HomeMy WebLinkAbout20160527Decision Memo.pdfDECISION MEMORANDI]M TO: COMMISSIONERIilELLAT{DER COMMISISIONER RAPER COMMISSIOIIIER AI\IDERSON COM1IflSSION SECRETARY COMMISSION STAX'X' LEGAL FROM: DAPHIIIE IfUAIYG DEPUTY ATTORTYEY GENERAL DATE: MAY 19,2016 SUBJECT: CASE NO. GNR-E-16-01 (Idaho Power, Avista, PacffiCorp) ANNUAL REVISION AND UPDATED CALCTILATION OT'TIIE ADJUSTABLE PORTION OX'TIM AVOIDED COST RATE X'OR EXISTING PURPA COI{TRACTS CASE NO. PAC-E-16-09 @acifrCorp) AI{I\ruAL REVISION OT QT VARIABLE EI\TERGY PRICES PT'RSUAIYT TO TIIE 1992 AMENDMENTS OF QX'CONTRACTS The Idaho Public Utilities Commission in Order No. 28708, Case No. GI{R-E-99-1, established a methodology for the annual adjustable rate portion of avoided costs for those QF contracts using variable costs associated with Colstip, a coal-fired generating facility in southeast Montana. For those QF contracts with Colstrip-related fuel costs and variable O&M, firture Colstrip variable cost adjusfinents are to be calculated by using FERC Form I Colstip Unit Coal Costs per megawatt hor:r (MWh) and adding $2.00AdWh (the average variable O&M cost of Colstrip plus 2O1lIvIWh for generation tanes plus a five percent (5%) adjustnent for line loss). As computed by Commission Staff, the Colstip related adjustable rate will change from 16.68 mill,/kWh to 15.61 mill,/kWh. The same calculated rate revision under the avoided cost methodology is used by Avista" PacifiCorp dba Rocky Mountain Power, and Idaho Power Company. This change in the variable rate affects existing contracts under the previous SAR methodology. The adjustable portion of the avoided cost rates under the Sumas-based methodology is based on annual average gas prices indexed at Sumas, Washington. As reported by Avist4 the indexed gas prices have decreased by $2.0084{MBtu. The approved gas price of $5.10/MMBtu DECISION MEMORAI{DI,JM minus the $2.008/ltdMBtu results in a gas price of $3.092/IvIMBtu for the 2016A0n year. This equates to a SAR fuel cost of 21.95 mill/kWh as used in the model. The Commission Staff calculated changes to the annual adjustable rate portion of avoided costs for those QF contracts, using variable costs associated with Colstip and Sumas, and provided the respective utilities with the updates for review by letter dated May 12,2016. Avista, Idaho Power, and PacifiCorp responded by letter ttrat Staffs calculations are correct. In accordance with Order No. 29316, the adjustable portion of the avoided cost rate for PacifiCorp contracts with 1992 amendments has also been recomputed. Beginning on July l, 2003, the adjustable portion for these cotrtrasts was ordered to be equal to the average cost of fuel for the Carbon, Hale, Naughtoq Huntingon, and Hunter generating plants, including a variable O&M component of $1.51 but exclusive of generation tanes and a line loss adjusmtent. The variable energy rate applicable to deliveries corrmencing July 1,2016 extending through June 30, 2017 has been computed to be $23.61/MlVlu an increase from $2I.75 last year. COMIVtrSSION DECISION Under avoided cost methodology the adjustable portion of avoided cost rates for existing contracts is calculated annually for an ef[ective date of July l. Avista,Idaho Power, and PacifiCorp agree with Staffs proposed calculations. Also adjusted anrually is the adjustable portion of avoided cost rates for existing PacifiCorp contacts with year 1992 artendments. PacifiCorp for those contracts has computed the new variable energy rate. Does the Commission agree with the proposed changes in the variable rates? bls/I\4:GNR-E- t 6-0 I _PAC-E- I ffi g_djh DECISION MEMORANDUM COLSTRIP ADJUSTABLE RATE CALCULATION For Period 7finA-AB0l17 Colstrlp Fuel Costfrom Avista FERC Form 1 for CY 2015 line 12 Net Generation (kwh) line 20 Fuel FuEl cost per kwh 1.689,s86,000 $22,992,450 $0.013805 $13.6051 $2.0000 $15.6051 Fuel Cosl per MWh Variable O&M, Gen. Tax, 5% llne loss per MWh Totat Colstrlp Adjustable Rate Reference GNR-E-99-1 O.N.28708 411712001 colEtrip_16-17 Avorage Gas Prices nt Sumas, Washington from Inside FERC publication (S/MMBtu) Calculating the 2016-2017 Avoided Cost Adjushbte Rate Jan Feb Mar Apt May Jun July AuB sep Oct Nov Dec Avcrage 2014 $4.89 $5.t2 $s.78 $4.37 $4.s3 $4.28 $4.37 $3.6e s3.8s $3.91 $3.62 $4.6E s4.424 2015 $3.23 $2.s6 $2,40 $2.t 5 $2.13 $2.48 $2.2r $2.43 $2.41 $2.4r $2.1r $2.47 $2.4t6 A$tual Annual Adiustment: $s. I 0 - ($4,424- $2.41 6) = $1092 Note: $6.94/MMBtu = 2007-08 Approved Rate $7.l8A,IMBtu = 2008-09 Approved Rute $9.00/MMBtu = 2009-10 Approved Rate $4.62lMMBtu = 2010-l I Approvcd Ratc $4.99/MMBtu = 201l-12 Approved Ratc $4.60/MMBtu = 2012-13 Approved Ratc $3.45/MMBtu = 2013-14 Approved Rate $4.35/MMBtu = 2014-15 Approved ltate $5.1O/MMBtu = 2015-16 Approved Ratc I =a ; E .>855 ===-\\ .a ta tt o;ri f! rt C, C,d)aoFN- lo, Gi..CiU:!NEB. 6.tmg, ll(ta * a!,:6EE BE (r- r?+crr@4lo "ttrcob(o.(.,-E,P 3.= Ar O,EolO=r,-r g> tl,?toNca\f,-g ri otEltdltn c6 tllEH t' 6 ooOF-Nrf) dltEe1\lEs s8ct oF E ?$iBf 9{ E gEFEE c e ia(- 4 I c F5 NEoN. HIotft CD s-EBEinorE5E'og>G'5E EDOStrlto,CgloFtr l(EF OrOR eac, cL(o NeF .GCIF-N>*x Ei.5 -tggElEi! .hotr PEB E80,coC :. 1!IIJ UO = -9 oEE E Hso .i -aE.P E PdlU O c,ft, o .Etrfir FERxuI-ts o@.EEi? tr'trr'oo>5 Eot-