HomeMy WebLinkAbout20160501Final Approved Tariff.pdf
First Revision of Sheet No. 135.1
I.P.U.C. No. 1 Canceling Original Sheet No. 135.1
Submitted Under Case No. PAC-E-16-07
FILED: February 29, 2016 EFFECTIVE: May 1, 2016
ROCKY MOUNTAIN POWER
ELECTRIC SERVICE SCHEDULE NO. 135
STATE OF IDAHO
______________
Net Metering Service
______________
AVAILABILITY: At any point on the Company's interconnected system.
APPLICATION: On a first-come, first-served basis to any customer that owns and operates an
Eligible Generating Plant that is located on the Customer’s premises, on the Customer’s side of the Point of
Delivery, is interconnected and operates in parallel with the Company’s existing transmission and
distribution facilities and is intended primarily to offset part or all of the Customer’s own electrical
requirements.
DEFINITIONS:
Net Metering: The difference between the electricity supplied by the Company and the electricity
generated by an eligible Customer and fed back to the electric grid over the applicable billing period.
Eligible Generating Plant: A facility that uses energy derived from the sun, wind, water, biomass
or fuel cell technology to generate electricity. An Eligible Generating Plant may not have a generating
capacity of more than twenty-five (25) kilowatts for customers taking service on Schedules 1, 36, 23 or 23A
or one hundred (100) kilowatts for all other customers. To qualify, a Customer must maintain its retail
electric service account for the loads served at the Point of Delivery adjacent to the Generation
Interconnection Point as active and in good standing.
Generation Interconnection Point: The point where the conductors installed to allow receipt of
Customer’s generation connect to the Company’s facilities adjacent to the Customer’s Point of Delivery.
MONTHLY BILL: The Electric Service Charge shall be computed in accordance with the charges
for the Monthly Bill in the applicable standard service tariff subject to the following Special Conditions.
(continued)
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 9, 2016 May 1, 2016
Per O.N. 33511
Jean D. Jewell Secretary