Loading...
HomeMy WebLinkAbout20180530Attorney General Letter and Worksheets.pdfftEC EIVED ?iil8 tl.{T 30 Pl{ k: 30 rr,ir l,l i_'LiCLlCj;:l :Jl,: I C()i*il''lissl0llSTATE OF IDAHO OFFICE OF THE ATTORNEY GENERAL LAWRENCE G. WASDENVIA E.MAIL May 30,2018 Avista Corpo MichaelAndrea Avista Utilities 14l I E. Mission PO Box3727 Spokane, WA Rocky Daniel Solander daniel Ted Weston PacifiCorp dba One Utah Cen 201 S. Main S Mountain Power Suite 2300 20-3727 Power Clint Kalich cl int.kal ich@avistacorp.com Avista Utilities l4l I E. Mission PO Box3727 Spokane, WA99220-3727 Brian Dickman brian.d ickman@pacifi corp.com DanielMacNeil dan iel.macnei l@pacifi corp.com Hui Shu hui. shu@pacifi corp.corn Laren Hale laren.hale@pacifi corp.com PacifiCorp dba Rocky Mountain Power 825 NE Multnomah Street Portland, OR97232 Michael Darrington M Darri n glon@idahopower.com Idaho Power Company PO Box 70 Boise, ID 83707-0070 Salt Lake City, UT 84111 Idaho Power Company Donovan E. Walker dwal ker@ idahopower.corn Idaho Power Company PO Box 70 Boise, ID 83707-007 Re: Case Nos. GNR-E-18-02; PAC-E-18-05 The Idaho Public Utilities Commission in Order No. 28708, Case No. GNR-E-99-1, established a methodology for the annual adjustable rate portion of avoided costs for those QF contracts using variable costs associated with Colstrip, a coal-fired generating facility in southeast Montana. For those QF contracts with Colstrip-related fuel costs and variable O&M, future Colstrip variable cost adjustments are to be calculated by using FERC Form I Colstrip Unit Coal Costs per megawatt hour (MWh) and adding $2.0044Wh (the average variable O&M cost of Colstrip plus 20plMWh for generation taxes plus a five percent (5%) adjustment for line loss). As computed Contracts & Administrative Law Division, ldaho Public Utilities Commission P.O. Box 83720, Boise, ldaho 83720-0074, Telephone: (208) 334-0300, FAX: (208) 3349-3762, Email: ipuc@puc.state.id.us Located at 472 West Washington St., Boise, ldaho 33702 201 830, 2 May Page by Commission Staff, the Colstrip related adjustable rate will change from 17.61 mill/kWh to 16.54 mill/kWh. The same calculated rate revision under the avoided cost methodology is used by Avista, PacifiCorp dba Rocky Mountain Power, and ldaho Power Company. This change in the variable rate affects existing contracts under the previous SAR methodology. Order Nos. 25882, 25883, and 25884 established a Suma-based methodology in which the adjustable portion of the avoided cost rates was based on annual average gas prices indexed at Sumas, Washington. As reported by Avista, the indexed gas prices have increased by $0.59/MMBtu. The approved gas price of $2. BS/Ir4MBtu plus the $0.59/MMBtu results in a gas price of $3.44A4MBtu for the 2018-2019 year. This equates to a SAR fuel cost of 24.42 mill/kWh as used in the model. In accordance with Order No. 29316, the adjustable portion of the avoided cost rate for PacifiCorp contracts with 1992 amendments has also been recomputed. Beginning on July 1,2003, the adjustable portion forthese contracts was ordered to be equal to the average cost of fuel for the Carbon, Hale, Naughton, Huntington, and Hunter generating plants, including a variable O&M component of $ 1 .5 I but exclusive of generation taxes and a line loss adjustment. The variable energy rate applicable to deliveries commencing July 1,2018 extending through June 30,2019 has been computed to be $23.67lMWh, an increase from $23.291MWh last year. Accompanying this letter are worksheets showing the computation of the updated adjustable rates for the various affected contracts. Ifyou accept the updated rates after reviewing them as accurate, please indicate your approval by letter (or other filing) directed to the Commission in the reserved case docket numbers identified above. The case heading for the generic adjustment, Case No. GNR-E-18-02, will read as follows: IN THE MATTER OF THE ANNUAL REVISION AND UPDATED CALCULATION OF THE ADJUSTABLE PORTION OF THE AVOIDED COST RATE(S) FOR EXISTING PURPA CONTRACTS FOR AVISTA CORPORATION DBA AVISTA UTILITIES, FOR IDAHO POWER COMPANY, AND FOR PACIFICORP DBA ROCKY MOUNTAIN POWE,R. The case heading in the PacifiCorp case for PacifiCorp QF contracts with 1992 Amendment language, Case No PAC-E-18-05, is as follows: TN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER REQUESTING APPROVAL OF THE ANNUAL REVISION OF QF VARIABLE ENERGY PRICES IN PURSUANT TO TERMS OF THE 1992 AMENDMENTS TO POWER PURCHASE AGREEMENTS BETWEEN IDAHO QFS AND PACIFICORP. Please file your respective responses with the Commission on or prior to June 1 l, 201 8. Thank you for your cooperation. Please feel free to contact Yao Yin if you have any questions. Sincerely, Sean Costello Deputy Attorney General Enclosures COLSTRIP ADJUSTABLE RATE CALCULATION Updated For Period 7 11 I 1 8-61301 1 I Colstrip Fuel Cost from Avista FERC Form 1 tor CY 2017 line 12 Net Generation (kwh) line 20 Fuel Fuel cost per kwh Fuel Cost per MWh Variable O&M, Gen. f ax,5/o line loss per MWh Total Colstrip Adjustable Rate Reference GNR-E-99-1 O.N. 28708 4117l2OO1 1 ,423,3'19,000 $20,697,118 $0.014541 $14.5414 $2.0000 $16.5414 Colstrip_'18-19 Average Gas Prices at Sumas, Washington from Inside FERC publication ($/MMBtu) Calculatin g the 2017 -20 1 8 Avoided C ost Adj ustable Rate Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec 2016 s2.s7 $2. l0 $ 1.41 $1.42 $ 1.34 $ 1.46 $2.28 s2.34 $2.63 $2.64 $2.62 $3.27 2017 $4.8s $3. l7 $2.20 $2.34 $2.42 $2.70 s2.29 $2.48 $2.s6 $2.35 $2.6s $3.ls Average $2.173 $2.763 Actual Annsal4ili ustrnqut : $2.8s0 - ($2, t73 - 52.763) : $3.440 Note: $6.94lMMBtu : 2007-08 Approved Rate $7. I 8/MMBtu : 2008-09 Approved Rate S9.O0/MMBtu : 2009-10 Approved Rate $4.62lMMBtu : 2010-1 I Approved Rate $4.99lMMBtu : 201 l-12 Approved Rate $4.60/MMBtn : 2012-13 Approved Rate $3.45lMMBtu : 2013-14 Approved Rate $4.3 s/MMBttt : 2014-15 Approved Rate $5. lO/MMBtu : 2015-16 Approved Rate S3.092A4MBtu : 201 6-17 Approved Rate $2.850/MMBtu : 2017- I 8 Approved Rate Carbon PacifiCorp Total Variable Energy Rate lor 2018 I 2A19 Naughton Huntington Hunter Totals $ 105,045,552 $ 138,300,998 $ 145,938,639 $ 389,285,189 4,740,158 5,399,777 7,429,297 17,fi9,232 22.16 1.51 23.67 Fuel Cost ($) $ 201 7 FERC FORM I - Peg. 402 Lin. 20 Generation (MWH) 2017 FERC FORM I - Pagc 402 Linc 12 Average Fuel Cost ($/M\Aftl) Variable O&M Total Variable Energy Rate for 2018 12419 For deliveries commencing July 1, 2018 extending through June 30, 2019 12 PacifiCorplQFs contracts with approved 1992 amendment language $ $ $ /MVlftt /MWH /M\,tl !