HomeMy WebLinkAbout20150225notice_of_modified_procedure_order_no_33235.pdfOffice of the Secretary
Service Date
February 25.2015
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION )
OF ROCKY MOUNTAIN POWER FOR )CASE NO.PAC-E-15-0l
AUTHORITY TO INCREASE RATES BY )
S 10.7 MILLION TO RECOVER DEFERRED )NOTICE OF
NET POWER COSTS THROUGH THE )i”IODIFIED PROCEDURE
ENERGY COST ADJUSTMENT )
MECHANISM (ECAM))ORDER NO.33235
_______________________________________________________________________________________
)
On February 2,2015,PacifiCorp dba Rocky Mountain Power (“Rocky Mountain”or
“Company”)submitted its annual Energy Cost Adjustment Mechanism (“ECAM”)filing in
accordance with Idaho Code §61-502 and 61-503,and Rule of Procedure 52,IDAPA
3 1.01.01.052.The Company requests an effective date of April 1,2015.Rocky Mountain
requests that this matter be processed through Modified Procedure.
On February 12.2015,the Commission issued a Notice of Application and
Intervention Deadline.See Order No.33228.Subsequently,the Commission has received
Petitions to Intervene in this case from Monsanto Company (“Monsanto”)and PacifiCorp Idaho
Industrial Customers (“PHC”).
NOTICE OF MODIFIED PROCEDURE
YOU ARE HEREBY NOTIFIED that the Commission has determined that the public
interest may not require a formal hearing in this matter and will proceed under Modified
Procedure pursuant to Rules 201 through 204 of the Idaho Public Utilities Commission’s Rules
of Procedure,IDAPA 31.01.01.201 through .204.The Commission notes that Modified
Procedure and written comments have proven to be an effective means for obtaining public input
and participation.
YOU ARE FURTHER NOTIFIED that any person desiring to state a position on this
Application may file a written comment in support or opposition with the Commission no later
than Friday,March 13,2015.The comment must contain a statement of reasons supporting the
comment.Persons desiring a hearing must specifically request a hearing in their written
comments.Written comments concerning this Application shall be mailed to the Commission
and Rocky Mountain Power at the addresses reflected below:
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33235 1
Commission Secretary Yvonne R.Hogle
Idaho Public Utilities Commission Assistant General Counsel
P0 Box 83720 Rocky Mountain Power
Boise,ID 83720-0074 201 South Main Street,Suite 2400
Salt Lake City,UT 84111
Street Address for Express Mail:E-Mail:yvonne.hogiepacificorp.com
472 W.Washington Street Ted Weston
Boise,ID 83702-5918 Idaho Regulatory Affairs Manager
Rocky Mountain Power
201 South Main Street,Suite 2300
Salt Lake City,UT 84111
E-Mail:ted.weston@pacificorp.com
These comments should contain the case caption and case number shown on the first page of this
document.Persons desiring to submit comments via e-mail may do so by accessing the
Commission’s home page located at www.puc.idaho.gov.Click the “Case Comment or Question
Form”under the “Consumers”tab,and complete the comment form using the case number as it
appears on the front of this document.These comments must also be sent to Rocky Mountain at
the e-mail addresses listed above.
YOU ARE FURTHER NOTIFIED that reply comments may be filed no later than
Friday,March 20,2015.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are
received within the time limit set,the Commission will consider this matter on its merits and
enter its Order without a formal hearing.If written comments are received within the time limit
set,the Commission will consider them and,in its discretion,may set the same for formal
hearing.
YOU ARE FURTHER NOTIFIED that the Application,testimonies,and exhibits
have been filed with the Commission and are available for public inspection during regular
business hours at the Commission offices.The Application,testimonies and exhibits are also
available on the Commission’s web site at wrvw.puc.idaho.gov.Click on the “File Room”tab at
the top of the page,scroll down to “Open Electric Cases,”then click on the case number as
shown on the front of this document.
YOU ARE FURTHER NOTIFIED that all proceedings in this case will be held
pursuant to the Commission’s jurisdiction under Title 61 of the Idaho Code and specifically
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33235 2
Idaho Code 6 1-502-503.The Commission may enter any final Order consistent with its
authority under Title 61.
YOU ARE FURTHER NOTIFIED that all proceedings in this matter will be
conducted pursuant to the Commission’s Rules of Procedure,IDAPA 3 1.01.01.000 ci seq.
ORDER
IT IS HEREBY ORDERED that this Application be processed under Modified
Procedure.Persons interested in submitting written comments regarding this case should do so
no later than March 13.2015.
IT IS FURTHER ORDERED that Rocky Mountain may file reply comments,if
necessary,no later than March 20,2015.
DONE by Order of the Idaho Public Utilities Commission at Boise,Idaho this
day of February 2015.
/7/;/
/
PAUL KJELLANDR,PRESIDENT
\L_4L.4j
MACK A.REDFORD,&M1’ilSSIONER
KR TINE RAPER,COMMISSIONER
ATTEST:
Je
ommission Secretary
O:PAC-E-I 5-OI_np2
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33235 3