Loading...
HomeMy WebLinkAbout20180911Teply Exhibit 6.pdfo a ?0i8 SIP I I [H ll:0 I Case No. PAC-E-I8-08 Exhibit No. 6 Witness: Chad A. Teply: , ,-il'ii-lc: . -6.riiiiiSlOi,l,II,..:.r,.:i,ijrru, BEFORE TIIE IDAHO PUBLIC UTILITIES COMMISSION ROCKY MOUNTAIN POWER Exhibit Accompanying Direct Testimony of Chad A. Teply September 2018 o Rocky Mountain Power Exhibit No. 6 Page 1 of '1 Case No. PAC-E-18-08 V1/itness: Chad A. Teply I I Estimated Decom missioning Costs Values in 2017 Dollars COAL NATURAL GAS 6EOTHERMAT Generating Facility Grand Total $/kw Cholla 4 5 20,328,470 5t.46 Cholla 5 2A328,470 DaveJohnston 1 5 3,630,058 34.25 Dave Johnston 2 s 3,630,0s8 34.25 Dave Johnston 3 5 7,s34,083 34.25 Dave Johnston 4 s 11,301,125 34.25 Dave Johnston 5 26,09s,324 34.25 Hunter 1 S rs,osg,gzr 43.19 Hunter 2 s 11,618,067 43.79 Hunter 3 5 20,343,737 43.79 H unter 5 so,02r,779 43.79 H untington 1 5 2A327,323 44.29 Huntington 2 5 t9,928,748 44.29 Huntington 5 40,2s6,07L 44.29 Jim Bridger 1 5 73,77L,s84 37.27 Jim Bridger 2 5 13,370,026 37.21 Jim Bridger 3 5 72,e73,142 37.2! Jim Bridger 4 5 B,MaJtg 37.21 Jim Bridger S 52,661,531 37.27 Naughton 1 5 7s,249,2O2 97.75 Naughton 2 s 19,648,011 97.75 Naughton 3 5 zt,zto,zaz 97.75 Naughton 5 62,267,s77 97.75 Wyodak 5 7,!38,204 26.64 Wyodak 5 7,138,204 26.64 Colstrip 3 5 6,342,s73 85.77 Colstrip 4 5 6,342,s13 85.7t Colstrip 3/4 5 L2,685,026 85.7L Craig 1 5 1,018,477 12.37 Craig2 ; 1,o2o,8s6 12.37 Craig 5 2,039,327 12.37 Hayden 1 s 203,384 4.57 Hayden 2 s 748,938 4.51 Hayden s 352,322 4.51 Fleet 46.14 GeneratinB Facility Grand Total $/kw Currant Creek 5 6,426,778 s 11.59 Gadsby 1, 2 and 3 s s,289,96s s 3e.12 Chehalis 5 3,2e4,t1!5 6.36 Lake Side s 7,62t,s!3 5 o.s+ Hermiston 5 4,727,878 5 17.42 Gadsby 4, 5, and 6 5 t,zos,zog S ro.oz Generating Facility Grand Total $/kw Blundell 1 (Geothermal)5 s,346,476 5 232.46 Blundell 2 (Geothermal)5 r,Egz,srs s 13s.28 Blundell s 6,73e,2e1 5 204.22 I