HomeMy WebLinkAbout20150331Volume I.pdfMarch 31, 2 015
Let’s turn the answers on.
Integrated
Resource
Plan
Volume I
2015
This 2015 Integrated Resource Plan Report is based upon the best available information at the time of
preparation. The IRP action plan will be implemented as described herein, but is subject to change as new
information becomes available or as circumstances change. It is PacifiCorp’s intention to revisit and
refresh the IRP action plan no less frequently than annually. Any refreshed IRP action plan will be
submitted to the State Commissions for their information.
For more information, contact:
PacifiCorp
IRP Resource Planning
825 N.E. Multnomah, Suite 600
Portland, Oregon 97232
(503) 813-5245
irp@pacificorp.com
http://www.pacificorp.com
This report is printed on recycled paper
Cover Photos (Top to Bottom):
Wind Turbine: Marengo II
Solar: Residential Solar Install
Transmission: Populus to Terminal Tower Construction
Demand-Side Management:Wattsmart Flower
Thermal-Gas: Lake Side 1
PACIFICORP – 2015 IRP TABLE OF CONTENTS
iii
TABLE OF CONTENTS
TABLE OF CONTENTS .................................................................................................................... III
INDEX OF TABLES ....................................................................................................................... VIII
INDEX OF FIGURES ......................................................................................................................... X
CHAPTER 1 – EXECUTIVE SUMMARY ............................................................................................. 1
PREFERRED PORTFOLIO HIGHLIGHTS ........................................................................................... 2
SUPPLEMENTAL STUDIES ............................................................................................................. 6
RESOURCE NEEDS ASSESSMENT .................................................................................................. 8
ACTION PLAN ............................................................................................................................ 10
CHAPTER 2 – INTRODUCTION ...................................................................................................... 15
2015 INTEGRATED RESOURCE PLAN COMPONENTS ................................................................... 16
THE ROLE OF PACIFICORP’S INTEGRATED RESOURCE PLANNING .............................................. 17
PUBLIC PROCESS ........................................................................................................................ 17
CHAPTER 3 – THE PLANNING ENVIRONMENT ............................................................................. 19
INTRODUCTION .......................................................................................................................... 19
WHOLESALE ELECTRICITY MARKETS ........................................................................................ 20
Natural Gas Uncertainty .................................................................................................................... 21
THE FUTURE OF FEDERAL ENVIRONMENTAL REGULATION AND LEGISLATION .......................... 26
Federal Climate Change Legislation ................................................................................................. 26
Federal Renewable Portfolio Standards ............................................................................................ 26
EPA REGULATORY UPDATE – GREENHOUSE GAS EMISSIONS ................................................... 27
New Source Review / Prevention of Significant Deterioration (NSR / PSD) ..................................... 27
Guidance for Best Available Control Technology (BACT) ................................................................ 27
New Source Performance Standards (NSPS) for Carbon Emissions – Clean Air Act § 111(b) ........ 28
Carbon Emission Guidelines for Existing Sources – Clean Air Act § 111(d) .................................... 28
EPA REGULATORY UPDATE – NON-GREENHOUSE GAS EMISSIONS .......................................... 29
Clean Air Act Criteria Pollutants – National Ambient Air Quality Standards .................................. 29
Cross-State Air Pollution Rule ........................................................................................................... 29
Regional Haze .................................................................................................................................... 29
Mercury and Hazardous Air Pollutants ............................................................................................. 31
Coal Combustion Residuals ............................................................................................................... 32
Water Quality Standards .................................................................................................................... 32
Cooling Water Intake Structures .................................................................................................... 32
Effluent Limit Guidelines .............................................................................................................. 32
STATE CLIMATE CHANGE REGULATION .................................................................................... 33
California ........................................................................................................................................... 33
Oregon and Washington ..................................................................................................................... 33
Greenhouse Gas Emission Performance Standards ........................................................................... 34
RENEWABLE PORTFOLIO STANDARDS ....................................................................................... 34
California ........................................................................................................................................... 35
Oregon ................................................................................................................................................ 37
Utah .................................................................................................................................................... 38
Washington ......................................................................................................................................... 39
HYDROELECTRIC RELICENSING ................................................................................................. 40
Potential Impact ................................................................................................................................. 41
Treatment in the IRP .......................................................................................................................... 41
PACIFICORP – 2015 IRP TABLE OF CONTENTS
iv
PacifiCorp’s Approach to Hydroelectric Relicensing ........................................................................ 41
UTAH RATE DESIGN INFORMATION ........................................................................................... 41
Residential Rate Design ..................................................................................................................... 42
Commercial and Industrial Rate Design ............................................................................................ 42
Irrigation Rate Design........................................................................................................................ 42
ENERGY IMBALANCE MARKET .................................................................................................. 43
RECENT RESOURCE PROCUREMENT ACTIVITIES ........................................................................ 44
Demand-side Resources ..................................................................................................................... 45
Oregon Solar Request for Proposal ................................................................................................... 45
Natural Gas Transportation Request for Proposals .......................................................................... 45
Renewable Energy Credit (REC) Request for Proposals ................................................................... 45
Oregon ........................................................................................................................................... 45
Washington .................................................................................................................................... 46
California ....................................................................................................................................... 46
Short-term Market Power Request for Proposals .............................................................................. 46
CHAPTER 4 – TRANSMISSION ....................................................................................................... 47
INTRODUCTION .......................................................................................................................... 47
REGULATORY REQUIREMENTS ................................................................................................... 48
Open Access Transmission Tariff ....................................................................................................... 48
Reliability Standards .......................................................................................................................... 48
REQUEST FOR ACKNOWLEDGEMENT OF WALLULA TO MCNARY ............................................... 49
Factors Supporting Acknowledgement ............................................................................................... 49
PLAN TO CONTINUE PERMITTING – WALLA WALLA TO MCNARY ............................................. 50
GATEWAY WEST – CONTINUED PERMITTING ............................................................................. 50
Windstar to Populus (Segment D) ...................................................................................................... 50
Populus to Hemingway (Segment E) .................................................................................................. 50
GATEWAY SOUTH – CONTINUED PERMITTING ........................................................................... 51
PLAN TO CONTINUE PERMITTING – GATEWAY WEST AND GATEWAY SOUTH ........................... 51
EVOLUTION OF THE ENERGY GATEWAY TRANSMISSION EXPANSION PLAN ............................... 51
Introduction ........................................................................................................................................ 51
Background ........................................................................................................................................ 52
Planning Initiatives ............................................................................................................................ 52
Energy Gateway Configuration .......................................................................................................... 54
Energy Gateway’s Continued Evolution ............................................................................................ 55
EFFORTS TO MAXIMIZE EXISTING SYSTEM CAPABILITY ............................................................ 58
CHAPTER 5 – RESOURCE NEEDS ASSESSMENT ............................................................................ 61
INTRODUCTION .......................................................................................................................... 61
SYSTEM COINCIDENT PEAK LOAD FORECAST ............................................................................ 61
EXISTING RESOURCES ................................................................................................................ 62
Thermal Plants ................................................................................................................................... 62
Renewable Resources ......................................................................................................................... 63
Wind............................................................................................................................................... 63
Solar ............................................................................................................................................... 65
Geothermal ..................................................................................................................................... 65
Biomass / Biogas ........................................................................................................................... 66
Renewables Net Metering .............................................................................................................. 66
Hydroelectric Generation................................................................................................................... 66
Hydroelectric Relicensing Impacts on Generation ........................................................................ 67
Demand-side Management ................................................................................................................. 68
Class 1 Demand-side Management ................................................................................................ 70
Class 2 Demand-side Management ................................................................................................ 70
PACIFICORP – 2015 IRP TABLE OF CONTENTS
v
Class 3 Demand-side Management ................................................................................................ 70
Class 4 Demand-side Management ................................................................................................ 70
Distributed Generation....................................................................................................................... 72
Power Purchase Contracts ................................................................................................................. 75
LOAD AND RESOURCE BALANCE ............................................................................................... 76
Capacity and Energy Balance Overview ............................................................................................ 76
Load and Resource Balance Components .......................................................................................... 76
Existing Resources ......................................................................................................................... 77
Obligation ...................................................................................................................................... 78
Planning Reserves .......................................................................................................................... 79
Position .......................................................................................................................................... 79
Capacity Balance Determination ....................................................................................................... 79
Methodology .................................................................................................................................. 79
Capacity Balance Results ............................................................................................................... 80
Energy Balance Determination .......................................................................................................... 84
Methodology .................................................................................................................................. 84
Energy Balance Results ...................................................................................................................... 84
Load and Resource Balance Conclusions .......................................................................................... 85
CHAPTER 6 – RESOURCE OPTIONS .............................................................................................. 87
INTRODUCTION .......................................................................................................................... 87
SUPPLY-SIDE RESOURCES .......................................................................................................... 87
Derivation of Resource Attributes ...................................................................................................... 88
Handling of Technology Improvement Trends and Cost Uncertainties ............................................. 89
Resource Options and Attributes ........................................................................................................ 90
Resource Descriptions ................................................................................................................. 104
Resource Option Description ........................................................................................................... 108
Coal .............................................................................................................................................. 108
Natural Gas .................................................................................................................................. 109
Wind............................................................................................................................................. 112
Other Renewable Resources ........................................................................................................ 112
Nuclear ......................................................................................................................................... 115
Energy Storage ............................................................................................................................. 116
Anaerobic Digesters – Washington State Service Territory ............................................................. 117
Study Description ........................................................................................................................ 117
Methodology ................................................................................................................................ 117
Results .......................................................................................................................................... 118
DEMAND-SIDE RESOURCES ...................................................................................................... 118
Resource Options and Attributes ...................................................................................................... 118
Source of Demand-side Management Resource Data .................................................................. 118
Demand-side Management Supply Curves .................................................................................. 118
TRANSMISSION RESOURCES ..................................................................................................... 127
MARKET PURCHASES ............................................................................................................... 128
CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH ..................................... 131
INTRODUCTION ........................................................................................................................ 131
RESOURCE PORTFOLIO DEVELOPMENT .................................................................................... 133
System Optimizer .............................................................................................................................. 133
Transmission System ................................................................................................................... 134
Transmission Costs ...................................................................................................................... 134
Resource Adequacy ..................................................................................................................... 135
New Resource Options ................................................................................................................ 135
Capital Costs and End-Effects ..................................................................................................... 137
Environmental Policy................................................................................................................... 138
PACIFICORP – 2015 IRP TABLE OF CONTENTS
vi
General Assumptions ................................................................................................................... 141
Case Definitions ............................................................................................................................... 142
Core Case Assumptions ............................................................................................................... 142
Core Case Definitions .................................................................................................................. 149
Sensitivity Case Assumptions ...................................................................................................... 150
Sensitivity Case Definitions ......................................................................................................... 155
COST AND RISK ANALYSIS....................................................................................................... 155
Planning and Risk (PaR) .................................................................................................................. 156
Stochastic Model Parameter Estimation ...................................................................................... 156
Monte Carlo Simulation ............................................................................................................... 165
Stochastic Portfolio Performance Measures ................................................................................ 165
Forward Price Curve Scenarios ................................................................................................... 167
Environmental Policy................................................................................................................... 168
Other PaR Modeling Methods and Assumptions ......................................................................... 169
Other Cost and Risk Considerations ................................................................................................ 169
Deterministic Risk Analysis ........................................................................................................ 169
Fuel Source Diversity .................................................................................................................. 170
Customer Rate Impacts ................................................................................................................ 170
PREFERRED PORTFOLIO SELECTION ......................................................................................... 170
Pre-Screening ................................................................................................................................... 170
Initial Screening ............................................................................................................................... 171
Final Screening ................................................................................................................................ 171
Preliminary Selection ....................................................................................................................... 171
Final Preferred Portfolio Selection .................................................................................................. 171
CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS ............................................ 173
INTRODUCTION ........................................................................................................................ 173
RESOURCE PORTFOLIO DEVELOPMENT .................................................................................... 174
Core Case Resource Portfolios ........................................................................................................ 174
System Costs ..................................................................................................................................... 175
Carbon Dioxide Emissions ............................................................................................................... 176
COST AND RISK ANALYSIS....................................................................................................... 177
PREFERRED PORTFOLIO SELECTION ......................................................................................... 178
Pre-Screening ................................................................................................................................... 178
Initial Screening ............................................................................................................................... 179
Final Screening ................................................................................................................................ 181
Risk-adjusted PVRR .................................................................................................................... 181
Oregon RPS Compliance ............................................................................................................. 182
Deterministic Risk Analysis ........................................................................................................ 182
System Optimizer PVRR ............................................................................................................. 183
Energy Not Served ....................................................................................................................... 184
Carbon Dioxide Emissions .......................................................................................................... 185
Fuel Source Diversity .................................................................................................................. 186
Customer Rate Impacts ................................................................................................................ 188
Preliminary Selection ....................................................................................................................... 188
Final Preferred Portfolio Selection .................................................................................................. 189
THE 2015 IRP PREFERRED PORTFOLIO .................................................................................... 189
SENSITIVITY ANALYSES ........................................................................................................... 198
Load Sensitivities (S-01, S-02, and S-03) .................................................................................... 198
Distributed Generation Sensitivities (S-04 and S-05) .................................................................. 198
Energy Gateway Sensitivity (S-07 and S-08) .............................................................................. 199
Production Tax Credit Extension Sensitivity (S-09) .................................................................... 201
East and West Balancing Authority Area Sensitivity (S-10) ....................................................... 202
PACIFICORP – 2015 IRP TABLE OF CONTENTS
vii
High CO2 Price Sensitivity (S-11) ............................................................................................... 204
Stakeholder Solar Cost Sensitivity (S-12) ................................................................................... 204
Energy Storage Sensitivities (S-06 and S-13) .............................................................................. 205
Class 3 DSM (S-14) ..................................................................................................................... 206
Restricted 111(d) Attribute Sensitivity (S-15) ............................................................................. 207
ADDITIONAL ANALYSIS ........................................................................................................... 207
Trigger Point Analysis...................................................................................................................... 207
Greenhouse Gas Goals ..................................................................................................................... 209
Washington .................................................................................................................................. 209
Oregon ......................................................................................................................................... 209
High CO2 Price Scenario PaR Results ............................................................................................. 210
CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT .................................................. 213
INTRODUCTION ........................................................................................................................ 213
THE 2015 IRP ACTION PLAN ................................................................................................... 215
PROGRESS ON PREVIOUS ACTION PLAN ITEMS ........................................................................ 218
ACQUISITION PATH ANALYSIS ................................................................................................. 236
Resource and Compliance Strategies ............................................................................................... 236
Acquisition Path Decision Mechanism ............................................................................................. 236
PROCUREMENT DELAYS........................................................................................................... 238
IRP ACTION PLAN LINKAGE TO BUSINESS PLANNING ............................................................. 239
RESOURCE PROCUREMENT STRATEGY ..................................................................................... 242
Renewable Energy Credits ............................................................................................................... 242
Demand-side Management ............................................................................................................... 242
Naughton Unit 3 ............................................................................................................................... 242
ASSESSMENT OF OWNING ASSETS VERSUS PURCHASING POWER ............................................. 243
MANAGING CARBON RISK FOR EXISTING PLANTS ................................................................... 243
PURPOSE OF HEDGING ............................................................................................................. 244
Risk Management Policy and Hedging Program ............................................................................. 244
Cost Minimization ............................................................................................................................ 245
Portfolio ........................................................................................................................................... 246
Effectiveness Measure ...................................................................................................................... 247
Instruments ....................................................................................................................................... 247
TREATMENT OF CUSTOMER AND INVESTOR RISKS ................................................................... 247
Stochastic Risk Assessment .............................................................................................................. 247
Capital Cost Risks ............................................................................................................................ 247
Scenario Risk Assessment ................................................................................................................. 248
PACIFICORP – 2015 IRP INDEX OF TABLES AND FIGURES
viii
INDEX OF TABLES
Table 1.1 – 2015 IRP Preferred Portfolio Summary (MW) .......................................................................... 2
Table 1.2 – PacifiCorp 10-year Capacity Position Forecast (MW) .............................................................. 8
Table 1.3 – 2015 IRP Action Plan .............................................................................................................. 10
Table 2.1 – 2015 IRP Public Meetings ....................................................................................................... 18
Table 3.1 – State RPS Requirements .......................................................................................................... 34
Table 3.2 – California Compliance Period Requirements .......................................................................... 36
Table 3.3 – California Balanced Portfolio Requirements ........................................................................... 37
Table 3.4 – PacifiCorp’s Request for Proposal Activities .......................................................................... 44
Table 5.1 – Forecasted System Coincidental Peak Load in Megawatts, Prior to Energy Efficiency and
Distributed Generation Reductions ................................................................................................ 62
Table 5.2 – 2015 Capacity Contribution at System Peak for Existing Resources ...................................... 62
Table 5.3 – Coal Fired Plants ...................................................................................................................... 63
Table 5.4 – Natural Gas Plants.................................................................................................................... 63
Table 5.5 – PacifiCorp-owned Wind Resources ......................................................................................... 64
Table 5.6 – Non-owned Wind Resources ................................................................................................... 64
Table 5.7 – Non-owned Solar Resources .................................................................................................... 65
Table 5.8 – Net Meter Customers and Capacities ....................................................................................... 66
Table 5.9 – Hydroelectric Contracts - Load and Resource Balance Capacities .......................................... 67
Table 5.10 – PacifiCorp Owned Hydroelectric Generation Facilities - Load and Resource Balance
Capacities ....................................................................................................................................... 67
Table 5.11 – Estimated Impact of FERC License Renewals and Relicensing Settlement Commitments
on Hydroelectric Generation .......................................................................................................... 68
Table 5.12 – Existing DSM Summary, 2015-2024 ..................................................................................... 71
Table 5.13 – Peak Capacity Contribution Values for Wind and Solar ....................................................... 77
Table 5.14 –System Capacity Loads and Resources without Resource Additions ..................................... 81
Table 6.1 – 2015 Supply Side Resource Table (2014$) .............................................................................. 92
Table 6.1 – 2015 Supply Side Resource Table (2014$) (Continued) ......................................................... 93
Table 6.2 – Total Resource Cost for Supply-Side Resource Options ......................................................... 94
Table 6.2 – Total Resource Cost for Supply-Side Resource Options (Continued) ..................................... 95
Table 6.2 – Total Resource Cost for Supply-Side Resource Options (Continued) ..................................... 96
Table 6.2 – Total Resource Cost for Supply-Side Resource Options (Continued) ..................................... 97
Table 6.2 – Total Resource Cost for Supply-Side Resource Options (Continued) ..................................... 99
Table 6.2 – Total Resource Cost for Supply-Side Resource Options (Continued) ................................... 100
Table 6.2 – Total Resource Cost for Supply-Side Resource Options (Continued) ................................... 101
Table 6.3 – Total Resource Cost, for various Capacity Factors (Mills/kWh, 2014$) ............................... 102
Table 6.4 – Glossary of Terms from Supply Side Resource Table ........................................................... 102
Table 6.5 – Glossary of Acronyms Used in the Supply Side Resource Table .......................................... 103
Table 6.6 – Cumulative Maximum Renewable Selection Limits by Year for the Regional Haze
Reference Case ............................................................................................................................ 115
Table 6.7 – HDR Energy Storage Study Summary Cost and Capacity Results (2014$) .......................... 116
Table 6.8 – Class 1 DSM Program Attributes West Control Area ........................................................... 120
Table 6.9 – Class 1 DSM Program Attributes East Control Area ............................................................. 120
Table 6.10 – Class 3 DSM Program Attributes, West Control Area ........................................................ 122
Table 6.11 – Class 3 DSM Program Attributes, East Control Area .......................................................... 122
Table 6.12 – Class 2 DSM MWh Potential by Cost Bundle ..................................................................... 125
Table 6.13 – Class 2 DSM Adjusted Prices by Cost Bundle .................................................................... 125
Table 6.14 – Example of Transmission Integration Costs by Size of Resource Additions ...................... 128
Table 6.15 – Maximum Available Front Office Transaction Quantity by Market Hub ........................... 129
PACIFICORP – 2015 IRP Index of Tables and Figures
ix
Table 7.1 – State 111(d) Emission Rate Assumptions .............................................................................. 144
Table 7.2 State 111(d) Emission Rate Assumptions .............................................................................. 148
Table 7.3 Core Case Definitions ............................................................................................................ 150
Table 7.4 Sensitivity Case Definitions .................................................................................................. 155
Table 7.5 – Short Term Load Stochastic Parameters ................................................................................ 157
Table 7.6 – Short Term Gas Price Parameters .......................................................................................... 157
Table 7.7 – Short Term Electricity Price Parameters ................................................................................ 157
Table 7.8 – Winter Season Price Correlation ............................................................................................ 158
Table 7.9 – Spring Season Price Correlation ............................................................................................ 158
Table 7.10 – Summer Season Price Correlation ....................................................................................... 158
Table 7.11 – Fall Season Price Correlation ............................................................................................... 158
Table 7.12 – Hydro Short Term Stochastic Parameters ............................................................................ 159
Table 8.1 Risk-adjusted PVRR among Top Performing Portfolios ....................................................... 182
Table 8.2 – System Cost Impact of Oregon Situs RPS Renewable Resources ......................................... 182
Table 8.3 – Deterministic Risk Analysis Results ...................................................................................... 183
Table 8.4 – Average Annual Stochastic Mean ENS among Top Performing Portfolios .......................... 184
Table 8.5 – Average Annual Upper-tail Mean ENS among Top Performing Portfolios .......................... 185
Table 8.6 – Percentage Share of Energy from New Resources by Category ............................................ 187
Table 8.7 – PacifiCorp’s 2015 IRP Preferred Portfolio ............................................................................ 196
Table 8.8 – Preferred Portfolio Capacity Load and Resource Balance ..................................................... 197
Table 8.9 – Load Sensitivity System Optimizer PVRR Cost Results ....................................................... 198
Table 8.10 – DG Sensitivity System Optimizer PVRR Cost Results ....................................................... 199
Table 8.11 – Increase/(Decrease) of Energy Gateway Sensitivity System Optimizer PVRR Relative to
the Benchmark ............................................................................................................................. 200
Table 8.12 – Increase/(Decrease) of Energy Gateway Sensitivity PaR Stochastic Mean PVRR
Relative to the Benchmark ........................................................................................................... 200
Table 8.13 – System Optimizer and PaR PVRR Costs Results for the PTC Sensitivity .......................... 201
Table 8.14 – System Optimizer and PaR PVRR Results for the East and West Balancing Authority
Area Sensitivity ............................................................................................................................ 202
Table 8.15 – System Optimizer and PaR PVRR Results for the High CO2 Price Sensitivity .................. 204
Table 8.16 – System Optimizer and PaR PVRR Results for the Solar Cost Sensitivity ........................... 205
Table 8.17 – Increase/(Decrease) of Energy Storage Sensitivity System Optimizer PVRR Relative to
the Benchmark ............................................................................................................................. 206
Table 8.18 – Increase/(Decrease) of Energy Storage Sensitivity PaR Stochastic Mean PVRR Relative
to the Benchmark ......................................................................................................................... 206
Table 8.19 – System Optimizer and PaR PVRR Results for the Class 3 DSM Sensitivity ...................... 207
Table 8.20 – System Optimizer and PaR PVRR Results for the Restricted 111(d) Attribute Sensitivity 207
Table 8.21 – Comparison of Trigger Point Portfolios to the Preferred Portfolio...................................... 208
Table 8.22 – Cost/Risk Comparison of Portfolios that Meet Washington’s Goal of Reducing Carbon
Emissions to 1990 Levels by 2020 .............................................................................................. 209
Table 8.23 – Cost/Risk Comparison of Portfolios that Meet Oregon House Bill 3543 Emission Goals
with the Preferred Portfolio ......................................................................................................... 210
Table 9.1 – 2015 IRP Action Plan ............................................................................................................ 215
Table 9.2 – 2013 IRP Action Plan Status Update ..................................................................................... 218
Table 9.3 – Near-term and Long-term Resource Acquisition Paths ......................................................... 237
Table 9.4 – Comparison of the 2015 IRP Preferred Portfolio with the 2013 IRP Update Portfolio ......... 240
Table 9.5 – Comparison of the 2015 IRP Preferred Portfolio with the Fall 2014 Business Plan
Portfolio ....................................................................................................................................... 241
PACIFICORP – 2015 IRP INDEX OF TABLES AND FIGURES
x
INDEX OF FIGURES
Figure 1.1 – Key Elements of PacifiCorp’s IRP Process .............................................................................. 1
Figure 1.2 – Load Forecast Comparison among Recent IRPs ...................................................................... 3
Figure 1.3 – Comparison of Total Energy Efficiency Savings between the 2015 IRP Preferred
Portfolio and the 2013 IRP Preferred Portfolio ............................................................................... 3
Figure 1.4 – Comparison of Power Prices and Natural Gas Prices among Recent IRPs .............................. 4
Figure 1.5 – Comparison of FOTs among Recent IRPs................................................................................ 4
Figure 1.6 – Annual State RPS Position Forecasts ....................................................................................... 5
Figure 1.7 – Economic System Dispatch of Existing Resources in Relation to Monthly Load ................... 9
Figure 3.1 – Henry Hub Day-ahead Natural Gas Price History .................................................................. 22
Figure 3.2 – U.S. Dry Natural Gas Production ........................................................................................... 23
Figure 3.3 – Lower 48 States Shale Plays ................................................................................................... 23
Figure 3.4 – Plays Accounting for all Natural Gas Production Growth 2011 -2013 .................................. 24
Figure 3.5 – Henry Hub NYMEX Futures .................................................................................................. 25
Figure 4.1 – Segment D .............................................................................................................................. 50
Figure 4.2 – Segment E ............................................................................................................................... 50
Figure 4.3 – Segment F ............................................................................................................................... 51
Figure 4.4 – Resource Portfolio Variation .................................................................................................. 52
Figure 4.5 – Energy Gateway Transmission Expansion Plan ..................................................................... 57
Figure 5.1 – Technical Potential Results .................................................................................................... 73
Figure 5.2 – Base Case Distributed Generation .......................................................................................... 74
Figure 5.3 – High Case Distributed Generation .......................................................................................... 74
Figure 5.4 – Low Case Distributed Generation .......................................................................................... 75
Figure 5.5 – Contract Capacity in the 2015 Load and Resource Balance ................................................... 75
Figure 5.6 – System Capacity Position Trend ............................................................................................. 82
Figure 5.7 – East Capacity Position Trend ................................................................................................. 83
Figure 5.8 – West Capacity Position Trend ................................................................................................ 83
Figure 5.9 – System Average Monthly Energy Positions ........................................................................... 85
Figure 6.1 – World Carbon Steel Pricing by Type...................................................................................... 89
Figure 6.2 – Historic Carbon Steel Pricing ................................................................................................. 90
Figure 7.1 – Modeling and Portfolio Evaluation Steps within the IRP Process ....................................... 133
Figure 7.2 – Transmission System Model Topology ................................................................................ 134
Figure 7.3 – Three Step Modeling Process Implemented for 111(d) Emission Rate Cases ..................... 139
Figure 7.4 – PacifiCorp System 111(d) Mass Cap Assumptions .............................................................. 144
Figure 7.5 – New Renewable Resource Energy Ceiling for 111(d) Compliance Strategies .................... 146
Figure 7.6 – Nominal CO2 Price Assumptions for the Portfolio Development Process .......................... 147
Figure 7.7 – Wholesale Electricity and Natural Gas Prices in Core Case Definitions.............................. 149
Figure 7.8 – Load Sensitivity Assumptions .............................................................................................. 151
Figure 7.9 – Distributed Generation Sensitivity Assumptions .................................................................. 151
Figure 7.10 – High CO2 Price Sensitivity Assumptions........................................................................... 153
Figure 7.11 – Wholesale Electricity and Natural Gas Prices in the High CO2 Sensitivity....................... 153
Figure 7.12 – Solar Cost Sensitivity Assumptions ................................................................................... 154
Figure 7.13 – Simulated Annual Mid-C Electricity Market Prices ........................................................... 159
Figure 7.14 – Simulated Annual Palo Verde Electricity Market Prices.................................................... 160
Figure 7.15 – Simulated Annual Western Natural Gas Market Prices...................................................... 160
Figure 7.16 – Simulated Annual Eastern Natural Gas Market Prices ....................................................... 161
Figure 7.17 – Simulated Annual Idaho (Goshen) Load ............................................................................ 162
Figure 7.18 – Simulated Annual Utah Load ............................................................................................. 162
Figure 7.19 – Simulated Annual Wyoming Load ..................................................................................... 163
PACIFICORP – 2015 IRP Index of Tables and Figures
xi
Figure 7.20 – Simulated Annual Oregon/California Load ........................................................................ 163
Figure 7.21 – Simulated Annual Washington Load .................................................................................. 164
Figure 7.22 – Simulated Annual System Load ......................................................................................... 164
Figure 7.23 – Simulated Annual Hydro Generation ................................................................................. 165
Figure 7.24 – Wholesale Electricity and Natural Gas Prices in PaR Simulations .................................... 168
Figure 8.1 – Total Cumulative Capacity through 2034, Regional Haze Scenarios 1 and 3 ...................... 174
Figure 8.2 – Total Cumulative Capacity through 2034, Regional Haze Scenarios 2 and 3 ...................... 175
Figure 8.3 – System Optimizer PVRR Costs for Regional Haze Scenarios 1 and 3 ................................ 175
Figure 8.4 – System Optimizer PVRR Costs for Regional Haze Scenarios 2 and 3 ................................ 176
Figure 8.5 – Increase in System Optimizer PVRR Costs under Regional Haze Scenario 2 Relative to
Regional Haze Scenario 1 ............................................................................................................ 176
Figure 8.6 – System Optimizer Annual CO2 Emissions for Regional Haze Scenarios 1 and 3 ............... 177
Figure 8.7 – System Optimizer Annual CO2 Emissions for Reference Haze Scenarios 2 and 3 ............. 177
Figure 8.8 – Pre-Screen Scatter Plots, Low Price Curve Scenario ........................................................... 178
Figure 8.9 Pre-Screen Scatter Plots, Base Price Curve Scenario ........................................................... 178
Figure 8.10 Pre-Screen Scatter Plots, High Price Curve Scenario......................................................... 179
Figure 8.11 Initial Screen Scatter Plot, Low Price Curve Scenario ....................................................... 180
Figure 8.12 Initial Screen Scatter Plot, Base Price Curve Scenario ...................................................... 180
Figure 8.13 Initial Screen Scatter Plot, High Price Curve Scenario ...................................................... 181
Figure 8.14 Change in System Optimizer PVRR among Top Performing Portfolios ........................... 184
Figure 8.15 PaR Mean CO2 Emissions among Top Performing Portfolios ........................................... 185
Figure 8.16 System Optimizer CO2 Emissions among Top Performing Portfolios ............................... 186
Figure 8.17 Resource Types among Top Performing Portfolios ........................................................... 187
Figure 8.18 Customer Rate Impacts Benchmarked to Case C05a-3 ...................................................... 188
Figure 8.19 Cumulative Increase/(Decrease) in Preferred Portfolio Capacity Relative to Case C05a-
3 ................................................................................................................................................... 189
Figure 8.20 Summary of PacifiCorp’s 2015 IRP Preferred Portfolio .................................................... 190
Figure 8.21 Comparison of Total Energy Efficiency Savings in the 2015 IRP Preferred Portfolio
and the 2013 IRP Preferred Portfolio ........................................................................................... 190
Figure 8.22 Comparison of FOTs in the 2015 IRP Preferred Portfolio with the 2013 IRP Preferred
Portfolio ....................................................................................................................................... 191
Figure 8.23 Energy Contribution of Preferred Portfolio Resources to Load Growth ............................ 191
Figure 8.24 – Meeting PacifiCorp’s Capacity Needs with Preferred Portfolio Resources ....................... 192
Figure 8.25 – Projected Energy Mix with Preferred Portfolio Resources ................................................ 193
Figure 8.26 – Projected Capacity Mix with Preferred Portfolio Resources .............................................. 193
Figure 8.27 – Annual State RPS Position Forecasts ................................................................................. 194
Figure 8.28 – Preferred Portfolio CO2 Emissions ..................................................................................... 195
Figure 8.29 – Cumulative New Renewable Resource Capacity in Energy Gateway Sensitivity Cases ... 199
Figure 8.30 – Cumulative New Renewable Resource Capacity in the PTC Sensitivity Case .................. 201
Figure 8.31 – Cumulative Increase/(Decrease) in Portfolio Capacity for the East and West Balancing
Authority Area Sensitivity without 111(d) .................................................................................. 203
Figure 8.32 – Cumulative Increase/(Decrease) in Portfolio Capacity for the East and West Balancing
Authority Area Sensitivity with 111(d) ....................................................................................... 203
Figure 8.33 – Increase/(Decrease) in System Optimizer Costs for the High CO2 Price Sensitivity
Relative to the Benchmark ........................................................................................................... 204
Figure 8.34 – Stochastic Mean Coal Capacity Factors from C14 Portfolios and High CO2 Price
Assumptions ................................................................................................................................. 208
Figure 8.35 – High CO2 Price Scenario Core Case Portfolio Scatter Plot ............................................... 211
PACIFICORP – 2015 IRP CHAPTER 1 – EXECUTIVE SUMMARY
1
CHAPTER 1 – EXECUTIVE SUMMARY
PacifiCorp’s 2015 Integrated Resource Plan (2015 IRP), developed with participation from an
active and diverse group of public stakeholders comprised of regulatory staff, advocacy groups,
and other interested parties, was initiated with the first public input meeting in June 2014. Over
the next nine months, PacifiCorp met with stakeholders in five states, hosted seven public input
meetings, and led two technical workshops. Through this process, PacifiCorp received valuable
input from its stakeholders and presented findings from a broad range of foundational studies and
technical analysis that supports the resource plan presented herein. PacifiCorp’s 2015 IRP,
representing the 13th plan submitted to state regulatory commissions, identifies future resources
needed to provide reliable, reasonable-cost service with manageable risks to its customers and
outlines specific resource actions PacifiCorp will implement over the next two to four years.
As depicted in Figure 1.1, PacifiCorp’s 2015 IRP was developed by progressing through five
fundamental planning steps. A key element of the planning process is to prepare a load and
resource balance to quantify resource need over time. In the next planning step, PacifiCorp
develops different resource portfolios that meet projected resource needs, each uniquely
characterized by the type, timing, and location of new resources in PacifiCorp’s system over
time. PacifiCorp then performs comparative cost and risk analysis among the different resource
portfolio alternatives. This cost and risk analysis informs selection of a preferred portfolio and
the associated resource action plan. Throughout this process, PacifiCorp assesses the current
planning environment to develop key planning assumptions and to identify key planning
uncertainties. Supplemental studies are also completed to support the derivation of specific
modeling assumptions.
Figure 1.1 – Key Elements of PacifiCorp’s IRP Process
Resource Needs
Assessment
Resource Portfolio
Development
Cost and Risk
Analysis
Preferred Portfolio
Selection
Action Plan
Key Planning
Assumptions
and
Uncertainties
Supplemental
Studies
PACIFICORP – 2015 IRP CHAPTER 1 – EXECUTIVE SUMMARY
2
Preferred Portfolio Highlights
Development of the 2015 IRP involved a balanced consideration of cost, risk, uncertainty, supply
reliability/deliverability, and public policy goals. Table 1.1 shows that PacifiCorp’s resource
needs can be met with demand side management (DSM) and low cost short-term firm market
purchases, labeled as front office transactions (FOTs), through 2027. The first deferrable thermal
resource in the 2015 IRP preferred portfolio is added in 2028, one year later when compared to
PacifiCorp’s 2013 IRP Update and four years later relative to the 2013 IRP preferred portfolio.
By the end of the twenty-year planning horizon, PacifiCorp’s 2015 IRP preferred portfolio
reflects an assumed reduction in existing owned capacity totaling 2,775 MW. By 2034, it is
assumed that approximately 2,800 MW of existing coal generation will either be retired or
converted to operate as natural gas-fired generation.
Table 1.1 – 2015 IRP Preferred Portfolio Summary (MW)
*Note, energy efficiency resource capacity reflects projected maximum annual hourly energy savings, which is
similar to a nameplate rating for a supply side resource. FOTs are short-term firm market purchases delivered only
on the year shown.
Figure 1.2 shows that the Company’s load forecast prior to incremental energy efficiency savings
and prior to assumed distributed generation penetration levels, is down beyond 2019 in relation
to projected loads used in the 2013 IRP and 2013 IRP Update. Forecasted peak falls between the
2013 IRP and 2013 IRP Update through 2019, and drops below the 2013 IRP and 2013 IRP
Update beyond 2020. Changes to PacifiCorp’s load forecast is driven by reduced residential class
load forecast due to increased energy efficiency, including continued phase in of the Energy
Independence and Security Act federal lighting standards. In addition, lower energy response to
economic growth has lowered system load and coincident peak growth.
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total
New Resources
FOTs 727 937 904 870 935 979 769 791 761 754 771 792 835 1,304 1,167 1,253 1,247 1,411 1,360 1,087 n/a
DSM - Energy Efficiency 133 139 146 146 153 135 137 144 146 149 123 126 130 132 128 125 122 122 122 120 2,678
DSM - Load Control 0 0 0 0 0 0 0 5 11 0 0 11 0 0 11 0 0 0 5 0 42
Natural Gas Combined Cycle 0 0 0 0 0 0 0 0 0 0 0 0 0 423 0 1,159 0 0 635 635 2,852
OR Solar Capacity Standard 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
Existing Unit Changes
Reduction in Owned Coal/Gas (222) 0 0 (280) 0 0 0 0 0 0 (387) 0 0 (762) 0 (807) (77) 0 (627) 0 (3,162)
Gas Conversion 0 0 0 337 0 0 0 0 0 0 387 0 0 0 0 (337) 0 0 0 0 387
Total Net Change in Resources 638 1,084 1,050 1,073 1,088 1,113 906 941 917 903 893 928 965 1,097 1,305 1,393 1,292 1,533 1,496 1,841
PACIFICORP – 2015 IRP CHAPTER 1 – EXECUTIVE SUMMARY
3
Figure 1.2 – Load Forecast Comparison among Recent IRPs
PacifiCorp continues to evaluate DSM as a resource that competes with traditional supply-side
resource alternatives when developing resource portfolios that are compared under a range of
cost and risk metrics. In preparing its 2015 IRP, PacifiCorp used updated estimates of reasonably
achievable DSM resource potential in each year of the planning horizon. Driven by increased
cost-effective lighting opportunities followed by cost-effective opportunities in heating, cooling,
water heating, appliances and industrial process end-uses, Class 2 DSM, or energy efficiency,
savings in the 2015 IRP preferred portfolio exceed energy efficiency savings from the 2013 IRP
preferred portfolio by 59 percent by 2024. Over this front ten years of the planning horizon,
accumulated acquisition of incremental energy efficiency resources meets 86 percent of forecast
load growth from 2015 through 2024. Figure 1.3 compares total energy efficiency savings by
state in the 2015 IRP preferred portfolio relative to the 2013 IRP preferred portfolio.
Figure 1.3 – Comparison of Total Energy Efficiency Savings between the 2015 IRP
Preferred Portfolio and the 2013 IRP Preferred Portfolio
Figure 1.4 shows that base case wholesale power prices and natural gas prices used in the 2015
IRP are significantly lower than the base case market prices used in the 2013 IRP and are more
closely aligned with those used in PacifiCorp’s 2013 IRP Update. Since the 2013 IRP planning
cycle, growth in natural gas supplies, primarily from prolific shale plays in North America, have
continued to outpace expectations. With continued declines in forward natural gas prices and
reduced regional electric load growth expectations, forward power prices have also declined
60,000
62,000
64,000
66,000
68,000
70,000
72,000
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Forecasted Annual System Load
(GWh)
2015 IRP 2013 IRP Update 2013 IRP
9,000
9,500
10,000
10,500
11,000
11,500
12,000
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Forecasted Annual System Coincident Peak
(MW)
2015 IRP 2013 IRP Update 2013 IRP
0
100
200
300
400
500
600
700
800
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
2013 IRP Preferred Portfolio 2015 IRP Preferred Portfolio
aM
W
CA
ID
WY
WA
OR
UT
PACIFICORP – 2015 IRP CHAPTER 1 – EXECUTIVE SUMMARY
4
significantly since the 2013 IRP. Figure 1.5 compares FOTs from the preferred portfolio among
recent IRPs. While market conditions for firm market purchases are favorable, growth in energy
efficiency savings mitigate the need for FOTs through the front ten years of the planning
horizon. On average 2015 IRP preferred portfolio FOTs are down 16% from the 2013 IRP
Update and down 29% when compared to the 2013 IRP preferred portfolio.
Figure 1.4 – Comparison of Power Prices and Natural Gas Prices among Recent IRPs
Figure 1.5 – Comparison of FOTs among Recent IRPs
PacifiCorp’s 2015 IRP preferred portfolio is built around a system reflecting the addition of 816
MW of executed wind and solar qualifying facility power purchase agreements from 36 projects
having in-service dates by the end of 2016. To mitigate the cost of state renewable portfolio
standard (RPS) compliance, analyses in the 2015 IRP continue to support the use of unbundled
renewable energy credits (RECs) to meet projected compliance needs through the planning
horizon. Figure 1.6 shows PacifiCorp’s RPS compliance forecast for California, Oregon, and
Washington covering the period 2015 through 2024. Utah’s RPS goal is tied to a 2025
compliance date, so the 2015 through 2024 position is not shown. However, PacifiCorp meets
the Utah 2025 state target of 20%, and has a significant bank to sustain continued future
compliance in Utah.
$-
$1
$2
$3
$4
$5
$6
$7
$8
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Henry Hub Natural Gas Prices
($/MMBtu)
2015 IRP (Sep 2014)2013 IRP Update (Dec 2013)
2013 IRP (Sep 2012)
$-
$10
$20
$30
$40
$50
$60
$70
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Average of MidC/Palo Verde Flat Power Prices
($/MWh)
2015 IRP (Sep 2014)2013 IRP Update (Dec 2013)
2013 IRP (Sep 2012)
0
200
400
600
800
1,000
1,200
1,400
1,600
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Th
i
r
d
Q
u
a
r
t
e
r
O
n
P
e
a
k
(
M
W
)
2015 IRP 2013 IRP Update 2013 IRP
PACIFICORP – 2015 IRP CHAPTER 1 – EXECUTIVE SUMMARY
5
Figure 1.6 – Annual State RPS Position Forecasts
During the 2015 IRP portfolio development process, PacifiCorp considered alternative Regional
Haze scenarios, which reflect potential inter-temporal and fleet trade-off compliance outcomes
for both known and prospective Regional Haze compliance requirements on existing coal units
in PacifiCorp’s fleet. Analysis of near-term Regional Haze compliance requirements support
converting Naughton Unit 3 to burn natural gas in 2018 and strategies that avoid installation of
-
2,000
4,000
6,000
8,000
10,000
12,000
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
GW
h
Oregon RPS
Unbundled REC Surrendered Bundled Bank Surrendered
Current Year Generation Surrendered Year-end Bundled Bank Balance
Year-end Unbundled REC Bank Balance Annual Requirement
0
200
400
600
800
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
GW
h
Washington RPS
Unbundled REC Surrendered Bundled Bank Surrendered
Current Year Generation Surrendered Year-end Bundled Bank Balance
Year-end Unbundled REC Bank Balance Annual Requirement
0
50
100
150
200
250
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
GW
h
California RPS
Unbundled REC Surrendered Bundled Bank Surrendered
Current Year Generation Surrendered Year-end Bundled Bank Balance
Year-end Unbundled REC Bank Balance Annual Requirement
PACIFICORP – 2015 IRP CHAPTER 1 – EXECUTIVE SUMMARY
6
selective catalytic reduction emissions control equipment at Wyodak, Dave Johnston Unit 3, and
Cholla Unit 4, saving PacifiCorp customers hundreds of millions of dollars.
Just as PacifiCorp was initiating its 2015 IRP public process, the U.S. Environmental Protection
Agency (EPA) issued a proposed rule under §111(d) of the Clean Air Act (111(d) or the 111(d)
rule) establishing state emission rate targets for existing resources through application of a best
system of emission reduction (BSER). PacifiCorp considered EPA’s proposed rule in its 2015
IRP by studying a range of assumed compliance requirements and alternative compliance
strategies. The 2015 IRP preferred portfolio meets PacifiCorp’s share of state emission rate
targets among those states in which PacifiCorp serves retail customers and owns existing fossil
generation potentially affected by the proposed rule. PacifiCorp’s compliance solution reflects a
BSER that is primarily comprised of allocating system renewable generation among states,
acquiring energy efficiency resources, and re-dispatching fossil-fired generation resources.
PacifiCorp continues to support transmission permitting efforts for Energy Gateway West
(Segments D and E), Energy Gateway South (Segment F), Boardman to Hemingway (Segment
H), and a line from Walla Walla to McNary. PacifiCorp will complete construction of the
Wallula to McNary project, driven by a customer request for transmission service, with a 2017
expected in-service date.
Supplemental Studies
PacifiCorp’s 2015 IRP relies on numerous supplemental studies that support the derivation of
specific modeling assumptions critical to its long-term resource plan. A description of these
studies, discussed in more detail in appendices filed with the 2015 IRP, is provided below.
Conservation Potential Assessment
Updated conservation potential assessment (CPA), prepared by Applied Energy Group
(commissioned by PacifiCorp) and Navigant Consulting (commissioned by the Energy
Trust of Oregon), drives the demand side management resource potential and cost
assumptions specific to PacifiCorp’s service territory. The CPAs support cost and DSM
savings data used during the portfolio development process.
Distributed Generation Resource Assessment
New to the 2015 IRP, this supplemental study, prepared by Navigant Consulting, Inc.,
produced distributed generation penetration forecasts for solar photovoltaic, small scale
wind, small scale hydro, combined heat and power reciprocating engines, and combined
heat and power micro-turbines specific to PacifiCorp’s service territory. The distributed
generation penetration forecasts from this study are applied as a reduction to forecasted
load throughout the IRP modeling process.
Anaerobic Digester Resource Assessment
An anaerobic digester resource assessment, prepared by Harris Group, Inc., reports on the
amount of potential electric power generation from dairy waste specific to PacifiCorp’s
service territory in Washington. Conclusions from the study indicate that economically
viable projects would require consolidation of dairies (or dairy waste) to form larger
digester facilities. Moreover, alternatives to power generation, such as selling synthetic
PACIFICORP – 2015 IRP CHAPTER 1 – EXECUTIVE SUMMARY
7
natural gas, may be more economically viable. PacifiCorp expects that economic projects
would be brought forward through qualifying facility power purchase agreements.
Energy Storage Screening Study
HDR Engineering prepared an updated energy storage screening study in support of
PacifiCorp’s 2015 IRP. The study catalogs commercially available utility scale and
distributed scale storage technologies, defines their performance characteristics, and
estimates capital and operating costs. The study is used to develop cost and performance
data applied during the portfolio development process and supports energy storage
sensitivities performed in the 2015 IRP.
Resource Adequacy Evaluation
PacifiCorp updated its analysis of regional resource adequacy to support its assumptions
for FOT limits. The resource adequacy evaluation presents data from the Western
Electricity Coordinating Council’s Power Supply Assessment and resource adequacy
assessments prepared by the Pacific Northwest Resource Adequacy Forum. PacifiCorp’s
review of regional resource adequacy continues to support the use of FOTs, representing
short-term firm market purchases, as a resource option in the 2015 IRP.
Planning Reserve Margin Study
The 2015 IRP was developed targeting a 13% planning reserve margin, which influences
the need for new resources and is applied during the portfolio development process. In its
updated planning reserve margin study, PacifiCorp analyzes the relationship between cost
and reliability among ten different planning reserve margin levels, accounting for
variability and uncertainty in load and generation resources.
Wind and Solar Capacity Contribution Study
PacifiCorp updated its wind and solar capacity contribution values for the 2015 IRP,
which were developed using the capacity factor approximation method. Capacity
contribution is defined as the availability of wind and solar resources among hours
having the highest loss of load probability, and the resulting values are used in the 2015
IRP resource needs assessment and in the portfolio development process.
Wind Integration Study
The updated wind integration study, prepared by PacifiCorp in coordination with a
technical review committee, estimates the operating reserves required to both maintain
system reliability and comply with North American Electric Reliability Corporation
reliability standards. Operating reserves estimated from the study are used in cost and risk
analysis modeling and estimated wind integration costs are applied during the portfolio
development process.
Stochastic Parameter Update
PacifiCorp’s preferred portfolio selection process relies, in part, on stochastic risk
analysis using a Monte Carlo random sampling process. Stochastic variables include
natural gas and wholesale electricity prices, load, hydro generation, and unplanned
thermal outages. For its 2015 IRP, an independent consultant prepared updated stochastic
parameters.
PACIFICORP – 2015 IRP CHAPTER 1 – EXECUTIVE SUMMARY
8
Flexible Resource Needs Assessment
PacifiCorp updated its flexible resource needs assessment, which forecasts flexible
resource needs and projected flexible resource supply, based upon the 2015 IRP preferred
portfolio. The flexible resource needs assessment shows that PacifiCorp’s system has
sufficient resources to meet its flexible resource needs throughout the IRP planning
horizon.
Resource Needs Assessment
PacifiCorp’s need for new resources is determined by developing a capacity load and resource
balance that considers the coincident system peak load hour capacity contribution of existing
resources, forecasted loads and sales, and reserve requirements. For capacity expansion planning,
the Company uses a 13% planning reserve margin, which is applied to PacifiCorp’s obligation
net of offsetting “load resources” such as dispatchable load control capacity.
Table 1.2 shows the PacifiCorp’s annual capacity position for 2015 through 2024, prior to adding
any incremental demand side or new supply side resources to the portfolio. Accounting for
available FOTs, PacifiCorp exceeds its 13% target planning reserve margin through 2019 and
falls just short of its target planning reserve margin in 2020. With the expiration of a legacy
exchange contract, available system capacity is increased in the summer of 2021, and
PacifiCorp’s system once again exceeds its 13% target planning reserve margin through 2022.
With continued load growth, PacifiCorp falls 82 MW and 165 MW below its target planning
reserve margin in 2023 and 2024, respectively.
Table 1.2 – PacifiCorp 10-year Capacity Position Forecast (MW)
The capacity position shows how existing resources and loads balance during the coincident
peak load hour of the year inclusive of a planning reserve margin. Outside of the peak hour,
PacifiCorp economically dispatches its resources to meet changing load conditions taking into
consideration prevailing market conditions. In those periods when system resource costs are less
than the prevailing market price for power, PacifiCorp can dispatch resources that in aggregate
exceed then-current load obligations, facilitating off system sales that reduce customer costs.
Conversely, at times when system resource costs are greater than prevailing market prices,
system balancing market purchases can be used to meet then-current system load obligations to
reduce customer costs. The economic dispatch of system resources is critical to how the
Company manages net power costs.
Figure 1.7 provides a snapshot of how existing system resources could be used to meet
forecasted load across on-peak and off-peak periods given current planning assumptions and
System 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Existing Resource Capacity Contribution 10,568 10,043 10,143 10,217 10,144 10,124 10,486 10,446 10,458 10,425
Available FOT Capacity Contribution 1,670 1,670 1,670 1,670 1,670 1,670 1,670 1,670 1,670 1,670
Total Existing Resource + FOTs 12,238 11,713 11,812 11,886 11,814 11,794 12,155 12,115 12,128 12,094
Obligation without Incremental DSM 10,104 9,930 10,089 10,225 10,333 10,452 10,569 10,674 10,788 10,832
13% Planning Reserve Margin 1,333 1,310 1,331 1,349 1,363 1,378 1,393 1,407 1,422 1,428
Obligation + 13% Planning Reserves 11,437 11,240 11,420 11,573 11,696 11,830 11,963 12,081 12,210 12,259
System Position with Available FOTs 801 472 393 313 117 (36)192 34 (82)(165)
Reserve Margin with Available FOTs 21.1%18.0%17.1%16.3%14.3%12.8%15.0%13.5%12.4%11.7%
PACIFICORP – 2015 IRP CHAPTER 1 – EXECUTIVE SUMMARY
9
recent wholesale power and natural gas prices.1 The figure shows expected monthly energy
production from system resources during on-peak and off-peak periods in relation to load
assuming no new demand side and supply side resources are added to PacifiCorp’s system. At
times, system resources are economically dispatched above load levels facilitating net system
balancing sales. This occurs more often in off-peak periods than in on-peak periods. At other
times, economic conditions result in net system balancing purchases, which occur more often
during on-peak periods. Figure 1.7 also shows how much system energy is available from
existing resources at any given point in time. Those periods where all available resource energy
falls below forecasted loads are highlighted in red, and are indicative of short energy positions
absent the addition of any new demand side or supply side resources to the portfolio. During on-
peak periods, the first energy shortfall appears in July 2020, totaling 5 GWh. In July 2024,
available system energy falls short of monthly loads by 189 GWh. During off-peak periods, there
are no energy shortfalls through the 2024 timeframe.
Figure 1.7 – Economic System Dispatch of Existing Resources in Relation to Monthly Load
1 On-peak hours are defined as hour ending 7 AM through 10 PM, Monday through Saturday.
All other hours define off-peak periods.
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
GW
h
On-Peak Energy Balance
System Energy at or Below Load Net Balancing Sale Net Balancing Purchase
Energy Shortfall System Energy Available Load
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
GW
h
Off-Peak Energy Balance
System Energy at or Below Load Net Balancing Sale Net Balancing Purchase
Energy Shortfall System Energy Available Load
PACIFICORP – 2015 IRP CHAPTER 1 – EXECUTIVE SUMMARY
10
Action Plan
The 2015 IRP action plan identifies specific resource actions the Company will take over the next two to four years. Action items are
based on the type and timing of resources in the preferred portfolio, findings from analysis completed during the development of the
2015 IRP, and other resource activities described in the 2015 IRP. Table 1.3 details specific 2015 IRP action items by category.
Table 1.3 – 2015 IRP Action Plan
The Company will pursue unbundled REC request for proposals (RFP) to meet its state RPS compliance
requirements.
–Issue at least annually, RFPs seeking then current-year or forward-year vintage unbundled RECs that will
qualify in meeting Washington renewable portfolio standard targets through 2017.
–Issue at least annually, RFPs seeking then current-year or forward-year vintage unbundled RECs that will
qualify in meeting California renewable portfolio standard targets through 2017.
–With a projected bank balance extending out through 2027, defer issuance of RFPs seeking unbundled RECs
that will qualify in meeting Oregon renewable portfolio standard targets until states begin to develop
implementation plans under EPA’s draft 111(d) rule, providing clarity on whether an unbundled REC strategy
is the least cost compliance alternative for Oregon customers.
On a quarterly basis, and through calendar year 2016, issue reverse RFPs to sell 2016 vintage or older RECs that are
not required to meet state RPS compliance obligations.
Conclude negotiations with shortlisted bids from the 2013S Request for Proposals (RFP), seeking up to 7 MWAC of
competitively priced capacity from qualifying solar systems that will be used to satisfy PacifiCorp’s obligation under
Oregon’s 2020 solar capacity standard.
PACIFICORP – 2015 IRP CHAPTER 1 – EXECUTIVE SUMMARY
11
Action
Item 2.Firm Market Purchase Actions
2a
Front Office Transactions
–
–
–
Action
Item 3.Demand Side Management (DSM) Actions
3a
Class 1 DSM
3b
Class 2 DSM
selections from the preferred portfolio as summarized in the following table. PacifiCorp’s implementation plan to
Year Annual Incremental Energy (GWh) Annual Incremental Capacity* (MW)
2015 551 133
2016 584 139
2017 616 146
2018 634 146
*Class 2 DSM capacity figures reflect projected maximum annual hourly energy savings, which is similar to a nameplate rating for a supply side
resource.
Action
Item 4.Coal Resource Actions
4a
Naughton Unit 3
PACIFICORP – 2015 IRP CHAPTER 1 – EXECUTIVE SUMMARY
12
4b
Dave Johnston Unit 3
The portion of EPA’s final Regional Haze Federal Implementation Plan (FIP) requiring the installation of selective
If following appeal, EPA’s final FIP as it pertains to Dave Johnston Unit 3 is upheld, PacifiCorp will commit to
ng appeal, EPA’s final FIP as it pertains to Dave Johnston Unit 3 is or will be modified, PacifiCorp will
4c
Wyodak
Continue to pursue the Company’s appeal of the portion of EPA’s final Regional Haze FIP that requires the
If following appeal, EPA’s final FIP as it pertains to installation of SCR at Wyodak is upheld (with a modified
4d
Cholla Unit 4
Action
Item 5.Transmission Actions
5a
Energy Gateway Permitting
–
–
–
PACIFICORP – 2015 IRP CHAPTER 1 – EXECUTIVE SUMMARY
13
5b
Wallula to McNary 230 kilovolt Transmission Line
PACIFICORP – 2015 IRP CHAPTER 1 – EXECUTIVE SUMMARY
14
PACIFICORP – 2015 IRP CHAPTER 2 – INTRODUCTION
15
CHAPTER 2 – INTRODUCTION
PacifiCorp files an Integrated Resource Plan (IRP) on a biennial basis with the state utility
commissions of Utah, Oregon, Washington, Wyoming, Idaho, and California. This IRP fulfills
the Company’s commitment to develop a long-term resource plan that considers cost, risk,
uncertainty, and the long-run public interest. It was developed through a collaborative public
process with involvement from regulatory staff, advocacy groups, and other interested parties.
As the owner of the IRP and its action plan, all policy judgments and decisions concerning the
IRP are ultimately made by PacifiCorp in light of its obligations to its customers, regulators, and
shareholders.
An analytical highlight of the 2015 IRP was to develop a planning framework to address the
cost, risk, and uncertainty associated with EPA’s proposed rule to regulate CO2 emissions from
existing resources under §111(d) of the Clean Air Act (111(d) rule). New tools were necessary to
analyze this policy development, and refinements will be implemented once the rule is finalized
and as states begin to develop implementation plans for submittal to EPA. To evaluate EPA’s
proposed rule, PacifiCorp developed the 111(d) Scenario Maker, a spreadsheet-based tool, to
study key 111(d) policy and 111(d) compliance uncertainties. PacifiCorp held two confidential
technical workshops, one in Portland, Oregon, and one in Salt Lake City, Utah to demonstrate its
use of the 111(d) Scenario Maker to stakeholders.
Another modeling improvement included implementation of an updated version of the Enterprise
Portfolio Management (EPM) model which improved the efficiency of the System Optimizer and
Planning and Risk (PaR) models.2 With improved modeling efficiencies, PacifiCorp did not need
to evaluate how model performance might be improved by potentially reducing the number of
cost bundles used to define demand side management (DSM) supply curves.
Compliance associated with Regional Haze requirements was another area of focus for the 2015
IRP. PacifiCorp developed resource portfolios among four potential Regional Haze scenarios,
assessing how different inter-temporal and fleet-tradeoff compliance outcomes might influence
new resource needs and system costs. Regional Haze scenarios outlining different potential
compliance requirements were analyzed concurrent with other environmental policies, including
analysis of EPA’s proposed 111(d) rule as discussed above. Coal-fired units subject to near-term
Regional Haze requirements are analyzed in Volume III, which presents financial analysis of
compliance alternative for Wyodak, Naughton Unit 3, Dave Johnston Unit 3, and Cholla Unit 4.
Other significant studies conducted to support the 2015 IRP include:
An updated conservation potential assessment;
A distributed generation resource assessment for PacifiCorp’s service territory;
An anaerobic digester resource assessment, specific to Washington;
An energy storage screening study examining utility scale storage potential;
A planning reserve margin study to determine selection of a planning reserve margin for
the 2015 IRP
2 EPM refers to ABB’s (formerly known as Ventyx) suite of applications. Among the applications, PacifiCorp
makes use of both System Optimizer and PaR. These applications use a common database and graphical user
interface.
PACIFICORP – 2015 IRP CHAPTER 2 – INTRODUCTION
16
A western region regional adequacy assessment;
A wind and solar capacity contribution study;
An updated wind integration study developed in coordination with a technical review
committee;
Update stochastic parameters; and
An updated flexible resource needs assessment.
Finally, this IRP reflects continued alignment efforts with the Company’s annual ten-year
business planning process. The purpose of the alignment, initiated in 2008, is to:
Provide corporate benefits in the form of consistent planning assumptions;
Ensure that business planning is informed by the IRP portfolio analysis, and, likewise,
that the IRP accounts for near-term resource affordability concerns as they relate to
capital budgeting; and
Improve the overall transparency of PacifiCorp’s resource planning processes to public
stakeholders.
This chapter outlines the components of the 2015 IRP, summarizes the role of the IRP, and
provides an overview of the public process.
2015 Integrated Resource Plan Components
The basic components of PacifiCorp’s 2015 IRP include:
Set of IRP principles and objectives adopted for the IRP effort (this chapter).
Assessment of the planning environment, market trends and fundamentals, legislative and
regulatory developments, and current procurement activities (Chapter 3)
Description of PacifiCorp’s transmission planning efforts and activities (Chapter 4)
Resource needs assessment covering the Company’s load forecast, existing resources,
and determination of the load and energy positions for the front ten years of the twenty
year planning horizon (Chapter 5)
Profile of the resource options considered for addressing future capacity and energy
needs (Chapter 6)
Description of the IRP modeling, including a description of the resource portfolio
development process, cost and risk analysis, and preferred portfolio selection process
(Chapter 7)
Presentation of IRP modeling results, and selection of top-performing resource portfolios
and PacifiCorp’s preferred portfolio (Chapter 8)
Presentation of PacifiCorp’s 2015 IRP action plan linking the Company’s preferred
portfolio with specific implementation actions, including an accompanying resource
acquisition path analysis and discussion of resource procurement risks (Chapter 9)
The IRP appendices, included as a Volume II, contain the items listed below.
Detailed load forecast (Volume II, Appendix A),
Fulfillment of regulatory compliance requirements, (Volume II, Appendix B),
Details about the public input process (Volume II, Appendix C),
DSM analysis and state implementation plans (Volume II, Appendix D),
PACIFICORP – 2015 IRP CHAPTER 2 – INTRODUCTION
17
Smart Grid discussion (Volume II, Appendix E),
Flexible resource needs assessment (Volume II, Appendix F),
Historical plant water consumption data (Volume II, Appendix G),
Updated wind integration cost study (Volume II, Appendix H),
Planning reserve margin study (Volume II, Appendix I),
Assessment of resource adequacy for western power markets(Volume II, Appendix J),
Detailed capacity expansion tables (Volume II, Appendix K),
Stochastic simulation results (Volume II, Appendix L),
Fact sheets for core cases and sensitivities (Volume II, Appendix M),
Wind, and solar capacity contributions (Volume II, Appendix N),
Distributed generation (DG) study(Volume II, Appendix O)
Anaerobic digester study (Volume II, Appendix P),
Energy storage study (Volume II, Appendix Q), and
Stochastic parameters (Volume II, Appendix R)
In an effort to improve transparency PacifiCorp is also providing data disks for the 2015 IRP.
These disks support and provide additional details for the analysis described within the
document. Disks containing confidential information are provided separately under non-
disclosure agreements, or specific protective orders in docketed proceedings.
The Role of PacifiCorp’s Integrated Resource Planning
PacifiCorp’s IRP mandate is to assure, on a long-term basis, an adequate and reliable electricity
supply at a reasonable cost and in a manner “consistent with the long-run public interest.”3 The
main role of the IRP is to serve as a roadmap for determining and implementing the Company’s
long-term resource strategy according to this IRP mandate. In doing so, it accounts for state
commission IRP requirements, the current view of the planning environment, corporate business
goals, and uncertainty. As a business planning tool, it supports informed decision-making on
resource procurement by providing an analytical framework for assessing resource investment
tradeoffs, including supporting RFP bid evaluation efforts. As an external communications tool,
the IRP engages numerous stakeholders in the planning process and guides them through the key
decision points leading to PacifiCorp’s preferred portfolio of generation, demand-side, and
transmission resources.
While PacifiCorp continues to plan on a system-wide basis, the Company recognizes that new
state resource acquisition mandates and policies add complexity to the planning process and
present challenges to conducting resource planning on this basis.
Public Process
The IRP standards and guidelines for certain states require PacifiCorp to have a public process
allowing stakeholder involvement in all phases of plan development. The Company organized
five state meetings, held 7 public meetings, some of which spanning two days, and hosted two
3 The Public Utility Commission of Oregon and Public Service Commission of Utah cite “long run public interest”
as part of their definition of integrated resource planning. Public interest pertains to adequately quantifying and
capturing for resource evaluation any resource costs external to the utility and its ratepayers. For example, the Public
Service Commission of Utah cites the risk of future internalization of environmental costs as a public interest issue
that should be factored into the resource portfolio decision-making process.
PACIFICORP – 2015 IRP CHAPTER 2 – INTRODUCTION
18
technical workshops to facilitate information sharing, collaboration, and expectations for the
2015 IRP. The topics covered all facets of the IRP process, ranging from specific input
assumptions to the portfolio modeling and risk analysis strategies employed. Table 2. lists the
public meetings/conferences and highlights major agenda items covered. Volume II, Appendix C
provides more details concerning the public input process.
Table 2.1 – 2015 IRP Public Meetings
Meeting Type Date Main Agenda Items
General Meeting 6/5/2014 2015 IRP kickoff meeting
State Meeting 6/10/2014 Washington state stakeholder comments
State Meeting 6/17/2014 Idaho state stakeholder comments
State Meeting 6/18/2014 Utah state stakeholder comments
State Meeting 6/19/2014 Wyoming state stakeholder comments
State Meeting 6/26/2014 Oregon state stakeholder comments
General Meeting (2-Day) 7/17/2014 Environmental Policy, Transmission, Portfolio Development
7/18/2014 Sensitivities, Demand Side Management and Load Forecast
General Meeting (2-Day) 8/7/2014 Supply-side Resources, Needs Assessment, Distributed Generation
8/8/2014 Portfolio Development, Wind Integration, Reliability metrics
General Meeting (2-Day) 9/25/2014 Stochastics, Portfolio Development and Selection, Grid efficiencies
9/26/2014 Anaerobic Digester, Volume 3 modeling, Additional study results
General Meeting 11/14/2014 Energy Imbalance Market Update, Portfolio Results
Confidential Workshop 12/8/2014 111(d) Scenario Maker Model (Salt Lake City)
Confidential Workshop 12/10/2014 111(d) Scenario Maker Model (Portland)
General Meeting (2-Day) 1/29/2015 Confidential Coal Analysis, Preferred Portfolio Overview, PaR Modeling
1/30/2015 Preferred Portfolio Selection, Sensitivities
General Meeting 2/26/2015 Draft Action Plan, Sensitivity Study Update,
In addition to the public meetings, PacifiCorp used other channels to facilitate resource planning-
related information sharing and consultation throughout the IRP process. The Company
maintains a public website (http://www.pacificorp.com/es/irp.html), an e-mail “mailbox”
(irp@pacificorp.com), and a dedicated IRP phone line (503-813-5245) to support stakeholder
communications and address inquiries by public participants. Additionally, a feedback form was
used to provide opportunities for stakeholders to submit additional input and ask questions
throughout the 2015 IRP public input process. The forms submitted may be found on the
comment section of PacifiCorp’s IRP website:
(http://www.pacificorp.com/es/irp/irpcomments.html)
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
19
CHAPTER 3 – THE PLANNING ENVIRONMENT
CHAPTER HIGHLIGHTS
Over the last ten years, North American natural gas markets have undergone a
remarkable paradigm shift. In 2009 the Marcellus shale play, centered in Pennsylvania
and West Virginia, produced 1.5 billion cubic feet per day (BCF/D) of natural gas, by
spring 2013 it was producing 8 BCF/D. Today, the Marcellus is producing 15 BCF/D and
the Utica, much of which underlies the Marcellus, produces another 1-2 BCF/D, a
compound annual growth rate of 48% since 2009. As such, the Marcellus and Utica plays
now account for 22% of the nation’s gas supply.
The challenge in gauging uncertainty in natural gas markets will be one of timing.
Producers respond to price signals, which usually lag market demand, which then creates
periods of asynchronous supply and demand.
U.S. Environmental Protection Agency (EPA) issued a proposed rule under §111(d) of
the Clean Air Act (111(d) or the 111(d) rule) to regulate greenhouse gas emissions from
existing sources in June 2014. At the same time, EPA issued a proposed rule for modified
or reconstructed sources. Comments on the proposed rule were due December 1, 2014,
and a final rule is expected summer 2015.
PacifiCorp signed a memorandum of understanding with the California Independent
System Operator (CAISO) February 12, 2013 to outline terms for the implementation of
an Energy Imbalance Market (EIM) by October 2014. The EIM between PacifiCorp and
CAISO launched at midnight November 1, 2014, following a 30-day test period. The new
market provides automated, optimized five-minute security constrained economic
dispatch across the combined balancing authority areas. The market immediately began
generating benefits for customers with significant economic transfers to California
occurring throughout the month of November and December with volumes exceeding
150,000 MWh.
Near-term procurement activities focused on three areas: natural gas supply and
transportation, the purchase and sale of Renewable Energy Credits and Oregon solar
resources.
Introduction
Chapter 3 profiles the major external influences that impact PacifiCorp’s long-term resource
planning as well as recent procurement activities. External influences include events and trends
affecting the economy, wholesale power and natural gas prices, and public policy and regulatory
initiatives that influence the environment in which PacifiCorp operates.
Concerning the power industry marketplace, the major issues addressed include capacity
resource adequacy and associated standards for the Western Electricity Coordinating Council
(WECC). As discussed elsewhere in this IRP, future natural gas prices and the role of gas-fired
generation and market purchases are some of the critical factors impacting the determination of
the preferred portfolio that best balances low-cost and low-risk planning objectives.
On the government policy and regulatory front, a significant issue facing PacifiCorp continues to
be planning for an eventual, but highly uncertain, climate change regulatory regime. This chapter
focuses on climate change regulatory initiatives. A high-level summary of the Company’s
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
20
greenhouse gas emissions mitigation strategy is included as well as a review of significant policy
developments for currently-regulated pollutants.
Other topics covered in this chapter include regulatory updates on the EPA, regional and state
climate change regulation, the status of renewable portfolio standards, and resource procurement
activities.
Wholesale Electricity Markets
PacifiCorp’s system does not operate in an isolated market. Operations and costs are tied to a
larger electric system known as the Western Interconnection which functions, on a day-to-day
basis, as a geographically dispersed marketplace. Each month, millions of megawatt-hours of
energy are traded in the wholesale electricity market. These transactions yield economic
efficiency by assuring that resources with the lowest operating cost are serving demand in a
region and by providing reliability benefits that arise from a larger portfolio of resources.
PacifiCorp actively participates in the wholesale market by making purchases and sales to keep
its supply portfolio in balance with customers’ constantly varying needs. This interaction with
the market takes place on time scales ranging from sub-hourly to years in advance. Without the
wholesale market, PacifiCorp or any other load serving entity would need to construct or own an
unnecessarily large margin of supplies that would go unutilized in all but the most unusual
circumstances and would substantially diminish its capability to cost effectively match delivery
patterns to the profile of customer demand.
The benefits of being able to access an integrated wholesale market have become even more
compelling with the increased penetration of intermittent generation such as solar and wind.
Intermittent generation tends to come online and go offline abruptly in congruence with
changing weather. For purposes of balancing sub-hourly demand and supply PacifiCorp
combined its resources with those of the California Independent System Operator (CAISO). The
resulting energy imbalance market (EIM) became operational November 1, 2014. Effective
October 1, 2015, it will also include the resources of Nevada Energy, and Puget Sound Energy as
of October 2016. The multi-service area footprint brings greater resource and geographical
diversity allowing for increased reliability and cost savings in balancing generation with demand
using 15-minute interchange scheduling and 5-minute dispatch. CAISO’s role is limited to the
sub-hourly scheduling and dispatching of participating EIM generators. CAISO does not have
any other grid operator responsibilities for PacifiCorp’s service areas. The EIM is discussed in
further detail in a subsequent section of Chapter 3.
As with all markets, electricity markets are faced with a wide range of uncertainties. However,
some uncertainties are easier to evaluate than others. Market participants are routinely studying
demand uncertainties driven by weather and overall economic conditions. Similarly, there is a
reasonable amount of data available to gauge resource supply developments. For example,
WECC publishes an annual assessment of power supply and any number of data services are
available that track the status of new resource additions. A review of the WECC power supply
assessment is provided in Volume II, Appendix J. The latest assessment, published in September
2014, indicates that even when including only existing and under-construction units, WECC as a
whole, has ample resources through 2024, the end of the study period (although California and
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
21
the WECC portion of Mexico4 only marginally exceed WECC’s calculated measure of resource
adequacy through 2024). The WECC subregions in which PacifiCorp operates, Northwest
Power Pool and Rocky Mountain Reserve Group, are capacity rich through 2024 and 2021,
respectively.
There are other uncertainties that are more difficult to analyze and that possess heavy influence
on the direction of future prices. One such uncertainty is the evolution of natural gas prices over
the course of the IRP planning horizon. Given the increased role of natural gas-fired generation,
gas prices have become a critical determinant in establishing western electricity prices, and this
trend is expected to continue over the term of this plan’s decision horizon. Another critical
uncertainty that weighs heavily on the 2015 IRP, as in past IRPs, is the prospect of future
greenhouse gas policy. A broad landscape of proposals aiming to curb greenhouse gas emissions
continues to widen the range of plausible future energy costs, and consequently, future electricity
prices. PacifiCorp’s official forward price curve incorporates potential impacts of EPA’s
proposed 111(d) rule. Other price scenarios developed for the IRP consider impacts of potential
future CO2 emission policies incremental to requirements established in EPA’s proposed 111(d)
rule. Each of these uncertainties is explored in the cases developed for this IRP and are discussed
in more detail below.
Natural Gas Uncertainty
Over the last ten years, North American natural gas markets have undergone a remarkable
paradigm shift. Figure 3. shows historical day-ahead prices at the Henry Hub benchmark from
January 1, 2005 through December 31, 2014. Over this period, day-ahead gas prices settled at a
high of $15.39/MMBtu on December 13, 2005 and at a low of $1.82/MMBtu on April 20, 2012.
Prices spiked December 2005 after a wave of hurricanes devastated the Gulf region in what
turned out to be the most active hurricane season in recorded history. Prices later topped
$13/MMBtu in the summer of 2008 when NYMEX oil futures climbed above $145 per barrel
(bbl) in the summer preceding the global credit crisis. By early 2009 slow economic growth
coupled with abundant shale gas supplies pressured day-ahead natural gas prices to dip to an
average of $3.92/MMBtu. Prices continued to tick down with day-ahead natural gas prices
averaging $2.75/MMBtu in 2012 and rebounding to $4.32/MMBtu in 2014. The relative price
placidity since 2009, labeled the “Shale Gale”, reflects a story of supply – mostly Appalachian
supply.5
In 2009 the Marcellus shale play, centered in Pennsylvania and West Virginia, produced 1.5
billion cubic feet per day (BCF/D) of natural gas, by spring 2013 it was producing 8 BCF/D.
Today, the Marcellus is producing 15 BCF/D and the Utica, much of which underlies the
Marcellus, produces another 1-2 BCF/D, a compound annual growth rate of 48% since 2009. As
such, the Marcellus and Utica plays now account for 22% of the nation’s gas supply. The price
spikes that have occurred in the last few years do not reflect commodity shortages, per se, but
instead, inadequate take-away capacity, as experienced February 2014 during a prolonged cold
snap. As new take-away capacity comes online, coupled with the reversal of key pipeline flows,
Appalachian gas displaces eastern-bound Rockies gas, southeastern-bound Henry Hub gas, and
4 The northern portion of Baja California, Mexico. 5 Other significant shale gas plays: Eagle Ford (TX); Haynesville (LA/TX); Permian (TX/NM); Niobrara (CO/WY);
Bakken (ND/MT).
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
22
U.S. northeastern-bound Canadian gas.6 In short, supply from the Marcellus and Utica plays
continues to grow as volumes and costs prove to be, respectively, higher and lower than
anticipated.
Figure 3.1 – Henry Hub Day-ahead Natural Gas Price History
Source: Intercontinental Exchange (ICE), Over the Counter Day-ahead Index
Historically, depletion of conventional mature resources largely offset unconventional resource
growth. But as shale gas “came into its own,” production gains outpaced depletion and, coupled
with reduced demand, sent the average day-ahead 2012 price to $2.75/MMBtu. Prices recovered
in 2013-2014 as demand rebuilt but still remained, on average, below $4.50/MMBtu. Figure 3.2
through Figure 3.4 show U.S. natural gas production by source and location.
6 Natural gas has historically flowed from the gulf coast to northern markets. Both Texas Eastern and Tennessee Gas
pipelines have reversed flow segments to bring Appalachian gas south. Similarly, the Rockies Express Pipeline,
built to flow west to east, added the Seneca Lateral line to bring Appalachian gas to Midwest markets.
*Decreased
demand from
economic down
turn
*Technological
advancements
yield growth in
“Shale Gale”
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
23
Figure 3.2 – U.S. Dry Natural Gas Production
Source: 2014 Annual Energy Outlook, U.S. Department of Energy, Energy Information Administration
Figure 3.3 – Lower 48 States Shale Plays
Source: U.S. Department of Energy, Energy Information Administration
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
24
Figure 3.4 – Plays Accounting for all Natural Gas Production Growth 2011 -2013
Source: Drilling Productivity Report, January 2015. U.S. Department of Energy, Energy Information Administration
However, even with this surfeit of gas the market is not without risks. Figure 3.5 shows Henry
Hub NYMEX futures, as of January 27, 2015. While the futures are mildly in contango, price
expectations offer little “signal-to-drill” in all but the lowest-cost plays. As such, producers are
somewhat a victim of their own success. The fallout from reduced drilling is limited in the short
term; there is no incentive to close in existing wells since the variable cost of ongoing production
is small and technology efficiencies in drilling and re-fracking continue to yield productivity
gains. Given the recent precipitous drop in crude prices, there will be some price support coming
from decreased associated gas volumes as oil-targeted drilling is curtailed but it will be gradual.
This is noteworthy since approximately 20% of supply comes from associated gas.7 But, even
with crude prices below $55/bbl there is little incentive for U.S. shale oil producers to lay down
rigs right away because: 1) many U.S. shale oil producers have already hedged their 2015
production so they are covered regardless of spot price; 2) variable operating costs (not full cycle
costs) are around $40/bbl for existing shale oil wells; and 3) nobody wants to be the first to cut
their production – only to provide price support for competitors.
In the longer term the current lack of a “signal-to-drill” price sets the stage for asynchronous
supply and demand, creating price volatility as supply chases demand – and a demand surge can
be expected. While the Marcellus is prolific and breakeven costs continue to decline many other
plays are higher cost with full-cycle breakeven costs greater than $4.00/MMBtu. Thus, boom and
bust cycles are likely since producers respond to price signals vis-à-vis demand expectations and
price signals lag demand. To make matters worse, in the past, increased power sector coal burn
could displace gas and dampen volatility but, with over 60 GWs expected to retire by 2020,
coal’s ability to mitigate natural gas volatility will be severely limited.8
7 Associated gas tends to be insensitive to the price of natural gas since it is produced as a byproduct to oil and/or
liquids targeted drilling. 8 Annual Energy Outlook 2014, Department of Energy, Energy Information Administration
Marcellus
& Utica
Bakken
Niobrara
Haynesville
e
Eagle Ford
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
25
Figure 3.5 – Henry Hub NYMEX Futures
The burgeoning demand for natural gas, prior to 2020, is expected to come from liquefied natural
gas (LNG) exports, industry, electricity generation, and pipeline exports to Mexico.
Prior to 2009, forecasters expected that a gradual restoration of improved supply/demand balance
would be achieved largely by growth in LNG imports. As such, there was tremendous growth in
global liquefaction facilities located in major producing regions. This, in turn, led to significant
investments in regasification capacity to accommodate future LNG imports; the U.S. has eleven
existing LNG import terminals. However, the growth of domestic unconventional supplies,
volumetric gains from technological efficiencies, and declining breakeven costs changed the
need for LNG imports to one of LNG exports. Today, liquefaction, not regasification, facilities
are being proposed with five having already been approved.9 As such, the U.S. is anticipated to
export 0.5 BCF/D starting in 2016 with volumes soaring to as much as 20 BCF/D by 2030,
depending on source and scenario.10 Several factors contribute to a wide range of price
uncertainty in the mid- to long-term. Increasing well productivity, technological innovations, and
large volumes of price-insensitive associated gas have flattened the supply curve. Moreover, low
oil prices will dampen demand for new LNG export facilities and for oil-to-gas substitution in
the transportation sector.11 Supporting upside price risks are: 1) surging demand; 2) higher
breakeven costs as producers call on higher-cost gas; 3) possible environmental restrictions on
hydraulic fracturing thereby increasing recovery costs; and 4) reduced associated gas volumes as
low crude prices diminish oil-targeted drilling.
9 Four of the five approvals were for conversion of existing regasification terminals to include liquefaction. The fifth
project, in Corpus Christi, is the first approved LNG greenfield project. 10 Annual Energy Outlook 2014, United States Department of Energy, Energy Information Administration. 11 U.S. LNG export facilities, currently under construction, are safe since the export capacity is under long-term
purchase agreements.
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
20
2
7
$/
M
M
B
t
u
Annual Strip as of Jan 27, 2015
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
26
The continued build out of Appalachian take-away capacity, coupled with flow reversals on key
pipelines, will keep western regional natural gas markets well-connected to North American
markets as a whole. Rocky Mountain production coupled with the westward push of Marcellus
volumes will maintain downward pressure on Opal vis-à-vis Henry Hub. Even West Coast prices
have been pushed down as more Rockies gas, previously destined for the East, moves west to
compete with Canadian gas to serve California. In the Northwest, where natural gas markets are
influenced by production and imports from Canada, prices at Sumas have traded at a premium
relative to AECO. This is likely to continue as AECO loses market share to the Marcellus in
serving AECO’s Ontario, Midwest, and even West Coast markets. In short, the challenge in
gauging the uncertainty in natural gas markets will be one of timing. Producers respond to price
signals, which usually lag market demand, which then creates periods of asynchronous supply
and demand.
The Future of Federal Environmental Regulation and Legislation
PacifiCorp faces a continuously changing environment with regard to electricity plant emission
regulations. Although the exact nature of these changes remains uncertain, they are expected to
impact the cost of future resource alternatives and the cost of existing resources in the
Company’s generation portfolio. PacifiCorp monitors these regulations to determine the potential
impact on its generating assets. PacifiCorp also participates in rulemaking processes by filing
comments on various proposals, participating in scheduled hearings, and providing assessments
of proposals.
Federal Climate Change Legislation
To date, no federal legislative climate change proposal has successfully been passed by both the
U.S. House of Representatives and the U.S. Senate for consideration by the President. The 113th
Congress was challenged by the President to pursue a bipartisan, market-based solution to
climate change. The President stated that if Congress did not act soon, he would direct his
Cabinet to implement executive action to reduce greenhouse gas (GHG) emissions. To date, such
bipartisan action has not occurred.
Accordingly, on June 25, 2013, President Obama directed the EPA to complete GHG standards
for both new and existing power plants. With regard to new sources, the EPA issued a re-
proposal of standards for carbon emissions from new electric generating units in September
2013. On June 2, 2014, EPA issued its Clean Power Plan proposal addressing carbon emissions
from existing power plants.12 The proposed standards are expected to be finalized by summer
2015, with implementation of regulations as proposed in state implementation plans required by
summer 2016, which would require approval by the EPA. Further discussion is included below
regarding how the EPA proposes to approach carbon regulation under the Clean Air Act.
Federal Renewable Portfolio Standards
Since 2010, no significant activity has occurred with respect to the development of a federal
renewable portfolio standard (RPS). In addition, current political environments are shifting focus
from items such as the extension of federal incentives for renewables and portfolio standards to
12 Carbon Pollution Emission Guidelines for Existing Stationary Sources: Electric Utility Generation Units, 79 Fed.
Reg. 117 at 34836 (June 18, 2014)
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
27
the EPA’s development of carbon standards. Accordingly, PacifiCorp’s 2015 IRP assumes no
federal RPS requirement over the course of the planning horizon.
EPA Regulatory Update – Greenhouse Gas Emissions
New Source Review / Prevention of Significant Deterioration (NSR / PSD)
On May 13, 2010, the EPA issued a final rule addressing GHG emissions from stationary
sources under the Clean Air Act (CAA) permitting programs, known as the “tailoring” rule. This
final rule sets thresholds for GHG emissions that define when permits under the New Source
Review / Prevention of Significant Deterioration and Title V Operating Permit programs are
required for new and existing industrial facilities. This final rule “tailors” the requirements of
these CAA permitting programs to limit which facilities will be required to obtain PSD and Title
V permits. The rule also establishes a schedule that initially focuses CAA permitting programs
on the largest sources with the most CAA permitting experience. Finally, the rule expands to
cover the largest sources of GHGs that may not have been previously covered by the CAA for
other pollutants.
Guidance for Best Available Control Technology (BACT)
On November 10, 2010, the EPA published a set of guidance documents for the tailoring rule to
assist state permitting authorities and industry permitting applicants with the Clean Air Act PSD
and Title V permitting for sources of GHGs. Among these publications was a general guidance
document entitled “PSD and Title V Permitting Guidance for Greenhouse Gases,” which
included a set of appendices with illustrative examples of Best Available Control Technology
determinations for different types of facilities, which are a requirement for PSD permitting. The
EPA also provided white papers with technical information concerning available and emerging
GHG emission control technologies and practices, without explicitly defining BACT for a
particular sector. In addition, the EPA has created a “Greenhouse Gas Emission Strategies
Database,” which contains information on strategies and control technologies for GHG
mitigation for two industrial sectors: electricity generation and cement production.
The guidance does not identify what constitutes BACT for specific types of facilities, and does
not establish absolute limits on a permitting authority’s discretion when issuing a BACT
determination for GHGs. Instead, the guidance emphasizes that the five-step top-down BACT
process for criteria pollutants under the CAA generally remains the same for GHGs. While the
guidance does not prescribe BACT in any area, it does state that GHG reduction options that
improve energy efficiency will be BACT in many or most instances because they cost less than
other environmental controls (and may even reduce costs) and because other add-on controls for
GHGs are limited in number and are at differing stages of development or commercial
availability. Utilities have remained very concerned about the NSR implications associated with
the tailoring rule (the requirement to conduct BACT analysis for GHG emissions) because of
great uncertainty as to what constitutes a triggering event and what constitutes BACT for GHG
emissions.
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
28
New Source Performance Standards (NSPS) for Carbon Emissions – Clean
Air Act § 111(b)
New Source Performance Standards (NSPS) are established under the CAA for certain industrial
sources of emissions determined to endanger public health and welfare. NSPS must be reviewed
every eight years. While NSPS were intended to focus on new and modified sources and
effectively establish the floor for determining what constitutes BACT, the emission guidelines
will apply to existing sources as well. In September 2013, the EPA issued a revised NSPS
proposal for new fossil-fueled generating facilities. The new proposal would limit emissions of
carbon dioxide to 1,000 pounds per megawatt hour (MWh) for large natural gas plants (roughly
100 MW or larger) and 1,100 pounds per MWh for smaller natural gas plants. The revised
proposal continues to largely exempt simple cycle combustion turbines from meeting the
standards. The standard for new coal units (1,000 to 1,100 pounds per MWh) would be set based
on the application of partial carbon capture and sequestration technology. The public comment
period closed in May 2014, and a final rule is expected summer 2015.
Carbon Emission Guidelines for Existing Sources – Clean Air Act § 111(d)
Consistent with the presidential directive mentioned above, the EPA issued a proposed rule,
known as the Clean Power Plan, for existing sources in June 2014. At the same time, the EPA
issued a proposed rule for modified or reconstructed sources. Comments on the proposed rule
were due December 1, 2014, and a final rule is expected summer 2015. States will be required to
submit compliance plans by summer 2016; however, a state may seek an extension to 2017 for
individual plans or to 2018 for multi-state plans. The EPA has also indicated that it will propose
a federal plan which states may adopt in lieu of submitting a state plan.
Under section 111(d) of the Clean Air Act, states are required to develop standards of
performance, which are the degree of emission limitation achievable through the application of
the best system of emission reduction (BSER). In the proposed rule, the EPA set forth emission
reduction goals, expressed as a pounds of carbon dioxide per megawatt hour (lb/MWh) rate, for
each state based on its formulation of BSER, which is made up of four building blocks: 1) heat
rate improvements at existing coal-fueled resources; 2) increased utilization of natural gas
resources; 3) increased deployment of zero-emitting resources; and 4) increased end-use energy
efficiency. The EPA applied the four building blocks to the loads and resources in each state as a
whole; the resulting emission reduction goal is not a requirement for individual resources but
rather the goal applies on a portfolio basis to all of the resources and loads within a state. States
would be required to meet the emission reduction goal by 2030, as well as an interim goal, which
would be met on average over the ten-year period 2020-2029. Each state may propose how to
meet its goal and is not required to achieve emission reductions in the same manner as that used
by the EPA to calculate the goal.
In this IRP, the Company provides extensive analysis of potential future resource portfolios
under a variety of compliance approaches to the EPA’s proposed Clean Power Plan. However,
significant uncertainty regarding the implementation of this program continues to exist. Once
final, the rule is likely to be subject to litigation, the outcome of which may not be known for
many years. In addition, the makeup of the final rule and the manner in which states choose to
implement the program will have a significant impact on ultimate compliance approaches and
similarly may not be known for some years. PacifiCorp will continue to monitor and engage in
the EPA’s rulemaking processes as well as with state agencies and a wide range of stakeholders
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
29
in order to continue to assess the potential impacts of the Clean Power Plan on PacifiCorp’s
integrated resource planning.
EPA Regulatory Update – Non-Greenhouse Gas Emissions
Clean Air Act Criteria Pollutants – National Ambient Air Quality Standards
The CAA requires the EPA to set National Ambient Air Quality Standards (NAAQS) for certain
pollutants considered harmful to public health and the environment. For a given NAAQS, the
EPA and/or a state identifies various control measures that, once implemented, are meant to
achieve an air quality standard for a certain pollutant, with each standard rigorously vetted by the
scientific community, industry, public interest groups, and the general public.
Particulate matter (PM), sulfur dioxide (SO2), ozone (O3), nitrogen dioxide (NO2), carbon
monoxide (CO), and lead are often grouped together because under the CAA, each of these
categories is linked to one or more NAAQS. These “criteria pollutants”, while undesirable, are
not toxic in typical concentrations in the ambient air. Under the CAA, they are regulated
differently from other types of emissions, such as hazardous air pollutants and GHGs. Within the
past few years, the EPA established new standards for particulate matter, sulfur dioxide, and
nitrogen dioxide.
On November 25, 2014, the EPA issued a proposed rule to modify the standards for ground-level
ozone. Comments on the proposed rule are due March 17, 2015. If revised standards are
finalized, the EPA will designate areas in the country as being in “attainment” or
“nonattainment” of the revised standards. Under the proposed rule, the EPA would make these
designations by October 2017, and states would have until 2020 or 2037, depending on the ozone
level in the area, to comply with the revised standards.
Cross-State Air Pollution Rule
In July 2011, the EPA finalized its Cross-State Air Pollution Rule (CSAPR), which required new
reductions in SO2 and nitrogen oxide (NOX) emissions from large stationary sources, including
power plants, located in 31 states and the District of Columbia. Litigation in the D.C. Circuit
Court of Appeals resulted in a stay on the implementation of the CSAPR in December 2011.
Ultimately, in April 2014, the U.S. Supreme Court reversed a D.C. Circuit Court of Appeals
opinion that vacated the CSAPR. CSAPR Phase I implementation is now scheduled for 2015.
PacifiCorp does not own generating units in states identified by the CSAPR and thus will not be
directly impacted; however, the Company intends to monitor amendments to these rules closely
in the event that the scope of a replacement rule extends the geographic scope of impacted states.
Regional Haze
The EPA’s Regional Haze Rule, finalized in 1999, requires states to develop and implement
plans to improve visibility in certain national park and wilderness areas. On June 15, 2005, the
EPA issued final amendments to its Regional Haze Rule. These amendments apply to the
provisions of the Regional Haze Rule that require emission controls known as the Best Available
Retrofit Technology (BART), for industrial facilities meeting certain regulatory criteria with
emissions that have the potential to impact visibility. These pollutants include fine particulate
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
30
matter (PM), NOX, SO2, certain volatile organic compounds, and ammonia. The 2005
amendments included final guidelines, known as BART guidelines, for states to use in
determining which facilities must install controls and the type of controls the facilities must use.
States were given until December 2007 to develop their implementation plans, in which states
were responsible for identifying the facilities that would have to reduce emissions under BART
guidelines as well as establishing BART emissions limits for those facilities. States are also
required to periodically update or revise their implementation plans to reflect current visibility
data and the effectiveness of the state’s long-term strategy for achieving reasonable progress
toward visibility goals. States will be required to submit the next periodic update by July 31,
2018.
The Regional Haze Rule may drive additional SO2 and NOx reductions, particularly from
facilities operating in the Western United States. This includes the states of Utah and Wyoming
where PacifiCorp operates generating units, in Arizona where PacifiCorp owns but does not
operate a coal unit, and in Colorado and Montana where PacifiCorp has partial ownership in
generating units operated by others, but is nonetheless subject to the Regional Haze Rule.
In May 2011, the state of Utah issued a Regional Haze state implementation plan (SIP) requiring
the installation of SO2, NOx and PM controls on Hunter Units 1 and 2 and Huntington Units 1
and 2. In December 2012, the EPA approved the SO2 portion of the Utah Regional Haze SIP and
disapproved the NOx and PM portions. The EPA’s approval of the SO2 SIP was appealed to
federal circuit court. In addition, PacifiCorp and the state of Utah appealed the EPA’s
disapproval of the NOx and PM SIP. PacifiCorp and the state’s appeals were dismissed. In
addition, and separate from the EPA’s approval process and related litigation, the Utah Division
of Air Quality undertook an additional BART analysis for each of Hunter Units 1 and 2 and
Huntington Units 1 and 2, which will be provided to the EPA as a supplement to the existing
Utah SIP. In October 2014, Utah proposed to amend its SIP with the updated BART analysis
concluding that no incremental controls (beyond those included in the May 2011 SIP) were
required at the Hunter and Huntington units. The public comment period for the amended SIP
closed December 22, 2014, and the SIP is expected to be submitted for approval to the EPA in
early 2015.
On January 10, 2014, the EPA issued a final action in Wyoming requiring installation of the
following NOx and PM controls at PacifiCorp facilities:
Naughton Unit 3 by December 31, 2014 - selective catalytic reduction (SCR) equipment
and a baghouse
Jim Bridger Unit 3 by December 31, 2015 - SCR equipment
Jim Bridger Unit 4 by December 31, 2016 - SCR equipment
Jim Bridger Unit 2 by December 31, 2021 - SCR equipment
Jim Bridger Unit 1 by December 31, 2022 - SCR equipment
Dave Johnston Unit 3 - SCR within five years or a commitment to shut down in 2027
Wyodak - SCR equipment within 5 years
Difference aspects of the EPA’s final action were appealed by a number of entities. PacifiCorp
appealed the EPA’s action requiring SCR at Wyodak. PacifiCorp requested, and was granted, a
stay of the EPA’s action as it pertains to Wyodak pending resolution of the appeals. A final
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
31
decision on the appeal is expected in 2016. With respect to Naughton Unit 3, in its final action
the EPA indicated support for the conversion of the unit to natural gas and that it would expedite
action relative to consideration of the gas conversion once the state of Wyoming submitted the
requisite SIP amendment. PacifiCorp has obtained a construction permit and revised Regional
Haze BART permit from the state of Wyoming to convert Naughton Unit 3 to natural gas in
2018. Wyoming has not yet submitted a revised Regional Haze SIP incorporating this alternative
compliance approach to the EPA.
The state of Arizona issued a Regional Haze SIP requiring, among other things, the installation
of SO2, NOx and PM controls on Cholla Unit 4, which is owned by PacifiCorp but operated by
Arizona Public Service. The EPA approved in part, and disapproved in part, the Arizona SIP and
issued a federal implementation plan (FIP) requiring the installation of SCR equipment on
Cholla Unit 4. PacifiCorp filed an appeal regarding the FIP as it relates to Cholla Unit 4, and the
Arizona Department of Environmental Quality and other affected Arizona utilities filed separate
appeals of the FIP as it relates to their interests. All appeals are pending. PacifiCorp is working
with Arizona Public Service as well as state and federal agencies on an alternate compliance
approach and associated approvals for Cholla Unit 4.
The state of Colorado issued a Regional Haze SIP requiring, among other things, the installation
of selective non-catalytic reduction (SNCR) technology at Craig Unit 1 by 2018. Environmental
groups appealed the EPA’s action, in which PacifiCorp intervened in support of the EPA. In July
2014, parties to the litigation, other than PacifiCorp, entered into a settlement agreement which
requires installation of SCR equipment at Craig Unit 1 in 2021. Following settlement, the EPA
filed a motion with the Tenth Circuit Court of Appeals seeking a voluntary remand to the EPA of
those portions of the EPA’s approval of Colorado’s SIP relating to Craig Unit 1. This motion is
pending. PacifiCorp opposed the settlement agreement between the EPA and other parties to the
litigation.
Mercury and Hazardous Air Pollutants
The Mercury and Air Toxics Standards (MATS) became effective April 16, 2012. The MATS
rule requires that new and existing coal-fueled facilities achieve emission standards for mercury,
acid gases and other non-mercury hazardous air pollutants. Existing sources are required to
comply with the new standards by April 16, 2015. Individual sources may be granted up to one
additional year, at the discretion of the Title V permitting authority, to complete installation of
controls or for transmission system reliability reasons. On November 25, 2014, the U.S. Supreme
Court announced that it will consider challenges to MATS specifically reviewing whether the
EPA unreasonably refused to consider costs in making its determination to regulate hazardous
pollutants from power plants. At this time, no requests for stay have been filed and the MATS
rule remains in place pending a decision from the U.S. Supreme Court, expected summer 2015.
Emission reduction projects completed to date or currently permitted or planned for installation,
including the scrubbers, baghouses and electrostatic precipitators required under other the EPA
requirements, are consistent with achieving the MATS requirements and will support
PacifiCorp’s ability to comply with the final standards for acid gases and non-mercury metallic
hazardous air pollutants. PacifiCorp will be required to take additional actions to reduce mercury
emissions through the installation of controls or use of reagent injection at certain of its coal-
fueled generating facilities to otherwise comply with the standards.
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
32
PacifiCorp continues to plan for retirement of its Carbon facility in April 2015 as the least-cost
alternative to comply with MATS and other environmental regulations for that facility.
Implementation of the transmission system modifications necessary to maintain system
reliability following disconnection of the Carbon facility generators from the grid is underway.
Coal Combustion Residuals
Coal Combustion Residuals (CCRs), including coal ash, are the byproducts from the combustion
of coal in power plants. CCRs have historically been considered exempt wastes under an
amendment to the Resource Conservation and Recovery Act (RCRA); however, the EPA issued
a final rule in December 2014 to regulate CCRs for the first time. Under the final rule, the EPA
will regulate CCRs as nonhazardous waste under Subtitle D of RCRA and establish minimum
nationwide standards for the disposal of coal combustion residuals. The final rule will be
effective 180 days from publication in the federal register. Under the final rule, surface
impoundments and landfills utilized for CCRs may need to close unless they can meet more
stringent regulatory requirements.
Water Quality Standards
Cooling Water Intake Structures
The federal Water Pollution Control Act (“Clean Water Act”) establishes the framework for
maintaining and improving water quality in the United States through a program that regulates,
among other things, discharges to and withdrawals from waterways. The Clean Water Act
requires that cooling water intake structures reflect the “best technology available for minimizing
adverse environmental impact” to aquatic organisms.
In May 2014, the EPA issued a final rule, effective October 2014, under §316(b) of the Clean
Water Act to regulate cooling water intakes at existing facilities. The final rule establishes
requirements for electric generating facilities that withdraw more than two million gallons per
day, based on total design intake capacity, of water from waters of the U.S. and use at least 25
percent of the withdrawn water exclusively for cooling purposes. PacifiCorp’s Dave Johnston
generating facility withdraws more than two million gallons per day of water from waters of the
U.S for once-through cooling applications. Jim Bridger, Naughton, Gadsby, Hunter, Carbon and
Huntington generating facilities currently utilize closed cycle cooling towers but withdraw more
than two million gallons of water per day. The rule includes impingement (i.e., when fish and
other aquatic organisms are trapped against screens when water is drawn into a facility’s cooling
system) mortality standards and entrainment (i.e., when organisms are drawn into the facility)
standards. The standards will be set on a case by case basis to be determined through site-
specific studies and will be incorporated into each facility’s discharge permit.
Effluent Limit Guidelines
EPA first issued effluent guidelines for the Steam Electric Power Generating Point Source
Category (i.e., the Steam Electric effluent guidelines) in 1974 with subsequent revisions in 1977
and 1982. On April 19, 2013, the EPA proposed revised effluent limit guidelines and is required,
under the terms of a stipulated extension to a consent decree, to finalize the rule by September
2015. The effluent limit guidelines will also apply to gas-fired generation.
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
33
State Climate Change Regulation
While national GHG legislation has not been successfully adopted, state initiatives continue with
the active development of climate change regulations that will impact PacifiCorp.
California
An executive order signed by California’s governor in June 2005 would reduce GHG emissions
in that state to 2000 levels by 2010, to 1990 levels by 2020 and 80 percent below 1990 levels by
2050. In 2006, the California Legislature passed, and Governor Schwarzenegger signed,
Assembly Bill 32, the Global Warming Solutions Act of 2006, which set the 2020 GHG
emissions reduction goal into law. It directed the California Air Resources Board (CARB) to
begin developing discrete early actions to reduce GHG while also preparing a scoping plan to
identify how best to reach the 2020 limit.
Pursuant to the authority of the Global Warming Solutions Act, in October 2011, CARB adopted
a GHG cap-and-trade program with an effective date of January 1, 2012; compliance obligations
were imposed on regulated entities beginning in 2013. The first auction of GHG allowances was
held in California in November 2012 and the second auction in February 2013. PacifiCorp is
required to sell, through the auction process, its directly allocated allowances, and purchase the
required amount of allowances necessary to meet its compliance obligations.
In October 2013, CARB kicked off an Assembly Bill 32 scoping plan update designed to build
upon the initial scoping plan. The scoping plan update defines climate change priorities for the
next five years and sets the groundwork for post-2020 climate goals. A proposed first update
issued in February 2014 indicated a post-2020 GHG reduction goal of 80 percent below 1990
levels by 2050.
Oregon and Washington
In 2007, the Oregon Legislature passed House Bill 3543 Global Warming Actions which
establishes GHG reduction goals for the state that (i) by 2010, cease the growth of Oregon
greenhouse gas emissions; (ii) by 2020, reduce greenhouse gas levels to 10 percent below 1990
levels; and (iii) by 2050, reduce greenhouse gas levels to at least 75 percent below 1990 levels.
In 2009, the Legislature passed Senate Bill 101 which requires the Oregon Public Utility
Commission (OPUC) to report to the Legislature before November 1 of each even-numbered
year on the estimated rate impacts for Oregon’s regulated electric and natural gas companies
associated with meeting the GHG reduction goals of 10 percent below 1990 levels by 2020 and
15 percent below 2005 levels by 2020. The OPUC submitted its most recent report November 1,
2012.
On July 3 2013, the Oregon Legislature passed Senate Bill 306 which directs the legislative
revenue officer to prepare a report examining the feasibility of imposing a clean air fee or tax as
a new revenue option. The report is to include an evaluation of how to treat imported and
exported energy sources. A final report was published December 2014.
In 2008, the Washington State Legislature approved the Climate Change Framework E2SHB
2815, which establishes state GHG emissions reduction limits. Washington’s emission limits are
to (i) by 2020, reduce emissions to 1990 levels; (ii) by 2035, reduce emissions to 25 percent
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
34
below 1990 levels; and (iii) by 2050, reduce emissions to 50 percent below 1990 levels, or 70
percent below Washington’s forecasted emissions in 2050.
Greenhouse Gas Emission Performance Standards
California, Oregon and Washington have all adopted GHG emission performance standards
applicable to all electricity generated within the state or delivered from outside the state that is no
higher than the GHG emission levels of a state-of-the-art combined-cycle natural gas generation
facility. The standards for Oregon and California are currently set at 1,100 pounds of carbon
dioxide equivalent per MWh, which is defined as a metric measure used to compare the
emissions from various GHG based upon their global warming potential. In March 2013, the
Washington Department of Commerce issued a new rule, effective April 6, 2013, lowering the
emissions performance standard to 970 pounds of carbon dioxide per MWh.
Renewable Portfolio Standards
An RPS requires a retail seller of electricity to include in its resource portfolio a certain amount
of electricity from renewable energy resources, such as wind, geothermal and solar energy. The
retailer can satisfy this obligation by using renewable energy from its own facilities, purchasing
renewable energy from another supplier’s facilities, using renewable energy certificates (RECs)
which certify renewable energy has been created, or a combination of all of these.
RPS policies are currently implemented at the state level and vary considerably in their
requirements with respect to renewable targets (percentages), target dates, resource/technology
eligibility, applicability of existing plants and contracts, arrangements for enforcement and
penalties, and whether they allow REC trading. By the end of 2014, twenty-nine states, the
District of Columbia and two territories had adopted a mandatory RPS, nine states and two
territories had adopted RPS goals.13
Within PacifiCorp’s service territory, California, Oregon, and Washington have each adopted a
mandatory RPS and Utah has adopted an RPS goal. Each of these states’ legislation and
requirements are summarized in Table 3.1, with additional discussion below.
Table 3.1 – State RPS Requirements
State California Oregon Washington Utah
Legislation Senate Bill 1078
(2002)
Assembly Bill 200
(2005)
Senate Bill 107 (2006)
Senate Bill 2 First
Extraordinary Session
(2011)
Senate Bill 838 Oregon
Renewable Energy Act
(2007)
House Bill 3039 (2009)
Initiative Measure
No. 937 (2006)
Senate Bill 202
(2008)
13 Database of State Incentives for Renewables & Efficiency (DSIRE)
http://www.dsireusa.org/documents/summarymaps/RPS_map.pdf
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
35
State California Oregon Washington Utah
Requirement
or Goal
20% by 2020
Average of 20%
through 2013
25% by December 31,
2016
33% by December 31,
2020 and beyond
Based on the retail
load for that
compliance period
At least 5% of load
through December 31,
2014
At least 15% of load
through December 31,
2019
At least 20% of load
through December 31,
2024
At least 25% of load
for 2025 and forward.
Based on the retail load
for that year
Invest in 20 MW solar
by 2020 – PacifiCorp,
PGE and Idaho Power
combined
At least 3% by
January 1, 2012
At least 9% by
January 1, 2016
At least 15% by
January 1, 2020
Annual targets are
based on the
average of the
utility’s load for
the previous two
years
Goal of 20% by 2025
(must be cost
effective
Annual targets are
based on the adjusted
retail sales for the
calendar year 36
months prior to the
target year
Adjustments for
generated or
purchased from
qualifying zero
carbon emissions and
carbon capture
sequestration and
DSM
California
California originally established its RPS program with passage of Senate Bill 1078 in 2002.
There have been several bills that have since been passed into law to amend the program. In the
2011 1st Extraordinary Special Session, the California Legislature passed Senate Bill 214 (SB 2
(1X)) to increase California’s RPS to 33 percent by 2020. SB 2 (1X) also expanded the RPS
requirements to all retail sellers of electricity and publicly owned utilities, and established the
following targets for renewable procurement based on retail load:
Extends the current 2010 mandate of procuring 20 percent of electricity from renewable
resources out to December 31, 2013;
Requires 25 percent of electricity to come from renewable resources by December 31,
2016; and,
Requires 33 percent of electricity to come from renewable resources by December 31,
2020, and each year thereafter.
Qualifying renewable resources include solar thermal electric, photovoltaic, landfill gas, wind,
biomass, geothermal, municipal solid waste, energy storage, anaerobic digestion, small
hydroelectric, tidal energy, wave energy, ocean thermal, biodiesel, and fuel cells using renewable
fuels. Renewable resources must be certified as eligible for the California RPS by the California
Energy Commission and tracked in the Western Renewable Energy Generation Information
System (WREGIS).
In addition to increasing the target from 20 percent in 2010 to 33 percent in 2020 and each year
thereafter, SB 2 (1X) also created multi-year compliance periods. The California Public Utilities
Commission approved the methodology for calculating the multi-year compliance periods and
years thereafter; this is provided below in Table 3.2.
14 http://www.leginfo.ca.gov/pub/11-12/bill/sen/sb_0001-0050/sbx1_2_bill_20110412_chaptered.pdf
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
36
Table 3.2 – California Compliance Period Requirements
Compliance Period 1: 2011-2013
20% * 2011 Retail Sales +
20% * 2012 Retail Sales +
20% * 2013 Retail Sales
Compliance Period 2: 2014-2016
21.7% * 2014 Retail Sales +
23.3% * 2015 Retail Sales +
25% * 2016 Retail Sales
Compliance Period 3: 2017-2020
27% * 2017 Retail Sales +
29% * 2018 Retail Sales +
31% * 2019 Retail Sales +
33% * 2020 Retail Sales
2021 and Beyond 33% * Annual Retail Sales
SB 2 (1X) also established new “portfolio content categories” for RPS procurement, which
delineated the type of renewable product that may be used for compliance and also set minimum
and maximum limits on certain procurement content categories that can be used for compliance.
The portfolio content categories pursuant to SB 2 (1X) are described below:
Portfolio Content Category 1 includes eligible renewable energy and RECs that meet either of
the following criteria: (a) have a first point of interconnection with a California balancing
authority, have a first point of interconnection with distribution facilities used to serve end users
within a California balancing authority area, or are scheduled from the eligible renewable energy
resource into a California balancing authority without substituting electricity from another
source. The use of another source to provide real-time ancillary services required to maintain an
hourly or sub-hourly import schedule into a California balancing authority shall be permitted, but
only the fraction of the schedule actually generated by the eligible renewable energy resource
shall count toward this portfolio content category; or (b) have an agreement to dynamically
transfer electricity to a California balancing authority.
Portfolio Content Category 2 includes firmed and shaped eligible renewable energy resource
electricity products providing incremental electricity and scheduled into a California balancing
authority.
Portfolio Content Category 3 includes eligible renewable energy resource electricity products, or
any fraction of the electricity, including unbundled15 renewable energy credits that do not qualify
under the criteria of Portfolio Content Category 1 or Portfolio Content Category 2.
Additionally, the California Public Utilities Commission established the balanced portfolio
requirements for contracts executed after June 1, 2010. The balanced portfolio requirements set
minimum and maximum levels for the Procurement Content Category products that may be used
in each compliance period as shown in Table 3.3.
15 A REC can be sold either "bundled" with the underlying energy or "unbundled", as a separate commodity from
the energy itself, into a separate REC trading market.
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
37
Table 3.3 – California Balanced Portfolio Requirements
Compliance Period 1: 2011-2013 Category 1 – Minimum of 50% of Requirement
Category 3 – Maximum of 25% of Requirement
Compliance Period 2: 2014-2016 Category 1 – Minimum of 65% of Requirement
Category 3 – Maximum of 15% of Requirement
Compliance Period 3: 2017-2020 Category 1 – Minimum of 75% of Requirement
Category 3 – Maximum of 10% of Requirement
In December 2011, the California Public Utilities Commission adopted a decision confirming
that multi-jurisdictional utilities, such as PacifiCorp, are not subject to the percentage limits
within the three portfolio content categories. PacifiCorp is required to file annual compliance
reports with the California Public Utilities Commission and annual procurement reports with the
California Energy Commission.
The California Public Utilities Commission is in the process of an extensive rulemaking to
implement the remaining requirements under SB 2 (1X).
The full California RPS statute is listed under Public Utilities Code Section 399.11-399.32.
Additional information on the California RPS can be found on the California Public Utilities
Commission and California Energy Commission websites.
Oregon
Oregon established the Oregon RPS with passage of Senate Bill 838 in 2007. The law, called the
Oregon Renewable Energy Act16 was adopted in June 2007 and provides a comprehensive
renewable energy policy for the state. Subject to certain exemptions and cost limitations
established in the Oregon Renewable Energy Act, PacifiCorp and other qualifying electric
utilities must meet the following minimum targets for qualifying electricity sold to retail
customers of at least five percent in 2011 through 2014, 15 percent in 2015 through 2019, 20
percent in 2020 through 2024, and 25 percent in 2025 and subsequent years. Qualifying
renewable energy sources can be located anywhere in the United States portion of the Western
Electricity Coordinating Council geographic area, and a limited amount of unbundled renewable
energy credits can be used toward the annual compliance obligation.
Eligible renewable resources include electricity generated from wind, solar photovoltaic, solar
thermal, wave, tidal, ocean thermal, geothermal, certain types of biomass and biogas, municipal
solid waste, and hydrogen power stations using anhydrous ammonia. Electricity generated by a
hydroelectric facility is eligible, if the facility is not located in any federally protected areas
designated by the Pacific Northwest Electric Power and Conservation Planning Council as of
July 23, 1999, or any area protected under the federal Wild and Scenic Rivers Act, P.L. 90-542,
or the Oregon Scenic Waterways Act, ORS 390.805 to 390.925; or if the electricity is
attributable to efficiency upgrades made to the facility on or after January 1, 1995, and up to 50
average megawatts of electricity per year generated by a certified low-impact hydroelectric
facility owned by an electric utility and up to 40 average megawatts of electricity per year
generated by certified low-impact hydroelectric facilities not owned by electric utilities.
16 http://www.leg.state.or.us/07reg/measpdf/sb0800.dir/sb0838.en.pdf
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
38
Utilities can bank RECs from qualifying resources beginning January 1, 2007 for the purpose of
carrying them forward for future compliance. The RECs must be certified as eligible for the
Oregon RPS by the Oregon Department of Energy and tracked in WREGIS.
In 2009, Oregon passed House Bill 3039, also called the Oregon Solar Initiative, requiring that
on or before January 1, 2020, the total solar photovoltaic generating nameplate capacity must be
at least 20 megawatts from all electric companies in the state. Qualifying solar photovoltaic
systems must be at least 500 kilowatts in capacity with no single project greater than five
megawatts of alternating current. Any qualifying solar photovoltaic systems that are online
before January 1, 2016 will be credited with two RECs for every one megawatt-hour generated.
The Oregon Public Utility Commission determined that PacifiCorp’s share of the Oregon Solar
Initiative is 8.7 megawatts.
PacifiCorp files an annual RPS compliance report by June 1 of every year. PacifiCorp files a
renewable implementation plan on or before January 1 of even-numbered years, unless otherwise
directed by the Commission. These compliance reports and implementation plans are available
on PacifiCorp’s website17.
The full Oregon RPS statute is listed in Oregon Revised Statutes (ORS) Chapter 469A and the
solar capacity standard is listed in ORS Chapter 757. The Public Utility Commission of Oregon
rules are included within Oregon Administrative Rules (OAR) Chapter 860 Division 083 for the
RPS and OAR Chapter 860 Division 084 for the solar photovoltaic program. The Oregon
Department of Energy rules are under OAR Chapter 330 Division 160.
Utah
In March 2008, Utah’s governor signed Utah Senate Bill 20218, “Energy Resource and Carbon
Emission Reduction Initiative;” legislation. Among other things, this law provides that,
beginning in the year 2025, 20 percent of adjusted retail electric sales of all Utah utilities be
supplied by renewable energy, if it is cost effective. Retail electric sales will be adjusted by
deducting the amount of generation from sources that produce zero or reduced carbon emissions,
and for sales avoided as a result of energy efficiency and demand-side management programs.
Qualifying renewable energy sources can be located anywhere in the Western Electricity
Coordinating Council areas, and unbundled renewable energy credits can be used for up to 20
percent of the annual qualifying electricity target.
Eligible renewable resources include electricity generation or a generation facility from a facility
or upgrade that becomes operational on or after January 1, 1995 that derives its energy from
wind, solar photovoltaic, solar thermal electric, wave, tidal or ocean thermal, certain types of
biomass and biomass products, landfill gas or municipal solid waste, geothermal, waste gas and
waste heat capture or recovery, and efficiency upgrades to hydroelectric facilities if the upgrade
occurred after January 1, 1995. Up to 50 average megawatts from a certified low impact hydro
facility and in state geothermal and hydro generation without regard to operational online date
may also be used toward the target. To assist solar development in Utah, solar facilities located
in Utah receive credit for 2.4 kilowatt-hours of qualifying electricity for each kWh of generation.
17 www.pacificpower.net/ORrps 18 http://le.utah.gov/~2008/bills/sbillenr/sb0202.pdf
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
39
Under the Carbon Reduction Initiative, PacifiCorp is required to file a progress report by January
1 of each of the years 2010, 2015, 2020 and 2024. Following the progress report filed on
December 31, 2009 the Utah Division of Public Utilities’ report to the Legislature stated that,
“Given PacifiCorp’s projections of its loads and qualifying electricity for 2025, PacifiCorp is
well positioned to meet a target of 20 percent renewable energy by 2025.”
PacifiCorp filed its most recent progress report on December 31, 2014. This report showed that
the Company is positioned to meet its 20 percent target requirement of an estimated target of
approximately 5.2 million megawatt-hours of renewable energy in 2025 from existing Company-
owned and contracted renewable energy sources.
In 2027, the legislation requires a commission report to the Utah Legislature which may contain
any recommendation for penalties or other action for failure to meet the 2025 target. The
legislation requires that any recommendation for a penalty must provide that the penalty funds be
used for demand-side management programs for the customers of the utility paying the penalty.
The Energy Resource and Carbon Emission Reduction Initiative is codified in Utah Code Title
54 Chapter 17.
Washington
In November 2006, Washington voters approved Initiative 937,19 a ballot measure establishing
the Energy Independence Act, which is an RPS and energy efficiency requirement applied to
qualifying electric utilities, including PacifiCorp. The law requires that qualifying utilities
procure at least three percent of retail sales from eligible renewable resources or RECs by
January 1, 2012 through 2015, nine percent of retail sales by January 1, 2016 through 2019 and
15 percent of retail sales by January 1, 2020 and every year thereafter.
Eligible renewable resources include electricity produced from water, wind, solar energy,
geothermal energy, landfill gas, wave, ocean, or tidal power, gas from sewage treatment
facilities, biodiesel fuel with limitation, and biomass energy based on organic byproducts of the
pulp and wood manufacturing process, animal waste, solid organic fuels from wood, forest, or
field residues, or dedicated energy crops. Qualifying renewable energy sources must be located
within the Pacific Northwest or delivered into Washington on a real-time basis without shaping,
storage, or integration services. Moreover, the only hydroelectric resource eligible for
compliance is electricity associated with efficiency upgrades to hydroelectric facilities. Utilities
may use eligible renewable resources, RECs or a combination of both to meet the RPS
requirement.
PacifiCorp is required to file an annual RPS compliance report demonstrating compliance with
the Energy Independence Act by June 1 of every year with the Washington Utilities and
Transportation Commission. PacifiCorp’s compliance reports are made available on PacifiCorp’s
website20.
The Washington Utilities and Transportation Commission adopted final rules to implement the
initiative; the rules are listed in the Revised Code of Washington (RCW) 19.285 and the
Washington Administrative Code (WAC) 480-109.
19 http://www.secstate.wa.gov/elections/initiatives/text/I937.pdf 20 www.pacificpower.net/WArps
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
40
Hydroelectric Relicensing
The issues involved in relicensing hydroelectric facilities are multifaceted. They involve
numerous federal and state environmental laws and regulations, and participation of numerous
stakeholders including agencies, Indian tribes, non-governmental organizations, and local
communities and governments.
The value to relicensing hydroelectric facilities is continued availability of hydroelectric
generation. Hydroelectric projects can often provide unique operational flexibility as they can be
called upon to meet peak customer demands almost instantaneously and provide back-up for
intermittent renewable resources such as wind. In addition to operational flexibility,
hydroelectric generation does not have the emissions concerns of thermal generation. With the
exception of the Klamath River, Wallowa Falls and Prospect No. 3 hydroelectric projects, all of
PacifiCorp’s applicable generating facilities now operate under contemporary licenses from the
Federal Energy Regulatory Commission (FERC). The 169 MW Klamath River hydroelectric
project continues to operate under its existing license while PacifiCorp works with parties to
implement a 2010 settlement agreement that would result in removal of the project. The assumed
date of the removal in the IRP is January 1, 2021. The 1.1 MW Wallowa Falls project and the 7.2
MW Prospect No. 3 project are currently undergoing the FERC relicensing process.
FERC hydroelectric relicensing is administered within a very complex regulatory framework and
is an extremely political and often controversial public process. The process itself requires that
the project’s impacts on the surrounding environment and natural resources, such as fish and
wildlife, be scientifically evaluated, followed by development of proposals and alternatives to
mitigate for those impacts. Stakeholder consultation is conducted throughout the process. If
resolution of issues cannot be reached in this process, litigation often ensues which can be costly
and time-consuming. The usual alternative to relicensing is decommissioning. Both choices,
however, can involve significant costs.
The FERC has sole jurisdiction under the Federal Power Act to issue new operating licenses for
non-federal hydroelectric projects on navigable waterways, federal lands, and under other certain
criteria. The FERC must find that the project is in the broad public interest. This requires
weighing, with “equal consideration,” the impacts of the project on fish and wildlife, cultural
resources, recreation, land-use, and aesthetics against the project’s energy production benefits.
However, because some of the responsible state and federal agencies have the ability to place
mandatory conditions in the license, the FERC is not always in a position to balance the energy
and environmental equation. For example, the National Oceanic and Atmospheric
Administration Fisheries agency and the U.S. Fish and Wildlife Service have the authority within
the relicensing process to require installation of fish passage facilities (fish ladders and screens)
at projects. This is often the largest single capital investment that will be considered in
relicensing and can significantly impact project economics. Also, because a myriad of other state
and federal laws come into play in relicensing, most notably the Endangered Species Act and the
Clean Water Act, agencies’ interests may compete or conflict with each other leading to
potentially contrary, or additive, licensing requirements. PacifiCorp has generally taken a
proactive approach towards achieving the best possible relicensing outcome for its customers by
engaging in settlement negotiations with stakeholders, the results of which are submitted to the
FERC for incorporation into a new license. The FERC welcomes settlement agreements in the
relicensing process, and with associated recent license orders, has generally accepted agreement
terms. The FERC encourages that project owners seeking a new license do so through the
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
41
Integrated Licensing Process (ILP). The ILP involves the FERC at early stages of the relicensing
and seeks to resolve stakeholder issues in a timely manner.
Potential Impact
Relicensing hydroelectric facilities involves significant process costs. The FERC relicensing
process takes a minimum of five years and may take longer, depending on the characteristics of
the project, the number of stakeholders, and issues that arise during the process. As of December
31, 2014, PacifiCorp had incurred approximately $10 million in costs for license implementation
and ongoing hydroelectric relicensing, which are included in construction work-in-progress on
PacifiCorp's Consolidated Balance Sheet. As current or upcoming relicensing and/or settlement
efforts continue for the Klamath River, Wallowa Falls, Prospect No. 3, and other hydroelectric
projects, additional process costs are being or will be incurred that will need to be recovered
from customers. Hydro relicensing costs have and continue to have a significant impact on
overall hydro generation cost. Such costs include capital investments, and related operations and
maintenance costs made in fish passage facilities, recreational facilities, wildlife protection,
cultural and flood management measures as well as project operational changes such as
increased in-stream flow requirements to protect aquatic resources resulting in lost generation.
The majority of these relicensing and settlement costs relate to PacifiCorp’s three largest
hydroelectric projects: Lewis River, Klamath River and North Umpqua.
Treatment in the IRP
The known or expected operational impacts related to FERC orders and settlement commitments
are incorporated in the projection of existing hydroelectric resources discussed in Chapter 5.
PacifiCorp’s Approach to Hydroelectric Relicensing
PacifiCorp continues to manage this process by pursuing interest-based resolutions and/or
negotiated settlements as part of relicensing. PacifiCorp believes this proactive approach, which
involves meeting agency and others’ interests through creative solutions is the best way to
achieve environmental improvement while managing costs. PacifiCorp also has reached
agreements with licensing stakeholders to decommission projects where that has been the most
cost-effective outcome for customers.
Utah Rate Design Information
Current rate designs in Utah have evolved over time based on orders and direction from the
Public Service Commission in Utah and settlement agreements between parties during general
rate cases. Most recently, current rates and rate design changes were adopted in Docket No.
13-035-184. Generally, the goals for rate design are to reflect the costs to serve customers and to
provide price signals to encourage economically efficient usage. This is consistent with resource
planning goals that balance consideration of costs, risk, and long-run public policy goals. The
Company currently has a number of rate design elements that take into consideration these
objectives, in particular, rate designs that reflect cost differences for energy or demand during
different time periods and that support the goals of acquiring cost-effective energy efficiency.
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
42
Residential Rate Design
Residential rates in Utah are comprised of a customer charge and energy charges. The customer
charge is a monthly charge that provides limited recovery of customer-related costs incurred to
serve customers regardless of usage. All other remaining costs are recovered through volumetric-
based energy charges. Energy charges for residential customers are designed with an inclining
tier rate structure such that high usage during a billing month is charged a higher rate than low
usage. In this way, customers face a price signal to encourage reduced consumption.
Additionally, energy charges are differentiated by season with higher rates in the summer when
the costs to serve are higher. Residential customers also have an option for time-of-day rates.
Time-of-day rates have a surcharge for usage during the on-peak periods and a credit for usage
during the off-peak periods. This rate structure provides an additional price signal to encourage
customers to use less energy during the daily on-peak periods when energy costs are higher.
Currently, less than one percent of customers have opted to participate in the time-of-day rate
option.
Changes in residential rate design that might facilitate IRP objectives include a critical peak
pricing program or an expansion of time-of-use rates. These types of rate designs are discussed
in more detail in Volume I, Chapter 6 (Resource Options). Any changes in residential rate design
to support energy efficiency or time-differentiated usage should be balanced with the recovery of
fixed costs in order to ensure the price signals are economically efficient.
Commercial and Industrial Rate Design
Commercial and industrial rates in Utah are comprised of customer charges, facilities charges,
power charges (for usage over 15 kW) and energy charges. As with residential rates, customer
charges and facilities charges are intended to recover costs that don’t vary with usage. Power
charges are applied to a customer’s monthly demand on a kW basis and are intended to recover
the costs associated with demand or capacity needs. Energy charges are applied to the customer’s
metered usage on a kWh basis. All commercial and industrial rates employ seasonal variations in
power and/or energy charges with higher rates in the summer months to reflect the higher costs
to serve during the summer peak period. Additionally, for customers with load 1,000 kW or
more, rates are further differentiated by on-peak and off-peak periods for both power and energy
charges. For commercial and industrial customers with load less than 1,000 kW, the Company
offers two optional time-of-day rates—one that differentiates energy rates for on- and off-peak
usage and one that differentiates power charges by on- and off-peak usage. Currently,
approximately 15 percent of the eligible customers are on the energy time-of-day option and less
than one percent are on the power time-of-day option.
Changes in rate design that might facilitate IRP objectives include deploying a mandatory
seasonal time-of-day rate design that reflects the higher costs of on-peak usage to all commercial
and industrial customers with load less than 1,000 kW rather than a self-selected few.
Irrigation Rate Design
Irrigation rates in Utah are comprised of an annual customer charge, a monthly customer charge,
seasonal power charge and energy charges. The annual and monthly customer charges provide
some recovery of customer-related costs incurred to serve customers regardless of usage. All
other remaining costs are recovered through a seasonal power charge and energy charges. Power
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
43
charge is for the irrigation season only and is designed to recover demand-related costs and to
encourage irrigation customers to control and reduce their power consumption. Energy charges
for irrigation customers are designed with two options. One is a time-of-day program with higher
rates for on-peak consumption than for off-peak consumption. The Company is currently
implementing a new irrigation time-of-use pilot in Oregon and may evaluate future changes to
the Utah irrigation time-of-day program based on findings from the Oregon pilot. Irrigation
customers also have an option to participate in a third party operated Irrigation Load Control
Program. Customers are offered a financial incentive to participate in the program and give the
Company the right to interrupt the service to the participating customers when energy costs are
higher.
Energy Imbalance Market
PacifiCorp signed a memorandum of understanding with the CAISO February 12, 2013 to
outline terms for the implementation of an EIM by October 2014. A benefit study was completed
by Energy and Environmental Economics which shows a range of benefits to PacifiCorp and the
ISO in 2017 from $21.44 million to $128.7 million per year. The Company’s costs payable to
CAISO are a one-time start-up fee of $2.1 million and on-going annual fees of $1.3 million.
These are in addition to internal Company costs for items such as metering, software and
additional staffing.
An energy imbalance market is a five-minute market administered by a single market operator
using an economic dispatch model to issue instructions to generating resources to meet the load
for the entire footprint of the EIM. Market participants voluntarily bid their resources into the
EIM. The market operator, in addition to providing dispatch instructions, provides five-minute
locational marginal prices to the market participants to be used for settlement of the energy
imbalance. Energy imbalance is the difference between the forecast load or generation and the
actual load or generation. The benefits of an EIM include economic efficiency of an automated
dispatch, savings due to diversity of loads and variable resources in the expanded footprint, and
favorable impacts to reliability or operational risk.
The EIM between PacifiCorp and CAISO launched at midnight November 1, 2014, following a
30-day test period. The new market provides automated, optimized five-minute security
constrained economic dispatch across the combined balancing authority areas. The market
immediately began generating benefits for customers with significant economic transfers to
California occurring throughout the month of November and December with volumes exceeding
150,000 MWh. The EIM successfully modeled and integrated a variety of different energy
contracts, jointly owned facilities, two balancing areas, non-power hydro constraints and wind
resources into one integrated balancing area with CAISO. This degree of functionality should
accommodate the varied and unique balancing areas for many of the western utilities. A regional
imbalance-styled energy market has been discussed for many years in the WECC; given the
relative success of the EIM in the first few months of operation, PacifiCorp is encouraged that
greater efficiencies lie ahead.
As would be expected with any new market, the EIM has undergone many enhancements since
the go-live date. Both CAISO and PacifiCorp have improved the EIM model, situational
awareness tools for real-time operators and system integration between vendors and the ISO.
PacifiCorp’s Participating Resources have had their parameters modified in the resource data
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
44
template to better align with the many systems within the EIM. The ability to start the EIM on
schedule has provided additional time for both CAISO and PacifiCorp to further refine market
systems. This ensures successive entrants into the EIM will have fewer challenges incorporating
their systems into this regional energy imbalance market. PacifiCorp has fielded calls from many
different western utilities who have expressed interest in joining the EIM. Part of the corporate
goals for PacifiCorp in 2015 is to foster greater awareness and support of those utilities.
In regard to planning, PacifiCorp has made few changes to the normal day-to-day operation of its
system. This is due to the fact that PacifiCorp is still the lone entrant in the EIM. However, with
the expected increase in participation, PacifiCorp will begin to make modifications to the IRP in
regard to benefits that the EIM will produce. These benefits include a reduction in reserve
carrying requirements, transmission improvements to mitigate congestion and greater reliance on
renewable energy.
On November 25, 2013 the Washington Utilities and Transportation Commission (WUTC)
found PacifiCorp’s 2013 IRP meets the requirements of Revised Code of Washington
19.280.030 and Washington Administrative Code 480-100-238. In their comments the WUTC
requested the 2015 IRP “contain a detailed analysis, based on up-to-date data, of how
participation in the EIM will impact the load-resource balance in the West Control Area, and
potentially defer the need for new generation resources.” As the go-live date was late last year
there is not enough information at this point for a detailed analysis. One thing to note; the EIM is
not envisioned to impact load resource balance in the West. As such, it should not impact
resource additions in the future. As a participant in EIM, PacifiCorp retains responsibility for
resource adequacy.
Recent Resource Procurement Activities
PacifiCorp issued and will issue multiple requests for proposals (RFP) to secure resources and /
or transact on various energy and environmental attribute products. Table 3.4 summarizes current
RFP activities.
Table 3.4 – PacifiCorp’s Request for Proposal Activities
RFP RFP Objective Status Issued Completed
Oregon Solar 2013S 7.0 MWAC Pending 1st Quarter 2013 December 2015
Natural Gas Long-term physical
and financial
products
Complete May 2012 May 2013
Natural Gas Transportation Firm natural gas
supply to Naughton
starting 2015
Canceled December 2013 March 2014
Renewable energy credits (Sale) Excess system RECs Open Quarterly Ongoing
Renewable energy credits
(Purchase)
Oregon compliance
needs
Open Based on
specific need
Ongoing
Renewable energy credits Washington Open Based on Ongoing
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
45
RFP RFP Objective Status Issued Completed
(Purchase) compliance needs specific need
Renewable energy credits
(Purchase)
California
compliance needs
Open Based on
specific need
Ongoing
Short-term Market (Sales) System balancing Open Quarterly Ongoing
Demand-side Resources
The Company will procure and/or re-procure for several major delivery contracts in 2015 and
2016 such as the residential appliance recycling program, Home Energy Savings program, its
small to mid-size business support services, energy management services, and oil and gas sector
service delivery. The Company will also look to expand services to the multifamily and
manufactured home sector either through the Home Energy Service program re-procurement or
through a standalone request for proposals.
Oregon Solar Request for Proposal
PacifiCorp secured a 2.0 MWAC solar photovoltaic project in 2012 located in Lakeview, Oregon
as a result of its 2010 solar RFP to meet Oregon Statute ORS 757.370 pertaining to the solar
photovoltaic generating capacity standard, which requires Oregon utilities to acquire at least 20
MWAC. PacifiCorp’s share of the total is a minimum of 8.7 MWAC operational by 2020. A
second solar RFP was issued in second quarter 2013 with a subsequent update of bids in April
2014. The RFP sought a total of 7.0 MWAC to meet PacifiCorp’s remaining share of the standard.
PacifiCorp is in negotiation with bidders for two projects.
Natural Gas Transportation Request for Proposals
PacifiCorp issued a natural gas transportation RFP in December 2013 to secure firm natural gas
supply to its Naughton Unit 3 power plant after the planned plant conversion to natural gas in
April 2015. In March 2014, PacifiCorp received a permit allowing for a 2018 natural gas
conversion schedule, therefore the RFP was canceled and a new request for proposals process
will be initiated in early 2016.
Renewable Energy Credit (REC) Request for Proposals
PacifiCorp issued multiple REC RFPs in 2013 and 2014 for two purposes; (i) the sale of RECs in
excess of compliance needs to market and, (ii) purchase of RPS-eligible RECs to fulfill specific
short-term needs to PacifiCorp’s RPS obligation in Oregon, Washington, and California. The
REC sale RFPs are typically issued on a quarterly basis and will continue in that format for 2015.
The RPS-eligible REC purchase RFPs are issued specific to address a state RPS compliance
shortfalls.
Oregon
PacifiCorp issued a request for proposal to the market in December 2012, seeking offers of
renewable energy credits from generation facilities that are certified by the Oregon Department
of Energy as eligible for the Oregon Renewable Portfolio Standard. Procurement of unbundled
PACIFICORP – 2015 IRP CHAPTER 3 – THE PLANNING ENVIRONMENT
46
RECs were completed to partially defer qualified resource additions in the future to comply with
Oregon RPS requirements.
Washington
PacifiCorp issued a request for proposal to the market in August 2013 and October 2014, seeking
offers of renewable energy credits from generation facilities that are eligible for Washington’s
renewable portfolio program (Washington Initiative 937). Procurement of unbundled RECs were
completed to comply with Washington’s renewable portfolio program requirements.
California
PacifiCorp issued a request for proposal to the market in March 2014, seeking offers of
renewable energy credits from generation facilities that are eligible for California’s renewable
portfolio standard.
Short-term Market Power Request for Proposals
PacifiCorp issued multiple short-term market power RFPs in 2013 and 2014 to sell power for
system balancing purposes. These RFPs are typically issued on a quarterly basis and will
continue through 2015.
PACIFICORP – 2015 IRP CHAPTER 4 – TRANSMISSION
47
CHAPTER 4 – TRANSMISSION
CHAPTER HIGHLIGHTS
PacifiCorp is obligated to plan for and meet its customers’ future needs, despite
uncertainties surrounding environmental and emissions regulations and potential new
renewable resource requirements. Regardless of future policy direction, the Company’s
planned transmission projects are well aligned to respond to changing policy direction,
comply with increasing reliability requirements while providing sufficient flexibility to
ensure investments cost-effectively and reliably meet its customers’ future needs.
Given the long periods of time necessary to site, permit and construct major new
transmission lines, these projects need to be planned well in advance and developed in
time to meet customer need.
The Company’s transmission planning and benefits evaluation efforts adhere to
regulatory and compliance requirements and are responsive to commission and
stakeholder requests for a robust evaluation process and criteria for evaluating
transmission additions.
PacifiCorp requests acknowledgment of its plan to construct the Wallula to McNary
portion of the Walla Walla to McNary transmission project (Energy Gateway Segment A)
based on customer need and associated regulatory requirements with continued
permitting of the Walla Walla to McNary transmission line.
While construction of future Energy Gateway segments (i.e., Gateway West, Gateway
South and Boardman to Hemingway) is beyond the scope of acknowledgement for this
IRP, these segments continue to offer benefits under multiple, future resource scenarios.
Thus, the Company believes continued permitting of these segments is warranted to
ensure it is well positioned to advance these projects as required to meet customer need.
Introduction
PacifiCorp’s bulk transmission network is designed to reliably transport electric energy from
generation resources (owned generation or market purchases) to various load centers. There are
several related benefits associated with a robust transmission network:
1. Reliable delivery of energy to continuously changing customer demands under a wide
variety of system operating conditions.
2. Ability to supply aggregate electrical demand and energy requirements of customers at all
times, taking into account scheduled outages and the ability to maintain reliability during
unscheduled outages.
3. Economic exchange of electric power among all systems and industry participants.
4. Development of economically feasible generation resources in areas where it is best
suited.
5. Protection against extreme market conditions where limited transmission constrains
energy supply.
6. Ability to meet obligations and requirements of PacifiCorp’s Open Access Transmission
Tariff (OATT).
7. Increased capability and capacity to access energy supply markets.
PACIFICORP – 2015 IRP CHAPTER 4 – TRANSMISSION
48
PacifiCorp’s transmission network is a critical component of the IRP process and is highly
integrated with other transmission providers in the western United States. It has a long history of
reliable service in meeting the bulk transmission needs of the region. Its purpose will become
more critical in the future as energy resources become more dynamic and customer demand
continues to grow.
Regulatory Requirements
Open Access Transmission Tariff
Consistent with the requirements of its OATT, approved by the Federal Energy Regulatory
Commission (FERC), PacifiCorp plans and builds its transmission system based on its network
customers’ 10-year load and resource (L&R) forecasts. Each year, the Company solicits L&R
data from each of its network customers in order to determine future load and resource
requirements for all transmission network customers. These customers include PacifiCorp
Energy (which serves PacifiCorp’s retail customers and comprises the bulk of the Company’s
transmission network customer needs), Utah Associated Municipal Power Systems, Utah
Municipal Power Agency, Deseret Generation & Transmission Cooperative (including Moon
Lake Electric Association), Bonneville Power Administration, Basin Electric Power Cooperative,
Black Hills Power and Light, Tri-State Generation & Transmission, the States Department of the
Interior Bureau of Reclamation, and Western Area Power Administration.
The Company uses its customers’ L&Rs and best available information to determine project
need and investment timing. In the event that customer L&R forecasts change significantly,
PacifiCorp may consider alternative deployment scenarios and/or schedules for its project
investment as appropriate. Per FERC guidelines, the Company is able to reserve transmission
network capacity based on this 10-year forecast data. PacifiCorp’s experience, however, is that
the lengthy planning, permitting and construction timeline required for significant transmission
investments, as well as the typical useful life of these facilities, is well beyond the 10-year
timeframe of load and resource forecasts.21 A 20-year planning horizon and ability to reserve
transmission capacity to meet forecasted need over that timeframe is more consistent with the
time required to plan for and build large scale transmission projects, and PacifiCorp supports
clear regulatory acknowledgement of this reality and corresponding policy guidance.
Reliability Standards
PacifiCorp is required to meet mandatory FERC, North American Electric Reliability
Corporation (NERC) and Western Electricity Coordinating Council (WECC) reliability
standards and planning requirements.22 PacifiCorp’s transmission system operations also
responds to requests issued by Peak Reliability as the NERC Reliability Coordinator. The
Company conducts annual system assessments to confirm minimum levels of system
performance during a wide range of operating conditions, from serving loads with all system
elements in service to extreme conditions where parts of the system are out of service. Factored
into these assessments are load growth forecasts, operating history, seasonal performance,
resource additions or removals, new transmission asset additions, and the largest transmission
21 For example, PacifiCorp’s application to begin the Environmental Impact Statement process for Gateway West of
its Energy Gateway Transmission Expansion Project was filed with the Bureau of Land Management in 2007 and
was received in late April 2013. 22 FERC requirements; NERC standards; WECC standards.
PACIFICORP – 2015 IRP CHAPTER 4 – TRANSMISSION
49
and generation contingencies. Based on these analyses, the Company identifies any potential
system deficiencies and determines the infrastructure improvements needed to reliably meet
customer loads. NERC planning standards define reliability of the interconnected bulk electric
system in terms of adequacy and security. Adequacy is the electric system’s ability to meet
aggregate electrical demand for customers at all times. Security is the electric system’s ability to
withstand sudden disturbances or unanticipated loss of system elements. Increasing transmission
capacity often requires redundant facilities in order to meet NERC reliability criteria.
This chapter provides:
Justification supporting acknowledgement of the Company’s plan to construct the
Wallula to McNary transmission project and support for the Company’s plan to continue
permitting Walla Walla to McNary.
Support for the Company’s plan to continue permitting Gateway West and Gateway
South;
Key background information on the evolution of the Energy Gateway Transmission
Expansion Plan; and
An overview of the Company’s investments in recent short-term system improvements
that have improved reliability, helped to maximize efficient use of the existing system
and enabled the Company to defer the need for larger scale infrastructure investment.
Request for Acknowledgement of Wallula to McNary
The Wallula to McNary transmission project is required to satisfy the Company’s federal
regulatory obligations to its network transmission customers under its OATT. The project
consists of a thirty mile 230 kilovolt (kV) transmission line between Wallula, Washington and
McNary, Oregon and represents a portion of the Walla Walla, Washington to McNary, Oregon
Energy Gateway transmission project (Segment A). Since 2008, the Company has worked with
stakeholders to pursue permitting of the transmission project. In 2009, the Company decided to
move forward with pursuing the Wallula to McNary portion of the transmission line and delay
development of the Wallula to Walla Walla portion based on continuing evaluation of evolving
regional transmission and resource plans. In 2011, PacifiCorp obtained a certificate of public
convenience and necessity from the Oregon Public Utility Commission. In 2014, transmission
customers determined a continued need for the Wallula to McNary portion of the transmission
line that has prompted the Company to restart permitting and right-of-way activities. In addition,
federal, county and local public outreach activities have been reinitiated in 2015. The project is
estimated to be placed into service in 2017, subject to completion of permitting. To meet its
obligation to network transmission customers under the OATT, the Company requests regulatory
acknowledgement of the Wallula to McNary transmission project.
Factors Supporting Acknowledgement
The key driver supporting PacifiCorp’s request for acknowledgement of the Wallula to McNary
transmission project is meeting its obligations to its network transmission customers consistent
with its OATT. Without the transmission line, there is no available capacity to serve transmission
customers on the existing Wallula to McNary transmission line. This new line will enable the
Company to meet its obligation to service transmission customers under the OATT and improve
reliability in the area by providing a second connection between Wallula to McNary and a future
connection between Walla Walla to McNary (see below Plan to Continue Permitting – Walla
Walla to McNary). The transmission line will support future resource growth, including access to
renewable energy, and transmission needs.
PACIFICORP – 2015 IRP CHAPTER 4 – TRANSMISSION
50
Plan to Continue Permitting – Walla Walla to McNary
The Walla Walla to McNary transmission project will offer benefits under multiple, future
resource scenarios. In addition, as part of its agreements to exchange certain assets with Idaho
Power there is an option upon close of the asset exchange for Idaho Power to partner with
PacifiCorp to construct the remaining Walla Walla to Wallula portion of the transmission line.23
To ensure the Company is well positioned to advance the projects as required to meet customer
need, PacifiCorp believes it is prudent to continue to permit the Walla Walla to McNary
transmission project.
Gateway West – Continued Permitting
The Gateway West transmission project is comprised of two segments: 1) Windstar to Populus
(Energy Gateway Segment D) and 2) Populus to Hemingway (Energy Gateway Segment E). In a
future IRP, the Company will support a request for acknowledgement to construct Gateway West
with a cost-benefit analysis for the project. While the Company is not requesting
acknowledgement in this IRP of a plan to construct the Windstar to Populus or the Populus to
Hemingway segments at this time, the Company will continue to permit the projects.
Windstar to Populus (Segment D)
The Windstar to Populus transmission project consists of three key sections:
A single-circuit 230 kilovolt (kV) line that will run approximately 75 miles between the
existing Windstar substation in eastern Wyoming and the Aeolus substation to be
constructed near Medicine Bow, Wyoming;
A single-circuit 500 kV line running
approximately 140 miles from the Aeolus
substation to a new annex substation near the
existing Bridger substation in western
Wyoming; and
A single-circuit 500 kV line running
approximately 200 miles between the new annex substation and the recently constructed
Populus substation in southeast Idaho.
Populus to Hemingway (Segment E)
The Populus to Hemingway transmission project
consists of two single-circuit 500 kV lines that run
approximately 500 miles between the Populus
substation in eastern Idaho to the Hemingway
substation in western Idaho.
The Gateway West project would enable the Company
to more efficiently dispatch system resources, improve
23 FERC Docket Nos. EC15-54 and ER15-680.
Figure 4.1 – Segment D
Figure 4.2 – Segment E
PACIFICORP – 2015 IRP CHAPTER 4 – TRANSMISSION
51
performance of the transmission system (i.e. reduced line losses), improve reliability, and enable
access to a diverse range of new resource alternatives over the long-term.
Under the National Environmental Policy Act, the Bureau of Land Management (BLM) has
completed the Environmental Impact Statement (EIS) for the Gateway West project. The BLM
released its final EIS on April 26, 2013, followed by the Record of Decision on November 14,
2013, providing a right-of-way grant for all of Segment D and most of Segment E of the project.
The agency chose to defer its decision on the western-most portion of Segment E of the project
located in Idaho in order to perform additional review of the Morley Nelson Snake River Birds
of Prey Conservation Area. Specifically, the sections of Gateway West that were deferred for a
later Record of Decision include the sections of Segment E from Midpoint to Hemingway and
Cedar Hill to Hemingway. The BLM is currently conducting a supplemental environmental
analysis for that portion of the segment of the project which encompasses that area. A final
record of decision is expected in late 2016, subject to permitting completion.
Gateway South – Continued Permitting
As part of PacifiCorp’s Energy Gateway
Transmission Expansion, the company is planning to
build a high-voltage transmission line, known as
Gateway South (Segment F), extending
approximately 400 miles from the planned Aeolus
substation in southeastern Wyoming into the Clover
substation near Mona, Utah.
The BLM published its Notice of Intent in the Federal Register in April 2011, followed by public
scoping meetings throughout the project area. Comments on this project from agencies and other
interested stakeholders were considered as the BLM developed the draft EIS, which was issued
in February 2014. Further comments were submitted on the draft EIS and a final EIS is expected
in fall of 2015 with a Record of Decision to follow in late 2015.
Plan to Continue Permitting – Gateway West and Gateway South
The Gateway West and Gateway South transmission projects continue to offer benefits under
multiple, future resource scenarios. To ensure the Company is well positioned to advance the
projects as required to meet customer need, PacifiCorp believes it is prudent to continue to
permit the Gateway West and Gateway South transmission projects.
Evolution of the Energy Gateway Transmission Expansion Plan
Introduction
Given the long periods of time necessary to successfully site, permit and construct major new
transmission lines, these projects need to be planned and developed in time to meet customer
need. The Energy Gateway Transmission Expansion Plan is the result of several robust local and
regional transmission planning efforts that are ongoing and have been conducted multiple times
Figure 4.3 – Segment F
PACIFICORP – 2015 IRP CHAPTER 4 – TRANSMISSION
52
over a period of several years. The purpose of this section is to provide important background
information on the transmission planning efforts that led to the Company’s proposal of the
Energy Gateway Transmission Expansion Plan.
Background
Until the Company’s announcement of Energy Gateway in 2007, its transmission planning
efforts traditionally centered around the generation additions identified in the IRP. As the figure
here shows, the generation resources
in the Company’s preferred
portfolio have historically fluctuated
significantly from one IRP to the
next. With timelines of seven to ten
years or more required to site,
permit, and build transmission, this
traditional planning approach was
proven problematic, leading to a
perpetual state of transmission
planning and new transmission
capacity not being available in time
to be viable transmission resource
options for meeting customer need.
The existing transmission system
has been at capacity for several
years and new capability is
necessary to enable new resource
development.
The Energy Gateway Transmission Expansion Plan, formally announced in May 2007, has
origins in numerous local and regional transmission planning efforts discussed further below.
Energy Gateway was designed to ensure a reliable, adequate system capable of meeting current
and future customer needs. Importantly, given the changing resource picture, its design supports
multiple future resource scenarios by connecting resource-rich areas and major load centers
across the Company’s multi-state service area. Energy Gateway has since been included in all
relevant local, regional and interconnection-wide transmission studies.
Planning Initiatives
Energy Gateway is the result of robust local and regional transmission planning efforts. The
Company has participated in numerous transmission planning initiatives, both leading up to and
since Energy Gateway’s announcement. Stakeholder involvement has played an important role in
each of these initiatives, including participation from state and federal regulators, government
agencies, private and public energy providers, independent developers, consumer advocates,
renewable energy groups, policy think tanks, environmental groups, and elected officials. These
studies have shown a critical need to alleviate transmission congestion and move constrained
energy resources to regional load centers throughout the West, and include:
0
200
400
600
800
1000
1200
1400
1600
1800
May-07 May-09 March-11 2012 Bus
Plan
DSM
Wind
Coal
CCCT
Short term
(avg/yr)
Me
g
a
w
a
t
t
s
Resource Portfolio Variation
Figure 4.4 – Resource Portfolio Variation
PACIFICORP – 2015 IRP CHAPTER 4 – TRANSMISSION
53
Northwest Transmission Assessment Committee (NTAC)
The NTAC was the sub-regional transmission planning group representing the Northwest
region, preceding Northern Tier Transmission Group and ColumbiaGrid. The NTAC
developed long term transmission options for resources located within the provinces of
British Columbia and Alberta, and the states of Montana, Washington and Oregon to
serve Northwest loads and Northern California.
Rocky Mountain Area Transmission Study24
Recommended transmission expansions
overlap significantly with Energy Gateway
configuration, including:
o Bridger system expansion similar to
Gateway West
o Southeast Idaho to Southwest Utah
expansion akin to Gateway Central
and Sigurd-Red Butte
o Improved East-West connectivity
similar to Energy Gateway Segment
H alternatives
Western Governors’ Association Transmission Task Force Report25
Examined the transmission needed to
deliver the largely remote generation
resources contemplated by the Clean and
Diversified Energy Advisory Committee.
This effort built upon the transmission
previously modeled by the Seams Steering
Group-Western Interconnection, and
included transmission necessary to support a
range of resource scenarios, including high
efficiency, high renewables and high coal
scenarios. Again, for PacifiCorp’s system,
the transmission expansion that supported
these scenarios closely resembled Energy Gateway’s configuration.
Western Regional Transmission Expansion Partnership (WRTEP)
The WRTEP was a group of six utilities working with four western governors' offices to
evaluate the proposed Frontier Transmission Line. The Frontier Line was proposed to
connect California and Nevada to Wyoming's Powder River Basin through Utah. The
utilities involved were PacifiCorp, Nevada Power, Pacific Gas & Electric, San Diego Gas
& Electric, Southern California Edison, and Sierra Pacific Power.
24 http://psc.state.wy.us/rmats/rmats.htm 25 http://www.westgov.org/index.php?option=com_joomdoc&task=doc_download&gid=97&Itemid
“The analyses presented in this
Report suggest that well-
considered transmission
greater access to lower cost
natural gas prices.”
“The Task Force observes that
transmission investments
typically continue to provide
value even as network
the site of a now obsolete
power plant continues to be
location.”
PACIFICORP – 2015 IRP CHAPTER 4 – TRANSMISSION
54
Northern Tier Transmission Group Transmission Planning Reports
o 2007 Fast Track Project Process and
Annual Planning Report26
o 2008-2009 Transmission Plan27
o 2010-2011 Transmission Plan28
Each Energy Gateway segment was included
in the 2007 Fast Track Project Process and
has since been reevaluated as part of each
Northern Tier Transmission Group biennial planning process. These are open,
stakeholder processes.
WECC/TEPPC Annual Reports and Western Interconnection Transmission Path
Utilization Studies 29
These analyses measure the historical
utilization of transmission paths in the West
to provide insight into where congestion is
occurring and assess the cost of that
congestion. The Energy Gateway segments
have been included in the analyses that
support these studies, alleviating several
points of significant congestion on the
system, including Path 19 (Bridger West) and Path 20 (Path C).
Energy Gateway Configuration
For addressing constraints identified on PacifiCorp’s system, as well as meeting system
reliability requirements discussed further below, the recommended bulk electric transmission
additions took on a consistent footprint, which is now known as Energy Gateway. This
expansion plan establishes a triangle over Utah, Idaho and Wyoming with paths extending into
Oregon and Washington, and contemplates logical resource locations for the long-term based on
environmental constraints, economic generation resources, and federal and state energy policies.
Since Energy Gateway’s announcement, this series of projects has continued to be vetted through
multiple public transmission planning forums at the local, regional and interconnection-wide
levels. In accordance with the local planning requirements in PacifiCorp’s federal OATT,
Attachment K, the Company has conducted numerous public meetings on Energy Gateway and
transmission planning in general. Meeting notices and materials are posted publicly on
PacifiCorp’s Attachment K Open Access Same-time Information System (OASIS) site.
PacifiCorp is also a member of the Northern Tier Transmission Group (NTTG) and WECC’s
Transmission Expansion Policy and Planning Committee (TEPPC).
These groups continually evaluate PacifiCorp’s transmission plan in their efforts to develop and
refine the optimal regional and interconnection-wide plans. Please refer to PacifiCorp’s OASIS
site for information and materials related to these public processes.30
26 http://nttg.biz/site/index.php?option=com_docman&task=doc_download&gid=353&Itemid=31 27 http://nttg.biz/site/index.php?option=com_docman&task=doc_download&gid=1020&Itemid=31 28 http://nttg.biz/site/index.php?option=com_docman&task=doc_download&gid=1437&Itemid=31 29 http://www.wecc.biz/committees/BOD/TEPPC/External/Forms/external.aspx 30 http://www.oatioasis.com/ppw/index.html
“The Fast Track Project Process
was used in 2007 to identify
to meet Transmission Service
Requests.”
“Path 19 [Bridger] i
study… Usage on this path is
currently of interest due to the
high number of requests for
transmission service to move
from the Wyoming area.”
PACIFICORP – 2015 IRP CHAPTER 4 – TRANSMISSION
55
Additionally, the Project Teams conducted an extensive 18-month stakeholder process on
Gateway West and Gateway South. This stakeholder process was conducted in accordance with
WECC Regional Planning Project Review guidelines and FERC OATT planning principles, and
was used to establish need, assess benefits to the region, vet alternatives and eliminate
duplication of projects. Meeting materials and related reports can be found on PacifiCorp’s
Energy Gateway OASIS site.
Energy Gateway’s Continued Evolution
The Energy Gateway Transmission Expansion Plan is the result of years of ongoing local and
regional transmission planning efforts with significant customer and stakeholder involvement.
Since its announcement in May 2007, Energy Gateway’s scope and scale have continued to
evolve to meet the future needs of PacifiCorp customers and the requirements of mandatory
transmission planning standards and criteria. Additionally, the Company has improved its ability
to meet near-term customer needs through a limited number of smaller-scale investments that
maximize efficient use of the current system and help defer, to some degree, the need for larger
capital investments like Energy Gateway (see the following section on Efforts to Maximize
Existing System Capability). The IRP process, as compared to transmission planning, is a
frequently changing resource planning process that does not support the longer-term
development needs of transmission, or the ability to implement transmission in time to meet
customer need. Together, however, the IRP and transmission planning processes complement
each other by helping the Company optimize the timing of its transmission and resource
investments for meeting customer needs.
While the core principles for Energy Gateway’s design have not changed, the project
configuration and timing continue to be reviewed and modified to coincide with the latest
mandatory transmission system reliability standards and performance requirements, annual
system reliability assessments, input from several years of federal and state permitting processes,
and changes in generation resource planning and our customers’ forecasted demand for energy.
As originally announced in May 2007, Energy Gateway consisted of a combination of single-
and double-circuit 230 kV, 345 kV and 500 kV lines connecting Wyoming, Idaho, Utah, Oregon
and Nevada. In response to regulatory and industry input regarding potential regional benefits of
“upsizing” the project capacity (e.g. maximized use of energy corridors, reduced environmental
impacts and improved economies of scale), the Company included in its original plan the
potential for doubling the project’s capacity to accommodate third-party and equity partnership
interests. During late 2007 and early 2008, PacifiCorp received in excess of 6,000 MW of
requests for incremental transmission service across the Energy Gateway footprint, which
supported the upsized configuration. The Company identified the costs required for this upsized
system and offered transmission service contracts to queue customers. These customers,
however, were unable to commit due to the upfront costs and lack of firm contracts with
customers to take delivery of future generation, and withdrew their requests. In parallel,
PacifiCorp pursued several potential partnerships with other transmission developers and entities
with transmission proposals in the Intermountain Region. Due to the significant upfront costs
inherent in transmission investments, firm partnership commitments also failed to materialize,
leading the Company to pursue the current configuration with the intent of only developing
system capacity sufficient to meet the long-term needs of its customers.
In 2010, the Company entered into memorandums of understanding (MOU) to explore potential
joint-development opportunities with Idaho Power on its Boardman to Hemingway project and
PACIFICORP – 2015 IRP CHAPTER 4 – TRANSMISSION
56
with Portland General Electric (PGE) on its Cascade Crossing project. One of the key purposes
of Energy Gateway is to better integrate the Company’s East and West control areas, and
Gateway Segment H from western Idaho into southern Oregon was originally proposed to satisfy
this need. However, recognizing the potential mutual benefits and value for customers of jointly
developing transmission, PacifiCorp has pursued these potential partnership opportunities as a
lower cost alternative.
In 2011, the Company announced the indefinite postponement of the 500 kV Gateway South
segment between the Mona substation in central Utah and Crystal substation in Nevada. This
extension of Gateway South, like the double-circuit configuration discussed above, was a
component of the upsized system to address regional needs if supported by queue customers or
partnerships. However, despite significant third-party interest in the Gateway South segment to
Nevada, there was a lack of financial commitment needed to support the upsized configuration.
In 2012, the Company determined, due to experience with land use limitations and National
Environmental Policy Act permitting requirements, that one new 230 kV line between the
Windstar and Aeolus substations and a rebuild of the existing 230 kV line was feasible, and that
the second new proposed 230 kV line planned between Windstar and Aeolus would be
eliminated. This decision resulted from the Company’s ongoing focus on meeting customer
needs, taking stakeholder feedback and land use limitations into consideration, and finding the
best balance between cost and risk for customers. In January 2012 the Company signed the
Boardman to Hemingway Permitting Agreement with Idaho Power and Bonneville Power
Administration (BPA) that provides for the Company’s participation through the permitting
phase of the project.
In January 2013, the Company began discussions with PGE regarding changes to its Cascade
Crossing transmission project and potential opportunities for joint-development and/or firm
capacity rights into PacifiCorp’s Oregon system. The Company further notes that it had a
memorandum of understanding with PGE with respect to the development of Cascade Crossing
that terminated by its own terms. PacifiCorp had continued to evaluate potential partnership
opportunities with PGE once it announced its intention to pursue a Cascade Crossing solution
with BPA. However, because PGE decided to end discussions with BPA and instead pursue
other options, PacifiCorp is not actively pursuing this development. PacifiCorp continues to look
to partner with third parties on transmission development as opportunities arise such as potential
partnership opportunities with Idaho Power and BPA on the Boardman to Hemingway project as
an alternative to PacifiCorp’s originally proposed transmission segment from eastern Idaho into
southern Oregon (Hemingway to Captain Jack). Idaho Power leads the permitting efforts on the
Boardman to Hemingway project and PacifiCorp continues to support these activities under the
conditions of the Boardman to Hemingway Transmission Project Joint Permit Funding
Agreement.
Finally, the timing of segments is regularly assessed and adjusted. While permitting delays have
played a significant role in the adjusted timing of some segments (e.g., Gateway West and
Gateway South), the Company has been proactive in deferring in-service dates as needed due to
permitting schedules, moderated load growth, changing customer needs, and system reliability
improvements.
The Company will continue to adjust the timing and configuration of its proposed transmission
investments based on its ongoing assessment of the system’s ability to meet customer needs and
its compliance with mandatory reliability standards.
PACIFICORP – 2015 IRP CHAPTER 4 – TRANSMISSION
57
Figure 4.5 – Energy Gateway Transmission Expansion Plan
This map is for general reference only and reflects current plans.
It may not reflect the final routes, construction sequence or exact line configuration.
Segment & Name Description
Approximate
Mileage Status31 and Scheduled In-Service
(A)
Wallula-McNary 230 kV, single circuit 30 mi Status: local permitting completed
Scheduled in-service: 2017 sponsor driven*
(B)
Populus-Terminal 345 kV, double circuit 135 mi Status: completed
Placed in-service November 2010
(C)
Mona-Oquirrh
500 kV single circuit
345 kV double circuit 100 mi Status: completed
Placed in-service: May 2013
Oquirrh-Terminal 345 kV double circuit 14 mi Status: rights-of-way acquisition underway
Scheduled in-service: June 2021*
(D)
Windstar-Populus
230 kV single circuit
500 kV single circuit 400 mi Status: permitting underway
Scheduled in-service: 2019-2024*
(E)
Populus-Hemingway 500 kV single circuit 500 mi Status: permitting underway
Scheduled in-service: 2019-2024*
(F)
Aeolus-Mona 500 kV single circuit 400 mi Status: permitting underway
Scheduled in-service: 2020-2024*
(G)
Sigurd-Red Butte 345 kV single circuit 170 mi Status: construction began April 2013
Scheduled in-service: May 2015
(H)
Boardman to
Hemingway
500 kV single circuit 500 mi
Status: pursuing joint-development and/or firm
capacity opportunities with project sponsors Scheduled in-service: sponsor driven
* Scheduled in-service date adjusted since last IRP Update.
31 Status as of the filing of this IRP.
PACIFICORP – 2015 IRP CHAPTER 4 – TRANSMISSION
58
Efforts to Maximize Existing System Capability
In addition to investing in the Energy Gateway transmission projects, the Company continues to
make other system improvements that have helped maximize efficient use of the existing system
and defer the need for larger scale longer-term infrastructure investment. Despite limited new
transmission capacity being added to the system over the last 20 to 30 years, PacifiCorp has
maintained system reliability and maximized system efficiency through other smaller-scale,
incremental projects.
System-wide, the Company has instituted more than 120 grid operating procedures and 17
special protection schemes to maximize the existing system capability while managing system
risk. In addition, PacifiCorp has been an active participant in the California Independent System
Operator’s (“ISO”) Energy Imbalance Market (“EIM”) since November 2014. The EIM provides
for more efficient dispatch of participating resources in real-time through an automated system
that dispatches generation across the EIM footprint which currently includes PacifiCorp’s east
and west balancing authority areas and the ISO’s balancing authority area for use as short-term
balancing resources to ensure energy supply matches demand. By broadening the pool of lower-
cost resources that can be accessed to balance systems, reliability is enhanced and system costs
are reduced. In addition, the automated system is able to identify and utilize available
transmission capacity to transfer the dispatched resources enabling more efficient use of the
available transmission system. Other opportunities that maximize existing transmission
capability include the PacifiCorp and Idaho Power asset exchange as mentioned earlier in this
chapter. This arrangement, if approved by regulators, would result in an exchange of
transmission assets between the parties that optimizes ownership rights and transfer capability
across certain transmission lines.
In addition to the Energy Gateway transmission projects, PacifiCorp also has other planned
transmission system improvements to be placed in-service over the next couple of years include:
Construct new Standpipe substation and install a synchronous condenser located in
Wyoming;
Install an additional 230/115 kV 250 MVA transformer at Casper substation located in
Wyoming;
Install shunt capacitors at Fry substation located in Oregon;
Install a load shedding scheme at Grass Creek substation and Thermopolis substation
located in Wyoming;
Install shunt capacitors and a static var compensator at Mathington substation located in
Utah;
Install a phase shifting transformer and series reactor at Upalco substation located in
Utah;
Install an additional 230/115 kV 250 MVA transformer and 230 kV ring bus at Union
Gap substation located in Washington;
Expand the 230 kV ring bus at Pomona Heights substation located in Washington;
Install new relays on the Rigby to Sugarmill 161 kV line located in Idaho;
Install new relays on the Rigby to Jefferson 161 kV line located in Idaho;
Install a phase shifting transformer at Pinto substation located in Utah;
Construct new Whetstone substation located in Oregon;
Construct a 10 mile 46 kV line from the Holden substation tap to the Flowell Robison
line located in Utah;
Convert the Highland substation to 138 kV located in Utah;
PACIFICORP – 2015 IRP CHAPTER 4 – TRANSMISSION
59
Construct a 138 kV line from Croydon substation to Silver Creek substation located in
Utah;
Convert the existing 69 kV line to 115 kV from Community Park substation to Casper
substation located in Wyoming;
Replace the existing 115/69 kV transformer at Weed substation with a 50 MVA LTC unit
located in California;
Replace 500 kV line relays at several 500 kV substations located in Oregon;
Install a 138/46kV transformer at Snyderville substation located in Utah.
These investments help maximize the existing system’s capability, improve the Company’s
ability to serve growing customer loads, improve reliability, increase transfer capacity across
WECC Paths, reduce the risk of voltage collapse and maintain compliance with NERC and
WECC reliability standards.
.
PACIFICORP – 2015 IRP CHAPTER 4 – TRANSMISSION
60
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
61
CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
CHAPTER HIGHLIGHTS
On both a capacity and energy basis, PacifiCorp calculates load and resource balances
from existing resources, forecasted loads and sales, and reserve requirements. The
capacity balance compares existing resource capability at the time of the coincident
system peak load hour.
For capacity expansion planning, the Company uses a 13% target planning reserve
margin applied to PacifiCorp’s obligation, which is calculated as projected load less
distributed generation (DG), less existing Class 2 demand side management (DSM)
energy efficiency savings, and less interruptible load.
A 2014 study prepared by Navigant Consulting, Inc. produced estimates on DG
penetration levels specific to PacifiCorp’s six-state territory. The study provided expected
penetration levels by resource type, along with high and low penetration sensitivities.
PacifiCorp’s 2015 IRP resource needs assessment treats base case DG penetration levels
as a reduction in load.
PacifiCorp’s system coincident peak load is forecasted to grow at a compounded average
annual growth rate of 0.89% over the period 2015 through 2024. On an energy basis,
PacifiCorp expects system-wide average load growth of 0.85% per year from 2015
through 2024.
After accounting for front office transaction (FOT) availability, and prior to incorporation
of future demand-side management resources, PacifiCorp’s system planning reserve
margin falls just short of its target planning reserve margin in 2020. With the expiration
of a legacy contract, reserve margins are on target through 2022.
Introduction
This chapter presents PacifiCorp’s assessment of resource needs, focusing on the first ten years
of the IRP’s 20-year study period, 2015 through 2024. The Company’s long-term load forecasts
(both energy and coincident peak load) for each state and the system as a whole are summarized
in Volume II, Appendix A. The summary level system coincident peak is presented first,
followed by a profile of PacifiCorp’s existing resources. Finally, load and resource balances for
capacity and energy are presented. These balances are comprised of a year-by-year comparison
of projected loads against the existing resource base, inclusive of available FOTs, prior to adding
new resources to the portfolio.
System Coincident Peak Load Forecast
The system coincident peak load is the annual maximum hourly load on the system. The
Company’s long-term load forecasts (both energy and coincident peak) for each state and the
system are summarized in Volume II, Appendix A.
The 2015 IRP relies upon the Company’s September 2014 load forecast. Table 5.1. shows the
annual coincident peak load stated in megawatts as reported in the capacity load and resource
balance prior to any load reductions from Class 2 DSM or DG. The system peak load
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
62
grows at a compounded average annual growth rate (CAAGR) of 0.89% over the period 2015
through 2024.
Table 5.1 – Forecasted System Coincidental Peak Load in Megawatts, Prior to Energy
Efficiency and Distributed Generation Reductions
Region 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
System 10,368 10,225 10,381 10,522 10,635 10,755 10,876 10,996 11,105 11,224
Existing Resources
On a system coincident basis, PacifiCorp is a summer-peaking utility. For the forecasted 2015
summer coincident peak, PacifiCorp owns, or has interest in, resources with an expected system
peak capacity of 11,810 MW. Table 5.2 provides anticipated system peak capacity ratings by
resource category as reflected in the IRP load and resource balance for 2015. Note that capacity
ratings in the following tables provide resource capacity value at the time of system coincident
peak, rounded to the nearest megawatt.
Table 5.2 – 2015 Capacity Contribution at System Peak for Existing Resources
Resource Type 1/
L&R Balance Capacity at System
Peak (MW) 2/ Percent of Total (%)
Pulverized Coal 5,938 50.3%
Gas-CCCT 2,598 22.0%
Gas-SCCT 369 3.1%
Hydroelectric 894 7.6%
DSM 3/ 433 3.7%
Renewables 356 3.0%
Purchase 4/ 818 6.9%
Qualifying Facilities 255 2.2%
Interruptible Contracts 149 1.3%
Total 11,810 100%
1/ Sales and Non-Owned Reserves are not included.
2/ Represents the capacity available at the time of system peak used for preparation of the
capacity load and resource balance. For specific definitions by resource type see the section
entitled, “Load and Resource Balance Components” later in this chapter.
3/ DSM includes existing Class 1 (direct load control) and Class 2 (energy efficiency) programs.
4/ Purchases constitute contracts that do not fall into other categories such as hydroelectric,
renewables, and natural gas.
Thermal Plants
Table 5.3 lists PacifiCorp’s existing coal-fired thermal plants and Table 5.4 lists existing natural
gas fired plants. The assumed end of life dates are used for the 2015 IRP modeling of existing
coal resources.
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
63
Table 5.3 – Coal Fired Plants
Plant
PacifiCorp
Percentage Share
(%) State
Assumed End of
Life Year
L&R Balance Capacity
at System Peak (MW)
Cholla 4 100 AZ 2042 387
Colstrip 3 10 MT 2046 74
Colstrip 4 10 MT 2046 74
Craig 1 19 CO 2034 82
Craig 2 19 CO 2034 83
Dave Johnston 1 100 WY 2027 106
Dave Johnston 2 100 WY 2027 106
Dave Johnston 3 100 WY 2027 220
Dave Johnston 4 100 WY 2027 330
Hayden 1 24 CO 2030 45
Hayden 2 13 CO 2030 33
Hunter 1 94 UT 2042 418
Hunter 2 60 UT 2042 269
Hunter 3 100 UT 2042 471
Huntington 1 100 UT 2036 459
Huntington 2 100 UT 2036 450
Jim Bridger 1 67 WY 2037 354
Jim Bridger 2 67 WY 2037 359
Jim Bridger 3 67 WY 2037 348
Jim Bridger 4 67 WY 2037 353
Naughton 1 100 WY 2029 156
Naughton 2 100 WY 2029 201
Naughton 3* 100 WY 2029 293
Wyodak 80 WY 2039 268
TOTAL – Coal 5,938
* Naughton Unit 3 is planned to be converted to natural gas in 2018.
Table 5.4 – Natural Gas Plants
Natural Gas -
fueled
PacifiCorp
Percentage Share
(%) State
Assumed End of
Life Year
L&R Balance Capacity
at System Peak (MW)
Chehalis 100 WA 2043 465
Currant Creek 100 UT 2045 518
Gadsby 1 100 UT 2032 64
Gadsby 2 100 UT 2032 69
Gadsby 3 100 UT 2032 105
Gadsby 4 100 UT 2032 39
Gadsby 5 100 UT 2032 39
Gadsby 6 100 UT 2032 39
Hermiston 1 * 50 OR 2036 227
Hermiston 2 * 50 OR 2036 227
Lake Side 100 UT 2047 537
Lake Side 2 100 UT 2054 624
James Riv. (CHP) 100 WA 2015 14
TOTAL – Gas and Combined Heat & Power 2,967
* Hermiston plant 50% owned and 50% under long-term contract.
Renewable Resources
Wind
PacifiCorp either owns or purchases under contract 2,373 MW of wind resources. Since the 2013
IRP Update, the Company has entered into power purchase agreements totaling 250 MW.
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
64
Table 5.5 shows existing wind facilities owned by PacifiCorp, while Table 5.6 shows existing
wind power purchase agreements.
Table 5.5 – PacifiCorp-owned Wind Resources
Utility-Owned Wind
Projects State Capacity (MW)
L&R Balance Capacity at
System Peak (MW)
Foote Creek I * WY 32 6
Leaning Juniper OR 101 26
Goodnoe Hills Wind WA 94 24
Marengo WA 140 36
Marengo II WA 70 18
Glenrock Wind I WY 99 14
Glenrock Wind III WY 39 6
Rolling Hills Wind WY 99 14
Seven Mile Hill Wind WY 99 14
Seven Mile Hill Wind II WY 20 3
High Plains WY 99 14
McFadden Ridge 1 WY 29 4
Dunlap 1 WY 111 16
TOTAL – Owned Wind 1,032 195
*PacifiCorp’s share is 32 MW of the 40 MW project.
Table 5.6 – Non-owned Wind Resources
Power Purchase Agreements / Exchanges PPA or QF State
Capacity
(MW)
L&R Balance
Capacity at
System Peak
(MW)
Combine Hills PPA OR 41 10
Foote Creek IV PPA** WY 17 2
Rock River I PPA WY 50 7
Stateline Wind PPA** OR / WA 175 45
Three Buttes Wind Power PPA WY 99 14
Top of the World PPA WY 200 29
Wolverine Creek PPA ID 65 9
Blue Mountain* QF UT 80 11
Casper Wind QF WY 17 2
Chopin* QF WA 10 3
Foote Creek II QF WY 2 0
Foote Creek III QF WY 25 4
Latigo Wind* QF UT 60 9
Mariah Wind* QF OR 10 3
Meadow Creek Project – Five Pine QF ID 40 6
Meadow Creek Project – North Point QF ID 80 12
Mountain Wind Power I QF WY 61 9
Mountain Wind Power II QF WY 80 12
Oregon Wind Farms I & II QF OR 65 16
Orem Family Wind* QF OR 10 3
Pioneer Wind Park I* QF WY 80 12
Power County Wind Park North QF ID 23 3
Power County Wind Park South QF ID 23 3
Spanish Fork Wind Park 2 QF UT 19 3
Three Mile Canyon QF WA 10 3
TOTAL – Purchased Wind 1,341 229
*New since the 2013 IRP Update. ** Storage and integration only
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
65
Solar
PacifiCorp has a total of 31 solar projects under contract representing 579 MW of nameplate
capacity. Of these, fifteen projects totaling 523 MW are new since the 2013 IRP Update.
Table 5.7 – Non-owned Solar Resources
Power Purchase Agreements / Exchanges PPA or QF State
Capacity
(MW)
L&R Balance
Capacity at
System Peak
(MW)
Bevans Point PPA OR 2 1
Black Cap PPA OR 2 1
Utah Solar PV Program PPA UT 2 1
Old Mill PPA OR 5 2
Oregon Solar Incentive Projects (OSIP) PPA OR 2 1
Adams Solar Center * QF OR 10 4
Bear Creek Solar Center * QF OR 10 4
Beatty Solar* QF OR 5 2
Beryl Solar QF UT 3 1
Black Cap Solar II* QF OR 8 3
Bly Solar Center * QF OR 10 4
Buckhorn Solar QF UT 3 1
Cedar Valley Solar QF UT 3 1
Elbe Solar Center * QF OR 10 4
Enterprise Solar * QF UT 80 31
Escalante Solar I * QF UT 80 31
Escalante Solar II * QF UT 80 31
Escalante Solar III * QF UT 80 31
Fiddler's Canyon Solar 1-3 QF UT 9 4
Granite Peak Solar QF UT 3 1
Greenville Solar QF UT 2 1
Ivory Pine Solar* QF OR 10 4
Laho Solar QF UT 3 1
Manderfield Solar QF UT 2 1
Milford Flat Solar QF UT 3 1
Milford Solar 2 * QF UT 3 1
Pavant Solar * QF UT 50 20
Quichapa Solar 1- 3 QF UT 9 4
South Milford Solar QF UT 3 1
Sprague River Solar* QF OR 7 3
Utah Red Hills Renewable Park * QF UT 80 31
TOTAL – Purchased Solar 579 223
*New since the 2013 IRP Update.
Geothermal
PacifiCorp owns and operates the Blundell Geothermal Plant in Utah, which uses naturally
created steam to generate electricity. The plant has a net generation capacity of 34 MW.
Blundell is a fully renewable, zero-discharge facility. The bottoming cycle, which increased the
output by 11 MW, was completed at the end of 2007. The Oregon Institute of Technology added
a new small qualifying facility (QF) using geothermal technologies to produce renewable power
for the campus and is rated at 0.28 MW. The Company has also entered into a QF agreement for
a 10 MW Oregon geothermal plant undergoing development. The project is in default for
missing commercial operating date (COD), but has not been terminated. The current scheduled
commercial operation date is June 2017.
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
66
Biomass / Biogas
PacifiCorp has biomass/biogas agreements with 19 projects totaling approximately 100 MW of
nameplate capacity. Each state served by PacifiCorp contains at least one project. Four of these
projects totaling 6.6 MW were added since the 2013 IRP Update.
Renewables Net Metering
As of year-end 2014, PacifiCorp had 8,266 net metering customers throughout its six-state
territory, generating more than 70,000 kW using solar, hydro, wind, and gas technologies. About
96% of net-metered customer generation is solar-based, followed by wind-based generation at
1.2%. Net metering has grown by more than 48% over the past year. The Company averaged
171 new net metered customers a month in 2014, compared to 115 new customers per month in
2013. Table 5.8 provides a breakdown of net metered capacity and customer counts from data
collected on January 3, 2015.
Table 5.8 – Net Meter Customers and Capacities
Fuel Solar Wind Gas* Hydro Mixed**
Nameplate
(kW) 67,205 858 914 548 758
Capacity
(percentage) 95.62% 1.22% 1.30% 0.78% 1.08%
Number of
customers 7,993 207 5 12 49
Customer
(percentage) 96.69% 2.50% 0.06% 0.15% 0.59%
*Gas includes: biofuel, waste gas, and fuel cells
**Mixed includes projects with both wind and solar
Hydroelectric Generation
PacifiCorp owns 1,145 MW32 of hydroelectric generation capacity and purchases the output from
140 MW of other hydroelectric resources. These resources provide operational benefits such as
flexible generation, spinning reserves and voltage control. PacifiCorp-owned hydroelectric plants
are located in California, Idaho, Montana, Oregon, Washington, Wyoming, and Utah.
The amount of electricity PacifiCorp is able to generate or purchase from hydroelectric plants is
dependent upon a number of factors, including the water content of snow pack accumulations in
the mountains upstream of its hydroelectric facilities and the amount of precipitation that falls in
its watershed. Operational limitations of the hydroelectric facilities are impacted by varying
water levels, licensing requirements for fish and aquatic habitat, and flood control which lead to
load and resource balance capacity values that are different from net facility capacity ratings.
Hydroelectric purchases are categorized into two groups as shown in, Table 5.9 which reports
2015 capacity included in the load and resource balance.
32 2014 PacifiCorp 10-K filing shows 1,145 MW of Net Facility Capacity.
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
67
Table 5.9 – Hydroelectric Contracts - Load and Resource Balance Capacities
Hydroelectric Contracts
by Load and Resource Balance Category L&R Balance Capacity at System Peak (MW)
Hydroelectric 99
Qualifying Facilities - Hydroelectric 42
Total Contracted Hydroelectric Resources 141
Table 5.10 provides the operational capacity for each of PacifiCorp’s owned hydroelectric
generation facilities at system peak (2015).
Table 5.10 – PacifiCorp Owned Hydroelectric Generation Facilities - Load and Resource
Balance Capacities
Plant State
L&R Balance Capacity at System
Peak (MW)
West
Big Fork MT 4
Clearwater 1 OR 15
Clearwater 2 OR 26
Copco 1 and 2 CA 47
Fish Creek OR 0
Iron Gate CA 11
JC Boyle OR 16
Lemolo 1 OR 32
Lemolo 2 OR 16
Merwin WA 23
Rogue OR 31
Small West Hydro 1 CA / OR / WA 2
Soda Springs OR 4
Swift 1 WA 240
Swift 2 2 WA 72
Toketee and Slide OR 26
Yale WA 135
East
Bear River ID / UT 78
Small East Hydro 3 ID / UT / WY 15
TOTAL – Hydroelectric before Contracts 795
Hydroelectric Contracts 141
TOTAL – Hydroelectric with Contracts 936
1/ Includes Bend, Fall Creek, and Wallowa Falls
2/ Cowlitz County PUD owns Swift No. 2, and is operated in coordination with the other projects by PacifiCorp
3/ Includes Ashton, Paris, Pioneer, Weber, Stairs, Granite, Snake Creek, Olmstead, Fountain Green, Veyo, Sand
Cove, Viva Naughton, and Gunlock
Hydroelectric Relicensing Impacts on Generation
Table 5.11 lists the estimated impacts to average annual hydro generation from expected FERC
orders and relicensing settlement commitments. PacifiCorp assumes that the Klamath
hydroelectric facilities will be decommissioned pursuant to the Klamath Hydroelectric
Settlement Agreement in the year 2020 and that other projects currently in relicensing will
receive new operating licenses, but that additional operating restrictions will be imposed in new
licenses, such as higher bypass flow requirements, will reduce generation available from these
facilities.
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
68
Table 5.11 – Estimated Impact of FERC License Renewals and Relicensing Settlement
Commitments on Hydroelectric Generation
Years Incremental Lost Generation
(MWh)
Cumulative Lost Generation
(MWh)
2016-2017 1,448 1,448
2018-2019 636 2,084
2020-2034 716,820 718,904
Demand-side Management
DSM resources/products vary in their dispatchability, reliability, term of load reduction and
persistence over time. Each has its value and place in effectively managing utility investments,
resource costs and system operations. Those that have greater persistence and firmness can be
reasonably relied upon as a base resource for planning purposes; those that do not are more
suited as system reliability resource options. The reliability resource options are used to avoid
outages or high resource costs as a result of weather conditions, plant outages, market prices, and
unanticipated system failures. PacifiCorp categorizes DSM resources into four general classes
based on their relative characteristics, the classes are:
Class 1 DSM: Resources from fully dispatchable or scheduled firm capacity product
offerings/programs – Class 1 DSM programs are those for which capacity savings occur as
a result of active Company control or advanced scheduling. Once customers agree to
participate in Class 1 DSM program, the timing and persistence of the load reduction is
involuntary on their part within the agreed upon limits and parameters of the program. In
most cases, loads are shifted rather than avoided. Examples include residential and small
commercial central air conditioner load control programs that are dispatchable in nature and
irrigation load management and interruptible or curtailment programs (which may be
dispatchable or scheduled firm, depending on the particular program design and/or event
noticing requirements).
Class 2 DSM: Resources from non-dispatchable, firm energy and capacity product
offerings/programs – Class 2 DSM programs are those for which sustainable energy and
related capacity savings are achieved through facilitation of technological advancements in
equipment, appliances, lighting and structures, or repeatable and predictable voluntary
actions on a customer’s part to manage the energy use at their facility or home. Class 2 DSM
programs generally provide financial and/or service incentives to customers to improve the
efficiency of existing or new customer-owned facilities through the installation of more
efficient equipment such as lighting, motors, air conditioners, or appliances or upgrading
building efficiency through improved insulation levels, windows, etc. however the category
has recently been expanded to include strategic energy management efforts at business
facilities and home energy reports in the residential sector. The savings endure (are
considered firm) over the life of the improvement or customer action. Program examples
include comprehensive commercial and industrial new and retrofit energy efficiency
programs, refrigerator recycling programs, comprehensive home improvement retrofit
programs, strategic energy management and home energy reports.
Class 3 DSM: Resources from price responsive energy and capacity product
offerings/programs – Class 3 DSM programs seek to achieve short-duration (hour by hour)
energy and capacity savings from actions taken by customers voluntarily, based on a
financial incentive or signal. Savings are measured at a customer-by-customer level (via
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
69
metering and/or metering data analysis against baselines), and customers are compensated in
accordance with a program’s pricing parameters. As a result of their voluntary nature,
participation tends to be low and savings are less predictable, making them less suitable to
incorporate into resource planning exercises, at least until such time that their size and
customer behavior profile provide sufficient information for a reliable diversity result
(predictable impact) for modeling and planning purposes. Savings typically only endure for
the duration of the incentive offering and in many cases loads tend to be shifted rather than
avoided. Program examples include large customer energy bid programs, time-of-use pricing
plans, critical peak pricing plans, and inverted block tariff designs. The impacts of Class 3
DSM resources may not be explicitly considered in the resource planning process however
they are captured naturally in long-term load growth patterns and forecasts.
Class 4 DSM: Non-incented behavioral based savings achieved through broad energy
education and communication efforts – Class 4 DSM programs promote reductions in
energy or capacity usage through broad based energy education and communication efforts.
The program objectives are to help customers better understand how to manage their energy
usage through no cost actions such as conservative thermostat settings and turning off
appliances, equipment and lights when not in use. The programs also are used to increase
customer awareness of additional actions they might take to save energy and the service and
financial tools available to assist them. Class 4 DSM programs help foster an understanding
and appreciation of why utilities seek customer participation in Classes 1, 2 and 3 DSM
programs. Program examples include Company brochures with energy savings tips, customer
newsletters focusing on energy efficiency, case studies of customer energy efficiency
projects, and public education and awareness programs such as “Let’s turn the answers on”
and “wattsmart” campaigns. Like Class 3 DSM resources, the impacts of such programs may
not be explicitly considered in the resource planning process however they are captured
naturally in long-term load growth patterns and forecasts.
PacifiCorp has been operating successful DSM programs since the late 1970s. While the
Company’s DSM focus has remained strong over this time, since the 2001 western energy crisis
the Company’s DSM pursuits have expanded to new heights in terms of investment level, state
presence, breadth of DSM resources pursued (Classes 1 through 4) and resource planning
considerations. Work continues on the expansion of cost-effective program portfolios and
savings opportunities in all states while at the same time adapting programs and measure
baselines to reflect the impacts of advancing state and federal energy codes and standards. In
2013 and 2014, the Company completed the implementation of over 30 DSM action items
identified in the 2013 IRP Action Plan, all geared towards accelerating and increasing the
acquisition of demand side resources. Actions such as, but not limited to, the consolidation and
expansion of the Company’s business programs and services under wattsmart business, adding
direct install and direct distribution measures to residential and business programs, creating new
service offerings for small business customers, expanding trade ally networks and services, and
increasing the number of households receiving home energy reports across our six states from
100,000 to over 380,000 households. In Oregon, the Company continues to work closely with the
Energy Trust of Oregon to help identify additional resource opportunities, improve delivery and
communication coordination, and ensure adequate funding and Company support in pursuit of
DSM resource targets. Finally, significant changes to the Idaho and Utah Class 1 DSM portfolios
were recently completed in an effort to improve program effectiveness and economics in those
states and provide for a more viable delivery platform for the potential expansion of Class 1
DSM programs to the west side of the system, as the need and value for new west-side capacity
resources dictate.
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
70
The following represents a brief summary of the existing resources by class.
Class 1 Demand-side Management
Currently there are two Class 1 DSM programs running across PacifiCorp’s six-state service
area: Utah’s “Cool Keeper” residential and small commercial air conditioner load control
program and dispatchable irrigation load management programs in Idaho and Utah. The two
programs represent over 300 MW of load reduction capability, helping the Company better
manage demand during peak periods.33
Class 2 Demand-side Management
The Company currently manages ten distinct Class 2 DSM programs or initiatives within the
Class 2 DSM category, many of which are available in multiple states.34 In all, the combination
of Class 2 DSM programs/initiatives across PacifiCorp’s six states totals twenty-seven, with
program services in some states combined within programs (i.e. the refrigerator recycling in
California is part of the Home Energy Saving program and therefore is not counted as a
standalone effort). The cumulative energy savings for the period 2003-2014 from Class 2 DSM
program activity was 4.9 million MWh.
Class 3 Demand-side Management
The Company has numerous Class 3 DSM offerings currently available. They include metered
time-of-day and time-of-use pricing plans (in all states, availability varies by customer class),
residential seasonal inverted block rates (Idaho, Utah and Wyoming), residential year-round
inverted block rates (California, Oregon and Washington) and Energy Exchange programs (all
states). System-wide, approximately 19,200 customers were participating in metered time-of-day
and time-of-use programs as of December 31, 2012.35 All of the Company’s residential
customers not opting for a time-of-use rates are currently subject to seasonal or year-round
inverted block rate plans.
Savings associated with these resources are captured within the Company’s load forecast, with
the exception of the more immediate call-to-action programs, and are thus captured in the
integrated resource planning framework. PacifiCorp continues to evaluate Class 3 DSM
programs for applicability to long-term resource planning.
As discussed in greater detail in Chapter 6, eight Class 3 DSM programs were bundled into four
discrete products and provided as resource options in preliminary IRP modeling scenarios.
Class 4 Demand-side Management
Educating customers regarding energy efficiency and load management opportunities is an
important component of the Company’s long-term resource acquisition plan. A variety of
channels are used to educate customers including television, radio, newspapers, bill inserts and
messages, newsletters, school education programs, and personal contact. Load reductions due to
33 Realized reductions vary by event (temperature and month and time dependent), cited load reduction represents
the sum of the highest event performance across the three states for the two programs and account for line losses
(are “at generator” values). 34 PacifiCorp collaborates with the Energy Trust of Oregon and Northwest Energy Efficiency Alliance (in
Washington) in delivering two of the ten programs/initiatives. 35 Year-end 2012 participation data was used in the development of the 2015 DSM Potential Study. By the end of
2013 participation levels had declined slightly too approximately 18,900 participants.
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
71
Class 4 DSM activity will show up in Class 1 and Class 2 DSM program results and non-
program reductions in the load forecast over time.
Table 5.12 summarizes the Company’s existing DSM programs, their assumed impact and how
they are treated for purposes of incremental resource planning. Note that since incremental Class
2 DSM is determined as an outcome of resource portfolio modeling and is characterized as a new
resource in the preferred portfolio, existing Class 2 DSM in the table below is shown as having
zero MW.36
Table 5.12 – Existing DSM Summary, 2015-2024
Program
Class Description
Energy Savings or Capacity
at Generator
Included as
Existing Resources for
2015-2024 Period
1
Residential/small
commercial air conditioner
load control
115 MW summer peak Yes
Irrigation load
management 190 MW summer peak37 Yes
Interruptible contracts
2015 149 MW
2016-2024 175 MW
Year around availability
Yes.
2 Company and Energy
Trust of Oregon programs 0 MW
No. Class 2 DSM programs are
modeled as resource options in the
portfolio development process, and
included in the preferred portfolio.
3
Energy Exchange
0-1938 MW (assumes no other
Class 3 DSM competing
products running)
No. Program is leveraged as
economic and reliability resource
dependent on market prices/system
loads.
Time-based pricing 9839 MW summer peak,
19,200 customers
No. Historical savings from
customer responses to pricing
signals are reflected in the load
forecast.
Inverted rate pricing
55-149 GWh40 (capacity
impacts are unavailable due to
lack of information on end use
loads being saved
No. Historical savings from
customer response to pricing
structure is reflected in load
forecast.
4 Energy Education Energy and capacity impacts
are not available/measured
No. Historical savings from
customer participation are reflected
in the load forecast.
36 The historic effects of prior Class 2 DSM savings are backed out of the load forecast prior to the modeling for
new Class 2 DSM. 37 Assumes realized irrigation load curtailment in Idaho and Utah of 171 MW and 38 MW, respectively. 38 PacifiCorp Demand-Side Resource Potential Assessment for 2015-2034, Volume 3: Class 1 and 3 DSM Analysis,
Applied Energy Group, January 30, 2015. 39 Ibid. 40 Ibid.
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
72
Distributed Generation
PacifiCorp’s first major effort to fully assess small-scale customer-sited generation resource
potential occurred in 2007 with an “Assessment of Long-Term, System Wide Potential for
Demand Side and Other Supplemental Resources” (2007 Potential Study). Customer-sited
distributed generation (i.e., DG) was a subset of the 2007 assessment. The technical and
achievable data from the 2007 Potential Study were converted into resource quantity and cost
curves (supply curves) that served as inputs to the Company’s 2008 IRP models where the
actionable economic potential screening was performed.
The 2007 Potential Study was updated in 2010 (included in the 2011 IRP) and again in 2012
(included in the 2013 IRP) to use the most current data and methods in developing supply curves
for the 2013 IRP. As in the 2010 Potential Study, only technical and achievable technical
potentials were assessed, with all economic screening conducted in the IRP model.
For the 2015 IRP, PacifiCorp contracted with Navigant Consulting Inc. (Navigant) to conduct an
updated assessment of DG. Deliverables include: 1) technical potential, 2) market potential, and
3) levelized cost of energy for each DG resource in each of the six states served by the Company.
Navigant examined both commercial and residential applications. Specific technologies studies
include: solar photovoltaic, small scale wind, small scale hydro, and CHP for both reciprocating
engines and micro-turbines. The study is included in Volume II, Appendix O.41
The major difference in the treatment of DG in the 2015 IRP is the application of DG as a
reduction to load. The Navigant study identifies expected levels of customer-sited DG. The DG
is then netted against the IRP load forecast rather than being selected as a utility resource. This
methodology more accurately reflects drivers behind DG penetration, which is customer
economics, not utility economics.
Initial analysis focused on the amount of technical potential of DG in PacifiCorp’s service
territory. The technical potential is the maximum amount that is available without consideration
of costs, or adoption rates. Figure 5.1 below shows Navigant’s initial estimate of technical
potential.
41 The study is also online at the following location:
http://www.pacificorp.com/content/dam/pacificorp/doc/Energy_Sources/Integrated_Resource_Plan/2015IRP/2015I
RPStudy/Navigant_Distributed-Generation-Resource-Study_06-09-2014.pdf
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
73
Figure 5.1 – Technical Potential Results
The technical potential was then refined by Navigant to an expected market penetration level.
The market penetration for DG technologies employed Fisher-Pry payback analysis. This method
looks at ‘S-curves” which describe penetration rates of products in markets. The penetration rates
are dependent on the length of time needed to ‘payback’ the investment costs. This approach was
applied for individual residential and commercial customers of PacifiCorp by rate class.
Figure 5.2 shows the DG base case market penetration over the 20-year study period. Note
expectations for solar form the majority of new DG over time, with residential making up the
overwhelming majority of installations by 2034.
CA
ID
OR
UT
WA
WY
0
500
1000
1500
2000
2500
Te
c
h
n
i
c
a
l
P
o
t
e
n
t
i
a
l
(
M
W
)
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
74
Figure 5.2 – Base Case Distributed Generation
Low and high DG penetration scenarios were also examined in sensitivity cases. These are
shown in Figure 5.3 and Figure 5.4 below. The Company used the base case assumptions for
analysis of the core cases and in its resource needs assessment. The low and high DG penetration
levels are used for sensitivity analysis.
Figure 5.3 – High Case Distributed Generation
0
100
200
300
400
500
600
700
800
900
1000
20
1
3
20
1
4
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
20
2
7
20
2
8
20
2
9
20
3
0
20
3
1
20
3
2
20
3
3
20
3
4
Cu
m
u
l
a
t
i
v
e
Ma
r
k
e
t
P
r
o
j
e
c
t
i
o
n
(
M
W
)
PacifiCorp Distributed Generation Base Case
Wind - Res
Wind - Comm
PV - Residential
PV - Commercial
Hydro
CHP Micro Turbines
CHP Recip Turbines
0
500
1000
1500
2000
2500
3000
20
1
3
20
1
4
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
20
2
7
20
2
8
20
2
9
20
3
0
20
3
1
20
3
2
20
3
3
20
3
4
Cu
m
u
l
a
t
i
v
e
Ma
r
k
e
t
P
r
o
j
e
c
t
i
o
n
(
M
W
)
PacifiCorp Distributed Generation High Penetration Case
Wind - Res
Wind - Comm
PV - Residential
PV - Commercial
Hydro
CHP Micro Turbines
CHP Recip Turbines
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
75
Figure 5.4 – Low Case Distributed Generation
Power Purchase Contracts
PacifiCorp obtains the remainder of its capacity and energy requirements through long-term firm
contracts, short-term firm contracts, and spot market purchases. Figure 5.5 presents the contract
capacity in place for 2015 through 2034. As shown, major capacity reductions in purchases and
hydro contracts occur. For planning purposes, PacifiCorp assumes that current purchases from
small qualifying facility and interruptible load contracts are extended through the end of the IRP
study period. Note that renewable wind contracts are shown at their capacity contribution levels.
Figure 5.5 – Contract Capacity in the 2015 Load and Resource Balance
0
50
100
150
200
250
300
350
20
1
3
20
1
4
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
20
2
7
20
2
8
20
2
9
20
3
0
20
3
1
20
3
2
20
3
3
20
3
4
Cu
m
u
l
a
t
i
v
e
M
a
r
k
e
t
P
r
o
j
e
c
t
i
o
n
(
M
W
)
PacifiCorp Distributed Generation Low Penetration Case
Wind - Res
Wind - Comm
PV - Residential
PV - Commercial
Hydro
CHP Micro Turbines
CHP Recip Turbines
-1,000
-500
0
500
1,000
1,500
2,000
MW
Sale Purchase QF Interruptible
Hydro Wind Solar Net Position
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
76
Listed below are the major contract expirations occurring in summer 2016:
Expiring Bonneville Power Administration Southeast Idaho Exchange – 369 MW
Expiring Hermiston Purchase – 227 MW
Load and Resource Balance
Capacity and Energy Balance Overview
The purpose of the load and resource balance is to compare annual obligations with annual
capability of PacifiCorp’s existing resources, absent new resource additions. This is done with
respect to two views of the system, the capacity balance and energy balance.
The capacity balance compares generating capability to expected peak load at time of system
peak load hours. It is a key part of the load and resource balance because it provides guidance as
to the timing and severity of future resource deficits. It is developed by first reducing the hourly
system load by hourly DG to then determining net system coincident peak load for each of the
first ten years (2015-2024) of the planning horizon. Interruptible load programs and existing load
reduction DSM programs at the time of the net system coincident peak are further netted from
the peak load forecast to compute the annual peak-hour obligation. Then the annual firm capacity
availability of the existing resources is determined. The annual resource deficit or surplus is then
computed by multiplying the obligation by the target planning reserve margin (PRM) and then
subtracting the result from existing resources, accounting for available FOTs.
The energy balance shows the average monthly on-peak and off-peak surplus or deficit of energy
over the first ten years of the planning horizon (2015-2024). The average obligation (load less
existing DSM programs and DG) is computed and subtracted from the average existing resource
availability for each month and time-of-day period. The energy balance complements the
capacity balance in that it also indicates when resource deficits occur, but it also provides insight
into what type of resource will best fill the need. The usefulness of the energy balance is limited
as it does not address the cost of the available energy. The economics of adding resources to the
system to meet both capacity and energy needs are addressed during the resource portfolio
development process described in Chapter 8.
Load and Resource Balance Components
The capacity and energy balances make use of the same load and resource components in their
calculations. The main component categories consist of the following: existing resources,
obligation, reserves, position, and available FOTs.
Under the calculations, there are negative values in the table in both the resource and obligation
sections. This is consistent with how resource categories are represented in portfolio modeling.
The resource categories include resources by type: thermal, hydroelectric, renewable, QFs,
purchases, existing Class 1 DSM, sales, and non-owned reserves. Categories in the obligation
section include load (net of DG), interruptible contracts, and existing Class 2 DSM.
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
77
Existing Resources
A description of each of the resource categories follows:
Thermal
This category includes all thermal plants that are wholly-owned or partially-owned by
PacifiCorp. The capacity balance counts them at maximum dependable capability at time of
system peak. The energy balance also counts them at maximum dependable capability, but
de-rates them for forced outages and maintenance. This includes the existing fleet of coal-
fired units, six natural gas-fired plants, and one cogeneration unit. These thermal resources
account for roughly two-thirds of the firm capacity available in the PacifiCorp system.
Hydroelectric
This category includes all hydroelectric generation resources operated in the PacifiCorp
system as well as a number of contracts providing capacity and energy from various
counterparties. The capacity balance counts these resources by the maximum capability that
is sustainable for one hour at the time of system peak, an approach consistent with current
WECC capacity reporting practices. The energy associated with stream flow is estimated and
shaped by the hydroelectric dispatch from the Vista Decision Support System model. Also
accounted for are energy impacts of hydro relicensing requirements, such as higher bypass
flows that reduce generation. Over 90 percent of the hydroelectric capacity is situated on the
west side of the PacifiCorp system.
Renewable
This category comprises geothermal and variable (wind and solar) renewable energy
capacity. The capacity balance counts the geothermal plant by the maximum dependable
capability while the energy balance counts the maximum dependable capability after forced
outages. The capacity contribution of wind and solar resources, represented as a percentage
of resource capacity, is a measure of the ability for these resources to reliably meet demand.
For purposes of the 2015 IRP, PacifiCorp defines the peak capacity contribution of wind and
solar resources as the availability among hours with the highest loss of load probability
(LOLP). PacifiCorp updated its capacity contribution values for solar and wind resources,
differentiated by resource type and balancing authority area (BAA), which is presented in
Volume II, Appendix N. The resulting capacity contribution values are shown in Table 5.13
below.
Table 5.13 – Peak Capacity Contribution Values for Wind and Solar
East BAA West BAA
Wind Fixed Tilt
Solar PV
Single Axis
Tracking
Solar PV
Wind Fixed Tilt
Solar PV
Single Axis
Tracking
Solar PV
Capacity
Contribution
Percentage
14.5% 34.1% 39.1% 25.4% 32.2% 36.7%
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
78
Purchase
This includes all major purchases contracts for firm capacity and energy in the PacifiCorp
system.42 The capacity balance counts these by the maximum contract availability at time of
system peak. The energy balance counts contracts at optimal economic model dispatch.
Purchases are considered firm and thus planning reserves are not held for them.
Qualifying Facilities (QF)
All QFs that provide capacity and energy are included in this category. Like other power
purchases, the capacity balance counts them at maximum system peak availability and the
energy balance counts them at optimal economic model dispatch.
Dispatchable Load Control (Class 1 DSM)
Existing dispatchable load control program capacity is categorized as an increase to resource
capacity.
Sales
This includes all contracts for the sale of firm capacity and energy. The capacity balance
counts these contracts by the maximum obligation at time of system peak and the energy
balance counts them by expected model dispatch. All sales contracts are firm and thus
planning reserves are held for them in the capacity view.
Non-owned Reserves
Non-owned reserve capacity is categorized as a decrease to resource capacity to represent the
capacity required to provide reserves as a balancing are authority for load and generation that
are in PacifiCorp’s BAA but not owned by PacifiCorp’s. There are a number of
counterparties that operate in the PacifiCorp control areas that purchase operating reserves.
The annual reserve obligation is about 3 MW and 38 MW on the west and east BAAs,
respectively. The non-owned reserves do not contribute to the energy obligation because the
requirement is for capacity only.
Obligation
The obligation is the total electricity demand that PacifiCorp must serve, consisting of forecasted
retail load less DG, existing Class 2 DSM, and interruptible contracts. The following are
descriptions of each of these components:
Load Net of Distributed Generation
The largest component of the obligation is retail load. In the 2015 IRP, the hourly retail load
at a location is first reduced by hourly distributed generation at the same location. The
system coincident peak is determined by summing the net loads for all locations (topology
bubbles with loads) and then finding the highest hourly system load by year. Loads reported
by east and west BAAs thus reflect loads at the time of PacifiCorp’s coincident system peak.
The energy balance counts the load on monthly basis by on-peak and off-peak hours. The
net load is simply referred to as load in the context of load and resources balances and
portfolio selection and evaluation.
42 PacifiCorp has curtailment contracts for approximately 172 MW on peak capacity which are treated as firm
purchases. PacifiCorp has the right to curtail the customer’s load as needed for economic purposes. The customer
in turn may or may not pay market-based rates for energy used during a curtailment period.
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
79
Existing Class 2 DSM
An adjustment is made to load to remove the projected embedded Class 2 DSM as a
reduction to load. Due to timing issues with the vintage of the load forecast, there is a level
of 2014 Class 2 DSM that is not incorporated in the forecast. The 2014 Class 2 DSM forecast
(110 MW) has been accounted for by adding an existing Class 2 DSM resource in the L&R.
Interruptible Contracts
PacifiCorp has interruptible contracts for approximately 175 MW of load interruption
capability beginning in 2015. These contracts allow the use of 175 MW of capacity for
meeting reserve requirements. Both the capacity balance and energy balance count these
resources at the level of full load interruption on the executed hours. Interruptible resources
directly curtail load and thus full planning reserves are not held for the load that may be
curtailed. As with Class 2 DSM, this resource is categorized as a decrease to the peak load.
Planning Reserves
Planning reserves represent an incremental planning requirement, applied as an increase to the
obligation to ensure that there will be sufficient capacity available on the system to manage
uncertain events (i.e., weather, outages) and known requirements (i.e., operating reserves).
Position
The position is the resource surplus or deficit after subtracting obligation plus required reserves
from total resources. While similar, the position calculation is slightly different for the capacity
and energy views of the load and resource balance. Thus, the position calculation for each of the
views will be presented in their respective sections.
Capacity Balance Determination
Methodology
The capacity balance is developed by first determining the system coincident peak load hour for
each of the first ten years of the planning horizon. Then the annual firm-capacity availability of
the existing resources is determined for each of these annual system peak hours and summed as
follows:
Existing Resources = Thermal + Hydro + Renewable + Firm Purchases + Qualifying
Facilities + Existing Class 1 DSM – Firm Sales – Non-owned Reserves
The peak load, interruptible contracts, and existing Class 2 DSM are netted together for each of
the annual system peak hours to compute the annual peak-hour obligation:
Obligation = Load – Interruptible Contracts – Existing Class 2 DSM
The amount of reserves to be added to the obligation is then calculated. This is accomplished by
the net system obligation calculated above multiplied by the 13% target planning reserve margin
adopted for the 2015 IRP. The formula for this calculation is:
Planning Reserves = Obligation x PRM
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
80
Finally, the annual capacity position is derived by adding the computed reserves to the
obligation, and then subtracting this amount from existing resources, inclusive of available
FOTs, as shown in the following formula:
Capacity Position = (Existing Resources + Available FOTs) – (Obligation + Reserves)
Capacity Balance Results
Table 5.14 shows the annual capacity balances and component line items using a target planning
reserve margin of 13% to calculate the planning reserve amount. Balances for PacifiCorp’s
system as well as east and west BAAs are shown. It should be emphasized that while west and
east balances are broken out separately, the PacifiCorp system is planned for and dispatched on a
system basis. Also note that new QF wind and solar projects listed earlier in the chapter are
reported under the QF line item rather than the Renewables line item.
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
81
Table 5.14 –System Capacity Loads and Resources without Resource Additions
Figure 5.6 through Figure 5.8 are graphic representations of the table above for annual capacity
position for the system, east balancing area, and west balancing area, respectively. Also shown
in the system capacity position graph are available FOTs, which can be used to meet capacity
Calendar Year 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
East
Thermal 6,410 6,397 6,397 6,453 6,449 6,448 6,444 6,439 6,434 6,431
Hydroelectric 117 114 114 114 114 114 114 114 114 94
Renewable 187 187 187 187 187 187 184 184 177 177
Purchase 627 406 300 300 300 300 272 272 272 272
Qualifying Facilities 139 222 348 347 346 339 337 332 331 280
Class 1 DSM 323 323 323 323 323 323 323 323 323 323
Sale (732) (732) (656) (656) (656) (656) (175) (175) (175) (144)
Non-Owned Reserves (38) (38) (38) (38) (38) (38) (38) (38) (38) (38)
East Existing Resources 7,033 6,880 6,976 7,031 7,026 7,018 7,462 7,453 7,439 7,396
East Total Resources 7,033 6,880 6,976 7,031 7,026 7,018 7,462 7,453 7,439 7,396
Load 7,157 6,977 7,102 7,208 7,295 7,382 7,448 7,529 7,617 7,640
Interruptible (149) (175) (175) (175) (175) (175) (175) (175) (175) (175)
Existing Class2 DSM (73) (73) (73) (73) (73) (73) (73) (73) (73) (73)
East obligation 6,935 6,729 6,854 6,960 7,047 7,135 7,200 7,281 7,370 7,392
Planning Reserves (13%)921 894 910 924 935 947 955 966 977 980
East Reserves 921 894 910 924 935 947 955 966 977 980
East Obligation + Reserves 7,855 7,623 7,764 7,885 7,982 8,081 8,155 8,247 8,347 8,372
East Position (823) (743) (789) (853) (957) (1,064) (693) (794) (908) (976)
Available Front Office Transactions 318 318 318 318 318 318 318 318 318 318
West
Thermal 2,495 2,251 2,248 2,248 2,248 2,248 2,245 2,241 2,239 2,239
Hydroelectric 777 770 752 775 725 728 643 620 652 646
Renewable 170 170 170 170 170 170 170 115 115 105
Purchase 191 22 22 22 5 5 5 5 5 5
Qualifying Facilities 116 114 140 135 134 120 120 120 115 115
Class 1 DSM 0 0 0 0 0 0 0 0 0 0
Sale (210) (160) (160) (160) (160) (160) (156) (105) (105) (78)
Non-Owned Reserves (3) (3) (3) (3) (3) (3) (3) (3) (3) (3)
West Existing Resources 3,535 3,163 3,167 3,185 3,119 3,107 3,023 2,993 3,019 3,029
West Total Resources 3,535 3,163 3,167 3,185 3,119 3,107 3,023 2,993 3,019 3,029
Load 3,206 3,237 3,271 3,301 3,323 3,354 3,406 3,429 3,455 3,476
Interruptible 0 0 0 0 0 0 0 0 0 0
Existing Class2 DSM (36) (36) (36) (36) (36) (36) (36) (36) (36) (36)
West obligation 3,169 3,201 3,235 3,264 3,286 3,317 3,369 3,393 3,419 3,440
Planning Reserves (13%)412 416 421 424 427 431 438 441 444 447
West Reserves 412 416 421 424 427 431 438 441 444 447
West Obligation + Reserves 3,581 3,617 3,655 3,689 3,714 3,748 3,807 3,834 3,863 3,887
West Position (46) (454) (488) (503) (595) (642) (784) (841) (844) (858)
Available Front Office Transactions 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352
System
Total Resources 10,568 10,043 10,143 10,217 10,144 10,124 10,486 10,446 10,458 10,425
Obligation 10,104 9,930 10,089 10,225 10,333 10,452 10,569 10,674 10,788 10,832
Reserves 1,333 1,310 1,331 1,349 1,363 1,378 1,393 1,407 1,422 1,428
Obligation + Reserves 11,437 11,240 11,420 11,573 11,696 11,830 11,963 12,081 12,210 12,259
System Position (869) (1,197) (1,277) (1,357) (1,552) (1,706) (1,477) (1,635) (1,752) (1,834)
Available Front Office Transactions 1,670 1,670 1,670 1,670 1,670 1,670 1,670 1,670 1,670 1,670
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
82
needs. The market availability assumptions used for portfolio modeling are discussed further in
Chapter 6 and Volume II, Appendix J.
Figure 5.6 – System Capacity Position Trend
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Me
g
a
w
a
t
t
s
Obligation + 13%Planning Reserves
Obligation
East Existing Resources
West Existing Resources
13% Reserves Available Front Office Transactions
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
83
Figure 5.7 – East Capacity Position Trend
Figure 5.8 – West Capacity Position Trend
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Me
g
a
w
a
t
t
s
Obligation + 13%Planning Reserves
Obligation
East Existing Resources
2024 Resource Gap
976 MW2015 Resource Gap
823 MW
13% Reserves
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Me
g
a
w
a
t
t
s
Obligation + 13%Planning Reserves
Obligation
2024 Resource Gap
858 MW
2015 Resource Gap
46 MW
West Existing Resources
13% Reserves
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
84
Energy Balance Determination
Methodology
The energy balance shows the monthly on-peak and off-peak surplus (deficit) of energy. The on-
peak hours are weekdays and Saturdays from hour-ending 7:00 am to 10:00 pm; off-peak hours
are all other hours. This is calculated using the formulas that follow. Please refer to the section
on load and resource balance components for details on how energy for each component is
counted.
Existing Resources = Thermal + Hydro + Existing Class 1 DSM + Renewable + Firm
Purchases + QF + Interruptible Contracts – Sales
The average obligation is computed using the following formula:
Obligation = Load + Firm Sales
The energy position by month and time block is then computed as follows:
Energy Position = Existing Resources – Obligation – Operating Reserve Requirements
Energy Balance Results
The capacity position shows how existing resources and loads balance during the coincident
peak load hour of the year inclusive of a planning reserve margin. Outside of the peak hour, the
Company economically dispatches its resources to meet changing load conditions taking into
consideration prevailing market conditions. In those periods when variable costs of the system
resources are less than the prevailing market price for power, the Company can dispatch
resources that in aggregate exceed then-current load obligations facilitating off system sales that
reduce customer costs. Conversely, at times when system resource costs fall below prevailing
market prices, system balancing market purchases can be used to meet then-current system load
obligations to reduce customer costs. The economic dispatch of system resources is critical to
how the Company manages net power costs.
Figure 5.9 provides a snapshot of how existing system resources could be used to meet
forecasted load across on-peak and off-peak periods given the assumption about resource
availability and wholesale power and natural gas prices. At times, resources are economically
dispatched above load levels facilitating net system balancing sales. At other times, economic
conditions result in net system balancing purchases, which occur more often during on-peak
periods. Figure 5.9 also show how much energy is available from existing resources at any given
point in time. Those periods where all available resource energy falls below forecasted loads are
highlighted in red, and are indicative of short energy positions absent the addition of incremental
resources to the portfolio. During on-peak periods, the first energy shortfall appears in July 2018
and July in the subsequent years. During off-peak periods, there are no energy shortfalls through
the 2024 timeframe.
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
85
Figure 5.9 – System Average Monthly Energy Positions
Load and Resource Balance Conclusions
Accounting for available FOTs, PacifiCorp exceeds its 13% target planning reserve margin
through 2019 and falls just short of its target planning reserve margin in 2020. With the
expiration of a legacy exchange contract, available system capacity is increased in the summer of
2021, and PacifiCorp’s system once again exceeds its 13% target planning reserve margin
through 2022.
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
GW
h
On-Peak Energy Balance
System Energy at or Below Load Net Balancing Sale Net Balancing Purchase
Energy Shortfall System Energy Available Load
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
GW
h
Off-Peak Energy Balance
System Energy at or Below Load Net Balancing Sale Net Balancing Purchase
Energy Shortfall System Energy Available Load
PACIFICORP – 2015 IRP CHAPTER 5 – RESOURCE NEEDS ASSESSMENT
86
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
87
CHAPTER 6 – RESOURCE OPTIONS
CHAPTER HIGHLIGHTS
PacifiCorp developed resource attributes and costs for expansion resources that reflect
updated information from project experience, public meeting comments and third party
studies. Similar to the 2013 IRP, current economic conditions have essentially remained
unchanged with reduced capital cost uncertainty. Long-term resource pricing, especially
for emerging technologies, remains a challenge to predict.
Resource costs have been generally stable since the previous IRP and any cost increases
have been modest. The cost of solar photovoltaic modules stabilized in 2014 after being
on a downward cost trend for several years.
As with the 2013 IRP both large utility scale solar photovoltaic options and geothermal
purchase power agreements (PPA) have been included as supply-side options in the 2015
IRP and updated to reflect current conditions.
The number of combustion turbine types and configurations has been slightly modified to
reflect different siting locations and are identified in the Supply Side Resource options
table.
Energy storage systems continue to be of interest to PacifiCorp stakeholders. Options for
advanced large batteries (one megawatt), pumped hydro and compressed air energy
storage are included in the IRP.
A 2015 resource potential study, conducted by Applied Energy Group, served as the basis
for updated resource characterizations covering demand-side management (DSM)
resources. The demand-side resource information was converted into supply curves by
measure or product type and competes against other resource alternatives in IRP
modeling.
PacifiCorp applied cost reduction credits for energy efficiency, reflecting risk mitigation
benefits, transmission & distribution investment deferral benefits, and a 10 percent
market price credit for Washington and Oregon as allowed by the Northwest Power Act.
Transmission integration costs and transmission reinforcement costs are based on the
timing and location of resource selection.
Introduction
This chapter provides background information on the various resources considered in the IRP for
meeting future capacity and energy needs. Organized by major category, these resources consist
of utility-scale supply-side generation, DSM programs, transmission resources and market
purchases. For each resource category, the chapter discusses the criteria for resource selection,
presents the options and associated attributes, and describes the various technologies. In addition,
for supply-side resources, the chapter describes how PacifiCorp addressed long-term cost trends
and uncertainty in deriving cost figures.
Supply-side Resources
The list of supply-side resource options has been updated to reflect the realities evidenced
through permitting, internally-generated studies and externally-commissioned studies undertaken
to better understand the details of available generation resources. Capital costs, in general, have
remained stable due to recessionary economic conditions in 2008-2009 and a very gradual
recovery experienced in 2010-2014. As with the 2013 IRP, natural gas-fueled plants are expected
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
88
to fulfill future base-load obligations for meeting customer needs therefore they have received a
significant level of attention. A variety of gas-fueled generating resources were selected after
consultation with major suppliers, large engineering-consulting firms, and primary stakeholders.
New coal-fueled resources received minimal focus during this planning cycle due to ongoing
environmental, permitting and sociopolitical obstacles for siting new coal-fueled generation. The
capital and operating costs of simple and combined-cycle gas turbine plants have remained
relatively flat to slightly increasing since the previous IRP. Certain alternative (i.e. non-fossil-
fuel) energy resources such as wind and solar received even greater emphasis during this review
cycle compared to prior reviews. Solar resource options include utility-size photovoltaic systems
(PV) with both fixed and single axis tracking. Energy storage options of at least one megawatt
continue to be of interest among the stakeholders, with options analyzed for large pumped-
storage projects, as well as advanced battery, fly wheel and compressed air energy storage
projects.
Derivation of Resource Attributes
The supply-side resource options were developed for a combination of resources. The process
began with the list of major generating resources from the 2013 IRP. This resource list was
reviewed and modified to reflect stakeholder input, environmental factors, cost dynamics, and
anticipated permitting constraints. Once the basic list of resources was determined, the cost and
performance attributes for each resource were estimated. The information sources used are listed
below, followed by a brief description on how they were used in the development of the Supply
Side Resource table:
Recent (2012 and 2014) third-party, cost and performance estimates;
Prior third-party, cost and performance studies or updated earlier estimates;
Actual PacifiCorp or electric utility industry installations, providing current
construction/maintenance costs and performance data with similar resource attributes;
Projected PacifiCorp or electric utility industry installations, providing projected
construction/maintenance costs and performance data of similar or identical resource
options; and
Recent Requests for Proposals and Requests for Information.
Recent third-party engineering information from original equipment manufacturers was used to
update capital, operating and maintenance costs, performance and operating characteristics, and
planned outage cycle estimates. Examples of this type of effort include the 2012 Black & Veatch
estimates prepared for simple cycle and combined cycle options and the 2014 Energy Storage
Screening Study performed by HDR Engineering Inc. (HDR), which was used to update various
storage technologies (see Volume II, Appendix Q).
Also informative were studies prepared by others in the industry that include similar types of
cost and performance data provided in the Supply Side Resource table. This information includes
publicly available engineering and government agency reports. An example of this type of study
is the United States Department of Energy’s 2013 Wind Technologies Market Report.
Both PacifiCorp and industry installations provide a solid basis for capital/maintenance costs and
operating histories. Performance characteristics were adjusted to site-specific conditions
identified in the Supply Side Resource Table. For instance, the capacity of combustion turbine
based resources varies both with elevation and ambient temperature and, to a lesser extent,
relative humidity. Adjustments were made for site-specific elevations of actual plants to more
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
89
generic, regional elevations for future resources. PacifiCorp also relies on information and
experience gathered through operations of its existing fleet of resources and its reviews of
potential resources.
Handling of Technology Improvement Trends and Cost Uncertainties
The capital cost uncertainty for some generation technologies is relatively high. Various factors
contribute to this uncertainty, including the relatively small number of facilities that have been
built, especially for new and emerging technologies, as well as prolonged economic uncertainty.
Despite these uncertainties, the cost profile between the last IRP and the current IRP has not
changed significantly. For example, Figure 6.1 shows the trend in North American carbon steel
sheet prices over the period from August 2013 through September 2014. Similar information was
presented in the 2013 IRP and has been updated in Figure 6.2. These figures illustrate near term
changes in capital costs of generation resources.
Figure 6.1 – World Carbon Steel Pricing by Type
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
90
Figure 6.2 – Historic Carbon Steel Pricing
Prices for solar photovoltaic (PV) panels have fallen slightly since the 2013 IRP. The dynamic
changes in the solar PV market make accurately predicting future prices difficult. Real prices are
projected to flatten out for the next several years given large demand to meet the 30% federal
investment tax credit deadline at the end of 2016 and recently announced panel tariffs on certain
Chinese imports. Other technologies, such as gas turbines, and wind turbines have seen more
stable prices since the 2013 IRP. Forecasting resource costs is increasingly more challenging for
projects proposed for construction many years in the future.
Some generation technologies, such as integrated gasification combined cycle (IGCC), have
shown significant cost uncertainty because of the scarcity of projects units being constructed and
operated. Recent experience with the significant cost overruns on IGCC projects such as Duke
Energy’s Edwardsport and Southern Company’s Kemper County IGCC plants illustrate the
difficulty in accurately estimating capital costs of these developing resource options. As these
technologies mature and more plants are constructed, the costs of such new technologies may
decrease relative to more mature options such as natural gas-fueled resources.
The Supply Side Resource options tables do not include the potential for such capital cost
reductions since the benefits are not expected to be realized until the next generation of new
plants are built and operated. For example, construction and operating “experience curve”
benefits for IGCC plants are not expected to be available until after their commercial operation
dates. As such, future IRPs will be better able to incorporate the potential benefits of future cost
reductions. The estimated capital costs are displayed in the Supply Side Resource tables along
with expected availability of each technology.
Resource Options and Attributes
Table 6.1. lists the cost and performance attributes for supply-side resources designated by
generic, elevation-specific regions where resources could potentially be located:
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
91
ISO conditions (sea level and 59 degrees F); used as a reference only for certain
modeling purposes.
1,500 feet elevation: eastern Oregon/Washington.
3,000 feet elevation: southern/central Oregon
5,050 feet elevation: central Utah, southern Idaho, central Wyoming.
6,500 feet elevation: southwestern Wyoming.
Table 6.2 presents the total resource cost attributes for supply-side resource options, and are
based on estimates of the first-year, real-levelized costs for resources, stated in June 2014
dollars. In the previous IRP, there was a proxy elevation of 4,500’ reflecting potential siting of
resources in northern Utah, specifically in Salt Lake/Utah/Davis/Box Elder counties; this general
area has been removed from the current IRP based on recent changes in the state implementation
plans for these counties regarding particulate matter 2.5 microns and less (PM2.5).
A Glossary of Terms and a Glossary of Acronyms from the Supply Side Resource table is
summarized in Table 6.4
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
92
Table 6.1 – 2015 Supply Side Resource Table (2014$)
Description Resource Characteristics Costs Operating Characteristics Environmental
Fuel Resource
Elevation
(AFSL)
Net
Capacity
(MW)
Commercial
Operation
Year
Design
Life (yrs)
Base Capital
($/KW)
Var O&M
($/MWh)
Fixed
O&M
($/KW-yr)
Average Full Load Heat
Rate (HHV
Btu/KWh)/Efficiency
EFOR
(%)
POR
(%)
Water
Consumed
(Gal/MWh)
SO2
(lbs
/MMBtu)
NOx
(lbs
/MMBtu)
Hg
(lbs
/TBTu)
CO2
(lbs
/MMBtu)
Natural Gas SCCT Aero x3, ISO 0 168 2019 30 1,188 2.98 9.57 9,738 2.6 3.9 58 0.0006 0.018 0.255 118
Natural Gas Intercooled SCCT Aero x1, ISO 0 106 2019 30 1,508 2.94 15.44 8,866 2.9 3.9 80 0.0006 0.018 0.255 118
Natural Gas SCCT Frame "F" x1, ISO 0 223 2019 35 779 3.54 10.04 9,780 2.7 3.9 20 0.0006 0.018 0.255 118
Natural Gas IC Recips x6, ISO 0 109 2019 35 1,553 8.05 17.79 8,134 2.5 5.0 5 0.0006 0.0295 0.255 118
Natural Gas CCCT Dry "F", 2x1, ISO 0 643 2021 40 895 1.14 4.90 6,636 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "F", DF, 2x1, ISO 0 101 2021 40 755 0.11 0.00 9,560 0.8 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "G/H", 1x1, ISO 0 393 2020 40 827 2.29 8.31 6,697 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "G/H", DF, 1x1, ISO 0 48 2020 40 604 0.10 0.00 8,451 0.8 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "G/H", 2x1, ISO 0 790 2021 40 820 2.11 4.38 6,666 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "G/H", DF, 2x1, ISO 0 96 2021 40 636 0.09 0.00 7,504 0.8 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "J", Adv 1x1, ISO 0 457 2020 40 860 2.00 7.22 6,494 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "J", DF, Adv 1x1, ISO 0 43 2020 40 481 0.10 0.00 8,610 0.8 3.8 11 0.0006 0.008 0.255 118
Natural Gas SCCT Aero x3 1,500 159 2019 30 1,251 3.11 10.08 9,738 2.6 3.9 58 0.0006 0.018 0.255 118
Natural Gas Intercooled SCCT Aero x1 1,500 101 2019 30 1,587 3.07 16.17 8,867 2.9 3.9 80 0.0006 0.018 0.255 118
Natural Gas SCCT Frame "F" x1 1,500 212 2019 35 820 3.73 10.59 9,781 2.7 3.9 20 0.0006 0.018 0.255 118
Natural Gas IC Recips x 6 1,500 109 2019 35 1,553 8.05 17.79 8,135 2.5 5.0 5 0.0006 0.030 0.255 118
Natural Gas CCCT Dry "F", 2x1 1,500 610 2021 40 942 1.20 5.14 6,637 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "F", DF, 2x1 1,500 101 2021 40 755 0.11 0.00 9,561 0.8 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "G/H", 2x1 1,500 750 2021 40 864 2.21 4.59 6,667 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "G/H", DF, 2x1 1,500 96 2021 40 636 0.09 0.00 7,504 0.8 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "J", Adv 1x1 1,500 434 2020 40 906 2.00 7.22 6,495 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "J", DF, Adv 1x1 1,500 43 2020 40 481 0.10 0.00 8,611 0.8 3.8 11 0.0006 0.008 0.255 118
Natural Gas SCCT Aero x3 3,000 151 2019 30 1,321 3.26 10.58 9,738 2.6 3.9 58 0.0006 0.018 0.255 118
Natural Gas Intercooled SCCT Aero x1 3,000 95 2019 30 1,676 3.24 17.14 8,867 2.9 3.9 80 0.0006 0.018 0.255 118
Natural Gas SCCT Frame "F" x1 3,000 200 2019 35 866 3.95 11.87 9,781 2.7 3.9 20 0.0006 0.018 0.255 118
Natural Gas IC Recips x 6 3,000 109 2019 35 1,553 8.05 17.79 8,135 2.5 5.0 5 0.0006 0.030 0.255 118
Natural Gas CCCT Dry "F", 2x1 3,000 578 2021 40 995 1.26 5.40 6,637 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "F", DF, 2x1 3,000 101 2021 40 755 0.11 0.00 9,561 0.8 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "G/H", 2x1 3,000 710 2021 40 912 2.33 4.82 6,667 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "G/H", DF, 2x1 3,000 96 2021 40 636 0.09 0.00 7,504 0.8 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "J", Adv 1x1 3,000 411 2020 40 956 2.11 7.57 6,495 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "J", DF, Adv 1x1 3,000 43 2020 40 481 0.10 0.00 8,611 0.8 3.8 11 0.0006 0.008 0.255 118
Natural Gas SCCT Aero x3 5,050 140 2019 30 1,430 3.48 11.41 9,739 2.6 3.9 58 0.0006 0.018 0.255 118
Natural Gas Intercooled SCCT Aero x1 5,050 88 2019 30 1,815 3.46 18.44 8,867 2.9 3.9 80 0.0006 0.018 0.255 118
Natural Gas SCCT Frame "F" x1 5,050 185 2019 35 937 4.24 9.51 9,781 2.7 3.9 20 0.0006 0.018 0.255 118
Natural Gas IC Recips x6 5,050 109 2019 35 1,553 8.05 17.79 8,135 2.5 5.0 5 0.0006 0.0295 0.255 118
Natural Gas CCCT Dry "F", 1x1 5,050 265 2020 40 1,152 1.60 11.19 6,667 2.5 3.8 11 0.0006 0.007 0.255 118
Natural Gas CCCT Dry "F", DF, 1x1 5,050 48 2020 40 539 0.09 0.00 7,864 0.8 3.8 11 0.0006 0.007 0.255 118
Natural Gas CCCT Dry "F", 2x1 5,050 534 2021 40 1,077 1.36 5.80 6,637 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "F", DF, 2x1 5,050 101 2021 40 755 0.11 0.00 9,561 0.8 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "G/H", 1x1 5,050 327 2020 40 996 2.77 9.89 6,698 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "G/H", DF, 1x1 5,050 48 2020 40 604 0.10 0.00 8,452 0.8 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "G/H", 2x1 5,050 656 2021 40 987 2.51 5.18 6,667 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "G/H", DF, 2x1 5,050 96 2021 40 636 0.09 0.00 7,504 0.8 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "J", Adv 1x1 5,050 380 2020 40 1,035 2.34 8.58 6,495 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "J", DF, Adv 1x1 5,050 43 2020 40 481 0.10 0.00 8,611 0.8 3.8 11 0.0006 0.008 0.255 118
Natural Gas Molten Carbonate Fuel Cell 5,050 5 2017 20 5,106 10.10 8.82 8,061 3.0 2.0 2 0 0 0 118
Natural Gas SCCT Aero x3 6,500 131 2019 30 1,519 3.66 12.11 9,739 2.6 3.9 58 0.0006 0.018 0.255 118
Natural Gas Intercooled SCCT Aero x1 6,500 83 2019 30 1,927 3.65 19.51 8,867 2.9 3.9 80 0.0006 0.018 0.255 118
Natural Gas SCCT Frame "F" x1 6,500 174 2019 35 996 4.50 12.17 9,781 2.7 3.9 20 0.0006 0.018 0.255 118
Natural Gas IC Recips x6 6,500 109 2019 35 1,553 8.05 17.79 8,135 2.5 5.0 5 0.0006 0.0295 0.255 118
Natural Gas CCCT Dry "G/H", 2x1 6,500 618 2021 40 1,049 2.66 5.47 6,667 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "G/H", DF, 2x1 6,500 96 2021 40 636 0.09 0.00 7,504 0.8 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "J", Adv 1x1 6,500 358 2020 40 1,099 2.48 9.08 6,495 2.5 3.8 11 0.0006 0.008 0.255 118
Natural Gas CCCT Dry "J", DF, Adv 1x1 6,500 43 2020 40 481 0.10 0.00 8,611 0.8 3.8 11 0.0006 0.008 0.255 118
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
93
Table 6.1 – 2015 Supply Side Resource Table (2014$) (Continued)
Description Resource Characteristics Costs Operating Characteristics Environmental
Fuel Resource
Elevation
(AFSL)
Net
Capacity
(MW)
Commercial
Operation
Year
Design
Life (yrs)
Base Capital
($/KW)
Var O&M
($/MWh)
Fixed
O&M
($/KW-yr)
Average Full Load Heat
Rate (HHV
Btu/KWh)/Efficiency
EFOR
(%)
POR
(%)
Water
Consumed
(Gal/MWh)
SO2
(lbs
/MMBtu)
NOx
(lbs
/MMBtu)
Hg
(lbs
/TBTu)
CO2
(lbs
/MMBtu)
Coal SCPC with CCS 5,000 526 2032 40 5,946 6.71 69.22 13,087 5.0 5.0 1,004 0.009 0.070 0.022 20.5
Coal SCPC without CCS 5,000 600 2027 40 3,289 0.96 40.65 9,106 4.6 4.0 600 0.005 0.070 0.022 205.4
Coal IGCC with CCS 5,000 466 2032 40 5,757 11.28 55.78 10,823 8.0 7.0 394 0.009 0.050 0.333 20.5
Coal IGCC without CCS 5,000 560 2027 40 4,104 8.39 42.45 8,734 8.0 7.0 361 0.013 0.059 0.333 205.4
Coal PC CCS retrofit @ 500 MW 5,000 -139 2029 20 1,305 6.20 74.52 14,372 5.0 5.0 1,004 0.005 0.070 1.200 20.5
Coal SCPC with CCS 6,500 692 2032 40 6,734 7.26 64.29 13,242 5.0 5.0 1,004 0.009 0.070 0.022 20.5
Coal SCPC without CCS 6,500 790 2027 40 3,724 1.27 37.71 9,214 4.6 4.0 600 0.005 0.070 0.022 205.4
Coal IGCC with CCS 6,500 456 2032 40 6,519 13.52 60.76 11,047 8.0 7.0 394 0.009 0.050 0.333 20.5
Coal IGCC without CCS 6,500 548 2027 40 4,647 10.06 46.24 8,915 8.0 7.0 361 0.013 0.059 0.333 205.4
Coal PC CCS retrofit @ 500 MW 6,500 -139 2029 20 1,478 6.71 69.22 14,372 5.0 5.0 1,004 0.005 0.070 1.200 20.5
Geothermal Blundell Dual Flash 90% CF 5,000 35 2019 40 5,748 1.30 106.79 n/a 5.0 5.0 10 n/a n/a n/a n/a
Geothermal Greenfield Binary 90% CF 5,000 43 2021 40 7,396 1.30 165.63 n/a 5.0 5.0 270 n/a n/a n/a n/a
Geothermal Generic Geothermal PPA 90% CF 5,000 30 2016 20 n/a 93.46 n/a n/a 5.0 5.0 270 n/a n/a n/a n/a
Wind 2.0 MW turbine 29% CF WA/OR 1,500 100 2020 30 2,135 0.00 34.46 n/a Included with CF n/a n/a n/a n/a n/a
Wind 2.0 MW turbine 31% CF UT/ID 4,500 100 2020 30 2,188 0.00 34.46 n/a Included with CF n/a n/a n/a n/a n/a
Wind 2.0 MW turbine 43% CF WY 6,500 100 2020 30 2,156 0.67 34.46 n/a Included with CF n/a n/a n/a n/a n/a
Solar PV Poly-Si Fixed Tilt 26.5% CF 5,000 5.4 2017 25 3,080 0.00 33.50 n/a Included with CF n/a n/a n/a n/a n/a
Solar PV Poly-Si Single Tracking 31.6% CF 5,000 5.4 2017 25 3,261 0.00 37.20 n/a Included with CF n/a n/a n/a n/a n/a
Solar PV Poly-Si Fixed Tilt 26.5% CF 5,000 50.4 2018 25 2,546 0.00 30.90 n/a Included with CF n/a n/a n/a n/a n/a
Solar PV Poly-Si Single Tracking 31.6% CF 5,000 50.4 2018 25 2,702 0.00 34.88 n/a Included with CF n/a n/a n/a n/a n/a
Solar PV Poly-Si Fixed Tilt 25.4% CF 4,000 50.4 2018 25 2,659 0.00 31.32 n/a Included with CF n/a n/a n/a n/a n/a
Solar PV Poly-Si Single Tracking 29.2% CF 4,000 50.4 2018 25 2,829 0.00 35.47 n/a Included with CF n/a n/a n/a n/a n/a
Solar CSP Trough w Natural Gas - 24% Solar 5,000 100 2019 30 5,826 0.00 66.19 11,750 Included with CF 725 n/a n/a n/a n/a
Solar CSP Tower 24% CF 5,000 100 2019 30 5,549 0.00 66.19 n/a Included with CF 725 n/a n/a n/a n/a
Solar CSP Tower Molten Salt 30% CF 5,000 100 2019 30 6,657 0.00 66.19 n/a Included with CF 750 n/a n/a n/a n/a
Biomass Forestry Byproduct 1,500 5 2017 30 4,291 0.96 40.65 10,017 5.06 4.4 660 0.1 0.2 0.4 205
Storage Pumped Storage (5280 MWh)5,000 600 2022 60 2,862 3.49 19.36 77.5%3 1.9 0 0 0 0 0
Storage Lithium Ion Battery (7.2 MWh/day)5,000 1 2016 20 10,160 0.00 28.68 91.0%3 1.9 0 0 0 0 0
Storage Sodium-Sulfur Battery (7.2 MWh/day)5,000 1 2016 20 4,740 0.00 28.68 72.5% 0.3 0 0 0 0 0 0
Storage Vanadium RedOx Battery (7.2 MWh/day) 5,000 1 2016 20 5,735 0.00 36.53 70.0%2 0 0 0 0 0 0
Storage Advanced Fly Wheel (1667 KWh/day)5,000 20 2019 20 2,585 0.00 1.85 85.0%2 1 0 0 0 0 0
Storage CAES (Mona, UT; 83.4% eff; 2,400 MWh) 4,640 300 2020 30 2,709 2.28 18.78 4,390 2.5 4.5 0 0.0006 0.018 0.255 118
Nuclear Advanced Fission 5,000 2,234 2025 40 9,042 9.80 96.00 10,710 7.7 7.3 767 0 0 0 0
Nuclear Small Modular Reactor x 12 5,000 518 2031 40 5,754 8.70 64.54 10,710 7.7 7.3 767 0 0 0 0
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
94
Table 6.2 – Total Resource Cost for Supply-Side Resource Options
Resource Description O&M
Capitalized
Premium
O&M
Capitalized
Gas
Transporta
tion Total
SCCT Aero x3, ISO 0 $1,188 8.247%$97.99 9.57 1.89%0.18 34.98 44.73 $142.72
Intercooled SCCT Aero x1, ISO 0 $1,508 8.247%$124.34 15.44 1.89%0.29 31.84 47.57 $171.91
SCCT Frame "F" x1, ISO 0 $779 7.767%$60.49 10.04 1.31%0.13 35.13 45.30 $105.79
IC Recips x6, ISO 0 $1,553 8.247%$128.05 17.79 0.73%0.13 29.21 47.13 $175.19
CCCT Dry "F", 2x1, ISO 0 $895 7.682%$68.73 4.90 2.79%0.14 23.83 28.87 $97.60
CCCT Dry "F", DF, 2x1, ISO 0 $755 7.682%$58.00 0.00 0.00%0.00 34.34 34.34 $92.33
CCCT Dry "G/H", 1x1, ISO 0 $827 7.682%$63.55 8.31 3.87%0.32 24.05 32.69 $96.24
CCCT Dry "G/H", DF, 1x1, ISO 0 $604 7.682%$46.38 0.00 0.00%0.00 30.35 30.35 $76.73
CCCT Dry "G/H", 2x1, ISO 0 $820 7.682%$63.01 4.38 3.56%0.16 23.94 28.48 $91.50
CCCT Dry "G/H", DF, 2x1, ISO 0 $636 7.682%$48.84 0.00 0.00%0.00 26.95 26.95 $75.79
CCCT Dry "J", Adv 1x1, ISO 0 $860 7.682%$66.07 7.22 3.87%0.28 23.32 30.82 $96.89
CCCT Dry "J", DF, Adv 1x1, ISO 0 $481 7.682%$36.93 0.00 0.00%0.00 30.92 30.92 $67.85
SCCT Aero x3 1500 $1,251 8.247%$103.18 10.08 1.89%0.19 34.98 45.25 $148.42
Intercooled SCCT Aero x1 1500 $1,587 8.247%$130.92 16.17 1.89%0.31 31.85 48.32 $179.24
SCCT Frame "F" x1 1500 $820 7.767%$63.69 10.59 1.31%0.14 35.13 45.86 $109.55
IC Recips x 6 1500 $1,553 8.247%$128.05 17.79 0.73%0.13 29.22 47.14 $175.19
CCCT Dry "F", 2x1 1500 $942 7.682%$72.36 5.14 2.79%0.14 23.84 29.12 $101.49
CCCT Dry "F", DF, 2x1 1500 $755 7.682%$58.00 0.00 0.00%0.00 34.34 34.34 $92.34
CCCT Dry "G/H", 2x1 1500 $864 7.682%$66.35 4.59 3.56%0.16 23.95 28.70 $95.05
CCCT Dry "G/H", DF, 2x1 1500 $636 7.682%$48.84 0.00 0.00%0.00 26.95 26.95 $75.79
CCCT Dry "J", Adv 1x1 1500 $906 7.682%$69.57 7.22 3.87%0.28 23.33 30.82 $100.39
CCCT Dry "J", DF, Adv 1x1 1500 $481 7.682%$36.93 0.00 0.00%0.00 30.93 30.93 $67.85
SCCT Aero x3 3000 $1,321 8.247%$108.94 10.58 1.89%0.20 20.48 31.26 $140.20
Intercooled SCCT Aero x1 3000 $1,676 8.247%$138.23 17.14 1.89%0.32 18.65 36.11 $174.34
SCCT Frame "F" x1 3000 $866 7.767%$67.25 11.87 1.31%0.16 20.57 32.59 $99.84
IC Recips x 6 3000 $1,553 8.247%$128.05 17.79 0.73%0.13 17.11 35.03 $163.08
CCCT Dry "F", 2x1 3000 $995 7.682%$76.41 5.40 2.79%0.15 13.96 19.51 $95.91
CCCT Dry "F", DF, 2x1 3000 $755 7.682%$58.00 0.00 0.00%0.00 20.11 20.11 $78.11
CCCT Dry "G/H", 2x1 3000 $912 7.682%$70.05 4.82 3.56%0.17 14.02 19.01 $89.07
CCCT Dry "G/H", DF, 2x1 3000 $636 7.682%$48.84 0.00 0.00%0.00 15.78 15.78 $64.62
CCCT Dry "J", Adv 1x1 3000 $956 7.682%$73.45 7.57 3.87%0.29 13.66 21.53 $94.98
CCCT Dry "J", DF, Adv 1x1 3000 $481 7.682%$36.93 0.00 0.00%0.00 18.11 18.11 $55.03
Supply Side Resource Options
Mid-Calendar Year 2014 Dollars ($)
Total Fixed
($/kW-Yr)
Capital Cost $/kW Fixed Cost
Elevation
(AFSL) Total Capital Cost
Payment
Factor
Annual
Payment
($/kW-Yr)
Fixed O&M $/kW-Yr
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
95
Table 6.2 – Total Resource Cost for Supply-Side Resource Options (Continued)
Credits
Resource Description
Capacity
Factor
Total Fixed
(Mills/kWh)
Storage
Efficiency ¢/mmBtu Mills/kWh O&M
Capitalized
Premium
O&M
Capitalized
Integration
Cost
Environmental
PTC Tax
Credits / ITC
(Solar Only)
SCCT Aero x3, ISO 0 33%49.37 na 483 47.00 2.98 11.19%0.33 - - 99.68 - 99.68
Intercooled SCCT Aero x1, ISO 0 33%59.47 na 483 42.79 2.94 11.45%0.34 - - 105.53 - 105.53
SCCT Frame "F" x1, ISO 0 33%36.59 na 483 47.20 3.54 14.39%0.51 - - 87.85 - 87.85
IC Recips x6, ISO 0 33%60.60 na 483 39.26 8.05 8.43%0.68 - - 108.59 - 108.59
CCCT Dry "F", 2x1, ISO 0 78%14.28 na 483 32.03 1.14 14.72%0.17 - - 47.62 - 47.62
CCCT Dry "F", DF, 2x1, ISO 0 12%87.84 na 483 46.14 0.11 0.00%0.00 - - 134.08 - 134.08
CCCT Dry "G/H", 1x1, ISO 0 78%14.08 na 483 32.32 2.29 13.33%0.31 - - 49.01 - 49.01
CCCT Dry "G/H", DF, 1x1, ISO 0 12%72.99 na 483 40.79 0.10 0.00%0.00 - - 113.88 - 113.88
CCCT Dry "G/H", 2x1, ISO 0 78%13.39 na 483 32.17 2.11 14.41%0.30 - - 47.97 - 47.97
CCCT Dry "G/H", DF, 2x1, ISO 0 12%72.10 na 483 36.21 0.09 0.00%0.00 - - 108.40 - 108.40
CCCT Dry "J", Adv 1x1, ISO 0 78%14.18 na 483 31.34 2.00 13.33%0.27 - - 47.79 - 47.79
CCCT Dry "J", DF, Adv 1x1, ISO 0 12%64.54 na 483 41.56 0.10 0.00%0.00 - - 106.20 - 106.20
SCCT Aero x3 1500 33%51.34 na 483 47.00 3.11 11.19%0.35 - - 101.80 - 101.80
Intercooled SCCT Aero x1 1500 33%62.00 na 483 42.79 3.07 11.45%0.35 - - 108.22 - 108.22
SCCT Frame "F" x1 1500 33%37.90 na 483 47.21 3.73 14.39%0.54 - - 89.37 - 89.37
IC Recips x 6 1500 33%60.60 na 483 39.26 8.05 8.43%0.68 - - 108.59 - 108.59
CCCT Dry "F", 2x1 1500 78%14.85 na 483 32.03 1.20 14.72%0.18 - - 48.26 - 48.26
CCCT Dry "F", DF, 2x1 1500 12%87.84 na 483 46.14 0.11 0.00%0.00 - - 134.09 - 134.09
CCCT Dry "G/H", 2x1 1500 78%13.91 na 483 32.17 2.21 14.41%0.32 - - 48.62 - 48.62
CCCT Dry "G/H", DF, 2x1 1500 12%72.10 na 483 36.22 0.09 0.00%0.00 - - 108.40 - 108.40
CCCT Dry "J", Adv 1x1 1500 78%14.69 na 483 31.34 2.00 13.33%0.27 - - 48.31 - 48.31
CCCT Dry "J", DF, Adv 1x1 1500 12%64.55 na 483 41.56 0.10 0.00%0.00 - - 106.20 - 106.20
SCCT Aero x3 3000 33%48.50 na 481 46.82 3.26 11.19%0.36 - - 98.95 - 98.95
Intercooled SCCT Aero x1 3000 33%60.31 na 481 42.63 3.24 11.45%0.37 - - 106.55 - 106.55
SCCT Frame "F" x1 3000 33%34.54 na 481 47.03 3.95 14.39%0.57 - - 86.09 - 86.09
IC Recips x 6 3000 33%56.41 na 481 39.12 8.05 8.43%0.68 - - 104.26 - 104.26
CCCT Dry "F", 2x1 3000 78%14.04 na 481 31.91 1.26 14.72%0.19 - - 47.40 - 47.40
CCCT Dry "F", DF, 2x1 3000 12%74.30 na 481 45.97 0.11 0.00%0.00 - - 120.38 - 120.38
CCCT Dry "G/H", 2x1 3000 78%13.04 na 481 32.05 2.33 14.41%0.34 - - 47.76 - 47.76
CCCT Dry "G/H", DF, 2x1 3000 12%61.47 na 481 36.08 0.09 0.00%0.00 - - 97.64 - 97.64
CCCT Dry "J", Adv 1x1 3000 78%13.90 na 481 31.23 2.11 13.33%0.28 - - 47.52 - 47.52
CCCT Dry "J", DF, Adv 1x1 3000 12%52.35 na 481 41.40 0.10 0.00%0.00 - - 93.86 - 93.86
Supply Side Resource Options
Mid-Calendar Year 2014 Dollars ($)
Elevation
(AFSL)
Levelized Fuel
Total
Resource
Cost
Total Resource
Cost -
With PTC / ITC
Credits
Convert to Mills
Variable Costs
(mills/kWh)
Total Costs and Credits
(Mills/kWh)
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
96
Table 6.2 – Total Resource Cost for Supply-Side Resource Options (Continued)
Resource Description O&M
Capitalized
Premium
O&M
Capitalized
Gas
Transporta
tion Total
SCCT Aero x3 5050 $1,430 8.247%$117.95 11.41 1.89%0.22 14.83 26.46 $144.40
Intercooled SCCT Aero x1 5050 $1,815 8.247%$149.66 18.44 1.89%0.35 13.50 32.29 $181.95
SCCT Frame "F" x1 5050 $937 7.767%$72.81 9.51 1.31%0.12 14.90 24.53 $97.34
IC Recips x6 5050 $1,553 8.247%$128.05 17.79 0.73%0.13 12.39 30.31 $158.36
CCCT Dry "F", 1x1 5050 $1,152 7.682%$88.49 11.19 2.94%0.33 10.15 21.68 $110.16
CCCT Dry "F", DF, 1x1 5050 $539 7.682%$41.42 0.00 0.00%0.00 11.98 11.98 $53.39
CCCT Dry "F", 2x1 5050 $1,077 7.682%$82.72 5.80 2.79%0.16 10.11 16.07 $98.80
CCCT Dry "F", DF, 2x1 5050 $755 7.682%$58.00 0.00 0.00%0.00 14.56 14.56 $72.56
CCCT Dry "G/H", 1x1 5050 $996 7.682%$76.49 9.89 3.87%0.38 10.20 20.47 $96.97
CCCT Dry "G/H", DF, 1x1 5050 $604 7.682%$46.38 0.00 0.00%0.00 12.87 12.87 $59.25
CCCT Dry "G/H", 2x1 5050 $987 7.682%$75.85 5.18 3.72%0.19 10.15 15.52 $91.37
CCCT Dry "G/H", DF, 2x1 5050 $636 7.682%$48.84 0.00 0.00%0.00 11.43 11.43 $60.26
CCCT Dry "J", Adv 1x1 5050 $1,035 7.682%$79.53 8.58 3.87%0.33 9.89 18.80 $98.33
CCCT Dry "J", DF, Adv 1x1 5050 $481 7.682%$36.93 0.00 0.00%0.00 13.11 13.11 $50.04
Molten Carbonate Fuel Cell 5050 $5,106 6.974%$356.09 8.82 1.33%0.12 12.28 21.21 $377.31
SCCT Aero x3 6500 $1,519 8.247%$125.27 12.11 1.89%0.23 9.65 21.99 $147.26
Intercooled SCCT Aero x1 6500 $1,927 8.247%$158.95 19.51 1.89%0.37 8.79 28.67 $187.61
SCCT Frame "F" x1 6500 $996 7.767%$77.33 12.17 1.31%0.16 9.69 22.02 $99.35
IC Recips x6 6500 $1,553 8.247%$128.05 17.79 0.73%0.13 8.06 25.98 $154.04
CCCT Dry "G/H", 2x1 6500 $1,049 7.682%$80.56 5.47 3.72%0.20 6.61 12.28 $92.83
CCCT Dry "G/H", DF, 2x1 6500 $636 7.682%$48.84 0.00 0.00%0.00 7.44 7.44 $56.27
CCCT Dry "J", Adv 1x1 6500 $1,099 7.682%$84.46 9.08 3.87%0.35 6.44 15.87 $100.33
CCCT Dry "J", DF, Adv 1x1 6500 $481 7.682%$36.93 0.00 0.00%0.00 8.53 8.53 $45.46
SCPC with CCS 5000 $5,946 7.577%$450.53 69.22 0.00 0.00 69.22 $519.75
SCPC without CCS 5000 $3,289 7.625%$250.77 40.65 0.00 0.00 40.65 $291.42
IGCC with CCS 5000 $5,757 7.254%$417.61 55.78 0.00 0.00 55.78 $473.38
IGCC without CCS 5000 $4,104 7.261%$298.00 42.45 0.00 0.00 42.45 $340.44
PC CCS retrofit @ 500 MW 5000 $1,305 7.554%$98.61 74.52 0.00 0.00 74.52 $173.13
SCPC with CCS 6500 $6,734 7.577%$510.20 64.29 0.00 0.00 64.29 $574.49
SCPC without CCS 6500 $3,724 7.625%$283.97 37.71 0.00 0.00 37.71 $321.69
IGCC with CCS 6500 $6,519 7.254%$472.86 60.76 0.00 0.00 60.76 $533.62
IGCC without CCS 6500 $4,647 7.261%$337.42 46.24 0.00 0.00 46.24 $383.66
PC CCS retrofit @ 500 MW 6500 $1,478 7.554%$111.67 69.22 0.00 0.00 69.22 $180.89
Supply Side Resource Options
Mid-Calendar Year 2014 Dollars ($)
Total Fixed
($/kW-Yr)
Capital Cost $/kW Fixed Cost
Elevation
(AFSL) Total Capital Cost
Payment
Factor
Annual
Payment
($/kW-Yr)
Fixed O&M $/kW-Yr
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
97
Table 6.2 – Total Resource Cost for Supply-Side Resource Options (Continued)
Credits
Resource Description Capacity
Factor
Total Fixed
(Mills/kWh)
Storage
Efficiency ¢/mmBtu Mills/kWh O&M
Capitalized
Premium
O&M
Capitalized
Integration
Cost
Environmental
PTC Tax
Credits / ITC
(Solar Only)
SCCT Aero x3 5050 33%49.95 na 474 46.17 3.48 11.19%0.39 - - 99.99 - 99.99
Intercooled SCCT Aero x1 5050 33%62.94 na 474 42.04 3.46 11.45%0.40 - - 108.83 - 108.83
SCCT Frame "F" x1 5050 33%33.67 na 474 46.37 4.24 14.39%0.61 - - 84.89 - 84.89
IC Recips x6 5050 33%54.78 na 474 38.57 8.05 8.43%0.68 - - 102.08 - 102.08
CCCT Dry "F", 1x1 5050 78%16.12 na 474 31.61 1.60 13.02%0.21 - - 49.54 - 49.54
CCCT Dry "F", DF, 1x1 5050 12%50.79 na 474 37.28 0.09 0.00%0.00 - - 88.16 - 88.16
CCCT Dry "F", 2x1 5050 78%14.46 na 474 31.46 1.36 14.57%0.20 - - 47.48 - 47.48
CCCT Dry "F", DF, 2x1 5050 12%69.02 na 474 45.33 0.11 0.00%0.00 - - 114.46 - 114.46
CCCT Dry "G/H", 1x1 5050 78%14.19 na 474 31.75 2.77 13.02%0.36 - - 49.07 - 49.07
CCCT Dry "G/H", DF, 1x1 5050 12%56.36 na 474 40.07 0.10 0.00%0.00 - - 96.53 - 96.53
CCCT Dry "G/H", 2x1 5050 78%13.37 na 474 31.61 2.51 14.26%0.36 - - 47.85 - 47.85
CCCT Dry "G/H", DF, 2x1 5050 12%57.33 na 474 35.58 0.09 0.00%0.00 - - 92.99 - 92.99
CCCT Dry "J", Adv 1x1 5050 78%14.39 na 474 30.79 2.34 13.64%0.32 - - 47.83 - 47.83
CCCT Dry "J", DF, Adv 1x1 5050 12%47.60 na 474 40.82 0.10 0.00%0.00 - - 88.52 - 88.52
Molten Carbonate Fuel Cell 5050 95%45.31 na 474 38.21 10.10 9.86%1.00 - - 94.62 - 94.62
SCCT Aero x3 6500 33%50.94 na 466 45.40 3.66 11.19%0.41 - - 100.41 - 100.41
Intercooled SCCT Aero x1 6500 33%64.90 na 466 41.33 3.65 11.45%0.42 - - 110.30 - 110.30
SCCT Frame "F" x1 6500 33%34.37 na 466 45.60 4.50 14.39%0.65 - - 85.11 - 85.11
IC Recips x6 6500 33%53.28 na 466 37.92 8.05 8.43%0.68 - - 99.94 - 99.94
CCCT Dry "G/H", 2x1 6500 78%13.59 na 466 31.08 2.66 14.26%0.38 - - 47.70 - 47.70
CCCT Dry "G/H", DF, 2x1 6500 12%53.53 na 466 34.98 0.09 0.00%0.00 - - 88.60 - 88.60
CCCT Dry "J", Adv 1x1 6500 78%14.68 na 466 30.27 2.48 13.64%0.34 - - 47.77 - 47.77
CCCT Dry "J", DF, Adv 1x1 6500 12%43.24 na 466 40.14 0.10 0.00%0.00 - - 83.48 - 83.48
SCPC with CCS 5000 90%65.74 na 6.71 NC - NC
SCPC without CCS 5000 92%36.32 na 0.96 NC - NC
IGCC with CCS 5000 86%63.16 na 11.28 NC - NC
IGCC without CCS 5000 86%45.42 na 8.39 NC - NC
PC CCS retrofit @ 500 MW 5000 90%21.90 na 6.20 NC - NC
SCPC with CCS 6500 90%72.67 na 7.26 NC - NC
SCPC without CCS 6500 92%40.10 na 1.27 NC - NC
IGCC with CCS 6500 86%71.20 na 13.52 NC - NC
IGCC without CCS 6500 86%51.19 na 10.06 NC - NC
PC CCS retrofit @ 500 MW 6500 90%22.88 na 6.71 NC - NC
Supply Side Resource Options
Mid-Calendar Year 2014 Dollars ($)
Elevation
(AFSL)
Levelized Fuel
Total
Resource
Cost
Total Resource
Cost -
With PTC / ITC
Credits
Convert to Mills
Variable Costs
(mills/kWh)
Total Costs and Credits
(Mills/kWh)
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
98
Table 6.2 – Total Resource Cost for Supply-Side Resource Options (Continued)
Resource Description O&M
Capitalized
Premium
O&M
Capitalized
Gas
Transporta
tion Total
Blundell Dual Flash 90% CF $5,748 6.676%$383.72 106.79 0.00%0.00 0.00 106.79 $490.51
Greenfield Binary 90% CF $7,396 6.676%$493.74 165.63 0.00%0.00 0.00 165.63 $659.37
Generic Geothermal PPA 90% CF $0 6.676%$0.00 0.00 0.00%0.00 0.00 0.00 $0.00
2.0 MW turbine 29% CF WA/OR $2,135 7.399%$157.96 34.46 0.00%0.00 0.00 34.46 $192.42
2.0 MW turbine 31% CF UT/ID $2,188 7.399%$161.89 34.46 0.00%0.00 0.00 34.46 $196.35
2.0 MW turbine 43% CF WY $2,156 7.399%$159.49 34.46 0.00%0.00 0.00 34.46 $193.94
PV Poly-Si Fixed Tilt 26.5% CF $3,080 8.029%$247.32 33.50 0.00%0.00 0.00 33.50 $280.82
PV Poly-Si Single Tracking 31.6% CF $3,261 8.029%$261.80 37.20 0.00%0.00 0.00 37.20 $299.00
PV Poly-Si Fixed Tilt 26.5% CF $2,546 8.029%$204.43 30.90 0.00%0.00 0.00 30.90 $235.33
PV Poly-Si Single Tracking 31.6% CF $2,702 8.029%$216.97 34.88 0.00%0.00 0.00 34.88 $251.85
PV Poly-Si Fixed Tilt 25.4% CF $2,659 8.029%$213.47 31.32 0.00%0.00 0.00 31.32 $244.79
PV Poly-Si Single Tracking 29.2% CF $2,829 8.029%$227.12 35.47 0.00%0.00 0.00 35.47 $262.59
CSP Trough w Natural Gas - 24% Solar $5,826 7.399%$431.04 66.19 0.00%0.00 17.89 84.08 $515.12
CSP Tower 24% CF $5,549 7.399%$410.60 66.19 0.00%0.00 0.00 66.19 $476.79
CSP Tower Molten Salt 30% CF $6,657 7.399%$492.52 66.19 0.00%0.00 0.00 66.19 $558.71
Forestry Byproduct $4,291 7.399%$317.49 40.65 0.00 0.00 40.65 $358.14
Pumped Storage (5280 MWh)$2,862 7.001%$200.38 19.36 0.00%0.00 0.00 19.36 $219.74
Lithium Ion Battery (7.2 MWh/day)$10,160 10.428%$1,059.57 28.68 0.00%0.00 0.00 28.68 $1,088.24
Sodium-Sulfur Battery (7.2 MWh/day)$4,740 10.428%$494.28 28.68 0.00%0.00 0.00 28.68 $522.96
Vanadium RedOx Battery (7.2 MWh/day)$5,735 10.428%$598.05 36.53 0.00%0.00 0.00 36.53 $634.58
Advanced Fly Wheel (1667 KWh/day)$2,585 8.531%$220.56 1.85 0.00%0.00 0.00 1.85 $222.41
CAES (Mona, UT; 83.4% eff; 2,400 MWh)$2,709 8.247%$223.38 18.78 0.00%0.00 6.69 25.47 $248.85
Advanced Fission $9,042 7.430%$671.78 96.00 0.00%0.00 0.00 96.00 $767.78
Small Modular Reactor x 12 $5,754 7.430%$427.52 64.54 0.00%0.00 0.00 64.54 $492.06
Supply Side Resource Options
Mid-Calendar Year 2014 Dollars ($)
Total Fixed
($/kW-Yr)
Capital Cost $/kW Fixed Cost
Elevation
(AFSL) Total Capital Cost
Payment
Factor
Annual
Payment
($/kW-Yr)
Fixed O&M $/kW-Yr
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
99
Table 6.2 – Total Resource Cost for Supply-Side Resource Options (Continued)
Credits
Resource Description Capacity
Factor
Total Fixed
(Mills/kWh)
Storage
Efficiency ¢/mmBtu Mills/kWh O&M
Capitalized
Premium
O&M
Capitalized
Integration
Cost
Environmental
PTC Tax
Credits / ITC
(Solar Only)
Blundell Dual Flash 90% CF 90%62.04 na 0 - 1.30 0.00%0.00 - - 63.34 (16.33) 47.02
Greenfield Binary 90% CF 90%83.40 na 0 - 1.30 0.00%0.00 - - 84.70 (16.33) 68.37
Generic Geothermal PPA 90% CF 90%- na 0 - 93.46 0.00%0.00 - - 93.46 - 93.46
2.0 MW turbine 29% CF WA/OR 29%75.74 na 0 - 0.00 0.00%0.00 3.06 - 78.80 (18.37) 60.43
2.0 MW turbine 31% CF UT/ID 31%72.31 na 0 - 0.00 0.00%0.00 3.06 - 75.36 (18.37) 56.99
2.0 MW turbine 43% CF WY 43%51.49 na 0 - 0.67 0.00%0.00 3.06 - 55.21 (18.37) 36.85
PV Poly-Si Fixed Tilt 26.5% CF 27%120.97 na 0 - 0.00 0.00%0.00 0.76 - 121.74 (5.11) 116.62
PV Poly-Si Single Tracking 31.6% CF 32%108.01 na 0 - 0.00 0.00%0.00 0.76 - 108.78 (4.54) 104.24
PV Poly-Si Fixed Tilt 26.5% CF 27%101.37 na 0 - 0.00 0.00%0.00 0.76 - 102.14 (4.23) 97.91
PV Poly-Si Single Tracking 31.6% CF 32%90.98 na 0 - 0.00 0.00%0.00 0.76 - 91.74 (3.76) 87.98
PV Poly-Si Fixed Tilt 25.4% CF 25%110.02 na 0 - 0.00 0.00%0.00 0.76 - 110.78 (4.60) 106.17
PV Poly-Si Single Tracking 29.2% CF 29%102.66 na 0 - 0.00 0.00%0.00 0.76 - 103.42 (4.26) 99.16
CSP Trough w Natural Gas - 24% Solar 33%178.19 na 474 12.59 0.00 0.00%0.00 0.76 - 191.55 (8.21) 183.34
CSP Tower 24% CF 24%226.78 na 0 - 0.00 0.00%0.00 0.76 - 227.55 (10.75) 216.80
CSP Tower Molten Salt 30% CF 30%212.60 na 0 - 0.00 0.00%0.00 0.76 - 213.36 (10.32) 203.05
Forestry Byproduct 91%45.04 na 0.96 NC - NC
Pumped Storage (5280 MWh)37%68.41 78%481 40.29 3.49 0.00%0.00 - - 112.20 - 112.20
Lithium Ion Battery (7.2 MWh/day)25%496.91 91%474 33.83 0.00 0.00%0.00 - - 530.75 - 530.75
Sodium-Sulfur Battery (7.2 MWh/day)25%238.79 73%474 42.47 0.00 0.00%0.00 - - 281.26 - 281.26
Vanadium RedOx Battery (7.2 MWh/day)25%289.76 70%474 43.99 0.00 0.00%0.00 - - 333.75 - 333.75
Advanced Fly Wheel (1667 KWh/day)5%507.79 85%474 36.22 0.00 0.00%0.00 - - 544.02 - 544.02
CAES (Mona, UT; 83.4% eff; 2,400 MWh)33%85.22 83%474 36.92 2.28 10.38%0.24 - - 124.66 - 124.66
Advanced Fission 86%102.44 na 0 - 9.80 0.00%0.00 - - 112.24 - 112.24
Small Modular Reactor x 12 86%65.65 na 0 - 8.70 0.00%0.00 - - 74.35 - 74.35
Supply Side Resource Options
Mid-Calendar Year 2014 Dollars ($)
Elevation
(AFSL)
Levelized Fuel
Total
Resource
Cost
Total Resource
Cost -
With PTC / ITC
Credits
Convert to Mills
Variable Costs
(mills/kWh)
Total Costs and Credits
(Mills/kWh)
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
100
Table 6.2 – Total Resource Cost for Supply-Side Resource Options (Continued)
Resource Description O&M
Capitalized
Premium
O&M
Capitalized
Gas
Transporta
tion Total
Brownfield Site
Dave Johnston
Intercooled SCCT Aero x1 5050 $1,697 8.247%$139.95 18.44 1.89%0.35 17.08 35.86 $175.82
CCCT Dry "F", 1x1 5050 $1,064 7.682%$81.72 11.19 2.94%0.33 12.84 24.36 $106.09
CCCT Dry "F", DF, 1x1 5050 $498 7.682%$38.25 0.00 0.00%0.00 15.14 15.14 $53.39
CCCT Dry "F", 2x1 5050 $1,030 7.682%$79.12 5.80 2.79%0.16 12.78 18.75 $97.86
CCCT Dry "F", DF, 2x1 5050 $722 7.682%$55.47 0.00 0.00%0.00 18.41 18.41 $73.88
CCCT Dry "J", Adv 1x1 5050 $967 7.682%$74.31 8.58 3.87%0.33 12.51 21.42 $95.73
CCCT Dry "J", DF, Adv 1x1 5050 $449 7.682%$34.50 0.00 0.00%0.00 16.58 16.58 $51.09
Huntington
Intercooled SCCT Aero x1 5050 $1,697 8.247%$139.95 18.44 1.89%0.35 13.50 32.29 $172.25
CCCT Dry "F", 1x1 5050 $1,064 7.682%$81.72 11.19 2.94%0.33 10.15 21.68 $103.40
CCCT Dry "F", DF, 1x1 5050 $498 7.682%$38.25 0.00 0.00%0.00 11.98 11.98 $50.23
CCCT Dry "F", 2x1 5050 $1,030 7.682%$79.12 5.80 2.79%0.16 10.11 16.07 $95.19
CCCT Dry "F", DF, 2x1 5050 $722 7.682%$55.47 0.00 0.00%0.00 14.56 14.56 $70.03
CCCT Dry "J", Adv 1x1 5050 $967 7.682%$74.31 8.58 3.87%0.33 9.89 18.80 $93.12
CCCT Dry "J", DF, Adv 1x1 5050 $449 7.682%$34.50 0.00 0.00%0.00 13.11 13.11 $47.62
Hunter
Intercooled SCCT Aero x1 5050 $1,697 8.247%$139.95 18.44 1.89%0.35 13.50 32.29 $172.25
CCCT Dry "F", 1x1 5050 $1,064 7.682%$81.72 11.19 2.94%0.33 10.15 21.68 $103.40
CCCT Dry "F", DF, 1x1 5050 $498 7.682%$38.25 0.00 0.00%0.00 11.98 11.98 $50.23
CCCT Dry "F", 2x1 5050 $1,030 7.682%$79.12 5.80 2.79%0.16 10.11 16.07 $95.19
CCCT Dry "F", DF, 2x1 5050 $722 7.682%$55.47 0.00 0.00%0.00 14.56 14.56 $70.03
CCCT Dry "J", Adv 1x1 5050 $967 7.682%$74.31 8.58 3.87%0.33 9.89 18.80 $93.12
CCCT Dry "J", DF, Adv 1x1 5050 $449 7.682%$34.50 0.00 0.00%0.00 13.11 13.11 $47.62
Jim Bridger
Intercooled SCCT Aero x1 6500 $1,802 8.247%$148.64 19.51 1.89%0.37 8.79 28.67 $177.31
CCCT Dry "G/H", 2x1 6500 $1,008 7.682%$77.44 5.47 3.72%0.20 6.61 12.28 $89.71
CCCT Dry "G/H", DF, 2x1 6500 $611 7.682%$46.95 0.00 0.00%0.00 7.44 7.44 $54.38
CCCT Dry "J", Adv 1x1 6500 $1,027 7.682%$78.93 9.08 3.87%0.35 6.44 15.87 $94.79
CCCT Dry "J", DF, Adv 1x1 6500 $449 7.682%$34.50 0.00 0.00%0.00 8.53 8.53 $43.04
Naughton
Intercooled SCCT Aero x1 6500 $1,802 8.247%$148.64 19.51 1.89%0.37 13.50 33.38 $182.03
CCCT Dry "J", Adv 1x1 6500 $1,027 7.682%$78.93 9.08 3.87%0.35 9.89 19.32 $98.25
CCCT Dry "J", DF, Adv 1x1 6500 $449 7.682%$34.50 0.00 0.00%0.00 13.11 13.11 $47.62
Wyodak
Intercooled SCCT Aero x1 6500 $1,802 8.247%$148.64 19.51 1.89%0.37 17.08 36.95 $185.60
Supply Side Resource Options
Mid-Calendar Year 2014 Dollars ($)
Total Fixed
($/kW-Yr)
Capital Cost $/kW Fixed Cost
Elevation
(AFSL) Total Capital Cost
Payment
Factor
Annual
Payment
($/kW-Yr)
Fixed O&M $/kW-Yr
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
101
Table 6.2 – Total Resource Cost for Supply-Side Resource Options (Continued)
Credits
Resource Description
Capacity
Factor
Total Fixed
(Mills/kWh)
Storage
Efficiency ¢/mmBtu Mills/kWh O&M
Capitalized
Premium
O&M
Capitalized
Integration
Cost
Environmental
PTC Tax
Credits / ITC
(Solar Only)
Brownfield Site
Dave Johnston
Intercooled SCCT Aero x1 5050 33%60.82 na 459 40.68 3.46 11.45%0.40 - - 105.36 - 105.36
CCCT Dry "F", 1x1 5050 78%15.53 na 459 30.59 1.60 13.02%0.21 - - 47.93 - 47.93
CCCT Dry "F", DF, 1x1 5050 12%50.79 na 459 36.08 0.09 0.00%0.00 - - 86.97 - 86.97
CCCT Dry "F", 2x1 5050 78%14.32 na 459 30.45 1.36 14.57%0.20 - - 46.33 - 46.33
CCCT Dry "F", DF, 2x1 5050 12%70.28 na 459 43.87 0.11 0.00%0.00 - - 114.26 - 114.26
CCCT Dry "J", Adv 1x1 5050 78%14.01 na 459 29.80 2.34 13.64%0.32 - - 46.47 - 46.47
CCCT Dry "J", DF, Adv 1x1 5050 12%48.60 na 459 39.51 0.10 0.00%0.00 - - 88.21 - 88.21
Huntington
Intercooled SCCT Aero x1 5050 33%59.58 na 474 42.01 3.46 11.45%0.40 - - 105.45 - 105.45
CCCT Dry "F", 1x1 5050 78%15.13 na 474 31.59 1.60 13.02%0.21 - - 48.53 - 48.53
CCCT Dry "F", DF, 1x1 5050 12%47.78 na 474 37.26 0.09 0.00%0.00 - - 85.13 - 85.13
CCCT Dry "F", 2x1 5050 78%13.93 na 474 31.44 1.36 14.57%0.20 - - 46.93 - 46.93
CCCT Dry "F", DF, 2x1 5050 12%66.62 na 474 45.30 0.11 0.00%0.00 - - 112.03 - 112.03
CCCT Dry "J", Adv 1x1 5050 78%13.63 na 474 30.77 2.34 13.64%0.32 - - 47.05 - 47.05
CCCT Dry "J", DF, Adv 1x1 5050 12%45.30 na 474 40.80 0.10 0.00%0.00 - - 86.20 - 86.20
Hunter
Intercooled SCCT Aero x1 5050 33%59.58 na 474 42.01 3.46 11.45%0.40 - - 105.45 - 105.45
CCCT Dry "F", 1x1 5050 78%15.13 na 474 31.59 1.60 13.02%0.21 - - 48.53 - 48.53
CCCT Dry "F", DF, 1x1 5050 12%47.78 na 474 37.26 0.09 0.00%0.00 - - 85.13 - 85.13
CCCT Dry "F", 2x1 5050 78%13.93 na 474 31.44 1.36 14.57%0.20 - - 46.93 - 46.93
CCCT Dry "F", DF, 2x1 5050 12%66.62 na 474 45.30 0.11 0.00%0.00 - - 112.03 - 112.03
CCCT Dry "J", Adv 1x1 5050 78%13.63 na 474 30.77 2.34 13.64%0.32 - - 47.05 - 47.05
CCCT Dry "J", DF, Adv 1x1 5050 12%45.30 na 474 40.80 0.10 0.00%0.00 - - 86.20 - 86.20
Jim Bridger
Intercooled SCCT Aero x1 6500 33%61.34 na 466 41.31 3.65 11.45%0.42 - - 106.71 - 106.71
CCCT Dry "G/H", 2x1 6500 78%13.13 na 466 31.06 2.66 14.26%0.38 - - 47.23 - 47.23
CCCT Dry "G/H", DF, 2x1 6500 12%51.73 na 466 34.96 0.09 0.00%0.00 - - 86.78 - 86.78
CCCT Dry "J", Adv 1x1 6500 78%13.87 na 466 30.26 2.48 13.64%0.34 - - 46.94 - 46.94
CCCT Dry "J", DF, Adv 1x1 6500 12%40.94 na 466 40.12 0.10 0.00%0.00 - - 81.16 - 81.16
Naughton
Intercooled SCCT Aero x1 6500 33%62.97 na 474 42.01 3.65 11.45%0.42 - - 109.05 - 109.05
CCCT Dry "J", Adv 1x1 6500 78%14.38 na 474 30.77 2.48 13.64%0.34 - - 47.97 - 47.97
CCCT Dry "J", DF, Adv 1x1 6500 12%45.30 na 474 40.80 0.10 0.00%0.00 - - 86.20 - 86.20
Wyodak
Intercooled SCCT Aero x1 6500 33%64.20 na 462 40.93 3.65 11.45%0.42 - - 109.20 - 109.20
Supply Side Resource Options
Mid-Calendar Year 2014 Dollars ($)
Elevation
(AFSL)
Levelized Fuel
Total
Resource
Cost
Total Resource
Cost -
With PTC / ITC
Credits
Convert to Mills
Variable Costs
(mills/kWh)
Total Costs and Credits
(Mills/kWh)
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
102
Additionally, a total resource cost sensitivity analysis was prepared for three natural gas-fired
combined cycle combustion turbine resource options at an elevation of 5050 feet at varying
capacity factors. Table 6.3 shows the total resource cost results for this analysis.
Table 6.3 – Total Resource Cost, for various Capacity Factors (Mills/kWh, 2014$)
Capacity Factor CCCT 40% 78% 94%
Capacity Factor Duct Fire 10% 12% 22%
CCCT Dry "F", 1x1 $64.86 $49.54 $46.79
CCCT Dry "F", DF, 1x1 $98.32 $88.16 $65.07
CCCT Dry "F", 2x1 $61.22 $47.48 $45.02
CCCT Dry "F", DF, 2x1 $128.26 $114.46 $83.08
CCCT Dry "G/H", 1x1 $62.55 $49.07 $46.65
CCCT Dry "G/H", DF, 1x1 $107.80 $96.53 $70.91
CCCT Dry "G/H", 2x1 $60.55 $47.85 $45.57
CCCT Dry "G/H", DF, 2x1 $104.46 $92.99 $66.93
CCCT Dry "J", Adv 1x1 $61.51 $47.83 $45.39
CCCT Dry "J", DF, Adv 1x1 $98.04 $88.52 $66.89
Table 6.4 – Glossary of Terms from Supply Side Resource Table
Term Description
Fuel Primary fuel used for electricity generation or storage.
Resource Primary technology used for electricity generation or storage.
Elevation (afsl) Average feet above sea level for the proxy site for the given resource.
Net Capacity (MW)
For natural gas-fired generation resources, the Net Capacity is net dependable capacity
(net electrical output) for a given technology, at the given elevation, at the annual
average ambient temperature in a "new and clean" condition.
Commercial Operation
Year
The resource availability year is the earliest year the technology associated with the
given generating resource is commercially available for procurement and installation.
The total implementation time is the number of years necessary to implement all
phases of resource development and construction: site selection, permitting,
maintenance contracts, IRP approval, RFP process, owner’s engineering, construction,
commissioning, and transmission grid interconnection.
Design Life (years)
Average number of years the resource is expected to be "used and useful,” based on
various factors such as manufacturer’s guarantees, fuel availability and environmental
regulations.
Base Capital ($/kW)
Total capital expenditure in $/kW for the development and construction of a resource
including: direct costs (equipment, buildings, installation/overnight construction,
commissioning, contractor fees/profit and contingency), owner's costs (land
acquisition, water rights, permitting, rights-of-way, design engineering, spare parts,
project management, legal/financial support, grid interconnection costs, owner’s
contingency), and financial costs (AFUDC, capital surcharge, capitalized property
taxes, escalation).
Var O&M ($/MWh)
Includes real levelized variable operating costs such as combustion turbine
maintenance, water costs, boiler water/circulating water treatment chemicals, pollution
control reagents, equipment maintenance, and fired hour fees.
Fixed O&M ($/kW-yr) Includes labor costs, combustion turbine fixed maintenance fees, contracted services
fees, office equipment, and training.
Full Load Heat Rate
HHV (Btu/kWh)
Net efficiency of the resource to generate electricity for a given heat input in a "new
and clean" condition on a higher heating value basis.
EFOR (%) Estimated Equivalent Forced Outage Rate, which includes forced outages and derates
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
103
Term Description
for a given resource.
POR (%) Estimated Planned Outage Rate for a given resource.
Water Consumed
(gal/MWh)
Average amount of water consumed by a resource for boiler water make-up, cooling
water make-up, inlet conditioning, and pollution control.
SO2 (lbs/MMBtu) Expected permitted level of sulfur dioxide emissions in pounds of sulfur dioxide per
million Btu of heat input.
NOx (lbs/MMBtu) Expected permitted level of nitrogen oxides (expressed as NO2) in pounds of NOx per
million Btu of heat input.
Hg (lbs/TBtu) Expected permitted level of mercury emissions in pounds per trillion Btu of heat input.
Table 6.5 – Glossary of Acronyms Used in the Supply Side Resource Table
Acronyms Description
Adv Advanced (Combined Cycle Combustion Turbine)
Aero Aero-derivative
AFSL Average Feet (Above) Sea Level
CAES Compressed Air Energy Storage
CCCT Combined Cycle Combustion Turbine
CCS Carbon Capture and Sequestration
CF Capacity Factor
CSP Concentrated Solar Power
DF Duct Firing
EFOR Equivalent Forced Outage Rate
Hg Mercury
HHV Higher Heating Value
IC-Recip Internal Combustion Reciprocating Engine
IGCC Integrated Gasification Combined Cycle
ISO International Organization for Standardization (Temp = 59oF/15oC, Pressure = 14.7
psia/1.013 bar)
MMBtu Millions of British Thermal Units
PC CCS Pulverized Coal equipped with Carbon Capture and Sequestration
POR Planned Outage Rate
PPA Power Purchase Agreement
PV Poly-Si Photovoltaic modules constructed from poly-crystalline silicon semiconductor wafers
SC Simple Cycle
SCCT Simple Cycle Combustion Turbine
SCPC Super-Critical Pulverized Coal
SO Solid Oxide (Fuel Cell)
Some important factors that apply to the Supply Side Resource Tables are listed below:
Capital costs are all-inclusive and include Allowance for Funds Used during Construction
(AFUDC), land, EPC (Engineer, Procure and Construct) cost premiums, owner’s costs,
etc. Capital costs in Table 6.1 and Table 6.2 reflect costs in mid-2014 dollars; they do not
include escalation from mid-year to the year of commercial operation.
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
104
Capital costs include interconnection costs to the transmission system i.e. typical direct
assigned costs such as switchyard and other upgrades needed to interconnect the resource
to PacifiCorp’s transmission network.
For the nuclear resource, capital costs include the cost of storing spent fuel on-site during
the life of the facility. Costs for ultimate off-site disposal of spent fuel are included in the
variable O&M costs.
Wind resources are representative of generic resources included in the IRP models for
planning purposes. Cost and performance attributes of specific resources are identified as
part of the acquisition process.
State specific tax benefits are excluded from the IRP supply side table but would be
considered in the evaluation of a specific project.
Resource Descriptions
The following are brief descriptions of each of the resources listed in Table 6.1.
Natural Gas, SCCT Aero x3 – a resource based on three General Electric LM6000PG-Sprint
simple cycle aero-derivative combustion turbines fueled on natural gas. Scope would include
selective catalytic reduction systems and oxidation catalysts to reduce NOx and carbon
monoxide/volatile organic compound (VOC) emissions.
Natural Gas, Intercooled SCCT Aero x1 – a resource based on a single General Electric
LMS100PA simple cycle aero-derivative intercooled combustion turbine fueled on natural gas.
Scope would include selective catalytic reduction systems and oxidation catalysts to reduce NOx
and carbon monoxide/VOC emissions. An air-cooled intercooler is assumed.
Natural Gas, SCCT Frame "F" x1 - a resource based on a single General Electric 7FA.05
simple cycle frame type combustion turbine fueled on natural gas. Scope would include selective
catalytic reduction systems and oxidation catalysts to reduce NOx and carbon monoxide/VOC
emissions.
Natural Gas, IC Recips x 6 - a resource based on six Wartsila 18V50SG reciprocating engines
fueled on natural gas. Scope would include selective catalytic reduction systems and oxidation
catalysts to reduce NOx and carbon monoxide/VOC emissions.
Natural Gas, CCCT Dry "F", 1x1 - a combined cycle resource based on one frame-type
General Electric 7FA.05 combustion turbine, one 3-pressure heat recovery steam generator and
one steam turbine. Scope would include selective catalytic reduction systems and oxidation
catalysts to reduce NOx and carbon monoxide/VOC emissions. Steam from the steam turbine is
condensed in an air-cooled condenser.
Natural Gas, CCCT Dry "F", 2x1 - a combined cycle resource based on two frame-type
General Electric 7FA.05 combustion turbines, two 3-pressure heat recovery steam generators and
one steam turbine. Scope would include selective catalytic reduction systems and oxidation
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
105
catalysts to reduce NOx and carbon monoxide/VOC emissions. Steam from the steam turbine is
condensed in an air-cooled condenser.
Natural Gas, CCCT Dry "F", DF, 2x1 – an option that can be added to a combined cycle plant
to increase its capacity by the addition of duct burners in the heat recovery steam generator. This
increases the amount of steam generated in the heat recovery steam generator. The amount of
duct firing is up to the owner. Depending on the amount of duct firing added, the size of the
steam turbine, steam turbine generator and associated feedwater, steam condensing and cooling
systems may need to be increased. Duct firing is not a standalone resource and can only be added
in combination with a combined cycle resource. This description also applies to the following
technologies that are listed on Table 6.: CCCT Dry "F", DF, 1x1; CCCT Dry "F", DF, 2x1;
CCCT Dry "G/H", DF, 1x1; CCCT Dry "G/H", DF, 2x1and CCCT Dry "J", DF, Adv 1x1.
Natural Gas, CCCT Dry "G/H", 1x1 - a combined cycle resource based on one frame-type
Mitsubishi M501GAC combustion turbine (air-cooled), one 3-pressure heat recovery steam
generator and one steam turbine. Scope would include selective catalytic reduction systems and
oxidation catalysts to reduce NOx and carbon monoxide/VOC emissions. Steam from the steam
turbine is condensed in an air cooled condenser.
Natural Gas, CCCT Dry "G/H", 2x1 - a combined cycle resource based on two frame-type
Mitsubishi M501GAC combustion turbines (air-cooled), two 3-pressure heat recovery steam
generators and one steam turbine. Scope would include selective catalytic reduction systems and
oxidation catalysts to reduce NOx and carbon monoxide/VOC emissions. Steam from the steam
turbine is condensed in an air cooled condenser.
Natural Gas, CCCT Dry "J", Adv 1x1 - a combined cycle resource based on one frame-type
Mitsubishi advanced M501J combustion turbine (steam-cooled), one 3-pressure heat recovery
steam generator and one steam turbine. Scope would include selective catalytic reduction
systems and oxidation catalysts to reduce NOx and carbon monoxide/VOC emissions. Steam
from the steam turbine is condensed in an air cooled condenser.
Natural Gas, Fuel Cell - a resource based on molten carbonate fuel cell. Fuel cells are highly
modular; the size of the resource can be customized to a specific size.
Coal, SCPC with CCS – conventional coal-fired generation resource including a supercritical
boiler (up to 4000 psig) using pulverized coal with all emission controls including scrubber,
fabric filters (baghouse), mercury control, selective catalytic reduction (SCR) and carbon capture
and sequestration (CCS) to reduce carbon dioxide emissions by 90%.
Coal, SCPC without CCS - conventional coal-fired generation resource including a
supercritical boiler (up to 4,000 psig) using pulverized coal with all emission controls including
scrubbers, baghouses, mercury control, selective catalytic reduction (SCR) but without carbon
capture and sequestration (CCS).
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
106
Coal, IGCC without CCS – advanced combustion turbine based resource using an Integrated
Gasification Combined Cycle (IGCC) but without the use of carbon capture and sequestration
costs. An IGCC plant produces a synthetic fuel gas from coal using an oxygen blown gasifier
and burning the syn-gas in a conventional combustion turbine combined cycle power facility.
IGCC would utilize the latest advanced gas turbine technology and provide fuel gas cleanup to
achieve low emissions of sulfur dioxide, nitrogen oxides using SCR, mercury and particulate
controls.
Coal, PC CCS retrofit @ 500 MW – a retrofit of an existing conventional coal-fired
boiler/steam turbine generator resource. Costs include the reduction in plant output due to higher
auxiliary power requirements and reduced steam turbine output and would remove carbon
dioxide by 90% and provide a marginal improvement in criteria pollutant emissions.
Coal, IGCC with CCS – an advanced Integrated Gasification Combined Cycle (IGCC) resource
to facilitate lower cost carbon capture and sequestration costs. An IGCC plant produces a
synthetic fuel gas from coal that uses an oxygen blown gasifier and burning the synthetic fuel gas
in a conventional combustion turbine combined cycle power facility. The IGCC would utilize the
latest advanced combustion turbine technology and provide fuel gas cleanup to achieve ultra-low
emissions of sulfur dioxide, nitrogen oxides using selective catalytic reduction systems, mercury
and particulate. Carbon dioxide would be removed from the synthetic fuel gas before combustion
thereby reducing carbon dioxide emissions by more than 90%.
Geothermal, Blundell Dual Flash 90% CF – a dual flash geothermal resource located at the
Roosevelt Hot Springs in southern Utah.
Geothermal, Greenfield Binary 90% CF - a geothermal resource based on binary technology
assuming development of a new geothermal resource.
Geothermal, Generic Geothermal PPA 90% CF – power and electric energy provided through
a power purchase agreement.
Wind, 2.0 MW turbine 29% CF WA/OR – a wind resource based on 2.0MW wind turbines
located in Oregon or Washington with an estimated net annual capacity factor of 29%. The scope
would include developing, permitting, engineering, procuring equipment and constructing the
wind resource.
Wind, 2.0 MW turbine 31% CF UT/ID – a wind resource based on 2.0MW wind turbines
located in Utah or Idaho an estimated net capacity factor of 31%. The scope would include
developing, permitting, engineering, procuring equipment and constructing a wind farm.
Wind, 2.0 MW turbine 43% CF WY – a wind resource based on 2.0MW wind turbines located
in Wyoming with an estimated net capacity factor of 43%. The scope would include developing,
permitting, engineering, procuring equipment and constructing a wind farm.
Solar, PV Poly-Si Fixed Tilt 26.5% CF (1.37 MWdc/MWac) – a large utility scale (50 MW)
solar photovoltaic resource using poly-crystalline silica panels in a fixed tilt configuration
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
107
located in south western Utah. Similar resources, with site specific capacity factors, are also
included for locations in Oregon.
Solar, PV Poly-Si Single Tracking 31.5% CF (1.34 MWdc/MWac) – a large utility scale (50
MW) solar photovoltaic resource using poly-crystalline silica solar panels and single axis
tracking system located in southwestern Utah. Similar resources, with site specific capacity
factors, are also included for locations in Oregon.
Solar, CSP Trough with Natural Gas – a concentrated solar resource using parabolic trough
technology. The system would be equipped with a backup natural gas fueled boiler to supply
steam during cloudy or evening hours.
Solar, CSP Tower 24% CF– a concentrated solar resource using a power tower technology
feeding a boiler based system for power production. The boiler based system could use natural
gas as a backup fuel for the boiler during cloudy or evening hours in which case the capacity
factor would be variable.
Solar, CSP Tower Molten Salt 30% CF – a concentrated solar resource using a power tower
technology. The boiler based system would use molten salt as the heat transfer medium with
natural gas as a backup fuel for the boiler during cloudy or evening hours. A four to six hour
storage system would allow a capacity factor increase of about six percent.
Biomass, Forestry Byproduct – a resource fueled by forestry byproducts. Resources tend to be
smaller and constrained by the economically available fuel. It is expected that these types of
resources would not be developed by the Company but would be secured through power
purchase agreements.
Storage, Pumped Storage – a moderately sized (600 MW) pumped storage system using a
combination of natural and constructed water storage combined with elevation difference to
enable a system capable of discharging the rated capacity for eight hours combined with
recharging that capacity over 16 hours. The estimated recharge ratio for this resource is 77.5%.
Storage, Lithium Ion Battery – a battery technology of lithium ion batteries located close to the
load center. The estimated recharge ratio for this storage resource is 91%.
Storage, Sodium-Sulfur Battery – a battery technology of sodium-sulfur batteries. The
estimated recharge ratio for this storage resource is 72.5%.
Storage, Vanadium RedOx Battery – a battery technology based vanadium ReDOx flow
battery. The estimated recharge ratio for this storage resource is 70%.
Storage, Advanced Fly Wheel – a storage resource consisting of multiple flywheel components
to deliver energy back to the grid primarily to maintain power quality. 20 MW system is
included with total storage time in minutes. The estimated recharge ratio for the storage resource
is 85%.
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
108
Storage, CAES – a storage system utilizing compressed air energy - A compressed air energy
storage (CAES) system consists of air storage reservoir replacing the compressor on a
conventional gas turbine. The gas turbine exhaust powers a power turbine providing a simple
cycle gas turbine energy at lower costs than a conventional gas turbine. Off-peak energy is used
to compress air into the storage reservoir. A system size of 300 MW is assumed. The air storage
reservoir is assumed to be solution mined to size. Natural gas to generate power is required. The
recharge ratio for this storage resource is 83.4%; this excludes fuel required during the power
generation cycle.
Nuclear, Advanced Fission – a large 2,234 MW nuclear resource reflects the current state-of-
the-art advanced nuclear plant and is modeled after the Westinghouse AP1000 technology
currently being installed by Southern Company at the Vogtle Generating Station in Georgia. The
assumed location for this resource is the proposed Blue Castle site near Green River, Utah which
is in development. A minimum of 10 years will be required to permit and construct a nuclear
plant.
Nuclear, Modular Reactor – A small modular reactor resource. Such systems hold the promise
of being built off-site and transported to a location at lower cost than traditional nuclear facilities.
A nominal 250 MW concept is included. It is recognized that this concept is still in the
conceptual design stage which is expected to increase the time before the technology is
commercially available.
Resource Option Description
Coal
Potential coal resources are shown in the Supply Side Resource options table as supercritical
pulverized coal boilers (PC) and Integrated Gasification Combined Cycle (IGCC), located in
both Utah and Wyoming. Current economic conditions have mitigated the concerns with
material cost uncertainty that was a factor in previous IRPs. However, the uncertainty
surrounding proposed carbon regulations and difficulty in obtaining environmental permits for
coal based generation requires the Company to not allow the potential for the selection of coal as
a resource in the 2015 IRP.
Supercritical technology is now considered the standard design technology compared to
subcritical technology for pulverized coal for a number of reasons. Increasing coal costs make
the added efficiency of the supercritical technology more cost-effective. Additionally, there is a
greater competitive marketplace for large supercritical boilers than for large subcritical boilers.
Increasingly, large boiler manufacturers only offer supercritical boilers in the 500-plus MW
sizes. Due to the increased efficiency of supercritical boilers, overall emission intensity rates are
lower than similarly sized subcritical units. Compared to subcritical boilers, supercritical boilers
also have better load following capability, faster ramp rates, use less water and require less steel
for construction. The costs for a supercritical PC facility reflect the cost of adding a new unit at
an existing site. PacifiCorp does not expect a significant difference in cost for a multi-unit plant
at a new site versus the cost of a single unit addition at an existing site.
The requirement for CO2 capture and sequestration (CCS) represents a significant cost for both
new and existing coal resources. Recently proposed federal New Source Performance Standards
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
109
for Greenhouse Gases (NSPS-GHG) regulations would require CCS for new coal resources in
order to meet the proposed emissions limit of 1,100 lbs per megawatt-hour.
Two major utility-scale CCS retrofit projects have been constructed or are in process on
pulverized coal plants. SaskPower’s $1.24 billion, 110 MW Boundary Dam project recently
entered commercial operation. Construction recently began on Petra Nova’s $1.0 billion, 250
MW slip-stream WA Parrish project. These projects are expected to have CO2 capture rates in
excess of 90% capture; sequestration is accomplished through enhanced oil recovery (EOR).
Both of these projects utilize amine-based technologies for carbon capture.
PacifiCorp continues to monitor CO2 capture technologies for possible retrofit application on its
existing coal-fired resources, as well as their applicability for future coal plants that could serve
as cost-effective alternatives to IGCC. An option to capture CO2 at an existing coal-fired unit has
been included in the supply side resource tables. Currently there are only a limited number of
large-scale sequestration projects in operation around the world; most of these have been
installed in conjunction with enhanced oil recovery. Given the high capital cost of implementing
CCS on coal fired generation (either on a retrofit basis or for new resources) CCS is not
considered a viable option before 2025. Factors contributing to this position include capital cost
risk uncertainty, the availability of commercial sequestration (i.e. non-EOR) sites, and the
uncertainty regarding long term liabilities for underground sequestration.
An alternative to supercritical pulverized-coal technology for coal-based generation is the
application of IGCC technology. A significant advantage for IGCC when compared to
pulverized coal, with amine-based carbon capture, is the reduced cost of capturing CO2 from the
process. Only a limited number of IGCC plants have been built and operated around the world.
In the United States, these facilities have been demonstration projects, resulting in capital and
operating costs that are significantly greater than those costs for conventional coal plants. These
projects have been constructed with significant federal funding. Two large, utility-scale IGCC
plants have recently entered service or are in construction. Duke Energy’s 618 MW Edwardsport
Plant (does not currently include carbon capture capability) went into service in June, 2013.
Southern Company’s $5.6 billion, 582 MW Kemper County project that includes carbon capture
(65% capture) and sequestration (as EOR) is nearing completion. A third IGCC project, the
Texas Clean Energy Project utilizing Siemens gasification technology, is planned to include CO2
capture and is currently in an advanced stage of development. The costs presented in the Supply
Side Resource option tables reflect costs based on 2007 studies of IGCC costs prepared by
PacifiCorp in conjunction with the Wyoming Infrastructure Authority (WIA) to investigate the
acquisition of federal grant money to demonstrate western IGCC projects.
No new cost studies were performed on new coal fueled generation options. Updated capital and
O&M costs for coal-fuel generation options were based on escalating costs used in the 2013 IRP.
Natural Gas
A number of natural gas-fueled generation options are included in the Supply Side Resource
options table and are intended to represent technologies that are both currently commercially
available and/or will be available over the next few years. Capital costs for gas-fueled generation
options are similar to capital costs reported in previous IRPs. In real terms, capital costs have
shown a modest decline compared to the previous IRP, primarily driven by limited domestic
orders for new gas-fired generation due to a lack of current economic growth.
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
110
Combustion turbine based options include both simple and combined cycle configurations. The
simple cycle (SCCT) options include traditional frame machines as well as aero-derivative
combustion turbines. Two aero-derivative options are included: the General Electric LM6000PG
combustion turbine and General Electric’s LMS100. These resources are highly flexible, high
efficiency machines and can be installed with high temperature oxidation catalysts for carbon
monoxide (CO) control and an SCR system for nitrogen oxides (NOx) control, which allows
them to be located in areas with air emissions concerns. Aero-derivative gas turbines have quick-
start capability (less than ten minutes to full load) and net full load heat rates near 10,000
Btu/kWh (higher heating value basis). As in the previous IRP, the Supply Side Resource table
includes General Electric’s LMS100 intercooled gas turbine. This combustion turbine has been
successful since its debut with 28 units in service with approximately another 20 being installed
as of summer 2012. It is a cross between a simple-cycle aero-derivative gas turbine and a frame
machine with compressor inter-cooling to improve efficiency. The machines have higher heating
value net full load heat rates of less than 9,000 Btu/kWh and similar starting capabilities as the
LM6000 with significant ramping capability (up to 50 MW per minute).
Frame simple cycle machines are represented by the “F” class technology and in the case of the
current IRP Supply Side Resource options table the frame machine reflects a General Electric 7F
5 series (previously referred to as the 7FA.05). One combustion turbine can generate
approximately 180 MW at Western U.S. elevations; they have efficiencies similar to the
LM6000 family of combustion turbines when operating in simple cycle.
Other natural gas-fired generation options include internal combustion engines and fuel cells.
Internal combustion engines are represented by a large power plant consisting of six machines at
18.4 MW each at typical elevations in the West (5,000’). The underlying technology for this
category is the Wartsila 18V50SG engine, although other suppliers (notably Caterpillar, General
Electric, MAN and Mitsubishi) have entered the market. These machines are spark-ignited and
have the advantage of a relatively high efficiency when compared to simple cycle combustion
turbines, low emissions profile and a high level of availability and reliability due to the relatively
high number of machines for a given target capacity. Similar to new frame and aero-derivative
combustion turbines, reciprocating engines are capable of being brought on line up to full load in
less than ten minutes. Reciprocating engines have distinct part-load efficiency capability on a
plant basis due to having both high part-load efficiency on a standalone engine basis combined
with the ability to start/stop multiple engines to meet a target capacity or reserve capability.
Reciprocating engines also have the advantages of being relatively insensitive to elevation, do
not require high-pressure natural gas, which is typically required for advanced combustion
turbines, and have limited water requirements.
At present, fuel cells hold less promise for large utility scale applications due to high capital and
maintenance costs, partly attributable to the lack of production capability and limited
development. Fuel cell applications are beginning to advance in small scale with some
customers. Typically fuel cells are used in distributed generation applications on the customer
side of the meter.
A number of combined cycle configurations have been provided in this version of the Supply
Side Resource options table. Configuration options include 1x1 and 2x1 configurations based on
“F” and “G/H” combustion turbines. The “G/H” frame combustion turbine, although they are
supplied by different equipment manufacturers, are combined, since the power and performance
outputs of the underlying combustion turbines are very similar. Also included in the current
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
111
version of the Supply Side Resource options table is the “J” class combustion turbine, which is a
large advanced combustion turbine (approximately 470 megawatts in a 1x1 combined cycle
configuration under ISO conditions). The “J” class combustion turbine is now commercially
available in the United States and a number of orders have been placed. General Electric has
recently received orders for its new HA.02 technology, which has similar performance
characteristics as the Mitsubishi “J” class combustion turbine.
The Supply Side Resource table also includes duct firing (DF), which is not a stand-alone
resource option, but is an option for any combined cycle configuration to add peaking
capability at relatively high efficiency and low cost. It is also a mechanism to recover lost power
generation capability that occurs at high ambient temperatures. The amount of duct firing in the
supply side resource options table are stated as fixed values at 50 MW for the 1x1 configuration
and 100 MW for the 2x1 configuration; in reality the amount of duct firing is a design
consideration and as such the incremental duct firing capacity that can be added is flexible.
The combined cycle options listed in the current supply side resource table are based on dry
cooling (i.e. they use an air-cooled condenser), rather than wet cooling (i.e. using a forced draft
cooling tower). It is assumed the availability of water in the western United States will continue
to be limited. The assumption of dry cooling is considered to be both prudent and conservative.
In certain cases and sites, sufficient water may be available for wet cooling (such as in the case
of installed a CCCT at the site of an existing coal-fueled plant), in which case, performance and
efficiency would be improved; the overall costs of energy would be site-specific depending on
the total cost of water (commodity cost, transport/storage infrastructure cost, treatment cost,
discharge cost).
For the 2015 IRP, and in comparison to the 2013 IRP, Owner’s costs were increased for new
gas-fired resources. These costs include the costs to acquire and develop a greenfield site on
either the west side of PacifiCorp’s system or for new resources to serve the east side load areas
along the Wasatch Front. These greenfield development costs include: installation of high
pressure natural gas pipeline laterals, additional power transmission interconnections, ambient air
quality monitoring, permitting and purchase of property, water rights and rights of way. In the
2013 IRP, new gas-fired resource additions were assumed to be installed at brownfield additions
(such as the Currant Creek or Gadsby Plants). Under new PM2.5 state implementation plans and
the limited availability of the appropriate emissions credits, these existing locations are not
currently suitable for siting large resource additions. For subsequent resource additions at a
developed greenfield site (or at an existing coal plant location), Owner’s costs are reduced to
reflect installation at an existing (brownfield) site. For installation of new gas-fired resources at
existing coal plants which do not currently have gas supplies (such as the Dave Johnston or Jim
Bridger plants), there would be additional costs to install a new natural gas tap/metering point
and a lateral extension from the adjacent natural gas transmission systems to plant.
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
112
Wind
Capacity Factors
The 2015 IRP reflects updated capacity factors and market prices of wind turbine generators
currently available. Wind farm designers have improved capacity factors by selecting wind
turbines and turbine options matched to the wind regime of specific turbine sites within wind
farms. Multiple blade length options and park-based controls are two improvements that have led
to net capacity improvements in some areas with wind regimes in the medium range of the wind
power classifications. Net capacity factor assumptions for resources located in Wyoming and
Utah increased compared to the 2013 IRP based upon analyses of wind turbine technologies
currently available at representative wind sites in those states.
Capital Costs
Capital cost estimates for wind resources are based on the development and construction costs of
previously built projects and recent budgetary prices for wind turbines provided by wind turbine
suppliers. Wind turbine prices were updated based upon budgetary estimates provided by some
major wind turbine suppliers. Wind turbine prices are expected to be stable through 2015.
Overall, the costs of wind resources are expected to increase at the overall rate of inflation. A
generic 2 MW wind turbine size was selected for the 2015 IRP to represent the range of wind
turbine sizes currently available from major suppliers.
Wind Integration Costs
To capture the costs of integrating wind into the system, PacifiCorp applied a value of
$3.06/MWh (in 2015 dollars) for resource selection. The source of this value was the Company’s
2014 wind integration study, which is included as Appendix H. Integration costs are included as
a variable cost for wind resources.
Other Renewable Resources
Other renewable generation resources included in the Supply Side Resource options table include
geothermal, biomass and solar.
Geothermal
Geothermal resources are a desirable renewable generation resource given their base-load
operating profile combined with high reliability and availability. However, geothermal resources
have significantly higher development costs and exploration risks than other renewable
technologies such as wind and solar. PacifiCorp has commissioned several studies of geothermal
options during the past several years to determine if additional sources of production can be
added to the Company’s generation portfolio in a cost effective manner. A 2010 study
commissioned by PacifiCorp and completed by Black & Veatch focused on geothermal projects
near to PacifiCorp’s service territory that were in advanced phases of development and could
demonstrate commercial viability. PacifiCorp commissioned Black & Veatch to perform
additional analysis of geothermal projects in the early stages of development and a report was
issued in 2012. An evaluation of the Roosevelt Hot Springs geothermal resource was started in
2013; this evaluation is still ongoing.
The cost recovery mechanisms currently available to PacifiCorp as a regulated electric utility are
not compatible with the inherent risks associated with the development of geothermal resources.
The primary risks of geothermal development are dry holes, well integrity and insufficient
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
113
resource adequacy (flow, temperature and pressure). These risks cannot be fully quantified until
wells are drilled and completed. The cost to validate total production and injection capability of a
geothermal resource can be as high as 35 percent of total project costs. Exploration test wells
typically cost between $500,000 and $1.5 million per well. Full production and injection wells
cost between $4-5 million per well. Variations in the permeability of subsurface materials can
determine whether wells in close proximity are commercially viable, lacking in pressure or
temperature, or completely dry with no interconnectivity to a geothermal resource. As a
regulated utility subject to the public utility commissions of six states, PacifiCorp is currently not
compensated nor incentivized to engage in these inherently risky development efforts.
To mitigate the financial risks of geothermal development, PacifiCorp would use an RFP process
to obtain market proposals for geothermal power purchase agreements or build-own-transfer
project agreement structures. Geothermal developers, external to PacifiCorp, have the flexibility
to structure project pricing to include development risks. Through an RFP process, PacifiCorp
could choose the geothermal project with the lowest cost offered by the market and avoid
considerable risk for the Company and its customers. In the event PacifiCorp identifies a
geothermal asset that appears to be economically attractive but also determines that there is a
significant possibility of development risk that the market will not economically absorb,
PacifiCorp may approach state regulators with estimates of resource development costs and risks
associated to obtain approval for a mechanism to address risks such as dry holes. Because public
utility commissions typically do not allow recovery of expenditures which do not result in a
direct benefit to customers, and at least one state has a statute that precludes cost recovery of any
asset that is not considered to be “used and useful,” obtaining a mechanism to recover
geothermal development costs may be difficult. To reflect this specific market condition, the
2015 supply side resource option for geothermal resources is based on publicly available prices
for energy supplied under power purchase agreements.
Biomass
Cost and performance data for biomass based resources were obtained from third-party studies.
In general, large-scale (greater than 50 MW) plants are very rare, which is why the resource is
represented as a 5 MW plant in the supply side resource table. Nonetheless, select coal plants
have been converted from burning coal to burning various types of biomass, including wood
chips, cellulosic switch grass, municipal solid waste, or, in rare cases, an engineered fuel which
adds processing and sorbents to the aforementioned base fuels. The greatest challenge to building
large biomass resources or retrofitting a coal unit, to a large biomass plant is the cost,
availability, reliability and homogeneity of a long-term fuel supply. The transport and handling
logistics of large quantities of biomass fuel poses a significant challenge, depending on the size
of the facility. Because of the need to be close to a large source of biomass, the Pacific
Northwest or Atlantic Southeast is generally considered good regions for siting biomass
resources. The climate and economy of these regions promotes growth of trees in large
plantations. While PacifiCorp currently does not own any biomass plants, the Company does
purchase power from a number of biomass resources in Oregon and California through power
purchase agreements.
Solar
Three solar technologies are included in the supply side resource table: 1) fixed tilt photovoltaic
(PV) systems based on poly crystalline modules, 2) single axis tracking photovoltaic (PV)
systems based on poly-crystalline modules and 3) concentrated solar. Based upon current
technology and market conditions, PV resources have lower capital intensity and are better suited
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
114
to Utah’s solar resource than concentrated solar systems. The use of lower cost fixed tilt PV
systems or higher capacity factor single axis tracking PV systems is site and project specific.
Since the 2013 IRP, market prices for PV modules in the United States have started to level out
after exhibiting significant declines between 2008 and 2013. During this period of PV module
price declines, the component basis of PV resources shifted; the costs of PV modules, racking
systems, design, and construction are now more evenly balanced. These price shifts, along with
changes in inverter capabilities, national electric code changes and the adoption of higher system
voltages have impacted plant designs. System designers continue to optimize designs with the
objectives of maximizing resource value, decreasing the levelized cost of energy and meeting
emerging safety requirements.
The market positions of PV crystalline and solar thin film have shifted in recent years. Thin film
technology had typically been considered the module technology of choice for large scale PV
systems which resulted in the lowest levelized cost of energy. However, crystalline module costs
have shown such significant cost reductions in recent years that there is no clear module type
“technology” winner. Technological improvements have increased the efficiency of some thin
film designs while silicon prices and manufacturing changes have lowered the costs to
manufacture crystalline panels. At this point in time, PacifiCorp considers the effective cost of
energy from systems based on thin film and crystalline PV systems to be essentially comparable,
for this reason a separate resource category for PV systems based on thin film modules was not
explicitly included. The costs and performance included in the supply side resource table are
based on the use of crystalline modules; however, this should not to be interpreted as a
preference for crystalline technology over thin film technology. Any determinations on
technology choice would be based on the results of a resource request for proposal process for
new resources.
There has been significant solar development activity in PacifiCorp’s service territory since early
2012. Solar projects in development comprise 169 of the 236 projects that filed interconnection
studies with PacifiCorp from the beginning of 2012 to the end of 2014. Solar projects with
nameplate capacities of 5 MW or less comprise just over half the projects that filed for
interconnection. The nameplate capacity of all solar resources in the interconnection process is
approximately 3,500 MW. Wind resources in development are a distant second with just under
2,000 MW in the interconnection study process.
Supply and Location of Renewable Resources
It should be noted that the primary drivers of renewable resource selection are the requirements
of renewable portfolio standards, compliance with draft EPA rules under §111(d) of the Clean
Air Act, and availability of tax credits. In the 2015 IRP, the availability of certain renewable
resources is contingent upon transmission availability. The availability of higher capacity factor,
lower cost43 Wyoming wind begins in 2028 for the Regional Haze reference case. Table 6.6
below shows the total cumulative resource selection limits for the Regional Haze reference case.
Regional Haze scenarios 1 and 2 will have different resource availability, dependent on FIP/SIP
requirements for meeting Best Available Retrofit Technology
(BART) requirements.
43 Retirement of the Dave Johnston units may allow additions of new resources in the Wyoming area without
incurring significant amount of investment in transmission.
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
115
Table 6.6 – Cumulative Maximum Renewable Selection Limits by Year for the Regional
Haze Reference Case
Type Renewable Resource
Capacity
Factor
Total MW Available
2020 2021-2022 2028-2034
Wind
Oregon Wind (Arlington) 29% 0 400 400
Washington Wind (Walla Walla) 29% 0 600 600
Utah Wind (South) 31% 0 400 400
Idaho Wind (Goshen) 31% 0 800 800
Wyoming Wind (Aeolius) 43% 0 0 762
Solar
Oregon Solar (Lakeview) 29% 405 405 405
Washington Solar (Yakima) 22% 200 200 200
Utah Solar (South) 32% 800 800 800
Geothermal Utah Geothermal (Milford) 90% 30 30 30
Oregon Geothermal (Neal Hot Springs) 90% 30 30 30
Nuclear
The supply side resource table includes two nuclear technology options. One is the larger 2,236
MW system, which reflects the traditional sized plant based on current state-of-the-art advanced
licensed plants; it is modeled on the Westinghouse AP1000 technology currently being employed
in Southern Company’s construction of Vogtle Units 3 & 4 in Georgia. This is the technology
that Blue Castle Holdings has indicated is the design basis for its proposed Blue Castle nuclear
facility currently in development near Green River, Utah. Compared to other fuels, the cost of
nuclear fuel is relatively low cost and exhibits limited price volatility; thus changes in nuclear
fuel prices have a negligible impact on the total cost of energy. The cost of nuclear fuel used in
the supply side resource table is $7.73/MWh in 2014 dollars, including the spent fuel permanent
disposal levy.
In 2014, the Company commissioned Sargent & Lundy (S&L) to prepare a report to summarize
costs, performance and development efforts on emerging commercially viable small modular
reactor (SMR) nuclear technologies. SMR’s offer simplicity, convenience, attractive economics
based on transportable modular construction processes, and, most importantly, an opportunity for
the producers of electric generation to reengage the nuclear option with significantly less capital
risk compared to traditional large-scale reactor designs. Three emerging SMR designs were
assessed (NuScale, mPower and Holtec); all are Integral Pressurized Water Reactors (iPWRs)
with passive safety design features. The SMR designs use varying degrees of first-of-a-kind
(FOAK) design concepts that simplify the SMR plant systems, enhancing safety, and reducing
capital and operations cost. However, these FOAK design concepts create risk that SMR plants
may not perform to a rated capacity and reliability or could result in design, construction, or
commissioning delays. The designs of all the assessed SMRs are evolving rapidly. The
Company will continue to monitor the SMR market.
At this time, other than technology monitoring, the Company is not actively involved in
development efforts of either the Blue Castle project or any specific SMR technologies.
Currently nuclear power is not considered a viable resource option until the 2025-2030
timeframe. Significant considerations are capital cost uncertainty (both for EPCs as well as
Owner’s costs), schedule risk, the high cost of development and permitting over an extended
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
116
period, cost recovery uncertainty associated with unsuccessful development efforts,
sociopolitical resistance and regulatory obstacles.
Energy Storage
As in previous IRPs, a number of energy storage technologies are considered; these include
compressed air energy storage (CAES), pumped hydroelectric storage and advanced batteries.
CAES is of significant interest because of the potential development of solution-mined storage
sites associated with Magnum Energy’s development activities adjacent to the Intermountain
Power Project located in Delta Utah.
Energy storage continues to be of interest since the variable nature of some renewable generation
alternatives could be enhanced if the energy produced during low demand or transmission
constraint periods could be stored at low cost. Energy storage resources also have the ability to
provide ancillary resources in the form of spinning reserves and sources of voltage control.
In 2014, PacifiCorp engaged HDR to update its 2011 Energy Storage Study44. Table 6.7
summarizes the costs and performance of available storage technologies from the updated HDR
study. Table 6.7 does not include dry cell and Zinc-Bromide (ZnBr) battery options because
these systems are similar to other options shown. Zinc-Bromide batteries are similar to the VRB
batteries, while dry cells are similar to the Lithium-Ion (Li-Ion) batteries.
Table 6.7 – HDR Energy Storage Study Summary Cost and Capacity Results (2014$)
Flywheel Li-Ion NaS VRB
Pumped
Storage CAES
System Cost
($/kW and/or
$/kWh)
$2,862
per kW
$800 -
$1,200/kWh
(High Energy)
$4,000/kW $675/kWh $1,700-
$2,500/kW
$2,000-
$2,300/kW
Rated System Size
(MW) 20 1 - 32 1 1 600 300+
Rated Capacity
(hours) 0.25 1
(High Energy) 7.2 1 8 to 10 8+
Roundtrip, AC to
AC efficiency (%) 85 91 70 – 75 65 – 75 75 – 82 64
Three examples of pumped storage hydro projects are described in the HDR study. The three
example projects detailed in the 2014 Energy Storage Screening Study are Swan Lake North in
Oregon, JD Pool in Washington and Black Canyon in Wyoming. These proxy projects were
selected based on technical and commercial development progress. A composite case is
presented in the resource table representing both the size of this technology (over 600 MW)45
and costs at the high end range to reflect the permitting, design and construction cost uncertainty.
CAES is represented in the 2015 IRP at the size case described in the HDR study. A 300 net
MW capacity case is shown in the resource table at the 4,640 foot elevation reflecting
prospective CAES resources under development by Magnum Energy near Delta, Utah. Capital
costs include the solution mining component of the technology.
44 See Volume II, Appendix Q for the 2014 Energy Storage Study (except associated appendices) the full version is
available on accompanying data disk and PacifiCorp’s IRP web page at: http://www.pacificorp.com/es/irp.html. 45 EDF, the developer of the Swan Lake pumped storage project, has recently indicated that they are currently
exploring a project size of 300-400 MW instead of the originally contemplated 600 MW, reflecting the results of
their internal valuation modeling work.
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
117
Battery energy storage is unique in that capital costs are defined in terms of energy storage
capability and not necessarily in terms of the amount of energy that can be delivered
instantaneously. In order to properly compare different battery systems it is necessary to compare
the battery systems on a common operating basis. The common operating basis is defined by the
sodium-sulfur (NaS) battery and all systems were compared on storing 7.2 hours of energy. The
results shown in the “$/kW–Capacity” and the “$/kWh Energy Storage” columns are based on
the high end cost estimates provided in the HDR study. The replacement cost is the average of
the initial cost range. All other columns are calculated from the first three columns of data and
other data contained in the HDR study. All O&M costs are assumed to be fixed. The “Adjusted
$/kWh” is an estimated cost on a $/kWh basis for those battery technologies where only $/kW
values were provided in the HDR report; an estimated replacement cost after 10 years for all
three battery technologies is assumed.
For the battery technologies listed in the supply side resource tables, normalized capital costs
were determined based on specific reference cases and operating assumptions. Since these only
reflect one operating scenario, there may be battery technology applications and operating
conditions which may be more cost effective under different design and operating conditions.
The information provided also does not represent normalized lifecycle costs which are
influenced by many factors. Life-cycle costs for battery technologies depend on many variables,
which include individual battery technology degradation rates and depth of discharge (DoD)
sensitivities, which also depend on site specific conditions and operating conditions. For
example, the capacity of Li-Ion batteries falls to below 75% after 100,000 cycles at 100% DoD,
or falls to 75% after 1,000,000 cycles at 2.5% DoD. NaS batteries, on the other hand, last for
2,500 cycles at 100% DoD, or 5,000 cycles at 80% DoD; however, their life is unknown if
operated at 2.5% DoD. Although VRB batteries do not degrade based on number of cycles, they
have additional parasitic loads that impact available energy based on operating history.
Performance is also sensitive to temperature which is not considered in this summary effort. The
HDR report provides more details on the effects of these variables on the different battery
technologies. PacifiCorp is working to provide more details on the costs and trade-offs of the
various battery technologies especially for applications other than for traditional load/resource
uses such as load shifting.
Anaerobic Digesters – Washington State Service Territory
Study Description
In response to the Company’s 2013 IRP, the Washington Utility and Transportation Commission
ordered the Company to perform an analysis of the potential for baseload generation resources
based on anaerobic digestion in the Company’s service territory in the state of Washington. In
2014, the Company commissioned Harris Group Incorporated to perform an extensive
assessment on power generation potential from anaerobic digestion. The study effort focused on
electric power generation from dairies since it is expected that the bulk of the biogas fuel
feedstock derived from anaerobic digestion would be supplied by dairy waste.
Methodology
An assessment was made of the distribution of dairies in the Company’s service territory; this
included a breakdown on the size and number of dairies. The bulk of the dairies in the
Company’s service territory are located in Yakima County. From the dairy distribution estimates
of the biogas potential, both in terms of fuel quality and quantity, were prepared. The power
generation potential was determined based on the estimated biogas potential by dairy size and the
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
118
assumption that the predominant form of power generation would use reciprocating engines.
Cost estimates were prepared on the basis of dairy size inasmuch as the cost of generation
resources is lower cost for larger sized dairies due to economies of scale.
Results
Based on the study effort, the estimated power generation potential based on biogas from
anaerobic digestion in the Company’s Washington state service territory is 16-27 megawatts.
Capital costs were estimated to be in the range of $3,200 to $3,700 per kilowatt installed for
systems of 500 kilowatts and larger. The final report has been published and is available in
Volume II, Appendix P and on the Company’s website.46 A public presentation on the report
findings was prepared and made at the 2015 IRP Public Input Meeting 4 on September 25; a
copy of that presentation is also available on the Company’s website.47
Demand-side Resources
Resource Options and Attributes
Source of Demand-side Management Resource Data
Demand-side management (DSM) resource opportunity estimates used in the development of the
2015 IRP were derived from the 2015 DSM potential study conducted by Applied Energy Group
(AEG). This study provided a broad estimate of the size, type, location and cost of demand-side
resources.48 For the purpose of integrated resource planning, the demand-side resource
information from the DSM potential study was converted into supply curves by type of DSM
(i.e. capacity-focused Classes 1 and 3 DSM and energy-based Class 2 DSM) for modeling
against competing supply-side alternatives.
Demand-side Management Supply Curves
Resource supply curves are a compilation of point estimates showing the relationship between
the cumulative quantity and cost of resources. Supply curves provide a representative look at
how much of a particular resource can be acquired at a particular price point. Resource modeling
utilizing supply curves allows utilities to select least-cost resources (products and quantities)
based on each resource’s competitiveness against alternative resource options.
As with supply-side resources, the development of demand-side resource supply curves requires
specification of quantity, availability, and cost attributes. Attributes specific to demand-side
supply curves include:
Resource quantities available in each year—either in terms of megawatts or megawatt-
hours— recognizing that some resources may come from stock additions not yet built,
and that elective resources cannot all be acquired in the first year;
Persistence of resource savings; for example, Class 2 DSM (energy-focused) resource
measure lives;
Seasonal availability and hours available (Class 1 and 3 DSM capacity resources);
46http://www.pacificorp.com/content/dam/pacificorp/doc/Energy_Sources/Integrated_Resource_Plan/2015IRP/2015
IRPStudy/Anaerobic_Digesters_Resource_Assessment_06-24-2014.pdf. 47http://www.pacificorp.com/content/dam/pacificorp/doc/Energy_Sources/Integrated_Resource_Plan/2015IRP/Pacif
iCorp_2015IRP_PIM04_9-25-26-2014.pdf 48 The 2015 DSM potential study is included on the data disk provided and available on PacifiCorp’s demand-side
management web page. http://www.pacificorp.com/es/dsm.html
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
119
The hourly shape of the resource (load shape of the Class 2 DSM energy resource); and
Levelized resource costs (dollars per kilowatt per year for Class 1 and 3 DSM capacity
resources, or dollars per megawatt-hour over the resource’s life for Class 2 DSM energy
resources).
Once developed, DSM supply curves are treated like discrete supply-side resources in the IRP
modeling environment.
Class 1 DSM Capacity Supply Curves
Supply curves were created for three distinct Class 1 DSM products:
1) Direct load control (DLC) of residential and small commercial central air conditioning
and water heating;
2) Irrigation load curtailment; and
3) Commercial/industrial curtailment
The potentials and costs for each product were provided at the state level resulting in three
products across six states or the development of 18 Class 1 DSM supply curves for the 2015 IRP
modeling process.
Class 1 DSM resource price differences between states for similar resources were driven by
resource differences in each market, such as irrigation pump size and hours of operation as well
as product performance differences. For instance, residential air conditioning load control in
Oregon is more expensive than Utah on a unitized or dollar per kilowatt-year basis due to
climatic differences that result in a lower load impact per installed switch.
The assessment of potential for distributed standby generation49 was combined with an
assessment of commercial/industrial energy management system controls in the development of
the resource opportunity and costs of the Class 1 DSM commercial/industrial curtailment
product. The costs for this product are generally constant across all jurisdictions assuming a pay-
for-performance delivery model.
Recognizing that some Class 1 and 3 DSM products compete for the management of the same
customer end-use loads, and to avoid overstating available impacts, the supply curves accounted
for interactions within and between Class 1 and Class 3 DSM resources. Resources were
prioritized within each customer sector by the firmness of the resource and then by cost. The
following are examples of the logic that was applied to account for these interactions:
Participation in the Class 1 DSM DLC air conditioning and water heating programs or
DLC irrigation programs would take precedence over participation in Class 3 DSM
Time-of-Use (TOU) rates/programs, assuming customers already enrolled in the DLC air
conditioning and water heating and DLC irrigation programs would not opt out to
participate in the TOU programs.
49 In February 2010 the Environmental Protection Agency made the Reciprocating Internal Combustion Engines
National Emission Standards for Hazardous Air Pollutants ruling. The ruling puts restrictions on the use of standby
generation after May, 2014 unless the generators meet the rulings required emission standards.
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
120
Participation in the Class 1 DSM commercial/industrial curtailment programs would take
precedent over Class 3 DSM Demand Buyback, Time-of-Use, Real-Time Pricing and/or
Critical Peak Pricing programs where load curtailment is offered.
Table 6.8 and Table 6.9 show the summary level Class 1 DSM resource information, by control
area, used in the development of the Class 1 DSM resource supply curves. Potential shown is
incremental to the existing Class 1 DSM resources identified in Table 5.12. For existing
program offerings, it is assumed that the Company could begin acquiring incremental potential in
2016. For resources representing new product offerings, it is assumed the Company could begin
acquiring potential in 2017, accounting for the time required for program design, regulatory
approval, vendor selection, etc.
Table 6.8 – Class 1 DSM Program Attributes West Control Area
Products Competing Strategy
Hours
Available
Seaso
n
Potentia
l (MW)
Levelized
Cost
($/kW-yr)
First
Year(s)
Available
Residential and Small
Commercial Air
Conditioning and
Water Heating
Residential and
commercial time-of-
use and critical peak
pricing
50 hours,
average of
4 hours per
event
Summ
er 47 $116 -
$152 2017
Irrigation Direct Load
Control
Irrigation time-of-use
and critical peak
pricing
52 hours,
average of
4 hours per
event
Summ
er 18 $69 - $71 2017
Commercial/Industrial
Curtailment (includes
distributed standby
generation)
Demand buyback,
commercial time-of-
use, real time pricing
and critical peak
pricing
30 hours,
average of
4 hours per
event
Summ
er 43 $74-$76 2017
Table 6.9 – Class 1 DSM Program Attributes East Control Area
Products Competing Strategy
Hours
Available Season
Potential
(MW)
Levelized
Cost
($/kW-yr)
First
Year(s)
Available
Residential and Small
Commercial Air
Conditioning and
Water Heating
Residential and
commercial time-of-
use and critical peak
pricing
50 hours,
average of
4 hours per
event
Summ
er 77 $62 - $156 2016-
2017
Irrigation Direct Load
Control
Irrigation time-of-use
and critical peak
pricing
52 hours,
average of
4 hours per
event
Summ
er 47 $51 - $71 2016-
2017
Commercial/Industrial
Curtailment (includes
distributed standby
generation)
Demand buyback,
commercial time-of-
use, real time pricing
and critical peak
pricing
30 hours,
average of
4 hours per
event
Summ
er 142 $76-$78 2017
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
121
Class 3 DSM Capacity Supply Curves
The Company analyzed the potentials for eight discrete opt-in Class 3 DSM products:
1) Residential time-of-use rates;
2) Residential critical peak pricing;
3) Commercial time-of-use rates;
4) Commercial critical peak pricing;
5) Commercial real-time pricing;
6) Commercial and industrial demand buyback;
7) Voluntary irrigation time-of-use rates; and
8) Voluntary irrigation critical peak pricing.
After accounting for product interactions through the participation hierarchy described in
PacifiCorp’s DSM Potential Study,50 supply curves were created for four bundled Class 3 DSM
product categories, which are capacity-focused resources like Class 1 DSM products:
1) Residential pricing;
2) Commercial and industrial pricing;
3) Commercial and industrial demand buyback; and
4) Irrigation pricing.
The potentials and costs for each product category were provided at the state level, resulting in
four products across six states or the development of 24 Class 3 DSM supply curves for the 2015
IRP modeling process.
As discussed above with regard to Class 1 DSM resources, the potential for each Class 3 DSM
product was adjusted for expected interactions with competing Class 1 and 3 DSM resource
options prior to the development of the supply curves.
Modest product price differences between states for most Class 3 DSM resources were driven by
resource opportunity differences. The DSM potential study assumed the same fixed costs in each
state in which it is offered regardless of quantity available. Therefore, states with lower resource
availability for a particular product have a higher cost per kilowatt-year. In the case of demand
buyback, costs are assumed to scale with the MWs and MWhs enrolled, and are thus nearly
constant across states.
Table 6.10 and Table 6.11 show the summary level Class 3 DSM resource information, by
control area, used in the development of the Class 3 DSM resource supply curves. Potential
shown is incremental to the existing Class 3 DSM resources identified in Table 5.12. In 2015 and
2016, it’s assumed the only impacts realized are from existing time-of-use rates. The impacts
from new time-of-use rates are available beginning in 2017, accounting for the time required for
program design, regulatory approval, vendor selection, etc. Dynamic pricing products (critical
peak pricing and real-time pricing) are assumed to be available for acquisition beginning in
2020, following the assumed installation of advance metering infrastructure (AMI) by the end of
2019, whose costs are not captured in the levelized costs for those products.
50 PacifiCorp Demand-side Resource Potential Assessment for 2015-2034, Volume 5: Class 1 and 3 DSM Analysis
Appendix G, Table G-1.
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
122
Table 6.10 – Class 3 DSM Program Attributes, West Control Area
Products
Competing
Strategy
Hours
Available Season
Potential
(MW)
Levelized
Cost
($/kW-yr)
First
Year(s)
Available
Residential Pricing
Residential A/C
and Water
Heating DLC
148 - 150
hours Summer 40 $16 - $29 2017
Commercial/Industrial
Pricing
C&I Curtailment
and Demand
Buyback
165 - 230
hours Summer 22 $5 - $11 2017
Commercial/Industrial
Demand Buyback
C&I
Curtailment,
Time-of-Use,
Critical Peak
Pricing, and
Real-Time
Pricing
50 hours Summer 3 $24 2017
Irrigation Pricing Irrigation DLC 60 - 61
hours Summer 3 $5 - $6 2017
Table 6.11 – Class 3 DSM Program Attributes, East Control Area
Products
Competing
Strategy
Hours
Available Season
Potential
(MW)
Levelized
Cost
($/kW-yr)
First
Year(s)
Available
Residential Pricing
Residential A/C
and Water
Heating DLC
60-150
hours Summer 82 $18 - $28 2017
Commercial/Industrial
Pricing
C&I Curtailment
and Demand
Buyback
98 - 252
hours Summer 51 $4 - $11 2017
Commercial/Industrial
Demand Buyback
C&I
Curtailment,
Time-of-Use,
Critical Peak
Pricing, and Real
Time Pricing
50 hours Summer 10 $24-$25 2017
Irrigation Pricing Irrigation DLC 49 - 61
hours Summer 3 $5 - $6 2017
Class 2 DSM, Energy Supply Curves
The 2015 DSM potential study provided the information to fully assess the potential contribution
from Class 2 DSM resources over the IRP planning horizon accounting for known changes in
building codes, advancing equipment efficiency standards, market transformation, resource cost
changes, changes in building characteristics and state-specific resource evaluation considerations
(e.g., cost-effectiveness criteria). Class 2 DSM resource potential was assessed by state down to
the individual measure and facility levels; e.g., specific appliances, motors, lighting
configurations for residential buildings, small offices, etc. The DSM potential study provided
Class 2 DSM resource information at the following granularity:
State: Washington, California, Idaho, Utah, Wyoming51
Measure:
–109 residential measures
51 Oregon’s Class 2 DSM potential was assessed in a separate study commissioned by the Energy Trust of Oregon.
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
123
– 171 commercial measures
– 150 industrial measures
– 19 irrigation measures
– Nine street lighting measures
Facility type52:
– Six residential facility types
– 28 commercial facility types
– 30 industrial facility types
– Two irrigation facility type
– Four street lighting types
The 2015 DSM potential study levelized total resource costs (including measure costs and a 20
percent adder for program administrative costs) over the study period at PacifiCorp’s cost of
capital, consistent with the treatment of supply-side resources. Consistent with regulatory
mandates, Utah Class 2 DSM resource costs were levelized using utility costs (incentive and
non-incentive program costs) instead of total resource costs.
The technical potential for all Class 2 DSM resources across five states over the twenty-year
DSM potential study horizon totaled 13.4 million MWh.53 The technical potential represents the
total universe of possible savings before adjustments for what is likely to be realized
(achievable). When the achievable assumptions described below are considered the technical
potential is reduced to an achievable technical potential for modeling consideration of 10.9
million MWh. The achievable technical potential, representing available potential at all costs, is
provided to the IRP model for economic screening relative to supply-side alternatives.
Despite the granularity of Class 2 DSM resource information available, it was impractical to
model the Class 2 DSM resource supply curves at this level of detail. The combination of
measures by facility type and state generated over 50,000 separate permutations or distinct
measures that could be modeled using the supply curve methodology. To reduce the resource
options for consideration without losing the overall resource quantity available or its relative
cost, resources were consolidated into bundles, using ranges of levelized costs to reduce the
number of combinations to a more manageable number. The range of measure costs in each of
the 27 bundles used in the development of the Class 2 DSM supply curves for the 2015 IRP are
the same as those developed for the 2013 IRP.
Bundle development began with the Class 2 DSM technical potential identified by the 2015
DSM potential study. To account for the practical limits associated with acquiring all available
resources in any given year, the technical potential by measure was adjusted to reflect the
amount that is realistically achievable over the 20-year planning horizon. Consistent with the
52 Facility type includes such attributes as existing or new construction, single or multi-family, etc. Facility types are
more fully described in Chapter 4 of Volume 2 of the 2015 DSM potential study; pages 4-3 for residential, pages 4-5
for commercial, and pages 4-8 for industrial. 53 The identified technical potential represents the cumulative impact of Class 2 DSM measure installations in the
20th year of the study period. This may differ from the sum of individual years’ incremental impacts due to the
introduction of improved codes and standards over the study period.
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
124
Northwest Power and Conservation Council’s aggressive54 regional planning assumptions, it
was assumed that 85 percent of the technical potential for discretionary (retrofit) resources and
77 percent of lost-opportunity (new construction or equipment upgrade on failure) could be
achievable over the 20-year planning period. Over the planning period, the aggregate (both
discretionary and lost opportunity) achievable technical potential is 81 percent of the technical
potential.
The 2013 DSM potential assessment applied market ramp rates on top of measure ramp rates to
reflect state-specific considerations affecting acquisition rates, such as age of programs, small
and rural markets, and current delivery infrastructure. These market ramp rates were applied in
California, Idaho and Wyoming in the development of the supply curves provided for the 2013
IRP modeling effort. Since that time, PacifiCorp’s programs have continued to gain traction and
market ramp rates were removed in California and Idaho in the development of the 2015 IRP
supply curves. However, as momentum in the Wyoming industrial sector is still building, the
2015 DSM potential study applied the “Emerging” market ramp rate used in the 2013 DSM
potential study to industrial measures in Wyoming.
The Energy Trust of Oregon (ETO) applies achievability assumptions and ramp rates in a similar
manner in its resource assessment. For a more detailed description of the methods used in
PacifiCorp’s 2015 DSM Potential study and the ETO’s resource assessment, see Appendix E in
Volume 4 of the 2015 DSM potential study report. Neither PacifiCorp nor the ETO performed an
economic screening of measures in the development of the Class 2 DSM supply curves used in
the development of the 2015 IRP, allowing resource opportunities to be economically screened
against supply-side alternatives in a consistent manner across PacifiCorp’s six states.
Twenty-seven cost bundles were available across six states (including Oregon), which equates to
189 Class 2 DSM supply curves.56 Table 6.12 shows the 20-year MWh potential for Class 2
DSM cost bundles, designated by ranges of $/MWh.
Table 6.13 shows the associated bundle price after applying cost credits afforded to Class 2 DSM
resources within the model. These cost credits include the following:
A transmission and distribution investment deferral credit of $54/kW-year;
Stochastic risk reduction credit of $4.02/MWh57;
Northwest Power Act 10-percent credit (Oregon and Washington resources only)58
54 The Northwest’s achievability assumptions include savings realized through improved codes and standards and
market transformation, and thus, applying them to identified technical potential represents an aggressive view of
what could be achieved through utility DSM programs. 55 The Wyoming industrial market ramp rate is provided in Table E-1 of Volume 4 of the 2015 DSM potential study
report. 56 Note for Washington state Yakima and Walla Walla are modeled as separate resources making seven total sets of
curves of 27 bundles, totaling 189 Class 2 DSM supply curves. 57 PacifiCorp developed this credit from two sets of production dispatch simulations of a given resource portfolio,
and each set has two runs with and without DSM. One simulation is on deterministic basis and another on stochastic
basis. Differences in production costs between the two sets of simulations determine the dollar per MWh stochastic
risk reduction credit. 58 The formula for calculating the $/MWh credit is: (Bundle price - ((First year MWh savings x market value x 10%)
+ (First year MWh savings x T&D deferral x 10%))/First year MWh savings. The levelized forward electricity price
for the Mid-Columbia market is used as the proxy market value.
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
125
The bundle price is the average levelized cost for the group of measures in the cost range,
weighted by the potential of the measures. In specifying the bundle cost breakpoints, narrow cost
ranges were defined for the lower-cost resources to ensure cost accuracy for the bundles
considered more likely to be selected during the resource selection phase of the IRP.
Table 6.12 – Class 2 DSM MWh Potential by Cost Bundle
Bundle
Cost
($/MWh) California Idaho Oregon Utah Washington Wyoming
<=10 30,331 92,569 825,665 844,577 240,894 361,822
10-20 21,989 85,081 132,013 2,015,723 121,227 196,956
20-30 26,202 27,983 558,510 1,395,248 70,320 294,359
30-40 20,471 36,945 138,175 844,350 57,730 244,710
40-50 6,943 18,176 166,858 455,228 43,377 217,083
50-60 6,264 21,938 74,488 232,260 56,447 99,352
60-70 11,906 22,615 31,192 199,908 46,483 52,133
70-80 4,217 12,098 111,248 121,324 20,012 25,305
80-90 5,721 10,428 95,838 187,073 49,849 94,715
90-100 3,304 25,935 115,241 99,577 14,151 51,928
100-110 3,254 3,893 52,537 111,496 21,588 7,898
110-120 4,636 14,905 - 133,370 36,821 16,366
120-130 1,361 3,173 33,791 68,446 11,022 14,095
130-140 1,894 5,291 46,292 40,182 7,121 20,567
140-150 12,752 9,047 65,726 67,985 6,314 6,556
150-160 3,001 5,285 1,118 68,483 13,729 9,501
160-170 1,261 1,245 211,761 57,846 5,186 6,847
170-180 2,373 5,011 5,808 26,946 10,439 9,173
180-190 1,119 4,692 - 93,370 2,358 10,029
190-200 2,734 8,424 15,596 19,218 5,105 3,328
200-250 5,027 9,149 20,896 67,965 14,108 28,550
250-300 5,927 8,380 3,760 119,276 37,312 38,205
300-400 15,182 22,589 21,409 384,577 56,865 39,492
400-500 4,707 8,443 38,715 57,957 39,828 20,383
500-750 9,218 17,778 24,179 104,247 21,148 38,720
750-1,000 1,156 3,626 2,692 10,629 6,345 14,257
> 1,000 1,843 4,069 92,882 22,500 6,294 9,381
Table 6.13 – Class 2 DSM Adjusted Prices by Cost Bundle
Levelized Bundle Price After Adjustments ($/MWh)
Bundle Cost
($/MWh) California Idaho Oregon Utah Washington Wyoming
<= 10 - - - - - -
10 - 20 0.24 - - - - 3.61
20 - 30 11.11 7.37 6.87 9.32 4.85 12.69
30 – 40 14.54 5.33 12.14 18.06 8.92 18.99
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
126
Levelized Bundle Price After Adjustments ($/MWh)
Bundle Cost
($/MWh) California Idaho Oregon Utah Washington Wyoming
40 – 50 29.30 25.14 15.20 22.43 23.43 32.59
50 - 60 38.81 31.82 5.89 20.17 26.38 40.11
60 – 70 52.67 46.84 33.76 40.00 41.60 50.07
70 – 80 52.78 52.88 45.39 45.67 39.94 54.93
80 – 90 68.40 64.34 37.29 68.20 47.58 69.16
90 – 100 67.77 66.21 73.27 67.28 58.78 77.40
100 – 110 80.27 73.16 84.99 84.36 63.51 73.56
110 – 120 90.79 86.26 N/A 81.35 75.15 100.14
120 – 130 102.48 99.59 71.97 100.48 90.38 99.89
130 – 140 108.19 108.11 111.63 118.04 96.34 112.57
140 – 150 115.68 110.92 97.29 90.17 110.12 120.11
150 - 160 133.15 133.46 129.55 124.19 122.30 135.55
160 – 170 134.04 124.02 115.74 105.28 143.79 141.75
170 – 180 154.62 148.17 155.16 151.65 147.29 157.69
180 – 190 157.50 160.42 N/A 157.42 134.23 160.48
190 – 200 171.24 159.31 174.83 180.06 165.11 173.95
200 – 250 200.35 186.91 205.84 174.60 184.57 192.15
250 – 300 245.54 244.78 258.28 222.07 241.94 242.93
300 – 400 341.43 333.83 292.73 308.05 322.95 325.60
400 – 500 424.84 417.84 432.05 386.82 380.32 414.85
500 – 750 545.50 575.15 521.73 527.35 568.91 566.21
750 – 1,000 837.82 873.66 898.39 820.57 838.14 764.83
> 1,000 2,297.73 9,999.00 1,353.39 4,921.77 2,987.36 3,183.83
To capture the time-varying impacts of Class 2 DSM resources, each bundle has an annual 8,760
hourly load shape specifying the portion of the maximum capacity available in any hour of the
year. These shapes are created by spreading measure-level annual energy savings over 8,760
load shapes, differentiated by state, sector, market segment, and end use accounting for the
hourly variance of Class 2 DSM impacts by measure. These hourly impacts are then aggregated
for all measures in a given bundle to create a single weighted average load shape for that bundle.
An accelerated Class 2 DSM acquisition scenario was created for inclusion in one of the IRP
core cases. Unlike the proxy accelerated scenario created by the Company and used in the 2013
IRP, the 2015 IRP accelerated scenario was informed by work completed by AEG as part of the
2015 DSM potential study. The analysis sought to assess a realistic level of acceleration,
recognizing that there may be barriers to accelerating certain measures, including timing of new
construction and equipment replacement, product availability, delivery infrastructure, and other
factors. To identify measures that would be candidates for accelerated acquisition, AEG
reviewed aggressive program structures that have proven successful in real markets; programs
with direct installation, early replacements, or neighborhood blitzes. While this accelerated case
is speculative and hypothetical in nature, this research allowed the analysis to be grounded in
real-world delivery examples with evidence of evaluated traction and market success.59 Under
59 The data sources, methodology, and results of this analysis are detailed in Chapter 6 of Volume 2 of the 2015
DSM potential study report.
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
127
the accelerated scenario, the total available potential over the 20-year planning period did not
change, however the assumed delivery costs for accelerated measures were adjusted to
acknowledge that such a scenario would likely require higher incentive and non-incentive
program expenditures to expand participation and delivery infrastructure60.
Distribution Energy Efficiency
The Company continues to evaluate distribution energy efficiency, including conservation
voltage reduction, options for feasibility and cost-effectiveness. To date, the largest effort in this
category has been in the area of voltage optimization. Details of our 2010-2013 analysis and
pilot project work are documented in Appendix E of the 2013 IRP.
The Company’s efforts in the past two years have further corroborated its earlier conclusions.
These four points are specifically of concern with regard to energy savings from distribution
system voltage optimization:
1) Potential energy savings are small for PacifiCorp’s distribution system given the
Company’s standard operating practices;
2) System changes such as load transfers, new feeders and the voltage control changes that
can be necessary when distributed energy resources are brought online always introduce
difficulty in estimating the net voltage changes over the long term;
3) The dynamic and unpredictable nature of customer loads, and their interaction with
voltage control devices on complex distribution circuits, makes the accurate
determination of energy savings statistically dubious; and
4) Recent and ongoing work at the National Electric Energy Testing, Research &
Applications Center (NEETRAC) has identified that the ratio between energy reduction
and voltage reduction can fall substantially over time, greatly affecting the business case
for any voltage reduction project.
In addition to voltage optimization, the Company investigated the possible applications and
cost-effectiveness of solid state “edge of grid” technologies now available, and has evaluated
potential efficiency savings from changes to specifications in streetlights and service
transformers. None of these opportunities were found to be cost effective for the Company.
Distribution energy efficiency measures were not modeled as potential resources in this
IRP, since savings from such measures are unreliable and generally not cost-effective.
Transmission Resources
For the 2015 IRP, the Company selects generation resource portfolios with a pre-determined
transmission topology based on transmission rights that are owned by the Company and
contracted with third parties. Potential transmission resource additions are examined prior to
generation resource selection. Sensitivities are also developed to test various transmission build-
out scenarios. Additionally, in order to determine the appropriate placement and timing of
generation resources, generic assumptions on transmission integration costs are included in the
costs of potential resources. These costs are associated with improvements needed to transfer the
60 The resource cost adjustments in the accelerated DSM scenario may not represent the actual costs of such a
scenario; there was limited information available to inform the Company what costs would be required to facilitate
this level of customer participation in markets with low retail rates and limited capital.
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
128
generation to load centers and/or markets and maintain the reliability and stability of the
transmission system.
Costs of transmission integration vary discretely based on size of the resources added. Table
6.14 provides an example how the transmission integration costs at a location may be structured
based on the size of the resource additions.
Table 6.14 – Example of Transmission Integration Costs by Size of Resource Additions
Size of the Resources Addition Transmission Integration Costs
Up to 500 MW $0 million
500 MW to 1,500 MW $350 million
1,500 MW to 2,500 MW $700 million
2,5000 MW to 3,000 MW $1,000 million
For any initial resource additions up to 500 MW there would not be incremental transmission
costs as there is capacity currently available. However, if a resource added is in any size between
500 MW and 1,500 MW, the transmission integration costs would be $350 million. If a second
resource added subsequently at the same location and total capacity between the two resources
does not exceed 1,500 MW, there would not be transmission integration costs for this second
resource.
In addition, if a comparable resource is selected immediately after a unit retires, there may not
need to be costs to reinforce the existing transmission resource in the area, otherwise, additional
costs would need to be incurred to maintain reliability of the transmission system. To accurately
reflect the impact of transmission costs of the resource portfolios, the generic assumptions are
later revised based on specific size, timing, location, and sequence of resources added in each
portfolio
Market Purchases
PacifiCorp and other utilities engage in purchases and sales of electricity on an ongoing basis to
balance the system and maximize the economic efficiency of power system operations. In
addition to reflecting spot market purchase activity and existing long-term purchase contracts in
the IRP portfolio analysis, PacifiCorp modeled front office transactions (FOT). FOTs are proxy
resources, assumed to be firm, that represent procurement activity made on an on-going forward
basis to help the Company cover short positions.
As proxy resources, FOTs represent a range of purchase transaction types. They are usually
standard products, such as heavy load hour (HLH), light load hour (LLH), and super peak (hours
ending 13 through 20) and typically rely on standard enabling agreements as a contracting
vehicle. FOT prices are determined at the time of the transaction, usually via an exchange or
third party broker, and are based on the then-current forward market price for power. An optimal
mix of these purchases would include a range of volumes and terms for these transactions.
Solicitations for FOTs can be made years, quarters or months in advance, however, most
transactions made to balance PacifiCorp’s system are made on a balance of month, day-ahead,
hour-ahead, or intra-hour basis. Annual transactions can be available three or more years in
advance. Seasonal transactions are typically delivered during quarters and can be available from
PACIFICORP - 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
129
one to three years or more in advance. The terms, points of delivery, and products will all vary
by individual market point.
Two FOT types were included for portfolio analysis: an annual flat product, and a HLH third
quarter product. An annual flat product reflects energy provided to PacifiCorp at a constant
delivery rate over all the hours of a year. Third-quarter HLH transactions represent purchases
received 16 hours per day, six days per week from July through September. Table 6.15 shows the
FOT resources included in the IRP models, identifying the market hub, product type, annual
megawatt capacity limit, and availability. PacifiCorp develops its FOT limits based upon its
active participation in wholesale power markets, its view of physical delivery constraints, market
liquidity and market depth, and with consideration of regional resource supply (see Volume II,
Appendix J for an assessment of western resource adequacy). Prices for FOT purchases are
associated with specific market hubs and are set to the relevant forward market prices, time
period, and location, plus appropriate wheeling charges, as applicable. Additional discussion of
how FOTs are modeled during the resource portfolio development process of the IRP is included
in Chapter 7.
Table 6.15 – Maximum Available Front Office Transaction Quantity by Market Hub
Market Hub/Proxy FOT Product Type Megawatt Limit and Availability
Mid-Columbia
Flat Annual (“7x24”) and
3rd Quarter Heavy Load Hour (“6x16”)
400 MW + 375 MW with 10% price premium, 2015-
2034
California Oregon Border (COB)
Flat Annual (“7x24”) and
3rd Quarter Heavy Load Hour (“6x16”)
400 MW, 2015-2034
Southern Oregon / Northern California (NOB)
3rd Quarter Heavy Load Hour (“6x16”) 100 MW, 2015-2034
Mona
3rd Quarter, Heavy Load Hour (6x16) 300 MW, 2015-2034
PACIFICORP – 2015 IRP CHAPTER 6 – RESOURCE OPTIONS
130
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
131
CHAPTER 7 – MODELING AND PORTFOLIO
EVALUATION APPROACH
CHAPTER HIGHLIGHTS
The IRP modeling approach seeks to determine the comparative cost, risk, and
reliability attributes of resource portfolios. The 2015 IRP modeling and evaluation
approach consists of three basic steps within the broader IRP process, including
resource portfolio development, cost and risk analysis, and the preferred portfolio
selection process.
PacifiCorp uses System Optimizer to produce unique resource portfolios across a
range of different planning assumptions. During the public input process, PacifiCorp
proposed combinations of planning assumptions to define core cases, each designed to
produce a unique resource portfolio defined by the type, timing and location of new
resources as well as assumed retirement dates for existing resources. Based input from
stakeholders participating in this process, PacifiCorp refined its core case definitions
resulting in 34 unique core case resource portfolios.
Taking into consideration stakeholder comments received during the public input
process, PacifiCorp also developed 15 sensitivity cases designed to highlight the
impact of specific planning assumptions on future resource selections along with the
associated impact on system costs and stochastic risks.
PacifiCorp developed a new spreadsheet-based modeling tool, the 111(d) Scenario
Maker, to facilitate modeling of EPA’s proposed rule to regulate CO2 emissions from
existing generating units under §111(d) of the Clean Air Act.
PacifiCorp uses Planning and Risk (PaR) to perform stochastic risk analysis of core
case and sensitivity case resource portfolios. PaR studies are performed for three
natural gas price scenarios (low, base, and high), which inform selection of the
preferred portfolio, and a high CO2 price scenario, which informs PacifiCorp’s 2015
IRP acquisition path analysis. Additional cost and risk considerations include results
from deterministic risk analysis.
Informed by comprehensive modeling, PacifiCorp’s preferred portfolio selection
process involves pre-screening and initial screening steps using both cost and risk
metrics reported from PaR and final screening analysis that compares resource
portfolios on the basis of expected costs, low-probability high cost outcomes,
reliability, deterministic risk, and other criteria.
Introduction
The IRP modeling approach seeks to determine the comparative cost, risk, and reliability
attributes of different resource portfolios, each meeting a target planning reserve margin. These
portfolio attributes form the basis of an overall quantitative portfolio performance evaluation.
This chapter describes the modeling and risk analysis process that supports this portfolio
performance evaluation, documents key modeling assumptions, and describes how this
information is used to identify PacifiCorp’s preferred portfolio. The results of PacifiCorp’s
modeling and portfolio evaluation approach are summarized in Chapter 8.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
132
The modeling and portfolio evaluation steps within the broader IRP process consist of three basic
steps, highlighted in red in Figure 7.1. The three basic modeling and portfolio evaluation steps,
discussed in detail in this chapter, include:
Resource Portfolio Development
Resource expansion plan modeling is used to identify resource portfolios that meet projected
resource needs. Each resource portfolio is uniquely characterized by the type, timing, and
location of new resources in PacifiCorp’s system over time. These resource portfolios are
produced using a specific combination of planning assumptions, referred to as case
definitions, related to environmental and tax policies, wholesale power and natural gas
prices, load growth net of assumed distributed generation penetration levels, and new
resource cost and performance data.
Cost and Risk Analysis
Additional modeling is performed to produce metrics that support comparative cost and risk
analysis among the different resource portfolio alternatives. Stochastic risk modeling of
resource portfolio alternatives is performed using Monte Carlo random sampling of
stochastic variables, which include load, natural gas and wholesale electricity prices, hydro
generation, and unplanned thermal outages. Deterministic risk modeling is performed on top
performing resource portfolios to assess the impact of applying planning assumptions that
differ from those used in the resource portfolio development process.
Preferred Portfolio Selection
The preferred portfolio selection process is based upon modeling results from the resource
portfolio development and cost and risk analysis steps. Preliminary and initial screening of
resource portfolios is based upon the present value revenue requirement (PVRR) of system
costs, assessed on a deterministic and expected value basis and on an upper tail stochastic
risk basis. Resource portfolios that remain after preliminary and initial screening are ranked
using a risk-adjusted PVRR metric, a metric that combines the expected value PVRR with
upper tail stochastic risk PVRR. Additional selection criteria consider relative portfolio
differences in supply reliability and carbon dioxide (CO2) emissions. The final selection
process considers results of deterministic risk analysis modeling, resource diversity, and
other supplemental modeling results.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
133
Figure 7.1 – Modeling and Portfolio Evaluation Steps within the IRP Process
Resource Portfolio Development
Resource expansion plan modeling, performed using System Optimizer, is used to identify
resource portfolios that meet projected resource needs. Each resource portfolio is uniquely
characterized by the type, timing, and location of new resources in PacifiCorp’s system over
time. These resource portfolios are produced using a specific combination of planning
assumptions related to environmental and tax policies, wholesale power and natural gas prices,
load growth net of assumed distributed generation penetration levels, and new resource cost and
performance data.
System Optimizer
The System Optimizer model operates by minimizing operating costs for existing and
prospective new resources, subject to system load balance, reliability and other constraints. Over
the 20-year planning horizon, it optimizes resource additions subject to resource costs and
capacity constraints (summer peak loads plus a planning reserve margin for each load area
represented in the model). In the event that an early retirement of an existing generating
resource is assumed for a given planning scenario, System Optimizer will select additional
resources as required to meet summer peak loads inclusive of a target planning reserve margin.
To accomplish these optimization objectives, System Optimizer performs a time-of-day least-
cost dispatch for existing and potential planned generation, while considering cost and
performance of existing contracts and new demand side management (DSM) alternatives within
PacifiCorp’s transmission system. Resource dispatch is based on a representative-week method.
Time-of-day hourly blocks are simulated according to a user-specified day-type pattern
Resource Needs
Assessment
Resource Portfolio
Development
Cost and Risk
Analysis
Preferred Portfolio
Selection
Action Plan
Key Planning
Assumptions
and
Uncertainties
Supplemental
Studies
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
134
representing an entire week. Each month is represented by one week, and the model scales
output results to the number of days in the month and then the number of months in the year.
Dispatch also determines optimal electricity flows between zones and includes spot market
transactions for system balancing. The model minimizes the system PVRR, which includes the
net present value cost of existing contracts, spot market purchase costs, spot market sale
revenues, generation costs (fuel, fixed and variable operation and maintenance,
decommissioning, emissions, unserved energy, and unmet capacity), costs of demand side
management resources and amortized capital costs for existing coal resources and potential new
resources.
Transmission System
PacifiCorp uses a transmission topology that captures major load centers, generation resources,
and market hubs interconnected via firm transmission paths. Transfer capabilities across
transmission paths are based upon the firm transmission rights of PacifiCorp’s merchant
function, including transmission rights from PacifiCorp’s transmission function and other
regional transmission providers. Figure 7.2 shows the 2015 IRP transmission system model
topology.
Figure 7.2 – Transmission System Model Topology
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
135
In developing resource portfolios for the 2015 IRP, PacifiCorp includes estimated transmission
integration and transmission reinforcement costs specific to each resource portfolio. These costs
are influenced by the type, timing, and location of new resources as well as any assumed
resource retirements, as applicable, in any given portfolio.
Resource Adequacy
Resource adequacy is modeled in the portfolio development process by ensuring each portfolio
meets a target planning reserve margin. In its 2015 IRP, PacifiCorp continues to apply a 13%
planning reserve margin target. The planning reserve margin, which influences the need for new
resources, is applied to PacifiCorp’s forecast coincident system peak load net of offsetting “load
resources” such as dispatchable load control or energy efficiency capacity. Planning to achieve a
13% planning reserve margin ensures that PacifiCorp has sufficient resources to meet peak loads,
recognizing that there is a possibility for load fluctuation and extreme weather conditions,
fluctuation of variable generation resources, a possibility for unplanned resource outages, and
reliability requirements to carry sufficient contingency and regulating reserves. Volume II,
Appendix I of this report summarizes PacifiCorp’s updated planning reserve margin study that
supports selection of a 13% target planning reserve margin in the 2015 IRP.
New Resource Options
Dispatchable Thermal Resources
System Optimizer performs time-of-day least cost dispatch of existing and potential new thermal
resources to meet load while minimizing costs. Dispatch costs applicable to thermal resources
include fuel costs, non-fuel variable operations & maintenance (VOM) costs, and the cost of
emissions, as applicable. For existing and potential new dispatchable thermal resources, System
Optimizer uses generator specific inputs for fuel costs, VOM, heat rates, emission rates, and any
applicable price for emissions to establish the dispatch cost of each generating unit for each
dispatch interval. Thermal resources are dispatched in least cost merit. The power produced by
these resources can be used to meet load or to make off-system sales at times when resource
dispatch costs fall below market prices. Conversely, at times when dispatch costs exceed market
prices, off-system purchases can displace dispatchable thermal generation to minimize system
energy costs. Dispatch of thermal resources reflects any applicable transmission constraints
connecting generating resources with both load and market bubbles as defined in the
transmission topology for the model.
Front Office Transactions
Front office transactions (FOTs) represent short-term firm market purchases for physical
delivery of power. PacifiCorp is active in western wholesale power markets and routinely makes
short-term firm market purchases for physical deliveries on a forward basis (i.e., prompt month
forward, balance of month, day-ahead, and hour-ahead). These transactions are used to balance
PacifiCorp’s system as market and system conditions become more certain as the time between
an effective transaction date and real time delivery is reduced. Balance of month and day-ahead
physical firm market purchases are most routinely acquired through a broker or an exchange,
such as the Intercontinental Exchange (ICE). Hour-ahead transactions can also be made through
an exchange. For these types of transactions, the broker or the exchange provides the service of
providing a competitive price. Non-brokered transactions can also be used to make firm market
purchases among a wide range of forward delivery periods.
Transmission Costs
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
136
From a modeling perspective, it is not feasible to incorporate all of the short-term firm physical
power products, which differ by delivery pattern and delivery period, that are available through
brokers, exchanges, and non-brokered transactions. However, considering that PacifiCorp
routinely uses these types of firm transactions, which obligate the seller to back the transaction
with reserves when balancing its system, it is important that the capacity contribution of short-
term firm market purchases are accounted for in the resource portfolio development process. For
capacity optimization modeling, short-term firm forward transactions are represented as FOTs
and configured in System Optimizer with either an annual flat or third quarter on-peak delivery
pattern in every year of the twenty-year planning horizon. As configured in System Optimizer,
FOTs contribute capacity toward meeting the 2015 IRP’s 13% target planning reserve margin
and supply system energy consistent with the assumed FOT delivery pattern.
Unlike FOTs, system balancing transactions do not contribute capacity toward meeting the 13%
target planning reserve margin. System balancing transactions include hourly off-system sales
and hourly off-system purchases, representing market activities that minimize system energy
costs as part of the economic dispatch of system resources, including energy from any FOTs
included in a resource portfolio.
A description of FOT limits assumed in the 2015 IRP is included in Chapter 6. PacifiCorp’s
evaluation of resource adequacy in the western power markets is summarized in Volume II,
Appendix J.
Demand Side Management
System Optimizer can select incremental DSM resources during the resource portfolio
development process. Selection of DSM resources is made from supply curves that define how
much of a DSM resource can be acquired at a given cost point.
Class 2 DSM resources, representing energy savings from energy efficiency programs, are
characterized with supply curves that represent achievable technical potential of the resource by
state, by year, and by measure specific to PacifiCorp’s service territory. For modeling purposes,
these data are aggregated into cost bundles. Each cost bundle of the Class 2 DSM supply curve
specifies the aggregate energy savings profile of all measures included in the cost bundle, with
an assumed capacity contribution based on aggregate energy savings during on-peak hours in
July, aligning with PacifiCorp’s coincident system peak load.
Class 1 DSM resources, representing direct load control capacity resources, are also
characterized with supply curves representing achievable technical potential by state and by year
for specific direct load control program categories (i.e., air conditioning, irrigation, and
commercial curtailment). System Optimizer evaluates Class 1 DSM resources by considering
capacity contribution, cost, and operating characteristics. Operating characteristics include
variables such as maximum energy that the Class 1 DSM resource may dispatch in a day and in a
given year.
Class 3 DSM resources, much like Class 1 DSM, are capacity-based resources with savings
assumed to be achieved with rate design (i.e., time-of-use rates or critical peak pricing).
PacifiCorp performed Class 3 DSM sensitivity analysis in its 2015 IRP, but did not include Class
3 DSM resources in its resource portfolio development process. Additional discussion of DSM
resources modeled in the 2015 IRP is included in Chapter 6 and in Volume II, Appendix D.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
137
Wind and Solar Resources
Wind and solar resources are modeled as non-dispatchable, must-run resources using fixed
energy profiles that vary by month and time of day. The total energy generation for wind and
solar resources represents the expected generation levels in which half of the time actual
generation would fall below expected levels, and half of the time actual generation would be
above expected levels.
The capacity contribution of wind and solar resources, represented as a percentage of resource
capacity, is a measure of the ability for these resources to reliably meet demand over time. The
capacity contribution of new and existing wind resources in PacifiCorp’s east and west balancing
authority areas (BAAs) is set to 14.5% and 25.4%, respectively. The capacity contribution of
new and existing fixed tilt solar photovoltaic resources in PacifiCorp’s east and west BAAs is set
to 34.1% and 32.2%, respectively. New single axis tracking solar photovoltaic capacity
contribution values in PacifiCorp’s east and west BAAs are set to 39.1% and 36.7%,
respectively. Volume II, Appendix N of this report summarizes PacifiCorp’s updated wind and
solar capacity contribution study used to derive these values.
Energy Storage Resources
Energy storage resources are distinguished from other resources by the following three attributes:
Energy take – generation or extraction of energy from a storage reservoir;
Energy return – energy used to fill (or charge) a storage reservoir; and
Storage cycle efficiency – an indicator of the energy loss involved in storing and
extracting energy over the course of the take-return cycle.
Modeling energy storage resources requires specification of the size of the storage reservoir,
defined in gigawatt-hours. System Optimizer dispatches a storage resource to optimize energy
used by the resource subject to constraints such as storage cycle efficiency, the daily balance of
take and return energy, and fuel costs (for example, the cost of natural gas for expanding air with
gas turbine expanders). To determine the least-cost resource expansion plan, System Optimizer
accounts for conventional generation system performance and cost characteristics of the storage
resource, including capital cost, size of the storage and time to fill the storage, heat rate (if fuel is
used), operating and maintenance cost, minimum capacity, and maximum capacity.
Capital Costs and End-Effects
System Optimizer uses annual capital recovery factors to convert capital dollars into real
levelized revenue requirement costs to address end-effects that arise with capital-intensive
projects that have different lives and in-service dates. All capital costs evaluated in the IRP are
converted to real levelized revenue requirement costs. Use of real levelized revenue requirement
costs is an established and preferred methodology for analyzing capital-intensive resource
decisions among resource alternatives that have unequal lives and/or when it is not feasible to
capture operating costs and benefits over the entire life of any given resource. To achieve this,
the real levelized revenue requirement method spreads the return of investment (book
depreciation), return on investment (equity and debt), property taxes and income taxes over the
life of the investment. The result is an annuity or annual payment that grows at inflation such that
the PVRR is identical to the PVRR of the nominal annual requirement when using the same
nominal discount rate. For the 2015 IRP, the PVRR is calculated inclusive of real levelized
capital revenue requirement through the end of the 2034 planning period.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
138
Environmental Policy
Regional Haze and Other Environmental Coal Costs
All case definitions developed for the 2015 IRP consider one of four potential Regional Haze
compliance scenarios developed for planning purposes. In addition to analyzing known and
prospective Regional Haze compliance requirements, PacifiCorp’s portfolio development
process incorporates compliance cost assumptions related to the Mercury and Air Toxics
Standard (MATS), coal combustion residuals (CCR), effluent limit guidelines (ELG), and
cooling water intake structures as may be required under the Clean Water Act (CWA).
Each Regional Haze scenario considered in the portfolio development process drives the timing
and magnitude of run-rate capital and operations and maintenance costs for each individual coal
unit in PacifiCorp’s fleet. For instance, if a specific Regional Haze scenario assumes an early
retirement for a given coal unit as part of a potential inter-temporal or fleet trade-off solution, the
run-rate operating costs for that unit are customized to reflect the assumed early closure date.
This can include changes to the timing of planned maintenance throughout the twenty year
planning horizon and avoidance of future costs related to known or assumed MATS, CCR, ELG
or CWA compliance requirements, as applicable.
EPA’s Proposed 111(d) Rule
PacifiCorp developed a three step process, which includes the use of a spreadsheet-based
modeling tool, to incorporate the U.S. Environmental Protection Agency’s (EPA) draft rule
establishing state emission rate targets for existing generating units under §111(d) of the Clean
Air Act (111(d) or 111(d) rule) into the 2015 IRP resource portfolio development process.61
Figure 7.3 summarizes the three-step process used to model EPA’s draft 111(d) rule for any case
that assumes state emission targets must be met at any point during the twenty year planning
horizon.62
61 Please refer to Chapter 3 of PacifiCorp’s 2015 IRP for a more detailed description of EPA’s draft 111(d) rule. 62 Some of the 2015 IRP case definitions do not implement EPA’s draft 111(d) rule or otherwise assume the rule
will be implemented on a mass cap basis. The three step 111(d) modeling process does not apply to these cases.
Cases that assume a mass cap utilize hard emission cap constraint logic available in System Optimizer.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
139
Figure 7.3 – Three Step Modeling Process Implemented for 111(d) Emission Rate Cases
First, an initial System Optimizer simulation is completed assuming that new combined cycle
plants will be regulated under the 111(d) rule. Given the low emission rate targets established by
EPA for Idaho, Oregon, and Washington, new combined cycle plants added in these states
exceed state emission rate targets, making it more difficult to meet EPA’s state emission rate
standard. As such, PacifiCorp assumes that no new combined cycle plants can be built in these
states. Any new combined cycle plants selected in this initial System Optimizer simulation sited
in Utah or Wyoming have emission rates that fall below the Utah and Wyoming state emission
rate targets, making it easier to meet EPA’s emission rate standard in these states. CO2 emissions
and generation from fossil units regulated under 111(d), new and existing renewable generation,
and incremental Class 2 DSM energy efficiency savings are reported from this initial System
Optimizer simulation, which served as inputs to the next modeling step.
In the second modeling step, annual CO2 emissions, generation, and Class 2 DSM energy
efficiency savings reported from the initial System Optimizer simulation are loaded into
PacifiCorp’s 111(d) Scenario Maker spreadsheet-based modeling tool. The 111(d) Scenario
Maker calculates an annual 111(d) emission rate for each state in which PacifiCorp owns fossil-
fired generation.63 The 111(d) emission rate is calculated by summing all 111(d)-affected CO2
emissions and dividing those emissions by the sum of 111(d)-affected generation, allocated
renewable energy, and accumulated incremental Class 2 DSM energy efficiency savings from
each state by year.64 If the average 111(d) emission rate over the period 2020 through 2029
shows that PacifiCorp would not meet its share of a state’s average 111(d) emission rate target
over the same period based on the initial System Optimizer results, the 111(d) Scenario Maker is
63 This includes Arizona, Colorado, Montana, Oregon, Utah, Washington, and Wyoming. 64 Allocated system renewable energy is based on system generation allocation factor assumptions under the 2010
revised multistate protocol, unless a resource is situs assigned to a specific state. PacifiCorp assumes that renewable
energy can only be credited to the compliance solution under 111(d) if PacifiCorp has rights to renewable energy
credits from a given renewable resource. Class 2 DSM energy savings are accumulated beginning 2017.
Step 1
Initial System
Optimizer
Simulation
Fossil unit generation
Fossil unit emissions
generation
111(d) Scenario
Maker
Spreadsheet
generation ceilings
generation floors
renewable resources
Final System
Optimizer
Simulation
Key Outputs
Resource portfolio
reflecting 111(d) re-
dispatch and 111(d)
resources
System costs reflecting
the 111(d) re-dispatch and
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
140
then used to determine compliance actions that need to be implemented in order to meet the
emission rate standard for each state.
The 111(d) Scenario Maker is configured to accommodate a broad range of compliance actions
by applying a best system of emission reduction (BSER) as contemplated in EPA’s draft rule. All
2015 IRP cases defined as having a 111(d) emission rate target assume, for compliance purposes,
that PacifiCorp can allocate system renewable energy toward meeting emission rate targets in
any given state. This flexible allocation of “111(d) attributes” from renewable resources is also
applied to cumulative Class 2 DSM energy efficiency savings from Idaho and California, where
PacifiCorp does not have a 111(d) compliance obligation. Use of this flexible allocation of
renewable energy and select Class 2 DSM energy efficiency savings is the lowest cost
compliance action as it does not lead to any incremental system costs from adding resources for
purpose of meeting 111(d) requirements.
Recognizing flexible allocation of system renewable energy and selecting Class 2 DSM energy
efficiency savings may not be enough to meet EPA’s draft emission rate targets in all states for
all cases, the 111(d) Scenario Maker can be used to implement other BSER compliance actions.
These include re-dispatch of existing fossil-fired generating units, adding new renewable
resources to the system, and acquiring additional Class 2 DSM resources. The 111(d) Scenario
Maker allows for flexibility in prioritizing which compliance action to implement in any given
case, providing the opportunity to study different compliance strategies built around varying
combinations of potential BSER compliance actions.
In the third and final modeling step, annual generation minimums and maximums from fossil-
fired generation affected by 111(d) regulations, incremental renewable resources as identified in
the 111(d) Scenario Maker, and Class 2 DSM energy efficiency savings used to meet emission
rate targets are reported and used as inputs to a final System Optimizer simulation.
Consequently, the final System Optimizer simulation produces a resource portfolio and system
cost data reflecting the impacts of meeting 111(d) emission rates consistent with 111(d)
compliance strategies and emission rate targets defined for a given case definition.
State Renewable Portfolio Standards (RPS)
For case definitions targeting new renewable resources as a state RPS compliance strategy, a
spreadsheet-based modeling tool, called the RPS Scenario Maker, is used to derive the size, type,
timing, and location of new renewable resources needed to meet increment state RPS compliance
requirements. The RPS Scenario Maker is also used to report state RPS compliance profiles for
case definitions targeting RPS compliance strategies that rely on unbundled renewable energy
credits (RECs).
The RPS Scenario Maker uses retail sales forecast net of incremental Class 2 DSM and
distributed generation penetration data, state-specific RPS targets, state-specific REC balances,
forecasted generation from existing RPS-eligible renewable resources, and cost and performance
assumptions for potential new resources. The RPS Scenario Maker considers compliance
flexibility mechanisms specific to any given state RPS program including unbundled REC rules
and banking rules that cannot be configured in System Optimizer. There are three steps to derive
state RPS-driven renewable resource additions.
First, an initial System Optimizer simulation is completed to determine if there are any cost-
effective system renewable resources selected for a given case. Annual renewable generation
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
141
from cost-effective system renewable resources added to the portfolio in this initial System
Optimizer simulation are reported, which serve as inputs to the next modeling step. This initial
System Optimizer simulation is the same initial simulation as used for the first step of the 111(d)
modeling process discussed above.
In the second modeling step, annual system renewable energy from the initial System Optimizer
simulation, allocated among states consistent with the 2010 revised multistate protocol, are
loaded into the RPS Scenario Maker. The RPS Scenario Maker, configured with constraints to
meet RPS targets and to accommodate state-specific RPS banking provisions, is used to select
incremental new renewable resources based on levelized cost net of the market value of energy
for the assumed hourly energy profile of each renewable alternative. RECs from incremental
renewable resources added in the RPS Scenario Maker for a specific state RPS program are situs
assigned to the state needing the resource to meet its RPS requirement.65 For cases that also
include a 111(d) state emission rate target, RPS-driven generation from renewable resources is
also loaded into the 111(d) Scenario Maker, described above.66
In the third and final modeling step, a final System Optimizer simulation is completed with the
addition of new RPS-drive renewable resources derived from the RPS Scenario Maker. The final
System Optimizer Simulation produces a resource portfolio and system cost data reflecting the
impacts of meeting state RPS requirements for cases targeting compliance with new renewable
resources, and as applicable, the final simulation captures the influence of RPS-driven renewable
resources in meeting any assumed 111(d) emission rate targets.
General Assumptions
Study Period and Date Conventions
PacifiCorp executes its 2015 IRP models for a 20-year period beginning January 1, 2015 and
ending December 31, 2034. Future IRP resources reflected in model simulations are given an in-
service date of January 1st of a given year, with the exception of coal unit natural gas
conversions, which are given an in-service date of June 1st of a given year.
Inflation Rates
The 2015 IRP model simulations and cost data reflect PacifiCorp’s corporate inflation rate
schedule unless otherwise noted. A single annual escalation rate value of 1.9% is assumed. The
annual escalation rate reflects the average of the annual corporate inflation rates for the period
2015 through 2034, using PacifiCorp’s September 2014 inflation curve. PacifiCorp’s inflation
curve is a straight average of forecasts for Gross Domestic Product (GDP) inflator and Consumer
Price Index (CPI).
Discount Factor
The discount rate used in present value calculations is based on PacifiCorp’s after-tax weighted
average cost of capital (WACC). The value used for the 2015 IRP is 6.66%. The use of the after-
tax WACC complies with the Public Utility Commission of Oregon’s IRP guideline 1a, which
65 Of the three states with RPS requirements, it is assumed that California and Washington requirements are met
with unbundled REC purchases, consistent with findings in the 2013 IRP. Case definitions in the 2015 IRP were
used to assess similar strategies for meeting forecasted Oregon RPS requirements. 66 PacifiCorp assumes that “111(d) attributes” from situs assigned renewable energy driven by state RPS compliance
needs are not reallocated to any other state.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
142
requires that the after-tax WACC be used to discount all future resource costs.67 PVRR figures
reported in the 2015 IRP are reported in 2015 dollars.
Case Definitions
Case definitions specify a combination of planning assumptions used to develop each unique
resource portfolio during the resource development process. Core cases include combinations of
alternative assumptions for key planning uncertainties informed by the current planning
environment. Sensitivity cases isolate the impact to the resource portfolio and system costs when
modifying a single assumption. The resource portfolio and system cost data from sensitivity
cases are compared to one of the core case portfolios.
During the public input process, PacifiCorp proposed combinations of planning assumptions to
define core cases and sensitivity cases. Through this process, PacifiCorp refined its case
definitions, taking into consideration comments and recommendations from its stakeholder
group. The final core case definitions reflect multiple combinations of planning assumptions
related to:
Requirements under EPA’s proposed 111(d) rule;
Compliance strategies for state 111(d) emission rate targets;
Class 2 DSM (energy efficiency);
CO2 price assumptions;
Availability of FOTs;
State RPS compliance strategies;
Regional Haze compliance requirements; and
Wholesale electricity and natural gas forward prices.
The final sensitivity case definitions isolate the impact of the following variables on the resource
portfolio and system costs:
Load forecast;
Distributed generation penetration levels;
Addition of energy storage resources;
Addition of Energy Gateway transmission segments;
Extension of production tax credits;
Separate east/west balancing authority area resource portfolios;
High CO2 price assumptions;
Alternative, stakeholder proposed, solar resource cost assumptions;
Addition of Class 3 DSM resources; and
Restricted 111(d) attributes.
Core Case Assumptions
Planning assumptions used in defining core cases for the 2015 IRP are summarized in turn
below.
67 Public Utility Commission of Oregon, Order No. 07-002, Docket No. UM 1056, January 8, 2007.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
143
Requirements under EPA’s Proposed 111(d) Rule
Five alternative assumptions defining compliance requirements related to EPA’s draft 111(d)
rule are used. These assumptions include:
No Requirement: Assumes there are no emission rate targets or mass cap requirements
associated with the 111(d) rule.
Emission Rate Target (All States): Assumes application of EPA’s proposed state 111(d)
emission rate targets are applied to PacifiCorp’s affected fossil-fired resources in all
states, including those states in which PacifiCorp does not serve retail customers. This
includes Arizona, Colorado, Montana, Oregon, Utah, Washington, and Wyoming.
Emission Rate Target (Retail States): Assumes application of EPA’s proposed state
111(d) emission rat targets are applied to PacifiCorp’s affected fossil-fired resources in
those states where PacifiCorp serves retail customers. This includes Oregon, Utah,
Washington, and Wyoming.
Mass Cap (New & Existing): Assumes EPA’s proposed 111(d) targets are applied to
PacifiCorp’s system as a mass cap. The mass cap is calculated off of state emissions
data from new and existing fossil-fired resources from EPA’s modeling over the 2020
through 2030 timeframe, allocated to PacifiCorp’s system based on its pro-rata share of
state emissions in the 2012 benchmark year. Because the mass cap is calculated based
on new and existing fossil-fired resources, the cap is applied to both new and existing
fossil-fired generation in PacifiCorp’s system beginning 2020.
Mass Cap (Existing): Assumes EPA’s proposed 111(d) targets are applied to
PacifiCorp’s system as a mass cap. The mass cap is calculated off of state emissions
data from existing fossil-fired resources used to calculate state emission rate targets. The
emissions are taken from EPA’s modeling over the 2020 through 2030 timeframe,
allocated to PacifiCorp’s system based on its pro-rata share of state emissions in the
2012 benchmark year. Because the mass cap is calculated off of existing fossil-fired
resources, the cap is applied to existing fossil-fired generation in PacifiCorp’s system
beginning 2020.
Table 7.1 shows interim 111(d) emission rate goals and the final emission rate targets by state,
which are assumed to apply to PacifiCorp’s system. PacifiCorp does not have existing generation
affected by EPA’s draft 111(d) in Idaho or California.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
144
Table 7.1 – State 111(d) Emission Rate Assumptions
State
Interim Goal
(Average 2020 – 2029)
(lb CO2/MWh)
Final Target
(2030 and Beyond)
(lb CO2/MWh)
Wyoming 1,808 1,714
Utah* 1,378 1,322
Oregon 407 372
Washington 264 215
Montana 1,882 1,771
Colorado 1,159 1,108
Arizona 753 702
*EPA’s calculation of the Utah target treated PacifiCorp’s Lake Side 2 combined cycle plant as an existing resource.
The Company used an emission rate for Utah that assumes Lake Side 2 is correctly classified as under construction
based on its status in the 2012 benchmark year.
Figure 7.4 shows assumed mass caps for cases in which EPA’s proposed 111(d) rule is applied
via a hard emissions cap on fossil-fired generation within PacifiCorp’s system. The new and
existing resources mass cap is applied to all new and existing fossil-fired generation in
PacifiCorp’s system. The existing resources mass cap is applied only to the fossil-fired
generation in PacifiCorp’s system used by EPA to calculate its state emission rate targets.
Figure 7.4 – PacifiCorp System 111(d) Mass Cap Assumptions
Compliance Strategies for 111(d) Emission Rate Cases
For those case definitions that include a 111(d) emission rate target, PacifiCorp developed three
different compliance strategies. Each of the three compliance strategies assume that, for
compliance purposes, PacifiCorp can allocate system renewable energy toward meeting emission
rate targets in any given state. The three compliance strategies include:
Prioritize Re-dispatch with Base Energy Efficiency: Prioritizes BSER 111(d) compliance
actions in the following order. First, for compliance purposes, system renewable energy
and cumulative Class 2 DSM energy efficiency savings from California and Idaho are
allocated among the states. Cumulative cost-effective Class 2 DSM energy efficiency
savings from an initial System Optimizer simulation are applied to state targets in
Oregon, Utah, Washington, and Wyoming. Second, existing fossil-fired generation is re-
25
27
29
31
33
35
37
39
41
43
45
Mi
l
l
i
o
n
T
o
n
s
C
O
2
New & Existing Resources Existing Resources
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
145
dispatched, as needed. PacifiCorp assumes that existing combined cycle plants in its west
BAA, where plant emission rates exceed state emission rate targets, cannot be dispatched
below annual generation levels equivalent to annual operation at plant minimums. For
coal resources, PacifiCorp assumes that annual generation levels cannot fall below an
equivalent 70% annual average capacity factor. PacifiCorp also assumes that 111(d) re-
dispatch will not cause coal consumption to fall below coal contract minimums, as
applicable. Selection of fossil-fired generating units that are subject to re-dispatch is
informed by the rank order of variable operating costs (highest to lowest). Lastly, new
renewable resources are added to the system, as required.
Prioritize Re-dispatch with Incremental Energy Efficiency: Prioritizes BSER 111(d)
compliance actions in the following order. First, for compliance purposes, system
renewable energy and cumulative Class 2 DSM energy efficiency savings from
California and Idaho are allocated among the states. Cumulative selection of Class 2
DSM energy efficiency savings set at levels no lower than 1.5% of retail sales beginning
2017 from an initial System Optimizer simulation are applied to state targets in Oregon,
Utah, Washington, and Wyoming. Second, existing fossil-fired generation is re-
dispatched, as needed. PacifiCorp assumes that existing combined cycle plants in its west
BAA, where plant emission rates exceed state emission rate targets, cannot be dispatched
below annual generation levels equivalent to annual operation at plant minimums. For
coal resources, PacifiCorp assumes that annual generation levels cannot fall below an
equivalent 70% annual average capacity factor. PacifiCorp also assumes that 111(d) re-
dispatch will not cause coal consumption to fall below coal contract minimums, as
applicable. Selection of fossil-fired generating units that are subject to re-dispatch is
informed by the rank order of variable operating costs (highest to lowest). Lastly, new
renewable resources are added to the system, as required.
Prioritize New Renewable Resources with Incremental Energy Efficiency: Prioritizes
BSER 111(d) compliance actions in the following order. First, for compliance purposes,
system renewable energy and cumulative Class 2 DSM energy efficiency savings from
California and Idaho are allocated among the states. Cumulative selection of Class 2
DSM energy efficiency savings set at no lower than 1.5% of retail sales beginning 2017
from an initial System Optimizer simulation are applied to state targets in Oregon, Utah,
Washington, and Wyoming. Second, new renewable resources are added to the system.
New renewable resources additions are based on levelized cost net of the market value of
energy for the assumed hourly energy profile of each renewable alternative with
consideration of transmission limits. Energy from new renewable resources is limited to
expected energy levels assumed in EPA’s calculation of state emission rate targets, pro-
rata allocated to PacifiCorp’s system based on retail sales. Lastly, existing fossil-fired
generation is re-dispatched, as needed. PacifiCorp assumes that existing combined cycle
plants in its west BAA, where plant emission rates exceed state emission rate targets,
cannot be dispatched below annual generation levels equivalent to annual operation at
plant minimums. For coal resources, PacifiCorp assumes that annual generation levels
cannot fall below an equivalent 70% annual average capacity factor. PacifiCorp also
assumes that 111(d) re-dispatch will not cause coal consumption to fall below coal
contract minimums, as applicable. Selection of fossil-fired generating units that are
subject to re-dispatch is informed by the rank order of variable operating costs (highest to
lowest).
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
146
Figure 7.5 shows the ceiling applied to annual new renewable resources tied to EPA’s
calculation of state emission rate targets. The renewable energy included in EPA’s calculation of
state emission rate targets is pro-rata allocated to PacifiCorp’s system based on retail sales.
Figure 7.5 – New Renewable Resource Energy Ceiling for 111(d) Compliance Strategies
Class 2 DSM (Energy Efficiency)
In addition to PacifiCorp’s base case Class 2 DSM supply curve assumptions, an additional set of
Class 2 DSM supply curves is evaluated in PacifiCorp’s 2015 IRP core case definitions assuming
accelerated acquisition of energy efficiency savings. Assumptions for the accelerated Class 2
DSM case are informed by the updated conservation potential assessment, prepared by Applied
Energy Group (AEG) in support of the 2015 IRP. In preparing these assumptions, AEG reviewed
aggressive program structures proven successful in real markets. Under this accelerated case,
total resource potential over the 20-year planning horizon is unchanged relative to the base case.
However, the technical potential of the measures is assumed to be achieved sooner at higher
delivery costs acknowledging that such a scenario would likely require higher incentive and non-
incentive program expenditures to expand participation and delivery infrastructure.
CO2 Price Assumptions
With the introduction of EPA’s proposed 111(d) rule, PacifiCorp has reflected how future
regulations targeting CO2 emission reductions in the electric sector might influence its resource
plan. PacifiCorp has also developed core cases that include, incremental to EPA’s proposed
111(d) rule, CO2 price assumptions that were recommended by members of its stakeholder
group. Consideration of these core cases recognize that there could be future CO2 emission
policies applicable to the electric sector that go beyond requirements proposed by EPA in its
111(d) rule.68 Figure 7.6 shows CO2 price assumptions applied to these core cases during the
2015 IRP portfolio development process.69 Prices are applied to each ton of CO2 emissions from
new and existing resources, beginning in 2020 at $22.39/ton and rising at 1.9% per year,
reaching $75.77/ton by 2034.
68 The Oregon Public Utility Commission (OPUC), in their IRP guidelines, directs utilities to construct a base-case
scenario that reflects what it considers to be the most likely regulatory compliance future for CO2, as well as
alternative scenarios “ranging from the present CO2 regulatory level to the upper reaches of credible proposals by
governing entities.” 69 A second set of CO2 price assumptions, also recommended by members of PacifiCorp’s stakeholder group, are
used to evaluate cost and risk of resource portfolios modeled using PaR.
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
GW
h
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
147
Figure 7.6 – Nominal CO2 Price Assumptions for the Portfolio Development Process
Availability of FOTs
As noted in Chapter 6, PacifiCorp develops FOT limits based on its active participation in
wholesale power markets; its view of physical delivery constraints, market liquidity, and market
depth; and with consideration of regional resource supply. Alternative FOT limit assumptions
applied during the portfolio development process eliminates the availability of FOTs at the NOB
(100 MW) and Mona (300 MW) market hubs beginning 2019.
State RPS Compliance Strategies
State RPS programs in California and Washington provide opportunities to use unbundled RECs
to meet forecasted compliance requirements. Based on current unbundled REC market prices,
PacifiCorp continues to pursue an unbundled REC strategy to meet future RPS compliance
requirements in these states. The Oregon RPS program allows unbundled RECs to be used for up
to 20% of annual compliance requirements; however, unbundled RECs can be banked
indefinitely. Core case definitions reflect three different Oregon RPS compliance strategies.
These three compliance strategies include:
Early Renewable Resource Acquisition: Assumes new renewable resources needed for
future Oregon RPS compliance requirements are added prior to projected expiration of
the existing REC bank in 2028, with consideration of timelines required for permitting,
procurement, and construction (2020 to 2021 timeframe, depending upon renewable
resource technology).
Deferred Renewable Resource Acquisition: Assumes new renewable resources needed for
future Oregon RPS compliance requirements are added concurrent with the projected
expiration of the existing REC bank in 2028.
Unbundled RECs: Assumes future Oregon RPS compliance requirements are met with
acquisition of unbundled RECs.
$0
$10
$20
$30
$40
$50
$60
$70
$80
$/
t
o
n
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
148
Regional Haze Compliance Requirements
Core case definitions reflect one of four Regional Haze compliance scenarios, a reference
scenario and three alternatives, developed for planning purposes. These scenarios are built
around both known and prospective Regional Haze compliance requirements for specific coal
generating units in PacifiCorp’s fleet.70 Assumed inter-temporal and fleet trade-off compliance
alternatives, whether built around known or prospective Regional Haze compliance
requirements, represent potential scenarios that might, pending agency support, achieve an
appropriate balance of economic justification for PacifiCorp’s customers and emissions
reductions contributing to long-term visibility improvements in affected Class I areas. Table 7.2
summarizes Regional Haze compliance requirements for each of the four scenarios used during
the 2015 IRP portfolio development process.
Table 7.2 State 111(d) Emission Rate Assumptions
Coal Unit* Reference Scenario 1 Scenario 2 Scenario 3
Dave Johnston 1 Shut Down Dec 2027 Shut Down Mar 2019 Shut Down Mar 2019 Shut Down Dec 2027
Dave Johnston 2 Shut Down Dec 2027 Shut Down Dec 2027 Shut Down Dec 2023 Shut Down Dec 2027
Dave Johnston 3 SCR Mar 2019 Shut Down Dec 2027 Shut Down Dec 2027 Shut Down Dec 2027
Dave Johnston 4 Shut Down Dec 2027 Shut Down Dec 2032 Shut Down Dec 2032 Shut Down Dec 2027
Hunter 2 SCR Dec 2021 Shut Down Dec 2032 Shut Down Dec 2024 Shut Down Dec 2032
Huntington 1 SCR Dec 2022 Shut Down Dec 2036 Shut Down Dec 2024 SCR Dec 2022
Huntington 2 SCR Dec 2022 Shut Down Dec 2021 Shut Down Dec 2021 Shut Down Dec 2029
Jim Bridger 1 SCR Dec 2022 Shut Down Dec 2023 Shut Down Dec 2023 SCR Dec 2022
Jim Bridger 2 SCR Dec 2021 Shut Down Dec 2032 Shut Down Dec 2028 SCR Dec 2021
Wyodak SCR Mar 2019 Shut Down Dec 2039 Shut Down Dec 2032 Shut Down Dec 2039
*Common to all scenarios: Carbon 1&2 shut down 2015; Colstrip 3&4 SCR 2023/2022, respectively; Craig 1&2
SCR 2021/2018, respectively; Hayden 1&2 SCR 2015/2016, respectively; Naughton 1&2 shut down 2029;
Naughton 3 gas conversion 2018, shutdown 2029; Hunter 1&3 SCR 2021/2024, respectively; and Bridger 3&4 SCR
2015/2016, respectively.
Wholesale Electricity and Natural Gas Forward Prices
Three different wholesale electricity and natural gas forward price curve assumptions are used in
core case definitions, a base case and two scenarios.71 The base case forward price curve is
PacifiCorp’s September 2014 official forward price curve (OFPC), the most current official
forward price curve available at the time 2015 IRP modeling was initiated. PacifiCorp’s OFPC is
derived using a combination of forward market observations, a transition period between market
and fundamentals, and a fundamentals-based forecast.
The front 72 months of the OFPC represents where the forward market was trading at market
close for a given trading day. For the September 2014 OFPC, prices over the front 72-months are
based on market forwards as of September 30, 2014. The blending period of the FPC (months 73
through 84) is calculated by averaging the month-on-month market-based price from the prior
year with the month-on-month fundamentals-based price from the subsequent year. The
fundamentals portion of the natural gas OFPC is based upon recent third-party price forecasts.
PacifiCorp reviews third party natural gas price forecasts each time it updates the OFPC, which
occurs at least quarterly. PacifiCorp uses the third party natural gas price forecast in Aurora, an
70 Detailed financial analysis of coal units with known Regional Haze compliance deadlines and implementation
timelines for compliance alternatives that would require emission control retrofit decisions be made in the next two
to four years, thereby falling within the 2015 IRP action plan window, is presented in Volume III of the 2015 IRP. 71 Additional price curve scenarios, described later in Chapter 7, are used to evaluate stochastic risk of each portfolio
with Planning and Risk.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
149
electric market model, to produce an accompanying wholesale electricity price forecast for
market hubs in which PacifiCorp is active. As with forecasted natural gas prices, the electricity
price forecast developed with Aurora is updated with each OFPC update.
The fundamentals portion of PacifiCorp’s September OFPC incorporates EPA’s proposed 111(d)
rule. To account for 111(d) in Aurora, PacifiCorp applied state 111(d) emission rate constraints
in the model, assuming energy efficiency goals assumed by EPA in its calculation of state
emission rate targets is achievable. PacifiCorp further assumes no coal unit efficiency
improvements are implemented and that regionally, the use of renewable energy for 111(d)
compliance purposes is based upon ownership, not by physical location of renewable resources
in any given state. Moreover, PacifiCorp’s Aurora-based forecast assumes that new combined
cycle units will be regulated under 111(d).
In addition to the base case, PacifiCorp developed two additional scenarios that align with CO2
policy assumptions used during the resource portfolio development process, discussed above.
One of these scenarios reflects a forward price curve absent any compliance requirements under
EPA’s proposed 111(d) rule. The second scenario reflects wholesale and market price impacts of
including CO2 price assumptions, incremental to 111(d) requirements, across the electric sector.
In both of these scenarios, changes in CO2 policy assumptions can influence demand for natural
gas from the electric sector, which in turn, influences forecasted natural gas prices. PacifiCorp
uses the Integrated Planning Model (IPM®), a linear program optimization model that simulates
the North American power system, to estimate changes in natural gas prices associated with
changes in CO2 policy assumptions. As is done for the base case OFPC, the resulting natural gas
price forecasts are used in Aurora to develop a corresponding wholesale electricity price forecast.
Figure 7.7 summarizes the three wholesale electricity and natural gas price assumptions used in
core case definitions for the 2015 IRP.72
Figure 7.7 – Wholesale Electricity and Natural Gas Prices in Core Case Definitions
Core Case Definitions
Table 7.3 summarizes the combination of core case assumptions used to specify core case
definitions for the portfolio development process in the 2015 IRP. In addition, PacifiCorp has
produced core case fact sheets, summarizing key assumptions and System Optimizer model
results for each core case. These fact sheets are provided in Volume II, Appendix M.
72 Additional electricity and natural gas price assumptions, based on low and high natural gas price scenarios and
high CO2 price assumptions, are used to evaluate cost and risk of resource portfolios with Planning and Risk (PaR).
$- $1
$2 $3 $4 $5
$6 $7 $8
$9 $10 $11
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
20
2
7
20
2
8
20
2
9
20
3
0
20
3
1
20
3
2
20
3
3
20
3
4
$/
M
M
B
t
u
Natural Gas Prices
Henry Hub
Sep 2014 OFPC 111(d) + CO2 Price No CO2
$-
$20
$40
$60
$80
$100
$120
$140
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
20
2
7
20
2
8
20
2
9
20
3
0
20
3
1
20
3
2
20
3
3
20
3
4
$/
M
W
h
Wholesale Electricity PricesAverage of Palo Verde and Mid-C (Flat)
Sep 2014 OFPC 111(d) + CO2 Price No CO2
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
150
Table 7.3 Core Case Definitions
Case ID
111(d)
Requirement
111(d)
Strategy CO2 Price FOTs
Regional
Haze OR RPS Price Curve
C01 None None No Base R, 1, 2 Early No CO2
C02 Emission Rate
(All States) Re-disp./Base EE No Base 1, 2 Early Base
C03 Emission Rate
(All States) Re-disp./Inc. EE No Base 1, 2 Early Base
C04 Emission Rate
(All States) Renew./Inc. EE No Base 1, 2 Early Base
C05 Emission Rate
(Retail States) Re-disp./Base EE No Base 1, 2 Early Base
C05a Emission Rate
(Retail States) Re-disp./Base EE No Base 1, 2, 3 Late Base
C05b Emission Rate
(Retail States) Re-disp./Base EE No Base 1, 3 RECs Base
C06 Emission Rate
(Retail States) Re-disp./Inc. EE No Base 1, 2 Early Base
C07 Emission Rate
(Retail States) Renew./Inc. EE No Base 1, 2 Early Base
C09 Emission Rate
(Retail States) Re-disp./Base EE No Limited 1, 2 Early Base
C11 Emission Rate
(Retail States) Re-disp./Acc. EE No Base 1, 2 Early Base
C12 Mass Cap (New
& Existing) None No Base 1, 2 Early Base
C13 Mass Cap
(Existing) None No Base 1, 2 Early Base
C14 Emission Rate
(Retail States) Re-disp./Base EE Yes Base 1, 2 Early 111(d) + CO2
C14a Emission Rate
(Retail States) Re-disp./Base EE Yes Base 1, 2 Early 111(d) + CO2
*Note, core case IDs throughout the 2015 IRP are often reported using the case ID followed by a hyphen and a
numerical value ranging from 1 through 3 (i.e., C05a-3). The numerical value following the hyphen identifies the
Regional Haze scenario applied to the case. The Reference Regional Haze scenario is identified with the letter “R”.
Case C14a is a variant of case C14 that allows endogenous coal unit retirements among not assumed to retire under
the applicable Regional Haze scenario.
Sensitivity Case Assumptions
Planning assumptions used in defining sensitivity cases for the 2015 IRP are summarized in turn
below.
Load Forecast
PacifiCorp includes three different load forecast sensitivities. The low load forecast sensitivity
reflects low economic growth assumptions from IHS Global Insight and low Utah and Wyoming
industrial loads. The high load forecast sensitivity reflects high economic growth assumptions
from IHS Global Insight and high Utah and Wyoming industrial loads. The low and high
industrial load forecasts focus on increased uncertainty in industrial loads further out in time. To
capture this uncertainty, PacifiCorp modeled 1,000 possible annual loads for each year based on
the standard error of the medium scenario regression equation. The low and high industrial load
forecast is taken from 5th and 95th percentile. The third load forecast sensitivity is a 1-in-20 (5%
probability) extreme weather scenario. The 1-in-20 year peak weather is defined as the year for
which the peak has the chance of occurring once in 20 years. This sensitivity is based on 1-in-20
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
151
peak weather for July in each state. Figure 7.8 compares the low, high, and 1-in-20 load
sensitivities, net of base case distributed generation penetration levels, alongside the base case
load forecast.
Figure 7.8 – Load Sensitivity Assumptions
Distributed Generation
Two distributed penetration sensitivities are analyzed. As compared to base penetration levels
that incorporated annual reductions in technology costs, the low distributed generation sensitivity
reflects reduced reductions in technology costs, reduced technology performance levels, and
lower retail electricity rates. In contrast, the high distributed generation sensitivity reflects more
aggressive technology cost reduction assumptions, higher technology performance levels, and
higher retail electricity rates. Figure 7.9 summarizes distributed generation penetration levels for
the low and high sensitivities alongside the base case.
Figure 7.9 – Distributed Generation Sensitivity Assumptions
Energy Storage
PacifiCorp includes two energy storage sensitivities. Both force large scale energy storage
resources into the resource portfolio. The first storage sensitivity forces a 400 MW pumped
storage plant sited in PacifiCorp’s west BAA. The second storage forces a 300 MW compressed
air energy storage (CAES) plant in PacifiCorp’s east BAA.
Energy Gateway
PacifiCorp has studied two Energy Gateway transmission sensitivities, patterned after scenarios
defined in the 2013 IRP (Energy Gateway scenarios 2 and 5). PacifiCorp base case includes
Energy Gateway Segments C and G. Incremental to the base case, the first sensitivity includes
Energy Gateway Segments D, with assumed in-service date in 2022. The second sensitivity
10,000
10,500
11,000
11,500
12,000
12,500
13,000
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
20
2
7
20
2
8
20
2
9
20
3
0
20
3
1
20
3
2
20
3
3
20
3
4
MW
Coincident System Peak
Base Low High 1 in 20
60,000
65,000
70,000
75,000
80,000
85,000
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
20
2
7
20
2
8
20
2
9
20
3
0
20
3
1
20
3
2
20
3
3
20
3
4
Ne
t
G
W
h
Load
Base Low High 1 in 20
0
100
200
300
400
500
600
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
20
2
7
20
2
8
20
2
9
20
3
0
20
3
1
20
3
2
20
3
3
20
3
4
MW
a
Base
UT OR WA WY ID CA
0
100
200
300
400
500
600
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
20
2
7
20
2
8
20
2
9
20
3
0
20
3
1
20
3
2
20
3
3
20
3
4
MW
a
Low
UT OR WA WY ID CA
0
100
200
300
400
500
600
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
20
2
7
20
2
8
20
2
9
20
3
0
20
3
1
20
3
2
20
3
3
20
3
4
MW
a
High
UT OR WA WY ID CA
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
152
includes Energy Gateway Segments D, E, and F with assumed in-service dates of 2022, 2023,
and 2024, respectively.
Production Tax Credits
PacifiCorp’s base case assumes that production tax credits (PTCs) and investment tax credits
(ITCs) applicable to eligible renewable resources expire consistent with current federal tax
policies. The PTC sensitivity assumes the PTC is available through the 20-year planning horizon,
beginning at 23¢/kWh in 2015 escalating at 1.9% per year.
Separate East/West BAAs
As required by the Washington Utilities and Transportation Commission, PacifiCorp’s 2015 IRP
includes a sensitivity that produces standalone resource portfolios for the east and west BAAs.
The sensitivity is generated both with and without 111(d) emission rate targets. This sensitivity
required different assumptions for the east and west BAAs, summarized in turn below.
West BAA Assumptions
Maintains 13% target planning reserve margin, applicable to a winter peak;
Allow January on-peak FOTs, maintaining limits at Mid-C (775 MW), COB (300 MW),
and NOB (100 MW);
Class 2 DSM capacity contribution values are updated to align with a winter peak;
All of Jim Bridger is included in the west BAA;
With 111(d) emission rate targets, assume the Chehalis combined cycle plant is retired at
the end of 2019, assume new combined cycle plants are not allowed, and assume Oregon
can use a west BAA allocation of renewable energy to meet PacifiCorp’s share of state
111(d) emission rate targets; and
Without 111(d), assume new combined cycle plants can be built in the west BAA.
East BAA Assumptions
Maintains a 13% target planning reserve margin, applicable to a summer peak;
Maintain summer on-peak FOTs, maintaining the Mona limit at 300 MW;
Maintain Class 2 DSM capacity contribution values, aligned with a summer peak;
None of Jim Bridger is included in the east BAA; and
With 111(d), assume flexible allocation of east BAA renewable energy can be used to
meet PacifiCorp’s share of Utah and Wyoming emission rate targets.
High CO2 Price
One sensitivity case includes CO2 price assumptions, recommended by members of PacifiCorp’s
stakeholder group, that are higher than those used in PacifiCorp’s core case definitions. The high
CO2 prices are assumed to be incremental to EPA’s proposed 111(d) emission rate targets.
Figure 7.10 shows the high CO2 prices for this sensitivity along with the incremental CO2 price
assumption used in core case definitions. Figure 7.11 shows forward price curve assumptions
developed for the high CO2 price sensitivity.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
153
Figure 7.10 – High CO2 Price Sensitivity Assumptions
Figure 7.11 – Wholesale Electricity and Natural Gas Prices in the High CO2 Sensitivity
Solar Resource Costs
One sensitivity case reflects alternative solar resource cost assumptions as recommended by
members of PacifiCorp’s stakeholder group. This sensitivity case also includes high distributed
generation penetration assumptions, summarized above. Figure 7.12 shows utility scale cost
assumptions, represented in real 2014 dollars, for this sensitivity case alongside PacifiCorp’s
base case assumptions.73
73 PacifiCorp’s base case solar resource costs assume real de-escalation through the first ten years of the planning
period due to such factors as technology and manufacturing improvements, government subsidization, over supply
compared to demand and improvement in implementation process.
$0
$20
$40
$60
$80
$100
$120
$140
$160
$180
$/
t
o
n
111(d) + CO2 High CO2 Sensitivity
$- $1 $2 $3
$4 $5 $6
$7 $8 $9 $10
$11
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
20
2
7
20
2
8
20
2
9
20
3
0
20
3
1
20
3
2
20
3
3
20
3
4
$/
M
M
B
t
u
Natural Gas Prices
Henry Hub
Sep 2014 OFPC 111(d) + CO2 High CO2
$-
$20
$40
$60
$80
$100
$120
$140
$160
$180
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
20
2
7
20
2
8
20
2
9
20
3
0
20
3
1
20
3
2
20
3
3
20
3
4
$/
M
W
h
Wholesale Electricity Prices
Average of Palo Verde and Mid-C (Flat)
Sep 2014 OFPC 111(d) + CO2 High CO2
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
154
Figure 7.12 – Solar Cost Sensitivity Assumptions
Class 3 DSM
Class 3 DSM includes non-firm price responsive capacity resources. The Class 3 DSM
sensitivity case utilizes Class 3 DSM supply curves developed as part of the conservation
potential study updated for the 2015 IRP. Class 3 DSM supply curves are comprised of four
products across six states. The four products include residential pricing programs, commercial
and industrial pricing programs, commercial and industrial demand buyback programs, and
irrigation pricing programs. Dynamic pricing products (critical peak pricing and real-time
pricing) are assumed to be available beginning 2020, following an assumed installation of
advanced metering infrastructure (AMI) by the end of 2019, costs of which are not included in
the levelized cost of these Class 3 DSM products.
Restricted 111(d) Attributes
PacifiCorp’s base case 111(d) emission rate modeling assumptions allows for allocation of
renewable energy among states for both RPS and 111(d) compliance purposes. This approach
assumes that the renewable attributes of a REC used for RPS compliance are separate and
distinct from 111(d) attributes used for 111(d) compliance. Moreover, this compliance approach
assumes that the two distinct attributes (RECs and 111(d) attributes) can be used for compliance
independent of one another. This sensitivity case assumes that state RPS-eligible RECs and
111(d) attributes are distinct; however, it is assumed that RECs and 111(d) attributes must be
surrendered at the same time. Consequently, if a state RPS programs requires more RECs to
meet its RPS requirements than 111(d) attributes required to meet its 111(d) targets, then 111(d)
attributes that could otherwise be used to mitigate 111(d) compliance costs in another state are
lost. Conversely, if a state requires more 111(d) attributes to meet its 111(d) emission rate targets
than RECs needed to meet its RPS requirements, then the state will more than meet its RPS
requirements, effective eliminating the need for the RPS program as a policy tool to drive
renewable resource acquisition.
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500
$4,000
$4,500
Re
a
l
2
0
1
4
$
/
k
W
Base Fixed Tilt (5 MW)Base Tracking (5 MW)Base Fixed Tilt (50 MW)
Base Tracking (50 MW)Sensitivity Fixed Tilt (5 MW)Sensitivity Tracking (5 MW)
Sensitivity Fixed Tilt (50 MW)Sensitivity Tracking (50 MW)
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
155
Sensitivity Case Definitions
Table 7.4 summarizes the combination of planning assumptions used to specify sensitivity case
definitions and the core case to which the sensitivity study is benchmarked. The benchmark case
ID reflects the applicable Regional Haze scenario assumption In addition, PacifiCorp has
produced sensitivity case fact sheets, summarizing key assumptions and System Optimizer
model results for each sensitivity case. These fact sheets are provided in Volume II, Appendix
M.
Table 7.4 Sensitivity Case Definitions
Case ID
111(d)
Attributes DSM
Resource
Specific
Price
Curve Load
Distributed
Gen. System
S-01 Flexible
Allocation Class 1 & 2 Base Base Low Base Base
S-02 Flexible
Allocation Class 1 & 2 Base Base High Base Base
S-03 Flexible
Allocation Class 1 & 2 Base Base 1-in-20 Base Base
S-04 Flexible
Allocation Class 1 & 2 Base Base Base Low Base
S-05 Flexible
Allocation Class 1 & 2 Base Base Base High Base
S-06 Flexible
Allocation Class 1 & 2 Forced Pump
Storage Base Base Base Base
S-07 Flexible
Allocation Class 1 & 2 Base Base Base Base Energy
Gateway 2
S-08 Flexible
Allocation Class 1 & 2 Base Base Base Base Energy
Gateway 5
S-09 Flexible
Allocation Class 1 & 2 Extended
PTC Base Base Base Base
S-10 Flexible
Allocation Class 1 & 2 Base Base Base Base East/West
BAA
S-11 Flexible
Allocation Class 1 & 2 Base High CO2 Base Base Base
S-12 Flexible
Allocation Class 1 & 2 Alternative
Solar Cost Base Base High Base
S-13 Flexible
Allocation Class 1 & 2 Forced CAES Base Base Base Base
S-14 Flexible
Allocation Class 1, 2 & 3 Base Base Base Base Base
S-15 Restricted Class 1 & 2 Base Base Base Base Base
*All sensitivity cases except S-07, S-08, S-10, and S-11 are benchmarked to the core case C05-1 with Regional
Haze scenario 1 assumptions. Sensitivity cases S-07 and S-08 are benchmarked to core case C07-1. Sensitivity case
S-10 is benchmarked to a variant of case C05a under Regional Haze scenario 3. Sensitivity case S-11 is
benchmarked to core case C14-1.
Cost and Risk Analysis
Once unique resource portfolios are developed using System Optimizer, additional modeling is
performed to produce metrics that support comparative cost and risk analysis among the different
resource portfolio alternatives. Stochastic risk modeling of resource portfolio alternatives is
performed with Planning and Risk (PaR). Deterministic risk modeling is performed on top
performing resource portfolios to assess the impact of applying planning assumptions that differ
from those used in the resource portfolio development process.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
156
Planning and Risk (PaR)
The stochastic simulation in PaR produces a dispatch solution that accounts for chronological
commitment and dispatch constraints. The PaR simulation incorporates stochastic risk in its
production cost estimates by using Monte Carlo random sampling of stochastic variables, which
include: load, wholesale electricity and natural gas prices, hydro generation, and thermal unit
outages.74 Wind and solar generation is not modeled with stochastic parameters; however, the
incremental reserve requirements associated with uncertainty and variability in wind generation,
as determined in the updated wind integration study, are captured in the stochastic simulations.
PacifiCorp’s updated wind integration study is provided in Volume II, Appendix H.
The stochastic parameters used in PaR for the 2015 IRP are developed with a short-run mean
reverting process, whereby mean reversion represents a rate at which a disturbed variable returns
to its expected value. Stochastic variables may have log-normal or normal distribution as
appropriate. The lognormal distribution is often used to describe prices because such distribution
is bounded on the low end by zero and has a long, asymmetric "tail" reflecting the possibility that
prices could be significantly higher than the average. Unlike prices, load generally does not have
such skewed distribution and is generally better described by a normal distribution. Volatility
and mean reversion parameters are used for modeling the volatilities of the variables, while
accounting for seasonal effects. Correlation measures how much the random variables tend to
move together.
Stochastic Model Parameter Estimation
Stochastic parameters are developed with econometric modeling techniques. The short-run
seasonal stochastic parameters are developed using a single period auto-regressive regression
equation (commonly called an AR(1) process). The standard error of the seasonal regression
defines the short run volatility, while the regression coefficient for the AR(1) variable defines the
mean reversion parameter. Loads and commodity prices are mean-reverting in the short term.
For instance, natural gas prices are expected to hover around a moving average within a given
month and loads are expected to hover near seasonal norms. These built-in responses are the
essence of mean reversion. The mean reversion rate tells how fast a forecast will revert to its
expected mean following a shock. The short-run regression errors are correlated seasonally to
capture inter-variable effects from informational exchanges between markets, inter-regional
impacts from shocks to electricity demand and deviations from expected hydroelectric
generation performance. The stochastic parameters are used to drive the stochastic processes of
the following variables:
Representative natural gas prices for PacifiCorp’s east and west BAAs;
Electricity market prices for Mid-C, COB, Four Corners, and Palo Verde;
Loads for California, Idaho, Oregon, Utah, Washington and Wyoming regions); and
Hydro generation.
Volume II, Appendix R of this report discusses the methodology on how the stochastic
parameters for the 2015 IRP were developed.
74 FOTs included in resource portfolios developed using System Optimizer are subject to the Monte Carlo random
sampling of wholesale electricity prices in PaR.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
157
Table 7.5 through7.7 summarize 2015 IRP short-term volatility and mean reversion
parameters by season for load, natural gas prices, and electricity prices, respectively. Table 7.8
through Table 7.11 summarize natural gas and electricity price correlation by delivery point
and season.Table 7.12 lists short term volatility and mean reversion parameters for hydro
generation by season.
Table 7.5 – Short Term Load Stochastic Parameters
Short-term Volatility
CA/OR
without
Portland Portland ID UT WA WY
Winter 2015 IRP 0.044 0.030 0.029 0.020 0.043 0.016
Spring 2015 IRP 0.036 0.029 0.045 0.025 0.036 0.016
Summer 2015 IRP 0.036 0.035 0.051 0.045 0.046 0.015
Fall 2015 IRP 0.040 0.031 0.048 0.029 0.042 0.018
Short-term Mean
Reversion
CA/OR
without
Portland Portland ID UT WA WY
Winter 2015 IRP 0.226 0.224 0.268 0.333 0.215 0.279
Spring 2015 IRP 0.278 0.164 0.093 0.295 0.220 0.318
Summer 2015 IRP 0.238 0.336 0.102 0.260 0.243 0.179
Fall 2015 IRP 0.207 0.324 0.176 0.339 0.182 0.230
Table 7.6 – Short Term Gas Price Parameters
Short-Term Volatility
Winter 2015 IRP 0.048 0.063
Spring 2015 IRP 0.029 0.026
Summer 2015 IRP 0.029 0.029
Fall 2015 IRP 0.036 0.043
Short-term Mean Reversion
Winter 2015 IRP 0.058 0.091
Spring 2015 IRP 0.110 0.083
Summer 2015 IRP 0.060 0.070
Fall 2015 IRP 0.110 0.109
Table 7.7 – Short Term Electricity Price Parameters
Short-Term Volatility Four Corners COB
Mid-
Columbia Palo Verde
Winter 2015 IRP 0.076 0.118 0.178 0.062
Spring 2015 IRP 0.092 0.318 0.317 0.072
Summer 2015 IRP 0.111 0.257 0.477 0.091
Fall 2015 IRP 0.060 0.063 0.069 0.047
Short-term Mean Reversion Four Corners COB
Mid-
Columbia Palo Verde
Winter 2015 IRP 0.095 0.193 0.282 0.093
Spring 2015 IRP 0.277 0.682 0.488 0.198
Summer 2015 IRP 0.380 0.534 0.943 0.289
Fall 2015 IRP 0.240 0.168 0.152 0.217
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
158
Table 7.8 – Winter Season Price Correlation
Table 7.9 – Spring Season Price Correlation
Table 7.10 – Summer Season Price Correlation
Table 7.11 – Fall Season Price Correlation
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
159
Table 7.12 – Hydro Short Term Stochastic Parameters
Winter 2015 IRP 0.170 0.836
Spring 2015 IRP 0.105 0.813
Summer 2015 IRP 0.139 1.093
Fall 2015 IRP 0.195 1.193
For unplanned thermal outages, PacifiCorp assumes a uniform distribution around an expected
rate. For existing units, the expected unplanned outage rates by unit are based on its historical
performance during the 4-year period ended December 2013. For new resources, the unplanned
outage rates are as specified for those resources as listed in the supply side resource table in
Chapter 6.
Figure 7.13 and Figure 7.14 show annual electricity prices at the first, 10th, 25th, 50th, 75th, 90th,
and 99th percentiles for Mid-C and Palo Verde market hubs based on a Monte Carlo simulation
using short-term volatility and mean reversion parameters. For Mid-C electricity prices,
differences between the first and 99th percentiles range from $4.11/MWh to $11.23/MWh during
the 20-year study period. For Palo Verde electricity prices, the difference between the first and
99th percentiles range from $2.34/MWh to $6.07/MWh.
Figure 7.13 – Simulated Annual Mid-C Electricity Market Prices
30.00
35.00
40.00
45.00
50.00
55.00
60.00
65.00
70.00
75.00
80.00
85.00
$/
M
W
h
99th 90th 75th mean 25th 10th 1st
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
160
Figure 7.14 – Simulated Annual Palo Verde Electricity Market Prices
Figure 7.15 and Figure 7.16 show annual electricity prices at the first, 10th, 25th, 50th, 75th, 90th,
and 99th percentiles for west and east natural gas prices. For west natural gas prices, differences
between the first and 99th percentiles range from $0.27/MMBtu to $0.81/MMBtu during the 20-
year study period. For east natural gas prices, differences between the first and 99th percentiles
range from $0.34/MMBtu to $0.90/MMBtu.
Figure 7.15 – Simulated Annual Western Natural Gas Market Prices
30.00
35.00
40.00
45.00
50.00
55.00
60.00
65.00
70.00
75.00
$/
M
W
h
99th 90th 75th mean 25th 10th 1st
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
$/
M
M
B
t
u
99th 90th 75th mean 25th 10th 1st
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
161
Figure 7.16 – Simulated Annual Eastern Natural Gas Market Prices
Figure 7.17 through Figure 7.22 show annual loads by load area and for PacifiCorp’s system at
the first, 10th, 25th, 50th, 75th, 90th, and 99th percentiles based on a Monte Carlo simulation using
short-term volatility and mean reversion parameters. For Idaho (Goshen) load, the annual
differences between the first and 99th percentiles range from 184 GWh to 382 GWh. The drop in
Idaho (Goshen) load from 2015 to 2017 is due to the expiration of a wholesale contract, under
which PacifiCorp serves third party retail load. For Utah load, the annual difference between the
first and 99th percentiles ranges from 1,408 GWh to 2,683 GWh. For Wyoming load, the annual
difference between the first and 99th percentiles range from 139 GWh to 279 GWh. For
Oregon/California load, annual differences between the first and 99th percentiles range from 895
GWh to 1,551 GWh. For Washington load, the annual difference between the first and 99th
percentile ranges from 233 GWh to 473 GWh. For PacifiCorp’s system load, the annual
difference between the first and 99th percentiles ranges from 2,110 GWh to 4,643 GWh.
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
$/
M
M
B
t
u
99th 90th 75th mean 25th 10th 1st
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
162
Figure 7.17 – Simulated Annual Idaho (Goshen) Load
Figure 7.18 – Simulated Annual Utah Load
1,500
2,000
2,500
3,000
3,500
4,000
4,500
GW
h
99th 90th 75th mean 25th 10th 1st
29,000
31,000
33,000
35,000
37,000
39,000
41,000
43,000
GW
h
99th 90th 75th mean 25th 10th 1st
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
163
Figure 7.19 – Simulated Annual Wyoming Load
Figure 7.20 – Simulated Annual Oregon/California Load
8,200
8,300
8,400
8,500
8,600
8,700
8,800
8,900
9,000
9,100
GW
h
99th 90th 75th mean 25th 10th 1st
15,000
15,500
16,000
16,500
17,000
17,500
18,000
18,500
19,000
GW
h
99th 90th 75th mean 25th 10th 1st
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
164
Figure 7.21 – Simulated Annual Washington Load
Figure 7.22 – Simulated Annual System Load
Figure 7.23 shows hydro generation at the first, 10th, 25th, 50th, 75th, 90th, and 99th percentiles
based on a Monte Carlo simulation using short-term volatility and mean reversion parameters.
PacifiCorp can dispatch its hydro generation on a limited basis to meet load and reserve
obligations. The parameters developed for the hydro stochastic process approximate the volatility
of hydro conditions as opposed to variations due to dispatch. The drop in 2021 is due to the
assumed decommissioning of the Klamath River projects. Annual differences in hydro
generation between the first and 99th percentiles range from 286 GWh to 634 GWh.
4,750
4,950
5,150
5,350
5,550
5,750
5,950
GW
h
99th 90th 75th mean 25th 10th 1st
60,000
65,000
70,000
75,000
80,000
GW
h
99th 90th 75th mean 25th 10th 1st
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
165
Figure 7.23 – Simulated Annual Hydro Generation
Monte Carlo Simulation
During model execution, the PaR model makes time-path-dependent Monte Carlo draws for each
stochastic variable based on input parameters. The Monte Carlo draws are percentage deviations
from the expected forward value of each variable. The Monte Carlo draws of the stochastic
variables among all resource portfolios modeled are the same, which allows for a direct
comparison of stochastic results among all of the resource portfolios being analyzed. In the case
of natural gas prices, electricity prices, and regional loads, the PaR model applies Monte Carlo
draws on a daily basis. In the case of hydroelectric generation, Monte Carlo draws are applied
on a weekly basis.
For the 2015 IRP, PaR is configured to conduct 50 Monte Carlo iterations for the 20-year study
period. For each of the 50 Monte Carlo iterations, PaR generates a set of natural gas prices,
electricity prices, loads, hydroelectric generation and thermal outages. Then, the model optimizes
resource dispatch to minimize costs while meeting load and wholesale sale obligations subject to
operating and physical constraints. In a 50-iteration simulation, the resource portfolio is fixed.
The end result of the Monte Carlo simulation is 50 production cost figures for the 20-year study
period reflecting a wide range of cost outcomes for the portfolio.
The expected values of the Monte Carlo simulation are the average results of all 50 iterations.
Results from subsets of the 50 iterations are also summarized to signify particularly adverse cost
conditions, and to derive associated cost measures as indicators of high-end portfolio risk. These
cost measures, and others are used to assess portfolio performance, and are described below.
Stochastic Portfolio Performance Measures
Stochastic simulation results for each unique resource portfolio are summarized, enabling direct
comparison among resource portfolio results during the preferred portfolio selection process. The
cost and risk stochastic measures reported from PaR include:
3,000
3,200
3,400
3,600
3,800
4,000
4,200
4,400
4,600
4,800
GW
h
99th 90th 75th mean 25th 10th 1st
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
166
● Stochastic mean PVRR;
● Risk-adjusted mean PVRR;
● Upper-tail Mean PVRR;
● 5th and 95th percentile PVRR;
● Average annual mean and upper tail energy not served (ENS);
● Loss of load probability; and
● Cumulative CO2 emissions.
Stochastic Mean PVRR
The stochastic mean PVRR is the average of system net variable operating costs among 50
iterations, combined with the real levelized capital costs and fixed costs taken from System
Optimizer for any given resource portfolio.75 The net variable cost from stochastic simulations,
expressed as a net present value, includes system costs for fuel, variable O&M, unit start-up,
market contracts, system balancing market purchases expenses and sales revenues, and ENS
costs applicable when available resources fall short of load obligations. Capital costs for new and
existing resources, taken from System Optimizer, are calculated on an escalated real-levelized
basis. Other components in the stochastic mean PVRR include fixed costs for new DSM
resources in the portfolio, also taken from System Optimizer, and CO2 emission costs for any
scenarios that include a CO2 price assumption.
Risk-Adjusted Mean PVRR
The risk-adjusted PVRR incorporates the expected-value cost of low-probability, high cost
outcomes. This measure is calculated as the PVRR of stochastic mean system variable costs plus
five percent of system variable costs from the 95th percentile. The PVRR of system fixed costs,
taken from System Optimizer, are then added to this system variable cost metric. This metric
expresses a low-probability portfolio cost outcome as a risk premium applied to the expected (or
mean) PVRR based on 50 Monte Carlo simulations for each resource portfolio. The rationale
behind the risk-adjusted PVRR is to have a consolidated stochastic cost indicator for portfolio
ranking, combining expected cost and high-end cost risk concepts.
Upper-Tail Mean PVRR
The upper-tail mean PVRR is a measure of high-end stochastic cost risk. This measure is derived
by identifying the Monte Carlo iterations with the three highest production costs on a net present
value basis. The portfolio’s real levelized fixed costs, taken from System Optimizer, are added to
these three production costs, and the arithmetic average of the resulting PVRRs is computed.
95th and 5th Percentile PVRR
The 5th and 95th percentile stochastic PVRRs are also reported from the 50 Monte Carlo
iterations. These measures capture the extent of upper-tail (high cost) and lower-tail (low cost)
stochastic outcomes. As described above, the 95th percentile PVRR is used to derive the high-end
cost risk premium for the risk-adjusted mean PVRR measure. The 5th percentile PVRR is
reported for informational purposes.
Production Cost Standard Deviation
To capture production cost volatility risk, PacifiCorp uses the standard deviation of the stochastic
production cost from the 50 Monte Carlo iterations. The production cost is expressed as a net
75 Fixed costs are not affected by stochastic variables, and therefore, do not change across the 50 PaR iterations.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
167
present value of annual costs over the period 2015 through 2034. This measure meets Oregon
IRP guidelines to report stochastic measure that addresses the variability of costs in addition to a
measure addressing the severity of bad outcomes.
Average and Upper-Tail Energy Not Served
Certain iterations of a stochastic simulation will have ENS, a condition where there are
insufficient resources, inclusive of system balancing purchases, available to meet load or
operating reserve requirements because of physical constraints. This occurs when Monte Carlo
draws of stochastic variables result in load obligation that is higher than capability of the
available resources in the portfolio. For example, this might occur in Monte Carlo draws with
large load shocks concurrent with a random unplanned plant outage event. Consequently, ENS,
when averaged across all 50 iterations, serves as a measure of reliability that can be compared
among resource portfolios. PacifiCorp calculates an average annual value over the 2015 through
2034 planning horizon, reported in gigawatt-hours, as well as the upper-tail ENS (average of the
three iterations with the highest ENS). In the 2015 IRP, ENS is priced at $1,000/MWh consistent
with a FERC imposed price cap.
Loss of Load Probability
Loss of load probability (LOLP) reports the probability and extent that available resources of a
portfolio cannot serve load during peak-load period of July in the 20-year period. PacifiCorp
reports LOLP statistics, which are calculated from ENS events that exceed threshold levels.
Cumulative CO2 Emissions
Annual CO2 emissions from each portfolio are reported from PaR and summed for the twenty
year planning period. Comparison of total CO2 emissions is used to identify potential outliers
among resource portfolios that might otherwise be comparable with regard to expected cost,
upper tail cost risk, and/or ENS.
Forward Price Curve Scenarios
Each of the unique resource portfolios developed with System Optimizer during the resource
portfolio development process are analyzed in PaR among four price curve scenarios. The price
curve scenarios include PacifiCorp’s September 2014 OFPC along with price curves developed
assuming low and high natural gas price assumptions. PaR results using each of these scenarios
inform selection of the preferred portfolio. A fourth price curve scenario includes a high CO2
price assumption, as recommended by members of PacifiCorp’s IRP stakeholder group, is
primarily used to inform PacifiCorp’s 2015 IRP acquisition path analysis.
Price assumptions for each of these scenarios are subject to short-term volatility and mean
reversion stochastic parameters when used in PaR. The approach for producing wholesale
electricity and natural gas price scenarios used for PaR simulations is identical to the approach
used to develop price scenarios for the resource portfolio development process. Figure 7.24
summarizes the four forward price curve scenarios used to analyze unique portfolios in PaR. The
CO2 price assumptions used in the high CO2 price forward curve scenario are identical to those
used for sensitivity case S-11, shown in Figure 7.10.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
168
Figure 7.24 – Wholesale Electricity and Natural Gas Prices in PaR Simulations
Environmental Policy
Regional Haze and Other Environmental Coal Costs
All portfolio fixed costs and timing of planned maintenance outages unique to each coal unit for
each Regional Haze scenario, inclusive of prospective costs related to MATS, CCR, ELG, and
CWA, used in System Optimizer are captured in all PVRR results from PaR.
EPA’s Proposed 111(d) Rule
PacifiCorp’s 111(d) modeling approach applied during the portfolio development process for
case definitions that include 111(d) state emission rate targets is not conducive to stochastic
modeling performed using PaR, which relies on chronological unit commitment and dispatch.
With chronological dispatch, PaR does not have foresight to account for how current dispatch
decisions might influence future dispatch restrictions needed to meet assumed emission rate
targets in a given year. Consequently, it is not possible to establish annual dispatch limits for a
given fossil-fired generating unit in PaR. Further, it is not feasible to impose manual dispatch
limits for a stochastic PaR simulation, considering each simulation produces 50 iterations with
varying combinations of load, wholesale electricity and natural gas prices, hydro generation, and
thermal unit outages. Each of these iterations produces different emission rates for each year.
Considering PaR simulations are performed for nearly 50 unique resource portfolios (inclusive of
sensitivity cases) among four different price curve scenarios, many thousands of 111(d) Scenario
Maker models would need to be created to develop thermal dispatch limits by unit and time
period for input back into PaR.
Considering these challenges, the PVRR of system costs reported by PaR in the 2015 IRP reflect
resource portfolio impacts of 111(d), but do not reflect re-dispatch of fossil-fired generation
resources that might be required to meet assumed state 111(d) emission rate targets. PaR results
are, nonetheless, used to screen relative cost and risk differences among candidate portfolios.
Compliance with state 111(d) emission rate targets, with consideration of fossil-fired generation
re-dispatch, is factored into the preferred portfolio selection process by comparing portfolio costs
from System Optimizer and by performing deterministic risk analysis using System Optimizer.
State Renewable Portfolio Standards (RPS)
Any renewable resources included in resource portfolios developed using System Optimizer,
including state RPS renewable resource selections from the RPS Scenario Maker, are included in
$-
$1 $2 $3
$4 $5 $6 $7
$8 $9 $10
$11
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
20
2
7
20
2
8
20
2
9
20
3
0
20
3
1
20
3
2
20
3
3
20
3
4
$/
M
M
B
t
u
Natural Gas Prices
Henry Hub
Sep 2014 OFPC Low Gas High CO2 High Gas
$-
$20
$40
$60
$80
$100
$120
$140
$160
$180
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
20
2
7
20
2
8
20
2
9
20
3
0
20
3
1
20
3
2
20
3
3
20
3
4
$/
M
W
h
Wholesale Electricity Prices
Average of Palo Verde and Mid-C (Flat)
Sep 2014 OFPC Low Gas High Gas High CO2
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
169
PaR. These renewable resources are modeled as non-dispatchable, must-run resources using the
same fixed energy profiles, which vary by month and time of day, as applied in System
Optimizer.
Other PaR Modeling Methods and Assumptions
Transmission System
The transmission topology used for System Optimizer, shown in Figure 7.2, is identical to the
transmission topology used for PaR simulations.
Resource Adequacy
The resource portfolio developed using System Optimizer, which meets an assumed 13% target
planning reserve margin, is fixed in all PaR simulations. With fixed resources, the unit
commitment and dispatch logic in PaR accounts operating reserve requirements. These reserve
requirements include contingency reserves, which are calculated as 3% of load and 3% of
generation. In addition, PaR reserve requirements account for regulation reserves, which include
ramp, regulating, and following reserves. PacifiCorp’s regulation reserve assumptions are
included in PacifiCorp’s updated wind integration study, provided in Volume II, Appendix H.
Energy Storage Resources
PaR unit commitment is implemented on a week-ahead basis. The model operates the storage
plant to balance generation and charging, accounting for cycle efficiency losses, in order to end
the week in the same net energy position as it began. The model chooses periods to generate and
return energy to minimize system cost. It does this by calculating an hourly value of energy for
charging. This value of energy, a form of marginal cost, is used as the cost of generation for
dispatch purposes, and is derived from calculations of system cost and unit commitment effects.
For CAES plants, a heat rate is included as a parameter to capture fuel conversion efficiency.
General Assumptions
The same general assumptions for study period (20-years beginning 2015), annual inflation rates
(1.9%), and discount rates (6.66%) applied in System Optimizer are also applied in PaR.
Other Cost and Risk Considerations
In addition to reviewing stochastic PVRR, ENS, and CO2 emissions data from PaR, PacifiCorp
considers other cost and risk metrics in its comparative analysis of resource portfolios. These
metrics include deterministic risk analysis, fuel source diversity, and customer rate impacts.
Deterministic Risk Analysis
Deterministic risk analysis is performed to quantify changes in system costs when a resource
portfolio, developed under a given set of planning assumptions, is locked down and simulated
under an alternative set of planning assumptions. For its 2015 IRP, PacifiCorp performed
deterministic risk analysis using System Optimizer to evaluate resource portfolio costs for core
cases C05a-3 and C05b-3, developed assuming state 111(d) emission rate target, and for case
C13-1, developed assuming EPA’s proposed 111(d) rule is implemented as a PacifiCorp system
mass cap applicable to PacifiCorp’s system.76 The deterministic risk analysis was performed by
76 These three cases ranked highest using the risk adjusted mean PVRR metric among portfolios analyzed with PaR.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
170
imposing the mass cap assumed when developing core case C13-1 to the resource portfolios
developed under core cases C05a-3 and C05b-3. Similarly, the resource portfolio developed
under core case C13-1, was evaluating in System Optimizer assuming it must meet state
emission rate targets applicable to those states in which PacifiCorp serves retail customers.
Fuel Source Diversity
PacifiCorp considers relative differences in resource mix among portfolios by comparing the
capacity of new resources in to performing portfolios by resource type, differentiated by fuel
source. PacifiCorp also reports summary fuel source diversity differences among top performing
portfolios based on forecasted generation levels of new resources in the portfolio. Generation
share is reported among thermal resources, renewable resources, DSM resources and FOTs.
Customer Rate Impacts
To derive a rate impact measure, PacifiCorp computes the percentage change in nominal annual
revenue requirement from top performing resource portfolios (with lowest risk adjusted mean
PVRRs) relative to a benchmark portfolio selected during the final preferred portfolio screening
process. Annual revenue requirement for these portfolios is based on the stochastic production
cost results from PaR and capital costs reported by System Optimizer on a real levelized basis.
The real levelized capital costs are adjusted to nominal dollars based on the timing of when new
resources are added to the portfolio. While this approach provides a reasonable representation of
relative differences in projected total system revenue requirement among portfolios, it is not a
prediction of future revenue requirement for rate-making purposes.
Preferred Portfolio Selection
The preferred portfolio selection process is based upon modeling results from the resource
portfolio development and cost and risk analysis steps. Preliminary and initial screening of
resource portfolios is based upon the PVRR of system costs, assessed on a deterministic and
expected value basis and on an upper tail stochastic risk basis. Resource portfolios that remain
after preliminary and initial screening are ranked using a risk-adjusted mean PVRR metric, a
metric that combines the expected value PVRR with upper tail stochastic risk PVRR. Additional
selection criteria consider relative portfolio differences in supply reliability and CO2 emissions.
The final selection process considers results of deterministic risk analysis modeling, resource
diversity, and other supplemental modeling results.
Pre-Screening
The pre-screening process is the initial step in the preferred portfolio selection process. The pre-
screening process plots the mean PVRR and upper-tail mean PVRR (net of fixed costs) for each
unique resource portfolio using base, low, and high forward price curve assumptions. The pre-
screening step eliminates outlier portfolios that have substantially higher cost and risk metrics
relative to others. Pre-screening also eliminates portfolios, produced for comparison purposes,
that may not meet future environmental compliance requirements.
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
171
Initial Screening
Initial screening also relies upon plots of the mean PVRR and the upper-tail mean PVRR (net of
fixed costs) for each unique resource portfolio remaining after removal of portfolios during the
pre-screening step. Based on the data used to produce these plots, PacifiCorp applied the
following selection criteria when identifying portfolios with the best combination of cost and risk
for the base, low, and high forward price curve scenarios:
Identify the portfolio with the lowest mean PVRR to establish a cost and risk threshold
calculated as 2% of the least-cost portfolio;
Identify portfolios that fall within the threshold amount as compared to the least cost
portfolio;
Identify portfolios that fall within the threshold amount as compared to the least risk
portfolio, using the upper tail mean PVRR net of fixed costs the risk metric; then
Select portfolios that fall within the least cost and least risk thresholds among any price
curve scenario.
Final Screening
During the final screening process, resource portfolios remaining after the initial screening step
are ranked by risk-adjusted mean PVRR, the primary metric used to identify top performing
portfolios. Portfolio rankings are reported for the base, low, and high price curve scenarios. The
average portfolio rank among each of the price curve scenarios is also produced. Resource
portfolios with the lowest risk-adjusted mean PVRR receive the highest rank. Final screening
also considers system cost PVRR data from System Optimizer, which captures the impact of re-
dispatch for those case developed assuming application of state 111(d) emission rate targets.
The final screening process also includes review of deterministic risk analysis and other
comparative portfolio analysis. At this stage, PacifiCorp reviews additional stochastic metrics
from PaR looking to identify if expected and upper tail ENS results and CO2 emissions results
can be used to differentiate portfolios that might be closely ranked on a risk-adjusted mean
PVRR basis. Comparative analysis of fuel source diversity and customer rate impacts is also
performed.
Preliminary Selection
Selection of a preliminary preferred portfolio is based upon the Company’s assessment of the
criteria and measures used to summarize and rank candidate portfolios in the final screening
analysis. In this phase, PacifiCorp considers comparative analysis of fuel source diversity and
customer rate impacts.
Final Preferred Portfolio Selection
Final selection is made after performing additional analysis, as required, on the preliminary
preferred portfolio taking into consideration conclusions drawn from analyses performed
throughout the modeling process or new resource information that might affect resource needs
received since modeling assumptions were locked down. For the 2015 IRP, PacifiCorp includes
in its preferred portfolio an updated list of executed qualifying facility contracts for projects
PACIFICORP – 2015 IRP CHAPTER 7 – MODELING AND PORTFOLIO EVALUATION APPROACH
172
expected to come on-line in 2015 and 2016 that were not included when assumptions for the
portfolio development process were lock down in September 2014.
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
173
CHAPTER 8 – MODELING AND PORTFOLIO SELECTION
RESULTS
CHAPTER HIGHLIGHTS
Core case portfolios are primarily influenced by Regional Haze assumptions, assumptions
related to EPA’s proposed rule to regulate CO2 emissions under §111(d) of the Clean Air
Act, and state RPS compliance assumptions. Portfolios developed with CO2 price
assumptions, incremental to EPA’s proposed 111(d) rule, tend to include more renewable
resources and modular nuclear resources in the out years of the planning horizon.
PacifiCorp’s proposed 111(d) emission rate targets for states in which PacifiCorp owns
fossil generation and serves retail customers can be met with re-allocation of existing
system renewable resources, acquisition of cost-effective energy efficiency resources, and
re-dispatch of existing fossil units.
Using a range of cost and risk metrics to evaluate a wide range of resource portfolios,
PacifiCorp selected a preferred portfolio meeting its energy and capacity needs with cost
effective energy efficiency resources and short-term firm market purchases through the
front ten years of the 20-year planning horizon.
Over the front ten years of the planning horizon, accumulated acquisition of incremental
energy efficiency resources meets 86% of forecast load growth from 2015 through 2024.
The first deferrable thermal resource in the 2015 IRP preferred portfolio is added in 2028,
four years later relative to the 2013 IRP preferred portfolio.
By the end of the twenty-year planning horizon, PacifiCorp’s 2015 IRP preferred portfolio
reflects an assumed reduction in existing owned capacity totaling 2,775MW. By 2034, it is
assumed that approximately 2,800 MW of existing coal generation will either be retired or
converted to operate as natural gas-fired generation.
The 2015 IRP preferred portfolio reflects 816 MW of executed qualifying facility power
purchase agreements from new wind and solar projects expected to come on-line in 2015
and 2016.
PacifiCorp’s forecasted CO2 emissions from the preferred portfolio fall below 1990 levels
by 2025. By the end of the 20-year planning period, PacifiCorp’s CO2 emissions from the
preferred portfolio are projected to drop 14% below 1990 emission levels.
Introduction
This chapter reports modeling and performance evaluation results for the resource portfolios
developed with a broad range of input assumptions using System Optimizer and simulated with
Planning and Risk (PaR). Using model data from the portfolio development process and subsequent
cost and risk analysis of unique preferred portfolio alternatives, PacifiCorp steps through its preferred
portfolio selection process and presents the 2015 IRP preferred portfolio. This chapter also presents
modeling results for 2015 IRP sensitivity cases.
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
174
Resource Portfolio Development
Core Case Resource Portfolios
Figure 8.1summarizes the cumulative capacity of new resources selected by System Optimizer, along
with cumulative reduction in existing resources, through 2034, for resource portfolios developed
under the reference Regional Haze scenario and under Regional Haze scenarios 1 and 3. Figure 8.2
presents the same summary for resource portfolios developed under the reference Regional Haze
scenario and under Regional Haze scenarios 2 and 3. Resource portfolios developed under the same
Regional Haze scenarios share the same assumptions for the timing of unit retirements. Those cases
developed under Regional Haze Scenario 2 assume more early retirements, and therefore, generally
have more new natural gas-fired capacity. New renewable resources vary among portfolios due to
assumed state renewable portfolio standard (RPS) compliance or 111(d) compliance strategies.
Portfolios developed assuming EPA’s proposed 111(d) rule is supplemented with a future policy that
applies an incremental cost on CO2 emissions (cases C14 and C14a) include new modular nuclear
resources. Detailed resource portfolio results for each core case, showing new resource capacity and
changes to existing resource capacity by year, are contained in Volume II, Appendix K. Summary
portfolio results are also shown in the case fact sheets presented in Volume II, Appendix M.
Figure 8.1 – Total Cumulative Capacity through 2034, Regional Haze Scenarios 1 and 3
2.8 2.7 2.6 3.9 3.9 2.6 2.6 2.6 2.8 2.7 2.7 3.9 3.9 2.9 2.7 2.7 2.7 3.1 3.1
1.0 1.1 1.0
1.0 0.8
1.1 1.2 1.1 1.1 1.0 1.0
1.1 0.9
0.9 1.1 1.2 1.1 1.0 1.0
1.8 3.3 3.5 3.0 3.0 3.5 3.5 3.5 2.2 2.2 2.2
3.0 3.0 3.5 3.7 3.4 3.6
1.1 2.0
0.9 0.7 2.2
0.5 0.8 1.0 1.2
1.2 0.6
1.6 1.9
2.6
2.6
(2.4)(2.4)(2.4)(2.4)(2.4)(2.4)(2.4)(1.6)(1.6)(1.6)(2.4)(2.4)(2.4)(2.4)(2.4)(2.4)(2.4)(3.3)(1.6)
(1.4)(1.4)(1.4)(1.4)(1.4)(1.4)(1.4)(1.6)(1.6)(1.6)(1.4)(1.4)(1.4)(1.4)(1.4)(1.4)(1.4)(1.4)
(8)
(6)
(4)
(2)
0
2
4
6
8
10
12
14
C01-R C01-1 C02-1 C03-1 C04-1 C05-1 C05a-1 C05b-1 C05a-3 C05-3 C05b-3 C06-1 C07-1 C09-1 C11-1 C12-1 C13-1 C14-1 C14a-1
Ca
p
a
c
i
t
y
(
G
W
)
DSM FOTs Gas Renewable Gas Conversion Nuclear Early Retirement End of Life Retirement
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
175
Figure 8.2 – Total Cumulative Capacity through 2034, Regional Haze Scenarios 2 and 3
System Costs
Figure 8.3 shows the present value revenue requirement (PVRR) of system costs among resource
portfolios developed under reference Regional Haze assumptions and under Regional Haze scenarios
1 and 3. Figure 8.4 shows the same data for resource portfolios developed under the reference
Regional Haze scenario and under Regional Haze scenarios 2 and 3. With incremental CO2 emission
costs, cases C14 and C14a have system costs significantly higher than all other cases. Cases with
111(d) compliance strategies that prioritize adding incremental Class 2 DSM energy efficiency
savings (cases C03 and C06) and prioritizing additional new renewable resources (cases C04 and
C07) are higher cost than cases developed with a 111(d) compliance strategy that prioritizes re-
dispatch of existing fossil-fired generating units. Figure 8.5 shows the differential in system PVRR
costs between cases developed under Regional Haze scenarios 1 and 2. Among cases developed
without a CO2 price assumption incremental to EPA’s proposed 111(d) rule, Regional Haze scenario
2 portfolio costs are between $458 million and $649 million higher than Regional Haze scenario 1
portfolio costs. The CO2 price assumptions in cases C14 and C14a largely overshadow the relative
cost differential between Regional Haze scenarios. Detailed portfolio cost results, showing system
cost line items by year, are included in Volume II, Appendix K. Summary portfolio costs are also
shown in the case fact sheets presented in Volume II, Appendix M.
Figure 8.3 – System Optimizer PVRR Costs for Regional Haze Scenarios 1 and 3
2.8 2.9 2.7 3.9 3.9 2.8 2.8 2.8 2.7 2.7 3.9 3.9 2.9 2.8 2.8 2.8 3.2 3.2
1.0 1.2 1.0
1.0 0.8
1.2 1.2 1.1 1.0 1.0
1.1 1.0 0.9 1.2 1.2 1.2 1.0 1.0 1.8
4.2 4.0 3.5 3.5 4.0 4.0 2.2 2.2 2.2
3.5 3.5 4.1 4.0 4.1 4.1 2.1 3.2
0.9 0.7 2.2
0.8 1.0 1.2
0.8 0.7 3.0 0.9
2.1 2.1
(3.3)(3.3)(3.3)(3.3)(3.3)(3.3)(1.6)(1.6)(1.6)(3.3)(3.3)(3.3)(3.3)(3.3)(3.3)(3.3)(4.1)(1.6)
(1.3)(1.3)(1.3)(1.3)(1.3)(1.3)
(1.6)(1.6)(1.6)
(1.3)(1.3)(1.3)(1.3)(1.3)(1.3)(1.3)(1.3)
(8)
(6)
(4)
(2)
0
2
4
6
8
10
12
14
C01-R C01-2 C02-2 C03-2 C04-2 C05-2 C05a-2 C05a-3 C05-3 C05b-3 C06-2 C07-2 C09-2 C11-2 C12-2 C13-2 C14-2 C14a-2
Ca
p
a
c
i
t
y
(
G
W
)
DSM FOTs Gas Renewable Gas Conversion Nuclear Early Retirement End of Life Retirement
$26.8 $26.7 $27.8 $28.9 $29.3
$26.6 $26.6 $26.6 $26.6 $26.6 $26.6 $27.9 $28.5 $26.8 $26.6 $26.7 $26.9
$39.4 $39.3
20
22
24
26
28
30
32
34
36
38
40
C01-R C01-1 C02-1 C03-1 C04-1 C05-1 C05a-1 C05b-1 C05a-3 C05-3 C05b-3 C06-1 C07-1 C09-1 C11-1 C12-1 C13-1 C14-1 C14a-1
PV
R
R
(
$
b
i
l
l
i
o
n
)
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
176
Figure 8.4 – System Optimizer PVRR Costs for Regional Haze Scenarios 2 and 3
Figure 8.5 – Increase in System Optimizer PVRR Costs under Regional Haze Scenario 2
Relative to Regional Haze Scenario 1
Carbon Dioxide Emissions
Figure 8.6 shows annual CO2 emissions among resource portfolios developed under reference
Regional Haze assumptions and under Regional Haze scenarios 1 and 3. Figure 8.7 shows the same
data for resource portfolios developed under the reference Regional Haze scenario and under
Regional Haze scenarios 2 and 3. All cases show CO2 emission reductions over the 20-year planning
horizon with the assumed end-of-life retirement of existing fossil-fired generating units. EPA’s
proposed 111(d) rule drives CO2 emission reductions beginning 2020. The resource portfolio
developed under reference Regional Haze assumptions and without 111(d) compliance requirements
has the highest CO2 emissions when compared to other portfolios. Portfolios showing the most
dramatic CO2 emission reductions include those cases that have additional CO2 costs imposed on
fossil-fired generation (cases C14 and C14a). Cumulative CO2 emissions over the 20-year planning
horizon for each resource portfolio is included in Volume II, Appendix K. Annual CO2 emission
profiles are also shown in the case fact sheets presented in Volume II, Appendix M.
$26.8 $27.3 $28.3 $29.5 $29.9
$27.2 $27.2 $26.6 $26.6 $26.6 $28.5 $29.1 $27.5 $27.2 $27.2 $27.4
$39.6 $39.3
20
22
24
26
28
30
32
34
36
38
40
C01-R C01-2 C02-2 C03-2 C04-2 C05-2 C05a-2 C05a-3 C05-3 C05b-3 C06-2 C07-2 C09-2 C11-2 C12-2 C13-2 C14-2 C14a-2
PV
R
R
(
$
b
i
l
l
i
o
n
)
$571 $527
$620 $604 $531
$649 $619 $599 $646
$526 $586
$458
$142
$43 $-
$100
$200
$300
$400
$500
$600
$700
C01 C02 C03 C04 C05 C05a C06 C07 C09 C11 C12 C13 C14 C14a
$
m
i
l
l
i
o
n
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
177
Figure 8.6 – System Optimizer Annual CO2 Emissions for Regional Haze Scenarios 1 and 3
Figure 8.7 – System Optimizer Annual CO2 Emissions for Reference Haze Scenarios 2 and 3
Cost and Risk Analysis
Results of resource portfolio cost and risk analysis are presented as PacifiCorp steps through its
preferred portfolio selection process in the section that follows. Stochastic modeling results from PaR
are also summarized in Volume II, Appendix L.
10
15
20
25
30
35
40
45
50
55
Mi
l
l
i
o
n
T
o
n
s
C
O
2
C01-R C01-1 C02-1 C03-1 C04-1 C05-1 C05a-1
C05b-1 C05-3 C05a-3 C05b-3 C06-1 C07-1 C09-1
C11-1 C12-1 C13-1 C14-1 C14a-1
10
15
20
25
30
35
40
45
50
55
Mi
l
l
i
o
n
T
o
n
s
C
O
2
C01-R C01-2 C02-2 C03-2 C04-2 C05-2
C05a-2 C05-3 C05a-3 C05b-3 C06-2 C07-2
C09-2 C11-2 C12-2 C13-2 C14-2 C14a-2
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
178
Preferred Portfolio Selection
Pre-Screening
As described in Chapter 7, PacifiCorp simulates each unique resource portfolio in PaR. For the 2015
IRP, PaR simulations used to inform selection of the preferred portfolio are done for three price curve
scenarios developed around base, low, and high natural gas price assumptions. A fourth price curve
scenario, reflecting high CO2 price assumptions recommended by members of PacifiCorp’s
stakeholder group, is largely used to inform PacifiCorp’s 2015 IRP acquisition path analysis. Pre-
screening scatter plots, shown in Figure 8.8 through Figure 8.10 for the low, base, and high price
scenarios, show the mean PVRR of each unique core case portfolio on the horizontal axis and the
upper-tail mean PVRR less fixed costs on the vertical axis.77 The red dashed line depicted on each of
the following figures demarcates the threshold used to identify outlier portfolios. Portfolios to the left
and below the dashed red line are lower cost and lower risk and are deemed superior relative to those
portfolios to the right and above the red dashed line.
Figure 8.8 – Pre-Screen Scatter Plots, Low Price Curve Scenario
Figure 8.9 Pre-Screen Scatter Plots, Base Price Curve Scenario
77 Case C01 is not considered as a candidate for the preferred portfolio as it was developed without EPA’s proposed
111(d) rule or any other future CO2 policy assumption. Stochastic model results from Case C01 are reported in Volume II,
Appendix L.
$17.5
$18.0
$18.5
$19.0
$19.5
$20.0
$20.5
$21.0
$25.5 $26.5 $27.5 $28.5 $29.5 $30.5
Up
p
e
r
T
a
i
l
M
e
a
n
P
V
R
R
L
e
s
s
F
i
x
e
d
C
o
s
t
s
($
b
i
l
l
i
o
n
)
Stochastic Mean PVRR($ billion)
Regional Haze Scenarios 1 and 3
C02-1 C03-1 C04-1 C05-1 C05a-1 C05b-1
C06-1 C07-1 C09-1 C11-1 C12-1 C13-1
C14-1 C14a-1 C05-3 C05a-3 C05b-3
$18.0
$18.5
$19.0
$19.5
$20.0
$20.5
$21.0
$26.0 $26.5 $27.0 $27.5 $28.0 $28.5 $29.0 $29.5 $30.0
Up
p
e
r
T
a
i
l
M
e
a
n
P
V
R
R
L
e
s
s
F
i
x
e
d
C
o
s
t
s
($
b
i
l
l
i
o
n
)
Stochastic Mean PVRR($ billion)
Regional Haze Scenario 2
C02-2 C03-2 C04-2 C05-2 C05a-2 C06-2 C07-2
C09-2 C11-2 C12-2 C13-2 C14-2 C14a-2
$19.0
$19.5
$20.0
$20.5
$21.0
$21.5
$22.0
$22.5
$27.5 $28.0 $28.5 $29.0 $29.5 $30.0 $30.5 $31.0
Up
p
e
r
T
a
i
l
M
e
a
n
P
V
R
R
L
e
s
s
F
i
x
e
d
C
o
s
t
s
($
b
i
l
l
i
o
n
)
Stochastic Mean PVRR($ billion)
Regional Haze Scenarios 1 and 3
C02-1 C03-1 C04-1 C05-1 C05a-1 C05b-1
C06-1 C07-1 C09-1 C11-1 C12-1 C13-1
C14-1 C14a-1 C05-3 C05a-3 C05b-3
$19.5
$20.0
$20.5
$21.0
$21.5
$22.0
$22.5
$23.0
$28.0 $28.5 $29.0 $29.5 $30.0 $30.5 $31.0 $31.5 $32.0
Up
p
e
r
T
a
i
l
M
e
a
n
P
V
R
R
L
e
s
s
F
i
x
e
d
C
o
s
t
s
($
b
i
l
l
i
o
n
)
Stochastic Mean PVRR($ billion)
Regional Haze Scenario 2
C02-2 C03-2 C04-2 C05-2 C05a-2 C06-2 C07-2
C09-2 C11-2 C12-2 C13-2 C14-2 C14a-2
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
179
Figure 8.10 Pre-Screen Scatter Plots, High Price Curve Scenario
A consistent set of resource portfolios among Regional Haze and price curve scenarios are outliers in
relation to other portfolios included on the above plots. These portfolios, developed under core cases
C03, C04, C06, C07, C14, and C14a, are removed from consideration as candidates for the preferred
portfolio.
Initial Screening
With the removal of pre-screened portfolios, scatter plots of the stochastic mean PVRR and upper tail
mean PVRR less fixed costs for the remaining portfolios are viewed with finer resolution. Figure 8.11
through Figure 8.13 show these scatter plots for the low, base, and high price curve scenarios. The red
line demarcates the group of portfolios designated as superior with respect to the combination of the
cost and risk metrics. The red demarcation line is established by calculating a cost/risk variance
threshold using 2% of the stochastic mean PVRR of the least cost portfolio under each price curve
scenario and applying this threshold to the least cost and least risk portfolios on each scatter plot. For
example, under base price curve scenario, the least cost portfolio has a stochastic mean PVRR of
$27.6 billion. Two percent of this figure is $550 million, which sets the threshold used for the base
price curve scenario. Any portfolio that is within $550 million of the lowest cost portfolio and within
$550 million of the least risk portfolio in the base price curve scenario is to the left and blow the red
dashed line. The cost/risk threshold used in the low and high price curve scenarios is $520 million
and $580 million, respectively.
$20.5
$21.0
$21.5
$22.0
$22.5
$23.0
$23.5
$24.0
$24.5
$29.0 $29.5 $30.0 $30.5 $31.0 $31.5 $32.0 $32.5
Up
p
e
r
T
a
i
l
M
e
a
n
P
V
R
R
L
e
s
s
F
i
x
e
d
C
o
s
t
s
($
b
i
l
l
i
o
n
)
Stochastic Mean PVRR($ billion)
Regional Haze Scenarios 1 and 3
C02-1 C03-1 C04-1 C05-1 C05a-1 C05b-1
C06-1 C07-1 C09-1 C11-1 C12-1 C13-1
C14-1 C14a-1 C05-3 C05a-3 C05b-3
$21.5
$22.0
$22.5
$23.0
$23.5
$24.0
$24.5
$25.0
$25.5
$30.5 $31.0 $31.5 $32.0 $32.5 $33.0 $33.5
Up
p
e
r
T
a
i
l
M
e
a
n
P
V
R
R
L
e
s
s
F
i
x
e
d
C
o
s
t
s
($
b
i
l
l
i
o
n
)
Stochastic Mean PVRR($ billion)
Regional Haze Scenario 2
C02-2 C03-2 C04-2 C05-2 C05a-2 C05b-2 C06-2
C07-2 C09-2 C11-2 C12-2 C13-2 C14-2 C14a-2
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
180
Figure 8.11 Initial Screen Scatter Plot, Low Price Curve Scenario
Figure 8.12 Initial Screen Scatter Plot, Base Price Curve Scenario
$17.8
$18.0
$18.2
$18.4
$18.6
$18.8
$19.0
$19.2
$19.4
$25.8 $26.0 $26.2 $26.4 $26.6 $26.8 $27.0 $27.2 $27.4
Up
p
e
r
T
a
i
l
M
e
a
n
P
V
R
R
L
e
s
s
F
i
x
e
d
C
o
s
t
s
($
b
i
l
l
i
o
n
)
Stochastic Mean PVRR($ billion)
Low Gas
C02-1 C05-1 C05a-1 C05b-1 C09-1 C11-1 C12-1 C13-1 C02-2
C05-2 C05a-2 C09-2 C11-2 C12-2 C13-2 C05-3 C05a-3 C05b-3
$19.4
$19.6
$19.8
$20.0
$20.2
$20.4
$20.6
$20.8
$21.0
$21.2
$21.4
$27.4 $27.6 $27.8 $28.0 $28.2 $28.4 $28.6 $28.8 $29.0 $29.2
Up
p
e
r
T
a
i
l
M
e
a
n
P
V
R
R
L
e
s
s
F
i
x
e
d
C
o
s
t
s
($
b
i
l
l
i
o
n
)
Stochastic Mean PVRR($ billion)
Medium Gas
C02-1 C05-1 C05a-1 C05b-1 C09-1 C11-1 C12-1 C13-1 C02-2
C05-2 C05a-2 C09-2 C11-2 C12-2 C13-2 C05-3 C05a-3 C05b-3
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
181
Figure 8.13 Initial Screen Scatter Plot, High Price Curve Scenario
Portfolios that fall within the threshold identified by the red dashed line in the figures above under
any price curve scenario are considered as candidates for the preferred portfolio and passed along for
final screening. Based upon the initial screening scatter plot analysis, the top performing portfolios
using least cost/least risk metrics include portfolios from cases C05-1, C05b-1, C05-3, C05a-3,
C05b-3, C09-1 and C13-1 (seven portfolios).
Final Screening
Risk-adjusted PVRR
The risk adjusted PVRR is the primary metric used to identify top performing resource portfolios
during the final screening step. Table 8.1. reports the risk-adjusted PVRR values and relative ranking
among the seven portfolios identified in the initial screening step. Portfolios developed under
Regional Haze scenario 3 rank high on a risk adjusted PVRR basis. Case C13-1, developed assuming
a 111(d) mass cap on existing PacifiCorp units under Regional Haze scenario 1 also ranks high. Case
C05a-3 has the highest risk-adjusted PVRR rank under base price curve assumptions and also scores
the highest rank when the risk-adjusted PVRR is averaged among low, base, and high price curve
scenarios. The top three portfolios ranked by average risk-adjusted PVRR among the low, base, and
high price curve scenarios include cases C05a-3, C13-1, and C05b-3.
$21.0
$21.5
$22.0
$22.5
$23.0
$23.5
$24.0
$29.0 $29.5 $30.0 $30.5 $31.0 $31.5
Up
p
e
r
T
a
i
l
M
e
a
n
P
V
R
R
L
e
s
s
F
i
x
e
d
C
o
s
t
s
($
b
i
l
l
i
o
n
)
Stochastic Mean PVRR($ billion)
High Gas
C02-1 C05-1 C05a-1 C05b-1 C09-1 C11-1 C12-1 C13-1 C02-2
C05-2 C05a-2 C09-2 C11-2 C12-2 C13-2 C05-3 C05a-3 C05b-3
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
182
Table 8.1 Risk-adjusted PVRR among Top Performing Portfolios
Base Price Curve Scenario Low Price Curve Scenario High Price Curve Scenario Average
Risk
Adjusted
PVRR
($m)
Change
from
Lowest Cost
Portfolio
($m) Rank
Risk
Adjusted
PVRR
($m)
Change
from
Lowest Cost
Portfolio
($m) Rank
Risk
Adjusted
PVRR
($m)
Change
from
Lowest Cost
Portfolio
($m) Rank
Risk
Adjusted
PVRR
($m)
Change
from
Lowest Cost
Portfolio
($m) Rank
C05-1 $29,319 $351 6 $27,547 $267 4 $31,295 $629 6 $29,387 $349 6
C05b-1 $29,226 $259 5 $27,471 $190 2 $31,189 $522 5 $29,295 $257 5
C05-3 $29,211 $244 4 $27,767 $487 6 $30,870 $203 3 $29,283 $244 4
C05a-3 $28,967 $0 1 $27,481 $201 3 $30,667 $0 1 $29,038 $0 1
C05b-3 $29,140 $173 3 $27,692 $412 5 $30,808 $141 2 $29,214 $175 3
C09-1 $29,469 $502 7 $27,769 $489 7 $31,381 $714 7 $29,540 $501 7
C13-1 $29,053 $86 2 $27,281 $0 1 $31,023 $357 4 $29,119 $81 2
Oregon RPS Compliance
As compared to case C05b-3, case C05a-3 costs are reduced when 448 MW of Oregon situs RPS
wind resources (coming online in 2028) are removed from the resource portfolio. Without the 448
MW of Oregon situs RPS wind resources, approximately 467,000 annual unbundled renewable
energy credit (REC) purchases would be required over the 2018 through 2034 timeframe to achieve
the same level of Oregon RPS compliance as achieved in case C05b-3. Table 8.2 summarizes the
unbundled REC price that would cause the PVRR from case C05a-3 to equal the PVRR from case
C05b-3. Based on the risk-adjusted mean PVRR from PaR, which does not reflect fossil-fired re-
dispatch associated with EPA’s proposed 111(d) rule, nominal levelized unbundled REC prices of
between $37/REC (high price curve assumptions) and $55/REC (low price curve assumptions) yield a
break-even PVRR. Based on PVRR costs from System Optimizer, which reflects 111(d) re-dispatch
costs, nominal levelized unbundled REC prices of $18/REC yield break-even economics with base
price curve assumptions. There is sufficient unbundled REC volume available at prices well below
these break-even unbundled REC price levels that can be used to satisfy near-term state RPS
compliance. Moreover, an unbundled REC strategy does not eliminate the option to pursue longer-
term compliance with bundled RECs for new renewable resources, which are not needed for Oregon
RPS compliance until 2028. These results indicate that case C05a-3 is lower cost and lower risk than
case C05b-3.
Table 8.2 – System Cost Impact of Oregon Situs RPS Renewable Resources
PaR System Optimizer
Reduction in Risk-
adjusted PVRR with
Removal of OR Situs
RPS Renewables
($m)
Nominal Levelized
Reduction in Risk-
adjusted PVRR per
MWh of OR
Unbundled RECs
Reduction in System
PVRR with Removal
of OR Situs RPS
Renewables
($m)
Nominal Levelized
Reduction in System
PVRR per MWh of
OR Unbundled RECs
Low Price Curve $211 $55/REC n/a
Base Price Curve $173 $45/REC $71 $18/REC
High Price Curve $141 $37/REC n/a
Deterministic Risk Analysis
PacifiCorp performed a deterministic risk analysis for the three portfolios with the highest rank based
on average risk-adjusted mean PVRR (cases C05a-3, C05b-3, and C13-1). Resource portfolios from
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
183
cases C05a-3 and C05b-3, developed assuming state emission rate targets under EPA’s proposed
111(d) rule, were locked down and simulated assuming 111(d) is implemented as a mass cap applied
to PacifiCorp’s existing fossil-fired resources. Conversely, the resource portfolio from case C13-1,
developed assuming 111(d) is implemented as a mass cap applied to PacifiCorp’s existing fossil-fired
resources, was locked down and simulated assuming 111(d) is implemented via state emission rate
targets. Table 8.3 summarizes the deterministic risk analysis results, showing that the portfolio from
case C05a-3 is lower cost under either of the 111(d) scenarios. The portfolio from case C13-1
includes new combined cycle plants sited in Oregon. When faced with 111(d) assumptions
implemented as a state emission rate target, these new combined cycle plants make it more difficult to
meet PacifiCorp’s share of the Oregon state emission rate target, increasing costs when compared to
cases C05a-3 and C05b-3.
Table 8.3 – Deterministic Risk Analysis Results
Case
111(d) State Emission Rate Targets with
Flexible Allocation of Renewables
111(d) Mass Cap Applicable to PacifiCorp’s
Existing Fossil Units
System Optimizer
PVRR ($m)
Increase from Lowest
Cost Portfolio ($m)
System Optimizer
PVRR ($m)
Increase from Lowest
Cost Portfolio ($m)
C05a-3 $26,578 n/a $26,879 n/a
C05b-3 $26,649 $71 $27,023 $144
C13-1 $27,042 $465 $26,902 $23
System Optimizer PVRR
As discussed in Chapter 7, PaR results do not incorporate the cost associated with 111(d) re-dispatch
of fossil-fired generating units. To ensure that these re-dispatch costs do not distort the relative rank
of portfolio costs among the top performing portfolios identified using the risk-adjusted mean PVRR
metric from PaR, PacifiCorp also reviewed the relative differences in PVRR among these portfolios
as reported by System Optimizer, which does incorporate 111(d) fossil-fired re-dispatch costs. Figure
8.14 shows the change in System Optimizer PVRR among the top performing portfolio relative to the
lowest cost portfolio (case C05a-3). As discussed above, with nominal levelized unbundled REC
purchases below approximately $18/REC, case C05a-3 is lower cost relative to case C05b-3. Case
C05a-3 is the lowest cost portfolio when considering costs associated with re-dispatch of fossil-fired
generation resources under EPA’s proposed 111(d) rule.
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
184
Figure 8.14 Change in System Optimizer PVRR among Top Performing Portfolios
Energy Not Served
Table 8.4 and Table 8.5 report average annual energy not served (ENS) and upper-tail mean ENS, for
each of the seven portfolios identified in the initial screening analysis. The difference among the top
and bottom ranked resource portfolios based on annual average ENS is approximately 0.03% (mean
ENS) and 0.04% (upper-tail mean) of the average annual forecasted load over the twenty year
planning horizon. Each of the portfolios, built to a 13% planning reserve margin, provide a reliable
supply of system energy and capacity. Differences in ENS metrics among portfolios are not material
for any of the price curve scenarios.
Table 8.4 – Average Annual Stochastic Mean ENS among Top Performing Portfolios
Base Price Curve Scenario Low Price Curve Scenario High Price Curve Scenario Average
Average
Annual
ENS,
2015-2034
(GWh)
Change
from
Lowest ENS
Portfolio Rank
Average
Annual
ENS, 2015-2034
(GWh)
Change
from
Lowest ENS
Portfolio Rank
Average
Annual
ENS, 2015-2034
(GWh)
Change
from
Lowest ENS
Portfolio Rank
Average
Annual
ENS, 2015-2034
(GWh)
Change
from
Lowest ENS
Portfolio Rank
C05-1 61 18 4 60 18 4 62 18 3 61 18 4
C05b-1 60 17 3 60 18 3 62 18 4 61 18 3
C05-3 65 22 7 64 22 7 67 22 7 65 22 7
C05a-3 62 19 5 61 19 5 64 19 5 62 19 5
C05b-3 64 21 6 63 21 6 65 21 6 64 21 6
C09-1 56 13 2 55 13 2 57 13 2 56 13 2
C13-1 43 0 1 42 0 1 44 0 1 43 0 1
$0.0 $37.5 $68.3 $71.0 $71.8 $231.3 $324.2$0
$50
$100
$150
$200
$250
$300
$350
C05a-3 C05-3 C05-1 C05b-3 C05b-1 C09-1 C13-1
$
M
i
l
l
i
o
n
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
185
Table 8.5 – Average Annual Upper-tail Mean ENS among Top Performing Portfolios
Base Price Curve Scenario Low Price Curve Scenario High Price Curve Scenario Average
Average
Annual ENS,
2015-2034
(GWh)
Change
from
Lowest
ENS
Portfolio Rank
Average
Annual ENS,
2015-2034
(GWh)
Change
from
Lowest
ENS
Portfolio Rank
Average
Annual ENS,
2015-2034
(GWh)
Change
from
Lowest
ENS
Portfolio Rank
Average
Annual ENS,
2015-2034
(GWh)
Change
from
Lowest
ENS
Portfolio Rank
C05-1 85 31 7 85 31 7 86 32 7 85 31 7
C05b-1 81 28 5 81 28 5 82 28 5 82 28 5
C05-3 84 31 6 84 30 6 85 31 6 84 31 6
C05a-3 80 26 3 79 26 3 81 26 3 80 26 3
C05b-3 81 27 4 80 27 4 82 27 4 81 27 4
C09-1 79 25 2 78 25 2 79 25 2 79 25 2
C13-1 53 0 1 53 0 1 54 0 1 54 0 1
Carbon Dioxide Emissions
Figure 8.15 shows mean CO2 emission levels (average of the 50 Monte Carlo iterations) from PaR,
which does not reflect re-dispatch of fossil fired generation associated with EPA’s proposed 111(d)
rule, for the seven portfolios identified in the initial screening analysis when simulated using base
price curve assumptions. Variation in mean CO2 emissions is driven by differences in assumed coal
unit retirements between Regional Haze scenarios 1 and 3. All portfolios show a drop in emissions in
2018 when Naughton Unit 3 is converted to natural gas-fired unit. Regional Haze scenario 1
portfolios show a further drop in emissions in 2022 and 2024 after assumed retirements of Huntington
Unit 2 and Jim Bridger Unit 1, respectively. Emission reductions in 2025 coincide with the assumed
natural gas conversion of Cholla Unit 4, an assumption common to all portfolios. By the end of the
20-year planning horizon, emission reductions are similar among the top performing portfolios.
Figure 8.15 PaR Mean CO2 Emissions among Top Performing Portfolios
Figure 8.16 shows the same data from System Optimizer, which captures re-dispatch of fossil fired
generation associated with EPA’s proposed 111(d) rule. When re-dispatch of fossil fired generation is
factored into the emissions profile for the top performing resource portfolios, the differential in
emissions between resource portfolios developed under Regional Haze scenarios 1 and 3 narrows
30
35
40
45
50
55
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
Mi
l
l
i
o
n
T
o
n
s
C
O
2
C05-1 C05b-1 C09-1 C13-1 C05-3 C05a-3 C05b-3
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
186
over the 2022 to 2030 timeframe. When the mass cap applied to existing fossil-fired resources in case
C13-1 is enforced in System Optimizer, emissions are reduced in 2020.
Figure 8.16 System Optimizer CO2 Emissions among Top Performing Portfolios
Fuel Source Diversity
Figure 8.17 summarizes the nameplate capacity of cumulative resource selections through 2024
among the seven portfolios remaining after initial screening. This figure illustrates the similarity
among the top performing portfolios, identified using cost and risk metrics, through the first 10 years
of the planning period when differences in resources among portfolios is most likely to influence the
2015 IRP action plan. All of these resource portfolios are dominated by Class 2 DSM resources and
FOT resources. Portfolios developed under Regional Haze scenario 1, which assumes incremental
early coal unit retirements relative to Regional Haze scenario 3, show new combined cycle plants
(denoted as CCCT in the chart) in the 2022 to 2024 timeframe. Differences in renewable resources
are driven by Oregon RPS assumptions. Cases that assume early acquisition of Oregon RPS resources
(cases C05-3, C05-1, C09-1, and C13-1) have new renewable plants showing up in the 2020 to 2023
timeframe. As discussed above, use of unbundled RECs for Oregon RPS compliance is a lower cost
lower risk alternative.
30
35
40
45
50
55
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
Mi
l
l
i
o
n
T
o
n
s
C
O
2
C05-1 C05b-1 C09-1 C13-1 C05-3 C05a-3 C05b-3
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
187
Figure 8.17 Resource Types among Top Performing Portfolios
Table 8.6 reports the generation share in each portfolio among new resources by resource category in
2024 and 2034 for the seven portfolios selected during the initial screening process. Through 2024,
DSM resources contribute significant levels of energy among all top performing portfolios. New
combined cycle resources also provide energy in portfolios developed under Regional Haze scenario
1. By 2034, DSM and new combined cycle resources provide the largest share of new system energy
among top performing resource portfolios.
Table 8.6 – Percentage Share of Energy from New Resources by Category
2024
Case ID
Thermal
Natural Gas FOTs Renewable DSM
Combined
Renewables/
DSM
C05-1 28% 13% 5% 54% 59%
C05b-1 29% 14% 0% 56% 56%
C05-3 0% 11% 9% 80% 89%
C05a-3 0% 13% 0% 87% 87%
C05b-3 0% 13% 0% 87% 87%
C09-1 45% 7% 4% 45% 49%
C13-1 31% 12% 5% 52% 57%
2034
Case ID
Thermal
Natural Gas FOTs Renewable DSM
Combined
Renewables/
DSM
C05-1 66% 4% 2% 28% 30%
C05b-1 65% 4% 3% 28% 31%
C05-3 51% 6% 8% 35% 43%
C05a-3 52% 6% 6% 36% 42%
C05b-3 50% 5% 9% 35% 44%
C09-1 64% 3% 4% 29% 33%
C13-1 66% 4% 1% 29% 30%
(2,000)
(1,000)
-
1,000
2,000
3,000
4,000
5,000
C0
5
-
3
C0
5
a
-
3
C0
5
b
-
3
C0
5
-
1
C0
5
b
-
1
C0
9
-
1
C1
3
-
1
C0
5
-
3
C0
5
a
-
3
C0
5
b
-
3
C0
5
-
1
C0
5
b
-
1
C0
9
-
1
C1
3
-
1
C0
5
-
3
C0
5
a
-
3
C0
5
b
-
3
C0
5
-
1
C0
5
b
-
1
C0
9
-
1
C1
3
-
1
C0
5
-
3
C0
5
a
-
3
C0
5
b
-
3
C0
5
-
1
C0
5
b
-
1
C0
9
-
1
C1
3
-
1
C0
5
-
3
C0
5
a
-
3
C0
5
b
-
3
C0
5
-
1
C0
5
b
-
1
C0
9
-
1
C1
3
-
1
C0
5
-
3
C0
5
a
-
3
C0
5
b
-
3
C0
5
-
1
C0
5
b
-
1
C0
9
-
1
C1
3
-
1
C0
5
-
3
C0
5
a
-
3
C0
5
b
-
3
C0
5
-
1
C0
5
b
-
1
C0
9
-
1
C1
3
-
1
C0
5
-
3
C0
5
a
-
3
C0
5
b
-
3
C0
5
-
1
C0
5
b
-
1
C0
9
-
1
C1
3
-
1
C0
5
-
3
C0
5
a
-
3
C0
5
b
-
3
C0
5
-
1
C0
5
b
-
1
C0
9
-
1
C1
3
-
1
C0
5
-
3
C0
5
a
-
3
C0
5
b
-
3
C0
5
-
1
C0
5
b
-
1
C0
9
-
1
C1
3
-
1
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Cu
m
u
l
a
t
i
v
e
C
a
p
a
c
i
t
y
(
M
W
)
Gas Conversion DSM CCCT FOTs Renewable Other Early Retirement End of Life Retirement
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
188
Customer Rate Impacts
Figure 8.18 shows the difference in nominal revenue requirement as a percentage change in nominal
revenue requirement from cases C05b-3 and C13-1 (among the highest ranking portfolios on a risk-
adjusted mean PVRR basis) relative to case C05a-3 (the highest ranking portfolio on a risk-adjusted
mean PVRR basis). The nominal revenue requirement from case C05b-3 is between 1.9% and 5.2%
higher relative to case C05a-3 over the 2028 to 2034 timeframe. This coincides with the timing of
new Oregon RPS renewable resources added in case C05b-3 that can be avoided with lower cost
unbundled REC purchases. The nominal revenue requirement from case C13-1 rises relative to case
C05a-3 in 2020 and 2021, coinciding with the timing of new renewable resources, and again in the
2023 to 2024 timeframe, coinciding with the timing of new combined cycle resources. In the long-
term, nominal revenue requirement is lower in case C13-1 relative to case C05a-3, largely driven by
differences in the timing of new resources between the two portfolios.
Figure 8.18 Customer Rate Impacts Benchmarked to Case C05a-3
Preliminary Selection
Based upon the criteria and analysis used to summarize and rank candidate portfolios in the final
screening analysis, PacifiCorp has selected case C05a-3 as its preliminary preferred portfolio for the
2015 IRP. Final selection criteria supporting case C05a-3 as the preliminary preferred portfolio
includes:
Case C05a-3 ranks highest on a risk-adjusted PVRR basis and has the lowest PVRR based on
System Optimizer results;
The portfolio developed under case C05a-3 accommodates a least cost, least risk state RPS
compliance strategy using unbundled RECs;
Deterministic risk analysis shows case C05a-3 is least cost based on System Optimizer PVRR
results;
The portfolio from case C05a-3 provides a reliable supply of energy based on ENS data
reported from PaR;
Forecasted CO2 emissions from case C05a-3 decline over the 20-year planning horizon; and
Relative to other top performing portfolios, case C05a-3 mitigates near-term customer rate
impacts.
-4%
-2%
0%
2%
4%
6%
%
C
h
a
n
g
e
i
n
N
o
m
i
n
a
l
R
e
v
e
n
u
e
Re
q
u
i
r
e
m
e
n
t
C05b-3 C13-1
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
189
Final Preferred Portfolio Selection
PacifiCorp’s 2015 IRP preferred portfolio is a variant of case C05a-3, that incorporates an updated
list of executed qualifying facility contracts that were not included when modeling assumptions were
locked down in September 2014. This resource portfolio variant of case C05a-3 (referred to as C05a-
3Q) was developed using System Optimizer with the addition of 3 MW of Utah solar coming online
in 2015, 320 MW of Utah solar coming online in 2016, and acceleration of 80 MW of Utah solar
from December 2016 to December 2015. With these updates, PacifiCorp’s 2015 IRP preferred
portfolio reflects 816 MW of new wind and solar qualifying facility power purchase agreements for
projects coming online in 2015 (327 MW) and 2016 (489 MW). Figure 8.19 summarizes the
cumulative change in resource portfolio capacity in the preferred portfolio as compared to case
C05a-3. With qualifying facility power purchase agreement updates, FOTs are reduced through the
planning horizon, DSM resources are slightly reduced, primarily beyond the first ten years of the
planning period, renewable resources in 2032 are displaced, and incremental renewable resources in
2034 are replaced with a combined cycle plant.
Figure 8.19 Cumulative Increase/(Decrease) in Preferred Portfolio Capacity Relative to Case
C05a-3
The 2015 IRP Preferred Portfolio
Figure 8.20 presents a summary of cumulative resource capacity in PacifiCorp’s 2015 IRP preferred
portfolio, including the 816 MW of executed qualifying facility power purchase agreements from
new wind and solar projects expected to come on-line in 2015 and 2016. Through the front ten years
of the planning horizon, PacifiCorp’s incremental resource needs can be met with DSM and FOTs.
The first deferrable thermal resource in the 2015 IRP preferred portfolio is added in 2028, four years
later relative to the 2013 IRP preferred portfolio. By the end of the twenty-year planning horizon,
PacifiCorp’s 2015 IRP preferred portfolio reflects an assumed reduction in existing owned capacity
totaling 2,775 MW. By 2034, it is assumed that approximately 2,800 MW of existing coal generation
will either be retired or converted to operate as natural gas-fired generation.
(1,500)
(1,000)
(500)
-
500
1,000
MW
DSM FOTs Gas Renewable
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
190
Figure 8.20 Summary of PacifiCorp’s 2015 IRP Preferred Portfolio
Figure 8.21 compares total Class 2 DSM energy efficiency savings by state in the 2015 IRP preferred
portfolio relative to the 2013 IRP preferred portfolio. Driven by increased cost-effective lighting
opportunities followed by cost-effective opportunities in heating, cooling, water heating, appliances
and industrial process end-uses, Class 2 DSM energy efficiency savings in the 2015 IRP preferred
portfolio exceed energy efficiency savings from the 2013 IRP preferred portfolio by 59 percent by
2024.
Figure 8.21 Comparison of Total Energy Efficiency Savings in the 2015 IRP Preferred
Portfolio and the 2013 IRP Preferred Portfolio
Figure 8.22 compares FOTs from the 2015 IRP preferred portfolio to FOTs in the 2013 IRP preferred
portfolio. On average 2015 IRP preferred portfolio FOTs through 2024 are down 29% when
compared to the 2013 IRP preferred portfolio.
(4,000)
(2,000)
0
2,000
4,000
6,000
8,000
10,000
MW
Class 1 DSM Class 2 DSM FOTs CCCT
New Wind/Solar QF Gas Conversion Existing Ret./Conv.
0
100
200
300
400
500
600
700
800
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
2013 IRP Preferred Portfolio 2015 IRP Preferred Portfolio
aM
W
CA
ID
WY
WA
OR
UT
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
191
Figure 8.22 Comparison of FOTs in the 2015 IRP Preferred Portfolio with the 2013 IRP
Preferred Portfolio
Figure 8.23 shows the contribution of energy from preferred portfolio resources to load growth
projections from 2015 levels. Over the front ten years of the planning horizon, accumulated
acquisition of incremental energy efficiency resources meets 86% of forecast load growth from 2015
through 2024. Energy represented as “Other” is primarily from distributed generation.
Figure 8.23 Energy Contribution of Preferred Portfolio Resources to Load Growth
Figure 8.24 graphically displays how preferred portfolio resources meet PacifiCorp’s capacity needs
over time. Through 2024, PacifiCorp meets its capacity needs, inclusive of a 13% target planning
reserve margin, through incremental acquisition of new DSM resources and through short-term firm
forward market purchases.
0
200
400
600
800
1,000
1,200
1,400
1,600
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Th
i
r
d
Q
u
a
r
t
e
r
O
n
P
e
a
k
(
M
W
)
2015 IRP 2013 IRP
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
2016 2017 2018 2019 2020 2021 2022 2023 2024
GW
h
Class 2 DSM FOTs Other Load Growth from 2015
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
192
Figure 8.24 – Meeting PacifiCorp’s Capacity Needs with Preferred Portfolio Resources
Figure 8.25 and Figure 8.26 show how PacifiCorp’s system energy and capacity mix is projected to
change over time. In developing these figures, purchased power is reported in identifiable resource
categories where possible. Energy mix figures are based upon base price curve assumptions.
Renewable capacity and generation reflect categorization by technology type and not disposition of
renewable energy attributes for regulatory compliance requirements.78 On an energy basis, coal
generation drops below 50% by 2025, falls to 36% by 2030, and declines to 31% by the end of the
planning period. On a capacity basis, coal resources drop to 41% by 2025, fall to 28% by 2030, and
decline to 24% by the end of the planning period. Reduced energy and capacity from coal is offset
primarily by increased energy and capacity from new natural gas and DSM resources.
78The projected PacifiCorp 2015 IRP preferred portfolio “energy mix” is based on energy production and not resource
capability, capacity or delivered energy. All or some of the renewable energy attributes associated with wind, biomass,
geothermal and qualifying hydro facilities in PacifiCorp’s energy mix may be: (a) used in future years to comply with
renewable portfolio standards or other regulatory requirements, (b) sold to third parties in the form of renewable energy
credits and/or other environmental commodities or (c) excluded from energy purchased. PacifiCorp’s 2015 IRP preferred
portfolio energy mix includes owned resources and purchases from third parties.
8,000
8,500
9,000
9,500
10,000
10,500
11,000
11,500
12,000
12,500
13,000
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
MW
New Firm Market Purchases New - DSM
Existing - Long Term Contracts and PPA's Existing - Physical Assests and DSM ***
Obligation + Reserves *
Existing -Physical Assets and DSM **
Existing -Long Term Contracts and PPA's
New -DSM
New Short-term Firm Market Purchases
Obligation + Reserves *
* Includes 13% Planning Reserves, Sales and Non-Owned Reserves** Includes retirements, and gas repower. DSM includes both Class 1 and 2.
New -DSM,
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
193
Figure 8.25 – Projected Energy Mix with Preferred Portfolio Resources
*Renewable resources include wind, solar, and geothermal.
**Hydroelectric resources included owned and contracted.
***Class 2 DSM resources represent cumulative acquisition of new DSM resources over time.
Figure 8.26 – Projected Capacity Mix with Preferred Portfolio Resources
*Renewable resources include wind, solar, and geothermal.
**Hydroelectric resources included owned and contracted.
***Class 2 DSM resources represent cumulative acquisition of new DSM resources over time.
Figure 8.27 shows PacifiCorp’s RPS compliance forecast for California, Oregon, and Washington
covering the period 2015 through 2024. Utah’s RPS goal is tied to a 2025 compliance date, so the
2015 through 2024 position is not shown. However, PacifiCorp meets the Utah 2025 state target of
20%, and has a significant bank to sustain continued future compliance in Utah.
61%61%61%57%56%56%56%55%55%52%49%47%47%45%46%36%36%35%32%31%
14%14%14%17%17%18%17%18%18%20%22%23%24%25%24%35%35%35%39%41%
6%6%6%6%6%6%5%5%5%5%5%5%5%5%5%5%5%5%5%4%
9%10%12%12%12%11%11%11%11%11%11%11%11%11%10%9%8%8%7%7%
3%4%5%6%7%7%8%9%10%11%12%12%13%13%14%14%15%15%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
Coal Gas Hydroelectric **Renewable *
Class 1 DSM + Interruptibles New Class 2 DSM ***Existing Purchases Front Office Transactions
49%50%50%47%46%46%45%45%44%44%41%41%40%34%34%28%27%27%25%24%
25%23%23%25%25%25%24%24%24%24%27%27%27%29%29%35%35%34%36%40%
7%7%7%7%7%7%6%5%6%5%5%5%5%5%5%5%5%5%5%5%
3%4%6%5%5%5%5%5%5%5%5%5%5%4%4%4%4%4%4%3%
5%6%6%6%6%5%5%5%5%5%5%5%5%5%5%5%5%5%5%5%
3%4%5%6%6%7%8%9%9%10%11%11%12%12%13%14%14%14%
7%9%8%8%8%8%7%7%6%6%6%7%7%11%9%10%10%11%11%8%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
Coal Gas Hydroelectric **Renewable *
Class 1 DSM + Interruptibles New Class 2 DSM ***Existing Purchases Front Office Transactions
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
194
Figure 8.27 – Annual State RPS Position Forecasts
Figure 8.28 shows CO2 emissions from the preferred portfolio through 2034 under base price curve
assumptions. Relative to 1990 CO2 emissions of approximately 46 million tons, PacifiCorp’s
forecasted CO2 emissions from the preferred portfolio fall below 1990 levels by 2025. By the end of
the 20-year planning period, PacifiCorp’s CO2 emissions from the preferred portfolio are projected to
drop 14% below 1990 emission levels.
-
2,000
4,000
6,000
8,000
10,000
12,000
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
GW
h
Oregon RPS
Unbundled REC Surrendered Bundled Bank Surrendered
Current Year Generation Surrendered Year-end Bundled Bank Balance
Year-end Unbundled REC Bank Balance Annual Requirement
0
200
400
600
800
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
GW
h
Washington RPS
Unbundled REC Surrendered Bundled Bank Surrendered
Current Year Generation Surrendered Year-end Bundled Bank Balance
Year-end Unbundled REC Bank Balance Annual Requirement
0
50
100
150
200
250
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
GW
h
California RPS
Unbundled REC Surrendered Bundled Bank Surrendered
Current Year Generation Surrendered Year-end Bundled Bank Balance
Year-end Unbundled REC Bank Balance Annual Requirement
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
195
Figure 8.28 – Preferred Portfolio CO2 Emissions
Table 8.7 provides line-item detail of PacifiCorp’s 2015 IRP preferred portfolio showing new
resource capacity along with changes in existing resource capacity through the 20-year planning
horizon. Table 8.8 shows line-item detail of PacifiCorp’s peak load and resource capacity balance,
inclusive of preferred portfolio resources, through the first ten years of the planning horizon.
30
35
40
45
50
55
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
Mi
l
l
i
o
n
T
o
n
s
C
O
2
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
196
Table 8.7 – PacifiCorp’s 2015 IRP Preferred Portfolio
Nameplate Capacity (MW)Resource
Totals 1/
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 10-year 20-year
East Existing Plant Retirements/Conversions
Hayden 1 - - - - - - - - - - - - - - - - (45) - - - - (45)
Hayden 2 - - - - - - - - - - - - - - - - (33) - - - - (33)
Hunter 2 (Coal Early Retirement/Conversions)- - - - - - - - - - - - - - - - - - (269) - - (269)
Huntington 2 (Coal Early Retirement/Conversions)- - - - - - - - - - - - - - - (450) - - - - - (450)
Carbon 1 (Coal Early Retirement/Conversions)(67) - - - - - - - - - - - - - - - - - - - (67) (67)
Carbon 2 (Coal Early Retirement/Conversions)(105) - - - - - - - - - - - - - - - - - - - (105) (105)
Cholla 4 (Coal Early Retirement/Conversions)- - - - - - - - - - (387) - - - - - - - - - - (387)
DaveJohnston 1 - - - - - - - - - - - - - (106) - - - - - - - (106)
DaveJohnston 2 - - - - - - - - - - - - - (106) - - - - - - - (106)
DaveJohnston 3 - - - - - - - - - - - - - (220) - - - - - - - (220)
DaveJohnston 4 - - - - - - - - - - - - - (330) - - - - - - - (330)
Naughton 1 - - - - - - - - - - - - - - - (156) - - - - - (156)
Naughton 2 - - - - - - - - - - - - - - - (201) - - - - - (201)
Naughton 3 (Coal Early Retirement/Conversions)(50) - - (280) - - - - - - - - - - - - - - - - (330) (330)
Gadsby 1-6 - - - - - - - - - - - - - - - - - - (358) - - (358)
Coal Ret_AZ - Gas RePower - - - - - - - - - - 387 - - - - - - - - - - 387
Coal Ret_WY - Gas RePower - - - 337 - - - - - - - - - - - (337) - - - - 337 -
Expansion Resources
CCCT - DJohns - F 1x1 - - - - - - - - - - - - - - - 313 - - - - - 313
CCCT - DJohns - J 1x1 - - - - - - - - - - - - - 423 - - - - - - - 423
CCCT - Utah-N - F 2x1 - - - - - - - - - - - - - - - - - - 635 635 - 1,270
CCCT - Utah-S - J 1x1 - - - - - - - - - - - - - - - 846 - - - - - 846
Total CCCT - - - - - - - - - - - - - 423 - 1,159 - - 635 635 - 2,852
DSM, Class 1, UT-DLC-RES - - - - - - - - - - - - - - - - - - 4.9 - - 4.9
DSM, Class 1 Total - - - - - - - - - - - - - - - - - - 4.9 - - 4.9
DSM, Class 2, ID 4 4 5 5 5 4 4 4 5 5 5 5 5 5 5 4 4 4 5 4 45 90
DSM, Class 2, UT 69 78 84 86 92 81 84 90 91 93 75 76 80 80 77 75 72 72 73 70 847 1,596
DSM, Class 2, WY 6 8 10 12 14 12 13 14 15 16 13 13 14 15 15 15 16 16 17 17 121 271
DSM, Class 2 Total 79 90 99 102 111 97 101 108 110 114 92 94 99 99 97 94 93 92 94 92 1,012 1,958
FOT Mona Q3 - - - - - - - - - - - - - 161 44 110 104 268 300 74 - 53
West Expansion Resources
Oregon Solar Capacity Standard - 7 - - - - - - - - - - - - - - - - - - 7 7
DSM, Class 1, OR-Curtail - - - - - - - - 10.6 - - 10.6 - - 10.6 - - - - - 10.6 31.8
DSM, Class 1, OR-Irrigate - - - - - - - 5.0 - - - - - - - - - - - - 5.0 5.0
DSM, Class 1 Total - - - - - - - 5.0 10.6 - - 10.6 - - 10.6 - - - - - 15.6 36.8
DSM, Class 2, CA 1 2 2 2 2 1 1 2 2 2 1 1 1 1 1 1 1 1 1 1 16 29
DSM, Class 2, OR 44 39 36 33 29 27 25 25 23 23 21 22 22 22 21 21 20 21 20 20 303 511
DSM, Class 2, WA 8 9 10 10 11 9 10 10 11 11 9 9 9 9 9 8 8 8 8 7 98 181
DSM, Class 2 Total 54 49 47 44 42 38 36 36 36 35 31 32 32 32 31 30 29 30 28 28 417 721
FOT COB Q3 - 62 29 - 60 104 - - - - - - - 268 248 268 268 268 185 138 26 95
FOT MidColumbia Q3 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400
FOT MidColumbia Q3 - 2 227 375 375 370 375 375 269 291 261 254 271 292 335 375 375 375 375 375 375 375 317 335
FOT NOB Q3 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
Existing Plant Retirements/Conversions (222) - - 57 - - - - - - - - - (762) - (1,144) (77) - (627) -
Annual Additions, Long Term Resources 133 146 146 146 153 135 137 149 157 149 123 137 130 555 139 1,284 122 122 762 755
Annual Additions, Short Term Resources 727 937 904 870 935 979 769 791 761 754 771 792 835 1,304 1,167 1,253 1,247 1,411 1,360 1,087
Total Annual Additions 860 1,084 1,050 1,016 1,088 1,113 906 941 917 903 893 928 965 1,859 1,305 2,537 1,369 1,533 2,123 1,841
1/ Front office transaction amounts reflect one-year transaction periods, are not additive, and are reported as a 10/20-year annual average.
Preferred Portfolio
(Case C05a-3Q)
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
197
Table 8.8 – Preferred Portfolio Capacity Load and Resource Balance
Calendar Year 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
East
Thermal 6,410 6,397 6,397 6,453 6,453 6,453 6,450 6,447 6,445 6,442
Hydroelectric 117 114 114 114 114 114 114 114 114 94
Renewable 187 187 187 187 187 187 184 184 177 177
Purchase 627 406 300 300 300 300 272 272 272 272
Qualifying Facilities 139 222 348 347 346 339 337 332 331 280
Class 1 DSM 323 323 323 323 323 323 323 323 323 323
Sale (732) (732) (656) (656) (656) (656) (175) (175) (175) (144)
Non-Owned Reserves (38) (38) (38) (38) (38) (38) (38) (38) (38) (38)
Transfers 760 607 570 548 553 577 235 230 229 230
East Existing Resources 7,792 7,488 7,545 7,579 7,582 7,599 7,703 7,691 7,679 7,637
Front Office Transactions 0 0 0 0 0 0 0 0 0 0
Gas 0 0 0 0 0 0 0 0 0 0
Wind 0 0 0 0 0 0 0 0 0 0
Solar 0 0 0 0 0 0 0 0 0 0
Class 1 DSM 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0
East Planned Resources 0 0 0 0 0 0 0 0 0 0
East Total Resources 7,792 7,488 7,545 7,579 7,582 7,599 7,703 7,691 7,679 7,637
Load 7,157 6,977 7,102 7,208 7,295 7,382 7,448 7,529 7,617 7,640
Existing Resources:
Interruptible (149) (175) (175) (175) (175) (175) (175) (175) (175) (175)
Class 2 DSM (73) (73) (73) (73) (73) (73) (73) (73) (73) (73)
New Resources:
Class 2 DSM (59) (126) (200) (277) (360) (433) (509) (590) (673) (758)
East obligation 6,876 6,603 6,654 6,684 6,687 6,702 6,691 6,691 6,697 6,634
Planning Reserves (13%)913 878 884 888 889 891 889 889 890 882
East Reserves 913 878 884 888 889 891 889 889 890 882
East Obligation + Reserves 7,789 7,481 7,539 7,572 7,576 7,592 7,580 7,580 7,587 7,516
East Position 4 7 7 7 7 7 122 111 92 121
East Reserve Margin 13.3% 13.4% 13.4% 13.4% 13.4% 13.4% 15.1% 14.9% 14.7% 15.1%
West
Thermal 2,495 2,251 2,248 2,248 2,248 2,248 2,245 2,241 2,239 2,239
Hydroelectric 777 770 752 775 725 728 643 620 652 646
Renewable 170 170 170 170 170 170 170 115 115 105
Purchase 191 22 22 22 5 5 5 5 5 5
Qualifying Facilities 116 114 140 135 134 120 120 120 115 115
Class 1 DSM 0 0 0 0 0 0 0 0 0 0
Sale (210) (160) (160) (160) (160) (160) (156) (105) (105) (78)
Non-Owned Reserves (3) (3) (3) (3) (3) (3) (3) (3) (3) (3)
Transfers (761) (608) (571) (549) (554) (578) (236) (232) (230) (232)
West Existing Resources 2,775 2,554 2,596 2,637 2,565 2,529 2,788 2,761 2,789 2,797
Front Office Transactions 770 993 959 922 991 1,037 815 839 806 800
Gas 0 0 0 0 0 0 0 0 0 0
Wind 0 0 0 0 0 0 0 0 0 0
Solar 0 0 0 0 0 0 0 0 0 0
Class 1 DSM 0 0 0 0 0 0 0 5 17 17
Other 0 0 0 0 0 0 0 0 0 0
West Planned Resources 770 993 959 922 991 1,037 815 844 823 816
West Total Resources 3,545 3,548 3,555 3,559 3,556 3,566 3,602 3,605 3,612 3,613
Load 3,206 3,237 3,271 3,301 3,323 3,354 3,406 3,429 3,455 3,476
Existing Resources:
Interruptible 0 0 0 0 0 0 0 0 0 0
Class 2 DSM (36) (36) (36) (36) (36) (36) (36) (36) (36) (36)
New Resources:
Class 2 DSM (32) (61) (88) (115) (139) (161) (181) (202) (222) (242)
West obligation 3,138 3,140 3,146 3,150 3,147 3,157 3,188 3,191 3,197 3,198
Planning Reserves (13%)408 408 409 409 409 410 414 415 417 417
West Reserves 408 408 409 409 409 410 414 415 417 417
West Obligation + Reserves 3,546 3,548 3,555 3,559 3,556 3,567 3,603 3,606 3,613 3,615
West Position (1) (1) (1) (1) (0) (1) (0) (1) (2) (2)
West Reserve Margin 13.0% 13.0% 13.0% 13.0% 13.0% 13.0% 13.0% 13.0% 13.0% 13.0%
System
Total Resources 11,338 11,036 11,100 11,137 11,138 11,165 11,305 11,297 11,291 11,250
Obligation 10,013 9,743 9,800 9,833 9,834 9,858 9,880 9,882 9,894 9,832
Reserves 1,321 1,286 1,293 1,298 1,298 1,301 1,304 1,304 1,307 1,299
Obligation + Reserves 11,335 11,029 11,094 11,131 11,132 11,159 11,183 11,187 11,200 11,131
System Position 3 6 6 6 6 6 122 110 91 120
Reserve Margin 13.2% 13.3% 13.3% 13.3% 13.3% 13.3% 14.4% 14.3% 14.1% 14.4%
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
198
Sensitivity Analyses
PacifiCorp completed sensitivity analysis for 15 cases. Assumptions for the sensitivity cases are
presented in Chapter 7 and summarized in case fact sheets located in Volume II, Appendix M. In
addition to the summary of results presented below, System Optimizer results are provided in
Volume II, Appendix K and PaR results are provided in Volume II, Appendix L.
Load Sensitivities (S-01, S-02, and S-03)
PacifiCorp conducted three System Optimizer runs for three alternative load growth scenarios:
low load growth (case S-01), high load growth (case S-02), and a 1-in-20 extreme system peak
scenario (case S-03). Each of these sensitivities is benchmarked to core case C05-1. Table 8.9
summarizes PVRR cost impacts for each load sensitivity case. Nominal levelized cost results are
calculated as the change in system PVRR divided by the present value change in coincident
system peak ($/kW-mo) or the present value change in load ($/MWh).
Table 8.9 – Load Sensitivity System Optimizer PVRR Cost Results
Base Load
(C05-1)
Low Load
(S-01)
High Load
PVRR ($m) $26,646 $24,715 $28,334 $27,709
Increase/(Decrease) from Base ($m) n/a ($1,931) $1,688 $1,063
Nominal Levelized Increase/(Decrease)
from Base ($/kW-mo) n/a ($43) $39 $15
Nominal Levelized Increase/(Decrease)
from Base ($/MWh) n/a ($55) $58 $13,057
Under the low load forecast sensitivity, the first deferrable combined cycle resource is deferred
by four years when compared to the benchmark case. By 2034, new thermal resources are
reduced by 423 MW. Under the high load forecast sensitivity, the first deferrable combined cycle
plant is accelerated by four years when compared to the benchmark case. Total new thermal
resource additions are increased by 635 MW by the end of the planning horizon. Under the 1-in-
20 peak load forecast scenario, the timing of the first deferrable combined cycle plant is
accelerated by five years when compared to the benchmark portfolio. Total new thermal resource
capacity is increased by 203 MW by the end of the study period.
Distributed Generation Sensitivities (S-04 and S-05)
Low and high distributed generation (DG) penetration sensitivities were analyzed. Both
sensitivities are benchmarked to core case C05-1. Table 8.10 summarizes PVRR cost impacts of
the low and high DG penetration sensitivities.
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
199
Table 8.10 – DG Sensitivity System Optimizer PVRR Cost Results
Base DG
(C05-1)
Low DG
(S-04)
High DG
(S-05)
PVRR ($m) $26,646 $26,885 $26,016
Increase/(Decrease) from Base ($m) n/a $239 ($630)
Nominal Levelized Increase/(Decrease)
from Base ($/kW-mo) n/a $26 ($31)
Nominal Levelized Increase/(Decrease)
from Base ($/MWh) n/a $74 ($74)
In the low DG sensitivity case, the timing of the first deferrable thermal resource was unchanged
relative to the benchmark case. By the end of the study period, total new thermal resource
capacity was increased by 212 MW. In the high DG sensitivity case, the timing of the first
deferral thermal resource is delayed by three years, and the total thermal capacity added by
the end of the planning horizon is decreased by 423 MW.
Energy Gateway Sensitivity (S-07 and S-08)
Incremental to the base case, Energy Gateway sensitivity case S-07 includes Segment D, with an
assumed 2022 in-service year. Energy Gateway sensitivity case S-08 includes Segments D, E,
and F, with assumed in-service years of 2022, 2024, and 2023, respectively. Both Energy
Gateway sensitivity cases are benchmarked to core case C07-1, which has a resource portfolio
with higher penetration of renewable resources. Figure 8.29 shows cumulative new renewable
resources in the benchmark portfolio and in each Energy Gateway sensitivity portfolio.
Incremental Energy Gateway transmission provides access to high capacity factor, low cost wind
resources in Wyoming, and with the addition of Segment F, access to Wyoming wind is higher in
sensitivity case S-08 than in sensitivity case S-07. The C07-1 benchmark case includes 25 MW
of Wyoming wind. Sensitivity cases S-07 and S-08 include 525 MW and 959 MW of Wyoming
wind, respectively.
Figure 8.29 – Cumulative New Renewable Resource Capacity in Energy Gateway
Sensitivity Cases
0
200
400
600
800
1,000
1,200
1,400
MW
C07-1 S-07 S-08
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
200
Table 8.11 summarizes PVRR impacts of both sensitivities from System Optimizer. Increased
access to low cost Wyoming wind resources reduces the cost of meeting PacifiCorp’s share of
state 111(d) emission rate targets under a compliance strategy that prioritizes increased energy
efficiency and adding incremental renewable resources. This reduces system costs; however, this
benefit is not enough to fully offset the assumed incremental cost of the Energy Gateway
segments modeled in sensitivity cases S-07 and S-08.
Table 8.11 – Increase/(Decrease) of Energy Gateway Sensitivity System Optimizer PVRR
Relative to the Benchmark
S-07 S-08
PVRR without Incremental Energy
Gateway Transmission Costs ($m) ($234) ($583)
PVRR of Incremental Energy Gateway
Transmission Costs ($m) $945 $2,044
Total PVRR ($m) $711 $1,461
Table 8.12 summarizes the stochastic mean PVRR costs impacts of both sensitivities from PaR
for the low, base, and high price curve scenarios. Relative to System Optimizer, under stochastic
conditions, PaR results show increased benefits of Energy Gateway Segments that are relatively
stable across price curve scenarios. However, these benefits do not fully offset assumed
incremental Energy Gateway costs.
Table 8.12 – Increase/(Decrease) of Energy Gateway Sensitivity PaR Stochastic Mean
PVRR Relative to the Benchmark
Sensitivity Case S-07
Low Price Curve
Scenario
Base Price Curve
Scenario
High Price Curve
Scenario
PVRR without Incremental Energy
Gateway Transmission Costs ($m) ($247) ($264) ($265)
PVRR of Incremental Energy Gateway
Transmission Costs ($m) $945 $945 $945
Total PVRR ($m) $698 $681 $680
Sensitivity Case S-08
Low Price Curve
Scenario
Base Price Curve
Scenario
High Price Curve
Scenario
PVRR without Incremental Energy
Gateway Transmission Costs ($m) ($560) ($624) ($665)
PVRR of Incremental Energy Gateway
Transmission Costs ($m) $2,044 $2,044 $2,044
Total PVRR ($m) $1,484 $1,421 $1,379
The Energy Gateway project originated under different conditions than exist today. The type,
timing, and location of future resource needs will drive future analysis of Energy Gateway
projects. Based upon the PaR results, benefits are approximately 30% of levelized Energy
Gateway costs on a PVRR basis through the 2034 planning horizon. Finding one or more
partners to share in Energy Gateway project costs may provide opportunities to size PacifiCorp
customer costs with benefits and provide regional benefits. PacifiCorp plans to continue its
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
201
Energy Gateway permitting efforts as outlined in the 2015 IRP action plan, presented in Chapter
9.
Production Tax Credit Extension Sensitivity (S-09)
Sensitivity case S-09 assumed the production tax credit (PTC) is available through the planning
horizon. This sensitivity case is benchmarked to core case C05-1. Figure 8.30 shows cumulative
new renewable resources in the benchmark portfolio and in the S-09 sensitivity portfolio. With
the PTC extension, 449 MW of economic Wyoming wind is selected in sensitivity case S-09
(106 MW in 2020, 326 MW in 2028, and 17 MW in 2030). Following the addition of this
system wind, an additional 143 MW of Utah wind is added in 2022 to meet Oregon’s RPS
requirements through 2034.
Figure 8.30 – Cumulative New Renewable Resource Capacity in the PTC Sensitivity Case
Table 8.13 shows system cost impacts of sensitivity case S-09 relative to the C05-1 benchmark
case. Results are shown for base price curve assumptions using System Optimizer and three price
curve scenarios applied in PaR. System Optimizer results reflect incremental 111(d) compliance
benefits from the additional renewable resources, added at lower cost with assumed PTC benefits
that are included in the S-09 portfolio. PaR results reflect portfolio cost and stochastic risk
impacts of S-09, but do not reflect 111(d) re-dispatch benefits. With medium to high price curve
assumptions, S-09 shows stochastic risk benefits. The PaR stochastic mean results under low
price curve assumptions are marginally higher cost than the benchmark case.
Table 8.13 – System Optimizer and PaR PVRR Costs Results for the PTC Sensitivity
System
Optimizer PaR Stochastic Mean
Base Price
Curve
Low Price
Curve
Base Price
Curve
High Price
Curve
Increase/(Decrease) in PVRR from
Benchmark ($m) ($203) $9 ($29) ($53)
0
100
200
300
400
500
600
MW
C05-1 S-09
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
202
East and West Balancing Authority Area Sensitivity (S-10)
Sensitivity case S-10 produces standalone resource portfolios for the east (summer peaking) and
west (winter peaking) balancing authority areas (BAAs). This sensitivity is benchmarked to a
variant of case C05a-3, which is developed under Regional Haze scenario 3 and assumes an
unbundled REC strategy for state RPS programs, consistent with the preferred portfolio. System
Optimizer simulations for sensitivity case S-10 was performed both with and without state
111(d) emission rate targets. PaR results incorporate resource portfolio impacts of 111(d), but do
not account for re-dispatch costs under 111(d). Table 8.14 shows system cost impacts of
sensitivity case S-10, reflecting the sum of system costs from both east and west standalone
portfolios, relative to the benchmark case. Results are shown for base price curve assumptions
using System Optimizer (with and without 111(d)) and three price curve scenarios applied in
PaR (reflecting portfolio impacts of 111(d)). Results show that standalone east and west resource
portfolios, when combined, are higher cost than a single system resource portfolio. Results also
show that the incremental cost of two standalone resource portfolios increases under 111(d).
Table 8.14 – System Optimizer and PaR PVRR Results for the East and West Balancing
Authority Area Sensitivity
Increase/(Decrease) in PVRR from
Benchmark ($m)
System
Optimizer PaR Stochastic Mean
Base Price
Curve
Low Price
Curve
Base Price
Curve
High Price
Curve
Without 111(d) Emission Rate Targets $1,149 n/a
With 111(d) Emission Rate Targets $1,326 $2,031 $2,109 $2,158
Figure 8.31 summarizes the cumulative change in resource portfolio capacity when two
standalone east and west portfolios are combined relative to a single system resource portfolio
without imputation of 111(d) state emission rate targets. Positive values show cumulative
resource additions relative to the system portfolio benchmark, and negative values show the
cumulative reduction in capacity relative to the system portfolio benchmark. In the standalone
east and west portfolios, each individual BAA cannot rely on resource selections in the other
BAA to meet the target planning reserve margin. January FOTs are needed in the west to meet its
winter peak, and a natural gas peaking unit is added in 2023, five years earlier than the first
deferrable thermal resource in the benchmark system portfolio. Without access to summer west
side markets, incremental DSM resources are needed in the east.79
79 For the east standalone portfolio, FOT limits for the Mona market had to be increased from 300 MW to 711 MW,
459 MW, and 359 MW in 2015, 2016, and 2017, respectively, for the east to meet a 13% target planning reserve
margin.
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
203
Figure 8.31 – Cumulative Increase/(Decrease) in Portfolio Capacity for the East and West
Balancing Authority Area Sensitivity without 111(d)
Figure 8.32 summarizes the cumulative change in resource portfolio capacity when two
standalone east and west portfolios are combined relative to a single system resource portfolio
with imputation of 111(d) state emission rate targets. Positive values show cumulative resource
additions relative to the system portfolio benchmark, and negative values show the cumulative
reduction in capacity relative to the system portfolio benchmark. With 111(d) state emission rate
targets, the standalone west BAA cannot rely on flexible allocation of system 111(d) attributes
from renewable resources in the east. To minimize 111(d) compliance costs, Chehalis is retired
at the end of 2019, eliminating PacifiCorp’s 111(d) compliance requirements in Washington.
This accelerates the timing of the west side natural gas peaking resource to 2020, eight years
before the first deferrable thermal resource is added in the benchmark case.
Figure 8.32 – Cumulative Increase/(Decrease) in Portfolio Capacity for the East and West
Balancing Authority Area Sensitivity with 111(d)
(2,000)
(1,500)
(1,000)
(500)
0
500
1,000
1,500
2,000
2,500
MW
Q3 Sum FOT Flat FOT Jan FOT Class 2 DSM Class 1 DSM
CCCT Gas Peaking Renewable Retire
(2,000)
(1,500)
(1,000)
(500)
0
500
1,000
1,500
2,000
2,500
MW
Q3 Sum FOT Flat FOT Jan FOT Class 2 DSM Class 1 DSM
CCCT Gas Peaking Renewable Retire
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
204
High CO2 Price Sensitivity (S-11)
Sensitivity case S-11 produces a resource portfolio with high CO2 price assumptions. The S-11
sensitivity case is benchmarked to case C14-1. Figure 8.33 shows the change in annual costs
from a base price curve System Optimizer simulation for sensitivity case S-11 relative to the
benchmark case C14-1. On an annual basis, costs increase beginning 2021 when the higher CO2
price assumption is applied. By 2034, the cumulative PVRR cost of sensitivity case S-11 is $5.6
billion higher than the benchmark case.
Figure 8.33 – Increase/(Decrease) in System Optimizer Costs for the High CO2 Price
Sensitivity Relative to the Benchmark
Table 8.15 summarizes system cost impacts of sensitivity case S-11 based on simulations from
both System Optimizer and PaR. The PaR results, which do not reflect 111(d) fossil re-dispatch
costs or CO2 costs, show lower cost impacts than reported from System Optimizer. PaR results
show the cost impact of sensitivity case S-11 is reduced with higher price curve assumptions,
reflecting the gross margin benefits of a portfolio with significant nuclear and renewable
resources.
Table 8.15 – System Optimizer and PaR PVRR Results for the High CO2 Price Sensitivity
System
Optimizer PaR Stochastic Mean
Base Price
Curve
Low Price
Curve
Base Price
Curve
High Price
Curve
Increase/(Decrease) in PVRR from
Benchmark ($m) $5,650 $3,027 $2,640 $2,310
Stakeholder Solar Cost Sensitivity (S-12)
Sensitivity case S-12 produces a resource portfolio using alternative solar resource costs,
recommended by members of PacifiCorp’s IRP stakeholder group, and high DG penetration
levels. The S-12 sensitivity case is benchmarked to case C05-1 and to sensitivity case S-05 (the
high DG sensitivity discussed above).
$(2,000)
$(1,000)
$-
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
$
m
i
l
l
i
o
n
System Balancing Net of Fuel, VOM, & FOTs Emission Expenses
New Resource Fixed Costs DSM Costs
Annual Net Cost Cumulative PVRR
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
205
The portfolio from sensitivity case S-12 adds 759 MW (154 MW in the east and 605 MW in the
west) of cost-effective utility-scale system solar resources in 2034, consuming available
transmission capacity in the east. Without transmission, this displaces 154 MW of Oregon RPS
solar that is included in case C05-1 and sensitivity case S-05 starting 2020. Consequently,
maintaining the same Oregon RPS compliance strategy as the benchmark case, Oregon RPS
renewables needed in sensitivity case S-12 (259 MW of west side wind in 2023) are higher cost.
Moreover, with the high DG penetration assumption applied to sensitivity case S-12, over 1,000
MW of new combined cycle capacity is eliminated from the portfolio by 2034.
Table 8.16 summarizes system cost impacts of sensitivity case S-12 relative to case C05-1 and
sensitivity case S-05 based on simulations from both System Optimizer and PaR. When
compared to case C05-1, costs are reduced in both System Optimizer and PaR, largely due to the
higher DG penetration level assumptions applied in S-11. When compared to S-05, which
includes high DG penetration assumptions, the cost from sensitivity case S-11 are higher in both
System Optimizer and PaR, reflecting the increased cost associated with meeting Oregon RPS
requirements.
Table 8.16 – System Optimizer and PaR PVRR Results for the Solar Cost Sensitivity
System
Optimizer PaR Stochastic Mean
Base Price
Curve
Low Price
Curve
Base Price
Curve
High Price
Curve
Increase/(Decrease) in PVRR from
C05-1 ($m) ($617) ($558) ($691) ($803)
Increase/(Decrease) in PVRR from
S-05 ($m) $14 $34 $15 $3
Energy Storage Sensitivities (S-06 and S-13)
Sensitivity case S-06 forces a west side 400 MW pumped storage plant in 2024, coincident with
the timing of the first combined cycle plant in the C05-1 benchmark case.80 Sensitivity case S-13
forces a 300 MW compressed air energy storage (CAES) plant in 2024, sited in PacifiCorp’s east
BAA.81 Sensitivity cases S-06 and S-13 are also benchmarked to case C05-1. Table 8.17
summarizes PVRR impacts of both sensitivities from System Optimizer, where storage resources
provide firm capacity applied toward meeting a 13% target planning reserve margin. System
Optimizer does not explicitly capture operating reserve benefits of storage projects. Both storage
plants provide system benefits relative to the benchmark case; however, these benefits do not
fully offset the assumed incremental fixed costs of the pumped storage and CAES plants
modeled in sensitivity cases S-06 and S-13.
80 The pumped storage plant has an assumed nominal capital cost of $3,455/kW, assumed first year nominal fixed
operations & maintenance costs of $23.37/kW-yr, and nominal first year variable operations & maintenance costs of
$4.21/MWh. 81 The CAES plant has an assumed nominal capital cost of $3,270/kW, assumed first year nominal fixed operations
& maintenance costs of $22.67/kW-yr, and nominal first year variable operations & maintenance costs of
$2.75/MWh.
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
206
Table 8.17 – Increase/(Decrease) of Energy Storage Sensitivity System Optimizer PVRR
Relative to the Benchmark
S-06
(Pumped Storage)
S-13
(CAES)
PVRR without Storage Resource Fixed
Costs ($m) ($63) ($53)
PVRR of Storage Resource Fixed Costs
($m) $511 $453
Total PVRR ($m) $448 $400
Table 8.18 summarizes the stochastic mean PVRR costs impacts of both energy storage
sensitivities from PaR for the low, base, and high price curve scenarios. Relative to System
Optimizer, PaR captures incremental operating reserve benefits of storage projects. Other grid
benefits, such as frequency regulation are not captured in System Optimizer or PaR. With these
additional operating reserve and stochastic benefits, PaR results show more system benefits of
the two storage projects when compared to System Optimizer results. However, these benefits do
not fully offset assumed incremental fixed costs of the pumped storage and CAES plants.
Table 8.18 – Increase/(Decrease) of Energy Storage Sensitivity PaR Stochastic Mean PVRR
Relative to the Benchmark
Sensitivity Case S-06 (Pumped Storage)
Low Price Curve
Scenario
Base Price Curve
Scenario
High Price Curve
Scenario
PVRR without Storage Resource Fixed
Costs ($m) ($76) ($74) ($72)
PVRR of Storage Resource Fixed Costs
($m) $511 $511 $511
Total PVRR ($m) $435 $437 $439
Sensitivity Case S-08 (CAES)
Low Price Curve
Scenario
Base Price Curve
Scenario
High Price Curve
Scenario
PVRR without Storage Resource Fixed
Costs ($m) ($87) ($80) ($76)
PVRR of Storage Resource Fixed Costs
($m) $453 $453 $453
Total PVRR ($m) $366 $373 $378
Class 3 DSM (S-14)
Sensitivity case S-14 produces a portfolio using non-firm price responsive Class 3 DSM supply
curves. The S-14 sensitivity case is benchmarked to case C05-1. Table 8.19 summarizes system
cost impacts of sensitivity case S-14 relative to case C05-1. The portfolio from sensitivity case
S-14 includes approximately 47 MW of Class 3 DSM by 2022, increasing to 213 MW by 2034.
These Class 3 DSM resources, supplemented with additional Class 2 DSM resources, displace
5 MW of Class 1 DSM resources in 2022 and 33 MW by 2034. The incremental Class 3 and
Class 2 DSM resources also displace FOTs from 2022 through 2027 and from 2030 through
2031 and defer or displace combined cycle resources beginning 2028. While PVRR costs are
reduced relative to the benchmark case, the Class 3 DSM supply curves assume installation of
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
207
advanced metering infrastructure (AMI) by the end of 2019, costs of which are not included in
the levelized costs of these Class 3 DSM products.
Table 8.19 – System Optimizer and PaR PVRR Results for the Class 3 DSM Sensitivity
System
Optimizer PaR Stochastic Mean
Base Price
Curve
Low Price
Curve
Base Price
Curve
High Price
Curve
Increase/(Decrease) in PVRR from
C05-1 ($m) ($44) ($48) ($57) ($63)
Restricted 111(d) Attribute Sensitivity (S-15)
Sensitivity case S-15 produces a portfolio assuming state RPS-eligible RECs and 111(d)
attributes must be surrendered at the same time. Sensitivity case S-15 is benchmarked to case
C05-1. Linking the Washington RPS program to 111(d) would force PacifiCorp to meet its share
of the state 111(d) emission rate target with situs assigned renewable resources, or alternatively,
PacifiCorp could eliminate its Washington 111(d) compliance obligation by retiring Chehalis at
the end of 2019. Considering the low emission rate targets proposed by EPA in its 111(d) rule for
Washington, a significant amount of situs assigned renewables would be required to offset
emissions from Chehalis. For this sensitivity, PacifiCorp assumes a lower cost alternative would
be to retire Chehalis at the end of 2019. With this early retirement, sensitivity case S-15 includes
incremental FOTs and DSM resources, along with a 2020 west side natural gas peaking resource.
Table 8.20 summarizes system cost impacts of sensitivity case S-15 relative to case C05-1.
Table 8.20 – System Optimizer and PaR PVRR Results for the Restricted 111(d) Attribute
Sensitivity
System
Optimizer PaR Stochastic Mean
Base Price
Curve
Low Price
Curve
Base Price
Curve
High Price
Curve
Increase/(Decrease) in PVRR from
C05-1 ($m) $411 $434 $406 $360
Additional Analysis
Trigger Point Analysis
Oregon Public Utility Commission (OPUC) IRP guideline 8(c) requires the utility to identify at
least one portfolio of resources that is substantially different from the preferred portfolio that can
be compared on a risk and cost basis among a range of CO2 compliance scenarios. Included in
PacifiCorp’s 2015 IRP core cases, there are four portfolios developed with CO2 price
assumptions incremental to emission rate targets in EPA’s proposed 111(d) (cases C14-1, C14-2,
C14a-1, and C14a-2). Each of these portfolios is substantially different from the preferred
portfolio. Table 8.21 compares the stochastic mean and risk-adjusted PVRR of these portfolios
relative to the preferred portfolio among different price curve assumptions, including a scenario
assuming high CO2 prices. The four C-14 cases are lower cost than the preferred portfolio when
high CO2 prices are assumed.
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
208
Table 8.21 – Comparison of Trigger Point Portfolios to the Preferred Portfolio
Case
Base Price Curve
Low Price Curve
High Price Curve
High CO2 Price Curve
Increase in
Stochastic
Mean
PVRR
Relative to
the
Preferred
Portfolio
($b)
Increase in
Risk-
adjusted
PVRR
Relative to
the
Preferred
Portfolio
($b)
Increase in
Stochastic
Mean
PVRR
Relative to
the
Preferred
Portfolio
($b)
Increase in
Risk-
adjusted
PVRR
Relative to
the
Preferred
Portfolio
($b)
Increase in
Stochastic
Mean
PVRR
Relative to
the
Preferred
Portfolio
($b)
Increase in
Risk-
adjusted
PVRR
Relative to
the
Preferred
Portfolio
($b)
Decrease in
Stochastic
Mean
PVRR
Relative to
the
Preferred
Portfolio
($b)
Decrease in
Risk-
adjusted
PVRR
Relative to
the
Preferred
Portfolio
($b)
C14-1 1.40 1.48 1.54 1.62 1.38 1.45 (1.12) (1.17)
C14-2 2.34 2.47 2.14 2.25 2.60 2.73 (1.52) (1.59)
C14a-1 2.17 2.29 1.92 2.03 2.52 2.65 (1.87) (1.96)
C14a-2 2.33 2.45 1.73 1.83 2.94 3.09 (2.08) (2.19)
Figure 8.34 shows fleet average coal capacity factors from the C14 cases taken from PaR under
the high CO2 price assumptions (primary vertical axis) and the assumed nominal annual CO2
prices (secondary vertical axis). As CO2 prices rise, fleet average coal capacity factors drop. The
introduction of a CO2 price in 2020 causes a decline in coal generation. As the CO2 price rises
over the 2020 to 2023 timeframe, coal generation levels remain relatively stable. As assumed
CO2 prices begin to approach $60/ton in the 2024 timeframe, coal generation begins to fall again,
with continued declines as CO2 prices are assumed to rise. A step change reduction in coal
capacity factors occurs in the 2029 to 2031 timeframe when CO2 price assumptions exceed
$100/ton.
Figure 8.34 – Stochastic Mean Coal Capacity Factors from C14 Portfolios and High CO2
Price Assumptions
$0
$20
$40
$60
$80
$100
$120
$140
$160
$180
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
CO
2
P
r
i
c
e
(
$
/
t
o
n
)
Av
e
r
a
g
e
C
o
a
l
C
a
p
a
c
i
t
y
F
a
c
t
o
r
%
Case 14-1 Case 14a-1 Case 14-2 Case 14a-1 High CO2 Price
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
209
Greenhouse Gas Goals
Washington
In its order in Docket UE-120416 the Washington Utilities and Transportation Commission
(WUTC) found PacifiCorp met all statutory requirements for the 2013 IRP. The WUTC also
stated that:
“The Company’s 2015 IRP should also examine ways in which PacifiCorp can contribute
to Washington’s goal of reducing carbon emissions to 1990 levels by 2020 and evaluate
the rate impacts of any such measure.”
For PacifiCorp’s system, the 1990 emission level was approximately 46 million tons. Table 8.22
shows portfolios with 2020 emissions falling below 1990 levels along with the cost of these
portfolios relative to the preferred portfolio. Detailed portfolios for these cases are included in
Volume II, Appendix K.
Table 8.22 – Cost/Risk Comparison of Portfolios that Meet Washington’s Goal of Reducing
Carbon Emissions to 1990 Levels by 2020
Portfolio Cost and Emissions
Increase/(Decrease) from the Preferred
Portfolio
Case
Stochastic
Mean PVRR
($ millions)
Risk
Adjusted
PVRR on
Scenario
($ millions)
CO2
Emissions in
2020
(million tons)
Stochastic
Mean PVRR
($ millions)
Risk
Adjusted
PVRR on
Scenario
($ millions)
CO2
Emissions in
2020
(million tons)
C05a-3Q $27,500 $28,890 49.7 $0 $0 0.0
C02-1 $28,350 $29,790 44.5 $850 $900 (5.1)
C02-2 $29,088 $30,564 44.5 $1,588 $1,674 (5.2)
C03-1 $29,521 $31,019 44.5 $2,021 $2,129 (5.2)
C03-2 $30,282 $31,820 44.5 $2,782 $2,930 (5.2)
C12-1 $27,801 $29,215 42.5 $301 $325 (7.2)
C12-2 $28,557 $30,013 42.5 $1,057 $1,123 (7.2)
C13-1 $27,649 $29,053 39.1 $149 $163 (10.6)
C13-2 $28,422 $29,865 39.1 $922 $975 (10.6)
Oregon
OPUC IRP guideline 8(d) requires that a portfolio be constructed that meets Oregon energy
policies, including state goals for reducing greenhouse emissions. Several of the portfolios
developed in this IRP fall below the Oregon goal stated in House Bill 3543 (10 percent below
1990 emission levels by 2020). For PacifiCorp’s system, the 1990 emission level was
approximately 46 million tons. Ten percent below this level equates to approximately 41.4
million tons. Table 8.23 compares preferred portfolio costs, both on a stochastic mean and risk-
adjusted PVRR basis, with portfolios that meets the Oregon goal in House Bill 3543. Detailed
portfolios for these cases are included in Volume II, Appendix K.
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
210
Table 8.23 – Cost/Risk Comparison of Portfolios that Meet Oregon House Bill 3543
Emission Goals with the Preferred Portfolio
Portfolio Cost and Emissions
Increase/(Decrease) from the Preferred
Portfolio
Case
Stochastic
Mean PVRR
($ millions)
Risk
Adjusted
PVRR on
Scenario
($ millions)
CO2
Emissions in
2020
(million tons)
Stochastic
Mean PVRR
($ millions)
Risk
Adjusted
PVRR on
Scenario
($ millions)
CO2
Emissions in
2020
(million tons)
C05a-3Q $27,500 $28,890 49.7 $0 $0 0.0
C13-1 $27,649 $29,053 39.1 $149 $163 (10.6)
C13-2 $28,422 $29,865 39.1 $922 $975 (10.6)
High CO2 Price Scenario PaR Results
In its cost and risk analysis, PacifiCorp completed PaR simulations under low, base, and high
price curve scenarios. Results from these PaR simulations informed selection of the 2015 IRP
preferred portfolio. PacifiCorp also completed PaR simulations assuming high CO2 price curve
assumptions, which inform the 2015 IRP acquisition path analysis summarized in Chapter 9. To
this end, assumptions used in the high CO2 price scenario help identify how PacifiCorp’s
resource portfolio might be impacted if future CO2 policies are expanded beyond what might be
required under the current policy environment (i.e., EPA’s proposed 111(d) rule).
Figure 8.35 presents the scatter plot, formatted consistent with the scatter plots used in the pre-
screening and initial screening steps of the preferred portfolio selection process, for core cases
simulated under the high CO2 price scenario in PaR. As expected, resource portfolios developed
with CO2 price assumptions incremental to 111(d) requirements (core cases C14 and C14a) are
lower cost and lower risk relative to portfolios that were developed with 111(d) considerations
but without incremental CO2 price assumptions. When allowing endogenous coal unit
retirements beyond those assumed for Regional Haze scenarios (core case C14a), costs are lower
than the C14 portfolios developed with specific timing for assumed coal unit retirements.
The stochastic mean PVRR differential between case C05a-3 (pre-cursor to the 2015 IRP
preferred portfolio) and case C14a-2 is $2.26 billion favorable to C05a-3 under base price curve
assumptions without an assumed CO2 price, while the stochastic mean PVRR differential
between case C05a-3 and C14a-2 is $2.38 billion favorable to C14a-2 under the high CO2 price
scenario. These PVRR differentials do not account for the reality that resource plans change with
changes in the planning environment (i.e., with the introduction policies resulting in a high CO2
price).
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
211
Figure 8.35 – High CO2 Price Scenario Core Case Portfolio Scatter Plot
$38.0
$39.0
$40.0
$41.0
$42.0
$43.0
$44.0
$47.5 $48.0 $48.5 $49.0 $49.5 $50.0 $50.5 $51.0 $51.5
Up
p
e
r
T
a
i
l
M
e
a
n
P
V
R
R
L
e
s
s
F
i
x
e
d
C
o
s
t
s
($
b
i
l
l
i
o
n
)
Stochastic Mean PVRR($ billion)
C02-1 C03-1 C04-1 C05-1 C05a-1 C05b-1 C06-1 C07-1 C09-1 C11-1
C12-1 C13-1 C14-1 C14a-1 C02-2 C03-2 C04-2 C05-2 C05a-2 C06-2
C07-2 C09-2 C11-2 C12-2 C13-2 C14-2 C14a-2 C05-3 C05a-3 C05b-3
PACIFICORP - 2015 IRP CHAPTER 8 – MODELING AND PORTFOLIO SELECTION RESULTS
212
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
213
CHAPTER 9 – ACTION PLAN AND RESOURCE
PROCUREMENT
CHAPTER HIGHLIGHTS
The 2015 IRP action plan identifies steps to be taken during the next two to four years to
deliver resources in the preferred portfolio.
PacifiCorp’s 2015 IRP action plan includes action items for renewable resources, short-
term firm market purchases of front office transactions (FOTs), demand side management
resources, coal resources, and transmission.
The 2015 IRP acquisition path analysis provides insight on how changes in the planning
environment might influence future resource procurement activities. Key uncertainties
addressed in the acquisition path analysis include load, distributed generation, CO2
emission polices, Regional Haze outcomes, and availability of purchases from the market.
Differences between the 2015 IRP preferred portfolio and the 2013 IRP Update and fall
ten-year plan business plan portfolios are primarily driven by changes in load forecasts and
model assumptions. The 2015 IRP preferred portfolio will serve as the starting point for
resource assumptions in the fall 2015 ten-year business plan.
PacifiCorp further discusses how it can mitigate procurement delay risk, summarizes
planned procurement activities tied to the action plan, assesses trade-offs between owning
and purchasing third-party power, discusses its hedging practices, and identifies the types
of risks borne by customers and the types of risks borne by shareholders.
Introduction
PacifiCorp’s 2015 IRP action plan identifies the steps the Company will take during the next two
to four years to deliver its preferred portfolio of resources with a focus on the front ten years of
the planning horizon. Associated with the action plan is an acquisition path analysis that
anticipates potential major regulatory actions and other trigger events during the action plan time
frame that could materially impact resource acquisition strategies.
Resources included in the 2015 IRP preferred portfolio help define the actions included in the
action plan, focusing on the size, timing and type of resources needed to meet load obligations,
and current and potential future state regulatory requirements. The preferred portfolio resource
combination was determined to be the lowest cost on a risk-adjusted basis accounting for cost,
risk, reliability, regulatory uncertainty and the long-run public interest.
The 2015 IRP action plan is based upon the latest and most accurate information available at the
time portfolios are being developed and analyzed on cost and risk metrics. PacifiCorp recognizes
that the preferred portfolio, upon which the action plan is based, is developed in an uncertain
planning environment and that resource acquisition strategies need to be regularly evaluated as
planning assumptions change.
Resource information used in the 2015 IRP, such as capital and operating costs, are based upon
recent cost and performance data. However, it is important to recognize that the resources
identified in the plan are proxy resources, which act as a guide for resource procurement and not
as a commitment. Resources evaluated as part of procurement initiatives may vary from the
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
214
proxy resource identified in the plan with respect to resource type, timing, size, cost and location.
PacifiCorp recognizes the need to support and justify resource acquisitions consistent with then-
current laws, regulatory rules and commission orders.
In addition to presenting the 2015 IRP action plan, reporting on progress in delivering the prior
action plan, and presenting the 2015 IRP acquisition path analysis, Chapter 9 covers the
following resource procurement topics:
Procurement delays;
IRP action plan linkage to the business plan;
Resource procurement strategy;
Assessment of owning assets vs. purchasing power;
Managing carbon risk for existing plants;
Purpose of hedging; and
Treatment of customer and investor risks.
PACIFICORP - 2015 IRP CHAPTER 9 –ACTION PLAN AND RESOURCE PROCUREMENT
215
The 2015 IRP Action Plan
The 2015 IRP Action Plan identifies specific actions the Company will take over the next two to four years. Action items are based on
the type and timing of resources in the preferred portfolio, findings from analysis completed over the course of portfolio modeling, and
feedback received by stakeholders in the 2015 IRP process. Table 9. details specific 2015 IRP action items by category.
Table 9.1 – 2015 IRP Action Plan
The Company will pursue unbundled REC request for proposals (RFP) to meet its state RPS compliance
requirements.
–Issue at least annually, RFPs seeking then current-year or forward-year vintage unbundled RECs that will
qualify in meeting Washington renewable portfolio standard targets through 2017.
–Issue at least annually, RFPs seeking then current-year or forward-year vintage unbundled RECs that will
qualify in meeting California renewable portfolio standard targets through 2017.
–With a projected bank balance extending out through 2027, defer issuance of RFPs seeking unbundled RECs
that will qualify in meeting Oregon renewable portfolio standard targets until states begin to develop
implementation plans under EPA’s draft 111(d) rule, providing clarity on whether an unbundled REC strategy
is the least cost compliance alternative for Oregon customers.
On a quarterly basis, and through calendar year 2016, issue reverse RFPs to sell 2016 vintage or older RECs that are
not required to meet state RPS compliance obligations.
Conclude negotiations with shortlisted bids from the 2013S Request for Proposals (RFP), seeking up to 7 MWAC of
competitively priced capacity from qualifying solar systems that will be used to satisfy PacifiCorp’s obligation under
Oregon’s 2020 solar capacity standard.
Acquire economic short-term firm market purchases for on-peak summer deliveries from 2015 through 2017
consistent with the Risk Management Policy and Commercial and Trading Front Office Procedures and Practices.
These short-term firm market purchases will be acquired through multiple means:
PACIFICORP - 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
216
–
–
–
Action
Item 8.Demand Side Management (DSM) Actions
3a
Class 1 DSM
3b
Class 2 DSM
selections from the preferred portfolio as summarized in the following table. PacifiCorp’s implementation plan to
Year Annual Incremental Energy (GWh) Annual Incremental Capacity* (MW)
2015 551 133
2016 584 139
2017 616 146
2018 634 146
*Class 2 DSM capacity figures reflect projected maximum annual hourly energy savings, which is similar to a nameplate rating for a supply side
resource.
Action
Item 9.Coal Resource Actions
4a
Naughton Unit 3
4b
Dave Johnston Unit 3
The portion of EPA’s final Regional Haze F
If following appeal, EPA’s final FIP as it pertains to Dave Johnston Unit 3 is upheld, PacifiCorp will commit to
PACIFICORP - 2015 IRP CHAPTER 9 –ACTION PLAN AND RESOURCE PROCUREMENT
217
If following appeal, EPA’s final FIP as it pertains to D
4c
Wyodak
Company’s appeal of the portion of EPA’s final Regional Haze FIP that requires the
If following appeal, EPA’s final FIP as it
4d
Cholla Unit 4
Action
Item 10. Transmission Actions
5a
Energy Gateway Permitting
–
–
–
5b
Wallula to McNary 230 kilovolt Transmission Line
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
218
Progress on Previous Action Plan Items
This section describes progress that has been made on previous active action plan items documented in the 2013 Integrated Resource Plan
and 2013 Integrated Resource Plan Update reports filed with the state commissions on April 30, 2013 and March 31, 2014, respectively.
Many of these action items have been superseded in some form by items identified in the current IRP action plan. The status for all action
items is summarized in Table 9.2.
Table 9.2 – 2013 IRP Action Plan Status Update
1a. Renewable Resource
Actions -Wind Integration
Update the wind integration study for the
2015 IRP. The updated wind integration
study will consider the implications of an
energy imbalance market along with
comments and feedback from the technical
review committee and IRP stakeholders
provided during the 2012 Wind Integration
Study.
The 2014 Wind Integration Study (WIS) estimates the
regulation reserve requirements from historical load and
wind generation production data. The updated WIS, provided
in Volume II, Appendix H, also estimates the incremental
cost associated with integrating wind resources specific to
PacifiCorp’s system. Study results incorporate estimated
impacts of the energy imbalance market. The 2014 WIS was
developed with participation of a technical review committee
(TRC). The 2014 WIS addresses recommendations the TRC
included in its review of the 2012 WIS.
1b. Renewable Resource
Actions - Renewable
Portfolio Standard
Compliance
With renewable portfolio standard (RPS)
compliance achieved with unbundled
renewable energy credit (REC) purchases, the
preferred portfolio does not include
incremental renewable resources prior to
2024. Given that the REC market lacks
liquidity and depth beyond one year forward,
the Company will pursue unbundled REC
requests for proposal (RFP) to meet its state
RPS compliance requirements.
1.Issue at least annually, RFPs seeking then
current-year or forward-year vintage
unbundled RECs that will qualify in
1.PacifiCorp issued a REC RFP on August 14, 2013 for
RECs that qualify for the Washington RPS. While there
were a number of offers received, none were compelling
from a price/structure perspective. Furthermore, when
issued, PacifiCorp did not see a need for RECs until
2016. PacifiCorp issued a REC RFP on October 22, 2014
for Washington RPS-eligible RECs. Bids were due
November 6, 2014; five offers were selected that matched
needs and specific pricing criteria.
2.PacifiCorp issued a REC RFP on December 31, 2012
with bids due January 15, 2013 for unbundled RECs that
will qualify for the Oregon RPS. A numbers of offers
were selected that met matched needs and specific pricing
criteria.
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
219
Action Item Activity Status
–
AC
AC
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
220
Action Item Activity Status
AC). The two PPAs would satisfy PacifiCorp’s
AC AC
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
221
Action Item Activity Status
generation sites on PacifiCorp’s system; (2)
ndix B of PacifiCorp’s 2013 IRP Update contains an
opportunities across PacifiCorp’s jurisdictions focus
PacifiCorp’s western balancing authority area
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
222
Action Item Activity Status
an order granting the CAISO’s request for a 90
the Company’s process in evaluating bids for
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
223
Action Item Activity Status
PacifiCorp’s review of long
state “total
resource cost test” evaluation
public input meeting the Company’s
generation facilities. The “Energy Analysis Report” was
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
224
Action Item Activity Status
PacifiCorp’s
–
–
–
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
225
Action Item Activity Status
st
rd
th
st
th
nd
–watt
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
226
Action Item Activity Status
by expanding the “Trade Ally Network”.rd
th
the Company’s trade al
st
“express” or “typical” measure offerings
st
rd
th
st
th
nd
watt
were previewed with Utah’s DSM Advisory Committee
watt
review by the Company’s Washington’s demand side
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
227
Action Item Activity Status
watt
.
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
228
Action Item Activity Status
nd
th
rd
rd
to design a “low risk” or “no risk” pilot for consideration
Staff supported the company’s proposal. Reports are
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
229
Action Item Activity Status
where the program vendor’s initial assessmen
Expand offering of “bundled” measure
st
nd
st
rd
nd
.
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
230
Action Item Activity Status
–rd
9. Provisions were added to the Company’s recycling
included as Appendix D to the Company’s 2013 IRP
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
231
Action Item Activity Status
EPA’s referenced action and has an effective date of July
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
232
Action Item Activity Status
X
X
ronmental Protection Agency’s Federal
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
233
Action Item Activity Status
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
234
Action Item Activity Status
Continue permitting Segments D, E, F, and H
until PacifiCorp files its 2015 IRP, at which
time a SBT analysis for these segments may be
performed.–
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
235
Action Item Activity Status
include PacifiCorp’s introduction of a Feedback Form for
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
236
Acquisition Path Analysis
Resource and Compliance Strategies
PacifiCorp worked with stakeholders to define core case definitions for the 2015 IRP. Core case
definitions contain a combination of specific planning assumptions related to CO2 emission
policies, compliance strategies under EPA’s proposed 111(d) rule, potential Regional Haze
compliance requirements, state RPS compliance strategies, and DSM acquisition strategies.
PacifiCorp further analyzed sensitivity cases on planning assumptions related to load forecasts,
distributed generation penetration levels, Energy Gateway transmission projects, CO2 emission
policies, and compliance strategies under EPA’s proposed 111(d) rule. The array of planning
assumptions that define core case and sensitivity case resource portfolios provides the framework
for a resource acquisition path analysis by evaluating how resource selections are impacted by
shifts planning assumptions.
Given current load expectations, portfolio modeling performed for the 2015 IRP shows the
resource acquisition path in the preferred portfolio is robust among a wide range of policy and
market conditions, particularly in the near-term, when FOTs and energy efficiency resources are
consistently selected. With regard to renewable resource acquisition, the portfolio development
modeling performed in the 2015 IRP shows that new renewable resource needs are driven by
RPS compliance obligations and potential 111(d) policy outcomes and associated compliance
strategies. Beyond load, the most significant driver affecting resource selection in the 2015 IRP
are potential compliance outcomes related to future Regional Haze requirements that might
trigger early coal unit retirements. CO2 policy uncertainty, whether related to EPA’s proposed
111(d) rule or some other future policy targeting electric sector emission reductions, also
influences resource selections in the 2015 IRP. For these reasons, the acquisition path analysis
focuses on load trigger events and environmental policy trigger events that would require
alternative resource acquisition strategies. For each trigger event, PacifiCorp identifies the
planning scenario assumption affecting both short-term (2015-2024) and long-term (2025-2034)
resource strategies.
Acquisition Path Decision Mechanism
The Utah Commission requires that PacifiCorp provide “[a] plan of different resource acquisition
paths with a decision mechanism to select among and modify as the future unfolds.”82
PacifiCorp’s decision mechanism is centered on the business planning and IRP processes, which
together constitute the decision framework for making resource investment decisions. The IRP
models are used on a macro-level to evaluate alternative portfolios and futures as part of the IRP
process, and then on a micro-level to evaluate the economics and system benefits of individual
resources as part of the supply-side resource procurement and DSM target-setting/valuation
processes. PacifiCorp uses the IRP and business plan to serve as decision support tools that can
be used to guide prudent resource acquisition paths that maintain system reliability at a
reasonable cost. Table 9.3 summarizes PacifiCorp’s 2015 IRP acquisition path analysis, which
provides insight on how changes in the planning environment might influence future resource
procurement activities. Changes in procurement activities driven by changes in the planning
82 Public Service Commission of Utah, In the Matter of Analysis of an Integrated Resource Plan for PacifiCorp,
Report and Order, Docket No. 90-2035-01, June 1992, p. 28.
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
237
environment will ultimately be reflected in future IRPs and will be incorporated in PacifiCorp’s
annual business planning process.
Table 9.3 – Near-term and Long-term Resource Acquisition Paths
Trigger Event
Planning
Scenario(s)
Near-Term Resource
Acquisition Strategy
(2015-2024)
Long Term Resource Acquisition
Strategy
(2025-2034)
Higher sustained
load growth
High economic
drivers and
increased demand
from industrial
customers
Increase acquisition of FOTs
Increase acquisition of Class
2 DSM resources in the
2020– 2024 timeframe
Accelerate and increase
acquisition of a gas-fired
thermal resources by
approximately 4 years (2024)
Increase acquisition of RECs
to maintain compliance with
RPS requirements consistent
with load growth
expectations by state
Increase acquisition of gas-fired
thermal resources.
Balance timing of thermal
resource acquisition with FOTs
and cost-effective Class 2 DSM
energy efficiency resources
Evaluate cost effective RPS
compliance strategies, including
tradeoffs between resource
acquisition and use of
compliance flexibility
mechanisms like banking and
use of unbundled RECs
Lower sustained
load growth
Low economic
drivers suppress
load requirements
with reduced
demand from
industrial customers
Reduce acquisition of FOTs
Continue to pursue Class 2
DSM energy efficiency
resources
Reduce acquisition of gas-fired
thermal resources
Balance timing of thermal
resource acquisition with FOTs
and cost-effective Class 2 DSM
energy efficiency resources
Higher sustained
distributed
generation
penetration levels
More aggressive
technology cost
reductions,
improved
technology
performance, and
higher electricity
retail rates
Reduce acquisition of FOTs
Continue to pursue Class 2
DSM energy efficiency
resources
Reduce acquisition of gas-fired
thermal resources
Balance timing of thermal
resource acquisition with FOTs
and cost-effective Class 2 DSM
energy efficiency resources
Lower sustained
distributed
generation
penetration levels
Less aggressive
technology cost
reductions, reduced
technology
performance, and
lower electricity
retail rates
Increase acquisition of FOTs
(primarily beginning 2024)
Continue to pursue Class 2
DSM energy efficiency
resources
Increase acquisition of gas-fired
thermal resources.
Balance timing of thermal
resource acquisition with FOTs
and cost-effective Class 2 DSM
energy efficiency resources
State
implementation
of 111(d)
emission rate
targets
EPA’s proposed
state emission rate
targets applied to
PacifiCorp’s share
of fossil generation
in AZ, CO, and MT
without relief on
2020 to 2029
compliance timeline
Initiate new renewable
resource procurement
activities for resources
coming on-line as early as
2020
Reduce acquisition of FOTs
concurrent with addition of
system renewable resources.
Maintain long-term acquisition
of new gas-fired thermal
resources, DSM and FOTs.
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
238
Trigger Event
Planning
Scenario(s)
Near-Term Resource
Acquisition Strategy
(2015-2024)
Long Term Resource Acquisition
Strategy
(2025-2034)
State
implementation
of 111(d) via a
mass cap
Mass cap applied to
PacifiCorp’s system
covering CO2
emissions from
existing fossil-fired
generation
beginning 2020
Potentially accelerate
acquisition of gas-fired
thermal resources, dependent
upon derivation of mass cap
limits.
Increase acquisition of Class
2 DSM resources
Balance timing of thermal
resource acquisition and
Class 2 DSM acquisition
with FOTs
Increase acquisition of Class 2
DSM resources
Balance timing of thermal
resource acquisition and Class 2
DSM resource acquisition with
FOTs
Restricted use of
“111(d)
attributes”
State RPS RECs
and 111(d)
attributes must be
surrendered
together in OR and
WA
Evaluate early retirement of
Chehalis to eliminate WA
111(d) compliance obligation
Procure natural gas peaking
resource
Increase acquisition of Class
2 DSM resources
Increase acquisition of FOTs
Increase acquisition of Class 2
DSM resources
Increase acquisition of FOTs
New CO2 policy
incremental to
EPA’s proposed
111(d) rule
Incremental to
EPA’s proposed
111(d) rule, fossil-
fired generation is
faced with a CO2
emissions cost at
approximately
$22/ton in 2020
rising to
approximately
$76/ton by 2034
Increase acquisition of gas-
fired thermal resources to
offset potential early
retirement of coal units
Increase acquisition of Class
2 DSM resources
Begin adding new renewable
resources, up to 1,600 MW to
replace generation from fossil-
fired assets
Procure low emission base load
modular nuclear resources (over
2,000 MW) thermal resources to
replace generation from fossil-
fired assets
Increase acquisition of Class 2
DSM resources
Regional Haze
outcome with
early coal unit
retirements
Potential Regional
Haze inter-temporal
and fleet trade-off
compliance scenario
with coal unit
assumptions as
defined in Regional
Haze Scenario 1
and Scenario 2 (see
Chapter 7)
Increase acquisition of FOTs
concurrent with assumed
coal unit retirements
Accelerate acquisition of
gas-fired thermal generation
to 2024
Increase procurement of new
gas-fired thermal resources
Balance timing of FOTs and
DSM resource acquisition with
timing of new gas-fired
generation
Limited
availability of
FOTs
Eliminates
availability of FOTs
at NOB (100 MW)
and Mona (300
MW) beginning
2019
Increase acquisition of Class
2 DSM resources
Accelerate timing and new gas-
fired thermal resource by two
years
Increase acquisition of Class 2
DSM resource
Procurement Delays
The main procurement risk is an inability to procure resources in the required timeframe to meet
the need. There are various reasons why a particular proxy resource cannot be procured in the
timeframe identified in the 2015 IRP. There may not be any cost-effective opportunities
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
239
available through an RFP, the successful RFP bidder may experience delays in permitting and/or
default on their obligations, or there might be a material and sudden change in the market for fuel
and materials. Moreover, there is always the risk of unforeseen environmental or other electric
utility regulations that may influence the Company’s entire resource procurement strategy.
Possible paths PacifiCorp could take in the event of a procurement delay or sudden change in
procurement need can include combinations of the following:
In circumstances where the Company is engaged in an active RFP where a specific bidder
is unable to perform, alternative bids can be pursued.
PacifiCorp can issue an emergency RFP for a specific resource and with specified
availability.
PacifiCorp can seek to negotiate an accelerated delivery date of a potential resource with
the supplier/developer.
PacifiCorp can seek to procure near-term purchased power and transmission until a
longer-term alternative is identified, acquired through customized market RFPs,
exchange transactions, brokered transactions or bi-lateral, sole source procurement.
Accelerate acquisition timelines for direct load control programs.
Procure and install temporary generators to address some or all of the capacity needs.
Temporarily drop below the target 13% planning reserve margin.
Implement load control initiatives, including calls for load curtailment via existing load
curtailment contracts.
IRP Action Plan Linkage to Business Planning
Primary drivers in the resource differences between PacifiCorp’s 2015 IRP and the 2013 IRP
Update include decreased load forecasts and lower power prices. The 2013 IRP Update also
assumed conversion of Naughton Unit 3 in 2015, whereas the 2015 IRP preferred portfolio
assumes Naughton Unit 3 will be converted to natural gas in 2018.83 With the delay in the
Naughton Unit 3 conversion, there is an assumed 50 MW reduction in its capacity beginning
2015 until the conversion is completed in 2018.84 Finally, the 2015 IRP includes an updated
DSM conservation potential assessment, which supports increased acquisition of DSM resources
the 2013 IRP and 2013 IRP Update.
Resource portfolio differences relative to the 2013 IRP Update also show reductions in
distributed solar and combined heat and power (CHP). These perceived declines are actually
driven by modeling changes. For the 2015 IRP, distributed generation (DG), informed by a study
producing DG penetration forecasts, included in Volume II, Appendix O, is applied as a
reduction in load, not as a resource for selection in portfolio modeling. Other changes in the
83 Financial analysis of the 2018 Naughton Unit 3 natural gas conversion is presented in Volume III. 84 The state of Wyoming’s permits governing natural gas conversion of Naughton Unit 3 set forth specific
environmental compliance requirements for the unit in the interim period between the April 2015 MATS compliance
deadline through the end of 2017, when the unit ceases coal-fueled operation. The Company’s IRP modelling
assumptions include a 50 MW reduction in Unit 3 capacity during the interim period. For modeling purposes, it was
assumed that this level of capacity reduction would be required to allow the unit’s existing emissions control
equipment to meet the more restrictive interim period permit limits. During the interim period, actual unit
performance and certified emissions data will be utilized to demonstrate compliance, which will likely result in
actual available capacity being different than that assumed for IRP modeling.
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
240
portfolio reflect a reduction in RPS-driven renewable resources. As outlined in Chapter 8, the
least cost least risk state RPS compliance strategy relies on unbundled RECs. PacifiCorp
continues to plan on using unbundled RECs to meet its forecasted needs under the California and
Washington RPS programs.
Table 9.4 compares the 2015 IRP preferred portfolio with the 2013 IRP Update portfolio for the
front ten years of the 2015 IRP planning period (2015-2024). The table shows year by year
capacity differences by major resource categories (yellow highlighted table).
Table 9.4 – Comparison of the 2015 IRP Preferred Portfolio with the 2013 IRP Update
Portfolio
2015 IRP Preferred Portfolio
Capacity (MW)Resource Totals
Resource 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2015-2024
Expansion Options
Gas - CCCT - - - - - - - - - - -
Gas- Peaking - - - - - - - - - - -
DSM - Energy Efficiency 133 139 146 146 153 135 137 144 146 149 1,429
DSM - Load Control - - - - - - - 5 11 - 16
Renewable - Wind - - - - - - - - - - -
Renewable - Utility Solar - 7 - - - - - - - - 7
Renewable - Distributed Solar - - - - - - - - - - -
Combined Heat & Power - - - - - - - - - - -
Front Office Transactions *727 937 904 870 935 979 769 791 761 754 843
Existing Unit Changes
Coal Early Retirement/Conversions (222) - - (280) - - - - - - (502)
Thermal Plant End-of-life Retirements - - - - - - - - - - -
Coal Plant Gas Conversion Additions - - - 337 - - - - - - 337
Turbine Upgrades - - - - - - - - - - -
Total 638 1,084 1,050 1,073 1,088 1,113 906 941 917 903
Study includes Naughton 3 gas conversion in 2018
FOT in resource total are 10-year averages
2015 IRP Preferred Portfolio less 2013 IRP Update
Capacity (MW)Resource Totals
Resource 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2015-2024
Expansion Options
Gas - CCCT - - - - - - - - - - -
Gas- Peaking - - - - - - - - - - -
DSM - Energy Efficiency 35 44 51 58 71 61 63 70 82 83 618
DSM - Load Control - - - - - - - 5 11 - 16
Renewable - Wind - - - - - - - - - (184) (184)
Renewable - Utility Solar (2) 7 - - - - - - - - 5
Renewable - Distributed Solar (14) (16) (17) (13) (14) (15) (15) (15) (15) (15) (151)
Combined Heat & Power (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (11)
Front Office Transactions *144 236 73 (61) (92) (282) (273) (307) (449) (548) (156)
Existing Unit Changes
Coal Early Retirement/Conversions 280 - - (280) - - - - - - -
Thermal Plant End-of-life Retirements - - - - - - - - - - -
Coal Plant Gas Conversion Additions (338) - - 337 - - - - - - (1)
Turbine Upgrades - - - - - - - - - - -
Total 103 270 107 40 (35) (237) (227) (248) (373) (666)
FOT in resource total are 10-year averages
2013 IRP Update
Capacity (MW)Resource Totals
Resource 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2015-2024
Expansion Options
Gas - CCCT 645 - - - - - - - - - - -
Gas- Peaking - - - - - - - - - - - -
DSM - Energy Efficiency 110 98 96 95 88 82 74 74 74 64 66 810
DSM - Load Control - - - - - - - - - - - -
Renewable - Wind - - - - - - - - - - 184 184
Renewable - Utility Solar 6 2 - - - - - - - - - 2
Renewable - Distributed Solar 11 14 16 17 13 14 15 15 15 15 15 151
Combined Heat & Power 1 1 1 1 1 1 1 1 1 1 1 11
Front Office Transactions *445 583 701 831 931 1,027 1,261 1,042 1,098 1,210 1,302 999
Existing Unit Changes
Coal Early Retirement/Conversions - (502) - - - - - - - - - (502)
Thermal Plant End-of-life Retirements - - - - - - - - - - - -
Coal Plant Gas Conversion Additions - 338 - - - - - - - - - 338
Turbine Upgrades - - - - - - - - - - - -
Total 1,218 534 814 944 1,034 1,123 1,351 1,132 1,189 1,290 1,569
Study includes Naughton 3 gas conversion in 2015
FOT in resource total are 10-year averages
2015 IRP vs 2013 IRP Update
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
241
Table 9.5 compares the fall 2014 ten-year business plan portfolio with the 2015 IRP preferred
portfolio. Differences between the two portfolios are driven by reduced loads and updated DSM
supply curve assumptions. The 2015 IRP preferred portfolio shows increased energy efficiency
and reduced FOTs relative to the fall 2014 ten-year business plan portfolio. Changes in
distributed solar and CHP are driven by changes in modeling approach, as discussed above.
Table 9.5 – Comparison of the 2015 IRP Preferred Portfolio with the Fall 2014 Business
Plan Portfolio
2015 IRP Preferred Portfolio
Capacity (MW)Resource Totals
Resource 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2015-2024
Expansion Options
Gas - CCCT - - - - - - - - - - -
Gas- Peaking - - - - - - - - - - -
DSM - Energy Efficiency 133 139 146 146 153 135 137 144 146 149 1,429
DSM - Load Control - - - - - - - 5 11 - 16
Renewable - Wind - - - - - - - - - - -
Renewable - Utility Solar - 7 - - - - - - - - 7
Renewable - Distributed Solar - - - - - - - - - - -
Combined Heat & Power - - - - - - - - - - -
Front Office Transactions *727 937 904 870 935 979 769 791 761 754 843
Existing Unit Changes
Coal Early Retirement/Conversions (222) - - (280) - - - - - - (502)
Thermal Plant End-of-life Retirements - - - - - - - - - - -
Coal Plant Gas Conversion Additions - - - 337 - - - - - - 337
Turbine Upgrades - - - - - - - - - - -
Total 638 1,084 1,050 1,073 1,088 1,113 906 941 917 903
Study includes Naughton 3 gas conversion in 2018
FOT in resource total are 10-year averages
2015 IRP Preferred Portfolio less Fall 2014 Ten-Year Business Plan
Capacity (MW)Resource Totals
Resource 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2015-2024
Expansion Options
Gas - CCCT - - - - - - - - - - -
Gas- Peaking - - - - - - - - - - -
DSM - Energy Efficiency 34 43 54 57 70 60 63 70 81 81 613
DSM - Load Control - - - - - - - 5 9 (22) (8)
Renewable - Wind - - - - - - - - - - -
Renewable - Utility Solar (7) 5 - - - - - - - - (2)
Renewable - Distributed Solar (14) (16) (17) (13) (14) (15) (15) (15) (15) (15) (151)
Combined Heat & Power (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (11)
Front Office Transactions *(204) (250) (405) (388) (400) (414) (374) (386) (483) (544) (385)
Existing Unit Changes
Coal Early Retirement/Conversions (5) - - 5 - - - - - - -
Thermal Plant End-of-life Retirements - - - - - - - - - - -
Coal Plant Gas Conversion Additions - - - (1) - - - - - - (1)
Turbine Upgrades - - - - - - - - - - -
Total (197) (220) (369) (341) (345) (370) (327) (328) (409) (501)
FOT in resource total are 10-year averages
Fall 2014 Ten-Year Business Plan
Capacity (MW)Resource Totals
Resource 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2015-2024
Expansion Options
Gas - CCCT 645 - - - - - - - - - - -
Gas- Peaking - - - - - - - - - - - -
DSM - Energy Efficiency 111 99 96 92 89 83 75 74 74 65 67 815
DSM - Load Control - - - - - - - - - 1 22 24
Renewable - Wind - - - - - - - - - - - -
Renewable - Utility Solar 1 7 2 - - - - - - - - 9
Renewable - Distributed Solar 11 14 16 17 13 14 15 15 15 15 15 151
Combined Heat & Power 1 1 1 1 1 1 1 1 1 1 1 11
Front Office Transactions *760 931 1,188 1,309 1,258 1,335 1,393 1,142 1,178 1,243 1,298 1,227
Existing Unit Changes
Coal Early Retirement/Conversions - (217) - - (285) - - - - - - (502)
Thermal Plant End-of-life Retirements - - - - - - - - - - - -
Coal Plant Gas Conversion Additions - - - - 338 - - - - - - 338
Turbine Upgrades - - - - - - - - - - - -
Total 1,529 835 1,304 1,419 1,414 1,433 1,483 1,233 1,269 1,326 1,404
Study includes Naughton 3 gas conversion in 2018
FOT in resource total are 10-year averages
2015 IRP vs Fall 2014 Ten-Year Business Plan
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
242
PacifiCorp’s 2015 IRP preferred portfolio will serve as the starting point for resource
assumptions in the fall 2015 ten-year business plan. Changes to the portfolio may be influenced
by assumptions such as updated load forecast inputs, updated price curve inputs, an updated load
and resource balance, and updated environmental policy developments.
Resource Procurement Strategy
To acquire resources outlined in the 2015 IRP action plan, PacifiCorp intends to continue using
competitive solicitation processes in accordance with the then-current law, rules, and/or
guidelines in each of the states in which PacifiCorp operates, as applicable. PacifiCorp will also
continue to pursue opportunistic acquisitions identified outside of a competitive procurement
process that provide clear economic benefits to customers. Regardless of the method for
acquiring resources, PacifiCorp will support its resource procurement activities with the
appropriate financial analysis using then-current assumptions for inputs such as load forecasts,
commodity prices, resource costs, and policy developments. Any such financial analysis account
will account for any applicable long-term system benefits with business planning goals in mind.
The sections below profile the general procurement approaches for the key resource categories
covered in the 2015 IRP action plan.
Renewable Energy Credits
The Company uses shelf RFPs as the primary mechanism under which REC RFPs and reverse
REC RFPs will be issued to the market. The shelf RFPs are updated to define the product
definition, timing, and volume and further provide schedule and other applicable criteria to
bidders.
Demand-side Management
The Company will procure and/or re-procure for several major delivery contracts in 2015 and
2016 such as the residential appliance recycling program, Home Energy Savings program, its
small to mid-size business support services, energy management services, and oil and gas sector
service delivery. The Company will also look to expand services to the multifamily and
manufactured home sector either through the Home Energy Service program re-procurement or
through a standalone request for proposals. See Volume II, Appendix D for further information.
Naughton Unit 3
The 2015 IRP action plan includes an action item to issue an RFP to procure gas transportation
and resume engineering, procurement, and construction (EPC) contract procurement activities
for the Naughton Unit 3 natural gas conversion in the first quarter of 2016. Both RFPs will be
used to ensure competitive market bids are evaluated to fuel the unit as a gas-fired facility and to
complete the conversion project. PacifiCorp may update its economic analysis of the Naughton
Unit 3 natural gas conversion in conjunction with the RFP processes to align gas transportation
and EPC cost assumptions with market bids.
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
243
Assessment of Owning Assets versus Purchasing Power
As PacifiCorp acquires new resources, it will need to determine whether it is better to own a
resource or purchase power from another party. While the ultimate decision will be made at the
time resources are acquired, and will primarily be based on cost, there are other considerations
that may be relevant.
With owned resources, PacifiCorp is in a better position to control costs, make life extension
improvements, use the site for additional resources in the future, change fueling strategies or
sources, efficiently address plant modifications that may be required as a result of changes in
environmental or other laws and regulations, and utilize the plant at cost as long as it remains
economic. In addition, by owning a plant, PacifiCorp can hedge itself from the uncertainty of the
ability to perform consistent with the terms and conditions outlined in a power purchase
agreement over time.
Depending on contract terms, purchasing power from a third party in a long term contract may
help mitigate and may avoid liabilities associated with closure of a plant. A long-term power
purchase agreement relinquishes control of construction cost, schedule, ongoing costs and
compliance to a third party, and exposes the buyer to default events and contract remedies that
will not likely cover the potential negative impacts. Finally, credit rating agencies impute debt
associated with long-term resource contracts that may result from a competitive procurement
process, and such imputation may affect PacifiCorp’s credit ratios and credit rating.
Managing Carbon Risk for Existing Plants
CO2 reduction regulations at the federal, regional, or state levels could prompt PacifiCorp to
continue to look for measures to lower CO2 emissions of fossil-fired power plants through cost-
effective means. The cost, timing, and compliance flexibility afforded by CO2 reduction rules
will impact what types of measures that might be cost-effective and practical from operational
and regulatory perspectives. As evident in the 2015 IRP, known and prospective environmental
regulations can impact coal plant utilization and investment decisions.
Under EPA’s proposed 111(d) rule, compliance strategies will be affected by changes to the rule
(i.e., targets, timelines, etc.) once finalized and how states choose to develop implementation
plans for EPA review and approval. Under a cap-and-trade policy framework, examples of
factors affecting carbon compliance strategies include the allocation of emission allowances, the
cost of allowances in the market, and any flexible compliance mechanisms such as opportunities
to use carbon offsets, allowance/offset banking and borrowing, and safety valve mechanisms.
Under a CO2 tax framework, the tax level and details around how the tax might be assessed
would affect compliance strategies.
To lower the emission levels for existing fossil-fired power plants, options include early
retirement, changes in plant dispatch, changing the fuel type, repowering with more efficient
generation equipment, lowering the plant heat rate so it is more efficient, and adoption of new
technologies such as CO2 capture with sequestration, when commercially proven. Indirectly,
plant CO2 emission risk can be addressed by acquiring offsets or other environmental attributes
that might become available in the market. Under an aggressive CO2 regulatory environment,
and depending on fuel costs, coal plant idling and replacement strategies may become tenable
options.
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
244
High CO2 costs would shift technology preferences both for new resources and existing
resources to those with more efficient heat rates and also away from coal, unless carbon is
sequestered. There may be opportunities to repower some of the existing coal fleet with a
different less carbon-intensive fuel such as natural gas, as is currently being pursued for the
Naughton Unit 3 generating unit. An ongoing consideration is whether new technologies will be
available that can be exchanged for existing coal economically, particularly if market and policy
drivers lead to large scale and abrupt early retirements across the region and the U.S. as a whole.
Purpose of Hedging
While PacifiCorp focuses every day on minimizing net power costs for customers, the Company
also focuses every day on mitigating price risk to customers, which is done through hedging
consistent with a robust risk management policy. For years PacifiCorp has followed a consistent
hedging program that limits risk to customers, has tracked risk metrics assiduously and has
diligently documented hedging activities. The Company’s risk management policy and hedging
program exists to achieve the following goals: (1) ensure reliable sources of electric power are
available to meet PacifiCorp’s customers’ needs; (2) reduce volatility of net power costs for
PacifiCorp’s customers. The purpose is solely to reduce customer exposure to net power cost
volatility and adverse price movement. PacifiCorp does not engage in a material amount of
proprietary trading activities. Hedging is done solely for the purpose of limiting financial losses
due to unfavorable wholesale market changes. Hedging modifies the potential losses and gains in
net power costs associated with wholesale market price changes. The purpose of hedging is not
to reduce or minimize net power costs. PacifiCorp cannot predict the direction or sustainability
of changes in forward prices. Therefore, the Company hedges, in the forward market, to reduce
the volatility of net power costs consistent with good industry practice as documented in the
Company’s risk management policy.
Risk Management Policy and Hedging Program
PacifiCorp’s risk management policy and hedging program were designed to follow electric
industry best practices and are periodically reviewed at least annually by the Company’s risk
oversight committee. The risk oversight committee includes Company representatives from the
front office, finance, risk management, treasury, and legal department. The risk oversight
committee makes recommendations to the president of Pacific Power, who ultimately must
approve any change to the risk management policy. PacifiCorp’s current policy is also consistent
with the guidelines that resulted from collaborative hedging workshops with parties in Utah,
Oregon, Idaho and Wyoming that took place in 2011 and 2012.
The main components of the Company’s risk management policy and hedging program are
natural gas percent hedged volume limits, value-at-risk (VaR) limits and time to expiry VaR
(TEVaR) limits. These limits force PacifiCorp to monitor the open positions it holds in power
and natural gas on behalf of its customers on a daily basis and limit the size of these open
positions by prescribed time frames in order to reduce customer exposure to price concentration
and price volatility. The hedge program requires purchases of natural gas at fixed prices in
gradual stages in advance of when it is required to reduce the size of this short position and
associated customer risk. Likewise, on the power side, PacifiCorp either purchases or sells power
in gradual stages in advance of anticipated open short or long positions to manage price volatility
on behalf of customers.
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
245
Since 2003, PacifiCorp’s hedge program has employed a portfolio approach of dollar cost
averaging to progressively reduce net power cost risk exposure over a defined time horizon while
adhering to best practice risk management governance and guidelines. The Company’s current
portfolio hedging approach is defined by increasing risk tolerance levels represented by
progressively increasing percentage of net power costs across the forward hedging period.
PacifiCorp incorporated a time to expiry value at risk (TEVaR) metric in May 2010. In May
2012, as a result of multiple hedging collaboratives, the Company reintroduced natural gas
percent hedge volume limits of forecast requirements into its policy. There has been no conflict
to-date between the new volume limits and the Company’s VaR and TEVaR limits, although the
volume limits would supersede in such conflict, consistent with the guidelines from the hedging
collaboratives.
The primary governance of PacifiCorp’s hedging activities is documented in the Company’s
Risk Management Policy. In May 2010, PacifiCorp moved from hedging targets based on
volume percentages to targets based on the “to expiry value-at-risk” or TEVaR metric. The
primary goal of this change was to increase the transparency of the combined natural gas and
power exposure by period. It enhances the progressive approach to hedging that the Company
has employed for many years and provides the benefit of a more sophisticated measure of risk
that responds to changes in the market and changes in open natural gas and power positions.
Importantly, the TEVaR metric automatically reduces hedge requirements as commodity price
volatility decreases and increases hedge requirements as correlations among commodities
diverge, all the while maintaining the same customer risk exposure.
Dollar cost averaging is the term used to describe gradually hedging over a period of time rather
than all at once. This method of hedging, which is widely used by many utilities, captures time
diversification and eliminates speculative bursts of market timing activity. Its use means that at
times the Company buys at relatively higher prices and at other times relatively lower prices,
essentially capturing an array of prices at many levels. While doing so, PacifiCorp steadily and
adaptively meets its hedge goals through the use of this technique while staying within VaR and
TEVaR and natural gas percent hedge volume limits.
The result of these program changes in combination with changes in the market (such as reduced
volatility to which the Company’s program automatically responds), has been a significant
decrease in PacifiCorp’s longer-dated hedge activity, i.e., four years forward on a rolling basis.
As a result of the hedging collaboratives, PacifiCorp made the following material changes to its
policy in May 2012: (l) a reduction in the standard hedge horizon from 48 months to 36 months
and (2) a percent hedged range guideline for natural gas for each of the three forward l2-month
periods, which includes a minimum natural gas open position in each of the forward 12-month
periods. The percent hedged range guideline is greater for the first rolling twelve months and
gradually smaller for the second and third rolling twelve-month periods. PacifiCorp also agreed
to provide a new confidential semi-annual hedging report.
Cost Minimization
While hedging does not minimize net power costs, PacifiCorp takes many actions to minimize
net power costs for customers. First, the Company is engaged in integrated resource planning to
plan resource acquisitions that are anticipated to provide the lowest cost resources to our
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
246
customers in the long-run. PacifiCorp then issues competitive requests for proposals to assure
that the resources we acquire are the lowest cost resources available on a risk-adjusted basis. In
operations, PacifiCorp optimizes its portfolio of resources on behalf of customers by maintaining
and operating a portfolio of assets that diversifies customer exposure to fuel, power market and
emissions risk and utilize an extensive transmission network that provides access to markets
across the western United States. Independent of any natural gas and electric price hedging
activity, to provide reliable supply and minimize net power costs for customers, the Company
commits generation units daily, dispatches in real time all economic generation resources and all
must-take contract resources, serves retail load, and then sells any excess generation to generate
wholesale revenue to reduce net power costs for customers. PacifiCorp also purchases power
when it is less expensive to purchase power than to generate power from our owned and
contracted resources.
Hedging cannot be used to minimize net power costs. Hedging does not produce a different
expected outcome than not hedging and therefore cannot be considered a cost minimization tool.
Hedging is solely a tool to mitigate customer exposure to net power cost volatility and the risk of
adverse price movement. However, PacifiCorp does minimize the cost of hedging by transacting
in liquid markets and utilizing robust protections to mitigate the risk of counterparty default. In
addition, PacifiCorp reduces the amount of hedging required to achieve a given risk tolerance
through its portfolio hedge management approach, which takes into account offsetting exposures
when these commodities are correlated, as opposed to hedging commodity exposures to natural
gas and power in isolation without regard for offsets.
Portfolio
PacifiCorp has a short position in natural gas because of its ownership of gas-fired electric
generation that requires it to purchase large quantities of natural gas to generate electricity to
serve its customers. PacifiCorp may have short or long positions in power depending on the
shortfall or excess of the Company’s total economic generation relative to customer load
requirements at a given point in time.
The Company hedges its net energy (combined natural gas and power) position on a portfolio
basis to take full advantage of any natural offsets between its long power and short natural gas
positions. Analysis has shown that a “hedge only power” or “hedge only natural gas” approach
results in higher risk (i.e., a wider distribution of outcomes). There is a natural need for an
electric company with natural gas fired electricity generation assets to have a hedge program that
simultaneously manages natural gas and power open positions with appropriate coordinated
metrics. PacifiCorp’s risk management department incorporates daily updates of forward prices
for natural gas, power, volatilities and correlations to establish daily changes in open positions
and risk metrics which inform the hedging decisions made every day by Company traders.
PacifiCorp’s hedge program does not rely on a long power position. However, the Company’s
hedge program takes into account its full portfolio and utilizes continuously updated correlations
of natural gas and power prices and thereby takes advantage of offsetting natural gas and power
positions in circumstances when prices are correlated and a forecast long power position offsets a
forecast short natural gas position. This has the effect of reducing the amount of natural gas
hedging that the Company would otherwise pursue. Ignoring this correlation would instead result
in the need for more natural gas hedges to achieve the same level of customer risk reduction.
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
247
PacifiCorp’s customers have benefited from offsetting power and natural gas positions. Power
and natural gas prices are closely related because natural gas is often the fuel on the margin in
efficient dispatch, as is practiced throughout the western U.S. This means power sales tend to be
more valuable in periods when natural gas is high cost, producing revenues that are a credit or
offset to the high cost fuel. If spot natural gas prices depart from prior forward prices, power
prices will tend to do so in the same direction, thereby naturally hedging some of the unexpected
cost variance.
Effectiveness Measure
The goal of the hedging program is to reduce volatility in the Company’s net power costs
primarily due to changes in market prices. The goal is not to “beat the market” and, therefore,
should not be measured on the basis of whether it has made or lost money for customers. This
reduction in volatility is calculated and reported in the Company’s confidential semi-annual
hedging report which it began producing as a result of the hedging collaborative.
Instruments
The Company’s hedging program allows the use of several instruments including financial
swaps, fixed price physical and options for these products. PacifiCorp chooses instruments that
generally have greater liquidity and lower transaction costs. The Company also considers, with
respect to options, the likelihood of disallowance of the option premium in its six jurisdictions.
There is no functional difference between financial swaps and fixed price physical transactions;
both instruments are equally effective in hedging the Company’s fixed price exposure.
Treatment of Customer and Investor Risks
The IRP standards and guidelines in Utah require that PacifiCorp “identify which risks will be
borne by ratepayers and which will be borne by shareholders.” This section addresses this
requirement. Three types of risk are covered: stochastic risk, capital cost risk, and scenario risk.
Stochastic Risk Assessment
Several of the uncertain variables that pose cost risks to different IRP resource portfolios are
quantified in the IRP production cost model using stochastic statistical tools. The variables
addressed with such tools include retail loads, natural gas prices, wholesale electricity prices,
hydroelectric generation, and thermal unit availability. Changes in these variables that occur over
the long-term are typically reflected in normalized revenue requirements and are thus borne by
customers. Unexpected variations in these elements are normally not reflected in rates, and are
therefore borne by investors unless specific regulatory mechanisms provide otherwise.
Consequently, over time, these risks are shared between customers and investors. Between rate
cases, investors bear these risks. Over a period of years, changes in prudently incurred costs will
be reflected in rates and customers will bear the risk.
Capital Cost Risks
The actual cost of a generating or transmission asset is expected to vary from the cost assumed in
the IRP. State commissions may determine that a portion of the cost of an asset was imprudent
and therefore should not be included in the determination of rates. The risk of such a
PACIFICORP – 2015 IRP CHAPTER 9 – ACTION PLAN AND RESOURCE PROCUREMENT
248
determination is borne by investors. To the extent that capital costs vary from those assumed in
this IRP for reasons that do not reflect imprudence by PacifiCorp, the risks are borne by
customers.
Scenario Risk Assessment
Scenario risk assessment pertains to abrupt or fundamental changes to variables that are
appropriately handled by scenario analysis as opposed to representation by a statistical process or
expected-value forecast. The single most important scenario risks of this type facing PacifiCorp
continues to be government actions related to CO2 emissions, renewable resources to meet
compliance requirements, and changes in load and transmission infrastructure. These scenario
risks relate to the uncertainty in predicting the scope, timing, and cost impact of CO2 emission
and renewable standard compliance rules.
To address these risks, PacifiCorp evaluates resources in the IRP and for competitive
procurements using a range of CO2 policy assumptions consistent with the scenario analysis
methodology adopted for PacifiCorp’s 2015 IRP portfolio development and evaluation process.
The Company’s use of IRP sensitivity analysis covering different resource policy and cost
assumptions also addresses the need for consideration of scenario risks for long-term resource
planning. The extent to which future regulatory policy shifts do not align with PacifiCorp’s
resource investments determined to be prudent by state commissions is a risk borne by
customers.