HomeMy WebLinkAbout20170908notice_of_application_order_no_33871.pdfOffice of the Secretary
Service Date
September 8,2017
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION )CASE NO.PAC-E-17-i1
OF PACIFICORP DBA ROCKY MOUNTAIN )
POWER FOR AUTHORIZATION TO )NOTICE OF APPLICATION
REVISE THE WIND INTEGRATION RATE )
AND IMPLEMENT A SOLAR )NOTICE OF
INTEGRATION RATE FOR SMALL POWER )INTERVENTION DEADLINE
GENERATION QUALIFYING FACILITIES )
____________________________
)ORDER NO.33871
On August 28,2017,PacifiCorp dba Rocky Mountain Power applied to the
Commission for an Order authorizing it to (1)decrease its wind integration rate for power
purchase agreements with wind-powered qualifying facilities (QF),from $3.06 to $0.57 per
megawatt-hour (MWh),and (2)implement a solar integration rate for purchases from solar-
powered QFs,of $0.60 per MWh.Application at 1.We now issue this Notice of Application
and set a deadline for submitting Petitions to Intervene.
BACKGROUND
Rocky Mountain’s wind integration charge offsets the published avoided cost rates
the Company pays for power under the Public Utility Regulatory Policies Act (PURPA).The
charge reduces published avoided cost rates to account for the costs of integrating wind QFs into
the Company’s system.See Order No.30497 at 6.When a utility has agreed to buy power from
a QF under PURPA,the rates for such power must not exceed the utility’s “avoided cost”—what
the utility would have incurred had it generated or acquired the power elsewhere.If the costs of
integrating wind into the Company’s system are not calculated and properly allocated to the
PURPA project developers,those costs will be impermissibly passed on to utility customers in
the avoided costs.
This Commission first approved Rocky Mountain’s wind integration charge in 2008.
Order No.30497.The charge was set forth in a stipulation between parties in Case No.PAC-E
07-07.which the Commission approved.Id.at 6.The parties to that case agreed that Rocky
Mountain’s “published avoided-cost rates for Wind QFs will be adjusted to recognize an
assumed cost of integrating the energy generated by Wind QFs as a part of the Company’s
generating resource portfolio.The integration charge will be equivalent to the calculated cost of
wind integration on a per MWh [basis]provided in the Company’s most recent Commission-
NOTICE OF APPLICATION
NC)T ICE OF INTERVENTION DEADLINE
OR[)ER NO.33871 1
acknowledged [Integrated Resource Plan (IRP)j....“Id.at 6.The stipulation also required
Rocky Mountain to notify “the Commission of any changes to its wind integration charge as
reflected in subsequent changes to its IRP.”Id.Rocky Mountain’s wind integration charge was
last updated in 2016 to $3.06 per MWh.Order No.33475.
NOTICE OF APPLICATION
YOU ARE HEREBY NOTIFIED that the Company explains that “in compliance
with Order No.30497,”it now applies to “update its wind integration rate and implement a solar
integration rate that can be deducted from the published avoided cost rates to determine a
purchase and sale price established for the duration of the power purchase agreement with a QF.”
Application at 2-3.The Company states that reducing the avoided cost rates “is intended to
reflect the cost of integrating wind and solar generation into the Company’s electrical system.”
Id.at 3.The integration rates ensure “that QFs that deliver less than 100 KW have a predictable
rate.”Id.
YOU ARE FURTHER NOTIFIED that the Company filed its 2017 IRP with this
Commission on April 4,2017,in Case No.PAC-E-17-03.Id.The Company attaches IRP
Appendix F,the Flexible Reserve Study (Study),as Exhibit A to its Application.Id.The Study
explains “the methodology used and results derived from PacifiCorp’s analysis of wind and solar
integration costs.”Id.
YOU ARE FURTHER NOTIFIED that the Study estimates the regulation reserve
required to maintain PacifiCorp’s system reliability and comply with North American Electric
Reliability Corporation (NERC)reliability standards.Id.It also estimates the additional cost of
this regulation reserve.Id.It also compares PacifiCorp’s overall operating reserve requirements,
including both regulation reserve and contingency reserve,to its flexible resource supply over
the IRP study period.Id.The Application further describes the methodology used in the Study,
including changes incorporated in the current version that were not included in the prior 2014
study of wind reserve requirements (2014 Wind Study).Id.4-6.
YOU ARE FURTHER NOTIFIED that the Study is based on operational data for
load,wind,and “Non-Variable Energy Resources (‘Non-VERs’)”from January 2015 through
December 2015.Id.at 4.The Company explains that solar generation on its system was
insignificant in 2015,but is expected to exceed 1,000 MW by the end of 2017.Id.The
NOTICE OF APPLICATION
NOTICE OF INTERVENTION DEADLINE
ORDER NO.33871
Company also analyzed how varying levels of wind and solar affect its system.Id.,see Exhibit
Aat 108-116.
YOU ARE FURTHER NOTIFIED that the Study’produces an hourly forecast of
regulation reserve requirements for the Company,for a range of scenarios,that will ensure the
reliability of the transmission system and compliance with NERC and Western Electricity
Coordinating Council reliability standards.Id.at 4-5,The forecast covers the combined
deviations of the load,wind,solar,and other resources on the Company’s system,and varies as a
function of the wind and solar capacity on the system,as well as forecasted wind and solar
output.Id.at 4.The Study also considers the impact of Energy Imbalance Market participation.
Id.at 5.
YOU ARE FURTHER NOTIFIED that the Study estimates two categories of flexible
resource costs—one for meeting intra-hour regulation reserve requirements,and one for inter-
hour system balancing costs (associated with committing gas plants using day-ahead forecasts of
load,wind,and solar).Id.at 6.The proposed wind integration and solar integration charges are
the sum of these two categories of costs for wind resources and for solar resources.Id.
YOU ARE FURTHER NOTIFIED that the Company requests that the Application be
processed by Modified Procedure.Id.at 7.
YOU ARE FURTHER NOTIFIED that the Company requests that the Commission
issue an Order (1)reducing the published avoided cost rate for the Company’s purchases of
electric power from wind-powered QFs from $3.06 MWh to $0.57 per MWh and (2)
implementing a solar integration rate of $0.60 per MWh for the Company’s purchases of electric
power from solar-powered QFs.Id.at 7-8.The Company explains these amounts represent the
wind and solar integration costs that will offset published avoided cost rates unless the QF
developer agrees with the Company to schedule and deliver,via a transmission provider,the QF
output to the Company on a firm hourly basis.Id.at 8.
YOU ARE FURTHER NOTIFIED that the Application and its exhibits have been
filed with the Commission and are available for public inspection during regular business hours
at the Commission offices.These documents are also available on the Commission’s web site at
vppcidaho,gpv.Click on the “File Room”tab at the top of the page,scroll down to
“Electric Cases”and click on the case numbers as shown on the front of this document.
NOTICE OF APPLICATION
NOTICE OF INTERVENTION DEADLINE
ORDER NO.33871 3
YOU ARE FURTHER NOTIFIED that all proceedings in this case will be held
pursuant to the Commission’s jurisdiction under Title 61 of the Idaho Code.The Commission
may enter any final Order consistent with its authority under Title 61.
YOU ARE FURTHER NOTIFIED that all proceedings in this matter will be
conducted pursuant to the Commission’s Rules of Procedure,IDAPA 31.01.01.000 et seq.
NOTICE OF INTERVENTION DEADLINE
YOU ARE FURTHER NOTIFIED that persons who wish to intervene in this matter
to obtain the rights of party (e.g.,to file formal discovery,or present evidence or cross-examine
witnesses at a hearing)must file a Petition to Intervene with the Commission pursuant to the
Commission’s Rules of Procedure 72 and 73,IDAPA 3 1.01.01.072 and .073.Persons who wish
to intervene as a party must file a Petition to Intervene no later than 21 days from the
service date of this Order.Such persons shall also provide the Commission Secretary with
their electronic mail address to facilitate further communications in this matter.After the
intervention deadline runs,the Commission Secretary shall issue a Notice of Parties that
identifies the parties and assigns exhibit numbers to each party in this proceeding.Once the
Notice of Parties has issued,Commission Staff shall informally confer with the Company and
any intervening parties about how to further process this case,and shall then report back to the
Commission on a proposed case schedule.
YOU ARE FURTHER NOTIFIED that persons who would like to present their views
without parties’rights of participation and cross-examination are not required to intervene but
may present their views by submitting written comments to the Commission.
YOU ARE FURTHER NOTIFIED that the following persons are designated as the
Company’s representatives in this matter:
Ted Weston Daniel E.Solander
Idaho Regulatory Manager Attorney
Rocky Mountain Power Rocky Mountain Power
1407 West North Temple,Suite 330 1407 West North Temple,Suite 320
Salt Lake City,UT 84116 Salt Lake City,UT 84116
E-mail:ted.weston@pacificorp.com E-mail:daniel.solander@pacificorp.com
ORDER
IT IS HEREBY ORDERED that persons desiring to intervene in this matter shall file
a Petition to Intervene no later than 21 days from the service date of this Order.Once the
NOTICE OF APPLICATION
NOTICE OF INTERVENTION DEADLINE
ORDERNO.33871 4
deadline for intervention has passed,the Commission Secretary shall prepare and issue a Notice
of Parties.
IT IS FURTHER ORDERED that.after the Notice of Parties has issued,Commission
Staff shall confer with the parties regarding a procedural schedule for this matter,and report the
proposed schedule to the Commission.
DONE by Order of the Idaho Public Utilities Commission at Boise,Idaho this
day of September 2017.
PA&L KJELLANDER,PRESIDENT
KRISTINE RAPER,COMMISSIONER
/n/_I/f /
.—--:2’/
ERIC ANDERSOi ,COMMISSIONER
ATTEST:
Diane M.Hanian
Commission Secretary
O:PAC-E-17-1 icc
NOTICE OF APPLICATION
NOTICE OF INTERVENTION DEADLINE
ORDER NO.33871 5