Loading...
HomeMy WebLinkAbout20180117Vail Exhibit 36.pdfCase No.PAC-E-17-07 Exhibit No.36 Witness:Rick A.Vail BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION ROCKY MOUNTAIN POWER Exhibit Accompanying Supplemental Direct Testimony of Rick A.Vail January 2018 O Rocky Mountain Power Exhibit No.36 Page 1 of 3 Case No.PAC-E-17-07 Witness:Rick A.Vail To support the inclusion of Q863 project the following scope of work is required in the FooteCreek area. O Constructa new three breaker 230 kV POI ring bus substation on the High Plains -Foote Creek 230 kV line,~2 miles southwest of High Plains substation. Proposed POI substation is shown below. Energy Vision 2020 Scope of Work QOB63 230 kv POI Substation To High Plains To QC635 ownership ¯¯ Customer r -- 1 owned and I .I operatedI---A Tie-line Substation To Q0863 O Rocky Mountain Power Exhibit No.36 Page 2 of 3 Case No.PAC-E-17-07 Witness:Rick A.Vail At the Windstar Substation,to support the inclusion of Cedar Springs 1 Wind project the following network upgradesare required. Two (2)230 kV 3000 ampere breakers and line positions with associated switches at Windstar substation These are identified within the red circle. Windstar Substation Energy Vision 2020 230kV Scope of Work M Q0712 A Collector-en.ng.oro-Substation 34 5kV 20 Miles 4 Miles Q0712 B Collector Substation 34 SkV O Rocky Mountain Power Exhibit No.36 Page 3 of 3 Case No.PAC-E-17-07 Witness:Rick A.Vail To support the addition of InvenergyProject Q715 in the Longhollowarea the following system modifications are required. o Constructa new three breaker 138 kV POI ring bus substationsouthwest of the Whitney Canyon Tap (near structure 116),with associated switches and line terminations. o Upgradeapproximately 13.7 miles of the Q0715 -Railroad 138 kV line with 1-1272 ACSR/phase (line has 1-795 ACSR/phase). o Modify the existing Naughton RAS to integrate the Q0715 project.(Redundant communication to the project is required.) Whitney Canyon i Canyon Compression 2 0.3 miles Energy Vision 2020 Q0715 POI Scope of Work 38 kV ailroad 34.5 kV 34.5 kVQ0715 Substation Energy Vision 2020 Scope of Work: Upgrade13.7 Miles 138kV Transmission (rebuild)to Railroad substation