Loading...
HomeMy WebLinkAbout20190621Decision Memo.pdfDECISION MEMORANDUM TO:COMMISSIONER KJELLANDER COMMISSIONER RAPER COMMISSIONER ANDERSON COMMISSION SECRETARY COMMISSION STAFF LEGAL FROM: YAO YIN DATE: JUNB 18,2019 SUBJECT:CASE NO. GNR.E.I9.OI ANNUAL REVISION AND UPDATED CALCULATION OF THE ADJUSTABLB PORTION OF THE AVOIDED COST RATE FOR BXISTING PURI'A CONTRACTS TOR AVISTA CORPORATION DBA AVISTA UTILITIES, FOR IDAHO POWER COMPANY, AND FOR PACIFICORP DBA ROCKY MOUNTAIN POWER cAsf, No. PAC-E-19-07 ANNUAL R.EVISION OT QT VAzuABLE ENERGY PRICES PURSUANT TO TERMS OF THE 1992 AMENDMENTS TO POWER PURCHASE AGRTEMrNTS BBTWEEN rIAHO QrS AND PACIFTCORp The ldaho Public Utilities Commission in Order No. 28708, Case No. GNR-E-99-1, established a methodology for the annual adjustable rate portion of avoided costs f,or those QF contracts using variable costs associated with Colstdp, u coal-fired generating facility in southeast Montana. For those QF contracts with Colstrip-related fuel costs and variable 0&M, future Colstrip variable cost adjustments are to be calculated by using FERC Form I Colstrip Unit Coal Costs per megawatt hour (MWh) and adding $2.00/It{Wh (the average variable 0&M cost of Colstrip plus ZO1llvIWh for generation taxes plus a five percent (5%) adustment for line loss). As computed by Commission Stafl the Colstrip related adjustable rate will change from 16.54 mill/kWh to 16.17 mill/kWh (see Attachment l). The same calculated rate revision under the avoided cost methodology is used by Avista, PacifiCorp dba Rocky Mountain Power, and Idaho Power Company. This change in the variable rate affects existing contracts under the previous SAR methodology. The adjustable portion of the avoided cosl rates under the Sumas-based methodology is based on annual average gas prices indexed at Sumas, Washington. As reported by Avista, the IDECISION MEMORANDUM indexed gas prices havc increased by Sl.s370itrIMBtu. The approved gas price of $3.4400/l\iIMBtu plus the $l.5370A,lMBtu results in a gas price of $4.9770lI4MBtu for the 2019-2A20 year (see Attachment 2). This is equivalent to 35.3367 millitkWh based upon a heat rate of 71 00 BTU/kWh as approved in Order No. 29 I 24. The Commission Staff calculated changes to the annual adjustable rate po(ion of avoided costs for those QF contracts, using variable costs associated with Colstrip and Sumas, and provided the respective utilities with the updates for review by letter dated May 31,2019. Avista, Idaho Power, and PacifiCorp responded by letter that Staff s calculations are correct. In accordance with OrderNo.29316, the adjustable portion of the avoided costrate for PaeifiCorp contracts with 1992 amendments has also been recomputed. Beginning on Juiy l, 2003, the adjustable portion for these conbacts was ordered to be equal to the average cost of fuel for the Carbon, Hale, Naughton, Huntington, and Hunter generating plants, including a variable O&M component of $1.51 but exclusive of generation taxes and a line loss adjustment. The variable energy rate applicable to deliveries commencing July 1,2019 extending tluough June 30, 2020 has been computed to be $23.85/M\il/h, an increase from $23.67lh,lWh last year. PacifiCorp confirmed that Staff s calculations are correct (sce Attachment 3). COMMISSION DECISION Under avoided cost methodology, the adjustable portion of avoided cost rates for existing contracts is calculated annually for an effective date of July l. Avista, Idaho Power, and PacifiCorp agree with StafPs proposed calculations. Also adjusted annually is the adjustable portion of avoided cost rates for existing PacifiCorp contracts with year 1992 amendments. For those contracts, PacifiCorp agrees with Staffls proposed calculations. Does the Commission agree with the proposed changes in the variable rates? Yin I \trgrllELICT[tC\GS[.E.1941\CNA!.l90l "f ACEl901- nm dc 2DECISION MEMORANDUM COLSTRIP ADJUSTABLE RATE CALCULATION Updated For Period 7 I 1 I 1 9-G130120 Colstrip Fuel Cost from Avista FERC Form 1 for CY 2018 line 12 Net Generation (kwh) line 20 Fuel Fuel cost per kwh Fuel Cost per MWh Variable O&M, Gen. Tax,5/" line loss per MWh Total Colstrip Adjustable Rate Reference GNR-E-99-1 O.N.28708 411712001 1,389,037,000 $19,679,460 $0.014168 $14.1677 $2.oooo $16.1677 Colstrip_19-20 ATTACHMENT 1 Average Gas Prices at Sumas, Washington from Inside FERC publication ($/IVIMBtu) Calculating the 2018-2019 Avoided Cost Adjustable Rate Jan Feb Mar Apr May Jun July Aug S"p Oct Nov Dec 2017 $4.85 $3.17 $2.20 $2.34 $2.42 $2.70 $2.29 $2.48 $2.s6 $2.3s $2.6s $3.15 2018 $2.90 s2.s3 $ 1.96 $ 1.7s $ 1.69 $ 1.48 $l.7s $2.24 $2.04 $2.2s $ 13.32 $17.69 Average $2.763 $4.300 Actual Annual Adjustment: $3.440 -($2.763 -$4.300) =$4.977 Note: $6.94A4MBtu = 2007-08 Approved Rate $7.18A4MBtu = 2008-09 Approved Rate $9.00/IvIMBtu = 2009-10 Approved Rate $4.62A4MBtu = 2010-11 Approved Rate $4.99llv[MBtu = 2011-12 Approved Rate $4.60AvIMBtu = 2012-13 Approved Rate $3.454{MBtu = 2013-14 Approved Rate $4.354{MBtu = 2074-15 Approved Rate $5.10/IVIMBtu = 2015-16 Approved Rate $3.092A4MBtu = 2016-17 Approved Rate $2.850/lvIMBtu = 2017-18 Approved Rate $3.440A4MBtu = 2018-19 Approved Rate ATTACHMENT 2 PacifiCorp Total Variable Energy Rate for 2019-2020 Fuel Cost (2018 FERC FORM 1) Page 402 Line 20 (S) Generation (2018 FERC FORM 1) Page 402 Line 12 (MWH) Naughton 175,283,027 4,740,078 H untington r25,760,156 5,O87,824 H u nter 737,576,088 7,t2L,380 Totals 378,619,277 t6,949,282 Average Fuel Cost (S/MWH) Variable O&M (S/MWH) Total Variable Energy Rate (S/MWH) 22.34 1.51 23.85 ATTACHMENT 3