HomeMy WebLinkAbout20190403Meredith Exhibit 3.pdfo
t
Case No. PAC-E-I9-04
Exhibit No. 3
Witness: Robert M. Meredith
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
ROCKY MOLINTAIN POWER
Exhibit Accompanying Direct Testimony of Robert M. Meredith
April20l9
t
o
ROCKY MOUNTAIN
HP,yy.E^.n",,
Rocky Mountain Power
Exhibit No. 3 Page 1 of 2
Case No. PAC-E-19-04
Vvitness: Robert M. Meredith
gigh+tsNinth Revision of Sheet No. 94.1
Canceling Sevent+Elehfth Revision of Sheet No. 94.1I.P.U.C. No. I
o
ROCKY MOUNTAIN POWER
ELECTRIC SERVICE SCHEDULE NO.94
STATE OF IDAHO
Energy Cost Adjustment
AVAILABILITY: At any point on the Company's interconnected system.
APPLICATION: This Schedule shall be applicable to all retail tariff Customers taking service under
the Company's electric service schedules.
ENERGY COST ADJUSTMENT: The Energy Cost Adjustment is calculated to collect the
accumulated difference between total Company Base Net Power Cost and total Company Actual Net Power Cost
calculated on a cents per kWh basis.
MONTHLY BILL: In addition to the Monthly Charges contained in the Customer's applicable
schedule, all monthly bills shall have applied the following cents per kilowatt-hour rate by delivery voltage.
Delivery Voltage
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
I
6
6A
7
74,
9
l0ll
12
t9
23
23A
24
35
35A
36
400
401
Secondary
0.27$)SA per kWh
0.276]15( per kWh
0.Ztb-315( per kWh
0.274315( per kWh
0.274315( per kWh
Primarv
0.26qn0 per kWh
0.%6392i, per kWh
0.%63U( per kWh
0.%6$fi perkWh
0.?663029 per kWh
0.?66302( per kWh
O.XW( per kWh
Transmission
0.?59ry0 per kWh
0.259292( per kWh
0.259292fi per kWh
0.?14316( per kWh
0.Zr$16( per kWh
0.27{])SF per kWh
0.27q)50 per kWh
0.2163169 per kWh
0.2763150 per kWh
0.274315i per kWh
0.276]159 per kWh
0.2763150 per kWh
0.%)J50 per kWh
o
EFFECTM: June l,20198
Submitted Under Case No. PAC-E-+8-0+19-04
ISSUED:@
o
ROCKY MOUNTAIN
POWER
A OtVtS|ON OF PACTFTCORP
Rocky Mountain Power
Exhibit No. 3 Page 2 ot 2
Case No. PAC-E-19-04
Wtness: Robert M. Meredith
Ninth Revision of Sheet No. 94.1
Canceling Eighth Revision of Sheet No. 94.1I.P.U.C. No.1
o
ROCKY MOUNTAIN POWER
ELECTRIC SERVICE SCHEDULE NO.94
STATE OF IDAHO
Energy Cost Adjustment
AVAILABILITY: At any point on the Company's interconnected system.
APPLICATION: This Schedule shall be applicable to all retail tariff Customers taking service under
the Company's electric service schedules.
ENERGY COST ADJUSTMENT: The Energy Cost Adjustment is calculated to collect the
accumulated difference between total Company Base Net Power Cost and total Company Actual Net Power Cost
calculated on a cents per kWh basis.
MONTHLY BILL: In addition to the Monthly Charges contained in the Customer's applicable
schedule, all monthly bills shall have applied the following cents per kilowatt-hour rate by delivery voltage.
Delivery Voltage
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
Schedule
I
6
6A
7
74,
9
10
1l
t2
l9
23
23A
24
35
35A
36
400
401
Secondary
0.316( per kWh
0.3 l6l per kWh
0.3 l6l per kWh
0.316$ per kWh
0.316f, per kWh
0.3160 per kWh
0.316i, per kWh
0.316i, per kWh
0.316(, per kWh
0.316i, per kWh
0.3160 per kWh
0.3160 per kWh
0.316( per kWh
0.316( per kWh
0.316( per kWh
Primary
03020 per kWh
0.302f, per kWh
0.302(, per kWh
0.302(, per kWh
0.3021, per kWh
0.3020 per kWh
0.302(, per kWh
Transmission
0.292A per kWh
0.2929 per kWh
0.2920 per kWh
o Submitted Under Case No. PAC-E-19-04
ISSUED: April3,2019 EFFECTM: June 1,2019