kW oer kW for all kW per kW for all kW The Faeilities Rete applies te the kW ef Baek up €entreet fewer Back-up Power is billed on a oer day basis and is based on the fifteen (15) minute period of the Customer's sreatest use of Back-up Power durins the day Scheduled Maintenance Power rate is one half (l/2) of the Back-up Power s0.22 $0.21 $0.1 4 $4# $23.62 s22.32 $15.48 $28.72 s27.42 s20.52 Suoolementan Power Rate: Secondary Voltaee Primar.v Voltage Transmission Voltage Supnlementan and Back-un Energv Rate: Secondary Voltaee Primarv Voltaee oer kW for all kW per kW for all kW per kW for all kW per kW for all kW oer kW for all kW per kW for all kW s14.36 $ 13.71 $10.26 $l l.8l $l l.l6 $7.74 3.9880C oer kWh 3.9880d per kWh Submitted Under Case No. PAC-E-I+BI9-15 ISSUED: (continued) EFFECTM: January l,W Y ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP I.P.U.C. No. I Se€ofd-I'hird Revision of Sheet No.31.2 Canceling Fi+s+Eecond Revision of Sheet No. 31.2 Transmission Voltaee -ga€**p+o#er*flte+ Exe€sd+€#er Rflte+ per kWh per kWh alHAltDay per kWh oer kWh,AJl-k{lADay 3.9880C 4.1872C $+19 3.9880d 4.1872C, $+14 dEr' Seheduled Makrtenanee Pewer rete is ene helf (l/2) ef th€ Ba€k tsp Pewer R€te $2053 pep**t+er+ll+l#$15++8 per*tti+erall-*w Supptemor*ory Poffrer+ot€+ ${€r5 per*IAr4oruIl+l$f $7,74 per*t*++++tOUf Supptemcntery ame+aei:-up C,nc+Sy*ate+ 4#79 pef-l(]|I/e wz$ pef+I+h POWER FACTOR: This rate is based on the Customer maintaining at all times a power factor of 85% lagging, or higher, as determined by measurement. If the average power factor is found to be less than 85% lagging, the Power as recorded by the Company's meter will be increased by % of l%o for every l%o that the power factor is less than 85%. VOLTAGE LEYELS: Secondary Voltaee applies where a distribution Customer takes service from Company's available lines of less than 2.300 volts. Primary Voltaee applies where a distribution Customer takes service from Comoany's available lines of 2.300 to less than 46.000 volts and orovides and maintains all transformers and other necessary related eouipment. Transmission Voltage applies where service is suoplied at approximatelv 46.000 volts or greater throueh a sinsle point of delivery. (een+inuee) (continued) Submitted Under Case No. PAC-E+BI9-15 ISSUED:EFFECTM: January 1,ru ROCKY MOUNTAIN POWER A OIV|S|ON OF PACTFTCORP I.P.U.C. No. I First Revision of Sheet No. 31.1 Canceling Original Sheet No.3l.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.31 STATE OF IDAHO Partial Requirements Service -- Large General Service - 1,000 kW and Over AVAILABILITY: At any point on the Company's interconnected system where there are facilities ofadequate capacity. APPLICATION: This Schedule is for alternating current, three phase electric service supplied at Company's available voltage through a single point of delivery for Supplementary, Back-up, Maintenance Power or Excess Service (partial requirements service) in addition to regular electric requirements obtained from any service other than the Company, including on-site generation. This Schedule is applicable to customers with on-site generation of more than 1,000 kW but that does not exceed 15,000 kW. Customers not contracting for Back-up Power shall not be subject to this Schedule and shall receive electric service under the applicable general service schedule. This Schedule is not applicable to service for resale, intermittent or highly fluctuating loads, or seasonal use. This Schedule is not required where on-site generation is used only for emergency supply during times of utility outage. This Schedule is not available to loads in excess of 15,000 kW, a maximum power requirement in excess of 15,000 kW shall be deemed to exist when a Customer's maximum power requirement exceeds 15,000 kW in at least three (3) months of any continuous period of six (6) successive months. MONTHLY BILL: Rate: Billing Months May throush October. Inclusive Billing Months November throueh April. Inclusive Customer Service Charge: Secondary Voltage Primary Voltage Transmission Voltage Back-up Facilities Rate: Secondary Voltage Primary Voltage Transmission Voltage per Customer per Customer per Customer $37.00 $111.00 $370.00 $37.00 $l I 1.00 $370.00 per Customer per Customer per Customer $7.94 $7.58 $s.70 $6.49 $6.1 3 $4.30 per kW for all kW per kW for all kW per kW for all kW per kW for all kW per kW for all kW per kW for all kW The Facilities Rate applies to the kW of Back-up Contract Power Submitted Under Case No. PAC-E-19-15 ISSUED: October 10,2019 (continued) EFFECTM: January 1,2020 ROCKY MOUNTAIN POWER A DIVISION OF PACIFICOBP I.P.U.C. No. I Third Revision of Sheet No. 31.2 Canceling Second Revision of Sheet No. 31.2 ELECTRIC SERVICE SCHEDULE NO.31 - Continued MONTHLY BILL: Rate Billing Months May throueh October. Inclusive Back-up Power Rate: Secondary Voltage Primary Voltage Transmission Voltage $0.26 $0.25 $0.1 9 s0.22 $0.21 $0.1 4 all kW Day all kW Day all kW Day per kW for all kW per kW for all kW per kW for all kW per kW for all kW per kW for all kW per kW for all kW per kWh per kWh per kWh Billing Months November throueh April. Inclusive allkW Day all kW Day all kW Day Back-up Power is billed on a per day basis and is based on the fifteen (15) minute period of the Customer's greatest use of Back-up Power during the day Scheduled Maintenance Power rate is one half (ll2) of the Back-up Power Excess Power Rate: Secondary Voltage Primary Voltage Transmission Voltage Supplementary Power Rate: Secondary Voltage Primary Voltage Transmission Voltage Supplementary and Back-up Energy Rate: Secondary Voltage Primary Voltage Transmission Voltage $28.72 $27.42 s20.52 $14.36 $ 13.71 $r0.26 3.98801 3.98801 4.18721, $23.62 $22.32 $15.48 per kW for all kW per kW for all kW per kW for all kW $l 1.81 $r 1.16 $7.74 3.9880p 3.98801 4.1872i, per kW for all kW per kW for all kW per kW for all kW per kWh per kWh per kWh POWER FACTOR: This rate is based on the Customer maintaining at all times a power factor of 85% lagging, or higher, as determined by measurement. If the average power factor is found to be less than 85Yo lagging, the Power as recorded by the Company's meter will be increased by % of 1%o for every lYo that the power factor is less than 85%. VOLTAGE LEYELS: Secondary Voltage applies where a distribution Customer takes service from Company's available lines of less than2,300 volts. Primary Voltage applies where a distribution Customer takes service from Company's available lines of 2,300 to less than 46,000 volts and provides and maintains all transformers and other necessary related equipment. Transmission Voltage applies where service is supplied at approximately 46,000 volts or greater through a single point of delivery. Submitted Under Case No. PAC-E-19-15 ISSUED: October 10,2019 (continued) EFFECTM: January 1,2020