Loading...
HomeMy WebLinkAbout20180216Vail Exhibit 48.pdfCase No.PAC-E-17-07 Exhibit No.48 Witness:Rick A.Vail BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION ROCKY MOUNTAIN POWER Exhibit Accompanying Second Supplemental Direct Testimony of Rick A.Vail Interconnection Network Upgrades February 2018 O Rocky Mountain Power Exhibit No.48 Page 1 of 8 Case No.PAC-E-17-07 Witness:Rick A.Vail February9,2018_V4 At the Aeolus Substation,to support the Ekola Flats Wind project the following network upgrades area required. One (1)230 kV 3000 ampere breakerand line position with associated switches at Aeolus substation 230kV#1to Shirley BasinAeolus500kV50Qf230kV#1 230kV Energy Vision 2020 Scope of Work Aeolus 230 kV Substation 230 kV to Freezeout "7 miles 230 kV to 00706 O 1 Rocky Mountain Power Exhibit No.48 Page 2 of 8 Case No.PAC-E-17-07 Witness:Rick A.Vail At the Shirley Basin Substation,to support the inclusion of TB Flats I wind project the following network upgrades are required: A new bay,five (5)new 3000 ampere 230 kV breakers,two line terminations with associated switches Constructionof a new approximately 16.5-mileShirley Basin -Aeolus 230 kV #2 line At the Aeolus substationthe following network improvements are required: Addition of one (1)new 230 kV breaker,line termination and associated switches Inclusion of the project in the Aeolus RAS generation dropping scheme 34 5 kV6Mues84/112/140MVAChanged230-34.5kVOwnersMpZ=9 % 84/112/140MVA - terconn 230-34.5kV Shirley Basiri T Tc>ySubstation QO707Substation O 230kV Dunlap Energy Vision 2020 Scope of Work: New Aeolus -Shirley Basin #2 230 kV line 16 5 Mues AeolusSubstation se a -00706 ,230 kV O Tranf.Freezeout 2 Rocky Mountain Power Exhibit No.48 Page 3 of 8 Case No.PAC-E-17-07 Witness:Rick A.Vail At the Shirley Basin Substation,to support the inclusion of TB Flats II wind project the following network upgrades are required: Expansion of the Shirley Basin 230 kV switchyard on the east side of the substation with a new bay. Two (2)230 kV 3000 ampere breakers,line termination and associated switches Inclusion of the project in the Aeolus RAS generation droppingscheme Difficulty QO707 Shirley Basin Energy Vision 2020 Substation Scope of Work Point ofInterconnection 230 kV L Dunlap hange ofOwnership 230kV QO708Substation 16.5 Mil 84/112/140MVA '84/112/140MVA230-34 5kV VG V 230-34.5kVZ=9%e .f1 Z=9% 34.5kV 34 SkV corrector amts collector circuit. AeolusSubstation 500 -Q0706230kVTranf.Freezeout O 3 Rocky Mountain Power Exhibit No.48 Page 4 of 8 Case No.PAC-E-17-07 Witness:Rick A.Vail At Windstar substation,to support the inclusion of Cedar Springs I wind project the following network upgrades are required: Two (2)230 kV 3000 ampere breakers and two line terminations with associated switches At Freezeout substation to support the inclusion of the Cedar Springs I wind project the following network upgradesare required: Add one new bay and four (4)230 kV (3000 ampere)breakers along with associated switches (staged in two bays)for re-termination of lines associated with the Aeolus -Freezeout-Standpipe 230 kV line rebuild. Rebuild the Aeolus -Freezeout -Standpipe 230 kV line ~15 miles Rebuild the Shirley Basin -Aeolus 230 kV #1line ~16 miles Windstar Substation Energy Vision 2020 Scope of Work: Pointsof Rebuild Aeolus -Freezeout -Standpipe 230kV intercon 230 kV line ~15 miles Rebuild Aeolus -Shirley Basin #l 230 kV line ~16 miles Q0712 A Collector--Change of Ownership[l Substation 4 Mlles Q0712 B Collector Substation 34 5kV O 4 Rocky Mountain Power Exhibit No.48 Page 5 of 8 Case No.PAC-E-17-07 Witness:Rick A.Vail Freezeout Substation Existing 230 kV Rebuild and Re line to Aeo us terminale 230 kV 230 kV Line in line to Aeolus Seven Mile Hill Substation r-·----·----· \ \ \ I I I I i I I 1 F Substation Rebuild and Re- E tmge230 Spansion terminate 230 kV Standpipe ne to Standpipe Energy Vision 2020 Scope of Work O 5 Rocky Mountain Power Exhibit No.48 Page 6 of 8 Case No.PAC-E-17-07 Witness:Rick A.Vail O To support the addition of the Uinta wind project the following system improvementsare required. Construct a new three (3)breaker230 kV ring bus Inclusion of the project into NaughtonRAS Whitney Canyon i Canyon Compression Q0715 POl Substation nt n°i Energy Vision 2020 Scope of Work 38 kV Railroad Change of Ownership 6 Miles 34.5 kV 84/112/140 MVA 138 -34.5 kV 34.5 kVQ0715 Substation O 6 Rocky Mountain Power Exhibit No.48 Page 7 of 8 Case No.PAC-E-17-07 Witness:Rick A.Vail To support the addition of the Uinta II wind project the following system improvementsare required. Construct a 230 kV single circuit transmission line beginningapproximately one mile outside of the Ben Lomond substationto replace the Ben Lomond -Naughton230 kV #1 circuit which resides on the north side of the 7-mile long lattice tower double circuit with the Ben Lomond -Birch Creek 230 kV line Energy Vision 2020 Scope of Work Ben Lomond 230 kV New230 kV(2-795ACSR) 230038 ~7 Miles De-energizeoneexistingcircuit Naughton 230/138 O Reconductor2.35 miles of 795 ACSR 138 kV line between Railroad and Croydon with 1222 ACCC high temperature conductor.The portion of the line to reconductor is on one side of a double-circuit tower. Railroad 138 kV 230/138 Energy Vision 2020 Scope of Work Reconductor 2.35 Miles Croydon I with 1222 Accc Railroad Tap Painter O 7 Rocky Mountain Power Exhibit No.48 Page 8 of 8 Case No.PAC-E-17-07 Witness:Rick A.Vail D.2 Project Facilities: D.2 Project TransmissionFacilities: Addition of the Aeolus 500/230 kV autotransformer Addition of the Aeolus -Anticline 500 kV line (~138 miles) Addition of the Anticline 500/345 kV autotransformer Addition of the Anticline -Bridger345 kV line (5 miles) SoutheastWyoming -Network Upgrades Loop the Shirley Basin -Freezeout 230 kV line into Aeolus 230 kV Add the Aeolus -Shirley Basin 230 kV #2 line (~16 miles)[QO707] Rebuild the Aeolus -Shirley Basin 230 kV #1 line (~16 miles)[Q0712] Rebuild the Aeolus -Freezeout -Standpipe 230 kV line (~15 miles)[Q0712] Add Latham SVC A drawing depicting all new D.2 Project network transmission facilities east of Jim Bridger Power Plant is provided below: GianrocW Honny His 110 5MWes GatewayWest-Sub600mentD 2WyomingLineConfiOuration kunu Rool creek so ww Difficulty on,.ShirleyBasin Mustang /Dunlap111 MW Aeolus(Future) Standp Freezeout 7 Mile Hil 118.5MW Platte Sn s Bridger 'q Anticline Echo Latham ,----- _unesprings,--135 MWL---- ,,-' FooteCreekPointofBitler Rock Creek Bar X <230kV Existing Existing Wind Gen 230kV Existing High Plains 99 MW----230kV Future McFaddenRidge 28.5 MWProposedWindGen345kVExisting ----345kV Future----500 kVFuture O 8