Loading...
HomeMy WebLinkAbout20160331Final Approved Tariff.pdf Sixth Revision of Sheet No. 94.1 I.P.U.C. No. 1 Canceling Fifth Revision of Sheet No. 94.1 Submitted Under Case No. PAC-E-16-05 ISSUED: February 1, 2016 EFFECTIVE: April 1, 2016 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 94 STATE OF IDAHO ______________ Energy Cost Adjustment ______________ AVAILABILITY: At any point on the Company’s interconnected system. APPLICATION: This Schedule shall be applicable to all retail tariff Customers taking service under the Company’s electric service schedules. ENERGY COST ADJUSTMENT: The Energy Cost Adjustment is calculated to collect the accumulated difference between total Company Base Net Power Cost and total Company Actual Net Power Cost calculated on a cents per kWh basis. MONTHLY BILL: In addition to the Monthly Charges contained in the Customer's applicable schedule, all monthly bills shall have applied the following cents per kilowatt-hour rate by delivery voltage. Delivery Voltage Secondary Primary Transmission Schedule 1 0.428¢ per kWh Schedule 6 0.428¢ per kWh 0.413¢ per kWh Schedule 6A 0.428¢ per kWh 0.413¢ per kWh Schedule 7 0.428¢ per kWh Schedule 7A 0.428¢ per kWh Schedule 9 0.402¢ per kWh Schedule 10 0.428¢ per kWh Schedule 11 0.428¢ per kWh Schedule 12 0.428¢ per kWh Schedule 19 0.428¢ per kWh Schedule 23 0.428¢ per kWh 0.413¢ per kWh Schedule 23A 0.428¢ per kWh 0.413¢ per kWh Schedule 24 0.428¢ per kWh 0.413¢ per kWh Schedule 35 0.428¢ per kWh 0.413¢ per kWh Schedule 35A 0.428¢ per kWh 0.413¢ per kWh Schedule 36 0.428¢ per kWh Schedule 400 0.402¢ per kWh Schedule 401 0.402¢ per kWh IDAHO PUBLIC UTILITIES COMMISSION Approved Effective March 31, 2016 April 1, 2016 Per O.N. 33492 Jean D. Jewell Secretary