HomeMy WebLinkAbout20160608IPC Compliance Filing of Common Equipment.pdfriIC E IVED
?ili6 ruli -8 PH 12: I I
,'' l^l t,1- .iir
't itSSlON, I ..,\,.,r!irrtv
38ffi*.
An IDACORP Companv
JULIA A. HILTON
Senior Counsel
ihi lton@idahopower.com
June 8, 2016
VIA HAND DELIVERY
Jean D. Jewell, Secretary
ldaho Public Utilities Commission
472 West Washington Street
Boise, ldaho 83702
Re: Case Nos. IPC-E-1441and PAC-E-14-11
Exchange of Certain Transmission Assets - ldaho Power Company's
Gompliance Filing of Updated Lists of Common Equipment
Dear Ms. Jewell:
Enclosed for filing in the above matters please find four (4) copies of the Joint
Ownership and Operating Agreement between ldaho Power Company and PacifiCorp
dated April 27,2016 ("Agreement"). Pursuant to Order No. 33313, updated Iists of
common equipment are to be filed with the ldaho Public Utilities Commission. The
enclosed Agreement includes the requested updated lists of each party's common
equipment. Please note that the Agreement is in tariff format so the document is
formatted in accordance with Federal Energy Regulatory Commission requirements.
The Agreement is being served on the parties to these proceedings.
Very truly yours,
JAH:csb
Enclosures
cc: Service List
1221 W. ldaho St. (83702)
PO. Box 70
Boise, lD 83707
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on the 8th day of June 2016 t served a true and correct
copy of IDAHO POWER COMPANY'S COMPLIANCE FILING OF UPDATED LISTS OF
COMMON EQUIPMENT upon the following named parties by the method indicated
below, and addressed to the following:
Commission Staff
Daphne Huang
Deputy Attorney General
ldaho Public Utilities Commission
472 West Washington (83702)
P.O. Box 83720
Boise, ldaho 83720-007 4
PacifiCorp
Danie! E. Solander
Yvonne R. Hogle
Rocky Mountain Power
1407 West North Temple, Suite 320
Salt Lake City, Utah 84116-3187
lndustrial Customers of ldaho Power
Peter J. Richardson
RICHARDSON ADAMS, PLLC
515 North 27th Street (83702)
P.O. Box 7218
Boise, ldaho 83707
Dr. Don Reading
6070 Hill Road
Boise, ldaho 83703
X Hand Delivered
U.S. Mail
Overnight Mail
FAX
Email daphne.huans@puc.idaho.sov
Hand Delivered
U.S. Mail
Overnight Mail
FAXX Email daniel.solander@pacificorp.com
Yvonne. hogle@ pacificorp. com
_Hand DeliveredX U.S. Mail
_Overnight Mail
FAX
Email peter@richardsonadams.com
Hand Delivered
U.S. Mail
,Overnight Mai!
FAX
Email dreadinq@mindsprins.com
CERTIF]CATE OF SERVICE
Idaho Power Company
FERC Elechic Tariff
Rate Schedules
RTCEIVED
2il16 Jiili -8 Pl{ 12: lE
i'i' '' 13 i:''uBLlcr ,;-CCn'tUtSSlOH
1.158
Page I of8
Version 0.0.3
Effective:
Filed on : April27,2016
JOINT OWNI'ERSIIIP AIID OPERATING AGREEMENT
BETWEEN
IDAHO POWER COMPAI\TY
AI\ID
PACIFICORP
DATED APRIL 27,2016
FERC Docka No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158
Page 2 of8
Version 0.0.3
TABLE OF CONTENTS
ARTICLE I DEFIMTIONS; RIILES OF INTERPRETATION1.1 Definitions1.2 Rules of Construction
ARTICLE II TERM2.1 Effectiveness of this Agreement2.2 Term2.3 Termination..............2.4 Effect of Termination
ARTICLE III TRANSMISSION FACILITIES OWI\TERSHIP INTERESTS........3.1 Ownershiplnterests3.2 Capacity Allocations...............3.3 Adjustment of Capacity Allocations and Ownership lnterests3.4 QualifiedOwner......3.5 No Right to Use......3.6 Payments3.7 Waiver of Panition Rights......3.8 Nonexclusive License to Enter and Use Real Properfy............3.9 Access to Antelope Substation for Idaho Power Maintenance of
Department of Energy Facilities
ARTICLE IV OPERATOR OF TRANSMISSION FACILITIES4.1 Appointment of Operator ...............4.2 Authority of Operator...............4.3 DelegationofResponsibilities
4.4 GovernmentalAuthorizations4.5 Audit.......4.6 Insurance4.7 Invoices
4.8 Disputed Amounts..4.9 Assistance
4.10 Remedies
ARTICLE VOPERATION AND MAINTENAIICE OF TRANSMISSION
FACILITIES..........5.1 Compliance; Standard of Work...5.2 Operation and Maintenance; Outages and Outage Coordination;
Capital Upgrades and Improvements
5.3 Requests for Generation or Transmission Interconnection Service
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
ARTICLE Vr............
9.1
9.2
9.3
9.4
9.5
9.6
ARTICLE
t2.t
12.2
12.3
XII EVENTS OF DEFAT]LT
Event of Default
Cure by Non-Defaulting Party
Remedies
1.158
Page 3 of8
Version 0.0.3
TRANSMISSION FACILITIES CAPITAL UPGRADES PROPOSED BY AI\
owNER.6.1 Capital Upgrades
6.2 McNary Transmission Project
ARTICLE \rII PHYSICAL DAMAGE TO TRANSMISSION FACILITIES;
CONDEMNATION.7.1 Rebuilding Damaged Facilities7.2 Decision not to Rebuild....
7.3 Purchase of Ownership Interest................
7.4 Cooperation..............
7 -5 Condemnation ...........
ARTICLE VIII
RETIREMENT AIID DECOMMISSIONING OF TRANSMISSION
FACILITIES ..........8.1 Decision to Retire Transmission Facilities..............
8.2 Costs of Decommissioning..
8.3 Purchase of Ownership Interest................
8.4 Cooperation..............
ARTICLE IX TRANSMISSION SYSTEM BOTJIIDARIES
Points of Interconnection; Points of Balancing Authority Area
Adjacency
E-Tags
Dynamic Transfer Capability Rights......
Jim Bridger Pseudo Tie...........
Electric Losses......
Jim Bridger Project Generation RAS.........
ARTICLE X TRANSMISSION SYSTEMS OPERATION AIID
MAINTENAIICE
10.1 ServiceConditions
10.2 Survival
ARTICLE XI FORCE MAJET'REl1.l Force Majeure Defined....
ll.2 Effect of Force Majeure
Effective:
Filed on : Apil27,20l6
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
ARTICLE XIII REPRESENTATIONS AND WARRANTIES.......
l.158
Page 4 of8
Version 0.0.3
13.1 Representations and Waranties of Idaho Power
13.2 Representations and Warranties of PacifiCorp
ARTICLE XIV INDEMNIFICATION14.l Indemnities ...............
14.2 Notice and Participation
14.3 NetAmount.............
14.4 No Release of Insurers ....-.....-..
14.5 Mitigation
14.6 Assertion of Claims
14.7 Survival ofObligation............
14.8 Limitation on Liability
ARTICLE XV PROPRIETARY INFORMATION
15.1 Disclosure of Proprietary Information Prohibited
15.2 Disclosure by Representatives
15.3 PermiuedDisclosures
15.4 Injunctive Relief
15.5 Publicity
15.6 Proprietary Information Defined
15.7 Survival
ARTICLE XW TAXES
16.1 No Parbrership..........
16.2 761 Election...............
16.3 Responsibility for Ta<es.......
16.4 Indemnification ........
16.5 Determination of Depreciation and Other Matters.....
XVII DISPUTES
Exclusive Procedure
Dispute Notices
lnformal Dispute Resolution
Submission of Dispute to FERC or Approved Courts
Continued Performance.............
ARTICLE XVIII ASSIGNMENT.
18.1 Prohibited Transfers and Assignments.......
18.2 Permitted Assignments and Transfers..
18.3 FERC Approval
ARTICLE XIX MISCELLANEOUS .......l9.l Notices.....
19.2 Parties Bound
19.3 Amendments............
ARTICLE
t7.l
17.2
17.3
17.4
t7.5
Effective:
Filed on : Aprit27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
DG{IBITS
Exhibit A
Exhibit B
Exhibit C
Exhibit D
Exhibit E
Exhibit F
Exhibit G
I .158
Page 5 of8
Version 0.0.3
19.4 Waivers....
19.5 Choice of Law
19.6 Headings
19.7 Relationship of Parties...............
19.8 Severability
19.9 No Third Party Benefi ciaries.............
I 9. I 0 Further Assurances ...............
19.11 Conflict of Interest
19.12 Exhibits and Schedules............
19.13 Counterparts ...............
19.14 Entire Agreement
SCHEDULES
Schedule 13.1(f)
Schedule 13.2(f)
Description of PacifiCorp Common Equipment
Description of Idaho Power Common Equipment
Ownership Interests; Directional Capacity Allocations; Directional Capacity
Allocation Percentages
Monthly Transmission Facilities O&M Charge; Monthly Substation O&M
Charge; Monthly Common Equipment Charge
Department of Energy Equipment Located in the Antelope Substation
Acquisition Costs
Joint Ownership Transmission Loss Calculation and Allocation Methodology
Idaho Power Governmental Authorizations
Pacifi Corp Govemmental Authorizations
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.158
Page 6 of8
Version 0.0.3
JOINT OWNERSHIP AND OPERATING AGREEMENT
This Joint Ownership and Operating Agreement, dated as of October 24,2014, as
amended and restated on October 30, 2015, and further amended and restated on April27,
2016, is between PacifiCorp, an Oregon corporation, ("PacifiCorp"), and Idatro Power, an
Idaho corporation ("Idaho Power"). Each of PacifiCorp and Idaho Power are sometimes
hereinafter referred to individually as 6(P@" and collectively as "Esrtieg.".
RECITALS:
WHEREAS, Idaho Power is a transmission provider which owns, controls and
operates, or in certain cases only operates, equipment for the transmission of electric power
and energy located in Idatro, Oregon, Washington and Wyoming (the "Idaho Power
Transmission System");
WHEREAS,Idaho Power uses the Idaho Power Transmission System, its
distribution system and its generation resources to provide retail and wholesale electric
services, and is the NERC recognized Balancing Authority Operator of one Balancing
Authority Area;
WHEREAS, PacifiCorp is a transmission provider which owns, control and
operates, or in certain cases only operates, equipment for the transmission of electric power
and energy located in Idaho, Oregon, Washington and Wyoming (the "Pagifieqp
Transmission System");
WHEREAS, PacifiCorp uses the PacifiCorp Transmission System, its distribution
system and its generation resources to provide retail and wholesale electric services, and is
the NERC recognized Balancing Authority Operator of two Balancing Authority Areas
(PACW and PACE);
WHEREAS, the Idaho Power Transmission System and the PacifiCorp
Transmission System interconnect at the Points of lnterconnection and the Idatro Power
and PacifiCorp Balancing Authority Areas are considered Adjacent Balancing Authority
Areas at the Points of Balancing Authority Area Adjacency;
WHEREAS, the Idaho Power Transmission System and the PacifiCorp
Transmission System include certain equipment for the transmission of electric power and
energy located in Idaho and Wyoming that are jointly owned and were operated pursuant to
certain legacy agreements between the Parties;
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158
Page 7 of8
Version 0.0.3
WHEREAS, the Parties previously desired to exchange with one another certain
jointly-owned and wholly-owned equipment to provide each Party with transmission
capacity that better aligns with the current configuration of its Transmission System and
current load service obligations, each of which had changed since the jointly-owned and
wholly-owned equipment were originally constructed;
WHEREAS, in order to facilitate such an exchange, the Parties previously entered
into a Joint Purchase and Sale Agreement (the "JPSA"), dated as of October 24,2014 (the
"Execution Date"), pursuant to which at the closing of the transaction contemplated by the
JPSA: (i) the ownership of certain jointly-owned equipment was reallocated and the
ownership of certain additional equipment was exchanged between the Parties; and (ii)
certain legacy agreements between the Parties were terminated and the transmission service
contained therein converted to OATT service;
WHEREAS, PacifiCorp individually owns additional equipment that serve and are a
part of the PacifiCorp Transmission System and will not be part of the Transmission
Facilities, but that PacifiCorp will make available to support the operation of the
Transmission Facilities (as further described in Exhibit A, the "PacifiCorp Common
Equipment");
WHEREAS, Idaho Power individually owns additional equipment that serve and are
aptrt of the Idatro Power Transmission System and will not be part of the Transmission
Facilities, but that Idaho Power will make available to support the operation of the
Transmission Facilities (as further described in Exhibit B, the "Idaho Power Common
Equipment" and, together with the PacifiCorp Common Equipment, the "Common
Equipment"); and
WHEREAS, in connection with the JPSA, the Parties previously entered into a Joint
Ownership and Operating Agreement, dated as of the Execution Date (the "2014
Aqreement"), in order to: (1) acknowledge each Party's ownership interest in the jointly-
owned Transmission Facilities; (2) allocate the transmission capacity of the jointly-owned
Transmission Facilities; (3) allocate operational responsibility for the Transmission
Facilities as between the Parties; (4) define the responsibility of the Operators with respect
to the operation and maintenance of the Transmission Facilities and Common Equipment;
and (5) define the responsibilities of the Owners with respect to the operation of their
Transmission Systems in relation to the other.
WHEREAS, pursuant to 9.5 of the 2014 Agreement, the Parties agreed to, on or
before the Effective Date of the 2014 Agreement, develop an OATT-based losses
methodology (the "Losses Methodology");
Effective:
Filed on : April 27 ,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158
Page 8 of8
Version 0.0.3
WHEREAS, the Parties developed the Losses Methodology and on October 31,
2015 amended and restated the2014 Agreement in its entiret5r to, among other things,
incorporate the Losses Methodology as Exhibit G thereto and make certain conforming
revisions to Section 9.5 thereof (the "2015 Agreement"); and
WHEREAS, the Parties now seek to amend and restate the 2015 Agreement to
include certain additional Transmission Facilities and Common Equipment and to clarify
the application of certain provisions of the Agreement with respect to Common Equipment
and certain wholly-owned Transmission Facilities, subject to and on the terms and
conditions provided for herein.
NOW, TIEREFORE, for good and valuable consideration, the receipt and
sufficiency of which are hereby acknowledged,Idaho Power and PacifiCorp agree as
follows:
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-l 507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l. ls8. I
Page I ofl0
Version 0.0.2
ARTICLE I
DEFIMTIONS: RULES OF INTERPRETATION
1.1 Definitions.
Unless the context otherwise requires, the following capitalized terms have the meanings
given to them below:
"Adjacent Balancing Authority Area" has the meaning set forth in the Reliability
Standards.
"Affected Party" has the meaning given to such term in Section 11.1.
"Affiliate" means, with respect to a Person, each other Person that, directly or
indirectly, controls, is controlled by or is under common control with, such designated Person;
provided, however, that in the case of PacifiCorp, the term "Affiliate" does not include
Berkshire Hathaway Inc. or any of its affiliates (other than PacifiCorp and any direct or
indirect subsidiaries of PacifiCorp), and no provision of this Agreement shall apply to, be
binding on, create any liability of, or otherwise restrict the activities of, Berkshire Hathaway
Inc. or any of its affiliates (other than PacifiCorp and any direct or indirect subsidiaries of
PacifiCorp). For the purposes of this definition, "control" (including with correlative
meanings, the terms "controlled by" and "under common control with"), as used with respect
to any Person, shall mean (a) the direct or indirect right to cast at least fifty percent (50%) of
the votes exercisable at an annual general meeting (or its equivalent) of such Person or, if there
are no such rights, ownership of at least fifty percent (50%) of the equity or other ownership
interest in such Person, or (b) the right to direct the policies or operations of such Person.
"AE@" means allowance for funds used during construction and has the meaning set
forth in 18 CFR $ 101, Elechic Plant Instructions $ 17 (2014), as amended from time-to-time.
"Asreement" means this Joint Ownership and Operating Agreement (including all
Exhibits and Schedules attached hereto), as the same may be amended and supplemented from
time to time in accordance with the terms hereof.
"Anqendmefi" has the meaning given to such term in Section 6.1(aXi).
"Approved Courts" has the meaning given to such term in Section 17.4.
"Automatic Generation " has the meaning set forth in the Reliability Standards.
"Balancing Authority Ared' means the collection of generation, transmission and loads
within the metered boundaries of each Owner determined in accordance with the Reliability
Standards.
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
ldaho Power Company
FERC Electric Tariff
Rate Schedules
1 .1 58.1
Page 2 of l0
Version 0.0.2
"Bankrup!" means, with respect to any Person, that such Person: (a) files a petition or
otherwise commences, authorizes or acquiesces in the commencement of a proceeding or
cause of action under any bankruptcy, insolvency, reorganization or similar law, or has any
such petition filed or commenced against it; (b) makes an assignment or any general
affangement for the benefit of creditors; (c) otherwise becomes insolvent (however
evidenced); (d) has a liquidator, administrator, receiver, trustee, conservator or similar official
appointed with respect to it or any substantial portion of its property or assets; or (e) is
generally unable to pay its debts as they fall due.
"Business Days" means any day except a Safurday, Sunday and any day which is a
legal holiday or a day on which banking institutions in New York, New York are authorized or
obligated by Governmental Requirements to close.
"Capital Upgrade Notice" has the meaning given to such term in Section 6.1(a).
"Claingg" has the meaning given to such term in Section 14.1(.a).
"Closing Date" has the meaning given to such term in the JPSA.
"Code" has the meaning given to such term in Section 16.2.
"Commercially Reasonfi ' means the level of effort thal a reasonable electric
utility would take in light of the then known facts and circumstances to accomplish the
required action at a then commercially reasonable cost (taking into account the benefits to be
gained thereby).
"Common Equipment" has the meaning given to such term in the recitals and includes
all ancillary equipment necessary to support the operation of the Substations, including land,
site preparation, improvements (control building and other permanent buildings),
communications equipment, control equipment, SCADA, relays, batteries, battery chargers,
cable trench, cabling, local service, security equipment, fencing, yard gravel, and grounding.
Each Owner's Common Equipment, sorted by Substation, on the Effective Date is identified
on Exhibit A or Exhibit B.
"Continuindumq" has the meaning given to such term in Section 7.3.
6(Costs" means, with respect to the construction, reconstruction or upgrade of the
Transmission Facilities or Common Equipment by or on behalf of the Operator responsible for
such Transmission Facilities or Common Equipment pursuant to this Agreement, including
capital upgrades and improvements thereto, such Operator's actual cost of: (a) preliminary
surveys and investigations and property acquisitions in connection therewith; and (b) the
development, design, engineering, procurement, construction, reconstruction and upgrade of
such Transmission Facilities and Common Equipment, including an allowance for AFUDC
and applicable overheads determined in accordance with such Operator's customary practices,
Effective:
Filed on : April27,20l6
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
r.l58.l
Page 3 of l0
Version 0-0.2
as calculated in accordance with FERC's Uniform System of Accounts; provided, however.
AFUDC shall be recovered by Operators, if at all, in accordance with Section 4.7(b).
"Damage Notice" has the meaning given to such term in Section 7.1(a).
"Damaeed Facilitied'has the meaning given to such term in Section 7.1(a).
"Decommissioning Notice" has the meaning given to such term in Section 8.3.
"Defaulligg_Party" has the meaning given to such term in Section 12.1.
"Delegate" has the meaning given to such term in Section 4.3.
"Directional Capacity Allocation" has the meaning given to such term in Section 3.2(a).
"Directional Capaci 'has the meaning given to such term in
Section 3.2(a).
6'pjgp1!e" has the meaning given to such term in Section 17.1.
"Dispute Notice" has the meaning given to such term in Section 17.2.
"Dynamic Transfer Capabilitv" means the intra-hour deviation from scheduled flow.
"Effective Date" has the meaning given to such term in Section 2.1.
"Enersy Emergency" has the meaning set forth in the applicable version of NERC
Reliability Standard EOP-002, which pertains to capacity and energy emergencies.
"Event of Default" has the meaning given to such term in Section 12.1.
"Executio4_Date" has the meaning given to such term in the preamble.
"ExeggliveQ)" has the meaning given to such term in Section 17.3(a).
"Excluded Transmiss 'has the meaning given to such term in Section
3.8(h).
"FE.BQ" means the Federal Energy Regulatory Commission.
"FERC Methodology" has the meaning given to such term in Section 4.7(b).
"FERC Uniform System of Accounts" means the Uniform System of Accounts
Prescribed for Public Utilities and Licensees Subject to the Jurisdiction of the Federal Power
Act prescribed by FERC, and codified as of the Execution Date at l8 C.F.R. Part 101, as the
same may be amended from time to time.
Effective:
Filed on : Apil27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.l58.l
Page 4 of l0
Version 0.0.2
"Facilities Proposed " means the Transmission Facilities or Common
Equipment that are the subject of a Decommissioning Notice.
"Force Majeure" has the meaning given to such term in Section I l.l.
"Good Utility Practicd'means any of the practices, methods and acts engaged in or
approved by a significant portion of the electric utility industry during the relevant time period,
or any of the practices, methods and acts which, in the exercise of reasonable judgment in light
of the facts known at the time the decision was made, would have been expected to accomplish
the desired result at a reasonable cost consistent with good business practices, reliability,
safety and expedition. Good Utility Practice is not intended to be limited to the optimum
practice, method, or act to the exclusion of all others, but rather to be acceptable practices,
methods, or acts generally accepted in the region, including those practices required by Federal
Power Act section 215(a)(4),16 U.S.C. $ 82ao(a)(4)(2014).
"Govemmental AuthoriV'means any federal, state, local or municipal governmental
body; any govemmental, quasi-govemmental, regulatory or administrative agency,
commission, body or other authority exercising or entitled to exercise any adminiskative,
executive, judicial, legislative, policy, regulatory or taring authority or power, including
FERC, NAESB, NERC or any regional reliability council; or any court or governmental
tribunal, in each case, having jurisdiction over the Person or matter in question, including
either Owner (including in its capacity as Operator) or any of its Affiliates or the ownership,
use, operation and maintenance, repair and reconstruction, or retirement and decommissioning
of all or a portion of the Transmission Facilities or the Common Equipment.
"Govemmental Authoriz 'means any license, permit, order, approval, filing,
waiver, exemption, variance, clearance, entitlement, allowance, franchise, or other
authorization from or by a Governmental Authority that is applicable to the Person or matter in
question.
"Governmental Requir 'means all laws, stafutes, ordinances, rules, regulations,
codes, and similar acts or promulgations or other legally enforceable requirements of any
Govemmental Authority that are applicable to the Person or matter in question.
ooldaho Power" has the meaning given to such term in the preamble.
"Idaho Power Common Equipment" has the meaning given to such term in the recitals.
"Idaho Power License" has the meaning given to such term in Section 3.8(aXi).
"Idaho Power Real Prop " has the meaning given to such term in Section
3.8(aXii).
"Idaho Power_Sites" has the meaning given to such term in Section 3.8(aXii).
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.l58.l
Page 5 of l0
Version 0.0.2
"Idaho Power Transmissi " has the meaning given to such term in the recitals.
"Impacted Party" means a Party whose Directional Capacity Allocation
Percentage(s) or Directional Capacity Allocation(s) is reasonably expected to have a
material adverse effect by the decision to be made.
"Indemnified Party" has the meaning given to such term in Section 14.1(a).
"Indemnifying Party" has the meaning given to such term in Section 14.1(a).
"Interconnection Owd'has the meaning given to such term in Section 5.3.
"Intemrpting Olvner" has the meaning given to such term in Section 10.1(c).
"Jim Brideer Projecf'means the four-unit Jim Bridger coal fired electric power plant
and related facilities, of which Idaho Power's ownership share is l/3, and PacifiCorp's
ownership share is 2/3 and which is metered at the bus bar located at the Jim Bridger Project.
"Jim Bridger Project Net Generation" means the gross generation output of the four
Jim Bridger Project generators metered on the low side of the generator step up
transformers, minus the calculated losses on the four step up transformers, minus the
tertiary loads on the 3451230 kV transformers #1 and #2, minus the 230/34 kV transformer
#5 load, as calculated below:
Jim Bridger total generation - (Jim Bridger Unitl)2 + (Jim Bridger lJni2)z
+ (Jim Bridger Uni6)2 + (Jim Bridger Unit4F) x@.4 x 10-6) - 1.2 -
XFMRltertiary - )GMR2tertiary - XFMR5.
"Jim Bridger Transmission Losses" means the calculated line losses on the Jim
Bridger-Goshen, Jim Bridger-Populus #l and #2, Populus-Kinport, and Populus-Borah #l
and#2 345 kV lines, and the transformer losses on the Jim Bridger 3451230kV
transformers #1, 2 and3.
6'JPSA" has the meaning given to such term in the recitals.
"Losses" mean any and all damages and losses, deficiencies, liabilities, ta)<es,
obligations, penalties, judgments, settlements, claims, payments, fines, interest, costs and
expenses, whether or not resulting from third party claims, including the costs and expenses of
any and all actions and demands, assessments, judgments, settlements and compromises
relating thereto and the costs and expenses of attorneys', accountants', consultants' and other
professionals' fees and expenses incurred in the investigation or defense thereof or the
enforcement of rights hereunder and costs and expenses of remediation (including, in the case
of remediation, all expenses and costs associated with financial assurance); provided, however,
Effective:
Filed on : April 27 ,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
that in no event shall Losses include lost profits or damages and losses excluded
1a.8(a).
l.158. I
Page 6 of l0
Version 0.0.2
under Section
term in Exhibit
"ManAreI" has the meaning given to such term in Section 17.3(a).
"McNary Transmission Project" has the meaning given to such term in Section 6.2.
"McNary Transmission Project Agreements" has the meaning given to such term in
Section 6.2.
"Monthly Common Equi 'has the meaning given to such
D.
"Monthly Transmission F 'has the meaning given to such term in
Exhibit D.
*NAESB" means the North American Energy Standards Board.
"Negotiation End Date" has the meaning given to such term in Section 6.2.
"MRC." means the North American Electric Reliability Corporation.
"Non-Defaultine Pary" means an Owner that is not a Defaulting Party.
"Non-Operating Olvner" means, in a given circumstance or context with respect to
certain Transmission Facilities or Common Equipment, the Owner which is not also serving as
the Operator in such circumstance or context with respect to such Transmission Facilities or
Common Equipment.
'oNon-Proposing Owner" means the Parry that receives a Capital Upgrade Notice
from the Proposing Owner as such term is used in Section 6.1, or the Party that receives a
Decommissioning Notice from the Proposing Owner as such term is used in:!9fu!e yIII.
*ol\I!'means, with respect to each Owner, the Owner's Open Access Transmission
Tariff on file with FERC.
'oQperatiqg_Qurner" means, in a given circumstance or context with respect to certain
Transmission Facilities or Common Equipment, the Owner which is also serving as the
Operator in such circumstance or context with respect to such Transmission Facilities or
Common Equipment.
"Ql2grater" means PacifiCorp or Idaho Power, in its capacity as Operator under this
Agreement.
"Other Costs" has the meaning given to such term in Section 4.7(a).
Effective:
Filed on : Lpril 27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
"Other Costs Records" has the meaning given to such term
l.158. I
Page 7 of l0
Version 0.0.2
"Ownef'means PacifiCorp or Idaho Power, in its capacity as an owner of Transmission
Facilities or Common Equipment under this Agreement.
"Ownership_Interes!" means: (a) in respect of an Owner and a Segment, the ownership
interest (expressed as a percentage) of such Owner in such Segment as described in Section
3.1(a) and set forth on Exhibit C. as the same may be adjusted from time to time pursuant to
Section 3.3O); and (b) in respect of an Owner and Common Equipment, the one hundred
percent (100%) ownership interest of such Owner in such Common Equipment.
"BAgifieorp." has the meaning given to such term in the preamble.
"PacifiCom Common Equioment" has the meaning given to such term in the recitals.
"PacifiCorp License" has the meaning given to such terrr in Section 3.8(aXii).
"PacifiCorp Real Propeff " has the meaning given to such term in Section
3.8(aX!.
"PacifiCorp Sites" has the meaning given to such term in Section 3.8(aXi).
"PacifiCorp Transmiss " has the meaning given to such term in the recitals.
"Party" and "Parties." have the meanings given to such terms in the preamble.
"p4ths'means the specific rated electric transmission paths within the Western
Interconnection that are identified in the WECC path rating catalogue and that are identified in
Exhibit C, which rated paths the Par.ties acknowledge may be comprised of transmission line
or substation equipment that are in addition to those identified on Exhibit C.
66ps1s6n" means an individual, partnership, corporation, limited liability company, joint
venture, association, trust, unincorporated organization, Governmental Authority, or other
form of entity.
"Points of Balancing Affi 'means the points at which Idatro
Power's Balancing Authority Area is an Adjacent Balancing Authority Area with each of
PacifiCorp's PACE and PACW Balancing Authority Areas.
"Points of Interconnection" means the points of interconnection between Idatro Power's
Transmission System and Pacifi Corp's Transmission System.
"PriglProiects" has the meaning given to such term in Section 5.2(e).
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.l58.l
Page 8 of l0
Version 0.0.2
"Pro Rata Share" or "Pro Rata Basis" means a proportionate allocation of a quantity
between the Owners that is calculated by multiplying the quantity being allocated by each
Owner's Ownership Interest or Directional Capacity Allocation Percentage or other metric,
as the context provides.
"Proposin@" means the Party that desires to make a capital upgrade or
improvement to Transmission Facilities or to Common Equipment as such term is used in
Section 6.1, or the Party that desires to retire and decommission Transmission Facilities or
Common Equipment as such term is used in:\X[g!e VIII.
. "Proprietary Information" has the meaning given to such term in Section 15.6.
"Oualified_Qumgt" means an Owner that has an OATT on file with FERC under which
it is authorized to provide transmission service on its transmission system.
"Real Property Licenses" has the meaning given to such term in Section 3.8(aXii).
"Real Property Rights" has the meaning given to such term in Section 3.8(aXii).
"Regulations" has the meaning given to such term in Section 16.2.
"Reliability Standards" means the electric reliability standards approved by FERC
pursuant to Federal Power Act Section2l5, 16 U.S.C. $82ao(d) (2014).
"Remainin@'has the meaning given to such term in Section 8.3.
"Be@iveq" means, in respect of an Owner or Operator, the directors, officers,
shareholders, partners, members, employees, agents, consultants, contractors or other
representatives of such Owner or Operator.
"Segment" means a Substation Segment or a Transmission Segment.
"Subglatiqqg" means the substations that are identified on Exhibit C.
"Substation Seprnent" means the Transmission Facilities that are identified on a
specific row of Exhibit C as a Substation.
"Transmission Segment" means the Transmission Facilities that are identified on a
specific row of Exhibit C as a transmission line.
"Ta:< Indemnif.ying Party" has the meaning given to such term in Section 16.4.
"Tax Indemnitee Party" has the meaning given to such term in Section 16.4.
"Taxes" has the meaning given to such term in Section 16.3.
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.1 58.1
Page 9 of l0
Version 0.0.2
"Term" has the meaning given to such term in Section 2.2.
"Terminated Transmissio " has the meaning given to such term in Section
2.3b\.
"Total Directional C 'has the meaning given to such term in Section 3.2(a).
"Transfer" has the meaning given to such term in Section 18.1.
"TlA4sferee" has the meaning given to such term in Section 15.1.
"Transferor" has the meaning given to such term in Section 15.1.
"Transmission Facilities" means all items identified on Exhibit C.
"Transmission Facili 'means, in respect of each Operator, each
agreement, instrument or other contract relating to or in connection with the Transmission
Facilities or Common Equipment it is responsible for, that such Operator enters into pursuant
to this Agreement and, in respect of the Prior Projects, that the Operating Owner entered into
prior to the Effective Date; but does not include transmission service agreements.
"Transmission Facilft 'has the meaning given to such term in Section 3.8(aXii).
"Transmission System" means, in the case of PacifiCorp, the PacifiCorp Transmission
System, and, in the case of Idaho Power, the Idaho Power Transmission System.
66\[rECC" means the Western Electricity Coordinating Council.
"WIS Agreement" has the meaning given to such term in Section 14.86).
1.2 Rules of Construction.
The following rules of interpretation shall apply in this Agreement:
(a) The masculine shall include the feminine and neuter.
(b) References to "Articles," "Sections," "Exhibits" and "Schedule" shall
be to articles, sections, exhibits and schedules of this Agreement.
(c) The Exhibits and Schedules attached hereto are incorporated in and
are intended to be apart of this Agreement.
(d) This Agreement was negotiated and prepared by both Parties with the
advice and participation of counsel. The Parties have agreed to the wording of this
Agreement and none of the provisions hereof shall be construed against one Party on the
ground that such Parfy is the author of this Agreement or any part hereof.
Effective:
Filed on : Apnl27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.158. I
Page l0 of l0
Version 0.0.2
(e) Each reference in this Agreement to any agreement or document or a
portion or provision thereof shall be construed as a reference to the relevant agreement or
document as amended, supplemented or otherwise modified from time to time with the
written approval of both the Parties.
(0 Each reference in this Agreement to Govemmental Requirements and
to terms defined in, and other provisions of, Govemmental Requirements shall be
references to the same (or a successor to the same) as amended, supplemented or otherwise
modified from time to time.
(g) The term "day" shall mean a calendar day, the term "month" shall
mean a calendar month, and the term "year" shall mean a calendar year. Whenever an
event is to be performed, a period commences or ends, or a payment is to be made on or by
a particular date and the date in question falls on aday which is not a Business Day, the
event shall be performed, or the payment shall be made, on the next succeeding Business
Day; provided, however, that all calculations shall be made regardless of whether any
given day is a Business Day and whether or not any given period ends on a Business Day.
(h) Each reference in this Agreement to a Person includes its successors
and permitted assigns; and each reference to a Governmental Authority includes any
Govemmental Authority succeeding to its functions and capacities.
(D In this Agreement, the words "include," "includes" and o'including"
are to be construed as being at all times followed by the words o'without limitation."
0) The words o'hereof,"'oherein" and "hereunder" and words of similar
import when used in this Agreement shall, unless otherwise specified, refer to this
Agreement as a whole and not to any particular provision of this Agreement.
Effective:
Filed on : Apil27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
I .158.2
Page I of2
Version 0.0.1
ARTICLE II
TERM
2.1 Effectiveness of this Agreement. This Agreement, including the Parties'
rights and obligations hereunder, shall become effective, if at all, on the Closing Date (the
"Effective Date"). For the avoidance of doubt, no aspect of this Agreement, other than this
Section 2.1, shall have any effect unless and until the Effective Date occurs. If the
Effective Date does not occur and the JPSA is terminated, this Agreement, including this
Section 2.1, shall become void ab initio.
2.2 Term. The term of this Agreement ("Term") shall commence upon the
Effective Date and shall continue in full force and effect until terminated in accordance
with the provisions hereof.
2.3 Termination.
(a) Subject to Section 2.4(a) and Section 2.4(b), this Agreement shall
terminate solely with respect to certain Transmission Facilities and Common Equipment
(each, "Terminated Transmiss '), and not otherwise with respect to any other
Transmission Facilities or Common Equipment or other obligations hereunder, if one or
more of the following events occur:
(i) The Terminated Transmission Facilities are damaged and
destroyed and the Owners decide not to repair or rebuild (or cannot reach agreement to
repair or rebuild) them in accordance with Article VII; or
(ii) The Terminated Transmission Facilities are retired and
decommissioned in accordance with Article VIII.
(b) Subject to Section 2.4(c), this entire Agreement shall terminate if one
or more of the following events occur:
(i) Mutual agreement of the Parties to terminate this Agreement;
(ii) This Agreement is terminated by exercise of remedies pursuant
to Section 12.3.
2.4 Effect of Termination.
(a) If this Agreement is terminated pursuant to Section 2.3(a) with respect
to any Terminated Transmission Facilities, then, except as for those provisions that are
expressly intended to survive termination and, subject to Section 2.46) and receipt of any
necessaxy Governmental Authorizations required by Governmental Requirements, this
Effective: October 30, 2015
Filed on : October 30,2015
or
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
I .158.2
Page 2 of2
Version 0.0.1
Agreement shall terminate and become void and of no further force and effect, without
further action by either Party solely with respect to such Terminated Transmission
Facilities, provided that neither Party shall be relieved from any of its obligations or
liabilities hereunder accruing prior thereto.
(b) In the event that this Agreement is terminated pursuant to Section
2.3@l with respect to any Terminated Transmission Facilities and the Non-Operating
Owner continues to own all or a portion of the Ownership Interest(s) in such Terminated
Transmission Facilities, then: (i) the Operator shall, upon written notice from the Non-
Operating Owner delivered to the Operator no later than fifteen (15) Business Days after
termination of this Agreement solely with respect to such Terminated Transmission
Facilities pursuant to Section 2.3(a). continue to perform such of its obligations and
covenants in Articles VI,I4L and MII as are set forth in the notice; (ii) such obligations
and covenants, together with Articles XI, XIV. XV, XVI, XVII, and XIX (to the extent
applicable to the surviving covenants and obligations), shall continue in full force and
effect notwithstanding the termination of this Agreement solely with respect to such
Terminated Transmission Facilities pursuant to Section 2.3(a); and (iii) the Parties shall
amend this Agreement to reflect such changes to this Agreement as shall be necessary and
mutually acceptable to the Parties to conform this Agreement solely as it relates to such
Terminated Transmission Facilities to the surviving provisions of this Agreement in
accordance with this Section 2.4(b).
(c) If this Agreement is terminated pursuant to Section 2.3(b), then,
except as for those provisions that are expressly intended to survive termination of this
Agreement and, subject to receipt of any necessary Governmental Authorizations required
by Governmental Requirements, including FERC approval, this Agreement shall terminate
and become void and of no further force and effect, without further action by either Party,
provided that neither Party shall be relieved from any of its obligations or liabilities
hereunder accruing prior thereto.
Effective: October 30, 2015
Filed on : October 30, 2015
FERC Docket No. ERl5-683-00 I
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.3
Page I of7
Version 0.0.1
ARTICLE III
TRANSMISSION FACILITIES OWI\-ERSHIP INTERESTS
3.1 Ownershiplnterests.
(a) Pursuant to the JPSA, as of the Closing Date: (i) the percentage of
ownership in a Segment that is owned by Idaho Power is set forth in column A of Exhibit
C, and the percentage of ownership in a Segment that is owned by PacifiCorp is set forth in
column B of Exhibit C; and (ii) when the Owners each own a percentage of a Segment,
each of the Owners own an undivided ownership interest in such Segment as tenants-in-
common.
(b) The Owners 4gree that they shall enter into such additional
documentation as shall reasonably be required to document the Owners' Ownership
Interests in the Transmission Facilities and any change in the Owners' Ownership Interests
in the Transmission Facilities as a result of the application of Section 0, provided that in no
event shall an Owner be responsible for paying any amount to the other Owner as a result
of any change in any Ownership Interest in the Transmission Facilities, except as expressly
provided for in this Agreement or as otherwise agreed to in writing by the Parties.
3.2 CapacitvAllocations.
(a) Directional Capacity Allocation. The Parties agree that the total
directional transmission capacity in megawatts of each Segment and Path is set forth in
columns E and H of Exhibit C (the "Total Directional "), zmd is allocated to: (i)
Idaho Power (A) as expressed in megawaffs as set forth in columns C and F of Exhibit C
and (B) as expressed as a percentage of the total directional transmission capacity of each
Segment and Path as set forth in columns I and K of Exhibit C; and (ii) PacifiCorp (A) as
expressed in megawatts as set forth in columns D and G of Exhibit C and (B) as expressed
as a percentage of the total directional transmission capacity of each Segment and Path as
set forth in columns J and L of Exhibit C. Each of the allocations of directional
transmission capacity of each of the Segments and Paths to each of the Owners expressed
in megawatts in Sections 3.2(aXiXA) and 3.2(aXiiX,A) is herein referred to as the
"Directional Capaci " and each of the allocations of directional transmission
capacity of each of the Segments and Paths to each of the Owners in percentages in
Sections 3.2(aXiXB) and 3.2(aXii)G) is herein referred to as the "Directional Capacit.v
Allocation Percentase."
(b) Scheduling Over Seements which are Not Part of a Path. Each Owner
shall have the right to post and sell its Directional Capacity Allocation over each Segment
(which is not part of a Path) in accordance with its OATT, and each Owner shall schedule
energy or make available for scheduling each Segment (which is not part of a Path) in each
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
I .158.3
Page 2 of7
Version 0.0.1
direction consistent with its applicable Directional Capacity Allocation Percentage of the
Total Directional Capacity of the Segment in each direction and pursuant to Governmental
Requirements and Governmental Authorizations; provided, however, that at no time shall
an Owner be entitled to post, sell, schedule or make available for scheduling more than its
applicable Directional Capacity Allocation Percentage of the Total Directional Capacity of
any Segment (which is not part of a Path) in any direction, unless otherwise mutually
agreed to in writing by the Owners.
(c) Scheduling Over Segments which are Part of a Path. Each Owner
shall have the right to post and sell its Directional Capacity Allocation over a Path in
accordance with its OATT, and each Owner shall schedule energy or make available for
scheduling a Path in each direction consistent with its applicable Directional Capacity
Allocation Percentage of the Total Directional Capacity of the Path in each direction and
pursuant to Governmental Requirements and Governmental Authorizations; provided,
however, that at no time shall an Owner be entitled to post, sell, schedule or make available
for scheduling more than its applicable Directional Capacity Allocation Percentage of the
Total Directional Capacity of any Path over one or more of the Segments which are part of
the Path in any direction, unless otherwise mutually agreed to in writing by the Owners.
3.3 Adjustment of Capacity Allocations and Ownership Interests.
(a) Adjustment of Directional Capacity Allocations and Directional
Capacity Allocation Percentages.
(i) Each of the Owners shall be allocated their Pro Rata Share
(based on their applicable Directional Capacity Allocation Percentages) of all temporary
changes in the Total Directional Capacity of a Segment or Path.
(ii) Permanent changes in the Total Directional Capacity of a
Segment or Path occur when the first of the following occurs: (A) when the quantity and,
if applicable, direction of change in Total Directional Capacity are agreed to by the
Owners; or (B) when WECC or the applicable WECC committee recognizes the quantity
and, if applicable, direction of change in Total Directional Capacity.
(iiD Each of the Owners shall be allocated their Pro Rata Share
(based on their applicable Directional Capacity Allocation Percentages) of any permanent
decrease or pennanent increase (which is not the result of a capital upgrade or which is the
result of a capital upgrade that both Owners participated in on a Pro Rata Basis (in
accordance with their Ownership Interests)) in the Total Directional Capacity of a Segment
or Path calculated pursuant to Section 3.3(aXii). In the event of a permanent increase in
the Total Directional Capacity of a Segment or Path calculated pursuant to Section
Effective: October 30, 2015
Filed on : October 30, 2015
FERC Docket No. ERl5-683-001
ldaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.3
Page3 of7
Version 0.0.1
3.3(aXii), then the increase in Total Directional Capacity shall be allocated to the Owners
based on their participation in the capital upgrade established pursuant to Section 6.1.
(iv) In the event there is a pernanent increase or decrease in the
Total Directional Capacity of a Segment or Path calculated pursuant to Section 3.3(aXii),
the Owners shall promptly amend the Agreement to update Exhibit C to reflect revisions in
the Total Directional Capacity of the Segment or Path as well as the Directional Capacity
Allocations and Directional Capacity Allocation Percentages of the Owners in the Segment
or Path calculated pursuant to Sections 3.3(aXii) and 3.3(aXiii).
(b) Adjustment of Ownership Interests in Segments.
O Only permanent changes in the Total Directional Capacity of a
Segment pursuant to Section 3.3(aXii) have the ability to affect the Owners' Ownership
Interests in a Segment. In the event that there is a permanent increase or decrease in the
Total Directional Capacity of a Segment in accordance with Section 3.3(aXii). then the
Ownership Interest for each Owner shall be calculated on the following basis:
(A) Add both of the Owner's Directional Capacity
Allocations in the Segment (taking into account the Owner's Pro Rata Share of the increase
or decrease determined in accordance with Section 3.3(a));
(B) Add both of the Segment's Total Directional Capacities
(taking into account the increase or decrease of the Segment's Total Directional Capacities
determined in accordance with Section 3.3(a)); and
(C) Divide t}re sum of clause A above by the sum of clause
B above to produce the Owner's revised Ownership Interest in the Segment.
(ii) In the event that there is a permanent increase or decrease in the
Total Directional Capacity of a Segment in accordance with Section 3.3(aXii), the Owners
shall promptly amend the Agreement to update Exhibit C to reflect any revisions in the
Ownership Interests of the Owners in any Segment calculated in accordance with this
Section 3.36Xi). In addition, the Owners shall promptly amend the Agreement to update
Exhibit C to reflect revisions in any Substation O&M Allocation as a result of changes in
the Ownership Interests of the Owners in any Substation Segment calculated in accordance
with Section 3.3ftXj).
(c) Reviews.
(i) Subject to Section 3.3(cXiii), the Owners shall meet
periodically, but not less than every five (5) years beginning in the year 2020, to review:
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-6E3-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.3
""13i"",1:r11
(A) The Directional Capacity Allocations, the Directional
Capacity Allocation Percentages and the Substation
O&M Allocations set forth in Exhibit C;
The formulas for adjusting Directional Capacity
Allocation Percentages and Ownership Interests set forth
in this Section 3.3;
The definition of Pro Rata Share;
(D) The treatment of electric losses set forth
The formulas describing the charges set forth in Exhibit
D; and
(F) Any other provisions of this Agreement as either Party
may elect.
(ii) Subject to Section 3.3(cXiii), the Owners shall meet promptly
and attempt to reach a mutually agreeable solution in the event that a Governmental
Requirement or Governmental Authorization adversely affects: (A) the ability of an Owner
to perform its obligations or exercise its rights under this Agreement; or (B) the treatment
of assets of an Owner that are subject to or affected by this Agreement.
(iii) In no event shall this Agreement be amended, supplemented or
otherwise modified pursuant to Sections 3.3(cXi) or 3.3(c)(ii). unless the Parties agree in
writing to such amendment, supplement or modification.
3.4 Oualified Owner. Each Owner shall take all actions required to continue to
be a Qualified Owner during the Term. If at any time during the Term an Owner ceases to
be a Qualified Owner, then such Owner shall immediately provide notice thereof to the
other Owner and take all actions required to resume being a Qualified Owner.
3.5 No Rieht to Use. For the avoidance of doubt, the provisions of this
Agreement shall not confer upon either Owner ttre right to use or transmit energy over any
transmission facilities owned by the other Owner (other than with respect to the
Transmission Facilities and Paths as provided for herein).
3.6 Payments. All payments required to be made by or on behalf of the Owners
under the terms of this Agreement, including payments to the Operators of the Monthly
Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, the Monthly
Common Equipment Charge and Other Costs, shall be made to the account or accounts
Effective: October 30, 2015
Filed on : October 30,2015
(B)
(c)
(E)
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.3
Page 5 of7
Version 0.0.1
designated by the Owner or Operator to which the payment is owed, by wire transfer in
immediately available funds in the lawful currency of the United States.
3.7 Waiver of Partition Rights. The Owners acknowledge that any exercise of
the remedy of partition (whether at law or in equity) of the jointly-owned Transmission
Facilities or any portion thereof would be impracticable in view of the purposes and
requirements of this Agreement, would violate the spirit and intent of this Agreement, and
would defeat the Owners' intentions and reasonable expectations as well as the
consideration upon which each Owner entered into this Agreement. Accordingly, each
Owner agrees that during the Term it (a) will not, directly or indirectly, commence,
maintain, support or join in any action or proceedings of any kind to partition the jointly-
owned Transmission Facilities or any portion thereof; and (b) waives, after consultation
with its qualified legal counsel, any and all rights that it may have under this Agreement or
Governmental Requirements (whether at law or in equity) or otherwise to commence,
maintain, support or join in any such action or proceeding. Each Owner acknowledges that
the other Owner has entered into and will perform the terms of this Agreement in reliance
upon the other Owner's agreement and adherence to the terms of this Section 3.7. and
would not have entered into this Agreement but for such reliance; and that it would be
unjust and inequitable for any Owner to violate or to seek relief from any provision of this
Section 3.7.
3.8 Nonexclusive License to Enter and Use Real Property.
(a) Subject to the terms and conditions of this Agreement, including this
Section 3.8:
(i) PacifiCorp hereby irrevocably grants to Idaho Power a
nonexclusive license (the "Idaho Power License") to use and access the real property to which
Idaho Power's Ownership Interests in the Transmission Facilities are affixed (the "PacifiCorp
Sites"), but only to the extent of, and subject in all respects to, PacifiCorp's real property
interests (including fee, rights-of-way, easements and other real property interests) and other
real property rights therein (collectively, the "PacifiCom Real Propertv Rights") and only to
the extent such Idaho Power License is permitted by the PacifiCorp Real Property Rights and
Governmental Requirements; and
(ii) Idaho Power hereby irrevocably grants to PacifiCorp a
nonexclusive license (the "PacifiCorp License" and, together with the Idaho Power License,
the "Real Property Licenses") to use and access the real property to which PacifiCorp's
Ownership Interests in the Transmission Facilities are affixed (the "Idaho Power Sites" and,
together with the PacifiCorp Sites, the "Transmission Facilities Sites"), but only to the extent
of, and subject in all respects to, Idaho Power's real property interests (including fee, rights-of-
way, easements and other real property interests) and other real property rights therein
Effective: October 30, 2015
Filed on : October 30, 2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.l s8.3
Page 6 of7
Version 0.0.1
(collectively, the "Idaho Power Real Property Rishts" and, together with the PacifiCorp Real
Property Rights, the "Real Property Riehts") and only to the extent such PacifiCorp License is
permitted by the Idaho Power Real Property Rights and Governmental Requirements.
(b) Each Real Property License will be utilized by the grantee Owner and
its Representatives for the use of, and rights of ingress, egress and access to, the applicable
Transmission Facilities Sites to permit the Owner and its Representatives to exercise the
Owner's rights and obligations as to its Ownership Interests in the Transmission Facilities.
(c) The rights of the grantee Owner and its Representatives for use of,
ingress, egress and access to the applicable Transmission Facilities Sites shall be governed
by this Section 3.8 during the period the Real Property License is in effect, including
during any period after this Agreement has been terminated but the surviving provisions
identified in Section 10.2 (including Section 3.8) remain in effect.
(d) Upon the termination or expiration of this Agreement, each Real
Property License may be utilized by the grantee Owner and its Representatives for the right
of ingress, egress and access to the Transmission Facilities Sites, for the sole purpose of
inspection and as provided for in Section 3.8(fl.
(e) In the exercise of its rights under the Real Property License: (i) the
grantee Owner and its Representatives shall not interfere with the construction,
commissioning, operation and maintenance, capital upgrades and improvements to, repair
and reconstruction of, and retirement and decommissioning of the Transmission Facilities
(or any other equipment or facilities owned, controlled or operated by the grantor Owner
on the Transmission Facilities Site) or any portion thereof by the Operator or pose a safety
hazard; (ii) the grantee Owner and its Representatives shall comply with any requirements
of the Real Property Rights applicable to the Transmission Facilities Sites as of the
Effective Date and any other Real Properry Rights arising after the Effective Date with
respect to which it receives written notice; (iii) the grantee Owner shall provide reasonable
prior written notice to the grantor Owner of its intent to exercise any right or privilege
granted by the Real Property License; and (iv) the grantee Owner and its Representatives
exercising any right or privilege under the Real Property License shall comply with the
grantor Owner's or any other contractor's safety and operational procedures and security
rules, provided that such procedures and rules are in writing and are delivered to the
grantee Owner in advance. For the avoidance of doubt, the Owners acknowledge that no
representations or warranties are made with respect to the Transmission Facilities Sites and
that the Real Property Licenses are expressly subject in all respects to all Real Property
Rights applicable to the Transmission Facilities Sites.
(0 Each Real Property License includes a nonexclusive right of the
grantee Owner for the location of equipment in which such Owner has an Ownership
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.3
PageT of7
Version 0.0.1
Interest, together with any replacements, capital upgrades or improvements thereto, on the
Transmission Facilities Sites, to be utilized by such Owner to locate such equipment on
such premises, together with the right to access such equipment over and across the
Transmission Facilities Sites, provided that any replacements, capital upgrades or
improvements to such equipment shall be made in accordance with the provisions of this
Agreement prior to its expiration or termination.
(g) Each Real Property License shall terminate, in whole or in part, if and
to the extent the grantee Owner no longer requires the Real Property License for the uses
described in this Section 3.8. including if and to the extent such Owner no longer has an
Ownership Interest in the Transmission Facilities affixed to the respective Transmission
Facilities Sites, written notice of which the grantee Owner shall promptly provide to the
grantor Owner.
(h) If and to the extent the Real Property Licenses are not permitted by
any of the Real Property Rights with respect to all or any portion of the Transmission
Facilities Sites (the "Excluded Transmissi "), then the Parties shall
cooperate in good faith to identify and use Commercially Reasonable Efforts to implement
an altemative to the Real Property Licenses with respect to the Excluded Transmission
Facilities Sites in order to attempt to provide each of the Parties with the rights that they
would have been provided under the Real Property Licenses with respect to the
Transmission Facilities Sites; ry4!g[, however, in no event shall an Owner be required to
amend, revise or modiff in any respect any of its Real Property Rights pursuant to this
Section 3.8(h).
3.9 Access to Antelope Substation for Idaho Power Maintenance of Department
of Enerey Facilities.
(a) PacifiCorp shall provide Idaho Power access to the Antelope
Substation for the purpose of maintaining the Department of Energy equipment that is
listed on Exhibit E and located in the Antelope Substation.
(b) PacifiCorp shall provide Idatro Power access to the Antelope
Substation control building to allow Idaho Power to perform the necessary switching to
maintain the Department of Energy equipment, and to allow access to Idaho Power's
SCADA, communication, telemetry and metering equipment. Idaho Power shall provide
PacifiCorp advance notice of its desire to gain access to the control building.
Effective: October 30, 201 5
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
r.158.4
Page I of7
Version 0.0.2
ARTICLE IV
OPERATOR OF TRANSMISSION FACILITIES
4.1 Appointment of Operator.
(a) The Owners hereby appoint the Party set forth in column M of Exhibit
C as the Operator of each of the Transmission Facilities associated with the Party's name
on Exhibit C, and the Party hereby accepts appointment, to serve as the Operator and to
perform the other covenants and obligations of the Operator expressly set forth in this
Agreement, in accordance with the terms and conditions of this Agreement.
(b) Each of the Owners hereby authorizes the Operators to utilize its
Common Equipment and wholly-owned Transmission Facilities to support the operation of
the Transmission Facilities in accordance with the terms of this Agreement.
(c) Notwithstanding anything to the contrary contained in this Agreement
or Governmental Requirements, the Owners agree that the Operators shall have no
obligations, responsibilities or duties to the Owners other than as are expressly provided for
in this Agreement.
(d) A sole Owner of Transmission Facilities that are operated by the other
Party to this Agreement may unilaterally elect to supervise and perform, or cause to be
supervised or performed, the physical operation and maintenance, interconnection, design
of capital upgrades and improvements, repair and reconstruction, security, outage
restoration, and retirement and decommissioning of the solely-owned Transmission
Facilities. Should the sole Owner choose to resume operation or perform any of the above-
listed items, the sole Owner will provide the Operator with sixty (60) days prior written
notice describing the specific work the sole Owner is electing. The Operator will be
relieved of this specific work, but will continue to perform all other covenants and
obligations of the Operator as expressly set forth in this Agreement.
4.2 Authority of Operator.
(a) Subject to the limitations set forth in Articles IV-VIII. each Operator
shall be responsible in all respects for the Transmission Facilities and Common Equipment
for which it is the Operator in accordance with the terms and conditions of this Agreement.
Without limiting the foregoing, each Operator shall supervise and perform, or cause to be
supervised and performed, the physical operation and maintenance of, interconnection to,
design of, capital upgrades and improvements to, repair and reconstruction of, sectrrity of,
outage restoration of, and retirement and decommissioning of, the Transmission Facilities
and Common Equipment it is responsible for in accordance with this Article IV and
Articles V-V[I. In the performance of its obligations under this Agreement, each Operator
shall have authority, subject to the other terms of this Article IV and Articles V-IX, to take
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.4
Page2 of7
Version 0.0.2
any or all of the actions it reasonably determines are necessary to perform its obligations
under this Agreement.
(b) The Owners and the Operators agree that title to all capital upgrades
and improvements to the Segments and Common Equipment constructed by or on behalf of
the Operators pursuant to Articles V and VI shall vest with the Owner or Owners of such
Segments or Common Equipment in accordance with their respective Ownership Interests
in such Segments or Common Equipment, and, in the case ofjointly-owned Segments,
shall be jointly owned by the Owners as tenants-in-common in accordance with their
respective Ownership Interests in the jointly-owned Segments.
(c) Each Operator will exercise or enforce all of the benefits, rights and
remedies under the Transmission Facilities Contracts for the benefit of the Owners without
adverse distinction between the Owners. In furtherance and not in limitation of the
immediately preceding sentence, and except as otherwise provided in Section 9.5 with
respect to electric losses, each Operator agrees to transfer, assign, distribute, pay over or
otherwise make available to the Non-Operating Owner, the Non-Operating Owner's Pro
Rata Share (based on its respective Ownership Interest(s), if any) of any payments or
proceeds obtained pursuant to any Transmission Facilities Contract. Notwithstanding
anything to the contrary contained in this Agreement, the Owners agree that only the
Operators shall be entitled to exercise or enforce the benefits, rights and remedies under
the Transmission Facilities Contracts.
4.3 Delegation of Responsibilities. An Operator may, in its sole and absolute
discretion, utilize its employees and supervisory personnel, and any independent technical
advisors, consultants, contractors and agents which it may select, as may be required to
perform its obligations (each, a "Delegate")- Notwithstanding any such delegation, the
Operator shall remain responsible and liable for all of its delegated obligations in
accordance with the terms of this Agreement. If a non-operating Owner is amenable to
such delegation, such non-operating Owner may be delegated certain responsibilities under
this section.
4.4 GovernmentalAuthorizations.
(a) Each Operator is authorized to prepare and submit to all appropriate
Governmental Authorities the necessary reports, applications, plans, specifications and
other documents to procure all Governmental Authorizations required to perform its
obligations under this Agreement with respect to the Transmission Facilities and Common
Equipment it is responsible for or to comply with Governmental Requirements, ry[glg[
that the Operator shall consult with the Non-Operating Owner prior to the submission of
any such reports, application, plans, specification and other documents to the extent to
which they relate to any jointly-owned Transmission Facilities. To the extent permiued by
Governmental Requirements, each Operator shall use Commercially Reasonable Efforts to
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.4
Page 3 of7
Version 0.0.2
obtain and structure all Government Authorizations for which it applies after the Effective
Date in such a way as to recognize each Owner's applicable Ownership Interest(s) (and
assoc iated D irectional Capacity Al location Percentage(s) and Directi onal Capacity
Allocation(s)), if any, as contemplated by this Agreement. Notwithstanding anything to the
contrary in this Agreement, except as set forth in Section 5.1ft), nothing in this Section 4.4
shall obligate an Operator to prepare and submit to appropriate Govemmental Authorities
any reports, applications, plans, specifications and other documents to procure any
Governmental Authorizations required by the Owners in connection with their ownership
of an Ownership Interest in the Transmission Facilities or the Common Equipment or the
recovery of any costs and expenses in connection therewith.
(b) To the extent that an Operator cannot obtain a Governmental
Authorization pursuant to Section 4.4(a) on behalf of one or both of the Owners, each such
Owner shall: (i) be responsible for preparing and submitting to the appropriate
Governmental Authority the necessary reports, applications, plans, specifications and other
documents to procure such Governmental Authorization; and (ii) exercise all
Commercially Reasonable Efforts to obtain such Governmental Authorization. Unless and
until the Owner or Owners are able to obtain such Governmental Authorizations, the
Operator shall not perform or continue to perform any of the obligations requiring such
Governmental Authorizations if to do so would result in the Owner or Owners or the
Operator being in violation of Governmental Requirements or Governmental
Authorizations.
(c) Each Owner shall, at its own cost: (i) reasonably cooperate and
support the Operators in obtaining any Governmental Authorizations required pursuant to
Section 4.4(a); and (ii) reasonably respond to inquiries or requests issued to it by any
Governmental Authorities in respect of such Governmental Authorizations; ry4!91!,
however. that an Owner shall not be obligated pursuant to this Section 4.4(c) to disclose
Proprietary Information except to the extent that it is otherwise required to disclose such
Proprietary Information: (A) by Governmental Requirements; (B) bV any Governmental
Authority; or (C) pursuant to the express terms of this Agreement.
4.5 Audit. Each Non-Operating Owner may, at its cost, atany time during
normal business hours and with reasonable prior notice of not less than thirty (30) Business
Days, but not more often than once in any twelve (12) month period, inspect and audit the
books and records of the Operator and any of its Affiliates and Delegates (and the Operator
shall secure such rights for the Non-Operating Owner from its Affiliates and Delegates)
involved in the provision of services pursuant to this Agreement ("Other Costs Records"),
to the extent reasonably relating to the determination of Monthly Transmission Facilities
O&M Charges, Monthly Substation O&M Charges, Monthly Common Equipment
Charges, and Other Costs for which the Non-Operating Owner is liable under this
Agreement as shown on an invoice provided to the Non-Operating Owner pursuant to
Section 4.7 within eighteen (18) months prior to the date of the audit notice. Each
Effective:
Filed on : April 27 ,2016
FERC Docket No. ERl6-1 507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
r.158.4
Page 4 of7
Version 0.0.2
Operator shall, and shall cause any of its relevant Affiliates and Delegates, to keep and
maintain all such Other Costs Records to the extent reasonably relating to the
determination of Monthly Transmission Facilities O&M Charges, Monthly Substation
O&M Charges, Monthly Common Equipment Charges, and Other Costs for which the
Non-Operating Owner is liable under this Agreement and make such Other Costs Records
available to the Non-Operating Owner in accordance with the terms of this Agreement. If
any audit discloses that, during such eighteen (18) month period, an overpayment or
underpayment of Monthly Transmission Facilities O&M Charges, Monthly Substation
O&M Charges, Monthly Common Equipment Charges or Other Costs has been made by
the Non-Operating Owner or the amount of any Monthly Transmission Facilities O&M
Charges, Monthly Substation O&M Charges, Monthly Common Equipment Charges, or
Other Costs allocated to the Non-Operating Owner in an invoice is incorrect, then such
overpayment, underpayment or incorrect amount shall be resolved pursuant to Section 4.8.
The Non-Operating Owner requesting the audit shall reimburse one hundred percent
(100%) of all reasonable costs and expenses (including internal costs and expenses)
incurred by or on behalf of the Operator and any of its Affiliates and Delegates in
complying with the provisions of this Section 4.6, provided that the Non-Operating Owner
shall not be required to reimburse any such costs if the audit determines that the Non-
Operating Owner has made more than Twenty-Five Thousand Dollars ($25,000) in
overpayments of Monthly Transmission Facilities O&M Charges, Monthly Substation
O&M Charges, Monthly Common Equipment Charges, or Other Costs or more than
Twenty-Five Thousand Dollars ($25,000) in Monthly Transmission Facilities O&M
Charges, Monthly Substation O&M Charges, Monthly Common Equipment Charges, or
Other Costs have been incorrectly allocated to the Owner.
4.6 Insurance.
(a) Owner Insurance. Each Owner shall be responsible for obtaining and
maintaining during the Term insurance covering its respective legal liabilities related to its
Ownership Interests in the Transmission Facilities and Common Equipment. Insurance
required by this Section 4.6(a) will be placed with appropriate carriers and in amounts in
accordance with Good Utility Practice and Governmental Requirements.
(b) Property Insurance. Each Operator, on behalf of the Owners and any
other named insureds or loss payees, will, with respect to Substations and equipment
therein that is included as part of the jointly-owned Transmission Facilities it is responsible
for: (i) determine the appropriate property insurance coverages, minimum amounts, self-
insured amounts, deductibles and other insurance policy terms which shall be reasonable
and customary for similarly situated utilities; (ii) obtain and maintain such property
insurance during the Term; and (iii) be solely responsible for pursuing claims and/or
negotiating settlements in respect of claims under such insurance coverages. The
Operators shall be compensated for the costs of obtaining and maintaining such insurance
(including any premiums, to<es and fees, but excluding deductibles, self-insurance or non-
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.4
Page 5 of7
Version 0.0.2
insured costs) through the Monthly Substation O&M Charge. Subject to Article VII, each
Owner shall be responsible for its Pro Rata Share (based on its applicable Ownership
Interest(s)) of any deductibles, self-insurance and non-insured costs, all of which shall be
Other Costs. The Operators shall not be obligated to obtain or maintain any other
insurance by or on behalf of the Owners with respect to the Transmission Facilities or
Common Equipment for which they are responsible.
4.7 Invoices.
(a) Each Non-Operating Owner shall pay the respective Operator the
Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, and
the Monthly Common Equipment Charge calculated in accordance with Exhibit D as
compensation for the Operator's services under this Agreement. In addition, each Owner
shall be responsible for its Pro Rata Share (based on its applicable Ownership Interest(s))
of costs incurred by or on behalf of the Operators pursuant to the terms of this Agreement,
including Sections 4.2(a), 4.4(a), 4.6. 5.2, 6.1, 7 .1,7 .5, 8.2 and 16.3 (collectively, the
"Qther Co$g"). In the event that an Operator incurs, or reasonably expects to incur,
significant Other Costs in excess of One Hundred Thousand Dollars (S100,000), the
Operator shall immediately notify the Owners in writing of such Other Costs.
(b) Within thirty (30) days after the end of the first full calendar month
during the Term, and within thirty (30) days after the end of each month thereafter during
the Term, each Operator will deliver to the Non-Operating Owner an invoice which will
show the total amount and each Owner's Pro Rata Share (based on its Ownership Interests)
of the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M
Charge and the Monthly Common Equipment Charge determined in accordance with the
terms and conditions of this Agreement. For purposes of clarity, the first such invoices will
include amounts owed for the first full month and any partial month that precedes it during
the Term. Within thifty (30) days after the end of the first calendar quarter first occurring
during the Term (i.e., within 30 days of the first March 3lst, June 30th, September 30ft, or
December 3l't during the Term), and within thirfy (30) days after the end of each calendar
quarter thereafter during the Term, each Operator will deliver to the Non-Operating Owner
an invoice which will show the total amount and each Owner's Pro Rata Share (based on
its Ownership Interests) of Other Costs determined in accordance with the terms and
conditions of this Agreement; provided. however, that Other Costs associated with capital
upgrades and improvements to, or repair and reconstruction of, Transmission Facilities: (a)
shall not include AFUDC, ry4!g!, that the first Other Costs invoice may include accrued
AFUDC on Prior Projects up to the Effective Date; and (b) that are a Substation Segment
shall be invoiced using estimated Other Costs, provided that each Operator shall provide a
final invoice showing a true-up of estimated Other Costs compared to actual Other Costs
after the upgrade, improvement, repair or reconstruction is placed into service;. The Non-
Operating Owner shall pay its Pro Rata Share (based on its Ownership Interests) of the
Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, the
Effective:
Filed on : April 27, 2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
I .158.4
Page 6 of 7
Version 0.0.2
Monthly Common Equipment Charge and the Other Costs shown on the invoice no later
than thiny (30) days after the date of the invoice. Any payment past due will accrue
interest, per annum, calculated in accordance with the methodology specified for interest in
the FERC regulations at l8 C.F.R. $ 35.19a(a)(2xiiD (the "FERC Methodology"). The
failure by an Operator to timely deliver an invoice shall not relieve the Non-Operating
Owner of its payment obligation in respect of its share of the Monthly Transmission
Facilities O&M Charge, the Monthly Substation O&M Charge, the Monthly Common
Equipment Charge and Other Costs as shown on such invoice, or release the Operating
Owner of its responsibility for such invoice.
4.8 Disputed Amounts. If any Non-Operating Owner disputes any portion of any
amount specified in an invoice delivered by an Operator pursuant to Section 4.7, the Non-
Operating Owner shall pay its total amount of the invoice when due, and, if actually known
at the time by the Non-Operating Owner, identify the disputed amount and state that the
disputed amount is being paid under protest. Any disputed amount shall be resolved
pursuant to the provisions of Article XVII. If it is determined pursuant to Article XMI that
an ovelpayment or underpayment has been made by the Non-Operating Owner or the
amount of any Monthly Transmission Facilities O&M Charge, Monthly Substation O&M
Charge, Monthly Common Equipment Charge, or Other Costs allocated to the Non-
Operating Owner on an invoice is incorrect, then: (i) in the case of any overpayment by
the Non-Operating Owner, the Operator shall promptly return the amount of the
overpayment (or credit the amount of the overpayment on the next invoice) to the Non-
Operating Owner; (ii) in the case of an underpayment by the Non-Operating Owner, the
Non-Operating Owner shall promptly pay the amount of the underpayment to the Operator
(for the benefit of the Operating Owner), otherwise, the Operator shall charge the Non-
Operating Owner for the underpayment on the next invoice; and (iii) in the case of an
incorrect allocation of Other Costs to an Owner, the allocations of Other Costs on the next
invoice shall be adjusted to correct for such incorrect allocation, in each case, together with
interest for the period from the date of overpayment, underpayment or incorrect allocation
until such amount has been paid or credited against a future invoice calculated in the
manner prescribed for calculating interest on refunds under the FERC Methodology.
4.9 Assistance. Each Non-Operating Owner shall cooperate with the Operator
promptly, as and when reasonably requested by the Operator, to assist the Operator in the
performance of its duties, responsibilities and obligations under this Agreement, including
executing and delivering from time to time such additional documents, certificates or
instruments, and taking such additional actions, as may be reasonably requested by the
Operator. Each Non-Operating Owner shall bear its own costs for providing such
cooperation and assistance as requested by the Operator unless the Owners agree otherwise
in writing.
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
4.10 Remedies.
1.158.4
PageT of7
Version 0.0.2
(a) Notwithstanding any provision to the contrary contained in this
Agreement, the Operators shall have no liability to the respective Non-Operating Owners
in connection with the performance of their covenants and obligations under this
Agreement, except as provided in this Section 4.10 and Section 14.1(c). The Non-
Operating Owners agree that they have a duty to mitigate any damages and shall use
Commercially Reasonable Efforts to minimize any damages they may incur as a result of
an Operator's failure to perform or breach of any of its covenants or obligations under this
Agreement.
(b) The Owners and Operators acknowledge that the obligations and
covenants performed by the Operators hereunder are unique and that the Non-Operating
Owners will be irreparably injured should such obligations and covenants not be performed
in accordance with the terms and conditions of this Agreement. Consequently, the Non-
Operating Owners will not have an adequate remedy at law if the Operators shall fail to
perform their obligations and covenants hereunder. The Non-Operating Owners shall have
the right, in addition to any other remedy available under this Agreement, to specific
performance of the Operators' obligations and covenants hereunder, and the Owners and
Operators agree not to take a position in any proceeding arising out of this Agreement to
the effect that the Non-Operating Owners have an adequate remedy at law.
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.5
Page I of3
Version 0.0.2
ARTICLE V
OPERATION AND MAINTENAI\CE OF TRANSMISSION FACILITIES
5.1 Compliance: Standard of Work.
(a) The Operator shall perform its obligations set forth in this Agreement:
(i) without adverse distinction between the Owners; and (ii) in accordance with Good
Utility Practice, Govemmental Requirements, Governmental Authorizations and Reliability
Standards.
(b) Without limiting the generality of Section 5.1(a), each Operator shall
comply with Governmental Requirements and Reliability Standards applicable to an owner
and an operator of the Transmission Facilities and Common Equipment for which it is
responsible, regardless of whether any such Transmission Facilities and Common
Equipment are solely owned by the Operating Owner, the Non-Operating Owner, orjointly
owned by the Parties.
5.2 Operation and Maintenance: Outases and Outaee Coordination: Capital
Upgrades and Improvements.
(a) Each Operator shall operate and maintain the Transmission Facilities
and Common Equipment for which it is responsible in accordance with Good Utility
Practice, Governmental Requirements, Governmental Authorizations and Reliability
Standards-
(b) Each Operator shall provide written notice of planned outages
associated with the Transmission Facilities, Common Equipment and Paths for which it is
responsible to the Non-Operating Owner's outage coordinator as soon as outage schedules
are known, but no later than the later of the period specified in the Operating Owner's
OATT or the Northwest Power Pool Processes document dated May 2014, as it is amended
from time-to-time, regarding outage coordination and shall, subject to Good Utility
Practice, Governmental Requirements, Governmental Authorizations and Reliability
Standards, accommodate reasonable requests of the Non-Operating Owner to change the
date or period of the planned outage. Each Operator shall promptly notify the Non-
Operating Owner's outage coordinator of any event or circumstance that results in a partial
or total reduction of the transmission capacity of a Segment or Path set forth in Exhibit C,
and shall use Commercially Reasonable Efforts to diligently: (i) coordinate operations
during such event or circumstance; (ii) coordinate the restoration of the transmission
capacity of such Segment from such event or circumstance with the Non-Operating Owner;
and (iii) perform the actions necessary to restore the transmission capacity of such Segment
or Path and otherwise recover from the event or circumstance. Notwithstanding any
provision to the contrary contained in this Agreement, the Owners shall be allocated their
share of a temporary reduction in the transmission capacity of the Transmission Facilities
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.l58.s
Page 2 of3
Version 0.0.2
and the Paths pursuant to Section 3.3(gXi), and shall be allocated their share of a permanent
reduction in transmission capacity of the Transmission Facilities and the Paths pursuant to
Sections 3.3(aXii) and 3.3(aXiii). The Operator's outage coordinator shall accommodate
reasonable requests of the Non-Operating Owner's outage coordinator, and Non-Operating
Owner's outage coordinator shall accommodate reasonable requests of the Operator's
outage coordinator, in the event of an actual or potential Energy Emergency to take
extraordinary steps to protect reliability.
(c) Each Operator shall make maintenance renewals and replacements to
the Transmission Facilities and Common Equipment it is responsible for: (i) the costs of
which are recordable as an operation and maintenance expense under the FERC Uniform
System of Accounts; and (ii) that are necessary for the operation of the Transmission
Facilities and Common Equipment in accordance with Good Utility Practice,
Govemmental Requirements, Governmental Authorizations and Reliability Standards.
Such maintenance renewals and replacements to the Transmission Facilities are included in
the services for which the Operator is compensated by the Monthly Transmission Facilities
O&M Charge. The Operator shall not separately invoice the Owners for the costs of such
maintenance renewals and replacements to the Transmission Facilities and Common
Equipment. Notwithstanding anything to the contrary contained in this Agreement, any
maintenance renewals and replacements made pursuant to this Section 6.1(c) to
Transmission Facilities shall be Transmission Facilities for purposes of this Agreement,
and any maintenance renewals and replacements made pursuant to this Section 6.1(c) to
Common Equipment shall be Common Equipment for purposes of this Agreement.
(d) Each Operator shall make capital upgrades and improvements to the
Transmission Facilities and Common Equipment it is responsible for: (i) the costs of which
are recordable as capital expenditures under the FERC Uniform System of Accounts; and
(ii) which are necessary for the operation of the Transmission Facilities and Common
Equipment in accordance with Good Utility Practice, Governmental Requirements,
Governmental Authorizations and Reliability Standards. The Operator shall consult with
the Non-Operating Owner and receive prior approval, such approval not to be unreasonably
withheld, delayed or conditioned, with respect to any capital upgrade or improvement for
which the Non-Operating Owner shall have financial responsibility under this Agreement
and which Operator reasonably expects to incur total project costs that exceed Five
Hundred Thousand Dollars ($500,000). The Owners shall be responsible for their Pro Rata
Share (based on their respective Ownership Interests, if any, in the Transmission Facilities
and Common Equipment being upgraded or improved) of any Costs incurred by or on
behalf of the Operator in making such capital upgrades or improvements. Such capital
upgrades and improvements to the Transmission Facilities and Common Equipment are
included in the services for which the Operator is compensated by the Other Costs charge.
Notwithstanding anything to the contrary contained in this Agreement, any capital
upgrades and improvements made pursuant to this Section 6.1(d) to the Transmission
Effective:
Filed on : April27,2016
FERC Docket No- ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.5
Page 3 of3
Version 0.0.2
Facilities shall be considered Transmission Facilities for purposes of this Agreement, and
any capital upgrades and improvements made pursuant to this Section 6.l(il to Common
Equipment shall be considered Common Equipment for purposes of this Agreement.
(e) Each Operator shall assume responsibility for completion of "Idaho
Power Extraordinary Items," "PacifiCorp Extraordinary Items," "Idaho Power Planned
Improvements," '?acifiCorp Planned Improvements" and completion of a "Casualty Loss"
as each is defined in the JPSA (collectively, the "Priq1-Proj-ects,"), underway on the
Effective Date on Segments for which it is responsible in accordance with the terms and
conditions of this Agreement, and such capital upgrades, improvements, repairs or
reconstruction shall not be subject to approval of the Non-Operating Owner. Such Prior
Projects are included in the services for which the Operator is compensated by the Other
Costs charge. The Owners shall be responsible for their Pro Rata Share (based on their
respective Ownership Interests in the Segment being upgraded, improved, repaired or
reconstructed) of any Costs incurred by or on behalf of: (i) the Prior Project's Owner prior
to the Effective Date; and (ii) the Operator commencing on the Effective Date through the
completion of such capital upgrades, improvements, repairs or reconstruction.
Notwithstanding anything to the contrary contained in this Agreement, any capital
upgrades and improvements made pursuant to this Section 6.1(e) to the Transmission
Facilities shall be considered Transmission Facilities for purposes of this Agreement.
Insurance proceeds received by a Party related to the Prior Projects, shall be forwarded to
the Operator, less an amount equal to that expended by the Party on the Prior Projects up to
the Effective Date and not reflected in Net Book Value on the Effective Date. The
Operator shall apply such proceeds (up to each Owner's Pro Rata Share (based on its
respective Ownership Interest(s) in the Segment being upgraded, improved, repaired or
reconstructed)) to the completion of the Prior Projects, and return to the Owners their Pro
Rata Share (based on their respective Ownership Interest(s) in the Segment being
upgraded, improved, repaired or reconstructed) of any excess insurance proceeds.
5.3 Requests for Generation or Transmission Interconnection Service. The
Owners acknowledge and agree that all requests for interconnection to any of the jointly-
owned Transmission Facilities must be coordinated with the Operator responsible for such
Transmission Facilities and processed in a manner consistent with the Owner's OATT
pursuant to which the request was made ("Interconnection Owner") and any Governmental
Requirements. An Interconnection Owner in receipt of a request for interconnection with
any jointly-owned Transmission Facilities will promptly notify the responsible Operator
and the other Owner, and thereafter the Owners and the Operator will coordinate and
cooperate to process the interconnection request. The Operator will coordinate and
conduct any studies required to determine the impact of the interconnection request on the
jointly-owned Transmission Facilities and other affected systems, including the Owners'
Transmission Systems, in accordance with the Interconnection Owner's OATI and any
Governmental Requirements. The Operator will notify the Owners and such affected
systems of all meetings held with the entity requesting an interconnection.
Effective:
Filed on : April 27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.6
Page I of4
Version 0.0.2
ARTICLE VI
TRANSMISSION FACILITIES CAPITAL UPGRADES PROPOSED BY AIT OWI\I'ER
6.1 Capital Upgrades.
(a) At any time during the Term, a Proposing Owner may elect to make a
capital upgrade or improvement to the Transmission Facilities to which it has an
Ownership Interest, provided that in no event shall a Proposing Owner be entitled to make
a capital upgrade or improvement to any Transmission Facilities that reasonably would be
expected to have a material adverse effect on the other Owner's ownership, use or
enjoyment of its Ownership Interest(s) in such Transmission Facilities (and associated
Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) as
contemplated in this Agreement. A Proposing Owner shall provide the other Owner no
less than sixty (60) days' prior written notice of its election, together with reasonable
details about the proposed upgrade or improvement to the Transmission Facilities (each, a
"Capital Upgrade Notice"). Within sixty (60) days of receipt of the Capital Upgrade
Notice, the Non-Proposing Owner may notify the Proposing Owner in writing that it elects
to participate in the capital upgrade or improvement to jointly owned Transmission
Facilities. The Non-Proposing Owner may not participate in any capital upgrade or
improvement to Transmission Facilities solely owned by the Proposing Owner, whether or
not the Non-Proposing Owner is an Impacted Party.
(i) If the Non-Proposing Owner delivers notice to the Proposing
Owner within the sixty (60) day period that it elects to participate in the capital upgrade or
improvement to the Transmission Facilities, then the Owners shall meet and agree on: (A)
the final scope of the capital upgrade or improvement; (B) the allocation of increased
transmission capacity, if any, associated with such capital upgrade and improvement
between the Owners, including arry change in the Owners' Directional Capacity Allocation
Percentage(s) and Directional Capacity Allocation(s) which shall be determined in
accordance with Section 3.3; (C) any change in each Owner's Ownership Interest with
respect to such Transmission Facilities and any applicable Substation O&M Allocation
which shall be determined in accordance with Section 3.3; (D) each Owner's share of the
costs of such upgrade or improvement (which shall be based on the Owners' respective
Ownership Interests in the Transmission Facilities); (E) any change in the Monthly
Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, or the
Monthly Common Equipment Charge, if any; and (F) such other matters as the Owners
may agree upon, all of which shall be memorialized in an amendment to this Agreement
executed by the Owners, including any amendments to the Exhibits hereto which shall be
effective as set forth in Section 6.1(b) (the "Amendment"); provided, however, that any
failure of the Owners to agree on any of the matters specified in subparts (A) through (F)
above shall be resolved pursuant to the provisions of Article XVII. Notwithstanding any
provisions to the contrary in this Agreement, an Owner shall not be prohibited from
making acapital upgrade or improvement to the Transmission Facilities pursuant to this
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-l 507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.6
Page 2 of 4
Version 0.0.2
Section 6.1(a) because the Owners fail to agree on any of the matters specified in subparts
(A) through (F) of the immediately preceding sentence, and any such disagreement shall be
resolved pursuant to Article XVII.
(ii) If the Non-Proposing Owner elects not to participate in the
capital upgrade or improvement to the Transmission Facilities (or fails to deliver a notice
to the Proposing Owner within the sixty (60) day period) or is not entitled to participate in
the capital upgrade or improvement to the Transmission Facilities pursuant to Section
6.1(a), then the Proposing Owner may proceed with the capital upgrade or improvement,
provided that the Proposing Owner shall coordinate with the Operator responsible for the
applicable Transmission Facilities on the final scope of the capital upgrade or
improvement.
(b) The applicable Operator shall design, permit, construct, install and
commission any upgrades or improvements to the Transmission Facilities provided for in
Section 6.1(aXi) in accordance with the Amendment or, if applicable, any resolution
pursuant to Article XVII, and otherwise in accordance with Good Utility Practice,
Governmental Requirements and Govemmental Authorizations. The Owners shall be
responsible, based on the Amendment or, if applicable, any resolution pursuant to Article
XV[, for all of the Costs incurred by or on behalf of the Operator in connection with such
capital upgrade or improvement to the Transmission Facilities. Effective as of the date of
successful commissioning of such capital upgrade or improvement, written notice of which
the Operator shall provide to the Owners, the Owners' Ownership Interests, Directional
Capacity Allocation Percentages and Directional Capacity Allocations in respect of such
Transmission Facilities any applicable Substation O&M Allocation shall be adjusted, if at
all, in accordance with the Amendment or, if applicable, any resolution pursuant to Article
XV[, and the Owners shall memorialize any revised Ownership Interests, Directional
C apacity Allocation Percentages, D irectional Capacity Al locations, and applicab le
Substation O&M Allocation in a revised Exhibit C. which shall be effective as of the date
of successful commissioning of such upgrade or improvement. Notwithstanding anything
to the contrary contained in this Agreement, any capital upgrades or improvements
provided for in this Section 6.1(b) shall be Transmission Facilities for purposes of this
Agreement.
(c) The applicable Operator shall design, permit, construct, install and
commission any upgrades or improvements to the Transmission Facilities provided for in
Section 6.I(aXii) in accordance with the final scope of the capital upgrade or improvement
established by the Proposing Owner pursuant to Section 6.1(aXii), and otherwise in
accordance with Good Utility Practice, Governmental Requirements and Governmental
Authorizations. Regardless of the foregoing, when an Owner of solely-owned
Transmission Facilities that are operated by the other Parfy makes a capital upgrade or
improvement, the Owner and Operator will jointly determine equipment specifications.
Unless agreed to otherwise, replacement equipment shall be consistent with the original
Effective:
Filed on : Apnl27,2016
FERC Docket No. ERl6-1507-000
ldaho Power Company
FERC Electric Tariff
Rate Schedules
L158.6
Page 3 of4
Version 0.0.2
equipment specifications. The Proposing Owner shall be responsible for all of the Costs
incurred by or on behalf of the Operator in connection with such capital upgrade or
improvement to the Transmission Facilities and title to such capital upgrades or
improvement shall vest solely with the Proposing Owner. Effective as of the date of
successful commissioning of such capital upgrade or improvement, written notice of which
the Operator shall provide to the Owners: (i) the Owners' Ownership Interests, Directional
Capacity Allocation Percentages and Directional Capacity Allocations in respect of such
Transmission Facilities and any applicable Monthly Transmission Facilities O&M Charge,
Substation O&M Allocation, and Monthly Common Equipment Charge shall be adjusted,
if at all, in accordance with Section 3.3; and (ii) the Operator shall operate and maintain
such capital upgrade or improvement in accordance with Section 6.1(a). In addition, the
Owners shall meet and agree on: (A) the allocation of increased transmission capacity, if
any, associated with such capital upgrade and improvement between the Owners, including
any change in the Owners' Directional Capacity Allocation Percentages and Directional
Capacity Allocations which shall be determined in accordance with Section 3.3; (B) any
change in the Monthly Transmission Facilities O&M Charge, the Monthly Substation
O&M Charge, or the Monthly Common Equipment Charge, if any; and (C) such other
matters as the Owners may agree upon, all of which shall be memorialized in an
amendment to this Agreement executed by the Owners, including any arnendments to the
Exhibits hereto which shall be effective as of the date of successful commissioning of such
upgrade or improvement; provided, however. that any failure of the Owners to agree on
any of the matters specified in subparts (A) through (C) above shall be resolved pwsuant to
the provisions of Article XVII. Notwithstanding anything to the contrary contained in this
Agreement, any capital upgrades or improvements provided for in this Section 6.1(c) shall
be Transmission Facilities for purposes of this Agreement.
(d) Notwithstanding anything to the contrary contained herein, the
provisions of this Section 6.1 shall not apply to capital upgrades or improvements made by
an Operator pursuant to Section 6.1(c) which are necessary for the operation of the
Transmission Facilities in accordance with Good Utility Practice or required by
Governmental Requirements or Govemmental Authorizations, which shall be governed by
the provisions of Section 5.1(d).
(e) Each Owner shall provide the applicable Operator prompt written
notice of any request pursuant to its OATT from a customer to provide additional
transmission capacity that will require one or more capital upgrades or improvements to
any of the Transmission Facilities. If capital upgrades or improvements are required in
accordance with such Owner's OATT, then such capital upgrades and improvements shall
be made by the Operator in accordance with the provisions of Section 6.1(a) and Section
6.1(b).
6.2 McNar.v Transmission Project. Within thirty (30) days after the earlier of the
date on which: (a) Idaho Power notifies PacifiCorp in writing that it desires to proceed
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
I .1s8.6
Page 4 of 4
Version 0.0.2
with negotiations regarding the development, construction, operation and joint ownership
of a new transmission line from McNary-Walulla-Walla Walla with capacity to be
determined based on future studies and needs (the "McNary Transmission Project"); or (b)
PacifiCorp notifies Idaho Power that it plans to proceed with all or a part of the McNary
Transmission Project, the Parties will meet and negotiate in good faith to reach agreement
on the definitive terms and conditions of construction, ownership and operation agreements
for the McNary Transmission Project (the "McNary Transmission Project Agreements")
pursuant to which the Parties will develop, design, engineer, procure, construct, test,
commission, operate and jointly own the McNary Transmission Project. Any such
negotiations shall automatically terminate if the Parties fail to reach agreement on the
definitive terms and conditions of the McNary Transmission Project Agreements within
ninety (90) days of receipt of the earlier of the notice in Section 6.2(a) and Section6.2(b)
(the 'Negotiations End Date"). The Parties will attempt, to the greatest extent possible, to
base the Parties' rights, duties, obligations, liabilities and remedies under the McNary
Transmission Project Agreements on the Parties' rights, duties, obligations, liabilities and
remedies under this Agreement; provided that the Parties agree that PacifiCorp shall be the
operator of and responsible for the design, engineering, procurement, construction, testing
and commissioning of the McNary Transmission Project under any McNary Transmission
Project Agreements and that the terms and conditions associated with PacifiCorp's
responsibilities as operator shall be definitively negotiated as part of any McNary
Transmission Project Agreements. If the Parties fail to reach agreement by the
Negotiations End Date on the definitive terms and conditions of the McNary Transmission
Project Agreements pursuant to this Section 6.Z,thenPacifiCorp may proceed or not
proceed with the McNary Transmission Project and Idaho Power will have no further right
to participate with PacifiCorp in the development, construction, operation and joint
ownership of the McNary Transmission Project.
Effective:
Filed on : Apil27,2016
FERC Docket No. ERI 6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.7
Page I of4
Version 0.0.2
ARTICLE VII
PHYSICAL DAMAGE TO TRANSMISSION FACILITIES: COIIDEMNATION
7.1 RebuildingDamagedFacilities.
(a) If any of the Transmission Facilities or Common Equipment are
materially damaged or destroyed (the "Damased Facilities"), then within thirty (30) days of
the date the damage or destruction occurred, the Operator responsible for such
Transmission Facilities and Common Equipment shall deliver to the Owners a written
notice (the "Darnag9_Ilqlig9") of the Operator's good faith reasonable estimate of the cost
to repair or rebuild the Damaged Facilities.
(i) If the Damaged Facilities consist of Transmission Facilities that
are jointly owned by the Owners and the Damage Notice indicates that the total project cost
to repair or rebuild the Damaged Facilities is estimated to be Five Million Dollars
(55,000,000) or more, inclusive of insurance proceeds, then the Owners will determine
whether the Damaged Facilities will be repaired or rebuilt within thirty (30) days of the
date of the Damage Notice.
(ii) If the Damaged Facilities consist of Transmission Facilities that
are jointly owned and the Damage Notice indicates that the total project cost to repair or
rebuild the Damaged Facilities is estimated to be less than Five Million Dollars
($5,000,000), inclusive of insurance proceeds, then, the Operator will determine in
accordance with Good Utility Practice whether the Damaged Facilities will be repaired or
rebuilt and provide notice thereof to the Owners within thirry (30) days of the date of the
Damage Notice.
(iiD If the Damaged Facilities consist of an Owner's wholly-owned
Transmission Facilities or Common Equipment, then, the Owner will determine in
accordance with Good Utility Practice whether the Damaged Facilities will be repaired or
rebuilt and provide notice thereof to the Operator within thirty (30) days of the date of the
Damage Notice.
(b) If the Owners, the Operator, or the Owner determines pursuant to
Sections 7. 10. 7.10. or 7.10. respectively, to repair or rebuild the Damaged Facilities, then
the Owners will, upon receipt of any insurance proceeds paid in connection with such
Damaged Facilities, apply such proceeds (up to each Owner's Pro Rata Share (based on its
respective Ownership Interest(s), if any, in the Damaged Facilities) in the amount to be
paid) to the repair and reconstruction of the Damaged Facilities which will be carried out
by the Operator. The Operator will be responsible for obtaining any necessary
Governmental Authorizations to repair or rebuild the Damaged Facilities and determining
the manner in which to repair and reconstruct the Damaged Facilities (including the
equipment to be used). Each Owner shall reasonably cooperate with and support the
Effective:
Filed on : April27,2O16
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.7
Page 2 of 4
Version 0.0.2
Operator in obtaining any such Governmental Authorizations in accordance with Section
4.4(c). The Operator will cause such repairs or reconstruction to be made so that the
Damaged Facilities will be repaired and restored to substantially the same general
condition, character and use as existed prior to such damage or destruction. If the cost of
such repairs or reconstruction exceeds the insurance proceeds required to be applied to the
repair or reconstruction pursuant to this Section 7.1, then the Owners shall pay, in
accordance with their applicable Ownership Interests, if any, the shortfall amount.
7.2 Decision not to Rebuild. If the Owners, the Operator, or the Owner
determines pursuant to Sections 0, 0, or 0, respectively, not to repair or rebuild the
Damaged Facilities (or cannot reach agreement to repair or rebuild the Damaged
Facilities), then, in each case: (a) each Owner shall: (i) be entitled to retain any insurance
proceeds received pursuant to insurance maintained by it with respect to the Damaged
Facilities; (ii) receive its Pro Rata Share (based on its respective Ownership Interest(s), if
any, in the Damaged Facilities) of any revenues from the salvage or sale of the Damaged
Facilities; and (iii) pay its Pro Rata Share (based on its respective Ownership Interest(s), if
any, in the Damaged Facilities) of any costs of removal of parts and equipment from the
Damaged Facilities; (b) the Operator shall pay to the Owners their Pro Rata Share (based
on their respective Ownership Interest(s), if any, in the Damaged Facilities) of any
insurance proceeds received from any property insurance obtained by the Operator
pursuant to Section 4.66); and (c) subject to Section 7.3. this Agreement shall terminate
pursuant to Section 2.3(a) solely with respect to such Damaged Facilities.
7.3 Purchase of Ownership Interest. If the Owners, the Operator, or the Owner
determines pursuant to Sections 0, 0, or 0, respectively, not to repair or rebuild the
Damaged Facilities (or cannot reach agreement to repair or rebuild the Damaged Facilities)
and, in each case, one Owner desires to repair or rebuild the Damaged Facilities (the
"Continuins Owner"), then the Continuing Owner shall have the option to purchase all of
the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s)
and Directional Capacity Allocation(s)) of the other Owner in the Damaged Facilities. In
order to exercise its option to purchase all of the Ownership Interest(s) (and associated
Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) of
the other Owner in the Damaged Facilities, the Continuing Owner must give written notice
thereof to the other Owner within thiny (30) days of the Owners' or Operator's
determination pursuant to Section 7.1 not to repair or rebuild the Damaged Facilities. The
Owners shall enter into such documentation as the Continuing Owner shall reasonably
request to document the purchase and sale of all of the Ownership Interest(s) (and
associated Directional Capacity Allocation Percentage(s) and Directional Capacity
Allocation(s)) of the other Owner in the Damaged Facilities, provided that the purchase
price of the Ownership Interest(s) (and associated Directional Capacity Allocation
Percentage(s) and Directional Capacity Allocation(s)) of the other Owner shall be equal to
Effective:
Filed on : April 27, 2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
I . 158.7
Page 3 of4
Version 0.0.2
the other Owner's Pro Rata Share (based on its respective Ownership Interest(s) in the
Damaged Facilities) of the salvage value of the Damaged Facilities.
7.4 Cooperation. If the Continuing Owner seeks to repair or rebuild the
Damaged Facilities purchased from the other Owner pursuant to Section 7.3, then, at the
Continuing Owner's request and expense, the other Owner and the responsible Operator (if
the Continuing Owner is not the responsible Operator) will, for a reasonable period of time,
cooperate with and use Commercially Reasonable Efforts to assist the Continuing Owner
in the repair or rebuilding of the Damaged Facilities. This Section 7.4 shall survive the
expiration or termination of this Agreement pursuant to Section 2.3(a) solely with respect
to such Damaged Facilities.
7.5 Condemnation. If there occurs a loss of title to, or ownership ol or use and
possession of,, all or any portion of any of the Transmission Facilities or Common
Equipment as the result of the exercise of the right of condemnation or eminent domain by
or on behalf of any Governmental Authority, then the Operator responsible for such
Transmission Facilities or Common Equipment will promptly give notice thereof to the
Owners, which notice shall generally describe the nature and extent of such condemnation
or eminent domain proceedings (including any negotiations in connection with such
proceedings). The Operator shall, in consultation with the Owners, use Commercially
Reasonable Efforts to resist the loss of title to, or ownership of, or use and possession of,
all or any portion of any of the Transmission Facilities or Common Equipment through
condemnation or eminent domain. If, as a result of condemnation or eminent domain, the
Owners shall lose title to, or ownership of, or use and possession of, all or any portion of
any of the Transmission Facilities or Common Equipment, then the Owner or Owners shall
determine whether:
(a) the relevant portion of the Transmission Facilities or Common
Equipment is no longer useful for the transmission of electric power and should be retired
and decommissioned, in which case the provisions of Article VIII shall control;
(b) the relevant portion of the Transmission Facilities or Common
Equipment should be replaced or modified, in which case the Owners will, upon receipt of
any awards paid in connection with such condemnation or eminent domain, apply such
awards to the replacement or modification of the Transmission Facilities or Common
Equipment which will be carried out by the Operator responsible for such Transmission
Facilities or Common Equipment. The Operator will, consistent with the decision of the
Owner or Owners, as applicable, determine the manner in which to replace or modify the
Transmission Facilities or Common Equipment, and will cause such replacement and
modifications to be made so that the Transmission Facilities or Common Equipment are
replaced or modified in accordance with the decision of the Owner or Owners, as
applicable. If the cost of replacement or modification of the Transmission Facilities or
Common Equipment exceeds the awards received by the Owners in connection with such
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.7
Page 4 of4
Version 0.0.2
condemnation or eminent domain, then the Owners shall pay their Pro Rata Share (based
on their respective Ownership Interest(s), if any, in the Transmission Facilities or Common
Equipment) of the shortfall amount; or
(c) if the Owner or Owners, as applicable, do not reach agreement on one
of the actions provided for in Section 7.5(.a) and Section 7.5(b), or on another course of
action, within sixty (60) days after the date of the notice provided by the Operator to the
Owners pursuant to the first sentence of this Section 7.5. then each Owner shall receive its
Pro Rata Share (based on its respective Ownership Interest(s), if any, in the Transmission
Facilities or Common Equipment) of all awards received by the Owners (or their Affiliates)
in connection with any such condemnation or eminent domain (less the actual cost fees
and expenses incurred by the Operator in collection thereof).
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.ls8.8
Page I of2
Version 0.0.2
ARTICLE VIII
RETIREMENT AIID DECOMMISSIONING OF TRANSMISSION FACILITIES
8.1 Decision to Retire Transmission Facilities. The Owners will determine in
accordance with the terms of this Article VIII when any of the Transmission Facilities or
Common Equipment are no longer useful for the transmission of electric power and
should be retired and decommissioned. If the Owner or Owners decide to retire and
decommission any of the Transmission Facilities or Common Equipment, then, subject to
Section 8.2 and Section 8.3, this Agreement shall terminate pursuant to Section 2.3(a)
solely with respect to such Transmission Facilities or Common Equipment once they are
retired and decommissioned.
8.2 Costs of Decommissioning. Each of the Owners shall be responsible for
paying its Pro Rata Share (based on its respective Ownership Interest(s), if any, in the
Facilities Proposed for Retirement) of the aggregate amount of all costs incurred by or on
behalf of the Operator to retire permanently the Facilities Proposed for Retirement from
service, including decommissioning, dismantling, demolishing and removal of equipment,
facilities and strucfures, security, maintenance, disposing of debris, abandonment and all
other costs incurred by or on behalf of the Operator to retire permanently the Facilities
Proposed for Retirement from service, net of any amounts recovered in connection with
the sale of any retired equipment, facilities and structures.
8.3 Decommissioning Notice; Purchase of Ownership Interest. A Proposing
Owner shall give written notice to the other Owner when it believes any of the
Transmission Facilities or Common Equipment in which it has an Ownership Interest
should be retired and decommissioned (each notice, a "Decommissionins Notice"). If the
Non-Proposing Owner either (i) has an Ownership Interest in the Facilities Proposed for
Retirement, or (ii) is an Impacted Party with respect to the Facilities Proposed for
Retirement, ffid, in either case, desires to continue the operation of the Facilities Proposed
for Retirement, then the Non-Proposing Owner shall have the option to purchase all of the
Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and
Directional Capacity Allocation(s)), if any, of the Proposing Owner in the Facilities
Proposed for Retirement. In order to exercise its option to purchase all of the Ownership
Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional
Capacity Allocation(s), if any) of the Proposing Owner in the Facilities Proposed for
Retirement, the Non-Proposing Owner must give written notice thereof to the Proposing
Owner within ninety (90) days of receipt of the Decommissioning Notice. The Owners
shall enter into such documentation as each Owner shall reasonably request to document
the purchase and sale of the Ownership Interest(s) (and associated Directional Capacity
Allocation Percentage(s) and Directional Capacity Allocation(s)), if any, of the Proposing
Party in the Facilities Proposed for Retirement, provided that the purchase price of the
Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and
Effective:
Filed on : April 27 ,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.8
Page2 of2
Version 0.0.2
Directional Capacity Allocation(s)) of the Proposing Party shall be equal to the Proposing
Party's Pro Rata Share (based on its respective Ownership Interest(s), if any, in the
Facilities Proposed for Retirement) of the depreciated cost of the Facilities Proposed for
Retirement.
8.4 Cooperation. If the Non-Proposing Owner seeks to purchase and continue
the operation of the Facilities Proposed for Retirement, then, at the Non-Proposing
Owner's request and expense, the Proposing Owner and the responsible Operator (if the
Non-Proposing Owner is not the responsible Operator) will, for a reasonable period of
time, cooperate with and use Commercially Reasonable Efforts to assist the Non-
Proposing Owner in the continued operation of the Facilities Proposed for Retirement.
This Section 8.4 shall survive the expiration or termination of this Agreement pursuant to
Section 2.3.
Effective:
Filed on : April?7,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.9
Page I of2
Version 0.0.2
ARTICLE IX
TRANSMISSION SYSTEM BOUNDARIES
9.1 Points of Interconnection: Points of Balancing Authority Area Adjacency.
(a) Each Owner's Transmission System, which includes the Owner's
Ownership Interests in the Transmission Facilities, shall be considered interconnected at
the Points of Interconnection, and the location and associated meter for each Point of
lnterconnection, and any other information required by Governmental Requirements to be
agreed to by the Parties, shall have been mutually agreed to by the Parties in writing and
included in operating procedures of the Parties on or before the Effective Date, which the
Parties shall review and update annually as necessary.
(b) Each Owner's Balancing Authority Area shall be considered Adjacent
Balancing Authority Areas at the Points of Balancing Authority Area Adjacency, and the
location and associated meter for each Point of Balancing Authority Area Adjacency, and
any other information required by Governmental Requirements to be agreed to by the
Parties, shall have been mutually agreed to by the Parties in writing and included in
operating procedures of the Parties on or before the Effective Date, which the Parties shall
review and update annually as necessary.
9.2 E-Tags. Each Party shall cause the Operator of a Path to be included on all e-
Tags as a scheduling entity.
9.3 Dynamic Transfer Capability Rights.
(a) Notwithstanding any provision of this Agreement to the contrary,
Idaho Power authorizes PacifiCorp to utilize up to 400 MW of Dynamic Transfer
Capability over the Idaho Power Transmission System in an east to west direction;
provided. however, no schedule shall exceed the scheduling capability of any point of
receipt and point of delivery combination.
(b) Idaho Power's grant of, and PacifiCorp's utilization of, Dynamic
Transfer Capability scheduling rights pursuant to this Section 9.3 are subject to Good
Utility Practice and Governmental Requirements.
(c) The Dynamic Transfer Capability rights provided for in this Section
9.3 does not include the Jim Bridger pseudo-tied generation provided for in Section 9.4 and
recognizes that Jim Bridger Project generation does not utilize Automatic Generation
Control. If the Parties desire to utilize Automatic Generation Control for Jim Bridger
Project generation in the future, it will be designed to have no impact to the Dynamic
Transfer Capability or any such impact will be mutually agreed to by the Parties.
Effective: October 30, 201 5
Filed on : October 30,2015
FERC Docket No. ERl6-210-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.9
Page2 of2
Version 0.0.2
9.4 Jim Bridger Pseudo Tie.
(a) Idaho Power authorizes PacifiCorp to transfer its share of the electrical
output of the Jim Bridger Project from the Jim Bridger Project bus bar meter into its
PACW Balancing Authority Area utilizing a pseudo-tie.
(b) Idaho Power's grant of, and PacifiCorp's utilization of, the pseudo-tie
are subject to Good Utility Practice and Governmental Requirements. In addition, the
pseudo-tie rights provided for in this Section 9.4 may not be sold or transferred by
PacifiCorp to anyone without Idaho Power's prior written consent.
(c) To calculate the PacifiCorp pseudo tie, PacifiCorp shall subtract Jim
Bridger Transmission Losses from PacifiCorp's share of the Jim Bridger Project Net
Generation.
9.5 Electric Losses. Each Party agrees that when it is the operator of the
Balancing Authority Area containing a Segment for which the other Owner is the
transmission provider for the Segment, that it will: (a) provide elecffic energy for
transmission losses as needed to keep ffansmission service schedules whole within its
Balancing Authority Areq consistent with Governmental Requirements and Reliability
Standards; and (b) provide compensation for electric losses in accordance with Exhibit G
"Joint Ownership Transmission Loss Calculation and Allocation Methodology."
9.6 Jim Bridger Project Generation RAS. The Parties agree that the Jim Bridger
Project shall be tripped to implement the Jim Bridger Project Generation RAS schemes
according to protocols that shall have been mutually agreed to by the Parties and included
in operating procedures of the Parties on or before the Effective Date, which operating
procedures the Parties shall review and update annually as necessary.
Effective: October 30, 201 5
Filed on : October 30,2015
FERC Docket No. ERl6-210-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l. l 58. l0
Page I of2
Version 0.0.1
ARTICLE X
TRANSMISSION SYSTEMS OPERATION AND MAINTENANCE
10.1 ServiceConditions.
(a) Operation and Maintenance. Each Owner shall operate and maintain
its Transmission System in a manner consistent with Good Utility Practice, Governmental
Requirements, Governmental Authorizations and Reliability Standards; provided. however.
that nothing in this Section 10.1(a) shall modify or amend such Party's responsibility as an
Operator under this Agreement.
(b) Additional Services. This Article X is applicable only to the physical
interconnection of the Owners' Transmission Systems at the Points of Interconnection and
does not obligate either Owner to receive or provide any service. Other services provided
by one Owner to the other Owner shall be govemed by such other agreements as the
Owners may enter into from time to time.
(c) Intemrption of Service. The Owners shall use Commercially
Reasonable Efforts, consistent with Good Utility Practice, Reliability Standards and
Govemmental Requirements, to provide a physical interconnection to be operated in
continuous synchronization at the Points of Interconnection, provided that an Owner
("Intemrpting Owner") may temporarily intemrpt or isolate the interconnected facilities
under the following circumstances: (i) by operation of automatic equipment installed for
power system protection; (ii) after consultation with the other Owner, other than in an
emergency situation where consultation is not practicable, when an Owner deems it
necessary for installation, maintenance, inspection, repairs or replacements of equipment
on its Transmission System; (iii) at any time that, in the sole judgment of the Intemrpting
Owner, such action is necessary to preserve the integrity of, or to prevent or limit any
instability on its Transmission System; (iv) where necessary to comply with documented
directives from a Governmental Authority; (v) as a result of one or more events of Force
Majeure; or (vi) where necessary to prevent: (A) death or serious rnjury to any person; (B)
material damage or harm to any property; or (C) any material adverse effect to the security
of, or damage to its Transmission System or the electric systems of others to which its
Transmission System is directly connected, including the other Owner's Transmission
System. An Intemrpting Owner shall use Commercially Reasonable Efforts to provide the
other Owner (1) with reasonable advance notice of anyplanned intemrption of the
interconnection facilities in accordance with the notice requirements set forth in Section
5.2(b), and (2) with notice of any other intemrption of the interconnected facilities as soon
as practicable after the intemrption. If synchronous operation is intemrpted, the Owners
shall cooperate so as to remove the cause of such intemrption as soon as commercially
practicable consistent with Good Utility Practice, Reliability Standards and Governmental
Requirements.
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERI 5-683-00 I
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.10
Page2 of2
Version 0.0.1
(d) Physical and Cyber Security. The Operators shall cooperate with the
Owners in complying with any physical and cyber security or other security requirement
established by Governmental Requirements or Reliability Standards applicable to the
Owners and the Transmission Facilities and the Common Equipment, written notice of
which the Owners shall provide to the Operators.
10.2 Survival. The provisions of this Article X, together with other provisions of
this Agreement (but only to the extent applicable to the surviving provisions of this Article
X), shall continue in full force and effect notwithstanding the termination of this
Agreement, provided that in the event of termination of this Agreement the Parties shall
amend this Agreement to reflect such changes to this Agreement as shall be necessary and
mutually acceptable to the Parties to conform this Agreement to the surviving provisions of
this Agreement in accordance with this Section 10.2.
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.l58.l I
Page I of2
Version 0.0.1
ARTICLE XI
FORCE MAJEURE
11.1 Force Majeure Defined. For purposes of this Agreement, "Force Majeure"
means an event or circumstance beyond the reasonable control of and without the fault or
negligence of the Party claiming Force Majeure ("Affected Parqy"), which, despite the
exercise ofreasonable diligence, cannot be or be caused to be prevented, avoided or
removed by such Affected Party including, to the extent satisffing the above requirements,
acts of God; earthquake; abnormal weather condition; hurricane; flood; lightning; high
winds; drought; peril of the sea; explosion; fire; war (declared or undeclared); military
action; sabotage; riot; insurrection; civil unrest or disturbance; acts of terrorism; economic
sanction or embargo; civil strike, work stoppage, slow-down, or lock-out that are of an
industry or sector-wide nature and that are not directed solely or specifically at the
Affected Party; the binding order of any Governmental Authority, provided that the
Affected Pafiy has in good faith reasonably contested such order; the failure to act on the
part of any Governmental Authority, provided that such action has been timely requested
and diligently pursued; unavailability of equipment, supplies or products, but only to the
extent caused by Force Majeure; failure of equipment, provided that the equipment has
been operated and maintained in accordance with Good Utility Practice; and transportation
delays or accidents, but only to the extent otherwise caused by Force Majeure; provided,
however. that neither insufficiency of funds, financial inability to perform nor changes in
market conditions shall constitute Force Majeure.
ll.2 Effect of Force Majeure.
(a) If an Affected Party is rendered wholly or partly unable to perform its
obligations under this Agreement or its performance is delayed because of Force Majeure,
such Affected Party shall be excused from, and shall not be liable for, whatever
performance it is unable to perform or delayed in performing due to the Force Majeure to
the extent so affected, ry4lgg[ that:
(i) The Affected Party, as soon as reasonably practical after the
commencement of the Force Majeure, gives the other Party prompt written notice thereof,
including a description of the particulars of the Force Majeure;
(ii) The suspension of perfoflnance is of no greater scope and of no
longer duration than is required by the Force Majeure; and
(iiD The Affected Party uses Commercially Reasonable Efforts to
overcome and remedy its inability to perfonn as soon as reasonably practical after the
commencement of the Force Majeure.
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.l58.l I
Page2 of2
Version 0.0.1
(b) Notwithstanding anything in this Article XI to the contrary, no
payment obligation arising under this Agreement prior to the date of an event of Force
Majeure shall be excused by such event of Force Majeure.
(c) Whenever an Affected Party is required to commence or complete any
action within a specified period and is prevented or delayed by Force Majeure from
commencing or completing such action within the specified period, such period shall be
extended by an amount equal to the duration of such event of Force Majeure occurring or
continuing during such period.
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l. I 58. l2
Page I of2
Version 0.0.1
ARTICLE XII
EVENTS OF DEFAULT
l2.l Event of Default. Each of the following events shall constitute an event of
default ("Event of Defaulf') by the defaulting Party (a "Defaultine Party"):
(a) The failure to make, when due, any payment required pursuant to this
Agreement, if such failure is not remedied within thirty (30) days after written notice
thereof from the Non-Defaulting Party;
(b) Any representation or warranty made by such Defaulting Party herein
is false or misleading in any material respect when made, unless: (i) the fact, circumstance
or condition that is the subject of such representation or warranty is made true within thirty
(30) days after notice thereof from the Non-Defaulting Party, ry4!91[that if the fact,
circumstance or condition that is the subject of such representation or warranty reasonably
cannot be corrected within such thirty (30) day period, then the Defaulting Parry shall have
an additional period of time (not to exceed sixty (60) days) in which to correct the fact,
circumstance or condition that is the subject of such representation or warranty; and (ii)
such cure removes any adverse effect on the Non-Defaulting Party of such fact,
circumstance or condition being otherwise than as first represented, or such fact,
circumstance or condition being otherwise than as first represented does not materially
adversely affect the Non-Defaulting Parry;
(c) A transfer, assignment or other disposition of its interest in this
Agleement or its Ownership Interests (or Directional Capacity Allocation Percentages and
Directional Capacity Allocations) in the Transmission Facilities, in each case, in violation
of Article )(IX;
(d)
Section 3.7;
The failure to perform or breach of its covenants and obligations in
(e) The failure to be a Qualified Owner, if such failure is not remedied
within thiffy (30) days after written notice thereof from the Non-Defaulting Party;
(0 The failure to perform or breach of any material covenant or
obligation set forth in this Agreement (other than provided for in Section 12.1(a). (b), G),
(O or (O), if such failure is not remedied within thirty (30) days after written notice thereof
from the Non-Defaulting Party, provided that if such failure or breach cannot reasonably be
cured within thirty (30) days, then the Defaulting Party shall have an additional period of
time (not to exceed ninety (90) days) in which to cure such failure or breach so long as the
Defaulting Party commences good faith activities to cure the failure or breach during the
initial 30-day cure period and continues to utilize Commercially Reasonable Efforts to
effect a cure; or
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERI 5-683-00 I
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.158. l2
Page2 of2
Version 0.0.1
(g) The Defaulting Party becomes Bankrupt.
12.2 Cure by Non-Defaultine Parqv. If a Defaulting Party fails to cure an Event of
Default, then the Non-Defaulting Parry may, in its sole discretion, attempt to cure the Event
of Default, provided that the Defaulting Party shall reimburse the Non-Defaulting Party for
all costs and expenses incurred by or on behalf of the Non-Defaulting Party pursuant to this
Section 12.2.
12.3 Remedies.
(a) If an Event of Default occurs and is continuing, then the Non-
Defaulting Parfy shall be entitled to exercise any of it remedies at law or in equity,
including recovery from the Defaulting Party of any damages suffered as a result of the
Event of Default, subject to Section 14.8. The Non-Defaulting Party shall use
Commercially Reasonable Efforts to mitigate any damages suffered as a result of the Event
of Default.
(b) The Parties acknowledge that the obligations and covenants performed
by each Party hereunder are unique and that the Non-Defaulting Party will be irreparably
injured should such obligations and covenants not be consummated in accordance with the
terms and conditions of this Agreement. Consequently, the Non-Defaulting Party will not
have an adequate remedy at law if the other Parfy shall fail to perform its obligations and
covenants hereunder. The Non-Defaulting Party shall have the right, in addition to any
other remedy available under this Agreement, to specific performance of the Defaulting
Party's obligations and covenants hereunder, and the Parties agree not to take a position in
any proceeding arising out of this Agreement to the effect that the Non-Defaulting Party
has an adequate remedy at law.
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l. ls8.l3
Page I of2
Version 0.0.1
ARTICLE XIII
REPRESENTATIONS AIID WARRANTIES
l3.l Representations and Waranties of Idaho Power. Idaho Power represents and
walrants to PacifiCorp as of the Execution Date as follows:
(a) It is duly formed, validly existing and in good standing under the laws
of the jurisdiction of its formation.
(b) It has all requisite corporate power necessary to own its assets and
carry on its business as now being conducted or as proposed to be conducted under this
Agreement.
(c) It has all necessary corporate power and authority to execute and
deliver this Agreement and to perform its obligations under this Agreement, and the
execution and delivery of this Agreement and the performance by it of this Agreement
have been duly authorized by all necessary corporate action on its part.
(d) The execution and delivery of this Agreement and the performance by
it of this Agreement do not: (i) violate its organizational documents; (ii) violate any
Governmental Requirements; or (iii) result in a breach of or constitute a default of any
material agreement to which it is a party.
(e) This Agreement has been duly and validly executed and delivered by
it and constitutes its legal, valid and binding obligation enforceable against it in accordance
with its terms, except as the same may be limited by bankruptcy, insolvency or other
similar laws affecting creditors' rights generally and by principles of equity regardless of
whether such principles are considered in a proceeding at law or in equity.
(0 Except as disclosed in Schedule 13.l(fl, all material Governmental
Authorizations required by Governmental Requirements to have been obtained by it prior
to the date hereof in connection with the due execution and delivery of this Agreement,
have been duly obtained or made and are in full force and effect.
(g) It is a Qualified Owner.
13.2 Representations and Warranties of PacifiCorp. PacifiCorp represents and
warrants to Idaho Power as of the Execution Date as follows:
(a) It is duly formed, validly existing and in good standing under the laws
of the jurisdiction of its formation.
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.158. t3
Page2 of2
Version 0.0.1
(b) It has all requisite corporate power necessary to own its assets and
carry on its business as now being conducted or as proposed to be conducted under this
Agreement.
(c) It has all necessary corporate power and authority to execute and
deliver this Agreement and to perform its obligations under this Agreement, and the
execution and delivery of this Agreement and the performance by it of this Agreement
have been duly authorized by all necessary corporate action on its part.
(d) The execution and delivery of this Agreement and the performance by
it of this Agreement do not: (i) violate its organizational documents; (ii) violate any
Governmental Requirements; or (iii) result in a breach of or constitute a default of any
material agreement to which it is a party.
(e) This Agreement has been duly and validly executed and delivered by
it and constitutes its legal, valid and binding obligation enforceable against it in accordance
with its terms, except as the same may be limited by bankruptcy, insolvency or other
similar laws affecting creditors' rights generally and by principles of equity regardless of
whether such principles are considered in a proceeding at law or in equity.
(0 Except as disclosed in Schedule 13.2(0, all material Governmental
Authorizations required by Governmental Requirements to have been obtained by it prior
to the date hereof in connection with the due execution and delivery of this Agreement,
have been duly obtained or made and are in full force and effect.
(e)It is a Qualified Owner.
Effective: October 30, 2015
Filed on : October 30, 2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.14
Page I of4
Version 0.0.1
ARTICLE XIV
IIIDEMNIFICATION
14.l Indemnities.
(a) Subject to the provisions of Section 14.3 and Section 14.8, each
Owner (the "Indemnifyine Parqy") shall indemnify, defend and hold harmless the other
Owner (the "Indemnified Party") and its Representatives, from and against any and all
suits, actions, liabilities, legal proceedings, claims, demands, losses, costs and expenses of
whatsoever kind or character (including reasonable attorneys' fees and expenses) of third
parties (collectively, "Claims"), for injury or death of persons or physical loss of or damage
to property of Persons (other than the Indemnified Pany and its Representatives) arising
from the Indemnifying Party's (including its Representatives'): (i) gross negligence or
willful misconduct in connection with the performance of this Agreement; or (ii) failure to
perform a material obligation under this Agreement.
(b) In addition to and not in limitation of the indemnity provided in
Section 14.1(a), but subject to the provisions of Section 14.3 and Section 14.8, each
Owner, as Indemnifying Party, shall severally and not jointly, in accordance with its
applicable Ownership Interest(s), indemnify, defend and hold harmless each Operator, as
Indemnified Party, and its Representatives from and against any and all Claims for injury
or death of persons or physical loss of or damage to property of Persons (other than the
Indemnified Party and its Representatives), or fines or penalties levied or imposed by
Governmental Authorities or other Losses incurred by the Indemnified Parry and its
Representatives, in each case, arising under or in connection with this Agreement,
including in connection with the performance by the Operator of its obligations under this
Agreement, except for such Claims or fines or penalties or other Losses arising from the
Operator's or its Representatives': (i) gross negligence or willful misconduct in connection
with the performance of this Agreement; or (ii) failure to perform a material obligation
under this Agreement.
(c) Subject to the provisions of Section 14.3 and Section 14.8, each
Operator, as Indemnifying P*y, shall indemnify, defend and hold harmless each Owner,
as Indemnified Party, and its Representatives from and against any and all Claims for
injury or death of persons or physical loss of or damage to property of Persons (including
the Indemnified Party and its Representatives), or fines or penalties levied or imposed by
Governmental Authorities or other Losses incurred by the Indemnified Party and its
Representatives, in each case, arising from the Operator's and its Representatives': (i)
gross negligence or willful misconduct in connection with the performance of this
Agreement; or (ii) failure to perform a material obligation under this Agreement; provided.
however. in no event shall the Operator be obligated to indemnify, defend or hold harmless
an Owner and its Representatives from and against any such Claims or fines or penalties or
Losses to the extent arising from such Owner's or its Representatives': (i) gross negligence
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.14
Page2 of 4
Version 0.0.1
or willful misconduct in connection with the performance of this Agreement; or (ii) failure
to perform any material obligation under this Agreement.
14.2 Notice and Participation.
(a) If an Indemnified Parfy intends to seek indemnification under this
Article XIV with respect to any Claims, the Indemnified Party shall give the Indemnifying
Party prompt written notice of such Claims upon the receipt of actual knowledge or
information by the Indemnified Party of any possible Claims or of the commencement of
such Claims. The Indemnifying Party shall have no liability under this Article XIV for any
Claim for which such notice is not provided, but only to the extent that the failure to give
such notice materially impairs the ability of the Indemnifying Parfy to respond to or to
defend the Claim.
(b) The lndemnifying Party shall have the right to assume the defense of
any Claim, at its sole cost and expense, with counsel designated by the Indemnifying Party
and reasonably satisfactory to the Indemnified Party; ryKlell, however, that if the
defendants in any such proceeding include both the Indemnified Party and the
Indemnifying Party, and the Indemnified Party shall have reasonably concluded that there
may be legal defenses available to it which are in conflict with those available to the
Indemnifying Party and that such conflict materially prejudices the ability of the counsel
selected by the Indemnifying Party to represent both Parties, the Indemnified Party shall
have the right to select separate counsel reasonably satisfactory to the Indemnifying Parfy,
at the Indemnifying Party's expense, to assert such legal defenses and to otherwise
participate in the defense of such Claim on behalf of such Indemnified Party, and the
Indemnifying Party shall be responsible for the reasonable fees and expenses of such
separate counsel.
(c) Should any Indemnified Party be entitled to indemnification under this
Article XIV as a result of a Claim, and should the Indemnifying Parfy fail to assume the
defense of such Claim within a reasonable period of time after the Indemnified Party has
provided the Indemnifying Party written notice of such Claim, the Indemnified Party may,
at the expense of the Indemnifying Party, contest or, with or without the prior consent of
the Indemnifying P*y, settle such Claim.
(d) Except to the extent expressly provided herein, no Indemnified Party
shall settle any Claim with respect to which it has sought or is entitled to seek
indemnification pursuant to this Article XIV unless: (i) it has obtained the prior written
consent of the Indemnifying Party; or (ii) the Indemnifying Party has failed to assume the
defense of such Claim within a reasonable period of time after the Indemnified Party has
provided the Indemnifying Party written notice of such Claim.
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l. I 58. l4
Page 3 of4
Version 0.0.1
(e) Except to the extent expressly provided otherwise herein, no
Indemnifying Party shall settle any Claim with respect to which it may be liable to provide
indemnification pursuant to this Section without the prior written consent of the
Indemnified Party; provided. however, that if the Indemnifying Party has reached a bona
fide settlement agreement with the plaintiff(s) in any such proceeding, which settlement
includes a full release of the Indemnified Party for any and all liability with respect to such
Claim and does not obligate the Indemnified Party to take or forbear to take any action, and
the Indemnified Party does not consent to such settlement agreement, then the dollar
amount specified in the settlement agreement, plus the Indemnified Party's reasonable
legal fees and other costs related to the defense of the Claim paid or incurred prior to the
date of such settlement agreement, shall act as an absolute ma:<imum limit on the
indemnification obligation of the Indemnifying Party with respect to the Claim, or portion
thereof, that is the subject of such settlement agreement.
14.3 Net Amount. Subject to the limitation in Section 14.2(e), if applicable, in the
event that an Indemnifying Party is obligated to indemnify and hold any Indemnified Party
harmless under this Article XIV, the amount owing to the Indemnified Pany shall be the
amount of such Indemnified Party's actual Claims, fines or penalties or other Losses, as the
case may be, net of any insurance or other recovery actually received by the Indemnified
Party.
14.4 No Release of Insurers. The provisions of this Article XIV shall not be
deemed or construed to release any insurer from its obligation to pay any insurance
proceeds in accordance with the terms and conditions of valid and collectible insurance
policies.
14.5 Mitieation. Each Indemnified Party entitled to indemnification hereunder
shall use Commercially Reasonable Efforts to mitigate all Claims, fines, penalties or other
Losses, as the case may be, after becoming aware of any event which could reasonably be
expected to give rise to any Claims, fmes, penalties or other Losses, as the case may be,
that are indemnifiable or recoverable hereunder or in connection herewith.
14.6 Assertion of Claims. No Claim of any kind shall be asserted against any
Owner or Operator pursuant to this Article XIV, whether arising out of contract, tort
(including negligence), strict liability, or any other cause of or form of action, unless it is
filed in a court of competent jurisdiction, or a demand for arbitration is made, within the
applicable statute of limitations period for such Claim.
14.7 Survival of Oblieation. The duty to indemnify under this Article XIV shall
continue in full force and effect notwithstanding the expiration or termination of this
Agreement, with respect to any Claim, fine, penalty or other Losses, as the case may be,
arising out of an event or condition which occurred or existed prior to such expiration or
termination.
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ER15-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.14
Page 4 of4
Version 0.0.1
14.8 Limitation on Liability.
(a) Notwithstanding any provision in this Agreement to the contrary,
neither Party shall be liable under this Agreement in any action at law or in equity, whether
based on contract, tort or strict liability or otherwise, for any special, incidental, indirect,
exemplary, punitive or consequential damages or losses, including any loss of revenue,
income, profits or investment opportunities, loss of the use of equipment, or the cost of
temporary equipment or services, ry4!g! that any fines or penalties or other Losses
levied or imposed by Govemmental Authorities shall not be excluded under this Section
1a.8(a) as special, incidental, indirect, exemplary, punitive or consequential damages or
losses.
(b) Notwithstanding any provision in this Agreement to the contrary,
neither Party shall be liable under this Agreement if and to the extent that the Agreement
Limiting Liability Among Western Interconnected Systems executed by Idaho Power on
August 5, 1985 and by PacifiCorp on August 22,1973 (the "WIS Agreement") is then in
effect between the Parties and expressly limits or precludes such liability. Nothing in this
Agreement shall amend or otherwise affect in any way the terms and conditions of or
liability of the Parties under the WIS Agreement.
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
15.3 Permitted Disclosures.
in this Article XV:
l.158. I 5
Page I of3
Version 0.0.1
Notwithstanding anyhing to the contrary contained
ARTICLE XV
PROPRIETARY INFORMATION
15.1 Disclosure of Proprietary Information Prohibited. Any Proprietary
Information of a Parfy (whether in its capacity as Owner or Operator) (the "Transferor")
which is disclosed to or otherwise received or obtained by the other Parry (whether in its
capacity as Owner or Operator) (the "Transferee") incident to this Agreement shall be held
in confidence and the Transferee shall not (subject to Sections 15.2, 15.3 and !5J) publish
or otherwise disclose any Proprietary Information of the Transferor to any Person for any
reason or purpose whatsoever, or use any Proprietary Information for any purpose other
than performance under this Agreement, without the prior written approval of the
Transferor, which approval may be granted or withheld by the Transferor in its sole
discretion. Without limiting the generality of the foregoing, each Transferee shall observe
at a minimum the same safeguards and precautions with regard to the Transferor's
Proprietary Information which the Transferee observes with respect to its own information
of the same or similar kind.
15.2 Disclosure by Representatives. Each Transferee agrees ttrat it will make
available Proprietary Information received from a Transferor to its own Representatives
only on a need-to-know basis and in compliance with Governmental Requirements, and
that all Persons to whom such Proprietary Information is made available will be made
aware of the confidential nature of such Proprietary Information, and will be required to
agree to hold such Proprietary Information in confidence in accordance with the terms
hereof and in compliance with Governmental Requirements.
(a) A Transferee may provide any Proprietary Information to any
Govemmental Authority having jurisdiction over or asserting a right to obtain such
information, plovjded that: (i) such Governmental Authority orders that such Proprietary
Information be provided; and (ii) unless prohibited from so doing by Governmental
Requirements, the Transferee promptly advises the Transferor of any request for such
information by such Governmental Authority and cooperates in giving the Transferor an
opporfirnity to present objections, requests for limitation, and/or requests for confidentiality
or other restrictions on disclosure or access, to such Governmental Authority.
(b) A Transferee may, to the extent required, disclose Proprietary
Information to any Governmental Authority in connection with the application for any
Governmental Authoization; provided that unless prohibited from so doing by
Governmental Requirements, the Transferee shall provide the Transferor prior written
advance notice of such disclosure and the Proprietary Information that is to be disclosed.
Effective: October 30, 20 15
Filed on : October 30, 2015
FERC Docket No. ERI 5-683-00 I
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.1 58.1 5
Page 2 of3
Version 0.0.1
(c) A Transferee may disclose such Proprietary Information regarding the
existence and terms of this Agreement as such Transferee deems necessary to enable it to
comply with the Securities Exchange Act of 1934, or the rules, regulations and forms of the
Securities and Exchange Commission, issued thereunder or the applicable rules of any
stock exchange, or as otherwise required by Governmental Requirements.
15.4 Injunctive Relief. In the event of a breach or threatened breach of the
provisions of this Article XV by any Transferee, the Transferor shall be entitled to an
injunction restraining the Transferee from such breach or threatened breach. Nothing
contained herein shall be construed as prohibiting the Transferor from pursuing any other
remedies available at law or equity for such breach or threatened breach of this Agreement.
15.5 Publicity. Any public relations matters, including public announcements and
press releases or similar publicity, arising out of or in connection with the terms of this
Agreement or the ffansactions contemplated herein, shall be coordinated and agreed to
between the Panies prior to said announcement or release.
15.6 Proprietary Information Defined. For pulposes of this Agreement,
"Proprietarf Information" means all information, written or oral, which has been or is
disclosed by the Transferor, or by any Representative of the Transferor, or which otherwise
becomes known to the Transferee, or to any Representative of such Transferee, or any
other party in a confidential relationship with, the Transferee, in each case, incident to this
Agreement, and which: (a) relates to matters such as patents, trade secrets, research and
development activities, draft or final contracts or other business arrangements, books and
records, budgets, cost estimates, pro forma calculations, engineering work product,
environmental compliance, vendor lists, suppliers, manufacfuring processes, energy
consumption, pricing information, private processes, and other similar information, as they
may exist from time to time; (b) and the Transferor expressly designates in writing to be
confidential, @yided that "Proprietary Information" shall exclude information falling into
any of the following categories:
(i) Information that, at the time of disclosure hereunder, is in the
public domain, other than information that entered the public domain by breach of this
Agreement by Transferee or any of its Representatives;
(ii) Information that, after disclosure hereunder, enters the public
domain, other than information that enters the public domain by breach of this Agreement
by Transferee or any of its Representatives;
(iii) Information, other than that obtained from third-parties, that
prior to disclosure hereunder, was already in Transferee's possession, either without
limitation on disclosure to others or subsequently becoming free of such limitation;
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.15
Page 3 of3
Version 0.0.1
(iv) Information obtained by Transferee from a third-party having
an independent right to disclose the information; or
(v) Information that is available through independent research
without use of or access to the Proprietary Information.
15.7 Survival. The provisions of this Article XV shall continue in full force and
effect during the Term and for a period of two (2) years thereafter, notwithstanding the
termination of this Agreement, with respect to any Proprietary Information obtained by any
Transferee prior to such termination.
Effective: October 30, 2015
Filed on : October 30, 2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l. I 58. l6
Page I of2
Version 0.0.1
ARTICLE XVI
TAXES
16.l No Partnership. Nothing in this Agreement shall be deemed to create or
constitute a partnership, joint venture or association between the Owners. Each Owner
agrees and covenants that it shall not take or omit to take any action or reporting position
with any Governmental Authority contrary to this Section 16.1.
16.2 761 Election. The Owners intend that, as tenants in common and owners of
undivided Ownership Interests, for United States income ta:< purposes the Owners shall
elect in accordance with the provisions of section 761 of the Internal Revenue Code of
1986, as amended ("Code"), and the applicable income tax regulations thereunder
("Regulations"), to be excluded from all of the provisions of Subchapter K of the Code
upon the first occasion in which such election may be filed under these Regulations and
that, if such election is not filed, this Agreement shall constitute an election under
Regulations section 1.761-2(b)(2)(iD to be excluded from all of the provisions of
Subchapter K of the Code and the applicable Regulations, beginning with the first year of
the creation of the tenancy in common as contemplated by this Agreement and that no
Owner shall object to any such election.
16.3 Responsibility for Tares. It is the intent of the Owners that so far as possible,
each Owner shall separately report, promptly and timely file returns with respect to, be
responsible for and pay all properfy, income, franchise, business, or other ta<es or fees
("Taxes"), arising out of its Ownership Interests and the matters contemplated by this
Agreement, that such Tares shall be separately levied and assessed against each Owner
severally and that each Owner shall be solely responsible for and shall pay all such Taxes
so levied and assessed against it without any responsibility of the other Owner with respect
thereto and without the amounts thereof being paid and apportioned between the Owners
under this Agreement. To the extent that Taxes (such as property, payroll, sales and use
Taxes) may be levied or assessed against the Transmission Facilities, their operation or the
Owners in such a manner as to make impossible the carrying out of the foregoing
provisions of this Section 16.3, then either Operator shall report, file returns with respect to
and pay such Taxes and each Owner shall immediately reimburse such Operator for each
such Owner's Pro Rata Share (based on its applicable Ownership Interest(s)) of such
Tores; plovitdgd, however, that sales and use tax included in Other Costs or in the Monthly
Transmission Facilities O&M Charge, the Monthly Substation O&M Charge or the
Monthly Common Equipment Charge shall be recovered by the Operator pursuant to
Section 4.7. Neither Operator shall have any obligation to contest or to seek refund of such
Taxes; provided, however. that each Operator may, by its personnel or counsel of its
selection, pursue such administrative or court proceedings as the Operator may determine.
Each Owner shall on request pay to the Operator such Owner's Pro Rata Share (based on
its applicable Ownership Interest(s)) of the costs of such proceedings and shall share in any
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ER15-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.16
Page2 of2
Version 0.0-l
savings resulting from such proceedings in the same proportion. Each Owner agrees to
cooperate with the other Owner with respect to reasonable requests for information or other
matters with respect to Taxes.
16.4 Indemnification. Each Owner (the "Tor Indemniffing Partv") shall
indemnify and hold harmless the other Owner (the "Tax Indemnitee Party"), on an after-tar
basis, from and against any Ta<es (including any interest or penalties) imposed on such
Tar Indemnitee Party or the Transmission Facilities or any part thereof, to the extent such
Tares are the responsibility of the Tor Indemnifying Party pursuant to this Article XVI.
16.5 Determination of Depreciation and Other Matters. Each Owner shall
determine the basis and method it will use for pu{poses of depreciation and other matters
where investment of the Transmission Facilities or Common Equipment is relevant.
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERI 5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.17
Page I of2
Version 0.0.1
ARTICLE XVII
DISPUTES
17.l Exclusive Procedure. Any dispute, controversy or claim arising out of or
relating to this Agreement or the breach, interpretation, termination, performance or
validity of this Agreement (each, a "Dispute") shall be resolved pursuant to the procedures
of this Article XVII.
17.2 Dispute Notices. If a Dispute arises between the Parties, then either Party
may provide written notice thereof to the other Party, including a detailed description of the
subject matter of the Dispute (the "Dispute Notice"). Any Parfy may seek a preliminary
injunction or other provisional judicial remedy if such action is necessary to prevent
ireparable harm or preserve the status quo, in which case the Parties nonetheless will
continue to pursue resolution of the Dispute pursuant to this Article XVII.
17.3 Informal Dispute Resolution.
(a) The Parties shall make a good faith effort to resolve any Dispute by
prompt negotiations between the Party's representative so designated in writing to the other
Party (each a "Manager"). If the Managers are not able to resolve the Dispute within thirfy
(30) days after the date of the Dispute Notice, then they shall refer the matter to the
designated senior officers of their respective companies (the "Executive(s)"), who shall
have authority to settle the Dispute. If the Executives are not able to resolve the Dispute
within sixty (60) days after the date of the Dispute Notice, then the Dispute shall be
resolved pursuant to Section 17.4.
(b) All negotiations, communications and writings exchanged between the
Parties pursuant to this Article XVII shall be treated and maintained as Proprietary
Information, shall be treated as compromise and settlement negotiations for purposes of the
federal and state rules of evidence, and shall not be used or referred to in any subsequent
adjudicatory process between the Parties, including at FERC, either with respect to the
current Dispute or any future Dispute between the Parties.
17.4 Submission of Dispute to FERC or Approved Courts. If a Dispute cannot be
settled amicably between the Parties pursuant to Section 17.3, then any Party may, in its
sole discretion, within one (1) year after the conclusion of the time period for informal
dispute resolution specified in Section 17.3, submit such Dispute (a) to FERC or (b) to the
jurisdiction of the state courts situated in the State of Idaho or the United States District
Court for the District of Idaho (the "Approved Courts"). Each of the Parties, in its capacity
as an Owner and Operator, consents to and accepts for itself and in respect of its property,
generally and unconditionally, the exclusive jurisdiction of the Approved Courts and
appellate courts from any appeal thereof, and irrevocably waives any objection which it
may now or hereafter have to the jurisdiction of the Approved Courts. Each of the Parties,
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.158. l7
Page2 ofZ
Version 0.0.1
in its capacity as an Owner and Operator, further irrevocably waives, to the fullest extent
permitted by law, any objection that it may now or hereafter have to the laying of venue of
any suit, proceeding or other action brought pursuant to this Article XVII in any of the
Approved Courts, and irrevocably waives, to the fullest extent permiued by law, and agrees
not to plead or claim in any such Approved Court that any suit, proceeding or other action
brought therein has been brought in an inconvenient forum.
17.5 Continued Performance. During the pendency of any Dispute, each Party
shall continue to perform all of its respective obligations under this Agreement.
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
r .1 58.1 8
Page I of2
Version 0.0.1
ARTICLE XYIII
ASSIGNMENT
18.1 Prohibited Transfers and Assignments. Neither Parry shall have the right to
transfer, assign, sell or otherwise dispose of (collectively, "Transfer"), in whole or in part,
its interest in this Agreement, including its rights, duties and obligations hereunder, nor to
Transfer, in whole or in part, its Ownership Interests (or Directional Capacity Allocation
Percentages and Directional Capacity Allocations) in the Transmission Facilities or
Common Equipment, except as permitted under this Article XVI[.
18.2 Permitted Assignments and Transfers. Subject to Section 18.3, the
restrictions set forth in Section 18.1 shall not restrict:
(a) Dispositions and sales of equipment or facilities by either Operator
incident to renewals or replacements of the Transmission Facilities or Common
Equipment;
(b) The right of an Owner to subject any of its Ownership Interests (or
Directional Capacity Allocation Percentages and Directional Capacity Allocations) to the
lien of any mortgage upon all or a portion of its own physical electric utility property or to
otherwise collaterally assign its rights and obligations in this Agreement to a lender or
other person providing financing to the Owner;
(c) The right of an Owner to Transfer voluntarily all of its Ownership
Interests (and Directional Capacity Allocation Percentages and Directional Capacity
Allocations) and all of its rights and obligations in this Agreement (including as part of
such Transfer, all of its rights and obligations in this Agreement as an Operator) in
connection with any sale, merger or other transfer of substantially all of such Owner's
electric transmission facilities as an operating entity; provided, however, that the
effectiveness of such Transfer shall be conditioned upon the fansferee: (i) agreeing in
writing, in form and substance reasonably satisfactory to the other Owner, to assume all of
the rights and obligations of the transferring Owner (including, all of its rights and
obligations in this Agreement as an Operator) as of the transfer date; and (ii) qualifying as
a Qualified Owner on the transfer date;
(d) The right of an Owner to Transfer voluntarily all of its Ownership
Interests (and Directional Capacity Allocation Percentages and Directional Capacity
Allocations) and all of its rights and obligations in this Agreement (including as part of
such Transfer, all of its rights and obligations in this Agreement as an Operator) to an
Affiliate of such Owner which owns all or substantially all of the transmission facilities of
such Owner; provided, however, that the effectiveness of such Transfer shall be
conditioned upon the ffansferee: (i) agreeing in writing, in form and substance reasonably
satisfactory to the other Owner, to assume all of the rights and obligations of the
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158. I 8
Page2 of2
Version 0.0.1
transferring Owner (including, all of its rights and obligations in this Agreement as an
Operator) as of the transfer date; and (ii) qualifying as a Qualified Owner on the transfer
date;
(e) The right of any Owner to Transfer voluntarily all of its Ownership
lnterests (and Directional Capacity Allocation Percentages and Directional Capacity
Allocations) and all of its rights and obligations in this Agreement (including as part of
such Transfer, all of its rights and obligations in this Agreement as an Operator) to a third
party; provided that: (i) the other Owner, in its sole discretion, approves such Transfer and
approves the third-party purchaser as having demonstrated that it is financially and
technically capable of performing the transferring Owner's (and Operator's) obligations
under this Agreement; and (ii) the other Owner is offered the right of flrst refusal to
purchase all of such Ownership Interests (and Directional Capacity Allocation Percentages
and Directional Capacity Allocations) and Common Equipment and all of the transferring
Owner's rights and obligations in this Agreement (including as part of such Transfer, all of
its rights and obligations in this Agreement as an Operator), on terms no less favorable than
those offered to such proposed third-party purchaser; provided, however, that the
effectiveness of such Transfer shall be conditioned upon the third-party purchaser: (A)
agreeing in writing, in form and substance reasonably satisfactory to the other Owner, to
assume all of the rights and obligations of the transferring Owner (including as part of such
Transfer, all of its rights and obligations in this Agreement as an Operator) as of the
transfer date; and (B) qualifying as a Qualified Owner on the transfer date; and
(0 The right of an Owner to post, sell or make available for scheduling
transmission capacity or schedule energy in accordance with Sections 3.2(b) and3.2(c),
unless otherwise mutually agreed to in writing in advance by the other Owner,
18.3 FERC Approval. Any Transfer pursuant to Section 18.2 that is subject to
FERC approval shall not take effect until FERC has approved such Transfer and has made
it effective.
Effective: October 30, 2015
Filed on : October 30, 2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
r.158.19
Page I of5
Version 0.0.1
ARTICLE XIX
MISCELLANEOUS
19.l Notices.
(a) Any notice, demand, request or other communication required or
permitted to be given pursuant to this Agreement shall be in writing and signed by the
Owner or Operator giving such notice, demand, request or other communication and shall
be hand delivered or sent by certified mail, return receipt requested, or overnight courier to
the other Owner and/or Operator at the address set forth below:
If to Idaho Power as Owner: Idatro Power Company
1221 West Idaho Street
With a copy to:
Boise, lD 83702
Attn: Director, Load Serving Operations
Telephone : 208-388-2360
Idaho Power Company
l22l West Idaho Street
Boise, ID 83702' Attn: Legal Department
Telephone: 208-388-2300
If to Idaho Power as Operator: Idaho Power Company
1221 West Idaho Street
With a copy to:
Boise, ID 83702
Attn: Director, Load Serving Operations
Telephone: 208-388-2360
Idaho Power Company
1221 West Idaho Street
Boise, lD 83702
Attn: Legal Department
Telephone: 208-388-2300
PacifiCorp
825 NE Multnomah Street, Suite 1600
Portland, OR97232
Attn: Director, Transmission Service
Telephone: 503-813-67 12
If to PacifiCorp as Owner:
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5{83-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
With a copy to:
1.158.19
Page 2 of5
Version 0.0.1
PacifiCorp
825 NE Multnomatr Street, Suite 2000
Portland, OR97232
Attn: Legal Department
Telephone: 503-8 1 3-5854
If to PacifiCorp as Operator: PacifiCorp
With a copy to:
825 NE Multnomah Street, Suite 1600
Portland, OR97232
Attn: Director, Transmission Service
Telephone: 503-813-67 12
PacifiCorp
825 NE Multnomah Street, Suite 2000
Portland, OR97232
Attn: Legal Department
Telephone: 503-8 I 3-5854
(b) Each Party shall have the right to change the place to which any
notice, demand, request or other communication shall be sent or delivered by similar notice
sent in like manner to the other Party. The effective date of any notice, demand, request or
other communication issued pursuant to this Agreement shall be when: (i) delivered to the
address of the Party personally, by messenger, by a nationally or internationally recognized
overnight delivery service or otherwise; or (ii) received or rejected by the P*ty, if sent by
certified mail, return receipt requested, in each case, addressed to the Party at its address
and marked to the attention of the person designated above (or to such other address or
person as a Party may designate by notice to the other Party effective as of the date of
receipt by the other Parfy).
19.2 Parties Bound. This Agreement shall be binding upon each of the Parties and
their respective successors and permitted assigns.
19.3 Amendments.
(a) Except as otherwise provided in Section 19.3(c), this Agreement may
not be amended, supplemented or otherwise modified, other than pursuant to an instrument
in writing executed by the Parties.
(b) Absent agreement of both Parties to the proposed change and except
as otherwise provided in Section 19.3(c), the standard of review for changes to this
Agreement proposed by a Party, or FERC acting sua sponte, shall be the "public interest"
standard of review set forth in United Gas Pipe Line Co. v. Mobile Gas Service Corp., 350
U.S. 332 (1956) and Federal Power Commission v. Sierra Pacific Power Co., 350 U.S. 348
Effective: October 30, 2015
Filed on : October 30, 2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.1 58. 1 9
Page 3 of5
Version 0.0.1
(1956); provided that the standard of review for any modification to this Agreement
requested by non-contracting third parties shall be the most stringent standard permissible
under then-app licable Governmental Requirements.
(c) Nothing contained in this Agreement shall be construed as affecting in
any way the right of either Party to unilaterally make application to FERC under Section
205 or Section 206 of the Federal Power Act for a change in the charges set forth in this
Asreement. It is the intent of the Parties that the standard of review that FERC will apply
to any such unilateral application shall be the just and reasonable standard of review rather
than the "public interest" standard of review.
(d) An amendment that is subject to FERC approval shall not take effect
until FERC has accepted such amendment for filing and has made it effective.
19.4 Waivers. No waiver by any Party of any one or more breaches or defaults by
the other Party in the performance of any of the provisions of this Agreement shall be
construed as a waiver of any other breaches or defaults whether of a like kind or different
nature. Any delay, less than any applicable statutory period of limitations, in asserting or
enforcing any rights under this Agreement shall not be deemed a waiver of such rights.
Failure of any Party to enforce any provisions hereof shall not be construed to waive such
provision, or to affect the validity of this Agreement or any part thereof, or the right of the
other Party thereafter to enforce each and every provision thereof.
19.5 Choice of Law.
(a) This Agreement, the rights and obligations of the Parties under this
Agreement, and any claim or controversy arising out of this Agreement (whether based on
contract, tort, or any other theory), including all matters of construction, validity, effect,
performance and remedies with respect to this Agreement, shall be governed by and
interpreted, construed, and determined in accordance with, the laws of the State of Idaho
(regardless of the laws that might otherwise govern under applicable principles of conflicts
of law).
(b) TO TI{E FULLEST EXTENT PERMITTED BY LAW, EACH OF
TIIE PARTIES HERETO WAIVES ANY RIGHT IT MAY HAVE TO A TRIAL BY
JURY IN RESPECT OF LITIGATION DIRECTLY OR INDIRECTLY ARISING OUT
OF, UNDER OR IN CONNECTION WITH TI{IS AGREEMENT. EACH PARTY
FIIRTI{ER WAIVES ANY RIGHT TO CONSOLIDATE ANY ACTION IN WHICH A
JURY TRIAL HAS BEEN WAIVED WITI{ ANY OTHER ACTION IN WHICH A ruRY
TRIAL CANNOT BE OR HAS NOT BEEN WAIVED.
Effective: October 30, 2015
Filed on : October 30, 2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.ls8.l9
Page 4 of5
Version 0.0.1
19.6 Headines. Article and Section headings used in this Agreement (including
headings used in any Exhibits or Schedules attached hereto) are for convenience of
reference only and shall not affect the construction of this Agreement.
19.7 Relationship of Parties. The covenants, obligations, and liabilities of the
Owners are intended to be several and not joint or collective, and nothing herein contained
shall be construed to create an association, joint venture, trust or partnership, or to impose a
trust or partnership covenant, obligation or liability on or with regard to any of the Owners.
Each Owner shall be individually responsible for its own covenants, obligations and
liability as herein provided. No Owner shall be under the control ol or shall be deemed to
control, the other Owner. Neither Owner shall have the right or power to bind the other
Owner without its express written consent.
19.8 Severability. In the event that any provision of this Agreement or the
application thereof becomes or is declared by a court of competent jurisdiction to be illegal,
void or unenforceable, the remainder of this Agreement will continue in full force and
effect and the application of such provision to other persons or circumstances will be
interpreted so as reasonably to effect the intent of the Parties. The Parties ftrther agree to
replace such illegal, void or unenforceable provision of this Agreement with a valid and
enforceable provision that will achieve, to the extent possible, the economic, business and
other purposes of such illegal, void or unenforceable provision.
19.9 No Third Partv Beneficiaries. Nothing expressed or implied in this
Agreement is intended to nor shall be construed to confer upon or give to any Person (other
than the Parties) any rights or remedies under or by reason of this Agreement or any
transaction contemplated herein.
19.10 Further Assurances. Each Party agrees to execute and deliver from time to
time such additional documents, and take such additional actions, as may be reasonably
required by the other Party to give effect to the purposes and intent hereof.
19.11 Conflict of Interest. Nothing in this Agreement shall prohibit any Party from
engaging in or possessing any interest in other projects or business ventures of any nature
and description, independently or with others.
19.12 Exhibits and Schedules. The Exhibits and Schedules to this Agreement are
identified as follows, and are incorporated herein by this reference:
Exhibit A
Exhibit B
Description of PacifiCorp Common Equipment
Description of Idaho Power Common Equipment
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERI 5-683-00I
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.19
,J.:ff"t:J.i
Ownership Interests; Directional Capacity Allocations;
Directional Capacity Allocation Percentages
Monthly Transmission Facilities O&M Charge; Monthly O&M
Equipment Charge
Department of Energy Equipment Located in the Antelope
Substation
Acquisition Costs
Idaho Power Governmental Authorizations
Exhibit C
Exhibit D
Exhibit E
Exhibit F
Schedule 13.1(0
Schedule 13.2(f) PacifiCorp GovemmentalAuthorizations
19.13 Counterparts. This Agreement may be executed in one or more counterparts,
each of which shall be original, and all of which together shall constitute one agreement.
Electronic transmission of any signed original document, and retransmission of any signed
electronic transmission, shall be the same as delivery of an original. At the request of
either Party, the other Party will confirm electronically transmitted signatures by signing an
original document.
19.14 Entire Agreement. This Agreement and the Exhibits and Schedules attached
hereto, and the other documents between the Parties referenced herein constitute the entire
agreement between the Parties and supersede all prior agreements and understandings,
whether oral and written, between the Parties with respect to the subject matter hereof.
There are no oral understandings, terms or conditions and the Parties have not relied upon
any representation or warranty, expressed or implied, not contained in this Agreement.
ISTGNATURE PAGE FOLLOWSI
Effective: October 30, 20 15
Filed on : October 30,2015
FERC Docket No. ERl5-6E3-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.20
P4ge I ofl
Version 0.0.3
IN WITNESS WHEREOF, each of the Parties has caused its duly authorized
representative to execute this Joint Ownership and Operating Agreement as of the date first
above written.
FACIFICORP,
AS OWNER AND OPERATOR
By:
Namc: Ric& Vail
Titlc Yie&csidd. Trrrrdrion
IDAIIO POWER COMPA}.IY,
AS OWNER AI{D OPERATOR
Btr
Nutc: Vern Porter
Titlc: VPr Custooer Operatlons
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.l58.2t
Page I ofl
Version 0.0.1
Efrective: October 30, 20 I 5
Filed on : October 30,2015
IPC-PAC JOINT OMIERSIIIP AIYD OPERATING AGREEMENT
E)CIIBITS AI\iD SCIMDT]LES
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
EXHIBIT A
Description of PacifiCorp Common Equipmentl
l .1 s8.2 I .l
Page I of25
Version 0.0.2
Effective:
Filed on : Apil27,2016
Asset Asset
Class
Asset description 2nd line of Description
Location:013019 - Goshen Substation, lD
303350 3s010 Goshen substation and Service center Bl-011 ER 85-8971
303359 35010 Goshen substation and Service center lDBl-
0010
ER 85-318
304729 35010 Goshen/Ridgeli ne/Wolverine lnterconnect
tDBt-0021
ozP R I 2O0s I cl 0o4 I 10029 49o
40050503 35201 CABLE TRAY CAATS# 62842
40053163 35201 CABLE TRAY ER 85-8887
40063710 3s201 CABLE TRAY ER 85-6207
40063777 35201 CABLE TRAY ER 85-6999
40063744 35201 CABLE TRAY ER 85-7028
40065335 35201 CABLE TRAY wBs rlD/200 6/ cl 001/ L00297 47,388 WOLV CRK
400635s2 3s201 CONTROL BUILDING ER 8s-318
40063660 35207 CONTROL BUILDING ER 85-1224
40063674 35201 CONTROL BUILDING ER 85-3370
40063686 35201 CONTROL BUILDING ER 85-3926
40063696 35201 CONTROL BUILDING ER 85-8887
40063708 3s201 CONTROL BUILDING ER 85-6053
40063667 35201 HEATER ER85-2297
40000610 35201 ROOF CAATS# 105120
40063720 35201 ROOF ER 85-6999
40064214 3s20L ROOF - CONTROL HOUSE ER 101852
40093381 35201 HOT WATER HEATER IN CONTROL
HOUSE/5HOP
TZP R / 207s / CIT R6 I 700ss7 29
40093382 3520L TOILET IN CONTROL HOUSE/SHOP lZP R / z0ts I C lr R6 / 7OOss7 2s
400637L5 35203 EMERGENCY GENERATOR BUILDING ER 8s-6999
40063745 3s203 EMERGENCY GENEMTOR BUILDING ER 86-7028
40063706 3s205 AIR CONDITIONER ER 85-6053
40063776 3s20s AIR CONDITIONER ER 85-6999
40072736 35205 AIR CONDITIONER TZP R / 2008 / ClT R5/1003 6s43
40087985 3s20s HVAC (UNIT HEATER)l7P R I 20L3 I ClTR6/100s0366
4006372L 3s20s UNIT HEATER ER 85-5999
40064t78 35207 LOAD CENTER ER 85-7028
40080307 35209 SECURITY SYSTEM wBs rz PR/2008/ cl 00L/ L003s459
40053684 352L3 PUMP ER 8s-3926
40063689 35213 SEWER SYSTEM ER 85-5790
40053593 35213 SEWER SYSTEM ER 85-8480
400535s6 3s273 WELL ER 85-318
40063700 35213 WELL ER 85-8887
40063719 3s2L9 FOUNDATION AND SUBSTRUCTURE ER 85-6999 GENERATOR BUILDING
40047725 35225 HOIST ER 370304 MANUAL HYDRAULIC TANK
400il863 35225 HOIST ER 85-2019
FERC Docket No. ER16-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1 .158.2 I .l
Page2 of25
Version 0.0.2
Effective:
Filed on : April27,2016
400s0277 35227 CEMENT CURB TIDMl2003/ClOO7
40092927 35227 CLEARING, GRADING & FILL MATERIAL TtD Al 2071 I C1004/GOSH ENSB
40000613 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF CMTS# 104348
40063691 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-7958
40053695 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-8887
40063707 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-6053
400637L2 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 8s-6890
40063718 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-6999
40063722 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-6294
40063749 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-5983
4006377L 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 381099
40053781 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 8s-6927
40065337 3s227 CLEARING, GRADING, & FILL MATERIAL (5URF wBs Tr r D/200 6 I cl oo! Loo297 4t,388 WOLV CR K
40090745 35227 CLEARING, GRADING. & FILL MATERIAL (SURF DZAF I 2073 / C / 00 1/GOS H E N 3
40092060 3s227 CLEARING, GRADING, & FILL MATERIAL (5URF r rD / 2073 / Cl O02 I t00s0974
40000516 3s2?7 FENCE CAATS# 104348
40063668 3s227 FENCE ER 85-2019
4006s343 35227 FENCE wBs rrD/2006/ cl 00L/ Loo29741.388 WOLV CRK
40063654 35227 FENCE & GATES ER 85-318 SHOP
40063655 35227 FENCE & GATES ER 85-318
40063551 35227 FENCE & GATES ER 85-1332
40053675 3s227 FENCE & GATES ER 8s-3370
40063590 35227 FENCE & GATES ER 85-5942
40063692 35227 FENCE & GATES ER85-7827
40063697 3s227 FENCE & GATES ER 85-8887
40063709 3s227 FENCE & GATES ER 85-50s3
40063773 35227 FENCE & GATES ER 381099
40063895 35227 FENCE & GATES ER 85-8513
40092924 3s227 FENCE & GATE5 \o Al 2011/ c/004/cosH E NSB
40063751 35227 ROADWAY ER3262748
40092949 3s227 ROADWAY TID AI 2077 / CIOO4IGOSH E NS B
400s3167 35229 FLOODLIGHT ER 8s-8887
4005s875 35229 FLOODLIGHT ER 85-7959
40092940 35229 LIGHTING FIXTURE/SYSTEM rtD Al 2077 I C1004/GOSH ENSB
40077758 35301 FIRE PROTECTION ER 85-3388
40053182 35301 STATION SERVICE TRANSFORMER ER 85-8887
40055887 35301 STATION SERVICE TRANSFORM ER ER 85-7959 7200-724 1240V
400s6316 3s301 STATION SERVICE TRANSFORM ER ER 8s-1332
40056968 35301 STATION SERVICE TRANSFORMER ER 8s-50s3
40057070 35301 STATION SERVICE TRANSFORM ER ER 85-3370
40090753 3s301 STATION SERVICE TRANSFORME R 72OI24O DZAF 120L3 I C/001/GOSH E N3
40059034 3s301 STATION SERVICE TRANSFORMER 5KVA ER 394015
40063907 35301 STATION SERVICE TRANSFORMER 5KVA ER 85-8513 WEST
40011988 35317 CABLE TRENCH CAATS# 368834
400t2067 35317 CABLE TRENCH CAATS# 104348
40047968 3s377 CABLE TRENCH TtoM/20021c/ots
40047976 35317 CABLE TRENCH ER 85-8887
40049276 35317 CABLE TRENCH TtoM/20031c|006/o1
40049773 353L7 CABLE TRENCH ER 85-6890
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.1
Page 3 of25
Version 0.0.2
Effective:
Filed on : April27,2016
4005049s 353L7 CABLE TRENCH ER 3269825
40056736 3s377 CABLE TRENCH T|DM/200slclo34
40056925 35317 CABLE TRENCH ER 85-5053
40059027 353L7 CABLE TRENCH ER 394015
40064L40 353t7 CABLE TRENCH ER 393983
40064756 3s3L7 CABLE TRENCH ER 8s-6983
40064L79 35317 CABLE TRENCH ER 85-7028
40064224 353L7 CABLE TRENCH ER 381099
4006s336 35317 CABLE TRENCH wBs rrD/200o/clooLl 100297 4r,388 woLV cRK
40092920 353L7 CABLE TRENCH TtD Al 2077 I C1004/GOSH E NSB
40072071 35377 CONDUIT CAATS# 104348
40049775 35377 CONDUIT ER 85-6890
4005203s 353L7 CONDUIT wBS DZPR/200s / Cl DR4/ LOO27933
40055872 35317 CONDUIT ER 8s-7959
40056926 35377 CONDUIT ER 8s-6053
400638s4 353t7 CONDUIT ER854771
40064143 35317 CONDUIT ER 393801
40064L67 35317 CONDUIT ER 85-6983
400642L6 3s3L7 CONDUIT ER 358899
40065338 353L7 CONDUIT wBs rrD/20061c/ oou t0o297 4L,388 woLV cRK
40065372 35377 CONDUIT wBS TrDM/200slcl}ss
4007639s 35317 CONDUIT Tr D M/200s/c I 037 I 70037848
40092922 353L7 CONDUIT lD Al ZOLL I C 1004/G OSH E NS B
40055879 353L7 GUY UNIT ER 85-7959
40057057 35319 ANNUNCTATOR EQ# 330685 ER 85-3370 L6L/691<\t
40056920 35319 ANNUNCIATOR EO# 330591 ER 8s-5053 345KV
40037996 35319 DIGITAL FAULT RECORDER ltDM/Lssg/C/012/0L
40058183 35319 METERING PACKAGE (qTlW)TrD 12006/ Clllu LOO297 47 100% RE rM B
INTERCNT
40092942 35319 METERING PACKAGE (CTIW) S/N EQ# 394727 TID AI 2077 I C IOO4IGOSH E NS B
40092943 35319 METERING PACKAGE (CTIVr) S/N EQ# 394728 TID AI 2O1U CIOO4IGOSH E NSB
40092944 35319 METERING PACKAGE (CTIW) S/N EQ# 394729 T tD Al 20tL I C I 004/GOSH E NS B
40011996 35319 REI.AY AND CONTROL CAATS# 368834
400L2087 35319 RELAY AND CONTROL CAATSS LO5622
40036600 35319 RELAY AND CONTROL wBs DsHE/1999 I ClO27 KrN PORT-GOSHEN 345KV
LNR
40047972 35319 RELAY AND CONTROL T|DMl2002lCl0L5
40047980 35319 REI.AY AND CONTROL ER 85-8887
40049278 35319 RELAY AND CONTROL TIDMl2003/C(006/0L
40050501 35319 RELAY AND CONTROL ER 3269826
400s0s0s 35319 RELAY AND CONTROL CAATS# 62842
40055733 3s319 RELAY AND CONTROL wBS Tr DM/2005 I CIOL3 /00L
40056967 35319 RELAYAND CONTROL ER 8s-50s3
400s8182 35319 RELAY AND CONTROL TnD I 2006 / Cl 00L/ L0O297 47 100% REt M B
INTERCNT
40059033 35319 RELAY AND CONTROL ER 394015
40053866 35319 REI.AY AND CONTROL ER 85-7868
40063918 35319 RELAY AND CONTROL ER 85-8383
40053919 35319 RELAY AND CONTROL ER 85-8217
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.1
Page 4 of25
Version 0.0.2
Effective:
Filed on : April27,2016
40063948 35319 RELAYAND CONTROL ER 85-8498
40063949 35319 RELAYAND CONTROL ER 85-8707
40063961 3s319 REI.AY AND CONTROL ER 85-5207
40063989 35319 RELAY AND CONTROL ER 85-6046
40054056 3s319 REI.AY AND CONTROL ER 85-6143
40054068 35319 RELAYAND CONTROL ER 85-6402
40064077 3s319 RELAY AND CONTROL ER 85-5294
40054084 35319 REI.AY AND CONTROL ER 85-5850
40064092 3s319 RELAYAND CONTROL ER 85-5571
40064L22 35319 REI.AY AND CONTROL ER 85-6782
40064133 35319 RELAY AND CONTROL ER 85-6985
40064L34 35319 RELAY AND CONTROL ER 85-9431
40064L73 3s319 REI.AY AND CONTROL ER 8s-5983
40064183 35319 REI.AYAND CONTROL ER 495333
40054L87 3s319 RELAY AND CONTROL ER3279270
40064200 35319 RELAY AND CONTROL ER 3300340
4006420L 35319 RELAY AND CONTROL ER 3364403
40064202 35319 RETAY AND CONTROL ER 3379906
40064203 35319 RELAYAND CONTROL ER3379922
40064208 3s319 REI.AY AND CONTROL ER327473L
40064209 35319 RELAY AND CONTROL ER 3538196
400642LO 35319 REI.AY AND CONTROL ER3s76220
400642LL 35319 REI.AY AND CONTROL ER 358702
400642t8 35319 RELAY AND CONTROL ER 368899
40065356 35319 REI.AY AND CONTROL wBS TilD/2006/C/OOU 700297 41,388 WOLV CRK
4007054s 35319 REI.AY AND CONTROL TMGM 12006 I Cl 004 I L003L77 s
40071424 3s319 REI.AY AND CONTROL rzP R I 2007 I CIT R2 I L0031327
40071930 35319 REI.AY AND CONTROL TZPR I 2005 I C lTR4 I L00361244
40076404 35319 RELAY AND CONTROL 'ilDM I 2005 I C l 037 I L0 03L848
40077955 35319 RELAY AND CONTROL ER 85-6990
40077956 35319 RETAY AND CONTROL ER s08929
400779s7 35319 RELAY AND CONTROL ER 3358371
40077969 35319 REI.AY AND CONTROL TIDM/2004/ClOO2/02
40078979 3s319 RELAY AND CONTROL ER 3s42123
40078980 3s319 RELAY AND CONTROL ER 3554190
40078981 3s319 RELAY AND CONTROL ER 3s38196
40078982 35319 RELAY AND CONTROL ER 392340
40078983 35319 RELAY AND CONTROL ER 85-6860
40078984 35319 RELAY AND CONTROL ER 85-6218
40084168 3s319 RELAYAND CONTROL TZP R I 20Lr I CITR 1/1004s 3 6s
40088444 35319 RELAY AND CONTROL TZP Rl 2073 I CITR 1 /1005060s
40092947 35319 REI.AY AND CONTROL TtD Al 20L7/ C/004/GOSH ENSB
40092065 35319 RELAY AND CONTROL T rD / 20L3 / Cl OO2 / LOO'0974
40092L7L 35319 REI.AY AND CONTROL rzP R / 20L4 I C I 004 I 70052809
40092L72 3s319 RELAY AND CONTROL TZPRlz}t l C/O041 L0052826 EO# 403072 . 403073
400L2L43 35319 SATELLITE CLOCK EQ# 354748 CAATS# 707\30
400120s9 35319 SATELLITE CLOCK EQ# 354749 CAATS# LO7L29
40053162 35327 AUTOMATIC TRANSFER SWITCH ER 85-8887
40048L52 35321 BATTERYAND RACK WBS TIDM/2003 /CIO34 C&D I N 161KV YARD
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Elechic Tariff
Rate Schedules
l 158.21.1
Page 5 of25
Version 0.0.2
Effective:
Filed on :, April 27,2016
40064083 3532L BATTERYAND RACK ER 85-672s9
40064093 35321 BATTERYAND RACK ER 85-6671
400642L2 35321 BATTERY AND RACK ER 100669
40048153 3532L BATTERY CHARGER wBs rDM/2003/c1034 LAMARCHE rN 161KV
YARD
40063920 3s327 BATTERY CHARGER ER 85-8677
400642L3 35321 BATTERY CHARGER ER 100669
4009L449 35327 BATTERY CHARGER EQ# 404131 TZP R I 20L4 I C lTRs I 700s24L4
40057255 3s32L POWER PANEL ER 65-6053
40064L45 35323 GENERATOR ER 393801
40064181 35323 GENERATOR ER 85-7028
40064229 3s323 GENERATOR ER 101835
40092926 3s32s GROUND GRID TtD Al 201-71 C/004/GOSH E NSB
40053169 35325 GROUND GRID SYSTEM ER 85-8887
40055878 35325 GROUND GRID SYSTEM ER 85-7959
40056323 35325 GROUND GRID SYSTEM ER 85-5942
40056930 3s32s GROUND GRID SYSTEM ER 85-6053
400s9029 35325 GROUND GRID SYSTEM ER 394015
40063806 3s32s GROUND GRID SYSTEM ER 85-2019
40063862 35325 GROUND GRID SYSTEM ER 85-7092
40063899 35325 GROUND GRID SYSTEM ER 85-8513
40064076 35325 GROUND GRID SYSTEM ER 85-6294
40064094 35325 GROUND GRID SYSTEM ER 85-5671
40064123 3s32s GROUND GRID SYSTEM ER 85-6782
40064!75 3s32s GROUND GRID SYSTEM ER 85-6983
40065346 35325 GROUND GRID SYSTEM wBS TilD/20061 Cl 00U 700297 41,388 WOLV CRK
40076400 35325 GROUND GRID SYSTEM T tDM / 200s / cl o37 /10037848
40091989 35325 GROUNDING MAT FOR SWITCHES TSHE /2077 / C/00vGOSH E N
40092062 35325 GROUND GRID r rD / 2013 I Cl 002 I LOO'09L4
40053808 35325 INSULATED PLATFORM 10'ER 85-2019
40053953 3s32s INSULATED PLATFORM 10'ER 85-6707
40064L25 35325 INSUI.ATED PLATFORM 10'ER 85-6782
40050523 35325 INSULATED PLATFORM 14'ER 85-8696
40055881 35325 INSUI.ATED PLATFORM 14'ER 85-7959
40056307 35325 INSULATED PLATFORM 14'ER 85-1332
40056309 35325 INSULATED PLATFORM 16'ER 85-1332
40039803 35325 INSULATED PLATFORM 4'ER3277749
400s0s22 3532s INSULATED PLATFORM 4'ER 8s-8696
40053772 35325 INSULATED PLATFORM 4'ER 85-8887
400ss880 35325 INSULATED PLATFORM 4'ER 85-7959
40056308 3s32s INSULATED PLATFORM 4'ER 85-1332
40056324 35325 INSULATED PLATFORM 4'ER 85-5942
40057063 35325 INSULATED PLATFORM 4'ER 85-3370
40053795 35325 INSUI.ATED PLATFORM 4'ER 85-1495
40063848 35325 INSULATED PLATFORM 4,ER 85-3782
40063962 3s32s INSULATED PLATFORM 4'ER 85-6207
40064L24 35325 INSULATED PLATFORM 4'ER 85-6782
40055932 35325 INSULATED PLATFORM 4,& 6'ER 85-6053
40053171 35325 INSUTATED PLATFORM 5'ER 85-8887
FERC Docket No. ERl6-l 507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21 .l
Page 6 of25
Version 0.0.2
Effective:
Filed on : April27,2016
40087851 3s327 ANIMIAL GUARDS TZP R I 20L3 / C lrR u1004995s
40092923 35327 CUTOUT POLYMER, 27KV 1OOA TtD Al 20LL/ Cl 004/GOSH E NSB
40092946 35327 POWER & CONTROL CABLE TtD Al 207u C1004/GOSH E NSB
40092064 35327 POWER AND CONTROL CABLE T tD I 2013 / Cl 002 I 700s09 L4
40011940 3s327 POWER AND CONTROL CABLE ER 3269826
40011992 35327 POWER AND CONTROL CABLE cMTSf 368834
40012083 35327 POWER AND CONTROL CABLE CAATS# L05622
40036s99 3s327 POWER AND CONTROL CABLE CMTS# 64872
40047970 3s327 POWER AND CONTROL CABLE T\DM/20021C/OLs
40047978 3s327 POWER AND CONTROL CABLE ER 8s-8887
40049277 3s327 POWER AND CONTROL CABLE rDM/20031C/006107
40049778 35327 POWER AND CONTROL CABLE ER 8s-6890
40050504 3s327 POWER AND CONTROL CABLE cMTSf 62842
40050527 3s327 POWER AND CONTROL CABLE ER 85-8696
40055732 35327 POWER AND CONTROL CABLE wBs Tr DM/200s I cl0L3 I 007
400ss88s 35327 POWER AND CONTROL CABLE ER 85-79s9
40056328 3s327 POWER AND CONTROL CABLE ER 85-5942
40056739 35327 POWER AND CONTROL CABLE TIDMl200slclo34
40056942 35327 POWER AND CONTROL CABLE ER 85-6053
40057058 3s327 POWER AND CONTROL CABLE ER 85-3370
40059032 35327 POWER AND CONTROL CABLE ER 394015
40063853 3s327 POWER AND CONTROL CABLE ER 85-4843
40063864 35327 POWER AND CONTROL CABLE ER 85-7092
40063905 35327 POWER AND CONTROL CABLE ER 85-8513
40063945 3s327 POWER AND CONTROL CABLE ER 85-8s51
40063968 3s327 POWER AND CONTROL CABLE ER 85-6207
40064075 35327 POWER AND CONTROL CABLE ER 85-6294
40064082 35327 POWER AND CONTROL CABLE ER 85-6459
40064097 35327 POWER AND CONTROL CABLE ER 85-5571
40064130 3s327 POWER AND CONTROL CABLE ER 85-6782
40064146 35327 POWER AND CONTROL CABLE ER 393801
40064177 35327 POWER AND CONTROL CABLE ER 85-6983
40064782 3s327 POWER AND CONTROL CABLE ER 85-7028
40064186 35327 POWER AND CONTROL CABLE ER 503945
40054225 35327 POWER AND CONTROL CABLE ER 381099
40065355 3s327 POWER AND CONTROL CABLE wBS Tl rDl2006/C/ 0OL/ L00297 4L,388 WOLV CRK
40076403 35327 POWER AND CONTROL CABLE T tDM / 20Os / C I O37 I 70031848
40078985 35327 POWER AND CONTROL CABLE CAATS# 104348
40053202 35327 TERMINATOR (POTHEAD}ER 85-318
4007205L 35329 LIGHTING FIXTURE/SYSTEM CAATS# 104348
400s0500 35329 LIGHTING FIXTURE/SYSTEM ER 3269826
40053199 35329 LIGHTING FIXTURE/SYSTEM ER 85-318
40056315 35329 LIGHTING FIXTURE/SYSTEM ER 85-1332
400s6327 35329 LIGHTI NG FIXTURE/SYSTEM ER 85-5942
40056939 3s329 LIGHTING FIXTURE/SYSTEM ER 85-6053
40057067 35329 LIGHTING FIXTURE/SYSTEM ER 85-3370
40063699 3s329 LIGHTING FIXTURE/SYSTEM ER 85-8887
40063704 35329 LIGHTING FIXTURE/SYSTEM ER 85-5053
40063850 3s329 LIGHTING FIXTURE/SYSTEM ER 85-3782
FERC Docket No. ER16-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.ls8.2l.l
PageT of25
Version 0.0.2
Effective:
Filed on : April 27 ,2016
40063903 3s329 LIGHTING FIXTURE/SYSTEM ER 85-8513
40063969 35329 LIGHTING FIXTURE/SYSTEM ER 85-6207
40064131 3s329 LIGHTI NG FIXTURE/SYSTEM ER 85-5782
40065351 35329 LIGHTING FIXTURE/SYSTEM wBS TilD/200 6/ Cl 00Ll L0029741,388 WOLV CRK
40064706 35341 INTERPOSITION CABINET ER 85-6807
40045527 35341 METER wBs TrDM/2003/C|BvU 151 TNTERTTE SCADA
tlo
40025656 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# 105656
40025550 3534L REMOTE TERMINAL UNIT (SCADA RTU)cAATSf 105622
40025664 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# 105688
40056953 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# L6897 WlO 7247
40057945 35341 REMOTE TERMINAL UNIT (SCADA RTU)1DMl2005lClOAs
40065357 35341 REMOTE TERMINAL UNIT (SCADA RTU)wBs fl rDl2006/cl oou L00297 47,388 WOLV CRK
40077995 35341 REMOTE TERMTNAL UNrT (SCADA RTU)
UPGRADE
rtDM / 2004/ cl oo2lo2 wESDAc D20ME UpGRADE
CARD
40039996 3s342 EQUIPMENT RACK/SHELF WBS TIDM/2OOO/ClRDF/OL FOR 345KV SOE
40038011 35342 SEQUENTIAL EVENT RECORDER EQ# 362693 CENGI L999 I C/063/00000001 161KV Hathaway
lnstr
4003999s 3s342 SEQUENTIAL EVENT RECORDER EQ# 362695 wBs TrDM/20OO I Cl RDF I 0t 345KV HATHAWAY
INST
40063536 36L27 CLEARING, GRADING, & FILL MATERTAL (SURF ER 13-1560 GRAVEL
40063549 36207 STATION SERVICE TRANSFORM ER ER 13-1560
40063640 36277 CABLE TRENCH ER 380407
4006364L 36217 CONDUIT ER 380407
40063633 36279 RELAY AND CONTROL ER 1-6411
40063634 36219 RELAY AND CONTROL ER 510214
40063647 362L9 RELAY AND CONTROL ER 380407
40090729 36225 GROUND GRID DZAF I 2OL3 I C/OO UGOS H E N7
40063s58 3622s GROUND GRID SYSTEM ER 13-1560
40063643 36225 INSULATED PLATFORM 4'ER 380407
40063644 3622s INSULATED PLATFORM 6'ER 380407
300s4527 3900s BUILDING - COTTAGE ER 85-318
30059607 39011 SEWER SYSTEM ER 3326386 COTTAGE #2
30001166 39405 GENERAL MASS UN ITIZATION 1998 BALANCE CONVERSION
30001168 39405 GEN ERAL MASS UNITIZATION 1998 BALANCE CONVERSION
30008365 39505 GENERAL MASS UN ITIZATION 1998 BALANCE CONVERSION
30008367 39s05 GENERAL MASS UNITIZATION 1998 BALANCE CONVERSION
30008369 39505 GENERAL MASS UNITIZATION 1998 BALANCE CONVERSION
30053245 39700 cY2072 GOSHEN SUB COMM EQU|P (C/C
13696)
30064754 39700 cY2013 GOSHEN 161SUB COMM EQUIP (C/C
13696)
30064755 39700 cy2013 GOSHEN 34s SUB COMM EQUrp (C/C
13696)
3006s523 39700 cY20t4 GOSHEN 161COMM EQU|P (C/C
13696)
30066457 39700 cY2O74 GOSHEN 161COMM EQU|P (C/C
13696)
TtD Al 207L/ C/004/GOSH ENSB
30015435 39705 ALARM RELAY PANEL ER 100387
30058797 39705 ALARM RELAY PANEL ER 101623
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.ls8.2l.l
Page 8 of25
Version 0.0.2
Effective:
Filed on : April 27, 2016
300s6984 3970s AUDIO ALARM AND CONTROL-COM BUSTIBLE
GAS DETECTOR
ER 393827 GAS DETECTOR/MONTTOR
30048499 39705 COMM. STATION ALARM CONTROL RTU - DSX wBs rrD/2006/ cl 007/ L00297 4L,388 WOLV CRK
30054615 39705 COMM. STATION AI.ARM CONTROL RTU - DSX DZP Rl 2008 / Cl OO2 / LO03s62s
30044697 397LL RADIO CONTROL SYSTEM{'See Long Descr (Alt
Cntl Ctr)
CAATS# L6897WlOt247
30015446 397LL SCADA REMOTE RTU EQf 331579 cAATSf 704218
30045739 397L4 CISCO SYSTEMS MULTI SERVICE NETWORK
ROUTERS
ctTc/20o6lcl40slo2Hw rNcL HW RAcKs &
SYSTM CA
30043225 397L4 DATA NETWORK CONNECTION TO CORP
NETWORK
DZP R I z0os I C I DUg / 100287 13
30042944 39774 MODEM CAATS# 106611
30033439 397L4 MODEM . UPGRADE EQUIPMENT CAATS# 65545
30057021 397\7 FIBER OPTIC CABLE - ADSS T|DM(2OO4|Cl0O2lO2
300s7023 39717 FIBER OPTIC PATCH PANEL \DM/2004/C/O02/O2
30048506 39717 FIBER OPTIC TRANSM ITTER/TRANSCEIVER EQ#
374045
wBS TilD/2006/C/ }OL/ 700297 41,388 WOLV CRK
DMX
300s7022 397L7 FIBER OPTIC TRANSM ITTER/TRANSCEIVER EQ#
38s788
TIDM / 2OO4/ Cl OO2/ 02 D MX H C
300s4616 39723 DIGITAL DEHYDRATOR SYSTEM DZPRI 2008 / Cl OO2 / 1003s62s
30054617 39723 RAD|O (RF) CONSTELT-ATTON HARRTSPSTRATEX
EQ# 383334
DZP Rl 2008 / Cl OO2 / L0O3s62s
30015401 39726 CROSS CONNECT TREE/FRAME ER 3431160
30015437 39726 CROSS CONNECT TREE/FRAME ER 100387
30054618 39726 EQUIPMENT RACK/SHELF DZPR I 2008 / C I OO2 /1003s62s
30057024 39726 EQUIPMENT RACK/SHELF TIDMl2004lClOO2lO2
30044698 39726 EQUIPMENT RACK/SHELF{'See Long Descr (Alt
Cntl Ctr)
CAATS# t5897 W/OL247
300s3680 39726 TELEPHON E PROTECTOR BLOCKS ER3726273
300s3681 39726 TELEPHONE PROTECTOR BLOCKS- ADDTL
cosrs
ER3726213
30054404 39729 DIGITAL CHANNEL DZPR I 2008 / C I OO2 I LOO35624
300s4808 39729 DIGITAL CHANNEL T|DM I 2005 I Cl 037 I 70037848 + 10032851
300s702s 39729 DIGITAL MULTIPLEX SYSTEM TIDMI2OO4/CIOOLIO2 COASTCOM 24 SLOT SHELF
30059171 39729 DIGITAL MULTIPLEX SYSTEM - ATLAS 550 &
COASTCOM
TIID I2OO7 / ClOOUWCGSP2DA DAF
3005rt405 39729 SYNCHRONIZI NG STANDARD DZP R I 2008 I Cl OO2 I LOO3S624
300s4812 39732 PLC TMNSMITTER/RECEIVER SET EQ# 385786 T tD M / 200s I c I 037 / 1003 7848
300s462L 39735 AC POWER TRANSFER PANEL DZPR I 2008 I Cl OO2 I LOO3S625
30054619 39735 BATTERYAND RACK DzP Rl 2008 / Cl OO2 / LOO3s62s
30015425 39735 BATTERYAND RACK4SVDC ER 3713880 C&D 1754
3003302s 39735 BATTERY AND RACK EQ# 331355 CAATS# 65746
30033025 3973s BATTERY CHARGER CAATS# 65745
30048495 39735 BATTERY CHARGER 48VDC wBS TilD/2006/Cl00Ll 1002974L,388 WOLV CRK
30054620 3973s BATTERY CHARGER SAGEON 161KV YARD EQ#
383338
DZPR I 2008 / C / 0O2 / L003s62s
300s7028 3973s GENERATOR TRANSFER PANEL DZP R I 20 tO I C I D R9/ 1 003 9834
300s8802 39735 UNINTERRUPTIBLE POWER SUPPLY (UPS)ctrc/20061c/47212Lo
3003303s 39738 Analog Telemetry Receiver wBs DsPT/1999 / Cl 022 / 0L2
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l.l s8.2l. r
Page 9 of25
Version 0.0.2
Effective:
Filed on : April27,2016
30043124 39738 PANEL.REI.AY AND CONTROL CAATS# 101083
30015440 39738 PROTECTIVE RELAYING RECEIVER ER 100387
300s7020 39738 PROTECTIVE REIAYING TERM I NAL RFL 9745
EQ# 385787
T tD M / 2005 / C I O37 / LO03 t8 48
30075442 39738 PROTECTIVE RELAYING TRANSMITTER ER 100387
30015407 39738 TELEM/FSK RECEIVER ASSEM BLY ER 3431160
30015409 39738 TELEM/FSK TRANSMITTER ASSEMBLY ER 3431160
30057027 39738 TELEM/TRANSMITTER OR RECEIVER TERMINAL ER 3527637 2ND BUS VOLTAGE TELEMETRY
POINT
30051553 3974L INTERNET PROTOCOL (IP) TELEPHONE SYSTEM ctrcl20o6/cl4L2/27o
30075427 39744 CALL SEQUENCER ER 3541547
30015413 39744 PARTY LINE SELECTOR ER 3394145
30058371 39744 TELEPHONE LINE SHARING SWITCH TIDMl2004lClO02lO2
30048509 39744 TELEPHON E SWITCH RS.232 wBs rrD/20061c100u Loo297 4L,388 WoLV CRK
300s4623 39747 (2) ANTENNA SYSTEMS. S'DZP R I 2008 / C I 002 / L003s 62s
30054624 39747 (2) RADOMES 5'TELGAR DZPRI 2008 / C/002/1003s62s
30054626 39747 (2)WAVEGUIDE DZP R / 20 08 I C I 002 I L0035 62s
30032828 39747 ANTENNA SYSTEM CAATS# 54872
300s4627 39747 GROUNDING GRID DZP Rl 2008 I C I O02 / 7003s62s
3005452s 39747 TOWER FOUNDATTON RE-BUTLD (EQ #362491)DZP R I 2008 / Cl 002 / L003s62s
30055188 39753 AIR CONDITIONER - FREE STANDING OUTSIDE
A/C SYSTEM
rzPR / 2009 / CITR9I10038873
30058372 397s3 UNDERGROUND ENCLOSURE - VAULT TZPR I 2009 I CITR9l10038873
location: 068194 - Summer Lake Switchvard, OR
40091809 35227 CLEARING, GRADING, & FILL MATERIAL (SURF TZBE / 2074 / C /00 1/100s 170s
40091810 353L7 CONDUIT TZBE I 2Ot4 / C I o0 1/1oos 17os
40091812 35325 GROUND GRID SYSTEM TZBE I 2074 I C 100 1/100s 170s
40091813 35327 POWER AND CONTROL CABLE TZBE I 2074 I Cl00 u100s 1705
40048909 35201 CABLE TRAY rsoul2003/c{004
400s3672 3520L DUCT ER37-27397-784
40053667 3s309 COMPRESSOR, GAS ER37-2L397-L84
40048910 35317 CABLE TRENCH rsou/2003/cloo4
40003362 35319 RELAY AND CONTROL cAATSf 60808
40003370 35319 RELAY AND CONTROL CMTS# 62305
40003378 3s319 RELAYAND CONTROL CAATS# 62306
40048914 3s319 REI.AY AND CONTROL rsoM/20031c{004
40070460 35319 RELAY AND CONTROL TORM/2004/C1009/01
40085750 35319 RELAY AND CONTROL rzKu 2017 / c / o04l1004388s
40085635 35319 REI.AY AND CONTROL TZBE I 2OL2 / C lT U2 / LO047 64t
40091006 35319 RETAYAND CONTROL DA TOREl20L3lC/001/100s1253 DA
40003374 35319 SATELLITE CLOCK CAATS# 62306
40053663 3s32L BATTERY AND RACK ER 31-21397-184 #3 TCX-580
400s3654 35321 BATTERYAND RACK ER 3t-27397 -L84 #4 TCX-580
40085149 3s32L BATTERY CHARGER EQ# 393538 TZBE / 2017 I C lTRsl 100449 38
40085148 35327 BATTERY CHARGER EQ# 393639 TZBE I 2071 I C lr Rs/100449 38
40048912 3s32s GROUND GRID SYSTEM TSOM/2003/Cl004
40003358 35327 POWER AND CONTROL CABLE CMTS# 50808
40048913 35327 POWER AND CONTROL CABLE TSOM/2003/C/004
40053677 35327 POWER AND CONTROL CABLE ER3L-2L397-184
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.1
Page 10 of25
Version 0.0.2
Effective:
Filed on : Apil27,2016
40070459 35327 POWER AND CONTROL CABLE TORMl2004lCl009lOL
4008s749 3s327 POWER AND CONTROL CABLE TZKU 20LL I C I O04l1 0043 885
40026415 35341 RELAY AND CONTROL ER 91-45604-5303
40026407 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 20286-075
40026471 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER22892-97 LANDIS & GYR
40003366 3s342 EQUIPMENT RACK/SHELF CMTS# 52306
30063479 39700 c.y20t2 coMM EQUTPMENT (ClCL2723)TZKU 20 LL I C I 004/ 1 0043 88s
3006s848 39700 cY2074 SUMMER LAKE COMM EQU|P gClC
L27231
30060474 39700 MODEM CAATS# 62306
30060475 39700 MODEM cAATSf 62306
30051499 39705 REMOTE TERMINAL UNIT (SCADA RTU)TORMl2004lC{OO9lOL
30051s00 39717 FO OPTICAUELECTRICAL CONVERTER TORM12004lCl009l07
30038166 397L7 SUMMER LAKE BPA SUB FO LINK REPEATER
DYMEC 5844
TORM/2004/Cl0r2/03
30038167 397L7 SUMMER LAKE SUB sUB FIBER OPTIC CABLE
(IUMPERS)
TORM/2004/ClO72/03
30019697 397?3 RADIO (RF)CAATS# 59502
30079707 39723 RADIO (RF)CMTS# 60684 CIAC
30051501 39726 EQUIPMENT RACK/SHELF foRMl2004lc/o09lot
30039314 39726 SUMMER LK COMMUNICATIONS RACK ER 45557-6301
30019711 39729 DIGITAL MULTIPLEX SYSTEM CAATS# 70574t
30051502 39729 DIGITAL MULTIPLEX SYSTEM TORM/2004/ClOO9/OL
30038168 39729 SUMMER LAKE DIGITAL MUX COASTCOM
UNIVERSAL 24 SLOT
TORM/20041C/OL2/03
30038159 39729 SUMMER LAKE DIGITL MUX CHANNEL,
coAsrcoM 30011-102
roRM/20041c|0L2/03
30051504 39732 PLC TMNSMITTER/RECEIVER SET 10 WATT TORMl2004lC(OO9lOL
30039322 39732 SUMMER LK COUPLING CAPACITOR
TELEMETRY EQUIP
ER 51384-5570
300367t2 39735 BATTERYAND RACK TSOM/2003/C/00s
30019701 39735 POWER SUPPLY CAATS# 60684 CIAC
30038165 39738 SUMMER LAKE BPA SUB RELAY/CONTROL
PANEL
TORM/2004/Clgtzl03
30038164 39738 SUMMER I.AKE MODULE REMOTE I/O SEL 2594
TONE EQUIP
TORM/20041C/OLZ/03
30038153 39738 SUMMER I.AKE TONE RFL 9745 REI.AY
RECEIV/TRANSMITTER
TORM/2004/ClOLz/03
30039313 39738 SUMMER LK RTU,51OO, LANDIS & GYR ER 45557-6301
30019699 39738 XMITTER, RECEIVER, 125 VDC, RFL 6750 CAATS# 60808 C|AC
3001959s 39747 ANTENNA SYSTEM cAATSf 59502
30019703 39747 ANTENNA SYSTEM CMTS# 60684 CIAC
Location: 068190 - Burns Reactive Station, OR
307722 35010 FEE LAND ER 31-16546-184 SEC 18 T22s R31E
40046458 3s201 BUI LDINGS (EXPLOSIVES STORAGE)TORMl200uCl0L7
4009002s 35201 BUILDINGS (TRAILER)TZBE I 2073 I C lT M 3/100s 1s2 1
40090026 3s20L BUITDINGS (TRAILER)TZBE I 20L3 I CIT M 3/1005 152 1
40003444 35207 CONTROL BUILDING ER 31-16546-184
40003396 3s2os I ArR CONDTTTONER (EVAPORATTVE OR REFRTG.)ER 31-16546-184
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
I .158.21 .l
Page ll of25
Version 0.0.2
Effective:
Filed on : April27,2016
40090005 3s205 HVAC (HEATER)TZBE I 2OL4 / C lT R5 / 100s228t
40003432 35207 LOAD CENTER ER 31-15546-184
40076347 35209 SECURITY SYSTEM wBS rzBEl2007 I Cl 002 I 70033499 ETC
40003420 352t3 PLUMBING SYSTEM ER 31-16546-184
40003452 3s213 WATER HEATER ER 31-16546-184
40003428 352L3 WELL ER 31-16546-184
40003400 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-16546-184
40089799 35227 CLEARING, GRADING, & FILL MATERIAL (SURF TZBE/20L3/ClO02
40003456 35227 CULVERT (FOR YARD DRAINAGE SYSTEM)ER 31-16545-184
40003408 35227 FENCE ER 31-16545-184
40065680 35227 FENCE CAATS wO 4870
40070759 35227 FENCE ER 31-16546-184
40070785 35227 OIL STORAGE TANK ER 31-16546-184
40072629 35227 ROADWAY, INC. CLRING, GRADING, SURFACE ER 31-16546-184
40003424 35227 SIGN ER 31-16545-184
40083194 35227 SORBWEB BERM DORE /20711 Cl 830 I L004sO73 SPCC
40003404 3s227 UNDERGROUND ENCLOSURE (MANHOLE)ER 31-16546-184
40070760 35229 FLOODLIGHTS ER 31-16546-184
40003412 35229 LIGHTING FIXTURE/SYSTEM ER 31-15545-184
40070787 35301 STATION SERVICE TRANSFORM ER ER 31-16546-184
40070773 35315 POWER FUSE MOUNTING 14.4KV ER 31-16546-184
4007075L 35377 CABLE TRENCH ER 31-16546-184
40070753 35317 CONDUIT ER 31-16546-184
400764L7 35319 ANNUNCIATOR TZBE / 2007 I C lT U2 I L003 L67 4
40070750 35319 CABINETS ER 31-16546-184
40070742 3s319 OSCILLOGRAPH ER 31-323-91-6089
40003274 35319 RELAY AND CONTROL CAATS# 60585
40049782 35319 RELAY AND CONTROL TORM/20041C{O77
40070s08 35319 RELAYAND CONTROL TORMl2004lC/OOq/03
40076238 35319 RELAY AND CONTROL WBS TORM/2 OO4/ CIOO2IO6 BRIDGER RAS
400764L8 3s319 RELAYAND CONTROL rzBE I 2007 I C lT U 2 / 7OO3 767 4
40077762 35319 REI.AY AND CONTROL TZBE / 2009 I C lT R2 / 7003s 77 8
40077976 3s319 RELAY AND CONTROL wBS "r-zBEl2007 / Cl007l 10035772,L0032860
40081902 35319 RELAY AND CONTROL TZBE I 2070 I C lT R2 I 700 40822
40083333 35319 RELAY AND CONTROL TZBE I 20 7L I C ITR 1/10045 1 6 1
40040404 35319 SATELLITE CLOCK wBS TORM/20071C/00u0L
40070744 35319 SATELLITE CLOCK ER 31-323-91-6089
40070746 35321 AUTOMATIC TRANSFER SWITCH ER 31-16546-184
40070747 35327 BATTERYAND RACK ER 31-16546-184
40068811 3s32L BATTERY CHARGER TORM/2005IC/014 AMERTCAN BATTERY
CHARGING
40070748 3s321 BATTERY CHARGER ER 31-16546-184
40070762 3s323 GENERATOR ER 31-15545-184
40070763 35325 GROUND GRID SYSTEM ER 31-16546-184
40049787 35327 POWER AND CONTROL CABLE TORMl2004lC/O77
40070774 3s327 POWER AND CONTROL CABLE ER 31-16546-184
40076346 3s327 POWER AND CONTROL CABLE wBs rz BEl2007 / cl 002 / 70033499 ETC
40070770 35329 LIGHTING FIXTURE/SYSTEM ER 31-16546-184
4002639s 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# 60585
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.1
Page 12 of25
Version 0.0.2
Effective:
Filed on : April27,2016
40078993 3s341 REMOTE TERMINAL UNIT (SCADA RTU) EQ#
380030
'toRM / 2OO4l ClO09 I 03 GE D-20
40070779 35341 SEQUENCE OF EVENTS RECORDER ER 31-15546-184
40049783 35341 SEQUENCE OF EVENTS RECORDER S/N 18891
EQf 358602
TORM I2OO4/C/017 HATHAWAY DFR
300627s4 39700 cy2011 BURNS REACTOR COMM EQUIP (C/C
73746l.
30064750 39700 cy2013 BURNS REACTOR COMM EQUrP (C/C
t3746l.
30051600 39708 FILTER SYSTEM DZBE / 2007 / Cl OO3 / L003L7 29 TELECT D UAL FE E D
FIL
300196s9 397tL MAS SCADA REMOTE RADIO CMTS# 106281
30054741 39774 DATA NETWORK ROUTER - CISCO 2811 wBs rz BEl2007 I c/o02/ 10033499 ETC
30051601 397L4 DATA SWITCH - ESS DZBE I 2007 I C I OO3 I LO0317 28
300s1602 39723 DEHYDRATOR SYSTEM DZBE I 2007 I C I OO3 I tOO3 L7 28
30051603 39723 RADIO (RF) TO BURNS BUTTE EQ# 37773L DZBE I 2007 I C I 003 I LOO3 77 28
30051604 39729 DIGITAL M U LTIPLEX SYSTEM EQ# 3777 33 DZBE I 2007 I C I OO3 I 7003 !7 29 COASTCO M
30051527 39732 PLC TRANSMITTER/RECEIVER SET 10 WATT TORMl2004lClO09/03
300s1s26 39732 PLC TRANSMITTER/RECEIVER SET 50 WATT TORMl2004lC/O09/03
30051605 3973s BATTERY AND RACK , 48V EQfi 377734 DZBE / 2007 / Cl 003 / 7003t7 29 C&D M SE N D U R
30051606 39735 BAfiERY CHARGER EQ# 377739 DZBE / 2007 / Cl OO3 / L003L7 29 VA LA R E
300195ss 3974L COMPUTERIZED DIAL EXCHANGE CAATS# 51598
30051607 39747 ANTENNA SYSTEM 5 FT ozBE / 2007 I c I o03 I L003 L7 29
30051608 39747 TOWER - 30 FT DZBE / 2007 | C / OO3 I LOO377 29
300627ss 39750 cy20L7 BURNS REACTOR MOBTLE RAD|O (C/C
137461
Location: 085050 - Threemile (noll Substation, lD
304274 35010 FEE LAND THREEMILE KNOLL IDCB-0151 T tDM / 2005 I Cl O37 / 70033667
40076973 3s207 CONTROL BUILDING WBS Tl DM/200s I ClO37 I LoO3 1845 +
40077028 35201 METAL CABINET WBS TIDM/20O5 /ClO37 / LOO31846 + FILING
CABINE
40077040 3s209 SECURITY SYSTEM EQf 382918 WBS Tl DM/20O5 I Cl O37 /1OO3 1846 +
40077070 35219 FOUNDATION AN D SUBSTRUCTURE WBS TIDM/20OslCl037 /1OO31846 + CONTROL
BUILD
40076970 35227 CEMENT CURB WBS TIDM/20OslClO37lt0031845 + INSIDE SUB
40076977 35227 CLEARING, GRADING, & FILL MATERIAL (SURF WBS Tl DM/20O5 I Cl 037 I t003 1846 +
40083599 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF TZP R I 2OO9 I C/OO1/3 M LTRAN S
40077009 35227 FENCE WBS Tl DM/20O5 I ClO37 I LOO3 1846 +
40077038 35227 ROADWAY, INCL CLRING, GRADING, SURFACE WBs Tl DM/200s I cl037 I 7oo3 1846 +
40077042 3s301 STATION SERVICE TRANSFORMER WBS TIDM/20O5/C|O37/t0O3L846 + NO DETAIL
INF
40077043 3s301 STATION SERVICE TRANSFORMER T|DM/20O51C1037170031846 + NO INFO IDAHO
POW
40083611 35301 STATION SERVICE TRANSFORM ER TZPRI 2009 / C1001/3 M LTRANS
40076969 353L7 CABLE TRENCH WBs Tl DM/2OO5 / Cl O37 / 7003 1846 +
40076972 353L7 CONDUIT wBS Tl DM/2005 / C/O37 / L0O3 1846 +
40077045 353L7 STORAGE CABINET WBS TIDM/20O1 / c1037 / 7003 1846 +
40076947 35319 ANNUNCIATOR WBS Tl DM/2005 / Cl O37 / LOO3 1845 +
4007700a 3s319 DIGITAL FAULT RECORDER EQ# 383154 WBS Tl DM/200s I C1037 I 7oo3 1846 +
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.1
Page 13 of25
Version 0.0.2
Effective:
Filed on : April27,2016
40087925 35319 DIGITAL RELAY TRIPPING DEVICE TWYOIaOIUC/O0 {TMKDIG (SEL 2411)
40077029 35319 METERING PACKAGE (CTIVT) 345KV WBS Tl D M/20os / clo37 I tO03 1845 +
40078954 3s319 METERING PACKAGE (CTIVI) 345I(V wBS TrDM/200s I Cl O37 I 70033453
40076524 3s319 RELAY AND CONTROL wBs Tt DM/200s I cl o37 I L0033453
40077036 35319 RELAY AND CONTROL WBS Tl D M/20O5 I Cl 037 I tOO3 1846 +
40077993 35319 RELAY AND CONTROL wBS TJBM/20041 Cl OO2 I L0035564 RAS
40090241 35319 RELAY AND CONTROL TTRB I 2074 I C lTRz I 10052044
40077039 35319 SATELLITE CLOCK EQ# 382426 WBS Tl DM/20O5 I C lO37 I IOO3 1846 +
40076948 3s32L AUTOMATIC TRANSFER SWITCH WBS Tl D M/20O5 I ClO37 I lOO3 1846 +
40076949 35327 BATTERY AND RACK EQ# 376225 WBS TIDM/20O5 I Cl O37 / L003 1846 +
40076950 35321 BATTERY CHARGER EQ# 37 6224 WBS Tl DM/20os I cl 037 / 1003 1845 +
40077072 3s323 GENERATOR WBS Tl DM/20O5 / Cl 037 I LO03 1846 +
40077073 35325 GROUND GRID SYSTEM WBS Tl DM/20O5 / Cl O37 / t003 1846 +
40076s23 35327 POWER AND CONTROL CABLE wBS TrDM/2005 I Cl O37 I 700334s3
40077033 35327 POWER AND CONTROL CABLE WBS Tl DM/2005 I Cl 037 i1003 1845 +
40077992 3s327 POWER AND CONTROL CABLE wBs rJBM/2004 I Cl OO2 I t003ss64 RAS
40077025 3s329 LIGHTING FIXTURE/SYSTEM WBs Tl DM/20o5 I Clo37 I 7003 1846 +
40085832 35341 HMI AUTOMATION ((SOFTWARE)TZPR I 20L7 I C/TR6/1004s 185
40077037 35341 REMOTE TERMINAL UNIT (SCADA RTU)WBS Tl DM/20o5 / C/O37 / t003 1845 +
4007704L 35341 SEQUENCE OF EVENTS RECORDER WBS Tl DM/20O1 / C/O37 / 7003 1846 +
30064302 39700 CY2O12 THREEMILE KNOLL SUB COMM EqUIP
(cc 13695)
30064757 39700 CY2O13 THREEMILE KNOLL SUB COMM EQUIP
(c/c 13695)
30055318 397L4 DATA NETWORK ROUTER EQ # 382416 wBs TIDM/2005 I Cl 037 I 70033277 CTSCO 2877
30055078 39774 DATA NETWORK SWITCH WBS Tl D M/20O5 I ClO37 I L003 1846 +
300s5317 39774 DATA NETWORKSWITCH wBS TtDM/2005 I ClO37 I 70033277 ETHERSWTTCH
300s5084 397L4 MODEM WBS Tl DM/20 05 / Cl 037 / 7OO3 1846 +
300ss320 397L7 FIBER OPTIC CABLE - ADSS wBs r D M/20 0s I c/o37 I 70033277
300ss321 397L7 FIBER OPTIC PATCH PANE6 wBs Tr DM/200s I cl o37 I t0033277
30055081 397L7 FIBER OPTIC/TRANSMITTER RECEIVER 5ET EQ#
382477
WBS TIDM/200s/c/o37 I 70031846 + DMX
30055088 39720 POWER QUALITY MONITOR WBS Tl DM/200s I cl 037 ho03 1846 +
300s5080 39726 EQUIPMENT RACK/sHELF WBS TIDM/20O5 I C lO37 I 7OO3 1846 +
300s5079 39729 DTGTTAL MULTTPLEX SYSTEM EQ# 382418 WBS TIDM/200s / c1037 / 1003 1846 + 10032865
30055070 39735 BATTERY AND RACK EQ# 382414 WBS Tl DM/20O5 / C/ 037 / 1003 1846 +
30055071 39735 BATTERY CHARGER EQ# 382415 WBS Tl DM/20 05 / C/O37 / 7OO3 1846 +
300ss069 39738 AUDIO-TON E PROTECTIVE RELAY TERM INAL
RFL 9745
WBS Tl D M/200s / Cl 037 / tOO3 1846 +
300s5085 39738 PANEL.RELAYAND CONTROL FOR RTU WBS Tl DM/20O5 I ClO37 / 7003 1845 +
300ss090 39744 TELEPHONE LINE SHARING SWITCH WBS Tl DM/2005 / Cl 037 / tOO3 1846 +
30058659 39744 TELEPHONE LINE SHARING SWITCH TJBM I 2004 I C I OO2 I 10035564
300ss089 397s8 SYNCHRONOUS TIMER EQ# 382425 WBS Tl D M/20Os I cl 037 I 7OO3 1846 +
location: 013209 - Big Grassy Substation, lD
40091701 35319 REI.AY AND CONTROL TZP R I 2073 I C lT R2 I LOO'209 L
30066402 39700 CY2O15 BIG GRASSY SUB COMM EQUIPMENT
(c/c 13696)
TSHE / 20L3 I Cl 002 / L00527 04
300955 35010 FEE LAND - BIG GRASSY IDJI-OO4O CAATS# LOO974
350209013209 35020 ACCESS ROAD RIGHT OF WAY cAATSf 100974
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
r.158.21.1
Page 14 of25
Version 0.0.2
Effective:
Filed on : April 27,2016
40051667 35201 CABLE TRAY cAATSf 100974
40051673 35201 CONTROL BUILDING CAATS# 700974
40051599 35205 UNIT HEATER CAATS# 700974
4005L727 35219 FOUN DATION AND SUBSTRUCTURE CMTS# 700974 FOR CONTROL BUILDING
40057677 35227 CLEARING, GRADING, & FILL MATERIAL (SURF CAATS# 700974
40085597 35227 CLEARING, GRADING, & FILL MATERIAL (SURF TZPRI 2OO9 / CIOO3lBG RASUB
40051675 35227 CULVERT (FOR YARD DRAINAGE SYSTEM)CAATS# 100974
40057677 35227 FENCE CAATS# LOO974
40085599 35227 FENCE/GATE fzPR/ 2009 / cloo3/BGRASUB
40051696 35227 SIGN CAATS# 100974
40051668 35377 CABLE TRENCH CAATS# 700974
40085595 3s3L7 CABLE TRENCH fzPR/ 2009 / cl 003/BG RASUB
4005L672 353L7 CONDUIT CAATS# 700974
40085598 35377 CONDUIT rzPRl 2009 / c/003/BGRASU B
40051598 353L7 MICROWAVE TOWER CMTS# t00974
40051660 35319 ANNUNCIATOR 12PT CAATS# 700974
40012339 35319 RELAY AND CONTROL CAATS wO BGSYg4RE s5850
40048213 35319 REI.AYAND CONTROL TIDMl2003/C/030/01
40051594 35319 RELAY AND CONTROL CAATS# L00974
40081301 35319 RELAY AND CONTROL TZPR I 2009 I C I OO2 I L0038044
40082329 3s319 RELAYAND CONTROL TZPR I 2008 I C lTR2 /1003s805
40085622 3s319 RELAY AND CONTROL rzP R / 2009 / c/003/BG RAS U B
40090276 35319 RELAY AND CONTROL rzP R I 20L3 I C lr R2l10049986
40051551 35327 BATTERY AND RACK 125VDC CAATS# 100974 ALCAD
40051552 35327 BATTERY CHARGER CAATS# tOO97425A
40057679 35325 GROUND GRID SYSTEM CAATS# 700974
4008s601 35325 GROUND GRID SYSTEM rzPR/ 2009 I cloo3lBG RASUB
40051580 35325 INSULATED PLATFORM 6'CAATS# 700974
40089316 35327 ANIMAL GUARDS TZP R / 2OO9 / ClOO3/VI B RTN
40051692 35327 POWER AND CONTROL CABLE CAATS# LOO974
40085505 35327 POWER AND CONTROL CABLE TZP Rl 2009 / C / Oo3lBG RAS U B
40051587 3s329 LIGHTING FIXTURE/SYSTEM cAATSf t00974
40085605 3s329 LIGHTING FIXTURE/SYSTEM 'tzPRl 2009 I c/003/BGRASUB
400s1685 35341 INTERPOSITION CABINET CAATS# 700974
4005169s 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# 100974 MG
30063295 39700 CY2O11 BIG GRASSY COMMUNICATION EQ
(c/c 13588)
TZP R I 2009 I Cl 003/BG RASU B
3005s743 39700 CY2OL4 COMM EQUIPMENT (BIG GRASSY/C
13696)
rzP Rl 20t3 I CITR2I10049986
30015853 39705 COMM. STATION ALARM CONTROL RTU CAATS# 702273
30015859 39774 MODEM CAATS# LO2273
30015867 39723 RADIO (RF)CMTS# L02273
3001587s 39726 EQUIPMENT RACK/SHELF CAATS# 702273
30046440 39735 COMM BATTERYAND RACK TDM/20O5/C/046 East Penn Unigy IIAGM seale
30046447 3973s COMM BATTERY CHARGER TIDM/2005/C/046 48 volt Batterv Charger Svste
3001s877 39744 PARTY LINE SELECTOR CAATS# 702273
30015879 39744 TELEPHONE LINE DATA CAATS# L02273
3001s865 39747 ANTENNA SYSTEM CAATS# LO2273
30015869 39747 RADOME CAATS# tO2273
FERC Docket No. ERl6-1507-000
30015871 39747 TOWER cAATSf 702273
30015873 39747 WAVEGUIDE CAATS# t02273
30041045 397s3 AIR CONDITIONER (EVAPORATIVE OR REFRIG.)TtDMl2OO4lClOL6
Location: 054003 - Hurricane Substation, OR
301046 3s010 FEE LAND JV 98
301047 35010 FEE LAND JV 98
40001502 35201 CONTROL BUILDING ER 31-8240-183
40001611 35201 EM ERGE NCY LIGHTING SYSTEM ER 31-8240-183
40001638 3s20L EMERGENCY LIGHTING SYSTEM ER 31-45565-4110
40089325 35205 HVAC (ArR CONDTTTONER)TZW Al 20L3 / C lTRsl100s0607
400910s8 35205 HVAC (AtR CONDTTTONER) EQ#403884 TZWW I 2014/C/rR5/100s3683
40001608 3s20s UNIT HEATER ER 31-8240-183
40001599 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-8240-183
40001623 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-1668s-183
40001629 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-16585-183
40001535 35227 CLEARING. GRADING. & FILL MATERIAL (SURF ER 31-45565-4110
4000160s 35227 FENCE ER 31-8240-183
40059121 35227 FENCE CAATS WO 49O9-4O92O
40001626 3s227 GATE ER 31-15685-183
40059011 35227 ISOI.ATION LINK PANEL CAATS# 61383
40001620 35227 LOAD CENTER ER 31-8240-183
4000L5L7 35227 ROADWAY ER 31-8240-183
40001614 35227 SIGN ER 31-8240-183
40090549 3s227 SORBWEB BERM DORE / 2074 / Cl 830/100s 196 1
40019081 35301 STATION SERVICE TMNSFORMER 25KVA JV 98
400L9L26 35317 CONDUIT ER 31-8240-183
40019242 35377 CONDUIT ER 31-45565-4110
40019286 353L7 CONDUIT ER3L-52228-43LO
40019102 35317 UNIT HEATER ER 31-8240-183
40079174 35319 ANNUNCIATOR ER 31-8240-183
40019150 35319 RELAY AND CONTROL ER 31-8240-183
40019270 35319 RELAY AND CONTROL ER 31-45598-4077
40019302 35319 RELAY AND CONTROL ER 31-52228-4310
40079188 3s319 RELAY AND CONTROL ER 31-50175
400s6961 3s319 RELAY AND CONTROL. JLs METER cw Es I 200 4 I cl 07 U Loo26626 J LS M ETE RS
40088248 3532t BATTERY AND RACK 125VDC eq# 398360 TZW W / 2073 /C/TR5/10048s84
40088249 3s327 BATTERY CHARGER EQ# 4OOO34 rzww I 2073 I c/TRs/10048s84
40019098 35323 GENERATOR ENCLOSURE ER 31-8240-183
40079L75 3s32s GROUND GRID SYSTEM ER 31-8240-183
40079189 35325 GROUND GRID SYSTEM ER 31-45565-4110
40079190 3s32s GROUND GRID SYSTEM ER3L-'2228-43LO
40019089 35329 FLOODLIGHT ER 31-8240-183
40019085 35329 LIGHTING FIXTURE/SYSTEM ER 31-8240-183
40019106 3s339 FIRE EXTINGUISHER ER 31-8240-183
40025848 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 31-45598-4077
400s8735 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# 5373516374t
40025836 3s343 EQUIPMENT RACK/SHELF ER37-45598-4077
30060500 39700 MODEM ENCLOSURE ER 31-45598-4077
Idaho Power Company
FERC Electric Tariff
Rate Schedules
Ll58.2l.t
Page 15 of25
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.1
Page 16 of25
Version 0.0.2
Effective:
Filed on : April27,20l6
30060499 39700 TRANSLATOR CABINET ER 31-45598-4077
Location: 085023 - Jefferson Substation, lD
301873 35010 JEFFERSON L6TI69 KV SUB LAND IDJI-0034 ER 85-7780
40077567 35207 CONTROL HOUSE ER 85-7780
40003928 35201 ROOF CAATS #105119
40068043 35273 WELL ER 85-7780
40051981 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 8s-8534
40077563 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 8s-8138
40078966 35227 FENCE ER 85-7780 INTERIOR FENCE AROUND REACTORS
40077580 35227 FENCE & GATES ER 85-8138
40089462 3s227 TREX BERM DZP R I 20 73 / C / 7 Oo / LoOs 70 26
40077606 35301 STATION SERVICE TRANSFORMER ER 83-8355
40051983 353L7 CABLE TRENCH ER 8s-8534
40068066 35377 CABLE TRENCH ER 85-7780
40077566 353L7 CABLE TRENCH ER 85-8138
40058057 353L7 CONDUIT ER 85-7780
40077659 35377 CONDUIT ER 101131
40048224 35319 REI.AY AND CONTROL TIDMl2003lclo32lot
40051990 3s319 RELAYAND CONTROL ER 85-8534
40051991 35319 REI.AY AND CONTROL ER 85-8534
4005803s 35319 REI.AYAND CONTROL ER 85-7780
40068093 35319 RELAY AND CONTROL ER 85-7780
40077586 35319 RELAY AND CONTROL ER 85-8138
4007760s 3s319 RELAY AND CONTROL ER 83-8355
400776L2 3s319 RELAY AND CONTROT ER 85-6403
40077629 35319 RELAY AND CONTROL ER 85-6670
40077633 35319 REI.AYAND CONTROL ER 8s-5892 & 8s-5906
4007764L 35319 REIAY AND CONTROL ER 393587
400776s3 3s319 RELAYAND CONTROL ER 383764
40077664 35319 REI.AYAND CONTROL ER 101131
40048353 35321 BATTERY AND RACK 125VDC wBs DzPR/2004 I Cl DRs I LO02 1825 C& D
40048364 3532L BATTERY CHARGER 135VDC wBS DZPR/2004lClDR5l 1002782s C&D 3sA
40068100 35325 GROUND GRID SYSTEM ER 85-7780
40068101 35325 GROUND GRID SYSTEM ER 85-7780
40077582 35325 GROUND GRID SYSTEM ER 85-8138
400776L5 35325 INSULATED PLATFORM ER 85-5557
40068104 35325 INSULATED PLATFORM 12'ER 85-7780
400s1986 35325 INSUI.ATED PLATFORM 14'ER 85-8s34
40077585 3s325 INSULATED PLATFORM 14'ER 85-8138
40051985 3s325 INSULATED PLATFORM 4'ER 85-8534
40058102 3s325 INSULATED PI.ATFORM 4'ER 85-7780
40077584 35325 INSUI.ATED PLATFORM 4'ER 85-8138
40068103 35325 INSULATED PLATFORM 5'ER 85-7780
40077589 3s325 INSUI.ATED PLATFORM 6'ER 85-8137
40051989 35327 POWER AND CONTROL CABLE ER 85-8534
40068109 35327 POWER AND CONTROL CABLE ER 85-7780
40077590 35327 POWER AND CONTROL CABLE ER 85-8137
40077602 3532t POWER AND CONTROL CABLE ER 83-8355
400776L8 3s327 POWER AND CONTROL CABLE ER 85-6557
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.1
Page 17 of25
Version 0.0.2
Effective:
Filed on : April27,2016
40068130 3s329 LTGHTTNG FTXTURE/SYSTEM ER 85-7780
40077607 3s329 LIGHTING FIXTURE/SYSTEM ER 83-8355
40077663 3s329 LIGHTING FIXTURE/SYSTEM ER 101131
40041681 35341 REMOTE TERMTNAL UNrT (SCADA RTU)TIDM/20O2/C1009/B L&G s700 RTU Type 1A
w/Atta
400s1992 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 85-8534
40058887 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS f104220
40068132 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 8s-7780
40077651 3s341 REMOTE TERMINAL UNIT (SCADA RTU)ER 3346400
30064810 39700 cY2013 JEFFERSON SUB COMM EQUrp (C/C
13696)
30065819 39700 cY2014 JEFFERSON SUB COMM EQUrp (C/C
13595
300200s9 39723 DEHYDRATOR SYSTEM CAATS #106921
30020061 39723 RADIO (RF)TO MENAN BUTTE EQ# 333534 ER 6-3360
30020041 39726 CROSS CONNECT TREE/FRAME ER 100388
30020035 39729 ANALOG CHANNEL ER 3429610
30020039 39729 ANALOG CHANNEL ER 3639473
30020043 39729 ANALOG CHANNET ER 100388
30020049 39729 ANALOG CHANNEL CAATS #29638
30058717 39729 ANALOG CHANNEL ER 3394384
30020037 39729 ANALOG MULTIPLEX SHELF ER 3429610
300ss030 39735 BATTERY AND RACK 48V EQS 386004 DZPR I 2009 I C/D R9/10039402
30020045 39738 PROTECTIVE REI.AYING RECEIVER ER 100388
30020047 39738 PROTECTIVE REI.AYING TMNSM ITTER ER 100388
300200s1 39747 COMPUTERIZED DIAL EXCHANGE CAATS #103068
300200s7 39747 ANTENNA SYSTEM CAATS #105921
Location:085026 - Antelooe Substation. lD
40051027 35201 CABLE TRAY ltDM/200slcloLL
40077623 35201 CONTROL BUILDING ER 85-8606
40064983 35207 ROOF TZP R I 200 6 I C / LU2 I 700297 88
40077637 35205 AIR CONDITIONER ER 85-6998
40077632 3s205 Heat Pump ER 6167
40059400 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 393041
400789s7 35227 CLEARING, GRADING, & FILL MATERIAL (SURF wBS TZ PR/2009/C/TR 1/10038830
40069401 35227 FENCE & GATES ER 393041
40077624 35227 FENCE & GATES ER 85-8606
40077638 3s227 FENCE & GATES ER 85-7007
40077639 35227 CLEARING, GRADING, & FILL MATERIAL (5URF ER-85-7007
40053477 35227 RETAINING WALL ER 8s-8505
40082503 35227 ROADWAY TZP R / 2OL7 I Cl7 00 / 7004367 4
40082502 3s227 TREX BERM TzP R / 2oLL / C /700/10043574 spcc
40077634 35229 LIGHTING FIXTURE/SYSTEM ER 85-8606
40077635 3s229 LIGHTING FIXTURE/SYSTEM ER 85-8606
40053478 35301 STATION SERVICE TRANSFORM ER ER 85-8606 GE
40053484 35301 STATION SERVICE TRANSFORMER ER 85-8506 ELEC DRYTYPE
40053480 35301 STATION SERVICE TRANSFORMER 5OKVA ER 85-8606 GE 74400-249
40053481 35301 STATION SERVICE TRANSFORMER sOKVA ER 85-8606 GEL2470-277
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
l. t 58.21.1
Page 18 of25
Version 0.0.2
Effective:
Filed on : April27,2016
400s3482 35301 STATION SERVICE TRANSFORMER 50KVA ER 85-8506 WEST
40077642 35301 STATION SERVICE TRANSFORMER 50KVA ER-85-5157
40077693 3s301 STATION SERVICE TRANSFORMER ER 393884 Over 100% CIAC
40077678 35377 CABLE TRENCH ER 85-6859
40069480 35377 CONDUIT TIDM/2004/Cl004lOL
40069820 35377 CONDUIT TzP R / 2007 / C lT R6 I LOO34427
40077679 35317 CONDUIT ER 85-5859
40077696 35317 CONDUIT ER 393884 Over 100% CIAC
40037997 3s319 DIGITAL FAULT RECORDER DREK/Lese/cloLz/07
40004900 35319 OSCILLOGRAPH ER 383741 ROCHESTER SN 38960
40038455 35319 REI.AY AND CONTROL CAATS #39063 WBS DSHE/L9991C1064
40049109 3s319 REI.AY AND CONTROL wBs rDM/2004lcloL8
40049275 35319 REI.AY AND CONTROL floM12003/cloo6
40055764 3s319 RELAY AND CONTROL wBS Tr DM/200s I Cl OL3 I OO2
40065150 3s319 REI.AY AND CONTROL ER 85-6119
40069399 3s319 RELAY AND CONTROL ER 86-6888
40069485 3s319 REIAY AND CONTROL TIDM12004lcloo4lo7
40077640 35319 RELAY AND CONTROL ER 85-8550
40077643 35319 RELAY AND CONTROL ER 85-5397
40077644 3s319 RELAY AND CONTROL ER 85-6202
40077645 35319 RELAY AND CONTROL ER 85-5573
40077647 3s319 REI.AYAND CONTROL ER 85-7088
40077684 3s319 REI.AY AND CONTROL ER 85-6859
40077699 35319 ANNUNCIATOR ER 393884 Over 100% CIAC
40077700 3s319 RELAY AND CONTROL ER 393884 Over 100% CIAC
40093429 3s319 RELAY AND CONTROL TZP U I 20 L4 I C lT R2 / LOOS 482 4
40077708 3532L BATTERYAND RACK ER 393884 Over 100% CIAC
40077709 35321 BATTERY CHARGER ER 393884 Over 100% CIAC
40077685 3s32s GROUND GRID SYSTEM ER 85-6859
40077707 3s325 GROUND GRID SYSTEM ER 393884 Over 100% CIAC
40077687 3532s INSUI.ATED PLATFORM 10'ER 85-6859
40053457 3s32s INSULATED PI.ATFORM 4'ER 85-8606
40077686 35325 INSULATED PLATFORM 4'ER 8s-68s9
400534s8 35325 INSUI.ATED PLATFORM 6'ER 8s-8606
40049274 35327 POWER AND CONTROL CABLE TIDM/20031C/006
40053473 35327 POWER AND CONTROL CABLE ER 85-8606
40055753 3s327 POWER AND CONTROL CABLE wBS Tr DM/2oos / C/O73 / 002
40069484 3s327 POWER AND CONTROL CABLE TIDMl2004lclOO4l07
40077697 3s327 POWER AND CONTROL CABLE ER 8s-68s9
40077706 35327 POWER AND CONTROL CABLE ER 393884 Over 100% CIAC
40095487 35327 INSULATOR, POST 15KV rzP R I 207s / ClTR61100s6633
4009s488 3s327 r Nsu rAToR, susPENsroN 7s / zsK\t TZP R / 20Ls / C /rR6/100s663 3
40095489 35321 CUTOUT TZP R / 2O7s I C lTR61100s6s9s
40095490 3s327 INSULATOR, POST 15KV TZP R I 20L5 I C/TR5/1 00s 6s 9s
40077677 35329 LIGHTING FIXTURE/SYSTEM ER 86-6859
40077692 3s329 LIGHTING FIXTURE/SYSTEM ER 85-5859
40077707 35329 LIGHTING FIXTURE/SYSTEM ER 393884 Over 100% CIAC
40026477 35341 INTERPOSITION CABINET ER 85-6805
40045539 35341 METER wBs Tf DM/2003 I ClO27 I Or
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.l
Page I9 of25
Version 0.0.2
Effective:
Filed on : April27,2016
40026475 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 85-6805 LEEDS & NORTHRUP
40026479 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS #103389 LEEDS & NORTHRUP
40025483 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS #105609 HARRIS CONTROE
40038308 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS #101090
40077648 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 85-6797, 85-5991
40077649 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 85-803s
40078832 35341 REMOTE TERMTNAL UN|T (SCADA RTU) EQ#
328178
CAATS #104205 I.ANDIS & GYR MODEL 5410
40038013 35341 SEQUENTIAL EVENT RECORDER SENGlt999/Cl062
40026487 35349 SATELLITE CLOCK CAATS #21206
30064761 39700 cY2013 ANTELOPE SUB COMM EQUrP (C/C
13696)
300201s7 39777 FIBER OPTIC CABLE CAATS #106293
30020159 397L7 FIBER OPTIC/TRANSMITTER RECEIVER SET CAATS #106293
30034104 397L7 FIBER OPTIC/TRANSMITTER RECEIVER SET CAATS #39063 WBS DSHE/1999/C/O64
30020143 39729 ANALOG CHANNEL ER 3394350
30020145 39729 ANALOG CHANNEL ER 3639465
30020151 39729 ANALOG CHANNEL ER 100964
30020161 39729 ANALOG CHANNEL CAATS #104205
30058712 39729 ANALOG CHANNEL CAATS #100597
30032507 39729 ANALOG CHANNEL MODEM & TERM UNIT
(ANALOG)
GRANGER/TELLABS FXS - PROJECT 65543
30020155 39729 DIGITAL MULTIPLEX SYSTEM CAATS #106293
30020149 3973s BATTERY CHARGER ER 5057
30036924 39735 COMM UN ICATIONS BATTERY BAN K TIDMl2002lclRDF/011
30036182 39738 PROTECTIVE RELAY TERMINAL - RFL 9745 TIDMl2000/cl0L3
30036183 3974r'.TELEPHONE LINE SIGNALLING UNIT - TELLABS
4470
TIDMl2000/clo73
30042062 39750 cELLUT-AR TELEPHONE (10761)rtoul2o04lcl0t8
Location:085051 Populus Substation, lD
304311 35010 POPULUS SUB LAND IDBA-0015 TUDI2OOT lC|OO2IPSUBR Goldbere Land
304312 35010 POPULUS 5UB LAND IDBA.OO16 TttD 12007 I C1002/PSUBR Hatfield Land
304313 3s010 POPULUS SUB LAND IDBA-0017 TllD l2OO7 / C|OO2IPSUBR Evans Land
40080144 35201 CONTROL BUILDING TrD12007lcloo2lPsuB
40080153 35207 METAL CABINET (FOR FIBER OPTICS)rilo/20071c1o02/PSUB
40080206 35209 SECURITY SYSTEM TrD/20071C/002/PSUB
40080149 352L9 FOUNDATION AND SUBSTRUCTURE . CTRL
BLDG
frD/20o7lcloo2lPsuB
40080142 35227 cLEARtNG, GRAD|NG, & FrLL MATERTAL (SURF rDl2O07lCl002lPSUB
40080147 35227 FENCE & GATES TilD12007lCl002lPSUB
400801s7 35301 STATION SERVICE TRANSFORMER T|O/2007/CIOOL(PSUS
40080146 35315 DISCONNECT SWITCH 5OA 24OVAC TfiD12007 lcl002lPsU B
40080384 353L7 CABLE TRENCH T|D12007lcloo2lPsUB
40080143 35317 CONDUIT rDl2007/c|002/PsuB
40080148 353L7 FOUNDATION AND SUBSTRUCTURE -
COMMON
TrD12007 lc/002/PSUB
4009L778 353L7 FOUN DATION AN D SUBSTRUCTURE - JOINTLY
OWNED
TrD/2007/C/002/PSUB
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.1
Page20 of25
Version 0.0.2
Effective:
Filed on : Apil27,2016
40080134 35319 ANNUNCIATOR TIID I2OO7 I CIOO2IPSUB ROCH ESTE R
40080140 3s319 CABLE TERMINATION CABINET TrD12007lc/002/PsuB
4008014s 35319 DIGITAL FAULT RECORDER TIID / 2OO7 / C/OO2IPSUB ROCH ESTE R
40090423 3s319 DIGITAL FAULT RECORDER/SYNCHROPHASOR
WECC WISP SYS
T UT H I 20Lr / Cl 003 /1O} 47 406
40080201 35319 METERING PACKAGE (CTIW) 345KV T|D12007/C1002/PSUB
40080202 35319 METERING PACKAGE (CTIyr) 345KV SPARE TtD/2007/C/Oo2IPSUB
40080155 3s319 RELAYAND CONTROL TilD/2007/C/002/PSUB
40080304 35319 RELAY AND CONTROL WBS TIID/2007/CIOO2IRAS MODIFY RAS SCHEME
40086594 35319 RELAY AND CONTROL TWY O I 20LL /C/00s/POPDATA
40088586 3s319 REI.AY AND CONTROL TZP R I 2Ot2 I ClT RU LoO4837 s
40080135 3s321 AUTOMATIC TRANSFER SWITCH TtDl20OT lC|Oo2IPSUB
40080136 35321 BATTERYAND RACK 125VDC EO# 381622 TrD/2007/C/002/PSUB
40080137 3532L BATTERY AND RACK 48VDC EQf 381520 TrD/2007/C/Oo2IPSUB
40080138 35321 BATTERY CHARGER 125VDC EQ# 381623 TilOl2O07lClOo2lPSUB
40080139 3s321 BATTERY CHARGER 48VDC EQ# 381621 TrD12007lC/002/PSUB
40080150 35323 GENERATOR TilO/2007/C1002/PSUB
40080151 3532s GROUND GRID SYSTEM rilD12007lcloo2lPsUB
40080154 35327 POWER AND CONTROL CABLE TrD12007lC|Oo2IPSUB
40086693 35327 POWER AND CONTROL CABLE TW\ O / 2077 lC1005/POPDATA
40080152 35341 HMI AUTOMATION (PC, PRINTER, SOFTWARE)TrD12007/C1002/PSUB
40080155 35341 REMOTE TERMINAL UNIT (SCADA RTU)TilD/2007/Cl002/PSUB
30058656 3900s PREFAB BUILDING.2 ROOM GFRC CONCRETE
7l'x24'
TilD / 2007 / Cl 0O2 / tOO347 2s
30060173 39011 SITE CLEARING T tD I 2007 I C I OO2 I rOO3 47 2s
30060174 39011 SITE GROUNDING T ilD / 2007 I C I OO2 I LOO3 47 2s
30059151 39700 cy2010 coMMUNrcATroN EQUTPMENT (CC
13695) CA
TnD / 2007 / Cl Oo2IPS U BCOM
30060197 39700 cy2010 coMMUNrcATroN EQUTpMENT (CC
13596) JO
rilD I 2007 I cloo2lPsu BcoM
30064303 39700 cY2O12 POPULUS SUB COMM EQUrP (CC
13695)
300s8641 39705 RTU - GE CANADA TrD 12007 I C/O02 I LO0347 25
30058642 39774 ROUTER - CISCO 2811 TrD I 2007 I CI OO2 / LOO3 47 2s
30058643 39723 DEHYDRATOR SYSTEM TilD / 2007 / C I 002 / L00347 2s
30058644 39723 RAD|O (RF) 11 GHZ 28DS1 TO RED ROCK
EQ#XXXXXX
T|D / 2007 / Cl OO2 / LO03 47 2s
30058645 39726 EQUIPMENT MCK/SHELF w FUSE PANEL TilD / 2007 I Cl 002 / LOO3 47 2s
300s8546 39729 DIGITAL MULTIPLEX SYSTEM COASTCOM R4O9 TrD / 2007 I Cl002/ 700347 2s
300s8650 39735 AC POWER TRANSFER PANEL TrD / 2007 / Cl 002/ L00347 2s
300s8647 39735 BATTERY AND RACK DEKA EAST PENN UNIGY II
EQ#XXXXXX
TrD I 2OO7 I Cl OO2 / L0O347 2s
300s8648 39735 BATTERY AND RACK EQ #XXXXXX rw /2007 I cl 0o2 / L0o347 2s
300s8649 3973s BATTE RY CHARGER Eq#XXXXXX T ilD I 2007 I C I 002 I tOO3 47 25
30058651 39735 EMERGENCY POWER GENERATOR SYSTEM
ONAN 35KW
f ro I 2007 | c | 002 / Loo3 47 2s
300585s2 39735 PROPANE STORAGE TANK f tD / 2007 / c I oo2 I L003 47 2s
300s86s4 I 39747 ANTENNA SYSTEM .6'TELGAR RADOME T nD I 2007 I C I 002 I LOO3 4t 25300s86s3 I 39747 ANTENNA SYSTEM - HP5-107-PIA EQ#XXXXXX T rD / 2007 I Cl O02 I LOO3 47 2s
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.t
Page2l of25
Version 0.0.2
Effective:
Filed on : April 27,2016
30058655 39747 TOWER SABRE S3TL 150', EQ#XXXXXX TrD /2007 I Cl 0O2 / L00347 2s
30058690 39747 WAVEGUIDE T tD 1 2007 I C l 002 I LOO3 47 25
Location: 238018 - Walla Wa!!a Substation, WA
30066230 39700 CY2OL4 WALLA WALLA SUB COMM EQUIP (C/C
1213s)
302032 35010 FEE LAND 1998 BALANCE CONVERSION
302033 3s010 FEE LAND 1998 BALANCE CONVERSION
40006115 35201 CONTROL BUILDING ER 31-11353-283
4000615s 35201 CONTROL BUILDING ER3L-L297-285
40006153 35201 CONTROL BUILDING ER 31-3032-285
40006171 3s201 CONTROL BUILDING ER 31-6625-283
4000619s 35201 CONTROL BUILDING ER 31-87s9-283
40006207 35201 CONTROL BUILDING ER 31-11825-284 ADD|T|ON 72', X 40'.
40005243 35201 ROOF CMTS# 63355
40006159 3s205 FAN SYSTEM ER3L-3726-283
40079192 35205 Heat Pump TZW Al 2009 I C/TR6/10039983
40006227 3520s UNIT HEATER ER 31-52545-4359 HEAT PUMP
40005191 35207 LOAD CENTER ER 31-8130-283
4000613s 3s213 PUMP ER 31-113s3-283 FOR WELL
40006279 35213 WELL ER 31-11185-285
40005091 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-11353-283
40006151 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER37-t9287-283
40005187 35227 CLEARING, GRADING, & FILL MATERIAL (SURF JV 98
40006203 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-8759-283
400062Lt 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER31-17074-283
40006235 35227 CLEARING, GRADING, & FILL MATERIAL (SURF CAATS# 62049
40006143 35227 FENCE ER 31-11353-283
40006215 3s227 FENCE ER3t-17074-283
40006223 35227 FENCE ER 31-51146-4283
40006231 35227 FENCE CAATS WO 5044-42960
40006239 3s227 FENCE CAATS# 62049
40006175 3s227 GATE ER 31-6625-283
40006099 35227 I.ANDSCAPING WSPRINKLING SYSTEM ER 31-11353-283
40006123 35227 LIGHTING FIXTURE/SYSTEM ER 31-11353-283
40006L67 35227 LIGHTING FIXTURE/SYSTEM ER 31.5095-286 FOR CONTROL BUILDING
40006111 35227 ROADWAY ER 31-11353-283
40006183 3s227 ROADWAY ER 31-5625-283
40006103 35227 SIDEWALK ER 31-11353-283
40006107 3s227 SIGN ER 31-11353-283
40083979 35227 SORBWEB BERM ow Asl 207L/ cl 830 / Lo04 4 477
40015680 3s301 STATION SERVICE TRANSFORMER ER 31-11353-283 15KVA & 75KVA
400L5757 35301 STATION SERVICE TRANSFORM ER ER 31-11353-283 2 2sKVA 51,020.30 1 50KVA S83
40015768 35317 CONDUIT ER 31-11353-283
40015873 35377 CONDUIT ER 31-6525-283
40015917 353L7 CONDUIT ER 31-87s9-283
40015970 35317 CONDUIT ER 31-13569-283
40016031 35317 CONDUIT ER31-L7074-283
40079177 35317 CONDUIT IZW A(2OO9 I CITR4I10038563 BLUE MOUNTATN
LINE
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.1
Page22 of25
Version 0.0.2
Effective:
Filed on : April27,2016
40016135 35319 RELAY AND CONTROL ER 31-45598-4085
40016147 3s319 REI.AY AND CONTROL WEST TYPE LCB-MDAR TONE TRANSFER
40016159 35319 RELAY AND CONTROL CAATS# 51140
40076779 35319 RELAYAND CONTROL cAATSf 62199
40037827 35319 RELAYAND CONTROL CAATS #6256s
40038965 35319 RELAY AND CONTROL TWAM/2000/Cl006/07
40039330 35319 RELAY AND CONTROL twaml2000lc/oO4
40045019 35319 RELAY AND CONTROL rwAM/2000/clo02/02
40051649 3s319 REI.AY AND CONTROL TMGM/200s/ClOO2/OO7
40062282 35319 RELAY AND CONTROL CAATS# 54711
40067360 35319 RELAY AND CONTROL wBS TWAM/2 006 I C / OOS{ LOo30393
40059614 35319 RELAY AND CONTROL TrwA/2006/c loo2 I 10030679 700% ctAc
40070542 35319 RELAY AND CONTROL DZW Al 2007 I C/D R2110033850
4007927L 35319 RELAY AND CONTROL CMTS# 60177
40084368 35319 RELAY AND CONTROL Tzw Al 20t2 / clTR2l10046085
40084398 35319 RELAY AND CONTROL TZW N 207L I C lTR2l100455 65
40084773 3s319 REI.AY AND CONTROL CWES/2008/C/OO5/GCPDWALL
40085983 3s319 RELAY AND CONTROL TZW A I 20 L3 I C I T R2 I 100 48488
40086984 35319 RELAYAND CONTROL TZW A / 2073 / C / T R2 / LOO 4860 4
400s6959 35319 RELAY AND CONTROL - JLs METER cw Es /2004/ cl 07 tl Loo26624 J LS M ETE RS
40016191 3s319 REI.AY, INSTRUMENT, OR DEVICE CAATS# 62199
40015195 35319 RELAY, INSTRUMENT, OR DEVICE CAATS# 62199
40015199 35319 REIXY, INSTRUMENT, OR DEVICE CMTS# 62199
40040442 3s319 SATELLITE CLOCK wBS TWAM/2 0OL/ ClRDF I 70009183 ARBTTER
40049636 35327 BATTERYAND RACK 125VDC DZW A/2O03 / ClDRs/10020340 C&D
40049637 3532t BATTERY CHARGER 125VDC DZW A I 2003 I C I DRs I tOO20340 LAMA RC H E
40015809 3s323 GENERATOR FUEL TANK ER37-1474-285
400t5772 3s325 GROUND GRID SYSTEM ER 31-11353-283
40015837 35325 GROUND GRID SYSTEM ER 31-19287-283
40015974 3532s GROUND GRID SYSTEM ER 31-13569-283
4001603s 3s325 GROUND GRID SYSTEM ER3L-L7074-283
40079179 3s325 GROUND GRID SYSTEM TZW Al 2OO9 I C/TR4l10038s63 BLU E MOU NTAI N
LINE
40015699 35327 CUTOUT ER 31-11353-283
40015053 35327 CUTOUT ER37-79742-286
40015780 3s327 POWER AND CONTROL CABLE ER 31-11353-283
40015986 35327 POWER AND CONTROL CABLE ER 31-13559-283
40015002 35327 POWER AND CONTROL CABLE ER37-74722-283
40016051 3s327 POWER AND CONTROL CABLE ER 31-17074-283
40016087 35327 POWER AND CONTROL CABLE ER 31-20078-285
400L6L07 35327 POWER AND CONTROL CABLE ER 31-3844-296
40016131 35327 POWER AND CONTROL CABLE ER 31-45598-4085
40015155 3s327 POWER AND CONTROL CABLE CAATS# 61140
40037826 35327 POWER AND CONTROL CABLE CAATS #52665
40069513 3s327 POWER AND CONTROL CABLE Ttw A12006/ c/0o2/ Loo30679 100% ctAc
40079180 35327 POWER AND CONTROL CABLE rzw Al 2oo9 I c/TR4l10038s63 B LU E MOU NTAI N
LINE
40015739 35329 LIGHTING FIXTURE/SYSTEM ER 31-11353-283
40015845 3s329 LIGHTING FIXTURE/SYSTEM ER 31-6625-283
FERC Docket No. ERt6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
I.l58.21.t
Page23 of25
Version 0.0.2
Effective:
Filed on : April27,2016
40016018 35329 LIGHTING FIXTURE/SYSTEM ER37-L7074-283
400L5776 3s339 FIRE PROTECTION SYSTEM ER 31-11353-283
40040993 35341 REMOTE TERMINAL UNIT (SCADA RTU)TW AM I 2OO2 I CI OLLI B GE HARRIS
40073835 35341 REMOTE TERMINAL UNIT (SCADA RTU)wBs DPrT/2007 I C I 007 I 10033783
40015139 35342 SEQUENTIAL EVENT RECORDER ER 31-45598-4085 HATHAWAY
30061183 39700 CY2Oll WALLA 2 SUB COMMUNICATION
EQU|P (C/C 137491
30054194 39700 cY2013 WALLA WALLA SUB COMM EQU|P (C/C
L37471
30065027 39700 CY2O13 WALLA WALLA SUB COMM EQUIP (C/C
13749l,
30065810 39700 C:YZOI4 WALLA WALLA 230 SUB COMM EQUIP
(c/ct2t37l
30050484 39700 PLC TRANSM ITTER/RECEIVER SET CAATS# 60177
30058938 39771 BASE STATION . TAITTB 81OO DSY S / 2007 I C1806/P PWW2 3 1
300s8945 397LL RADIO CONTROL - DISPATCH OUTPOST
CONTROLLER
DSys I 2007 / c/806/ppww23 AWEC (A/r
coNVERTER)
300s8944 397lt RADIO CONTROL SYSTEM - TAIT 1541 NODE DSYS I 2007 I C I 806/P PWW23
30058941 397LL RADIO CONTROL SYSTEM - TAIT CMM DSYS I 2OO7 I CI8O6IPPWW23 1 CONTROL M ODULE
30058945 39711 RADIO CONTROL SYSTEM - TAIT DAS DSYSIZOOT I C/806/PPWW23 TAIT DIGITAL AU DIO
swt
30058940 397lL RADIO CONTROL SYSTEM - TAIT SMM DSYS I 2007 / C1806/PPWW23 1 S|TE M G MT
MODULES
300s8939 397tL RF COMBINER DSYS I2OO7 I CI8O5IPPWW23 1 D B SPECTRA
30044266 39777 WW SUB GROUP PENDLETON RADIO CONTROL
sYS #360705
DZWW / 2002 / C/D Us/10013392
30047400 397L4 csu/Dsu CMTS# 54711
30058948 397\4 DATA NETWORK ROUTER - CISCO 2811 DSY s I 2007 / C/806/P PWW23
30058947 397t4 DATA NETWORK SWITCH - CISCO
ETHERSWITCH
osYs/ 2oo7 I c/805/PPWW23
30047401 397L4 MODEM CAATS# 64711
3004r'940 39714 TERMINAL CONTROLLER *see long descrio.xFR FR 3970230025620 PN629L7
30055181 397L7 PATCH PANEL FOR FIBER-OPTICS T tw A / 2008 / c / oos / Loo37 97 4
30054429 39723 MICROWAVE RADIO TO KENNEWICK EQ
#381360
ozw A/2008/ clo02/ L003548t - MoD A84797F1-A
30040190 39723 MICROWAVE SYSTEM TO COMBINE HILLS EQ
fi373072
DWAL/20O4/ClOO7/03
30045833 39723 MW TOWER tsee lons descrip.XFR fr 39702 30025618 PRJ 707223
30058950 39726 EQUIPMENT RACK/SHELF DSYS I 2007 I C1806/PPWW23
30058942 39726 EQUIPMENT RACK/SHELF WFUSE PANEL DSYS/ 2007 I C/806/PPWW23 1
300s89s1 39729 DIGITAL CHANNEL osYs / 2oo7 I c/806/PPWW23
30055182 39729 DIGITAL M ULTI PLEX SYS.IMACS PREM ISYS
CHANNEL BANK
f tw A I 2008 I cl oos I L0037 97 4
3002s616 39729 DIGITAL MULTIPLEX SYSTEM CAATS 106733
30040401 39729 WALLA WALI.A CHANNEL CARDS FOR PARTY
LINE CONNECTN
TWAM/200s/C/030
30040189 39729 WALLA WALLA SUB MULTIPLEX SYSTEM DWALl2004lClOO1l03
30025672 39732 PLC TRANSMITTER/RECEIVER 5ET CAATS 52199
30058952 39735 BATTERY AND RACK 48V DEKA DSY S / 2007 / C / 806/P PvvW2 3
300s89s3 39735 BATTERY CHARGER 48VDC AMERICAN POWER DSYS / 2oO7 | C l8o6lPPWW2 3
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.1
Page24 of25
Version 0.0.2
Effective:
Filed on : April27,2016
300M944 39735 DC POWER SUPPLY PANEL *see lons descrio.xFR FR 39702 30025520 PN 629L7
300s89s5 39735 EMERGENCY POWER GENEMTOR SYSTEM
WSAFTEYSWITCH
DSYS / 2007 / C/805/PPWW23
300589s4 39735 GROUNDING GRID DSYS/ 2007 / C/805/PPWW23
300s89s7 39735 PROPANE STORAGE TANK DsY S I 2007 / Cl 805/P PWW2 3
30058956 39735 VOLTAGE CONVERTER DC TO DC 48.12 VDC DSYSI 2007 / C/805/PPWW23
30025514 39744 TELEPHONE SWITCH CAATS 62199
30058943 39747 ANTENNA SYSTEM - VHF FOR TAIT BASE
STATION
DSv S | 2007 I C I 806/PPWW2 3 1
30040188 39747 WALLA WALI.A SUB ANTENNA SYSTEM owAL/20041c{00L/03
30054430 39747 WALLA WALLA SUB ANTENNA SYSTEM DZW A / 2008 / C / 002 I 1003s 481
30040191 39747 WALLA WALIA SUB RADOME DWAv2004/C/001/03
30040192 39747 WALLA WALLA SUB WAVEGUIDE MATERIAs DwAV20O4/C/001/03
30046553 39753 WALLA WALI.A COMMUNICATIONS ROOM AIR
CONDITIONER
DW AL/ 2006 I Cl D R9/100294ss
Location: 540065 - Jim Brideer Substation, 345kV Non-Shared
40084979 35227 CLEARING, GRADING & FILL MATERIAL rrc/2007/cl002rBsuB
40055232 3s227 FENCE TWY M / 2002 / C I OoU L00L2388
40055237 35227 ROADWAY TWY M | 2002 / Cl O0 1/100 12388
40055230 353L7 CABLE TRENCH TWY M I 2002 I C I OO7 / t00L2388
40076407 353L7 CONDUIT TIDM I 2005 I Cl 037 I L0037847
40084980 35317 CONDUIT TilO12007IC1002lJBSUB
40037972 35319 RELAY AND CONTROL CAATS f37855
40047923 3s319 RELAY AND CONTROL TW Y M I 2002 I C I O0 U 700 167 83
40055235 3s319 RELAY AND CONTROL TWv M I 2002 I C I 00U L00L2388
4005524L 3s319 RELAY AND CONTROL TJ B M/2005/C I OO7 I tOO27 424
40063425 3s319 RELAY AND CONTROL CAATS# 64841
40065263 35319 RELAY AND CONTROL TWYM/2 005/ C I O 46 I 7002s37 0
400764L5 35319 RELAY AND CONTROL T\DM / 200s / c / o37 I LO03t847
40084985 35319 REI.AYAND CONTROL TrD12007lCl002lBSUB
40093311 35319 REI.AY AND CONTROL TZRS / z0ts / ClTR1/1oos s4o8
40055234 35325 GROUND GRID SYSTEM TWv M I 2002 I C I 007 I t0012388
400764L2 35325 GROUND GRID SYSTEM TIDM / Z00s / c / 037 / L0037847
40084982 35325 GROUND GRID SYSTEM TilD12007IClOo2lJBsUB
40055235 35327 POWER AND CONTROL CABLE TWY M I 2002 I C I OoL I L0072388
40065262 35327 POWER AND CONTROL CABLE TWYM/2005/C I 046 I L002s37 0
40076474 3s327 POWER AND CONTROL CABLE T tDM I 2005 I C I 037 I tOO3 t847
40084984 35327 POWER AND CONTROL CABLE filD12007IClOo2lJBSUB
40084985 35341 SEQUENTIAL EVENT RECORDER TrD/20071C/002rBSUB
30051281 39700 cy2010 JB suM coMM EQUIP (C/C 13918)
30037769 39705 SCADA L&G TW Y M / 2Oo2 / C / OO7 I LoO7239 O
30047883 39774 MODEM CMTS# 64841
30054817 397L7 FIBER OPTIC TRANSCEIVER/MODEM T tDM I 2005 I C I O37 I LO037847
30037772 39777 FI BER OPTIC TRANSM ITTER/RECEIVER TWY M I 2002 I C I 00 U 700 L239 0
30054816 39729 DIGITAL CHANNEL TtDMl2OOs 1037 I L0031847 + 10032865
300s8806 39729 DIGITAL CHANNEL Tr DM/200s/037 I 10032866
30037773 39729 DIGITAL MULTIPLEXER TWY M / 2002 / C /00 ul00 12 390
30037774 39729 DIGITAL MULTIPLEXER SHELF TW Y M / 2002 / C I 00 U L00 1239 0
3004L287 39729 JB SUB DIG MULT CARD FOR T1 CIRC JB TO ctTclz}oslcls07ls7
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
r.158.21.1
Page25 of25
Version 0.0.2
Effective:
Filed on : April 27,2016
CASPER
30033442 39738 AUDIO-TONE PROTECTIVE RELAYING SYSTEM SAATS#37677
30033448 39738 AUDIO-TONE PROTECTIVE RELAYING SYSTEM CAATS #37855
3003777L 39738 Telemetry Receiver TWY M I 2002 I C I OOl I L00L2390
30037770 39738 Tone Relav Equip TWY M I 2002 I C I OOL I LO0L2390
30047884 39738 TRANSMITTER, RECEIVER, 125 VDC, RFL 6745 CAATS# 54841
30054815 3974/,COMMUNICATION CABLE >5OO FT.TIDM/2005/C lO37 I LOO3L847 COAX FO PLC
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
EXHIBIT B
Description of Idaho Power Common Equipment
t.158.21.2
Page I of69
Version 0.0.2
Effective:
Filed on : April27,2016
Adelaide Transmission Station
FERC Acct Adetaide Asset Description VintaEe
35011 LAND OWNED IN FEE TS 1974
35011 PERMANENT LAND IMPROVEMENTS TS 1975
3s011 PERMANENT LAND IMPROVEMENTS TS 7977
35200 DRAI NAG E SYSTEMS-CU LVERTS, ETC L976
35200 YARD SURFACING. GRAVEL, ETC.7976
35200 YARD SURFACING - GRAVEL, ETC.7977
3s200 ENGR, SURVEYING OR CONSULTING L976
35200 PERIMETER FENCE & GATES 7977
35200 WATER WELL PUMP 1977
35200 SEPTIC TANK & CESSPOOL 7977
3s200 SEWER LINE t977
35200 LIGHT LOWERING DEVICE & LIGHT 1977
35200 LIGHT MAST L977
3s200 FOUNDATION - STATION BUILDING L977
35200 COMPLETE STATION BUILDING L977
35200 BUILDING PLUMBING SYSTEM L977
35200 BUILDING HVAC SYSTEM t977
3s200 BUILDING ELECTRICAL SYSTEM L977
35200 BUILDING ELECTRICAL SYSTEM L977
35200 D.C. EMERGENCY FIXTURE t977
35200 BUILDING ELECTRICAL SYSTEM 7977
35200 BUILDING ELECTRICAT SYSTEM 7977
35200 LOCAT SERVICE FND L977
35200 FOUNDATION - COMMUNICATION t977
35200 EQUIPMENT PAD L977
35200 LIGHTING MAST FND 1977
35200 CONCRETE SURFACE TRENCH W/LIDS 1977
35200 CONDUIT & FITTINGS UNDERGROUND L977
3s200 CONDUIT & FITTINGS UNDERGROUND 1995
35200 UNIWALKS 7977
3s200 LOCAL SERVICE STRUCTURE L977
35200 METAL STRUCT - COMMUNICATION 1977
35200 15KV BUS SUP, CT, PT, MISC STR L977
3s300 CABLE TRAY AND ACCESSORIES L977
FERC Docket No. ERl6-1507-000
3s300 CABLE TRAY AND ACCESSORIES 1995
35300 INSULATORS - PIN OR POST 7977
35300 U8" X7" FI.AT BAR COPPER 7977
35300 CONTROL WIRE - LOW VOLTAGE t977
3s300 #18 - #19 CONTROL WtRE 1995
35300 #18 - f19 CONTROL WtRt 1980
3s300 #78 - #L9 CONTROL WIRE 1991
35300 #18 - #19 CONTROL WtRE 1993
35300 #18 - #19 CONTROL WrRE 1995
35300 #18 - #19 CONTROL WtRE 1995
35300 #18 - f19 CONTROL WrRE 1996
35300 s18 - #19 CONTROL WIRE 1980
3s300 f18 - #19 CONTROL WtRE 1993
35300 #18 - #19 CONTROL WrRE 1995
35300 #18 - #19 CONTROL WtRE 1995
3s300 #L4. #L6 CONTROL WIRE 1995
3s300 #I4 - #76 CONTROL WIRE 1993
35300 #T4 -#L6 CONTROL WIRE 1980
3s300 #14 -#L6 CONTROL WIRE L996
35300 frL4 - #76 CONTROL WIRE 1995
35300 #L4 - fi76 CONTROL WtRt 1980
3s300 #L4 - #L6 CONTROL WIRE 1991
35300 #70 - #12 CoNTROL WrRE 1995
35300 #LO - #I2 CONTROL WIRI 1991
35300 #10 . #L2 CONTROL WIRE 1993
3s300 #LO - #72 CONTROL WIRE 1995
3s300 #7O - #L2 CONTROL WIRE 1995
3s300 #LO - #72 CONTROL WIRE 1991
3s300 #LO - *L2 CONTROL WIRE 1995
35300 #LO - #72 CONTROL WIRE 1995
35300 #to - #72 CoNTROL WtRE 1995
3s300 #IO - #L2 CONTROL WIRE t977
35300 #7 -#9 CONTROLWIRE 1980
35300 #7 - #6 CONTROL WIRE 7977
35300 #L-#6 CONTROL WIRE L977
3s300 #7 - #6 CONTROL WIRE t977
3s300 #L-#6 CONTROL WIRE 7977
35300 *7 - #6 CONTROL WIRE L977
3s300 #L - *6 CONTROL WIRE 1995
35300 4/0 coPPER CONTROL W|RE L977
35300 350 MCM ALUM CONTROL WIRE t977
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.1s8.2t.2
Page 2 of 69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl5-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 3 of69
Version 0.0.2
Effective:
Filed on:. April27,2016
35300 350 MCM COPPER CONTROL WIRE L977
35300 5OO MCM COPPER CONTROL WIRE L977
35300 COMPOSITE CABLE - LOW VOLTAGE 1995
35300 GROUNDING AND FITTINGS 1995
35300 #6 COPPER GROUND L977
35300 f6 COPPER GROUND MAT L977
35300 #6 COPPER GROUND MAT 1995
35300 7/L6COPPER GROUND 7977
35300 2/O COPPER GROUND L977
3s300 250 MCM COPPER GROUND 7977
35300 CONDUIT & FITTINGS ABOVE GROUN 1995
3s300 CONDUIT & FITTINGS ABOVE GROUN 1995
3s300 CONDUIT & FITTINGS ABOVE GROUN 7977
3s300 CONDUIT & FITTINGS ABOVE GROUN t977
35300 CONDUIT & FITTINGS ABOVE GROUN 1977
35300 CONDUIT & FITTINGS ABOVE GROUN 199s
35300 CONDUIT & FITTINGS ABOVE GROUN 1977
35300 CONDUIT & FITTINGS ABOVE GROUN L977
35300 2" -3-L12" CONDUIT 1995
3s300 2" -3-l/2" CONDU|T 1977
35300 2" -3-u2" CONDU|T L977
35300 5,,CONDUIT t977
35300 SMALL ELECTRICAL ENCLOSURE 1995
35300 SMALL ELECTRICAL ENCLOSURE 1977
35300 sOKVA LOCAL SERVICE XFMR 1977
3s300 L67-499KVA LOCAL SERVICE XFMR L977
35300 SWITCH - POWER FUSE 7977
35300 CONTROL RACK/PANEL FRAME 7977
35300 CONTROL RACK/PANEL FRAME L977
35300 CONTROL RACK/PANEL FRAME 7977
35300 CONTROL RACK/PANEL FRAME t977
3s300 CONTROL RACK/PANEL FRAME 7977
3s300 CONTROL RACK/PANEL FRAME 1991
35300 CONTROL RACK/PANEL FMME 1995
3s300 CONTROL RACK/PANEL FRAME 1995
35300 CONTROL RACK/PANEL FRAME 1995
35300 CONTROL RACK/PANEL FRAME 7977
35300 CONTROL RACK/PANEL FRAME 7977
35300 CONTROL RACK/PANEL FRAME L977
35300 PROTECTION EQUIPMENT 1996
35300 CONTROL COMPUTER & PERIPHERALS 1995
FERC Docket No. ERl6-1507-000
35300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 1995
3s300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 1995
3s300 PROTECTION EQUIPMENT 1995
3s300 PROTECTION EQUIPMENT 1995
3s300 PROTECTION EQUIPMENT 1995
35300 METERING EQUIPMENT 1993
3s300 METERING EQUIPMENT 1995
35300 CONTROL EQUIPMENT 7977
35300 CONTROL EQUIPMENT 7977
3s300 CONTROL EQUIPMENT 1980
35300 CONTROL EQUIPMENT 1980
35300 CONTROL EQUIPMENT 1965
35300 CONTROL EQUIPMENT 1977
35300 CONTROL EQUIPMENT 1980
35300 CONTROL EQUIPMENT 1965
35300 CONTROL EQUIPMENT 7977
35300 CONTROL EQUIPMENT 1980
3s300 CONTROL EQUIPMENT 1980
35300 CONTROL EQUIPMENT 7977
35300 CONTROL EQUIPMENT 7977
35300 CONTROL EQUIPMENT 1980
3s300 CONTROL EQUIPMENT 1980
35300 CONTROL EQUIPMENT 1995
35300 CONTROL EQUIPMENT 1995
35300 CONTROL EQUIPMENT 1995
3s300 SCADA EQUIPMENT 1991
3s300 COMM RACK/PANEL FRAME 1977
35300 COMM RACK/PANEL FRAME 1977
3s300 COMMUNICATIONS EQUIP 7977
35300 AUXILIARY LOAD CENTER 7977
3s300 LOAD CENTER, AC L977
35300 LOAD CENTER, DC 1995
3s300 10 - 40 AMP CIR BRKR 1991
3s300 10 - 40 AMP CIR BRKR 1995
35300 TRANSFER SWITCH 7977
35300 ALARM SYSTEMS-WIRED CIRCUITS 1992
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 4 of69
Version 0.0.2
Effective:
Filed on : April 27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
CABINET OR PANEL
r.158.2t.2
Page 5 of69
Version 0.0.2
Effective:
Filed on : April27,2016
3s300 OTHER METERING EQUIPMENT 1995
35300 OTHER METERING EQUIPMENT 1995
3s300 MISC OFFICE FURNITURE L975
3s300 CHAIR 7952
35300 CHAIR 1953
3s300 CHAIR L964
35300 DESK 1931
35300 DESK 1950
35300 DESK 1961
3s300 DESK L977
35300 FILE CABINET 7977
3s300 TABLE 1952
3s300 TABLE 1954
35300 COMPUTER AND PERIPHERAL5 1991
3s300 PRINTER 1991
39720 MICROWAVE, ANTENNA 1999
39720 MICROWAVE, ANTENNA 1999
39720 MICROWAVE, EQUIPMENT 1999
39720 MICROWAVE, EQUIPMENT 1999
39720 MICROWAVE, EQUIPMENT 1999
39720 MICROWAVE, EqUIPMENT 1999
39720 MICROWAVE. CARD UNIT 1999
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, CARD UNIT 1999
3s300 #18 - #19 CONTROL WIRE 1999
35300 #L4 - #16 CONTROL WIRE 1999
35300 #LO - #12 CONTROL WIRE 1999
35200 SMOKE DETECTOR 2001
3s300 METER 1999
39720 MICROWAVE, EQUIPMENT 2000
39720 MICROWAVE, ANTENNA 2000
39720 M ICROWAVE, STR UCT( POLES&FIX}1998
39720 M rcRowAVE, STRUCT(POLES&F lX)1998
3s200 BUILDING HVACSYSTEM 2004
3s300 AUXILIARY LOAD CENTER 2004
35300 130 VOLT BATTERY CHARGER 2003
3s300 130 VOLT BATTERY 2003
35300 BATTERY RACK 2003
35300 SAFEWSWITCH 2003
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
35300 PROTECTION EQUIPMENT
35200 SITE PREPARATION & IMPROVEMENT 2005
35200 SUPERSTRUCTURE ROOF 2005
3s300 CONTROL RACIVPANEL FRAME 2006
3s300 DISTANCE / FAULT LOCATOR 2006
3s300 COMMUNICATIONS EQUIP 2006
35200 CONDUIT & FITTINGS UNDERGROUND 2005
35300 CONTROL WIRE . LOW VOLTAGE 2005
3s300 COAXIAL CABLE 2005
35300 GROUNDING AND FITTINGS 2006
35300 CONDUIT & FITTINGS ABOVE GROUN 2006
3s300 SMALL ELECTRICAL ENCLOSURE 2006
35300 CONTROL RACK/PANEL FRAM E 2005
35300 CONTROL RACK/PANEL FRAME 2006
3s300 CONTROL RACK/PAN EL FRAME 2006
35300 CONTROL RACK/PANEL FRAME 2006
35300 CONTROL RACK/PANEL FRAME 2006
35300 PROTECTION EQUIPMENT 2006
35300 PROTECTION EQUIPMENT 2006
3s300 PROTECTION EQUIPMENT 2006
35300 CONTROL EQUIPMENT 2006
3s300 CONTROL EQUIPMENT 2005
3s300 CONTROL EQUIPMENT 2005
35300 CONTROL EQUIPMENT 2006
35300 ATARM/MONITORING EQUIPM ENT 2006
35300 ALARM/MON ITORI NG EQUIPM ENT 2006
35300 ALARM/MONITORING EQUIPMENT 2006
3s300 SCADA RACK/PANEL FRAME 2006
3s300 SCADA RACK/PANEL FRAME 2006
35300 SCADA EQUIPMENT 2006
3s300 SCADA COMPUTER AND PERIPHERA6 2006
39740 FIBER, MISC EQUIPMENT 2007
39740 FIBER, MISC EQUIPMENT 2007
39740 FIBER, CARD SHELF 2007
39740 FIBER, CARD SHELF 2007
39740 FIBER, CARD UNIT 2007
39740 FIBER, CARD UNIT 2007
39740 FIBER, WIRE/CABLE 2007
39740 FIBER, WIRE/CABLE 2007
3s300 ALARM/MONITORING EQUIPMENT 2008
39720 NETWORK EQ 2009
1.158.21.2
Page 6 of69
Version 0.0.2
Effective:
Filed on : April 27,2016
FERC Docket No. ER16-1507-000
39120 NETWORK EQ I 2OO9
35300 CONTROL WIRE - LOW VOLTAGE 2009
3s300 COAXIAL CABLE 2009
35300 GROUNDING AND FITTINGS 2009
35300 CONDUIT & FITTINGS ABOVE GROUN 2009
35200 CONDUIT & FITTINGS UNDERGROUND 2008
3s300 CONTROL WIRE . LOW VOLTAGE 2008
3s300 CONTROL RACK/PANEL FRAME 2008
35300 CONTROL RACK/PANEL FRAME 2008
35300 CONTROL RACK/PANEL FRAME 2008
3s300 CONTROL RACK/PANE L FRAM E 2008
35300 CONTROL MCK/PANEL FRAME 2008
35300 CONTROL RACK/PANE L FRAME 2008
35300 COMMUNICATIONS EQUIP 2008
3s300 COMMUNICATIONS EQUIP 2008
3s300 COMMUNICATIONS EQUIP 2008
35300 COMMUNICATIONS EQUIP 2008
35300 COMMUNICATIONS EQUIP 2008
3s300 COMMUNICATIONS EqUIP 2008
39500 OTHER LAB/RESEARCH EQUIPM ENT 2009
39500 OTHER I.AB/RESEARCH EQUIPMENT 2009
35300 CONTROL WIRE - LOW VOLTAGE 20t2
35300 CONTROL MCK/PANEL FRAME 20L2
3s300 PROTECflON EQUIPMENT 20L2
3s300 PROTECTION EQUIPMENT 20t2
35300 CONTROL RACK/PANEL FRAME 2008
3s300 CONTROL RACK/PANEL FRAME 2008
3s300 CONTROL RACK/PANEL FRAME 2008
3s300 CONTROL RACK/PANEL FRAME 2008
35300 CONTROL RACK/PANEL FRAME 2008
35300 CONTROL RACK/PANEL FRAME 2008
35300 COMMUNICATIONS EQUIP 2008
3s300 COMMUNICATIONS EQUIP 2008
3s300 COMMUNICATIONS EqUIP 2008
35300 COMMUNICATIONS EQUIP 2008
3s300 COMMUNICATIONS EQUIP 2008
35300 COMMUNICATIONS EQUIP 2008
35300 CONTROL WIRE . LOW VOLTAGE 2007
35300 CONTROL WIRE - LOW VOLTAGE 2007
35300 FIBER OPTIC CABLE 2007
3s300 FIBER OPTIC CABLE 2007
Idaho Power Company
FERC Electric Tariff
Rate Schedules
r.158.21.2
Page 7 of69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
35300 CONDUIT & FITTINGS ABOVE GROUN 2007
35300 CONDUIT & FITTINGS ABOVE GROUN 2007
35300 COMM RACK/PANEL FRAME 2007
35300 COMM RACK/PANEL FRAME 2007
35300 COMMUNICATIONS EOUIP 2007
35300 COMMUN]CATIONS EQUIP 2007
35300 48 VOLT BATTERY CHARGER 2007
35300 48 VOLT BATTERY CHARGER 2007
35300 48 VOLT BATTERY 2007
3s300 48 VOLT BATTERY 2007
35300 BATTERY RACK 2007
3s300 BATTERY RACK 2007
35300 TRANSFER SWITCH 2007
3s300 TRANSFER SWITCH 2007
3s300 METERING EQUIPMENT 2012
35300 COMMUNICATIONS EQUIP 2012
35300 SCADA EQUIPMENT 20L3
3s300 SCADA EQUIPMENT 2073
35300 ALARM/MONITORING EQUIPM ENT 20L4
35200 WOOD POLE - MISC 2074
35300 CONTROL WIRE - LOW VOLTAGE 20L4
3s300 FIBER OPTIC CABLE 2074
35300 CONDUIT & FITTINGS ABOVE GROUN 20L4
3s300 COMM MCK/PANEL FMME 2074
35300 COMMUNICATIONS EQUIP 20L4
3s300 BUILDING SECURITY SYSTEM 2014
35300 CONTROL WIRE - LOW VOLTAGE 20L4
3s300 CONTROL RACK/PANEL FRAM E 20L4
3s300 PROTECTION EQUIPMENT 2014
35300 COMMUNICATIONS EQUIP 20L4
3s300 CONTROL WIRE - LOW VOLTAGE 7977
35300 CONTROL WIRE. tOW VOLTAGE t977
3s300 CONTROL RACK/PANEL FRAME 7977
35300 CONTROL EQUIPMENT 1965
35300 CONTROL EQUIPMENT 1977
35300 CONTROL EQUIPMENT 1980
3s300 COMMUNICATIONS EQUIP 1977
35200 CONDUIT & FITTINGS UNDERGROUND 20L5
35300 CONTROL WIRE - LOW VOLTAGE 2015
35300 COMMUNICATIONS UPGRADE 20L4
35300 PROTECTION EQUIPMENT 2014
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 8 of69
Version 0.0.2
Effective:
Filed on :, April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
t.158.21.2
Page 9 of69
Version 0.0.2
Effective:
Filed on : April 27,2016
Borah Transmission Station
FERC ACct Borah Asset Description Vintage
35011 I.AND OWNED IN FEE TS r972
35011 I.AND OWNED IN FEE TS 1983
35011 PERMANENT LAND IMPROVEMENTS TS 7975
35011 PERMANENT LAND TMPROVEMENTS TS 1983
3s200 YARD SURFACING. GRAVEL, ETC.7975
35200 YARD SURFACING. GRAVEI- ETC.L982
3s200 YARD SURFACING - GRAVEL. ETC.1983
35200 SITE EXCAVATION L972
35200 SITE EXCAVATION 1983
35200 ENGR, SURVEYING OR CONSULTING L972
35200 ENGR, SURVEYING OR CONSULTING 1983
3s200 ROAD EXCAVATION 7972
35200 ROAD EXCAVATION 1983
35200 PERIMETER FENCE & GATES 1975
3s200 PERIMETER FENCE & GATES 1982
35200 PERIMETER FENCE & GATES 1983
3s200 WATER WELL PUMP 1975
3s200 WATER WELL PUMP 1983
35200 WATER SYSTEM r975
35200 WATER SYSTEM 1983
35200 WATER WELL t97s
35200 WATER WELL 1983
3s200 SEPTIC TANK & CESSPOOL L975
3s200 SEPTIC TANK & CESSPOOL 1983
35200 SEWAGE DRAIN SYSTEM 7975
3s200 SEWAGE DRAIN SYSTEM 1983
35200 SEWER LINE 7975
35200 OIL CATCH BASIN L975
35200 LIGHT LOWERING DEVICE 7975
35200 LIGHT LOWERING DEVICE 1983
35200 LIGHT MAST 1975
35200 LIGHT MAST 1983
35200 LIGHT MAST, LOWER DEVICE & LIG L977
3s200 LIGHT MAsT, LOWER DEVICE & LIG 1983
35200 FOUNDATION . STATION BUILDING L975
3s200 FOUNDATION - STATION BUILDING 1983
35200 COMPLETE STATION BUILDING 1975
35200 COMPLETE STATION BUILDING 1983
FERC Docket No. ERl6-1507-000
35200 BUITDING PLUMBING SYSTEM 1983
35200 BUILDING HVAC SYSTEM 1983
35200 AIR CONDITIONERS &/OR COOLERS 1983
35200 EXHAUST FANS & DUCT 1983
35200 HUMIDIFIER 1983
35200 BUILDING ELECTRICAL SYSTEM 7975
35200 BUILDING ELECTRICAL SYSTEM 1983
35200 BUILDING ELECTRICAL SYSTEM 1975
35200 BUlLDI NG ELECTRICAL SYSTE M 1983
35200 BUILDING ELECTRICAL SYSTEM 7975
35200 BUILDING ELECTRICAL SYSTEM 1983
3s200 BUILDING ELECTRICAL SYSTEM 7975
35200 BUILDING ELECTRICAL SYSTE M 1983
3s200 AIR COMPRESSOR FND 7975
35200 FOUNDATION - COMMUNICATION L975
35200 EQUIPMENT PAD L975
35200 LIGHTING MAST FND 1975
3s200 TIGHTING MAST FND 7977
35200 LIGHTING MAST FND 1983
35200 TUNNELS 1975
35200 TUNNELS 1983
3s200
CONCRETE ABOVE GROUND
CABLEWAY 1975
35200 coNcRETE SURFACE TRENCH WLTDS 7975
35200 CONCRETE SURFACE TRENCH W/LIDS 1982
3s200 CONCRETE SURFACE TRENCH W/LIDS 1983
3s200 CONDUIT & FITTINGS UNDERGROUND 7975
35200 CONDUIT & FITTINGS UNDERGROUND t979
3s200 CONDUIT & FITTINGS UNDERGROUND 1983
35200 TREAD PLATES t982
35200 TREAD PLATES 1983
35200 UNIWALKS L975
35200 UNIWALKS 1983
3s200 METAL STRUCT - COMMUN]CATION t975
35200 HEATERS L975
35200 HEATERS 1983
35200 LIGHTING L975
35200 LIGHTING 1983
35200 WELL HOUSE (INACTIVE)7975
35200 WELL HOUSE (INACTIVE)1983
ldaho Power Company
FERC Electric Tariff
Rate Schedules
BUILDING PLUMBING SYSTEM35200
1.158.21.2
Page l0 of69
Version 0.0.2
Effective:
Filed on : April27,20l6
FERC Docket No. ERl6-1507-000
35200 TOOL SHED, MAINT BLDG, ETC L975
35200 TOOL SHED, MAINT BLDG, ETC 1983
3s300 CABLE TRAY AND ACCESSORIES t975
35300 CABLE TRAY AND ACCESSORIES 1983
35300 15KV POWER CABLE 1975
35300 15KV POWER CABLE L975
35300 15KV POWER CABLE 1983
35300 CONTROL WIRE. LOW VOLTAGE 1985
35300 CONTROL WIRE - LOW VOLTAGE 1991
35300 CONTROL WIRE - LOW VOLTAGE 1993
35300 CONTROL WIRE - LOW VOLTAGE 199s
35300 CONTROL WIRE - LOW VOLTAGE 7975
3s300 CONTROL WIRE - LOW VOLTAGE t975
35300 #18 - f19 CONTROL WIRE 1995
3s300 f18 - #19 CONTROL WIRE 1982
35300 #18 - f19 CONTROL WIRE 1983
3s300 f18 - #19 CONTROL WIRE 1985
35300 #18 - #19 CONTROL WIRE 1991
35300 #18 - #19 CONTROL WlRt 1995
3s300 f18 - #19 CONTROL WIRE 1996
3s300 #18 - #19 CONTROL WIRE 7997
3s300 #18 - #19 CONTROL WIRE 1982
3s300 f18 - #19 CONTROL WIRE 1983
3s300 f18 - #19 CONTROL WIRE 1985
35300 #18 - #19 CONTROL WIRE 1995
35300 #18 - f19 CONTROL WIRE 7977
35300 #18 - f19 CONTROL WIRE t977
35300 #18 - #19 CONTROL WIRE 7982
35300 f18 - #19 CONTROL WIRE 1983
35300 #18 - #19 CONTROL WIRE 1985
3s300 f18 - #19 CONTROL WIRE 1993
3s300 #18 - f19 CONTROL WIRE 1995
35300 #18 - #19 CONTROL WIRE 7977
35300 #74 - fr76 CONTROL WIRE L979
3s300 *74 - #L6 CONTROL WIRE 1995
35300 #14 - #15 coNTROL WIRE L975
3s300 #r4 - #16 CoNTROL WrRt 7982
35300 #14 - #16 coNTROL WIRE 1983
3s300 #74 - #L6 CONTROL WIRE 1993
35300 #74 - *15 CONTROL WlRt 1995
35300 *L4 - #L6 CONTROL WIRE L975
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page ll of69
Version 0.0.2
Effective:
Filed on :. April 27,2016
FERC Docket No. ERl6-1507-000
35300 #14 - #15 CONTROL WrRE 7975
35300 r14 - #16 CONTROL WtRE L975
35300 #L4. #L6 CONTROL WIRE 1985
35300 #74 - #76 CONTROL WtRE 1991
35300 #L4 - #76 CONTROL WtRt 1975
3s300 #L4. #L6 CONTROL WIRE 1982
35300 #I4 - #L6 CONTROL WIRE 1983
35300 COMIAL CABLE L982
3s300 COAXIAL CABLE L982
35300 COAXIAL CABLE 1983
35300 fiLO - #L2 CONTROL WIRE L982
35300 #70 -#L2 CONTROL WtRt 1983
35300 frLO . *72 CONTROL WIRE 1985
3s300 #70 - #72 CONTROL WtRE 1985
35300 #TO - #L2 CONTROL WIRE 1991
35300 #10 - #12 CONTROL WtRE 1993
35300 #70 - #72 CONTROL WrRE 1995
3s300 #LO -#I2 CONTROL WIRE 1995
35300 #70 - #12 CoNTROL WrRE 1980
35300 #LO - fiLz CONTROL WIRE 1981
35300 *LO.*12 CONTROL WIRE L982
35300 #TO - #L2 CONTROL WIRE 1983
3s300 #LO -#72 CONTROL WIRE 1995
35300 i7O -#72 CONTROL WIRE 7975
3s300 frLO - #12 CONTROL WrRt L975
35300 #10 - #12 CONTROL WtRE L982
3s300 #10 - *72 CONTROL WrRE 1983
3s300 #LO. *T2 CONTROL WIRE 1985
35300 #7O. #L2 CONTROL WIRE 1991
3s300 #LO - #12 CONTROL WIRE 1993
3s300 #7O - *L2 CONTROL WIRE 1995
35300 frLO - #72 CONTROL WIRE 1996
3s300 #70 - #t2 CoNTROL WIRE 1981
35300 #LO. #L2 CONTROL WIRE 1984
35300 #7O. #L2 CONTROL WIRE 7987
3s300 #70 - #72 CONTROL WtRE 1995
3s300 $10 - #L2 CoNTROL W|RE 1979
3s300 #70 - #72 CONTROL WIRE 1975
35300 #TO -*L2 CONTROL WIRE 1975
3s300 fr10 - #72 CoNTROL WtRE 7975
3s300 #to - #12 coNTRoL wrRr 1981
Idaho Power Company
FERC Electric Tariff
Rate Schedules
r.158.21.2
Page 12 of69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
3s300 s10 - #12 CONTROL WIRE t982
35300 #LO - #L2 CONTROL WIRt 1983
3s300 frLO. #L2 CONTROL WIRE 1991
35300 #LO . #72 CONTROL WIRE 1995
35300 *LO - #L2 CONTROL WIRE L975
35300 #7.#9 CONTROLWIRE 7975
35300 #7 - #9 CONTROT WIRE t975
35300 #7 -#9 CONTROLWIRE L977
3s300 #7 -#9 CONTROLWIRE 1980
35300 #7 -*9 CONTROLWIRE L982
3s300 #7 -#9 CONTROLWIRE 1983
35300 #I - #6 CONTROL WIRE 1985
35300 #1 - f5 CONTROL WIRE t97S
35300 #1- #5 CONTROL WIRE 7975
35300 #L - #6 CONTROL WIRE L975
3s300 f1 . #5 CONTROL WIRE L982
35300 #L - #5 CONTROL WIRE 1983
3s300 f1 - #5 CONTROT WIRE 1995
3s300 *L-*6 CONTROL WIRE 1982
35300 #T - #6 CONTROL WIRE 1983
35300 #I - #6 CONTROL WIRE 1995
3s300 #1 - f6 CONTROL WIRE 7975
35300 #I - #6 CONTROL WIRE 7982
35300 #L - #6 CONTROL WIRE 1983
35300 fr1- #6 CONTROL WIRE 7982
3s300 fiL -*6 CONTROL WIRE 1983
3s300 f1 - #6 CONTROL WIRE 1995
35300 #1 . f6 CONTROL WIRE 1975
3s300 1/0 coPPER CONTROL WIRE 7975
35300 2/O COPPER CONTROL WIRE 7982
35300 2/0 coPPER CONTROL WIRE 1983
35300 5OO MCM ALUM CONTROLWIRE L975
3s300 1/0 ALUM CONTROT WIRE t975
35300 GROUNDING AND FITTINGS L982
35300 GROUNDING AND FITTINGS 1983
3s300 GROUNDING AND FITTINGS L975
35300 GROUNDING AND FITTINGS 7982
3s300 GROUNDING AND FITTINGS 1983
35300 #4 COPPER GROUND L975
35300 #4 COPPER GROUND 1983
3s300 f5 COPPER GROUND MAT L975
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.t58.2t.2
Page 13 of69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
t.1s8.21.2
Page l4 of69
Version 0.0.2
Effective:
Filed on ; April27,2016
35300 #6 COPPER GROUND MAT 7982
35300 #5 COPPER GROUND MAT 1983
35300 7/16 COPPER GROUND L975
3s300 7/16 COPPER GROUND L982
35300 TIL6COPPER GROUND 1983
3s300 2/O COPPER GROUND t975
3s300 2/O COPPER GROUND 7979
35300 2/O COPPER GROUND 1982
3s300 2/O COPPER GROUND 1983
35300 250 MCM COPPER GROUND L975
35300 250 MCM COPPER GROUND L979
35300 250 MCM COPPER GROUND 1980
35300 250 MCM COPPER GROUND 1942
3s300 250 MCM COPPER GROUND 1983
35300 5OO MCM COPPER GROUND L975
3s300 5OO MCM COPPER GROUND 1983
3s300 CONDUIT & FITTINGS ABOVE GROUN L977
35300 CONDUIT & FITTINGS ABOVE GROUN 7975
3s300 CONDUIT & FITTINGS ABOVE GROUN L975
35300 CONDUIT & FITTINGS ABOVE GROUN 1975
3s300 CONDUIT & FITTINGS ABOVE GROUN L982
35300 CONDUIT & FITTINGS ABOVE GROUN 1983
35300 CONDUIT & FITTINGS ABOVE GROUN 7975
35300 CONDUIT & FITTINGS ABOVE GROUN L982
35300 CONDUIT & FITTINGS ABOVE GROUN 1983
35300 CONDUIT & FITTINGS ABOVE GROUN L975
35300 CONDUIT & FITTINGS ABOVE GROUN 1975
35300 CONDUIT & FITTINGS ABOVE GROUN 1981
35300 CONDUIT & FITTINGS ABOVE GROUN L975
35300 2" -3-L/2" CONDUTT L975
35300 2" -3-U2" CONDU|T 1975
35300 2" -3-7/2" CONDUIr 1981
35300 2" -3-u2" CONDUTT t9a2
3s300 2" -3-L/2" CONDUIT 1983
3s300 2" -3-L/2" CONDU|T 7975
35300 2" -3-7/2" CONDU|T 1981
35300 2" -3-L/2" CONDU|T L982
3s300 2" -3-t/2" CONDUTT 1983
35300 2" -3-7/2" CONDUtT L975
35300 2" -3-L/2" CONDUTT L982
35300 2" -3-712" CONDUTT 1983
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page l5 of69
Version 0.0.2
Effective:
Filed on : Apil27,2016
35300 4" CONDUIT 7975
3s300 4'' CONDUIT t979
35300 4, CONDUIT L982
35300 4" CONDUIT 1983
35300 4.'CONDUIT \982
35300 4" CONDUIT 1983
35300 5,.CONDUIT L982
35300 5'' CONDUIT 1983
3s300 SMALL ELECTRICAL ENCLOSURE L975
3s300 SMALL ELECTRICAL ENCLOSURE 1981
3s300 SMALL ELECTRICAL ENCLOSURE t982
3s300 SMALL ELECTRICAL ENCLOSURE 1983
35300 1549KVA LOCAL SERVICE XFMR L975
3s300 1549KVA LOCAL SERVICE XFMR L975
35300 15-49KVA LOCAL SERVICE XFMR L975
35300 15-49KVA LOCAL SERVICE XFMR 1982
35300 15-49KVA LOCAL SERVICE XFMR 1983
35300 SWITCH - POWER FUSE L975
35300 CONTROL RACIVPANEL FRAME t975
3s300 CONTROL RACK/PANEL FRAME 1983
35300 CONTROL RACK/PANEL FRAME t975
35300 CONTROL RACK/PANEL FRAME 1996
35300 CONTROL RACK/PANEL FRAME 1975
35300 CONTROL RACK/PANEL FRAME 7975
35300 CONTROL RACK/PANEL FRAME 1983
35300 CONTROL RACK/PANEL FRAM E 1985
35300 CONTROL RACK/PANEL FRAME 1985
35300 CONTROT RACK/PANEL FRAME 1975
35300 CONTROL RACK/PANEL FRAME L975
35300 CONTROL RACK/PANEL FRAME 7975
3s300 CONTROL RACK/PANEL FRAME L975
3s300 CONTROL RACK/PANEL FRAME 7975
35300 CONTROL RACK/PANEL FRAME 1991
35300 CONTROL RACK/PANEL FRAME 1995
35300 CONTROL RACK/PANEL FRAME 1995
35300 CONTROL RACIVPANEL FRAME 1995
3s300 CONTROL RACK/PANE L FRAME 7975
35300 CONTROL COMPUTER & PERIPHERALS 199s
3s300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 199s
35300 PROTECTION EQUIPMENT 199s
FERC Docket No. ERl6-1507-000
35300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 199s
3s300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 199s
35300 PROTECTION EQUIPMENT 1996
3s300 PROTECTION EQUIPMENT 1991
3s300 PROTECTION EQUIPMENT 1991
3s300 METERING EQUIPMENT L982
3s300 METERING EQUIPMENT 1983
35300 CONTROL COMPUTER & PERIPHERA6 1996
3s300 ALARM/MONITORING EQUIPMENT 1975
3s300 METERING EQUIPMENT L982
3s300 METERING EQUIPMENT 1983
3s300 CONIROL COMPUTER & PERIPHERA6 1995
35300 METERING EQUIPMENT 1993
35300 CONTROL EOUIPMENT 1995
35300 CONTROL EQUIPMENT L974
35300 CONTROL EQUIPMENT 7975
35300 CONTROL EQUIPMENT L975
3s300 CONTROL EQUIPMENT 7975
35300 CONTROL EQUIPMENT 7975
35300 CONTROL EQUIPMENT 1980
3s300 CONTROL EQUIPMENT 1985
35300 CONTROL EQUIPMENT 1975
3s300 CONTROL EQUIPMENT 198s
35300 CONTROL EQUIPMENT L975
35300 CONTROL EQUIPMENT 1980
3s300 CONTROL EQUIPMENT 1983
35300 CONTROL EQUIPMENT 1985
35300 CONTROL EQUIPMENT 7975
3s300 CONTROL EQUIPMENT L977
35300 CONTROL EQUIPMENT 1985
35300 CONTROL EQUIPMENT 7975
35300 CONTROL EQUIPMENT L977
3s300 CONTROL EQUIPMENT 1982
35300 CONTROL EQUIPMENT 1983
35300 CONTROL EQUIPMENT 198s
3s300 CONTROL EQUIPMENT 1981
35300 CONTROL EQUIPMENT 1984
35300 CONTROL EQUIPMENT 1985
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.t58.21.2
Page 16 of69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page l7 of69
Version 0.0.2
Effective:
Filed on : April27,2016
3s300 CONTROL EQUIPMENT 1987
35300 CONTROL EQUIPMENT L975
35300 CONTROL EQUIPMENT 1985
35300 CONTROL EQUIPMENT 1995
35300 CONTROL EQUIPMENT 1995
3s300 CONTROL EQUIPMENT 1995
35300 CONTROL EQUIPMENT 1995
3s300 CONTROL EQUIPMENT 1996
3s300 SCADA RACK/PANEL FRAME L975
35300 SCADA RACK/PANEL FRAME 1983
35300 SCADA RACK/PANEL FRAME t975
3s300 SCADA RACK/PANEL FRAME 1983
35300 SCADA RACK/PANEL FRAME L975
35300 SCADA MCK/PANEL FRAME 1983
3s300 SCADA RACK/PANEL FRAME 1985
35300 SCADA EQUIPMENT t976
3s300 SCADA EQUIPMENT 1983
35300 SCADA EQUIPMENT 7976
35300 SCADA EQUIPMENT 1983
3s300 SCADA EQUIPMENT 1976
3s300 SCADA EQUIPMENT 1983
3s300 SCADA EQUIPMENT 1985
35300 YARD LOCALSERV OR LOAD CENTER 7975
3s300 48 VOLT BATTERY CHARGER L982
35300 48 VOLT BATTERY CHARGER 1983
3s300 48 VOLT BATTERY 1982
35300 48 VOLT BATTERY 1983
3s300 BATTERY RACK 7975
35300 BATTERY RACK 7982
35300 BATTERY RACK 1983
35300 LOAD CENTER, AC L975
35300 LOAD CENTER, AC L975
35300 LOAD CENTER, AC 7982
35300 LOAD CENTER, AC 1983
35300 LOAD CENTER, DC t975
35300 LOAD CENTER, DC L982
35300 LOAD CENTER, DC 1983
3s300 10 - 40 AMP CIR BRKR 1995
35300 VOLTAGE ALARM L975
35300 VOLTAGE ALARM 1983
35300 AUXILIARY POWER XFMR 1PH L975
FERC Docket No. ERl6-1507-000
35300 AUXIL]ARY POWER XFMR 1PH 1983
3s300 25KVA 1 PH XFMR 1975
35300 25KVA 1 PH XFMR 1983
3s300 5OKVA 1 PH XFMR L97s
35300 sOKVA 1 PH XFMR 1983
35300 75KVA 3 PH XFMR 7975
3s300 75KVA 3 PH XFMR 1983
35300 112KVA 3 PH XFMR 7975
35300 112KVA 3 PH XFMR 1983
35300 sOOKVA 3 PH XFMR t975
3s300 sOOKVA 3 PH XFMR 1983
35300 Lt<\tA 480/240-120 VOLT XFMR 1975
3s300 tKv A 48O/ 240-120 VOLT XFM R 1983
35300 OTHER METERING EQUIPMENT 1982
3s300 OTHER METERING EQUIPMENT 1983
35300 MISC OFFICE FURNITURE L979
3s300 MISC OFFICE FURNITURE 1983
35300 CHAIR 1975
35300 CHAIR 1983
35300 DESK 7975
3s300 DESK 1983
35300 FILE CABINET 1975
35300 FILE CABINET 7979
35300 FILE CABINET 1983
3s300 PRINT HOLDER 1975
3s300 PRINT HOLDER 1983
35300 TABLE 19s6
35300 TABLE 1983
35300 COMPUTER AND PERIPHEMLS 7992
3s300 INTERCOM SYSTEM 7975
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, EQUIPMENT 1999
39720 MICROWAVE, EQUIPMENT 1999
39720 MICROWAVE, EQUIPMENT 1999
39720 MICROWAVE, EQUIPMENT 1999
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, CARD SHELF 1999
39720 MICROWAVE, CARD SHELF 1999
39720 MICROWAVE, CARD UNIT 1999
Idaho Power Company
FERC Electric Tariff
Rate Schedules
r.158.21.2
Page l8 of69
Version 0.0.2
Effective:
Filed on : Apil27,2016
FERC Docket No. ERl6-1 507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
r.158.21.2
Page 19 of69
Version 0.0.2
Effective:
Filed on : April27,2016
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, EQUIPMENT 1999
39720 MICROWAVE, EQUIPMENT 1999
35300 #18 - #19 CONTROL WIRE 1999
35300 CONTROL RACK/PANEL FRAME 1999
35300 CONTROL COMPUTER & PERIPHERALS 1999
3s200 EQUIPMENT PAD 1999
35300 15KV POWER CABLE 1999
35300 #L8 - #19 CONTROL WlRt 1999
35300 #7O - #L2 CONTROL WIRE 1999
35300 2" -3-L12" CONDUIT 1999
35300 4- CONDUIT 1999
35300 AUXILLARY GENERATOR 1999
3s300 #L4 - #L6 CONTROL WIRE 1999
35300 CONTROL RACK/PANEL FRAME 1999
35300 CONTROL RACIVPANEL FRAME 1999
3s300 AIARM/MONITORI NG EQUIPMENT 1999
35300 ALARM/MONITORING EQUIPMENT 1999
35300 CONTROL COMPUTER & PERIPHERAL5 1999
3s300 CONTROL WIRE. LOW VOLTAGE 1999
3s300 #18 - #19 CONTROL WlRt 1999
35300 #74 - #76 CONTROL WIRE 1999
35300 #70 - #72 CONTROL WlRt 1999
3s300 PROTECTION EQUIPMENT 1999
39720 MICROWAVE, BATTERY 1999
39720 MICROWAVE, BATTERY 1999
39720 MICROWAVE, EQUIPMENT 1999
39720 MICROWAVE, EQUIPMENT 1999
35300 130 VOLT BATTERY CHARGER 2000
35300 130 VOLT BATTERY 2000
3s300 BATTERY RACK 2000
35300 SAFETY SWITCH 2000
39720 M rcRowAVE, STRUCT(POLES&FlX)1998
39720 M ICROWAVE, STR UCT( POLES&FIX)1998
39720 MICROWAVE, PANEL UNIT 1998
39720 MICROWAVE, PANEL UNIT 1998
35200 COMPLETE STATION BUILDING 200L
35200 SMOKE DETECTOR 200L
3s300 METERING EQUIPMENT 1999
35300 METERING EQUIPMENT 1999
35300 METERING EQUIPMENT 1999
FERC Docket No. ERl6-1507-000
39720 MICROWAVE, EQUIPMENT 2000
3s300 CONTROL RACK/PANEL FRAME 1998
3s200 CONDUIT & FITTINGS UNDERGROUND 2003
35300 CONTROL WIRE - LOW VOLTAGE 2003
35300 CONTROL RACK/PANEL FRAME 2003
35300 CONTROL RACK/PANEL FRAME 2003
35300 PROTECTION EQUIPMENT 2003
3s300 MDF BOARD FOR COMMUNICATIONS 2003
35300 COMMUNICATIONS EQUIP 2003
3s300 COMMUNICATIONS EQUIP 2003
3s300 COMMUNICATIONS EQUIP 2003
3s300 AUXILIARY LOAD CENTER 2003
35300 CONTACTOR 2003
35300 COMMUNICATIONS EQUIP 2004
35300 COMMUNICATIONS EQUIP 2004
3s300 CONTROL WIRE - LOW VOLTAGE 2004
39720 MICROWAVE, EQUIPMENT 2004
3s300 PROTECTION EQUIPMENT 2005
35300 DISTANCE / FAULT LOCATOR 2005
3s300 COMMUNICATIONS EQUIP 2007
35300 COMMUNICATIONS EQUIP 2007
35200 CONCRETE SURFACE TRENCH WLIDS 2007
35300 BARRIER. FENCE, EQUIP PROT 2007
35300 GRATING 2007
3s300 CONTROL WIRE - LOW VOLTAGE 2007
35300 CONTROL RACK/PANEL FRAME 2007
35300 PROTECTION EQUIPMENT 2007
35300 SCADA RACK/PANEL FRAME 2007
3s300 SCADA RACK/PANEL FRAME 2007
3s300 SCADA RACK/PANEL FRAME 2007
35300 SCADA EQUIPMENT 2007
35300 SCADA EQUIPMENT 2007
35300 SCADA COMPUTER AND PERIPHERA6 2007
3s300 AUXILIARY POWER XFMR 3 PH 2007
35300 ALARM/MONITORI NG EQUIPMENT 2008
3s300 CONTROL RACK/PANE L FRAM E 2007
3s300 CONTROL RACK/PANEL FRAME 2007
3s300 PROTECTION EQUIPMENT 2007
35300 PROTECTION EQUIPMENT 2007
39740 FIBER, MISC EQUIPMENT 2008
39740 FIBER, CARD SHELF 2008
Idaho Power Company
FERC Electric Tariff
Rate Schedules
r.158.21.2
Page20 of69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-l 507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
t.158.21.2
Page2l of69
Version 0-0.2
Effective:
Filed on :, April27,2016
39740 FIBER, CARD UNIT 2008
39740 FIBER, WIRE/CABLE 2008
35200 CONDUIT & FITTINGS UNDERGROUND 2007
3s300 CONTROL WIRE - LOW VOLTAGE zooT
3s300 GROUND]NG AND FITTINGS 2007
3s300 COMM RACK/PANEL FRAME 2007
3s300 COMM RACK/PANEL FRAME 2007
35300 COMM RACK/PANEL FRAME 2007
35300 YARD LOCAL SERV OR LOAD CENTER 2007
39120 NETWORK EQ 2009
39120 NETWORK EQ 2009
35300 CONTROL WIRE - LOW VOLTAGE 2008
35300 CONTROL WIRE. LOW VOLTAGE 2008
35300 FIBER OPTIC CABLE 2008
35300 FIBER OPTIC CABLE 2008
35300 CONDUIT & FITTINGS ABOVE GROUN 2008
35300 CONDUIT & FITTINGS ABOVE GROUN 2008
35300 CONTROL RACK/PANEL FRAME 2008
3s300 CONTROL RACK/PANEL FRAME 2008
3s300 CONTROL RACVPANEL FRAME 2008
35300 CONTROL RACK/PANEL FRAME 2008
3s300 PROTECTION EQUIPMENT 2008
35300 PROTECTION EQUIPMENT 2008
3s300 PROTECTION EQUIPMENT 2008
35300 PROTECTION EQUIPMENT 2008
35300 COMMUNICATIONS EQUIP 2008
35300 COMMUNICATIONS EqUIP 2008
35300 COMMUNICATIONS EQUIP 2008
35300 COMMUNICATIONS EQUIP 2008
39720 MICROWAVE, BATTERY 2009
39720 M ICROWAVE, BATTERY CHARGER 2009
39720 MICROWAVE, EQUIPMENT 2009
35300 COMM RACK/PANEL FRAME 2009
3s300 COMMUNICATIONS EQUIP 2009
3s300 CONTROL WIRE - LOW VOLTAGE 2009
35300 CONDUIT & FITTINGS ABOVE GROUN 2009
3s300 AUXILIARY LOAD CENTER 2009
35200 BUILDING HVAC SYSTEM 2009
35200 BUILDING HVAC SYSTEM 20LO
3s300 CONTROL WIRE - LOW VOLTAGE 2017
35300 GROUNDING AND FITTINGS 20L7
FERC Docket No. ERl6-1507-000
35300 LARGE ELECTRICAL ENCLOSURE 2077
3s300 COMPOSITE CABLE - LOW VOLTAGE 2070
35300 COMMUNICATIONS EQUIP 20L0
3s300 COMMUNICATIONS EQUIP 207L
3s300 CONTROL WIRE - LOW VOLTAGE 20L2
3s300 CONTROL WIRE - LOW VOLTAGE 2072
3s300 COMM RACK/PANEL FRAME 2072
3s300 COMM RACK/PANEL FRAME 2072
3s300 COMMUNICATIONS EQUIP 20L2
35300 COMMUNICATIONS EQUIP 2012
35300 CONTROL WIRE . LOW VOLTAGE 20L2
35300 CONTROL WIRE - LOW VOLTAGE 2072
3s300 COMM RACK/PANEL FRAME 20L2
35300 COMM RACK/PANEL FRAME 2072
3s300 COMMUNICATIONS EQUIP 20L2
3s300 COMMUNICATIONS EQUIP 2072
35300 COMMUNICATIONS EQUIP 20L2
35300 COMMUNICATIONS EQUIP 2072
35200 CONDUIT & FITTINGS UNDERGROUND 2010
3s200 CONDUIT & FITTINGS UNDERGROUND 2010
35300 CONTROL WIRE - LOW VOLTAGE 20LO
35300 CONTROL WIRE - tOW VOLTAGE 2070
3s300 COAXIAL CABLE 20LO
35300 COAXIAL CABLE 2070
35300 CONTROL RACK/PANE L FRAM E 2070
3s300 CONTROL RACK/PANE L FRAM E 20LO
35300 CONTROL RACK/PANEt FRAME 2010
3s300 CONTROL RACK/PANEL FRAME 20L0
35300 CONTROL RACK/PANEt FRAME 2010
3s300 CONTROL RACK/PANE L FRAME 20L0
3s300 PROTECTION EQUIPMENT 20to
35300 PROTECTION EQUIPMENT 20L0
3s300 PROTECTION EQUIPMENT 20\0
3s300 PROTECTION EQUIPMENT 20LO
35300 PROTECTION EQUIPMENT 20L0
3s300 PROTECTION EQUIPMENT 2070
35300 COMMUNICATIONS EQUIP 2010
35300 COMMUNICATIONS EQUIP 20LO
35300 AUXILIARY LOAD CENTER 2070
35300 AUXILIARY LOAD CENTER 2010
3s300 CONTROL WIRE - LOW VOLTAGE 20to
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.1s8.2t.2
Page 22 of 69
Version 0.0.2
Effective:
Filed on : April 27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.t58.21.2
Page 23 of 69
Version 0.0.2
Effective:
Filed on : April27,2016
35300 CONTROL WIRE . LOW VOLTAGE 2010
35300 COMPOSITE CABLE - LOW VOLTAGE 2070
35300 COMPOSITE CABLE - LOW VOLTAGE 2010
35300 COAXIAL CABLE 2070
35300 COAXIAL CABLE 20L0
3s300 CONTROL RACK/PANEL FRAME 2070
35300 CONTROL RACK/PANEL FRAME 2010
35300 CONTROL RACK/PANEL FRAME 2070
35300 CONTROL RACK/PANEL FRAME 2010
3s300 CONTROL RACK/PANEL FRAME 2010
3s300 CONTROL RACK/PANEL FRAME 20LO
3s300 CONTROL RACK/PANE L FRAME 2010
35300 CONTROL RACK/PANEL FRAME 20to
3s300 CONTROL RACK/PANEL FRAME 2010
35300 CONTROL RACK/PANEL FRAME 2070
3s300 CONTROL RACK/PANEL FRAME 20to
3s300 CONTROL RACK/PAN EL FRAME 2010
35300 PROTECTION EQUIPMENT 20LO
3s300 PROTECTION EQUIPMENT 2010
35300 PROTECTION EQUIPMENT 2010
35300 PROTECTION EQUIPMENT 2010
3s300 PROTECTION EQUIPMENT 2070
3s300 PROTECTION EQUIPMENT 2070
3s300 CONTROL EQUIPMENT 2010
3s300 CONTROL EQUIPMENT 2010
35300 COMMUNICATIONS EQUIP 2010
35300 COMMUNICATIONS EQUIP 2010
35300 PROTECTION EQUIPMENT 20L2
35300 CONTROL WIRE - LOW VOLTAGE 2072
3s300 GROUNDING AND FITTINGS 2072
3s300 CONDUIT & FITTINGS ABOVE GROUN 2072
3s300 TARGE ELECTRICAL ENCLOSURE 2072
35300 YARD LOCAL SERV OR LOAD CENTER 2012
3s300 CONTROL WIRE - LOW VOLTAGE 2008
35300 CONTROL WIRE - LOW VOLTAGE 2008
3s300 FIBER OPTIC CABLE 2008
3s300 FIBER OPTIC CABLE 2008
35300 CONDUIT & FITTINGS ABOVE GROUN 2008
35300 CONDUIT & FITTINGS ABOVE GROUN 2008
35300 CONTROL RACK/PANEL FRAME 2008
3s300 CONTROL RACK/PANEL FRAME 2008
FERC Docket No. ERl6-1507-000
3s300 CONTROL RACK/PANEL FRAME 2008
35300 CONTROL RACK/PANEL FRAM E 2008
35300 PROTECTION EOUIPMENT 2008
3s300 PROTECflON EQUIPMENT 2008
35300 PROTECTION EQUIPMENT 2008
35300 PROTECTION EQUIPMENT 2008
35300 COMMUNICATIONS EQUIP 2008
3s300 COMMUNICATIONS EQUIP 2008
3s300 COMMUNICATIONS EQUIP 2008
3s300 COMMUNICATIONS EQUIP 2008
3s300 COMMUNICATIONS EQUIP 2007
3s300 COMMUNICATIONS EQUIP 2007
35300 METERING EQUIPMENT 2072
3s200 CONCRETE SURFACE TRENCH W/LIDS 2073
35300 STN POWER CABLE AND FITTINGS 20t3
36600 PAD-3PH SECT ENCLOSURE- PRIMAR 20L3
36600 VAULT BASE SECTION 2073
36600 VAULT TOP SECTION 20L3
36600 CONDUIT DUST-DIRECT BURIAL.PRI 2073
36700 UG CONDUCTOR-PRIMARY 15KV 2013
35700 SECT ENCLOSURE 3PH . PRIMARY 20L3
3s300 GROUNDING AND FITTINGS 20L3
39720 M lcRowAVE, STR UCT(POLES&FrX)2072
39720 MICROWAVE, EQUIPMENT 2012
39720 MICROWAVE, WIRE/CABLE 20L2
35300 CONTROL RACK/PANEL FRAME 2015
3s300 CONTROL EQUIPMENT 2075
3s300 ALARM/MONITORING EQUIPMENT 20L5
39720 MICROWAVE, BATTERY CHARGER 2074
39740 FIBER, CARD UNIT 2075
35300 COMMUNICATIONS EQUIP 20L2
3s300 CIP SECURIW SYSTEM 2074
35300 COMMUNICATIONS EQUIP 2014
3s200 FOUNDATION . COMMUNICATION 20L2
Idaho Power Company
FERC Electric Tariff
Rate Schedules
t.158.2t.2
Page24 of 69
Version 0.0.2
Effective:
Filed on : April27,2016
Hemingway Transmission Station
FERC Acct Heminsway Asset DescriDtion Vintaee
35011 LAND OWNED IN FEE TS 2008
35300 COMMUNICATIONS EQUIP 207t
35200 SITE PREPARATION & IMPROVEMENT 20L0
3s200 PERIMETER FENCE & GATES 20L0
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 25 of 69
Version 0.0.2
Effective:
Filed on : April 27 ,2016
35200 WATER SYSTEM 2070
35200 WATER WELL 2010
35200 COMPLETE SEPTIC SYSTEM 2010
35200 YARD LIGHTSYSTEM 20LO
35200 FOUNDATION - STATION BUILDING 2010
35200 COMPLETE STATION BUILDING 2010
35200 BUILDING PLUMBING SYSTEM 20ro
35200 BUILDING HVAC SYSTEM 2070
35200 BUILDING ELECTRICAL SYSTEM 20LO
35200 BUILDING FIRE PROTECTION 2010
3s200 FOUNDATION - STRUCTURE 2010
35200 FOUNDATION . OTHER EQUIPMENT 20LO
3s200 CONCRETE SURFACE TRENCH WLIDS 2070
35200 CONDUIT & FITTINGS UNDERGROUND 2010
35200 METAL STRUCT - OTHER SUPPORT 20L0
35200 METAL STRUCT - EQUIPMENT 2070
35200 WOOD POLE - MISC 2010
35300 CABLE TRAY AND ACCESSORIES 2010
3s300 CABLE TRAY AND ACCESSORIES 2010
35300 CABLE TRAY AND ACCESSORIES 20t0
35300 CABLE TRAY AN D ACCESSORIES 2070
35300 CABLE TRAY AND ACCESSORIES 20LO
35300 CABLE TRAY AND ACCESSORIES 20to
3s300 CABLE TRAY AND ACCESSORIES 20LO
35300 CABLE TRAY AND ACCESSORIES 20LO
35300 CABLE TRAY AND ACCESSORIES 2010
35300 INSUI.ATORS - PIN OR POST 2010
35300 BUS. RIGID WITH FITTINGS 20LO
35300 STN POWER CABLE AND FITTINGS 2070
35300 STN POWER CABLE AND FITTINGS 20LO
35300 CONTROL WIRE - LOW VOLTAGE 2010
35300 CONTROL WIRE - LOW VOLTAGE 20LO
35300 COAXIAL CABLE 2010
35300 FIBER OPTIC CABLE 20to
35300 GROUNDING AND FITTINGS 20LO
35300 75KVA LOCAL SERVICE XFMR 2070
35300 5OO-1499KVA LOCAL SERVICE XFMR 2010
3s300 SWITCH - POWER FUSE 20LO
35300 CONTROL RACK/PANEL FRAME 2070
35300 CONTROL RACK/PANEL FRAME 2070
35300 CONTROL RACK/PANEL FRAME 20LO
FERC Docket No. ERl6-1507-000
35300 CONTROL RACK/PAN E L FRAME 2010
35300 CONTROL RACK/PANEL FRAM E 20LO
3s300 CONTROL RACK/PANEL FRAME 2010
3s300 CONTROL RACK/PANEL FRAME 2010
3s300 CONTROL RACK/PANEL FRAME 2070
3s300 CONTROL RACK/PAN EL FRAME 20L0
35300 CONTROL RACK/PANEL FRAM E 2010
3s300 CONTROL RACK/PANEL FRAME 2010
3s300 CONTROL MCK/PANEL FRAME 2010
35300 CONTROL RACK/PANEL FRAME 20to
35300 CONTROL RACK/PANEL FRAME 20L0
35300 CONTROL RACK/PANEL FRAM E 2010
35300 CONTROL RACK/PANEL FRAME 20to
3s300 CONTROL RACK/PANEL FRAME 20to
35300 CONTROL RACK/PANEL FRAME 2010
3s300 CONTROL RACK/PANEL FRAME 2010
35300 CONTROL RACK/PANEL FRAME 2070
3s300 CONTROL RACK/PANEL FRAM E 2010
35300 CONTROL RACK/PANE L FRAME 2070
35300 CONTROL RACK/PANEL FRAME 2070
35300 CONTROL RACK/PANEL FRAME 2070
35300 CONTROL MCK/PANEL FRAME 2010
35300 CONTROL RACK/PANEL FRAME 20LO
3s300 CONTROL RACK/PANE L FRAME 2010
35300 CONTROL RACK/PANEL FRAME 2010
3s300 CONTROL RACK/PANEL FRAME 20ro
3s300 CONTROL RACK/PANEL FRAME 2010
3s300 CONTROL RACK/PANEL FRAME 20t0
35300 CONTROL RACK/PANEL FRAME 2070
3s300 CONTROL RACK/PANEL FRAM E 2070
35300 CONTROL RACK/PANE L FRAME 2010
35300 PROTECTION EQUIPMENT 2010
3s300 PROTECTION EQUIPMENT 20LO
35300 PROTECTION EQUIPMENT 2010
35300 PROTECTION EOUIPMENT 2070
3s300 PROTECTION EQUIPMENT 2010
35300 PROTECTION EQUIPMENT 20to
3s300 PROTECTION EQUIPMENT 2010
35300 PROTECTION EQUIPMENT 2010
3s300 CONTROL EQUIPMENT 20LO
35300 CONTROL EQUIPMENT 2070
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.2t.2
Page26 of69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
35300 METERING E
1.158.21.2
Page27 of69
Version 0.0.2
Effective:
Filed on : Apnl27,2016
35300 ALARM/MONITORING EQUIPMENT 20LO
35300 SCADA RACK/PANEL FRAME 20t0
35300 SCADA RACK/PANEL FRAME 2010
35300 SCADA RACK/PANEL FRAME 2010
35300 SCADA RACK/PANEL FRAME 20LO
35300 SCADA RACK/PANEL FRAME 20L0
3s300 SCADA EQUIPMENT 2070
35300 SCADA EQUIPMENT 20LO
35300 SCADA EQUIPMENT 20to
3s300 SCADA EQUIPMENT 2010
3s300 SCADA EQUIPMENT 2070
35300 COMM RACK/PANEL FRAME 20LO
35300 COMM RACK/PANEL FRAME 20L0
35300 COMM RACIVPANEL FRAME 2070
3s300 COMM MCK/PANEL FRAME 20LO
35300 COMM RACK/PANEL FRAME 2010
35300 COMM RACK/PANEL FRAME 2010
35300 COMM RACK/PANEL FRAME 2010
35300 COMM RACK/PANEL FRAME 2010
35300 DISTANCE / TAUIT LOCATOR 20to
35300 COMMUNICATIONS EQUIP 2010
35300 COMMUNICATIONS EQUIP 2070
35300 COMMUNICATIONS EQUIP 20L0
35300 COMMUNICATIONS EQUIP 2010
3s300 COMMUNICATIONS EQUIP 2010
35300 COMMUNICATIONS EQUIP 2070
3s300 COMMUNICATIONS EQUIP 20LO
35300 COMMUNICATIONS EQUIP 2010
3s300 YARD LOCAT SERV OR LOAD CENTER 2010
35300 48 VOLT BATTERY CHARGER 2010
35300 48 VOLT BATTERY CHARGER 2070
35300 130 VOLT BATTERY CHARGER 2010
3s300 48 VOLT BATTERY 2010
35300 130 VOLT BATTERY 2070
3s300 BATTERY RACK 2010
35300 TRANSFER SWITCH 2070
35300 BUILDING SECURITY SYSTEM 2010
3s300 BUILDING SECURITY SYSTEM 2010
35300 BOX, CABINET OR PANEL 2070
35300 MISC OFFICE FURNITURE 20L0
FERC Docket No. ERl6-1507-000
3s300 MISC OFFICE EQUIPMENT 2070
3s300 COMMUNICATIONS EQUIP 20L7
35200 WOOD POLE - MISC 2073
35300 CONTROL WIRE - LOW VOLTAGE 2013
35300 FIBER OPTIC CABLE 2013
35300 GROUNDING AND FIfiINGS 2013
35300 CONDUIT & FITTINGS ABOVE GROUN 2013
35300 COMM RACK/PANEL FRAME 20t3
35300 COMM RACK/PANEL FRAME 20L3
35300 COMMUNICATIONS EQUIP 2013
3s200 SITE PREPARATION & IMPROVEMENT 2014
3s300 BUILDING SECURIW SYSTEM 20L4
35300 PROTECTION EQUIPMENT 2015
397LO TELEPHONE, VOICE TERMINALS 2074
39740 FIBER, MISC EQUIPMENT 2014
39740 FIBER, WIRE/CABLE 20L4
35300 BUILDING SECURITY SYSTEM 2073
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.2t.2
Page 28 of69
Version 0.0.2
Effective:
Filed on : Apil27,2016
Kinport Transmission Station
FERC Acct Kinport Asset Description VintaSe
35011 LAND OWNED IN FEE TS L970
35011 LAND OWNED IN FEE TS 7972
35011 LAND OWNED IN FEE TS 1976
35200 RETAINING WALLS t972
3s200 SITE PREPARATION & IMPROVEMENT 7972
3s200 DRAINAGE SYSTEMS-CULVERTS, ETC L972
35200 YARD SURFACING - GRAVEI" ETC.7972
35200 YARD SURFACING - GRAVEL, ETC.L976
3s200 YARD SURFACING - GRAVEL, ETC.7979
35200 SITE EXCAVATION L972
35200 BLACKTOP 7972
3s200 GRAVEL 7972
35200 GRAVEL \976
35200 CULVERTS 7972
35200 ROAD EXCAVATION t972
35200 ROAD REGRADING 1984
35200 CONCRETE WALK 1980
3s200 PERIMETER FENCE & GATES L976
35200 PERIMETER FENCE & GATES L992
3s200 WATER WELL PUMP 1976
FERC Docket No. ERl6-1507-000
35200 WATER SYSTEM L976
35200 WATER WELL 7976
35200 COMPLETE SEPTIC SYSTEM L976
35200 WATER STOMGE RESERVOIR 7976
35200 YARD LIGHT SYSTEM 7976
35200 YARD LIGHT SYSTEM 1980
3s200 YARD TIGHTSYSTEM 1992
35200 YARD LIGHT SYSTEM 7976
35200 YARD LIGHT SYSTEM 1980
3s200 YARD LIGHT SYSTEM 7976
35200 LIGHT STANDARD 7976
3s200 LIGHT STANDARD 1992
35200 FOUNDATION . CONDENSER BLDG 1980
35200 FOUNDATION - STATION BUILDING L976
35200 COMPLETE STATION BUILDING L976
35200 COMPLETE STATION BUILDING 1980
3s200 COMPLETE CONDENSER CNTRL BLDG 1980
35200 COMPLETE CONDENSER CNTRL BLDG 1980
3s200 PIPING FOR PLUMBING L976
35200 SHOWER 7976
35200 WATER HEATER t975
35200 BUILDING HVAC SYSTEM 7976
3s200 HEATER & AIR COND]TIONER COMBI 1980
35200 HEATER & AIR CONDITIONER COMBI 1980
35200 AIR CONDITIONER TRANSFORMER 1980
35200 BUILDING ELECTRICAL SYSTEM t976
35200 BUILDING ELECTRICAL SYSTEM t976
3s200 BUILDING LI6HT FIXTURE 1980
35200 BUILDING ELECTRICAL SYSTEM 1980
35200 BUILDING ELECTRICAL SYSTEM L976
3s200 BUILDING ELECTRICAL SYSTEM 1980
3s200 D.C. EMERGENCY FIXTURE L976
35200 BUILDING ELECTRICAL SYSTEM 1976
35200 CATWALK FND L976
3s200 FOUNDATION - COMMUNICATION L976
35200 COMMUNICATION BOX FND 7976
35200 EQUIPMENT PAD 1980
35200 OUTDOOR CABINET FND 1993
35200 FOUNDATION - METAL CI.AD 7976
35200 LIGHTING MAST FND 1992
35200 TUNNELS 7976
Idaho Power Company
FERC Electric Tariff
Rate Schedules
t.158.21.2
Page29 of69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
3s200 CONCRETE SURFACE TRENCH WLIDS t976
35200 CONCRETE SURFACE TRENCH W/LIDS 1981
35200 CONCRETE SURFACE TRENCH WLIDS 1992
3s200 CONDUIT & FITTINGS UNDERGROUND t979
35200 CONDUIT & FITTINGS UNDERGROUND 1980
35200 CONDUIT UNDER GROUND CABLEWAY 1981
3s200 CONDUIT & FITTINGS UNDERGROUND 1981
35200 UNIWALKS 7976
35200 CONCRETE MAN HOLE WCOVER 1981
35200 CONCRETE MANHOLE WCOVER L992
3s200 CABLE RISER SUPPORT 1976
35200 CATWALK STRUCTURE t976
3s200 METAL STRUCT - COMMUNICATION L976
3s200 STATIC BAR SUPPORT STRUCTURE 1976
3s200 WELL HOUSE (INACTIVE)1976
35200 TOOL SHED, MAINT BLDG, ETC L976
3s200 HEATERS t976
35200 LIGHTING L976
3s200 PLUMBING 1976
3s300 BARRIER - FIRE, SWITCHING, ETC L976
35300 HANDRAIL 1976
35300 GRATING L976
35300 CABLE TRAY AND ACCESSORIES 7976
35300 2/O AWG CONDUCTOR COPPER 1985
35300 250 MCM CONDUCTOR COPPER 1981
35300 266.8 MCM CONDUCTOR ALUMINUM 1976
3s300 336.4 MCM CONDUCTOR ALUMINUM L976
35300 397.5 MCM CONDUCTOR ALUMINUM 7976
3s300 15KV POWER CABLE t976
3s300 15KV POWER CABLE 1976
35300 15KV POWER CABLE 1980
3s300 15KV POWER CABLE L976
35300 CONTROL WIRE - LOW VOLTAGE L976
3s300 CONTROL WIRE - LOW VOLTAGE r976
35300 #18 - #19 CONTROL WrRE 1991
3s300 #18 - #19 CONTROL WtRt 1995
3s300 f18 - #19 CONTROL WtRE 1976
35300 #18 - #19 CONTROL WtRE 1980
3s300 #78 - #L9 CONTROL WIRE 1981
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 30 of69
Version 0.0.2
Effective:
Filed on : April27,2016
CONCRETE ABOVE GROUND
CABLEWAY 797635200
FERC Docket No. ERl6-1507-000
35300 #18 - #19 CONTROL WlRt 1986
35300 #18 - #19 CONTROL WIRE 1990
35300 f18 - #19 CONTROL WIRE 1991
3s300 #18 - #19 CONTROL WIRE L992
35300 #18 - #19 CONTROL WlRt 1993
35300 #18 - #19 CONTROL WIRE 199s
35300 #18 - #19 CONTROL WlRt 1995
35300 #18 - f19 CONTROL WIRE 1997
35300 #18 - f19 CONTROL WIRE 1980
35300 #78 - fiLg CONTROL WlRt 7992
35300 f18 - f19 CONTROL WIRE 7976
35300 #18 - f19 CONTROL WIRE 7979
3s300 f18 - #19 CONTROL WIRE 1981
35300 #18 - #19 CONTROL WlRt 1991
35300 f18 - #19 CONTROL WIRE t992
35300 f18 - #19 CONTROL WlRt 7976
3s300 #18 - f19 CONTROL WIRE 7979
35300 #18 - #19 CONTROL WlRt 1982
3s300 *14 - #16 CONTROL WIRE 7976
3s300 #14 - #16 CONTROL WlRt 7979
35300 #L4 - #L6 CONTROL WIRE 1981
35300 #14 -#16 CONTROL WlRt 1995
35300 #L4.#L6 CONTROL WIRE 1992
35300 #14 - #L6 CONTROL WlRt t976
35300 *74 - #16 CONTROL WIRE t979
3s300 #74 -#L6 CONTROL WIRE 1991
35300 #74. #L5 CONTROL WIRE 1992
3s300 #L4 - #L6 CONTROL WIRE 1993
35300 #14 -#t5 CoNTROL WIRE 1980
3s300 #14. #L5 CONTROL WIRE 1980
35300 #74 - #76 CONTROL WIRE 1993
35300 #74 - #76 CONTROL WIRE 7996
3s300 #74 - #76 CONTROL WIRE 1990
35300 *14 - #76 CONTROL WIRE 1980
3s300 #74 - #L6 CONTROL WIRE 1981
3s300 fi]^4.*L6 CONTROL WIRE 1991
35300 #L4 -#L6 CONTROL WIRE L976
35300 *I4. #L5 CONTROL WIRE 1980
35300 frI4 -#L6 CONTROL WIRE 1981
35300 #14 - #L6 CONTROL WIRE 1990
35300 COAXIAL CABLE 7976
Idaho Power CompanY
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page3l of69
Version 0.0.2
Effective:
Filed on : April27,2016FERC Docket No. ERl6-1507-000
3s300 #70 - #72 CONTROL WtRE t976
3s300 #LO -#L2 CONTROL WIRE 1980
35300 #LO -#L2 CONTROL WIRE 1981
35300 #LO -#L2 CONTROL WIRE 7992
3s300 #70 -#72 CONTROL WtRE 1996
35300 #70 -#L2 CONTROL WIRE 1980
35300 #LO. #L2 CONTROL WIRE 1980
3s300 #70 - #72 CONTROL WrRE 1990
3s300 #70 - #12 CONTROL W|RE 1991
35300 #10 - #12 CONTROL WIRE 1992
3s300 #10 - #72 CoNTROL WrRE 1995
3s300 fito - #12 CoNTROL WtRE 7979
35300 #LO -#L2 CONTROL WIRE 1980
3s300 #10 - #12 CONTROL WrRE 1995
35300 frIO -*L2 CONTROL WIRE L976
35300 #LO. #72 CONTROL WIRE 1980
35300 #70 - #12 CONTROL WrRE 1981
3s300 #to - #72 CoNTROL W|RE 1981
35300 #70 - #72 CONTROL WtRE 1991
3s300 #LO - #!2 CONTROL WIRE 1992
3s300 #70 - #72 CONTROL WtRE 1996
35300 fr70 -#72 CONTROL WtRE 1980
35300 frLO - #L2 CONTROL WIRE L992
35300 #70 - #72 CONTROL WtRt 1976
35300 #10 - #L2 CONTROL WIRE 1992
35300 #LO - #L2 CONTROL WIRE 1980
35300 #70 - #12 coNTROL WrRE 1981
35300 #t0 -#L2 CoNTROL WtRt L984
35300 #TO - fiL2 CONTROL WIRE L987
3s300 #\O - #12 CONTROL WIRE 1995
35300 #1O -#L2 CONTROL WIRE 7979
35300 #10 -#72 coNTROL WrRE L976
3s300 *TO -#L2 CONTROL WIRE 1983
3s300 #LO -#I2 CONTROL WIRE 1991
35300 #tO - fiLz CONTROL WIRE 7992
35300 #10 - #72 coNTROL WrRE 1995
3s300 #TO - #L2 CONTROL WIRE 1996
35300 #10 - #12 CONTROL W|RE L976
3s300 #TO - #L2 CONTROL WIRE 1981
35300 #LO -#72 CONTROL WIRE 1981
3s300 #TO - #L2 CONTROL WIRE 7976
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page32 of69
Version 0.0.2
Effective:
Filed on : April 27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 33 of69
Version 0.0.2
Effective:
Filed on : April27,2016
35300 #LO -#72 CONTROL WIRE
3s300 fr7 -#9 CONTROLWIRE 1981
35300 #7.#9 CONTROLWIRE 7976
35300 #7 -#9 CONTROLWIRE L979
35300 #7 -#9 CONTROLWIRE 1983
35300 #7 -#9 CONTROLWIRE L976
35300 #7 -#9 CONTROLWIRE 1980
35300 *7 -#9 CONTROLWIRE 1983
35300 #7 -#9 CONTROLWIRE 1981
35300 *7 -*9 CONTROTWIRE 1980
35300 #1 - #6 CONTROL WIRE L992
35300 #I - fi6 CONTROL WIRE 1976
35300 #1 - #6 CONTROL WIRE 1981
35300 #1- #6 CONTROL WIRE 1980
3s300 f1 . #6 CONTROL WIRE 1980
35300 #1 - #5 CONTROL WIRE L976
35300 #L. #6 CONTROL WIRE L976
35300 #L - #6 CONTROL WIRE 1976
35300 #1 . #6 CONTROL WIRE 7992
35300 f1- #6 CONTROL WIRE t975
3s300 #1- #6 CONTROL WIRE 7979
3s300 #I. #6 CONTROL WIRE t992
35300 1/O ALUM CONTROL WIRE 1980
35300 2/0 coPPER CONTROL WIRE L976
35300 250 MCM ALUM CONTROLWIRE 7976
35300 250 MCM ALUM CONTROL WIRE t976
3s300 350 MCM COPPER CONTROL WIRE 7976
35300 350 MCM COPPER CONTROL WIRE 7976
35300 350 MCM COPPER CONTROL WIRE 1980
35300 350 MCM COPPER CONTROL WIRE 1980
35300 5OO MCM ALUM CONTROLWIRE 7976
35300 750 MCM COPPER CONTROL WIRE 1980
35300 1OOO MCM COPPER CONTROL WIRE 1980
35300 1/O ALUM CONTROL WIRE 1980
35300 COMPOSITE CABLE - LOW VOLTAGE 1995
35300 COMPOSITE CABLE - LOW VOLTAGE 1996
35300 GROUNDING AND FITTINGS 7992
35300 GROUNDING AND FITTINGS L976
35300 #5 COPPER GROUND MAT L976
3s300 fi5 COPPER GROUND MAT 1980
3s300 #5 COPPER GROUND MAT 7992
FERC Docket No. ERl6-1507-000
35300 #7 COPPER GROUND 7976
3s300 7/16 COPPER GROUND 1976
35300 216 COPPER GROUND 7992
35300 2/O COPPER GROUND 7976
35300 2/O COPPER GROUND 1979
35300 2/O COPPER GROUND 1980
3s300 2/O COPPER GROUND 1981
35300 2/O COPPER GROUND 7984
35300 2/O COPPER GROUND 1985
3s300 2/O COPPER GROUND 7987
35300 2/O COPPER GROUND 1992
3s300 4/O ALUMINUM GROUND L976
35300 250 MCM COPPER GROUND 7976
35300 250 MCM COPPER GROUND L979
3s300 250 MCM COPPER GROUND 1980
35300 250 MCM COPPER GROUND 1981
35300 250 MCM COPPER GROUND 7992
3s300 5OO MCM COPPER GROUND 1976
3s300 5OO MCM COPPER GROUND 1980
35300 CONDUIT & FITTINGS ABOVE GROUN 1976
3s300 CONDUIT & FITTINGS ABOVE GROUN 7979
35300 CONDUIT & FITTINGS ABOVE GROUN 7976
35300 CONDUIT & FITTINGS ABOVE GROUN t976
35300 CONDUIT & FITTINGS ABOVE GROUN t992
35300 CONDUIT & FITTINGS ABOVE GROUN 7976
35300 CONDUIT & FITTINGS ABOVE GROUN L976
35300 CONDUIT & FITTINGS ABOVE GROUN !976
35300 CONDUIT & FITTINGS ABOVE GROUN 7979
3s300 CONDUIT & FITTINGS ABOVE GROUN 1981
3s300 CONDUIT & FITTINGS ABOVE GROUN 7976
35300 CONDUIT & FITTINGS ABOVE GROUN L976
3s300 CONDUIT & FITTINGS ABOVE GROUN 1981
35300 CONDUIT & FITTINGS ABOVE GROUN 1980
35300 CONDUIT & FITTINGS ABOVE GROUN L976
3s300 CONDUIT & FITTINGS ABOVE GROUN L976
3s300 CONDUIT & FITTINGS ABOVE GROUN 1979
3s300 CONDUIT & FITTINGS ABOVE GROUN L976
35300 2" -3-U2" CONDUTT 1976
35300 2" -3-L/2" CONDUTT 1976
35300 2" -3-U2" CONDUIT L992
3s300 2" -3-L/2" CONDUTT 7992
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 34 of 69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
3s300 2" -3-t/2" CONDUIT
1.158.21.2
Page 35 of69
Version 0.0.2
Effective:
Filed on : April 27,2016
35300 4'' CONDUIT 1976
35300 4'' CONDUIT 7979
35300 4'' CONDUIT L992
35300 4'' CONDUIT L976
35300 5.'CONDUIT t979
35300 5" CONDUIT L992
35300 SMALL ELECTRICAL ENCLOSURE L992
35300 SMALL ELECTRICAL ENCLOSURE 7976
3s300 SMALL ELECTRICAL ENCLOSURE 1981
35300 SMALL ELECTRICAL ENCLOSURE L992
3s300 5OO-1499KVA LOCAL SERVICE XFMR 1980
3s300 5OO.1499KVA LOCAL SERVICE XFMR 1980
35300 UNDER 15KVA LOCAL SERVICE XFMR L982
3s300 15-49KVA LOCAL SERVICE XFMR L976
35300 15-49KVA LOCAL SERVICE XFMR 1992
35300 167-499KVA LOCAL SERVICE XFMR 1981
35300 5OO-1499KVA LOCAL SERVICE XFMR 1973
35300 5OO-1499KVA LOCAL SERVICE XFMR 1981
3s300 CONTROL RACK/PANEL FRAME 7976
3s300 CONTROL RACK/PANEL FRAME 7976
3s300 CONTROL RACK/PANEL FRAME 1976
35300 SWITCHBOARD RACK OR PANEL 1980
3s300 CONTROL RACK/PANEL FRAME 1980
35300 CONTROL RACK/PANEL FRAME 7976
3s300 CONTROL RACK/PANEL FRAME 7976
35300 CONTROL RACK/PANEL FRAME 1976
3s300 CONTROL RACK/PANEL FRAME 7976
35300 CONTROL RACK/PAN EL FRAM E 7976
35300 SWITCHBOARD RACK OR PANEL 1980
35300 CONTROL RACK/PANEL FRAME 1980
35300 SWITCHBOARD RACK OR PANEL 1980
3s300 CONTROL RACK/PANEL FRAME 1980
35300 SWITCHBOARD RACK OR PANEL 1980
3s300 CONTROL RACK/PAN EL FRAME 1980
35300 SWITCHBOARD RACK OR PANEL 1980
3s300 CONTROL RACK/PANEL FRAME 1980
3s300 SWITCHBOARD RACK OR PANEL 1980
35300 CONTROL RACK/PANEL FRAME 1980
3s300 SWITCHBOARD RACK OR PANEL 1980
3s300 CONTROL RACK/PANEL FRAM E 1980
FERC Docket No. ERl6-1507-000
35300 CONTROL RACK/PANEL FRAME 1980
35300 SWITCHBOARD RACK OR PANEL 1980
3s300 CONTROL RACK/PANEL FRAME 1980
35300 SWITCHBOARD RACK OR PANEL 1980
3s300 CONTROL RACK/PANEL FRAME 1980
3s300 CONTROL RACK/PANEL FRAME 7992
35300 CONTROL RACK/PANEL FRAME t976
3s300 CONTROL RACK,/PANEL FRAME 7997
35300 CONTROL RACK/PANEL FRAME 1991
35300 CONTROL RACK/PANEL FRAME 1995
35300 CONTROL RACK/PANEL FRAME L975
3s300 CONTROL RACK/PANEL FRAME 7976
35300 CONTROL RACK/PANEL FRAM E 1976
3s300 CONTROL RACK/PANEL FRAME 1990
35300 CONTROL RACK/PANEL FRAME 1995
35300 SWITCHBOARD RACK OR PANEL 1980
3s300 CONTROL RACK/PANEL FRAME 1980
35300 SWITCHBOARD RACK OR PANEL 1980
35300 CONTROL RACK/PANEL FRAME 1980
3s300 CONTROL RACK/PANEL FRAME !976
3s300 SWITCHBOARD RACK OR PANET 7979
3s300 CONTROL RACK/PAN EL FRAM E L979
35300 CONTROL RACK/PANEL FRAME 1992
35300 CONTROL RACK/PANEL FRAME L976
3s300 CONTROL RACK/PANEL FRAME 7976
3s300 PROTECTION EQUIPMENT 7992
35300 CONTROL COMPUTER & PERIPHERALS 1996
35300 PROTECTION EQUIPMENT 1996
35300 PROTECTION EQUIPMENT 1995
3s300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 1981
35300 PROTECTION EQUIPMENT 1990
35300 PROTECTION EQUIPMENT 1996
3s300 PROTECTION EQUIPMENT 1996
35300 PROTECTION EQUIPMENT L992
3s300 PROTECTION EQUIPMENT 1990
35300 CONTROL COMPUTER & PERIPHERALS L996
3s300 ALARM/MONITORING EQUIPMENT 1976
35300 METERING EQUIPMENT 1990
35300 METERING EQUIPMENT 1990
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 36 of69
Version 0.0.2
Effective:
Filed on : April 27, 2016
3s300 SWITCHBOARD RACK OR PANEL
FERC Docket No. ER1 6-1507-000
35300 AI.ARM/MONITORING EQUIPMENT 1986
35300 ALARM/MONITORING EQUIPMENT 1985
35300 ALARM/MONITORING EQUIPMENT 1980
35300 ALARM/MONITORING EQUIPMENT 1980
35300 METERING EQUIPMENT 1993
35300 CONTROL EQUIPMENT 1997
35300 CONTROL EQUIPMENT L976
35300 CONTROL EQUIPMENT L976
35300 CONTROL EQUIPMENT 7976
35300 CONTROL EQUIPMENT 7976
3s300 CONTROL EQUIPMENT 1976
35300 CONTROL EQUIPMENT 7976
3s300 CONTROL EQUIPMENT 1980
3s300 CONTROL EQUIPMENT 1983
35300 CONTROL EQUIPMENT L972
35300 CONTROL EQUIPMENT L976
3s300 CONTROL EQUIPMENT 1976
35300 CONTROL EQUIPMENT L979
35300 CONTROL EQUIPMENT 1981
35300 CONTROL EQUIPMENT 1984
35300 CONTROL EQUIPMENT 1987
35300 CONTROL EQUIPMENT 1981
3s300 CONTROL EQUIPMENT 1980
35300 CONTROL EQUIPMENT 1980
35300 CONTROL EQUIPMENT 1980
35300 CONTROL EQUIPMENT 1980
35300 CONTROL EQUIPMENT 1980
35300 CONTROL EQUIPMENT 1980
35300 CONTROL EQUIPMENT 1980
35300 CONTROL EQUIPMENT 1980
35300 CONTROL EQUIPMENT 1985
3s300 CONTROL EQUIPMENT 1986
3s300 CONTROL EQUIPMENT 1990
35300 CONTROL EQUIPMENT 1990
3s300 CONTROL EQUIPMENT 1991
35300 CONTROL EQUIPMENT 1990
3s300 CONTROL EQUIPMENT 1996
35300 CONTROL EQUIPMENT 1992
3s300 CONTROL EQUIPMENT L992
35300 CONTROL EQUIPMENT 1995
35300 CONTROL EQUIPMENT 1996
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.t58.21.2
Page37 of69
Version 0.0.2
Effective:
Filed on : April27,2016FERC Docket No. ERl6-1507-000
35300 SCADA EQUIPMENT L992
35300 COMM RACK/PANEL FRAME 1976
3s300 COMM RACK/PANEL FRAME L976
35300 YARD LOCAL SERV OR LOAD CENTER L976
3s300 JUNCTION BOX 1980
35300 48 VOLT BATTERY CHARGER \997
35300 48 VOLT BATTERY L997
35300 LOAD CENTER, AC 7976
35300 LOAD CENTER, AC 1980
35300 LOAD CENTER, DC 7976
35300 LOAD CENTER. DC L992
3s300 10 - 40 AMP CIR BRKR L992
35300 41- 1OO AMP CIR BRKR !992
3s300 3 POLE DISCONNECT L976
35300 3 POLE DISCONNECT 1980
35300 3 POLE DISCONNECT L997
35300 CONTACTOR 1976
35300 VOLTAGE ALARM 1976
35300 AUXILIARY POWER XFMR 1PH 7976
35300 1OOKVA 1 PH XFMR L976
35300 AUXILIARY POWER XFMR 3 PH 1976
3s300 sOOKVA 3 PH XFMR 7976
35300 45KV 480 VOLTXFMR 1976
35300 3OKV 480 VOLT XFMR 1976
35300 EVENTS RECORDER (INACTIVE)1982
35300 ALARM SYSTEMS-WIRED CIRCUITS L992
3s300 SPECIAL METERING COMPUTER t976
3s300 MISC OFFICE FURNITURE 1989
35300 MISC OFFICE FURNITURE L982
3s300 MISC OFFICE FURNITURE 1982
35300 CHAIR 7976
35300 CHAIR 1981
35300 DESK 1976
3s300 DESK t952
35300 DESK 1953
3s300 DESK 1980
35300 FILE CABINET L979
35300 FILE CABINET 7976
35300 FILE CABINET L979
35300 FILE CABINET 1980
Idaho Power Company
FERC Electric Tariff
Rate Schedules
35300 SCADA
1.158.21.2
Page 38 of69
Version 0.0.2
Effective:
Filed on: April27,2016
FERC Docket No. ERl6-1507-000
3s300 DRAFTING TABLE t947
35300 DRAFTING TABLE 1950
3s300 TABLE t976
3s300 TABLE 7949
35300 COMPUTER AND PERIPHERAL5 199s
3s300 COMPUTER AND PERIPHERALS 1995
3s300 COMPUTER AND PERIPHERALS 1992
3s300 INTERCOM SYSTEM t976
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, EQUIPMENT 1999
39720 MICROWAVE, EQUIPMENT 1999
39720 MICROWAVE, CARD SHELF 1999
39720 MICROWAVE, CARD SHELF 1999
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, CARD UNIT 1999
35300 f18 - #19 CONTROL W|RE 1999
35300 CONTROL RACK/PANEL FRAME 1999
35300 CONTROL COMPUTER & PERIPHERALS 1999
35300 fiL4 - #t6 CONTROL WlRt 1999
3s300 CONTROL RACK/PANEL FRAME 1999
3s300 ALARM/MONITORING EQUI PMENT 1999
35300 CONTROL COMPUTER & PERIPHERALS 1999
3s200 EQUIPMENT PAD 1999
35200 CONDUIT & FITTINGS UNDERGROUND 1999
35300 15KV POWER CABLE 1999
35300 AUXILLARY GENERATOR 1999
3s300 #18 - #19 CONTROL WIRE 1999
35300 #74 - #L6 CONTROL WIRE 1999
35300 #LO - #L2 CONTROL WIRE 1999
35300 CONTROL RACK/PANEL FRAME 1999
35300 PROTECTION EQUIPMENT 1999
3s300 ALARM/MONITORING EQUIPMENT 1999
3s300 SAFEW SWITCH 1999
39720 MICROWAVE, STRUCT( POLES&FIX)1998
39720 MtcRowAVE, STRUCT(POLES&FlX)1998
39720 MICROWAVE, RADIO 2000
35200 COMPLETE STATION BUILDING 2007
35200 SMOKE DETECTOR 2007
3s300 METERING EQUIPMENT 1999
3s300 METERING EQUIPMENT 1999
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 39 of69
Version 0.0.2
Effective:
Filed on :, April27,2016
FERC Docket No. ERl6-1507-000
35300 METERING EQUIPMENT 1999
3s300 ALARM/MONITORING EQUIPMENT 1999
35300 COMMUNICATIONS EQUIP 2002
35300 COMMUNICATIONS EQUIP 2002
3s300 COMMUNICATIONS EQUIP 2002
35300 SWITCHBOARD RACK OR PANEL 200t
35300 CONTROL RACK/PANEL FRAME 2001
3s300 ALARM/MONITORI NG EQUIPMENT 2001
3s300 ALARM/MON ITORI NG EQU I PM E NT 2001
3s300 CONTROL RACK/PANEL FRAM E 1998
35300 CONTROL RACK/PANEL FRAM E 1998
35300 PROTECTION EQUIPMENT 1998
35300 PROTECTION EQUIPMENT 1998
35300 CONTROL RACK/PANEL FRAME 2001
3s300 CONTROL RACK/PANEL FMME 2001
3s300 PROTECTION EQUIPMENT 2001
35300 ALARM/MONITORING EQUIPM ENT 200L
3s300 CONTROL RACK/PANEL FRAME 200L
35300 CONTROL RACK/PANE L FRAM E 200r
3s300 PROTECTION EQUIPMENT 2007
3s300 PROTECTION EQUIPMENT 2007
3s300 tr18 - #19 CONTROL WtRE 2001
3s300 #LO - fi72 CONTROL WIRE 2001
3s300 CONTROL RACK/PANEL FRAME 2007
35300 PROTECTION EQUIPMENT 2001
35300 PROTECTION EQUIPMENT 2001
35300 PROTECTION EQUIPMENT 2001
3s300 CONTROL EQUIPMENT 2007
39710 TELEPHONE, CARD UNIT 200L
35300 CONTROL RACK/PANEL FRAME 2004
35300 PROTECTION EQUIPMENT 2004
35300 CABLE TRAY AND ACCESSORIES 2004
3s300 CONTROL WIRE - LOW VOLTAGE 2004
35300 METERING EQUIPMENT 2004
35300 AUXILIARY LOAD CENTER 2004
39720 MICROWAVE, CARD SHELF 2004
39720 MICROWAVE, CARD UNIT 2004
39720 MICROWAVE, EQUIPMENT 2004
39740 FIBER, MISC EQUIPMENT 2004
35300 CONTROL RACK/PANEL FRAME 2005
35300 CONTROL RACK/PANEL FRAME 2005
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.t58.21.2
Page 40 of69
Version 0.0.2
Effective:
Filed on : April 27,2016
FERC Docket No- ERI 5-1507-000
3s300 PROTECTION EQUIPMENT 200s
35300 PROTECTION EQUIPMENT 2005
3s300 130 VOLT BATTERY CHARGER 2005
3s300 130 VOLT BATTERY 2006
3s300 BATTERY RACK 2005
35300 SAFEW SWITCH 2006
35300 130 VOLT BATTERY CHARGER 2006
3s300 SAFEW SWITCH 2005
35300 MISC TEST EQUIPMENT 2007
35300 MISC TEST EQUIPMENT 2007
35300 MISCTEST EQUIPMENT 2007
35300 CABLE TRAY AND ACCESSORIES 2007
3s300 CABLE TRAY AND ACCESSORIES 2007
35300 CONTROL RACK/PANEL FRAM E 2007
3s300 CONTROL RACK/PANEL FRAME 2007
35300 CONTROL RACK/PANEL FRAME 2007
3s300 CONTROL RACK/PANEL FRAME 2007
35300 PROTECTION EQUIPMENT 2007
35300 PROTECTION EQUIPMENT 2007
35300 SCADA RACK/PANEL FRAME 2007
35300 SCADA RACK/PANEL FRAME 2007
35300 SCADA EQUIPMENT 2007
3s300 SCADA EQUIPMENT 2007
3s300 SCADA COMPUTER AND PERIPHERALS 2007
35300 SCADA COMPUTER AND PERIPHERALS 2007
39720 MICROWAVE, BATTERY 2007
39730 BASE STATION, MISC EQUIPMENT 2007
35300 AI.ARM/MONITORING EQUIPMENT 2008
3s200 METAL STRUCT - COMMUNICATION 2007
35200 CONDUIT & FITTINGS UNDERGROUND 2007
35300 CONTROL WIRE. LOW VOLTAGE 2007
35200 BUILDING HVAC SYSTEM 2009
3s200 FOUNDATION . OTHER EQUIPMENT 2008
35200 CONDUIT & FITTINGS UNDERGROUND 2008
35300 CONTROL WIRE - LOW VOLTAGE 2008
35300 GROUNDING AND FITTINGS 2008
35300 CONTROL RACK/PANEL FRAME 2008
35300 CONTROL RACK/PANEL FRAME 2008
35300 CONTROL RACK/PANEL FRAME 2008
3s300 PROTECTION EQUIPMENT 2008
35300 CONTROL EQUIPMENT 2008
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 4l of 69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
39740 FIBER, MISC EQUIPMENT 2009
35300 CONTROL WIRE - LOW VOLTAGE 2008
35300 CONTROL WIRE - LOW VOLTAGE 2008
35300 CONTROL EQUIPMENT 2008
35300 CONTROL EQUIPMENT 2008
35300 CONTROL EQUIPMENT 2008
35300 CONTROL EQUIPMENT 2008
35300 COMMUNICATIONS EQUIP 2008
35300 COMMUNICATIONS EQUIP 2008
35300 COMM RACK/PANEL FRAME 2009
3s300 COMMUNICATIONS EQUIP 2009
35300 CONTROL WIRE - LOW VOLTAGE 2009
3s300 CONDUIT & FITTINGS ABOVE GROUN 2009
3s300 130 VOLT BATTERY 2009
35300 BATTERY RACK 2009
35300 PROTECTION EQUIPMENT 2009
35300 PROTECTION EQUIPMENT 2009
3s300 COMM RACK/PANEL FRAME 2009
35300 COMM RACK/PANEL FRAME 2009
35300 COMM RACK/PANEL FRAME 2009
35300 COMM RACK/PANEL FRAME 2009
35300 COMMUNICATIONS EQUIP 2009
35300 COMMUNICATIONS EQUIP 2009
35300 COMMUNICATIONS EQUIP 2009
35300 COMMUNICATIONS EQUIP 2009
39720 MICROWAVE, RADIO 2017
39720 MICROWAVE, ANTENNA 2077
35300 COMMUNICATIONS EQUIP 2077
39720 MICROWAVE, RADIO 2077
39720 MICROWAVE, RADIO 20L7
39720 MICROWAVE, ANTENNA 20lL
39720 MICROWAVE, ANTENNA 2017
39720 MICROWAVE, WIRE/CABLE 20!L
39720 MICROWAVE, WIRE/CABLE 20L7
3s300 CONTROL WIRE - LOW VOLTAGE 2071
35300 CONDUIT & FITTINGS ABOVE GROUN 20L7
3s300 I.ARGE ELECTRICAL ENCLOSURE zo77
35300 CONTROL WIRE - LOW VOLTAGE 2070
3s300 CONTROL WIRE - LOW VOLTAGE 20to
3s300 COMPOSITE CABLE - LOW VOLTAGE 20L0
Idaho Power Company
FERC Electric Tariff
Rate Schedules
L158.2t.2
Page 42 of 69
Version 0.0.2
Effective:
Filed on : April27,2016
35300 COMMUNICATIONS EQUIP 2008
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.t58.21.2
Page 43 of69
Version 0.0.2
3s300 COMPOSITE CABLE - LOW VOLTAGE 2010
35300 COAXIAL CABLE 2010
3s300 COAXIAL CABLE 2070
3s300 CONTROL RACK/PANEL FRAME 20ro
35300 CONTROL RACK/PANEL FRAM E 2070
35300 CONTROL RACK/PANEL FRAME 2010
3s300 CONTROL RACK/PANEL FRAME 20LO
35300 CONTROL RACK/PANEL FRAM E 20to
3s300 CONTROL RACK/PANEL FRAME 20LO
35300 PROTECTION EQUIPMENT 2010
3s300 PROTECTION EQUIPMENT 2010
3s300 PROTECTION EQUIPMENT 20to
35300 PROTECTION EQUIPMENT 2010
35300 PROTECTION EQUIPMENT 2010
3s300 PROTECTION EQUIPMENT 20to
3s300 SCADA EQUIPMENT 2010
3s300 SCADA EQUIPMENT 2010
3s300 SCADA EQUIPMENT 2070
3s300 SCADA EQUIPMENT 2010
3s300 SCADA EQUIPMENT 2010
35300 SCADA EQUIPMENT 20LO
3s300 COMMUNICATIONS EQUIP 2070
35300 COMMUNICATIONS EQUIP 20L0
3s300 AUXILIARY LOAD CENTER 2010
35300 AUXILIARY LOAD CENTER 2010
3s300 METERING EQUIPMENT 20L2
3s300 CONTROL WIRE - LOW VOLTAGE 2008
3s300 CONTROL WIRE - LOW VOLTAGE 2008
35300 CONTROL EQUIPMENT 2008
35300 CONTROL EQUIPMENT 2008
35300 CONTROL EQUIPMENT 2008
35300 CONTROL EQUIPMENT 2008
3s300 COMMUNICATIONS EQUIP 2008
35300 COMMUNICATIONS EQUIP 2008
35300 COMMUNICATIONS EQUIP 2002
3s300 CONTROL WIRE - LOW VOLTAGE 20L3
35300 TRANSFER SWITCH 20L3
3s200 CONDUIT & FITTINGS UNDERGROUND 20L3
35300 CONTROL WIRE - LOW VOLTAGE 20L3
35300 GROUNDING AND FITTINGS 20L3
3s200 SITE PREPARATION & IMPROVEMENT 2073
FERC Docket No. ERl6-1507-000
Filed on : April 27,2016
35200 YARD LIGHT SYSTEM 20L3
3s200 CONDUIT & FITTINGS UNDERGROUND 2073
35300 CONTROL WIRE - LOW VOLTAGE 2013
35300 COAXIAL CABLE 2013
3s300 FIBER OPTIC CABLE 2073
35300 GROUNDING AND FITTINGS 20L3
35300 SMALL ELECTRICAL ENCLOSURE 20L3
3s300 5OKVA TOCAL SERVICE XFMR 2013
35300 SWITCH - POWER FUSE 2013
3s300 CONTROT RACK/PAN EL FRAME 2013
3s300 CONTROL MCK/PANE L FRAM E 2013
35300 CONTROL RACK/PANEL FRAME 2073
35300 CONTROL RACK/PANEL FRAME 20L3
3s300 CONTROL RACK/PANEL FRAME 20L3
35300 CONTROL RACK/PANEL FRAME 2013
35300 CONTROL RACK/PANEL FRAME 2013
35300 CONTROL RACK/PANEL FMME 2073
35300 CONTROL RACK/PANEL FRAME 20L3
35300 PROTECTION EQUIPMENT 2073
3s300 PROTECTION EQUIPMENT 2013
3s300 PROTECTION EQUIPMENT 20L3
3s300 PROTECTION EQUIPMENT 2013
3s300 CONTROL EQUIPMENT 20\3
3s300 CONTROL EQUIPMENT 20L3
35300 CONTROL EQUIPMENT 2013
35300 METERING EQUIPMENT 20L3
35300 METERING EQUIPMENT 2013
3s300 ALARM/MONITORING EQUIPMENT 20t3
3s300 SCADA EQUIPMENT 2073
35300 COMM RACK/PANEL FRAME 2013
3s300 COMMUNICATIONS EQUIP 20t3
35300 48 VOLT BATTERY CHARGER 2073
3s300 BATTERY RACK 20L3
35300 AUXILIARY LOAD CENTER 2073
35300 TRANSFER SWITCH 20L3
35200 SUPERSTRUCTURE ROOF 20L3
3s200 COMPLETE CONDENSER CNTRL BLDG 20L3
35200 BUILDING HVAC SYSTEM 2073
3s200 BUILDING ELECTRICAL SYSTE M 20L3
35200 CONCRETE SURFACE TRENCH WLIDS 20t3
35300 CONTROL WIRE - LOW VOLTAGE 2074
Idaho Power Company
FERC Electric Tariff
Rate Schedules
r.158.21.2
Page 44 of69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
ldaho Power Company
FERC Electric Tariff
Rate Schedules
35300 COAXIAL CABLE 2014
r.r58.21.2
Page 45 of 69
Version 0.0.2
Effective:
Filed on : April 27,2016
35300 COMM MCK/PANEL FRAME 20L4
3s300 COMMUNICATIONS EQUIP 20L4
3s300 COAXIAL CABLE r976
35300 PROTECTION EQUIPMENT 1998
35300 PROTECTION EQUIPMENT 1998
35300 COMM RACIVPANEL FRAME 7976
35200 CONDUIT & FITTINGS UNDERGROUND 20L4
35300 CONTROL WIRE - LOW VOLTAGE 20L4
35300 GROUNDING AND FITTINGS 20L4
3s300 CONDUIT & FITTINGS ABOVE GROUN 2014
3s300 CONTROL EQUIPMENT 20t4
3s300 SCADA EQUIPMENT 2074
35300
COMMON ASSET.KPRT REPI.ACE
FAILING SEQUENCE OF EVENT
RECORDER 2015
3s300 KINPORT - CIP PHYSICAL SECURITY 2074
35300
KINPORT . COMMUNICATIONS
UPGRADE 2014
39710
JIM BRIDGER RAS UPGRADE (ANALOG
TO DIGITAL). KINPORT 20t4
39740
JIM BRIDGER RAS UPGRADE (ANALOG
TO DIGITAL)- KINPORT 20L4
3s300 CONTROL EQUIPMENT 1991
M idooint Transmission Station
FERC Acct Midpoint Asset Description Vintage
35200 YARD SURFACING - GRAVEL, ETC.1988
39740 FIBER, WIRE/CABLE 2009
35011 LAND OWNED IN FEE TS 1965
35011 I-AND OWNED IN FEE TS t976
35011 I.AND OWNED IN FEE TS 1980
35011 I.AND OWNED IN FEE TS 1988
35011 PERMANENT LAND IMPROVEMENTS TS 1966
35011 PERMANENT LAND IMPROVEMENTS TS 7976
35011 PERMANENT IAND IMPROVEMENTS TS 1980
3s200 DRAINAGE SYSTEMS-CULVERTS, ETC 1988
35200 YARD SURFACING - GRAVEI- ETC.1955
35200 YARD SURFACING - GRAVEL, ETC.1966
3s200 YARD SURFACING - GRAVEL ETC.L977
35200 YARD SURFACING. GRAVEL, ETC.1980
3s200 YARD SURFACING - GRAVEL, ETC.1981
35200 PARKING CHOCKS 1988
FERC Docket No. ER16-1507-000
35200 DRAIN ROCK 1980
3s200 PERIMETER FENCE & GATES 1955
35200 PERIMETER FENCE & GATES 7977
35200 PERIMETER FENCE & GATES 1980
35200 PERIMETER FENCE & GATES 1981
35200 PERIMETER FENCE & GATES 1983
3s200 PERIMETER FENCE & GATES 1988
35200 WATER WELL PUMP t977
3s200 WATER WELL PUMP 1988
35200 WATER SYSTEM 1988
35200 WATER WELL 7977
35200 WATER WELL 1988
3s200 COMPLETE SEPTIC SYSTEM 1988
35200 YARD LIGHT SYSTEM 1965
35200 YARD LIGHT SYSTEM 1977
35200 YARD LIGHT SYSTEM 1981
35200 YARD LIGHT SYSTEM 1988
35200 LIGHT STANDARD 1955
35200 LIGHT STANDARD 1966
3s200 FOUNDATION - STATION BUILDING 1965
3s200 FOUNDATION . STATION BUILDING 1983
3s200 FOUNDATION . STATION BUILDING 1988
3s200 COMPLETE STATION BUILDING 1965
35200 COMPLETE STATION BUILDING 1983
35200 COMPLETE STATION BUILDING 1983
3s200 COMPLETE STATION BUILDING 1983
35200 COMPLETE STATION BUILDING 1988
35200 EYE WASH STATION 1983
35200 EYE WASH STATION 1988
35200 WATER HEATER 1988
3s200 BUILDING HVAC SYSTEM 1988
35200 EXHAUST FANS & DUCT 1955
3s200 EXHAUST FANS & DUCT 1988
35200 HEATER & AIR CONDITIONER COMBI 1992
35200 BUILDING ELECTRICAL SYSTEM 1983
3s200 BUILDING ELECTRICAL SYSTEM 1988
3s200 BUILDING ELECTRICAL SYSTEM 1980
35200 JUNCTION BOX MEDIUM OR LARGE 1983
35200 BUILDING ELECTRICAL SYSTEM 1980
3s200 BUILDING ELECTRICAL SYSTEM 1983
Idaho Power Company
FERC Electric Tariff
Rate Schedules
35200 MANHOLES & GRATES
t.158.21.2
Page 46 of69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
3s200 BUILDING ELECTRICAL SYSTEM 1988
35200 D.C. EMERGENCY FIXTURE 1983
35200 BUILDING ELECTRICAL SYSTEM 1983
35200 BUI LDING ELECTRICAL SYSTEM 1988
35200 LOCAL SERVICE FND 1980
35200 LOCAL SERVICE TRANSFORMER FND 1988
35200 AIR COMPRESSOR FND L976
35200 345KVXFMR, REG, REACTOR FND 1983
3s200 CULVERTS 1981
35200 EQUIPMENT PAD 1988
35200 OUTDOOR CABINET FND 1988
3s200 MISCELLANEOUS BUILDING FND 196s
35200 SPILL GAP SUPPORT FND 1988
35200 LIGHTING MAST FND 1965
3s200 LIGHTING MAST FND 1966
35200 YARD MONUMENT MARK (INACflVE)1955
3s200 YARD MONUMENT MARK (INACTIVE)L966
35200 CONCRETE SURFACE TRENCH WLIDS 7976
35200 CONCRETE SURFACE TRENCH W/LIDS 1988
35200 CONCRETE SURFACE TRENCH WLIDS 1988
3s200 CONCRETE SURFACE TRENCH WLIDS 1955
35200 CONCRETE SURFACE TRENCH WLIDS L976
35200 CONCRETE SURFACE TRENCH W/LIDS 1980
3s200 CONCRETE SURFACE TRENCH W/LIDS 1981
35200
CONCRETE UNDER GROUND
CABLEWAY 1981
35200 CONDUIT & FITTINGS UNDERGROUND L976
35200 CONDUIT & FITTINGS UNDERGROUND L979
35200 CONDUIT & FITTINGS UNDERGROUND 1980
35200 CROSSOVER TRENCH 1981
35200 TREAD PLATES 1981
35200 CONCRETE MANHOLE WCOVER 1955
3s200 LOCAL SERVICE STRUCTU RE 1980
35200 LOCAT SERVICE STRUCTU RE 1988
35200 OUTDOOR CABINETSUP STR 1988
3s200 SPILL GAP SUPPORT STRUCTURE 1988
35200 TOOL SHED, MAINT BLDG, ETC 1965
35200 TOOL SHED, MAINT BLDG, ETC 7976
3s200 TOOL SHED, MAINT BLDG, ETC 1988
3s300 BARRIER - FIRE, SWITCHING, ETC 1988
35300 CABLE TRAY AND ACCESSORIES 1983
Idaho Power Company
FERC Electric Tariff
Rate Schedules
t.158.2t.2
Page47 of69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ER16-1507-000
35300 4-7KV PIN/POST INSULATORS t976
35300 3/8 STATIC WIRE 7964
3s300 3/8 STATIC WIRE 1965
35300 250 MCM CONDUCTOR COPPER L976
3s300 250 MCM CONDUCTOR COPPER 1988
35300 350 MCM CONDUCTOR COPPER 1983
35300 8 SHIELD, 7 STMND ALUM 1981
3s300 3" -3-314" ALUM TUBE 1983
35300 15KV POWER CABLE 1983
35300 CONTROL WIRE - LOW VOLTAGE L976
35300 CONTROL WIRE . LOW VOLTAGE 1976
35300 CONTROL WIRE - LOW VOLTAGE 7993
35300 CONTROL WIRE - LOW VOLTAGE 1995
3s300 #18 - #19 CONTROL WrRE 1995
3s300 #18 - #19 CONTROL WIRE L976
35300 #18 - #19 CONTROL WIRE 1988
35300 #t8 - #L9 CONTROL WIRE 1989
35300 #18 - f19 CONTROL WIRE 7976
35300 #18 - #19 CONTROL WtRE 1981
35300 #18 - f19 CONTROL WrRE 1983
3s300 #18 - #19 CONTROL WtRt 1989
3s300 #18 - #19 CONTROL WrRE 1990
3s300 f18 - f19 CONTROL WtRE 1992
35300 f18 - #19 CONTROL WrRE 7994
3s300 #18 - #19 CONTROL WtRE 1995
35300 f18 - #19 CONTROL WIRE 1996
3s300 #18 - f19 CONTROL WrRr 1980
35300 #18 - #19 CONTROL WtRE 1981
35300 #18 - #19 CONTROL WtRE 1983
3s300 #18 - #19 CONTROL WtRE 1989
3s300 #18 - #19 CONTROL WIRE 1990
3s300 #18 - #19 CONTROL WrRE 1993
35300 #18 - #19 CONTROL WIRE 1995
3s300 #18 - #19 CONTROL WrRE 1996
35300 #18 - #19 CONTROL WtRE 1980
3s300 #18 - #19 CONTROL WrRE 1981
35300 #18. #19 CONTROL WIRE 1983
3s300 #18 - #19 CONTROL WrRE 1990
35300 #18 - #19 CONTROL WtRt 1993
35300 f18 - #19 CONTROL WIRE L994
3s300 #18 - #19 CONTROL WrRE 1995
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 48 of69
Version 0.0.2
Effective:
Filed on :. April 27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 49 of69
Version 0.0.2
Effective:
Filed on : April27,2016
3s300 s18 - #19 CONTROL WIRE 1980
35300 #14.#L5 CONTROL WIRE 1980
35300 #L4 - #L6 CONTROL WIRE 1981
3s300 *L4 - #16 CONTROL WIRE 1989
35300 #74 - #L6 CONTROL WIRE 1980
35300 #I4 - *L6 CONTROL WIRE 1993
35300 #L4 - fiL6 CONTROL WIRE 1983
35300 #14 - #L6 CONTROL WIRE 1989
35300 #L4 - #16 CONTROL WIRE 1993
35300 #74 - #L6 CONTROL WIRE 199s
3s300 #74 - #16 CONTROL WIRE 1996
35300 #t4 - *76 CONTROL WlRt 1976
35300 #I4 - #L6 CONTROL WIRE t976
35300 #74 - #16 CONTROL WIRE 1955
35300 #L4. fiL6 CONTROL W]RE 1955
35300 #74 - #L5 CONTROL WIRE 1980
35300 *74 - #76 CONTROL WIRE 1981
35300 #L4 - #L6 CONTROL WIRE 1983
35300 #14 - #L6 CONTROL WIRE 1989
35300 #L4 - #76 CONTROL WIRE 7976
35300 #L4 - #76 CONTROL WIRE 1980
35300 COAXIAL CABLE 1955
3s300 COAXIAL CABLE 1980
35300 COAXIAL CABLE 1981
35300 #L0 - #12 CONTROL WlRt 1988
3s300 #LO - *L2 CONTROL WIRE 1983
35300 #70 - #t2 CoNTROL WIRE 1988
35300 #LO -#L2 CONTROL WIRE 1989
35300 #7O - #L2 CONTROL WIRE 7992
3s300 #LO - #I2 CONTROL WIRE 1995
3s300 #LO - *L2 CONTROL WIRE 1989
3s300 frLO - #12 CONTROL WIRE 1993
35300 #7O - #L2 CONTROL WIRE 1995
35300 #7O - #L2 CONTROL WIRE 1995
35300 *LO . #L2 CONTROL WIRE 1965
35300 #7O - #L2 CONTROL WIRE 1965
3s300 #70 - #12 CONTROL WlRt 1966
3s300 #10 - #72 CONTROL WIRE 1980
35300 #IO -#L2 CONTROL WIRE 1981
3s300 frLO - #I2 CONTROL WIRE 1983
35300 #70 - #L2 CONTROL WIRE 1989
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
35300 *70 - #72 CONTROT WIRE
1.158.21.2
Page 50 of69
Version 0.0.2
E{fective:
Filed on : April27,20l6
3s300 #70 -#L2 CONTROL WIRE 1988
35300 #70 -#72 CONTROL WIRE 1981
35300 #70 -#L2 CONTROL WIRE 1983
35300 #7O. #L2 CONTROL WIRE 1988
35300 s10 - #12 CONTROL W|RE 1989
35300 fr70 - fi12 CoNTROL WtRE 1980
35300 #TO - #L2 CONTROL WIRE 1983
35300 *to - #t2 coNTRoL wtRE 1988
35300 #to - *72 CoNTROL WtRE 1989
35300 #70 - #72 CONTROL W|RE 1990
3s300 *70 - #L2 CONTROL WtRE 1995
3s300 *70 - fi72 CONTROL WrRt 1995
35300 #IO. #L2 CONTROL WIRE 1981
35300 #70 - #12 CoNTROL WtRE 1980
35300 #10 - #72 CONTROL W|RE 1988
35300 tr70 -#L2 CONTROL WIRE 1980
35300 #7 - #9 CONTROL WIRE 1965
35300 #7 -#9 CONTROLWIRE 1965
3s300 #7 -#9 CONTROLWIRE 1966
35300 #7 -#9 CONTROLWTRE 1988
35300 #7 - *9 CONTROL WIRE 1988
3s300 #7 -#9 CONTROLWIRE 1988
35300 #7 -#9 CONTROL WIRE 1988
35300 fi7 .#9 CONTROL WIRE 1966
3s300 #7 - f9 CONTROL WIRE 1980
35300 #7 -#9 CONTROLWIRE 1981
35300 #7 - #9 CONTROL WIRE 1965
35300 #7 -#9 CONTROLWIRE 1966
35300 fi7 -#9 CONTROTWTRE 1980
35300 #7 -#9 CONTROLWIRE 1981
35300 #7 -#9 CONTROLWIRE 7966
35300 #7 -#9 CONTROLWIRE 1988
3s300 #7 -*9 CONTROTWTRE 1965
3s300 #1 - #6 CONTROL WIRE 1988
35300 #1 - #5 CONTROL WIRE 1992
35300 f1 . #6 CONTROL WIRE 1995
3s300 #7 - fi6 CONTROL WIRE 1981
3s300 #1 - #6 CONTROL WIRE 1983
3s300 #1 - f6 CONTROL WIRE 7976
3s300 #1 - #5 CONTROL WIRE 1980
FERC Docket No. ERl6-1507-000
35300 #1 - #6 CONTROL WIRE 1983
35300 #1 - #6 CONTROL WIRE L976
35300 #7 -fr6 CONTROLWIRE 1981
3s300 f1 - #6 CONTROL WIRE 1988
35300 #T - #6 CONTROL WIRE 1983
35300 #L - *6 CONTROL WIRE 1977
35300 #I - #6 CONTROL WIRE 1965
35300 #1 - f6 CONTROL WIRE 1966
35300 #1 - #6 CONTROL WIRE 1968
35300 f1 . f5 CONTROL WIRE L976
3s300 #7. #6 CONTROL WIRE 1981
35300 *7 - #6 CONTROL WIRE 1988
35300 #L - #6 CONTROL WIRE 1992
35300 #1 - #5 CONTROL WIRE 1983
3s300 1/O ALUM CONTROL WIRE 7976
3s300 1/O AI.UM CONTROLWIRE 1980
35300 1/O ALUM CONTROL WIRE 1988
35300 1/O COPPER CONTROL WIRE 1988
3s300 1/0 coPPER CONTROL WIRE 1995
35300 2/O COPPER CONTROL WIRE 1955
35300 2/0 coPPER CONTROL WIRE 1983
35300 2/O COPPER CONTROL WIRE 1988
35300 3/0 coPPER CONTROL WIRE 1988
35300 4/O COPPER CONTROL WIRE 1988
35300 250 MCM COPPER CONTROL WIRE 1988
35300 350 MCM ALUM CONTROLWIRE L976
35300 350 MCM COPPER CONTROL WIRE 1983
3s300 5OO MCM COPPER CONTROL WIRE 1983
35300 5OO MCM ALUM CONTROL WIRE 1965
35300 COMPOSITE CABLE - LOW VOLTAGE 1988
35300 COAXIAL CABLE 1988
35300 COMPOSITE CABLE . LOW VOLTAGE 1995
35300 COMPOSITE CABLE - LOW VOLTAGE 1996
35300 S1 COPPER GROUND 1965
35300 GROUNDING AND FITTINGS 1980
35300 GROUNDING AND FITTINGS 1981
3s300 GROUNDING AND FITTINGS t976
35300 GROUNDING AND FITTINGS 1996
3s300 GROUNDING AND FITTINGS 1965
35300 GROUNDING AND FITTINGS 1966
35300 GROUNDING AND FITTINGS 1976
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 5l of69
Version 0.0.2
Effective:
Filed on : April 27,2016
FERC Docket No. ERl6-1507-000
35300 #6 COPPER GROUND I PTC
35300 #6 COPPER GROUND 7976
3s300 #5 COPPER GROUND 1981
35300 #6 COPPER GROUND MAT t976
35300 f6 COPPER GROUND MAT 1980
35300 #5 COPPER GROUND MAT 1981
3s300 #5 COPPER GROUND MAT 1988
35300 f6 COPPER GROUND MAT 1989
35300 1/4 COPPER GROUND 1980
3s300 7/16 COPPER GROUND 7976
35300 7/15 COPPER GROUND 1980
3s300 7/16 COPPER GROUND 1981
35300 9/16 COPPER GROUND 1988
3s300 1/O COPPER GROUND 1988
35300 2/O COPPER GROUND 1980
3s300 2/O COPPER GROUND 1981
3s300 2/O COPPER GROUND 1989
35300 4/O COPPER GROUND 1988
35300 250 MCM COPPER GROUND 1965
3s300 250 MCM COPPER GROUND 1972
35300 250 MCM COPPER GROUND 7976
35300 250 MCM COPPER GROUND 1980
35300 250 MCM COPPER GROUND 1981
3s300 250 MCM COPPER GROUND 1983
3s300 250 MCM COPPER GROUND 1989
35300 350 MCM COPPER GROUND 1983
35300 5OO MCM COPPER GROUND 1965
35300 5OO MCM COPPER GROUND 7965
35300 5OO MCM COPPER GROUND 1983
3s300 5OO MCM COPPER GROUND 1988
35300 CONDUIT & FITTINGS ABOVE GROUN 1955
35300 CONDUIT & FITTINGS ABOVE GROUN 7976
35300 CONDUIT & FITTINGS ABOVE GROUN 1981
35300 CONDUIT & FITTINGS ABOVE GROUN 1983
35300 CONDUIT & FITTINGS ABOVE GROUN 1988
3s300 CONDUIT & FITTINGS ABOVE GROUN 1988
35300 CONDUIT & FITTINGS ABOVE GROUN 1988
3s300 CONDUIT & FITTINGS ABOVE GROUN 1965
35300 CONDUIT & FITTINGS ABOVE GROUN t976
3s300 CONDUIT & FITTINGS ABOVE GROUN 1981
3s300 CONDUIT & FITTINGS ABOVE GROUN 1988
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.1s8.21.2
Page 52 of69
Version 0.0.2
Effective:
Filed on : April 27 ,2016
FERC Docket No. ERl6-1507-000
35300 CONDUIT & FITTINGS ABOVE GROUN 1965
35300 CONDUIT & FITTINGS ABOVE GROUN 1983
35300 CONDUIT & FITTINGS ABOVE GROUN 1955
35300 CONDUIT & FITTINGS ABOVE GROUN 7976
3s300 CONDUIT & FITTINGS ABOVE GROUN 1980
3s300 CONDUIT & FITTINGS ABOVE GROUN 1988
35300 CONDUIT & FITTINGS ABOVE GROUN 7966
3s300 CONDUIT & FITTINGS ABOVE GROUN L976
35300 CONDUIT & FITTINGS ABOVE GROUN 7976
3s300 CONDUIT & FITTINGS ABOVE GROUN 1980
35300 CONDUIT & FIfiINGS ABOVE GROUN 1980
3s300 CONDUIT & FITTINGS ABOVE GROUN 1981
35300 CONDUIT & FITTINGS ABOVE GROUN 1988
3s300 2" -3-!12" CONDU|T 1976
35300 2" -3-u2" CONDU|T 1980
35300 2" -3-u2" CONDU|T 1981
3s300 2" -3-712" CONDU|T 1988
35300 2" -3-L/2" CONDU|T 1980
3s300 2" -3-L/2" CONDU|T 1965
3s300 2" -3-L12" CONDUTT 1988
3s300 2" -3-L/2" CONDU|T 1965
35300 2" -3-u2" CONDUTT 7976
3s300 2" - 3-L12" CONDU|T 1988
3s300 2" -3-L12" CONDUTT 1976
3s300 2" -3-t/2" CONDU|T 1980
35300 2" -3-L/2" CONDUIT 1981
35300 2" -3-L12" CONDUTT 1983
35300 2" -3-712" CONDU|T 1980
35300 2" -3-u2" CONDU|T 1981
35300 2" -3-u2" CONDU|T 1983
35300 2" -3-7/2" CONDUIT 1988
35300 4" CONDUIT 1965
35300 4'' CONDUIT L976
35300 4.'CONDUIT 1979
3s300 4" CONDUIT 1980
35300 4'' CONDUIT 1981
3s300 4" CONDUIT 1989
3s300 4'' CONDUIT 1980
3s300 4" CONDUIT 1989
3s300 5'' CONDUIT 1965
3s300 5" CONDUIT 1981
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 53 of69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ER16-1507-000
3s300 6'' CONDUIT 1988
35300 SMALL ELECTRICAL ENCLOSURE 1988
3s300 SMALL ELECTRICAL ENCLOSURE 1988
3s300 SMALL ELECTRICAL ENCLOSURE 1988
3s300 SMALL ELECTRICAL ENCLOSURE 1988
35300 SMALL ELECTRICAL ENCLOSURE 1976
35300 SMALL ELECTRICAL ENCLOSURE 1980
35300 SMALL ELECTRICAL ENCLOSURE 1981
35300 SMALL ELECTRICAL ENCLOSURE 1983
3s300 25KVA 34KV GRND XFMR 1988
35300 UNDER 15KVA LOCAL SERVICE XFMR 1980
35300 UNDER 15KVA LOCAL SERVICE XFMR 1988
35300 75KVA LOCAL SERVICE XFMR 1983
35300 1OO-165KVA LOCAL SERVICE XFMR 1983
3s300 1OO-166KVA LOCAL SERVICE XFMR 1988
35300 167-499KVA LOCAL SERVICE XFMR 1981
3s300 35KV OR LESS 1 PH REGULATOR 1988
3s300 35KV OR LESS 1 PH REGUI.ATOR 1988
35300 35KV OR LESS 1 PH REGULATOR 1991
35300 35KV OR LESS 1 PH REGULATOR 1988
35300 35KV OR LESS 1 PH REGUI.ATOR 1988
3s300 CONTROL MCK/PANEL FRAME L976
3s300 CONTROL RACK/PANEL FRAME 1989
35300 CONTROL RACK/PANEL FRAME 1955
35300 CONTROL RACK/PANEL FRAME 1965
3s300 CONTROL RACK/PANEL FRAME 1965
35300 CONTROL RACK/PANEL FRAME 1996
3s300 CONTROL RACK/PANE L FRAM E 1965
3s300 CONTROL RACK/PANEL FRAM E 7976
35300 CONTROL RACK/PANEL FRAME L976
35300 CONTROL RACK/PANEL FRAME L976
3s300 CONTROL RACK/PANEL FRAM E 1980
35300 CONTROL RACK/PANEL FRAME 1983
3s300 CONTROL RACK/PANEL FRAME 1983
3s300 CONTROL RACK/PANEL FRAME 1989
35300 CONTROL RACK/PANEL FRAME 1989
3s300 CONTROL RACK/PANEL FRAME 1989
35300 CONTROL RACK/PANEL FRAME 1995
3s300 CONTROL MCK/PANEL FRAME 1995
35300 CONTROL RACK/PANEL FRAME 1996
35300 CONTROL RACK/PANEL FRAME 1993
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 54 of69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.2t.2
Page 55 of69
Version 0.0.2
3s300 CONTROL MCK/PANEL FRAME I 1993
35300 CONTROL RACK/PANEL FRAME 1955
3s300 CONTROT RACK/PANEL FRAME 1976
35300 CONTROL RACK/PANEL FRAME 1995
3s300 CONTROL RACK/PANEL FRAME 1996
3s300 CONTROL RACK/PANEL FRAME 7976
35300 CONTROL RACK/PANEL FRAME 1988
35300 CONTROL RACK/PANEL FRAME 1988
35300 PROTECTION EQUIPMENT 1981
3s300 PROTECTION EQUIPMENT 1989
35300 PROTECTION EQUIPMENT 1981
35300 PROTECTION EQUIPMENT 1981
35300 PROTECTION EQUIPMENT 1981
3s300 PROTECTION EQUIPMENT 1981
35300 CONTROL COMPUTER & PERIPHERAL5 1996
35300 CONTROL COMPUTER & PERIPHERAL5 1995
3s300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 1995
3s300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 1995
3s300 PROTECTION EQUIPMENT 1996
3s300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 1981
3s300 PROTEfiION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 1995
35300 PROTECTION EQUIPMENT 1996
3s300 PROTECTION EQUIPMENT 1996
35300 PROTECTION EQUIPMENT 7994
3s300 AI.ARM/MONITORING EqUI PMENT L994
35300 AI.ARM/MON ITORI NG EQU I PM ENT 1993
3s300 AI.ARM/MONITORI NG EQU I PM ENT 1981
35300 ALARM/MONITORING EQUIPMENT 1994
3s300 AI.ARM/MONITO RING EQU I PM E NT 1994
35300 ALARM/MONITORING EQUI PMENT 1989
35300 CONTROL COMPUTER & PERIPHERALS 1989
3s300 CONTROL COMPUTER & PERIPHERALS 1989
35300 PROTECTION EOUIPMENT 1989
35300 PROTECTION EQUIPMENT 1989
3s300 PROTECTION EQUIPMENT 1989
Filed on : April2T ,2016
FERC Docket No. ERl6-1507-000
3s300 PROTECTION EQUIPMENT 1989
3s300 METERING EQUIPMENT 1993
3s300 METERING EQUIPMENT 1993
35300 CONTROL EQUIPMENT 1982
3s300 CONTROL EQUIPMENT 1984
3s300 CONTROL EQUIPMENT 1983
3s300 CONTROL EQUIPMENT 196s
35300 CONTROL EQUIPMENT 1965
35300 CONTROL EQUIPMENT 7976
3s300 CONTROL EQUIPMENT 1955
35300 CONTROL EQUIPMENT 7976
3s300 CONTROL EQUIPMENT 1980
35300 CONTROL EQUIPMENT 1976
3s300 CONTROL EQUIPMENT 1980
3s300 CONTROL EQUIPMENT L976
3s300 CONTROL EQUIPMENT 1976
3s300 CONTROL EQUlPMENT 1980
3s300 CONTROL EQUIPMENT 1980
3s300 CONTROL EQUIPMENT 1981
3s300 CONTROL EQUIPMENT 1980
3s300 CONTROL EQUIPMENT 1983
35300 CONTROL EQUIPMENT 1984
3s300 CONTROL EQUIPMENT 1985
35300 CONTROL EQUIPMENT 1983
3s300 CONTROL EQUIPMENT 1985
3s300 CONTROL EQUIPMENT 1989
3s300 CONTROL EQUIPMENT 1989
3s300 CONTROL EQUIPMENT 1989
3s300 CONTROL EQUIPMENT 1989
35300 CONTROL EQUIPMENT 1995
3s300 CONTROL EQUIPMENT 1993
3s300 CONTROL EQUIPMENT 1993
35300 CONTROL EQUIPMENT 1995
35300 CONTROL EQUIPMENT 1995
35300 CONTROL EQUIPMENT 1995
3s300 CONTROL EQUIPMENT 1996
35300 CONTROL EQUIPMENT 1996
3s300 CONTROL EQUIPMENT 1989
3s300 CONTROL EQUIPMENT 1985
3s300 CONTROL EQUIPMENT 1985
35300 SCADA RACK/PANEL FRAME 1981
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 56 of69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 57 of69
Version 0.0.2
Effective:
Filed on : April27,2016
3s300 SCADA RACK/PANEL FRAME 1990
35300 SCADA EQUIPMENT 1991
35300 SCADA EQUIPMENT 1990
35300 COMMUNICATIONS EQUIP 1965
3s300 COMMUNICATIONS EQUIP 1983
3s300 COMMUNICATIONS EQUIP 1984
35300 OIL STORAGE TANKS 1988
35300 YARD LOCAL SERV OR LOAD CENTER 1956
3s300 YARD LOCAL SERV OR LOAD CENTER 1983
3s300 YARD LOCAL SERV OR LOAD CENTER 1988
35300 LOAD CENTER, AC L976
35300 LOAD CENTER, AC 1980
35300 LOAD CENTER, AC 1981
35300 IOAD CENTER, AC 1983
3s300 LOAD CENTER, AC 1988
35300 LOAD CENTER, DC 1965
3s300 LOAD CENTER, DC t976
35300 LOAD CENTER, DC 7979
35300 LOAD CENTER, DC 1981
35300 LOAD CENTER, DC 1983
35300 LOAD CENTER, DC 1995
3s300 10 - 40 AMP CIR BRKR 1989
35300 10 - 40 AMP CIR BRKR 1995
3s300 47 - LOO AMP CIR BRKR 1992
35300 3 POLE DISCONNECT 1988
35300 TRANSFER SWITCH 1990
35300 ALARM SYSTEMS-WIRED CIRCUITS 1992
35300 MISC OFFICE FURNITURE 1968
3s300 MISC OFFICE FURNITURE 1938
35300 MISC OFFICE FURNITURE 1981
35300 MISC OFFICE FURNITURE 1981
35300 CRT/ MONITOR 1954
35300 CHAIR L976
3s300 CHAIR 1956
35300 CHAIR 1968
3s300 CHAIR t974
35300 CHAIR L974
35300 CHAIR L975
35300 DESK L975
35300 DESK 1950
35300 FILE CABINET L976
FERC Docket No. ERl6-1507-000
35300 FILE CABINET 7934
35300 FILE CABINET 1966
35300 DRAFTING TABLE L975
35300 TABLE 1938
35300 TABLE 1968
35300 HYDROGEN ANALYZER 1988
3s300 LOCKER 1954
35300 MODEM 1988
35300 VACUUM GAUGE 1988
35300 VISE 1984
35300 SIGN 1988
3s300 COMPUTER AND PERIPHERALS 1992
3s300 PRINTER 1988
35300 PRINTER 1989
35300 PRINTER 1992
35300 PRINTER 7992
35300 INTERCOM SYSTEM r976
39720 MICROWAVE, PANEL UNIT 1999
39720 MICROWAVE, PANEL UNIT 1999
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, RADIO 1999
39720 MICROWAVE, RADIO 1999
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, EQUIPMENT 1999
39720 MICROWAVE, EQUIPMENT 1999
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, EQUIPMENT 1999
39720 MICROWAVE, EQUIPMENT 1999
39720 MICROWAVE, CARD UNIT 1999
39720 MICROWAVE, CARD UNIT 1999
35300 CONTROL RACK/PANEL FRAME 1999
3s300 CONTROL COMPUTER & PERIPHERA6 1999
35200 OUTDOOR CABINET FND 1999
35300 #78. #L9 CONTROL WIRE 1999
35300 #14 - #!6 CONTROL WtRE 1999
3s300 #10 - #72 CONTROL WtRE 1999
35300 #1 - #6 CONTROL WIRE 1999
35300 #6 COPPER GROUND MAT 1999
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 58 of69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
35300 250 MCM COPPER GROUND I 1999
35300 4'' CONDUIT 1999
3s300 SMALL ELECTRICAL ENCLOSURE 1999
3s300 #10 - #72 CONTROL WIRE 1999
35300 ALARM/MONITORING EQUI PMENT 1999
3s300 CONTROL COMPUTER & PERIPHERA6 1999
35300 CONTROL WIRE - LOW VOLTAGE 1999
35300 #18 - #19 CONTROL WIRE 1999
3s300 #LO - #L2 CONTROL WIRE 1999
35300 FIBER OPTIC CABLE 2001
39720 MICROWAVE, BATTERY 2000
39720 MICROWAVE, EQUIPMENT 2000
3s300 CONTROL WIRE - LOW VOLTAGE 2007
3s300 fiLO - #72 CONTROL WIRE 2007
35300 COAXIAL CABLE 2001
35300 FIBER OPTIC CABLE 2007
3s300 COMPUTER AND PERIPHERATS 2001
35200 COMPLETE STATION BUILDING 200t
35200 SMOKE DETECTOR 200L
35200 CEMENT WALL (FENCE)1998
35300 CONTROL RACK/PANEL FRAME 1998
35300 CONTROL RACK/PANEL FRAME 1998
3s300 ALARM/MONITORING EQUIPMENT 1998
3s300 ALARM/MONITORING EQUIPMENT 2002
35300 SCADA MCK/PANEL FRAME 2002
35300 SCADA RAC(/PANEL FRAME 2002
35300 SCADA RACK/PANEL FRAME 2002
35300 SCADA RACK/PANEL FRAME 2002
3s300 SCADA MCK/PANEL FRAME 2002
35300 SCADA EQUIPMENT 2002
35300 SCADA EQUIPMENT 2002
35300 SCADA EQUIPMENT 2002
35300 2/0 AWG CONDUCTOR COPPER 2002
3s300 250 MCM CONDUCTOR COPPER 2002
35300 5OO MCM CONDUCTOR COPPER 2002
3s300 f18 - #19 CONTROL WIRE 2002
35300 #74 - *L6 CONTROL WIRE 2002
35300 #LO. #L2 CONTROL WIRE 2002
35300 f6 COPPER GROUND 2002
3s300 2" -3-7/2" CONDUlr 2002
3s300 4'' CONDUIT 2002
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 59 of69
Version 0.0.2
Effective:
Filed on : April 27,2016
FERC Docket No. ERl6-1507-000
35300 PROTECTION EQUIPMENT 2004
3s300 PROTECTION EQUIPMENT 2004
3s300 PROTECTION EQUIPMENT 2004
35300 PROTECTION EQUIPMENT 2004
35300 COMMUNICATIONS EQUIP 2004
35300 COMMUNICATIONS EQUIP 2004
35300 COMMUNICATIONS EQUIP 2004
35300 COMMUNICATIONS EQUIP 2004
35200 CONDUIT & FITTINGS UNDERGROUND 2004
35300 CONTROL WIRE - LOW VOLTAGE 2004
35300 GROUNDING AND FITTINGS 2004
35300 CONTROL MCK/PANEI FRAME 2004
3s300 PROTECTION EQUIPMENT 2004
35300 SCADA EQUIPMENT 2004
3972A MICROWAVE, RADIO 2005
39720 MICROWAVE, EQUIPMENT 2005
35300 SCADA EQUIPMENT 2005
3s300 CONTROL WIRE - LOW VOLTAGE 2005
35300 CONTROL EQUIPMENT 2005
35300 METERING EQUIPMENT 200s
35300 METERING EQUIPMENT 200s
35300 METER 2005
35300 130 VOLT BATTERY CHARGER 2004
35300 130 VOLT BATTERY 2004
35300 BATTERY RACK 2004
3s300 SAFETY SWITCH 2004
35200 WOOD POLE - COMMUNICATION 2005
35300 FIBER OPTIC CABLE 2005
3s300 COMMUNICATIONS EQUIP 2006
35300 COMPUTER AND PERIPHERA6 2006
35300 CONTROL WIRE - LOW VOLTAGE 2005
35300 CONTROL RACK/PANEL FRAME 2006
3s300 PROTECTION EQUIPMENT 2006
35300 CONTROL EQUIPMENT 2006
35300 130 VOLT BATTERY CHARGER 2005
35300 130 VOLT BATTERY 2005
35300 BATTERY RACK 2005
3s300 SAFEW SWITCH 2006
3s200 CONDUIT & FITTINGS UNDERGROUND 2007
35200 CONDUIT & FITTINGS UNDERGROUND 2007
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.1s8.21.2
Page 60 of69
Version 0.0.2
Effective:
Filed on : April27,2016
35300 PROTECTION EQUIPMENT 2002
FERC Docket No. ERl6-1507-000
35200 WOOD POLE - COMMUNICATION 2007
3s200 WOOD POLE - COMMUNICATION 2007
3s200 WOOD POLE - COMMUNICATION 2007
3s200 WOOD POLE - COMMUNICATION 2007
35300 MISC TEST EQUIPMENT 2007
35200 CONDUIT & FITTINGS UNDERGROUND 2006
35300 BARRIER - FENCE, EQUIP PROT 2006
35300 CONTROL WIRE - LOW VOLTAGE 2006
3s300 CONTROT RACK/PANEL FRAM E 2005
3s300 CONTROL RACK/PANEL FRAME 2006
35300 PROTECTION EQUIPMENT 2006
35300 SCADA RACK/PANEL FRAME 2006
3s300 SCADA EQUIPMENT 2006
3s300 SCADA COMPUTER AND PERIPHERALS 2006
3s300 CONTROL WIRE - LOW VOLTAGE 2006
35300 GROUNDING AND FITTINGS 2006
3s300 CONTROL EQUIPMENT 2005
35300 AI.ARM/MONITORING EQUIPM ENT 2007
35300 CONTROL RACK/PANEL FRAM E 2007
35300 CONTROL RACIVPANEL FRAME 2007
3s300 CONTROL RACK/PANEL FRAME 2007
35300 CONTROL RACK/PANEL FRAME 2007
3s300 CONTROL RACK/PANEL FRAME 2007
3s300 CONTROL MCIVPANEL FRAME 2007
3s300 CONTROL RACK/PANEL FRAME 2007
35300 CONTROL RACIVPANET FRAME 2007
3s300 CONTROL RACK/PANEL FMME 2007
35300 CONTROL RACK/PANEL FRAME 2007
3s300 PROTECTION EQUIPMENT 2007
3s300 PROTECTION EQUIPMENT 2007
35300 PROTECTION EQUIPMENT 2007
3s300 PROTECTION EQUIPMENT 2007
35300 ALARM/MONITORI NG EQUIPM ENT 2007
3s300 ALARM/MON ITORING EQU I PM E NT 2007
3s300 SCADA MCK/PANEL FRAME 2007
35300 SCADA RACK/PANEL FRAME 2007
35300 SCADA EQUIPMENT 2007
35300 SCADA EQUIPMENT 2007
35300 SCADA COMPUTER AND PERIPHERALS 2007
35300 SCADA COMPUTER AND PERIPHERALS 2007
3s300 COMM RACK/PANEL FRAME 2007
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.1s8.21.2
Page6l of69
Version 0.0.2
Effective:
Filed on : April27,20l6
FERC Docket No. ERl6-1507-000
35300 COMM RACK/PANEL FRAME 2007
3s300 COMM RACK/PANEL FRAME 2007
35300 DISTANCE / FAULT LOCATOR 2007
3s300 DISTANCE / FAULT LOCATOR 2007
35300 COMMUN]CATIONS EQUIP 2007
35300 COMMUNICATIONS EQUIP 2007
35300 COMMUNICATIONS EqUIP 2007
3s300 COMMUNICATIONS EQUIP 2007
3s300 coMMUNTCATTONS EQUTP 2007
35300 COMMUNICATIONS EQUIP 2007
35300 IT8 VOIT BATTERY CHARGER 2007
3s300 48 VOLT BATTERY CHARGER 2007
35300 II8 VOLT BATTERY 2007
35300 48 VOLT BATTERY 2007
35300 BATTERY RACK 2007
3s300 BATTERY RACK 2007
35300 BATTERY RACK 2007
3s300 BATTERY RACK 2007
35300 AUXILIARY LOAD CENTER 2007
35300 AUXILIARY LOAD CENTER 2007
35300 TMNSFER SWITCH 2007
35300 TRANSFER SWITCH 2007
35200 CONDUIT & FITTINGS UNDERGROUND 2008
35300 CONTROL WIRE - LOW VOLTAGE 2008
397LO TELEPHONE, MISC EQUIPMENT 2009
39740 FIBER, MISC EQUIPMENT 2009
35300 CONTROT WIRE - LOW VOLTAGE 2009
35300 GROUNDING AND FITTINGS 2009
3s300 CONDUIT & FITTINGS ABOVE GROUN 2009
3s300 COMMUNICATIONS EQUIP 2006
35200 SUPERSTRUCTURE ROOF 2009
3s300 CONTROLWIRE - LOW VOLTAGE 2009
35300 PROTECTION EQUIPMENT 2009
35300 CONTROL WIRE - LOW VOLTAGE 20LO
35300 GROUNDING AND FITTINGS 20LO
3s300 CONDUIT & FITTINGS ABOVE GROUN 2070
35300 SMALL ELECTRICAL ENCLOSU RE 20LO
35300 CONTROL WIRE - LOW VOLTAGE 2009
3s300 CONDUIT & FITTINGS ABOVE GROUN 2009
3s300 SMALL ELECTRICAL ENCLOSURE 2009
ldaho Power Company
FERC Electric Tariff
Rate Schedules
COMM RACK/PANEL FRAME3s300
1.158.21.2
Page 62 of69
Version 0.0.2
Effective:
Filed on : April 27 ,2016
FERC Docket No. ERl6-1507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
3s300 BUS - CONDUCTOR WITH FITTINGS 20LO
35300 CONTROL WIRE - LOW VOLTAGE 20LO
35300 YARD LOCAL SERV OR LOAD CENTER 2070
35300 TRANSFER SWITCH 2010
3s200 CONDUIT & FITTINGS UNDERGROUND 2009
3s300 COAXIAL CABLE 2009
35300 COMM RACK/PANEL FRAME 2009
3s300 COMMUNICATIONS EQUIP 2009
35300 CONTROL WIRE - LOW VOLTAGE 2070
3s300 CONDUIT & FITTINGS ABOVE GROUN 20ro
35200 CONDUIT & FITTINGS UNDERGROUND 2070
35300 CONTROL WIRE - LOW VOLTAGE 20L0
35300 CONTROL WIRE - LOW VOLTAGE 2010
35300 CONTROL WIRE - LOW VOLTAGE 2017
35300 COAXlAL CABLE 20tL
3s300 CONDUIT & FITTINGS ABOVE GROUN 2017
3s300 MISC TEST EQUIPMENT 2071
3s200 CONDUIT & FITTINGS UNDERGROUND 20LO
35200 CONDUIT & FITTINGS UNDERGROUND 20LO
35200 CONCRETE MAN HOLE WCOVER 2010
3s200 CONCRETE MAN HOLE W/COVER 20L0
3s300 COMPOSITE CABLE. LOW VOLTAGE 2010
35300 COMPOSITE CABLE - LOW VOLTAGE 20to
35300 CONTROL RACK/PANEL FRAME 2070
35300 CONTROL RACK/PANEL FRAME 2010
35300 CONTROL RACK/PANEL FRAME 2070
35300 CONTROL RACIVPANEL FRAME 20L0
35300 CONTROL RACK/PANEL FRAME 2070
3s300 CONTROL RACK/PANEL FRAME 2010
3s300 CONTROL RACK/PANEL FRAME 2070
35300 CONTROL RACK/PANEL FRAME 2070
35300 CONTROL RACK/PANEL FRAME 2010
35300 CONTROL RACK/PANEL FRAM E 2010
35300 CONTROL RACK/PANEL FRAM E 2070
35300 CONTROL RACK/PANEL FRAME 20LO
3s300 CONTROL RACK/PANEL FRAM E 20to
35300 CONTROL RACK/PANEL FRAME 2010
35300 PROTECTION EQUIPMENT 2070
35300 PROTECTION EQUIPMENT 20LO
35300 PROTECTION EQUIPMENT 2070
35300 PROTECTION EQUIPMENT 20LO
r.158.21.2
Page 63 of69
Version 0.0.2
Effective:
on: April 27,2016
FERC Docket No. ER15-1507-000
3s300 PROTECTION EQUIPMENT 20to
3s300 PROTECTION EQUIPMENT 2070
35300 PROTECTION EQUIPMENT 2070
3s300 PROTECTION EQUIPMENT 2010
35300 CONTROL COMPUTER & PERIPHERALS 2010
35300 CONTROL COMPUTER & PERIPHERALS 2010
3s300 CONTROL COMPUTER & PERIPHERALS 20LO
35300 CONTROL COMPUTER & PERIPHERA6 2010
3s300 CONTROL COMPUTER & PERIPHERALS 2010
35300 CONTROL COMPUTER & PERIPHERALS 20LO
3s300 COMMUNICATIONS EQUIP 2010
35300 COMMUNICATIONS EQUIP 20LO
3s300 COMMUNICATIONS EQUIP 20L0
35300 COMMUNICATIONS EQUIP 2070
3s300 COMMUNICATIONS EQUIP 20LO
35300 COMMUNICATIONS EQUIP 2070
3s300 COMMUNICATIONS EQUIP 2010
35300 COMMUNICATIONS EQUIP 20L0
3s300 coMMUNTCAT|ONS EQUTP 20LO
3s300 COMMUNICATIONS EOUIP 20LO
35300 COMMUNICATIONS EQUIP 2070
35300 COMMUNICATIONS EQUIP 2010
35300 COMMUNICATIONS EQUIP 2010
3s300 COMMUNICATIONS EQUIP 2010
35200 COMPLETE STATION BUILDING 2017
3s200 CONCRETE SURFACE TRENCH WLIDS 2077
35300 GROUNDING AND FITTINGS 2077
3s300 CONTROL WIRE - LOW VOLTAGE 20Lt
3s300 SMALL ELECTRICAL ENCLOSURE 20tL
3s300 SWITCH - AIR BREAK OR BYPASS 20tL
3s300 CONTROL MCK/PANEL FRAM E 207L
35300 CONTROL RACK/PANEL FRAME 20Ll
3s300 CONTROL RACK/PANEL FRAME 20tL
35300 PROTECTION EQUIPMENT 20L7
35300 PROTECTION EQUIPMENT 2017
35300 PROTECTION EQUIPMENT 20LI
3s300 COMMUNICATIONS EQUIP 2077
35300 COMMUNICATIONS EQUIP 2011
35300 CONTROL WIRE - LOW VOLTAGE 207L
35300 CONTROL RACK/PANEL FRAME 20LL
35300 PROTECTION EQUIPMENT 20L7
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.1s8.21.2
Page 64 of69
Version 0.0.2
Effective:
Filed on : April 27,2016
FERC Docket No. ERl6-1507-000
3s300 COMMUNICATIONS EQUIP 20t7
3s300 COMMUNICATIONS EQUIP 2017
35300 COMMUNICATIONS EQUIP 20LL
39720 MICROWAVE, EQUIPMENT 20to
39720 MICROWAVE, WIRE/CABLE 20to
3s300 CONTROL WIRE. LOW VOLTAGE 2012
35300 COMM RACK/PANEL FRAME 20L2
35300 COMMUNICATIONS EQUIP 2072
35300 CONTROL WIRE - LOW VOLTAGE 20L2
35300 FIBER OPTIC CABLE 20L2
3s300 CONDUIT & FITTINGS ABOVE GROUN 2012
35300 SCADA EQUIPMENT 20L2
35300 PROTECTION EQUIPMENT 2012
35300 MISC TEST EQUIPMENT 20Lt
35300 PROTECTION EQUIPMENT 2012
35300 PROTECTION EQUIPMENT 20t2
35300 COMMUNICATIONS EQUIP 2012
3s300 COMMUNICATIONS EQUIP 20L2
35300 PROTECTION EQUIPMENT 2004
35300 PROTECTION EQUIPMENT 2004
3s300 PROTECTION EQUIPMENT 2004
3s300 PROTECTION EQUIPMENT 2004
35300 COMMUNICATIONS EQUIP 2004
3s300 COMMUNICATIONS EQUIP 2004
35300 COMMUNICATIONS EQUIP 2004
35300 COMMUNICATIONS EQUIP 2044
3s200 CONDUIT & FITTINGS UNDERGROUND 2070
35200 CONDUIT & FITTINGS UNDERGROUND 20to
3s200 CONCRETE MANHOLE WCOVER 2010
3s200 CONCRETE MANHOLE WCOVER 2010
35300 COMPOSITE CABLE - TOW VOLTAGE 20LO
35300 COMPOSITE CABLE - LOW VOLTAGE 2010
35300 CONTROL RACK/PANEL FRAME 20LO
35300 CONTROL RACK/PANEL FRAME 2070
3s300 CONTROL RACK/PANEL FRAME 2010
35300 CONTROL RACK/PANEL FRAME 2010
35300 CONTROL RACK/PANEL FRAME 20LO
35300 CONTROL RACK/PANEL FRAME 2010
3s300 CONTROL RACK/PANEL FRAME 20to
35300 CONTROL RACK/PANEL FRAM E 20L0
35300 CONTROL RACK/PANEL FRAM E 2010
Idaho Power Company
FERC Electric Tariff
Rate Schedules
t.1s8.21.2
Page 65 of69
Version 0.0.2
Effective:
Filed on : April27,2016
FERC Docket No. ERl6-1507-000
35300 CONTROL RACK/PANEL FRAME 2010
3s300 CONTROL RACK/PANEL FRAME 2070
35300 CONTROL RACK/PANEL FRAME 2010
35300 CONTROL RACK/PANEL FRAME 20LO
35300 CONTROL RACK/PANEL FRAME 2010
35300 PROTECTION EQUIPMENT 2010
3s300 PROTECTION EQUIPMENT 2010
3s300 PROTECTION EQUIPMENT 20LO
35300 PROTECTION EQUIPMENT 2010
3s300 PROTECTION EQUIPMENT 2010
35300 PROTECTION EQUIPMENT 2010
3s300 PROTECTION EQUIPMENT 2010
35300 PROTECTION EQUIPMENT 20to
3s300 CONTROL COMPUTER & PERIPHERA6 20LO
35300 CONTROL COMPUTER & PERIPHERALS 20LO
3s300 CONTROL COMPUTER & PERIPHEMLS 2010
35300 CONTROL COMPUTER & PERIPHERALS 20LO
3s300 CONTROL COMPUTER & PERIPHERALS 2010
35300 CONTROL COMPUTER & PERIPHERALS 20LO
3s300 coMMUNtCATtONS EQUTP 2010
3s300 COMMUNICATIONS EQUIP 2010
3s300 COMMUNICATIONS EQUIP 2010
35300 COMMUNICATIONS EQUIP 2010
3s300 COMMUNICATIONS EQUIP 2070
35300 COMMUNICATIONS EQUIP 2010
3s300 COMMUNICATIONS EQUIP 20L0
3s300 COMMUNICATIONS EQUIP 2070
3s300 COMMUNICATIONS EQUIP 2010
3s300 COMMUNICATIONS EQUIP 2010
35300 COMMUNICATIONS EQUIP 2010
35300 COMMUNICATIONS EQUIP 2010
35300 COMMUNICATIONS EQUIP 2010
35300 COMMUNICATIONS EQUIP 20LO
3s200 CONDUIT & FITTINGS UNDERGROUND 2007
3s200 CONDUIT & FITTINGS UNDERGROUND 2007
35200 CONCRETE MANHOLE WCOVER 2007
35200 CONCRETE MANHOLE W/COVER 2007
3s200 WOOD POLE - COMMUNICATION 2007
35200 WOOD POLE - COMMUNICATION 2007
35200 WOOD POLE - COMMUNICATION 2007
35200 WOOD POLE - COMMUNICATION 2007
Idaho Power Company
FERC Electric Tariff
Rate Schedules
t.ts&.21.2
Page 66 of69
Version 0.0.2
Effective:
Filed on : April27,20l6
FERC Docket No. ERl6-1 507-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
r.158.21.2
Page67 of69
Version 0.0.2
Effective:
Filed on : April27,2016
35300 COMMUNICATIONS EQUIP 2007
35300 COMMUNICATIONS EQUIP 2007
35300 CONTROL WIRE . LOW VOLTAGE 2072
35300 CONTROL RACK/PANEt FRAME 20L2
35300 PROTECTION EQUIPMENT 20L2
3s300 METERING EQUIPMENT 2072
3s200 CONCRETE SURFACE TRENCH WLIDS 2013
35200 CONDUIT & FIfiINGS UNDERGROUND 2013
3s300 CONTROL WIRE. LOW VOLTAGE 2073
35300 GROUNDING AND FITTINGS 20L3
3s300 UNDER 15KVA LOCAL SERVICE XFMR 2073
35200 SITE PREPARATION & IMPROVEMENT 20L3
3s200 YARD LIGHT SYSTEM 2073
35200 CONCRETE SURFACE TRENCH W/LIDS 2073
35300 CONTROL WIRE . LOW VOTTAGE 20L3
35300 GROUNDING AND FITTINGS 2013
35300 AUXILIARY LOAD CENTER 2073
3s300 AUXILIARY POWER XFMR 3 PH 20L3
35200 CONDUIT & FITTINGS UNDERGROUND 2017
3s300 CONTROL WIRE. LOW VOLTAGE 2011
3s300 GROUNDING AND FITTINGS 20L7
3s200 SITE PREPARATION & IMPROVEMENT 2073
3s200 CONDUIT & FITTINGS UNDERGROUND 2073
3s300 CONTROL WIRE. LOW VOLTAGE 2013
35300 CONTROL RACIVPANEL FRAME 20L3
3s300 CONTROL MCK/PANEL FRAME 20L3
35300 YARD LOCAL SERV OR LOAD CENTER 2073
35300 CONTROL WIRE - LOW VOLTAGE 2073
35300 CONTROL WIRE - LOW VOLTAGE 20L3
35300 CONTROL WIRE - LOW VOLTAGE 20L5
35300 CONTROT RACK/PANEL FRAME 2015
35300 CONTROL MCK/PANEL FRAME 2075
35300 CONTROL EQUIPMENT 2015
35300 CONTROL EQUIPMENT 20L5
3s300 COMMUNICATIONS EQUIP 2015
35300 CONTROL WIRE - LOW VOLTAGE 2015
35300 CONTROL RACK/PANEL FRAME 2075
3s300 CONTROL RACIVPANEL FRAME 2075
35300 CONTROL RACK/PANEL FRAME 2015
35300 PROTECTION EQUIPMENT 2075
35300 PROTECTION EQUIPMENT 2075
FERC Docket No. ERl6-1507-000
35300 PROTECTION EQUIPMENT 2015
35300 CONTROL EQUIPMENT 20L5
3s300 CONTROL EQUIPMENT 2015
35300 CONTROL EQUIPMENT 2015
35200 FOUNDATION - OTHER EQUIPMENT 2015
3s200 CONDUIT & FITTINGS UNDERGROUND 2075
35300 CONTROL WIRE - LOW VOLTAGE 2075
35300 TRANSFER SWITCH 20ts
35200 SITE PREPARATION & IMPROVEMENT 2015
35200 PERIMETER FENCE & GATES 20L5
35200 YARD LIGHT SYSTEM 2015
35200 BUILDING FIRE PROTECTION 2015
35200 CONCRETE SURFACE TRENCH WLIDS 2015
3s200 CONDUIT & FITTINGS UNDERGROUND 2015
35300 CABLE TRAY AND ACCESSORIES 2015
3s300 CONTROL WIRE - LOW VOLTAGE 2075
3s300 FIBER OPTIC CABLE 2015
35300 GROUNDING AND FITTINGS 20L5
3s300 CONDUIT & FITTINGS ABOVE GROUN 2075
35300 LARGE ELECTRICAL ENCLOSURE 20L5
3s300 15.49KVA LOCAL SERVICE XFMR 201s
35300 75KVA LOCAL SERVICE XFMR 2075
35300 SCADA RACK/PANEL FRAME 20L5
3s300 SCADA EQUIPMENT 2075
3s300 COMM RACK/PANEL FRAME 2075
35300 COMM RACIVPANEL FRAME 2015
35300 COMMUNICATIONS EQUIP 20L5
35300 COMMUNICATIONS EQUIP 20L5
35300 YARD LOCAL SERV OR LOAD CENTER 2015
3s300 130 VOLT BATTERY CHARGER 2015
35300 130 VOLT BATTERY 20L5
35300 BATTERY RACK 20L5
3s300 SAFETY SWITCH 20]-5
35300 TRANSFER SWITCH 20t5
35300 BUILDING SECURITY SYSTEM 2015
35200 CONDUIT & FITTINGS UNDERGROUND 2015
3s300 CONTROL WIRE - LOW VOLTAGE 2015
35300 GROUNDING AND FITTINGS 2075
35300 CONDUIT & FITTINGS ABOVE GROUN 2075
35300 SMALL ELECTRICAL ENCLOSURE 2075
35300 LARGE ELECTRICAL ENCLOSURE 20L5
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.1s8.2t.2
Page 68 of69
Version 0.0.2
Effective:
Filed on : April 27, 2016
FERC Docket No. ERl6-1507-000
3s300 CONTROL RACK/PANEL FRAME 20L5
35300 CONTROL RACK/PANEL FRAME 2015
35300 CONTROL RACK/PANEL FRAM E 20t5
35300 CONTROL MCK/PANEt FRAME 20L5
35300 PROTECTION EQUIPMENT 2015
35300 PROTECTION EQUIPMENT 2015
35300 PROTECTION EQUIPMENT 2015
35300 PROTECTION EQUIPMENT 2015
3s300 COMMUNICATIONS EQUIP 20L5
35300 YARD LOCAL SERV OR LOAD CENTER 20Ls
3s300 CONTROL EQUIPMENT 2015
35300 PROTECT]ON EQUIPMENT 2015
39740 FIBER, CARD UNIT 20L5
35300 CIP SECUR]TY SYSIEM 2014
35300 COMMUNICATIONS UPGRADE 20t4
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.2
Page 69 of69
Version 0.0.2
Effective:
Filed on : Apil27,2016
FERC Docket No. ERl6-l 507-000
i', I
6NrE rjEI
La.
o
o
IL
=
co O\ c.I
crts=
6h- =* o.Yr 9pr.:- c)
Jaq)
b0
COPfi-ol-rd)AH
ao
Ptu(.)o
I()-cBrO.d()
-Qq)t-jo.tP()
C)l{l!.-srOr\V.^al-d!- ii uta.=l+l 9Fcg+rXXi o*Al \
P.lL)(J(B6dO
CB$o.lI()o)li
A
,i-0<
(l)l-.(.)I-
g*alix()
=:f; tr
>E.G ^ vt-Q- - v oI-J.g () C
>G)(j)-
dIlE Ool)0 'A€*g .2
=adz E1Atrt!
F
ooa1'-
a\o
&rI]
z
G)J'oo
H
U&rrlLL
)
FoF
u
4
UC
J
FoF
(J
4
IJ4
}R
o
=o
Gu
IR
oU
o
o
=
ts
o
=o
Gu
=
6U
o
o
=
x
E.o
o
-9a
!
N
dUEc.9
@
i5
==c
-9Gu
-9
!
GooLJEcoEoo
i5
iR >e\\(oo@@
xxdl 6:
oodo'oo6€
dleoo
\r:€@6@N N
n<fm
NltEo
6
tlt
^!Ao-:oy.o
f=
lfeeooGE
Xu
x60 @cEo<'uo
oPUA'i:g
oaUTE
5!PAop .i,60Ll=s
:RXXNNFctdd60\o
xxxcdldl
brF
E€
sd
x;RxNNNdooN N F
xxiRoq oq ogooo
}RnoN
aoqoN
Fo
=F
gH
Oe
.lou
Uo
J
F}P
,S t-.1if;o
=(Jc
=
c.o6ooa
=oqoUtao
o
i5
oooc, ci ctooo666
d'! d! d?mom
onn
tsrrduid@@oNNN
qoo{N
qoo@
qoo@
qqqoooooot$ri
\\\o@@
dld.}c
6@@
eooN
q
o
qo
N
co'a
-2E
cE
F
a
=oq!
@
E
< + +r
S#$r
a!!E:>l6oaE83:J- J- l,o o or@@u'p=pl
6601
o
o
oooU
4
J
FoFFU
=dr(,o
G6
!,, I
5N
h9 rjEN.;a
o
()
=tL
c., O\ oI
c!Eo
frc.r E
- o.Y-; sn
=
xaxrxqoqogr9mrtsN$ 6 6l <t
I
!e x xlxnn.!lq@NN.T6S+.n
x
o
=o
GU
s
ouo
o
=
E.9
@
-9
oo
G(J
E
.9
o'o
=
o
=o
GU
=
oq
o
o3
3
c.9
o
oa
G
6(J
6CoEo
i5
I:F >R iRr *ooooooo'o I
IA X;RrXooooooorooOOrO
t^+@6Ydi di odl h3G3: K
il6-l c333; E6o-rli
I
d6ml 9RBd,GTNNI:
6cotq.i d; d'il IilBs: E
IqqqrqoOot()
I
t^hctY.ididirPsss: E
I
I
I
mml
&t!
t '6 '6tnoo_<f E ElI=lr.= d, d,tP:qEr
= o or2EE.J<h-iir1E 9r-= o o.Y66l
i&!t#*i
U
;ic.E+6e€EE
oO-o3;xE.TooEoJ.gB eo==
X;Rqcoooo
axooci ci
xxqqoooo
xxqqoo
F}P
=fi3;' -o (J>+f
-oo .:,o6t-t.r
OJo<
E=l-O-E3u6g ^i@
=u c
ooci cioo@@
oodcioo6€
eqoo
qgoooo@6
ooociooo6
qqoo
wsi
c.9
.2E
EG
F
omN
odE.C
6
.E
E.OcE.eotACUooL:a>=J>or
N;
4u:E
E.=
oi
.:Coc4r
oou!==6d
^XcrEE IE+ET€E H
oo+:RuulfE,5Oo
o6.=oYo==
F
=P
-a5-oL)>+ f-o.o.]
60!uH
uGJ
6L:=9czOyEBu5g'
o
=u a
Oo
Ir-o
\o
&E]
z
q)
lloooUdra
'L
aaotr
c
.9tn.9
Etntro
F
-Lc! l+i
ECE
U.g u
oH=}UU
a-q (,)o(Jm1e ISLLI (€3'tL d
:: \o.i=ENI.9rjEN.Eo
co€g
h
c.) O\ (\l
-':. dc!Eofr- F- o.=-: !pedg
x€xoz
6tfuf4o-o
x€xoqo
5Lrtss2
J
=PEtoZU+fE:8ug
J
=tsE
ffiiocfEt2E
qqmo<t+
qgmmst
qcoc,
JO
EEe(,OEfF
0rgt.cEE
ooat-ort)
a\0
&E]
ciz
C)ltoooo&Elh
Eqcl qiq'=Ed5t r
sEfo=-co-H oo\)08f;frXtL&
(J
4
(JG
LJ
4
(Je
J
FoF
3
itto<
=eof
og
Ug
FoF
B
,f;x.Got
o
=
o3o
6u
TR
GU
o
o
=
o
o
-9
=6o6(J
E
.9
o.!o
=
co.,
G
Ia
Pooao(J
6g
.9oo
i-
coo
coo
qo
s
o
=o
GU
a
or
o
oB
=
o
=o
ou
B
6u
o
o
=
s
E.9
6uIa
.T
oooU
6c.o
@
i5
=
co'i6o
-9
2uGo6U
ic
.9
o
i5
oOo
qooo
qo
<i
of;o
coo@
coots
.A,j P
ENPFJE c't'io.
;o
!3E.
o
.E
c'6
EEcG
o
Goao
TJ
d
bi).cE
=B
o.=
oo6o
6
o
E
Ef
G
=@.c
Eo
=oE
uqEoCt
ojOozEEO6O@Oc-EtstrOOq-m9c.=E;!t9o.=o
9o.=J
-6OJgq6EcE
tst ';o>
i]vuog;Eoo=-9Po
E6o.-T(J
Ed9secOGco=yoQ
-q
E9EqCLo=6OgEsfia-
e@(JEeoa-E
Eo
o.=
tioc
tr
.9vl.2
Evltr
IE
F
=
co O. e.l-i-Ac'l E cifr+ =- o.Y-: 9pr:" c)
OIr-.
I\o
dtI]
ctz
0),jlooo
Q
E.
>rEq(d q-i
tr(g
\JOO
o;:=
'UU6-r ooL)u)!f;€vnd.
x
@
=o
Gu
x
Gu
o
o
=
=
o
=o
oU
=
6uo
o
=
s
c.9o
=
Uooo(J
6c
Eoo
i5
=
co'a6
oa
.goeo(J
Ec.9
o
i5
xxNMdq;
!e :Roq\
aa
oqO^ O6- odo
9o8P'
ooct ct
cqo@6066
qoediHr
gqonNN<t6
fiac3tNJOLCooco
i,i
F=.=6#g
.9
.9
E
co
F
o3EtozoEo!
cr9
Eor19rJEN'i
o'oc)
tL
3
o
=o
@u
=
Guo
o
=
d'lo
x\@o
qo@N
r
u,o
c
N
co'6.9
E
CoF
-g'to
=
cn o\ c{_-:
"rb=fr- E
-'9psd -a)
U
l
L'g
(.,
c
()
_q
FoF
=sI(Jo<zc
o
Eao
(,)g
J
Fo
t
=Uo<
o
Etoz Ua
xEtsoz
o
E
fo
xE
fo
o
Etoz
x
c.9
@Io
.g
@ooL)'6c
.9
o.=o
3
EoE6
oa
6edL)6c.9
o.=o
xeNo
xN
F
q
6
e@N
qo
c
.9
.9E
oFcooo
=Iou
a,9
oE
o@
ool
o
cooo
=!Grg
@.9o
E
oooIt-o
I\o
&lll
z
G'.tloooU
Hfrr
tloq
c
.9IA.2
E.AtrtE
l-
Eqcd (io.'=
\JOo
o:=}UE
a-H o-.\U)4F4g
ij9
ENh9FsE"t'ia
:
o!{)
=E.
=
ca O\ (\l
-'a c;clEctfr.o =- o,Y
- !98dg
*(JEt
=itxU-
leuEfu
s.rYl(J
5
J
FoF
u
a
uG
J
FoF
3
=o
=o
.l
or
=
oq
o
.I
o
=
=E
c.9ouoa
2Iooou
dc
_9oo
i5
xx**lNH++Id.id*,EFOTOT'I
HEEsiBNdudr
xle.! d'!(ndFO!
ExRd
ooo6lci d ri qilo 6 rl t-d 6 rt <'r
I
d6oold; d di ciId6dNnloa+l
a
\L-oolHHRxi:
qqloroo6+ott
I
t:\l@NHNool
Idldlt6 666 1
!
I
I
I
I
I
I
t9rjrqr
;ir:i'
Irl
Er
EIoFI
btIrer
PrPrF
t1H@d
6ttm
Edc*
Ed
d.=FF
=6!9.cg
=Eo-goE
Z,Poo06oo=_Es gFYF
oo?F-orat
a\o
&t4
ciz
6)ltooo
(-)I14lL
x
c
-96uo
=oooo(J
oE
-9uo!o
3
=c.9
oI
-9
ti,uGeoIJ
Gc
-9uo:o
qcqoooooo666
om6d; di n;moo666
\tr:iD@rO@rolo
qgqoooooo<f!t<l
r:r:t@ro@omm
d! dt n?ooo660
o.Ec
6geo
EgLOOCF=coqt8Eg,F
eo^u!oiJ .o
GOoqc,=JE6:EEb
EgLO0@F=oa
PE
6
E
co
6
!3
r/trtm
9vg
oo
EF
c
oo
=oco
-=coEo!
oEtc.E
oF
oEo
EoFo
ot>
o3.Piil!oPEU'ts.O i,=*.tt z
Etsq'iEGt5t r
sEf
a-H ()
ol)04e IgHg
lj9.ao6NflrsEIr
:oEo
t!
ca O\ ol
-.: - c;olEofrr- =- o.YJ ^F'8
=
oooIf-ola)
I\o
&rI]
C,z
()
-ta()ooUil
14Er
lRl9tot
!
lRl!rol
I
JRI9rot
I
lRlq!
8r
xxeqoooo
xxooct c;
*E6Ysg
6ERd
EEE*ggEs
**re*ooc!-ciddg
*x*xeqqqoooooooodddH
xx*xoocroc, ci ct ci
:exxxx*8oooocroc,oooocrctc,oooocroc,Hdddddd
xxxlRx*x6000crocldcicidcrcici
xxxxxxxoooocr()odctdctcioctoooooo0dHHdHdd
xx*xx8x600000ctdcrctdddc;
x*rt !tq'+o6
a8qq66
J
FoF
ur
(,d
J
FoF
()
L
x
o3o
oE
x
ou
o
o3
qqoo€rt
oq8g
eoRc,
ee6€ttsrl
qcoo
<t rt
eq66
qqooorf
qogs
ctCqtoctH
oc
6EEE_ EF;.-EEEE*E;E_EEbi6OEOEEFSF!E'= E b oEE€=EiEE;EEE--a.i.bgo=S!9-mEitrcB6AAi7<gu
ii?irtddo6:J@@mmortoilJdH@S\\\\\\66dddHc+rootorodoHddd
HNOS6€It rt! lt tt + 1t
666GOOrccEcc.E'E'E'E'EE
oooooiu=FFFFFF=.=ooooruoFCCCE9Ei
ooooooF
666qc=cccc!266dG60pFtsFtstsFg,
,ntro
PlEPul!
=tn
xEh
trcl5t r
SEE
6-E OoU@!f;€,=tL&
ij9.l-oENtg FjEN'iA
co!*IL
=es6lEc;fr- E- o.Y'sg
FoF
(,
A
IJo
)
FoF
u
e
ug
==o3o
.5
6u
=
ouot
(,
=
x*lqqloo.od dl
IX*req.o
xxld Ntd ct.
!xxre og.
6 6!
oeld citoo_6 6ld 't
oolci dloOt66'd d!
Iqqtoor
qqroo-6 6!nhl
Iq9rooo old tr
Iqq.o o'6 nt
clolO Ur
Ee:d. i.i93|
G!
G .:lcc
EP'FOtr' trBE,cct'E Erfdt
c.o
G
t!,
oo6
a56
oootr-orr,
a\o
&E]
c,z
c)li()oo
O&E]lL
ciLa :H
CGI5t r
sEf
a-H o
€83
ii \o>=60rg9FjEc{'io
;ot:E.
ciO\N
r'!Eofro s- o.Y-_i uo ps6
=
E
u
c,
o
vltro
o+..A.o
=tn
6! q-i
trd
5'., 3
9EE
o-H ooUa1d I
,:tLd
x
-Ua<@d
=o
EU64u
xuE*uonSH5
)
FoF
U
r
uc
)
FoF
u
4
x
c.9
G
o
Eu6a6U
i6c.9
qo.:6
=
c,9o9a
2
Goo(J'6c.9
o
i-
3
o
=o
6U
=
6Bo
o
=
*xloolci ci.oo'ddt
ISErqq.oo'
xEisEl
I
EE]Eol
qooo
qoo
oc,
6.c
E
oF
o]sc.E
oI
xsxxx!ooooolcicicido.ooooo'diddHl
IXXlRleXlqqq99,ooooo'
HSEEE]xxEEEi
fis5E5lRPo.icil
.Esgg E
=p'E=.= u5F s
33ouL)<g
3= PE1
-!l @ ..Eg tr6*o3t.l g
qq
<f <t
qc60<l si
oooci
qqoo<t+
eqoo
gc@6oo
!Jlg 33,= \ \Eddl6O@--.HdlH-514++l9tE.
6.=qEEPP: frEg-EEE; q
:34-.Et6h !! F.lJ Jlr >46,e?e;:6 .e9 .99 g E: iri(96GFF!d
oooIt..o
I\o
t!
z
C)L()o
!
U&rrl
ij9
6Nt9r.lE!'=E
:oEc)=IL
ci o\ c{J-c;c!Eci3o r
'$5d.. a
I
t
I
I
I
!
t
I
I
I
I
I
I
I
!
I
I
XEqc;oo
5xciqoo
xEqc;oo
E*dg(fo
leqoo
xqo
x4+N
;enuiN
J
FoF
(,
&
(Jc
)
FoF
L,,
4
3
=o
=o
Gr
3
oU
o
i.o
=
t!Jlo-6l)ro,dlfrIt
ErE '!r
'=?g'i E '. I.OEE.
c b Er0FoI 'c titgs Er96ts!
oo<fIFoia
I\o
&rI]
C,z
c)llooo
UdrI]l&
EEtr(t5t r
sEf8E€o(JoEf;€,=iid
ca o\ c.l
-': cjqEcj€h- !J--!l:7t?9p6o--
=
-
r
(,
o
lhco
PG
tall
=tt
EUo.'Ecd5t r
oX=}UB
a-s ()
oU@4d I-s tIJ co:,tLd
OO
Ir--O
I\o
il14
z
q)L(.)o
!
Od
14IL
xxx.ooo'ci ct dlooo.
IsxxrqqQrooot
x
o
=o
6u
x
o!o
o
=
x
c.oo
oa
ooo()6
o'a
o
i-
)
FoF
U
4
Uc
J
FoF
(J
e
Ur
=
o
=o
oU
=
6u
o
o
=
=
c.o6
o
!
6aoUEc.9
@
i-
xxXr66Y-qi dt Prdd=l
I
AXpl\\5rSSeit
ooddioo
qq
€@(n0
qqc)o
cqlo66 0mol
Icq.tsN.I
oolriuitd dmml
tr:l
3rbro_str 6at Sal(
6=E E
=i
3'EL->E g.6r:
gr fi-A o 0r N
:s.e: E
=!c.F*gs; ;
g
.9
6
!f
omNoco.c
lI
s.I e
.E* e
oo9flJ;u13 =
69XuU; S
EfogEE e6U
axx;RxiRqgqcqcooooooooooooH d d d d i
}RaslRxxooooooctddctoct
sSXXXXfrcgqqciooooO
=ooooo" d H d d d
Sxxaxx,:ooooogctddcto
=f^4F
=t
=g LrEs f;i*-83 u
UJo<B= h
OP
.o,ft,lE+ ri-E
=E
I
I
I
I
I
I
I
!
I
I
g
@o
odtOr
qo
qo6
q
N
qnN
c.9
o,:
ooN!o
=_eo
=
ttrYlt60@@lg bbrai66v d Nl.U lrrb 1r *l
q 6 6.c clEi'7t; .E E . E E' Hi c.= c F F, qo l- E = q gr {F6:EqqrOFE6FF.:E$:E€e; ;iE=EEE: R
ii \o.u5EN
hg rjE c't
.E
A
troE*tL
6 O\ a.l
-.: - c;.!Eofr"t q
--.:l'$5o--
tJ
c
(,g
(,
r
us
J
FoF
(J
c
(,g
J
FoF
IJ
4
(JG
q!
Nt
^!Iq.
Sr
'!
s:lol
UIEtlN
6d<t
qc,
<.dl
5rbrRr
alIr
Er'fr
br!r9t
-El€r
Ettst
E.=6!.=oE1-
oC,F.:>tsEe8d J
oOoIFoin
I\o
dt!
C,z
0J'ooao&14Il
-Gdqio'=trcl5t rgEE
6- H (.)'oL)o
Ef;fi
cr9
ENtg rjEN.Er
doE*E.
('to\NJ-c;o!Eofr- E
- &BOr-
=
oootr-oin
a\o
&rI]
ctz
o&()oa()&14
=
c.9o
o
'oGoo(J
6c
-9oo
a
I
I
!
t
a
t
I
I
I
!
qtN
tl N --:s9 i;
qNroSsB
eu!nct6doEro
-^lv J!Soarlrom-ESS:S33,9r!:G G O.c E cr'E 'E 'Er eEEEb'gFFF.6EsLLt<E g E E: HE€€€I?I E E E! s19FFF'd
vltro
Po+.Uttt
=tn
xEiqdqio.'.cd
5',, ts
eEf
a-H ooUaEB€.3tLd
li:
ENk9FsEN.;o
--oE*tl.
ca o\ (\l
-:-c;c'lEofr+ I- -.='s5C\-
ee€ieXX*lRRRRqqqqIgEEBEgEE:
IHilS{8585:gggBcrctcid:
x
co
6o
-9
=uoeoutco
oo
i5
3
o
=o
ou
==6Uo
o
=
XXXSEEEE:EEFEEEEgI
EEEEEE6"EiRRRRcjcic;
eqg9oooooooo6666
d! n.! d? t!mmmmmmmon6ut6
NtstsFddGtro@r.orOrONNNN
cqqgoooooooorl' sl t ti
NNNtsuidddddddo606
f,] dl d! d!oo6mo@66
CCooUUooooee
li@6ddecrF6L, IJ
oo'tr'troGoocc
EE
66i;.a.cqql:l:EE-E'=i*sggFEE=E
dN.6FFbE*+FiNce e*:tt!:oo:--Ll!,#SEEE;-A'E'=-=OOOC'a0coy60(o6
o
oacr
r)
I\o
ilEI
C,z
0,&ooo
UdHEr
EG6qq'EE65t r
9EEo=ECLH Ool)0€*E
=Hd
xxxx!oo6di di di dirrnmm-l
IXXXHrt\\\.@@(oE'lOtO@al
Iqq\tsrEEHs;I
Id'! d! .! 9rmm+O'tlttm6l
a
Ir: \ !'! n.@ooHroo o o @l
I
I
I
-^l?!,601mm-Hdl\\-HHIo ro-ddlIir+ ltl
6 G.dNc.=l+*EEtE E.b.br7'?:=t= tr o oro o c c'FFiia-CSB€.=66'6 O d o'A#FtsI
-u9
5Ntg FSE!
o
o
EIt)
h
cnO\N
-'- c;o'l E ctfr,n q
- i.Y- &Bo.a
=
(!,
o
?rr
in
a\o
&trl
C,z
o14ooo
UilglIL
o
c.96
It5
om
-toc3o
L)e
XXE6EEEXEF:EESEEgESEg:
IHSEsEsSEEE:SgBctddSBgS;
leuEt
=+fi(JGBq
""Hfu
s.rgE
IR
c
-eou
-9
!qoooL)
6co
uo
6
J
tsoF
(,
e
(,g
J
FoF
L'
c
(Jg
!R * }ql\\tl@@o.@6Er Ixxx!moo!6 d; ail
X*HEEEERRREEEE
EEEEEESRRRdddg
d! d? d!mom66@
5555:6q6qt(9999tE eet=rrr'HcrRBBiiii:E99q.q.q.q.s.q.q:ju96h66n66l9gPEEEESEEIE#}E!!EeE!:E Y
- 6 d o d d 6 o.EEE€EEEEEE;cEErrrrttr;EihEEgEEgE:=TE"EEEEEEE:o==60qqO:).cacccEtr:6o 9 s g g E g e:F4dFFFFFF}-'
vlgo.},o+,vltt
=ttt
EcG! qio.'EEd5t r
sEf
a-H o'oUo
€*g
=td
ij9.loENrE rJE1'=r
:o
E
C)
f!
=
cn o\ (\J-c;e'lEofr.o q
--.: C) !,P-po.-
ooOaFrorr)
a\o
&14
C,z
6)l4ooo
L)dE]CL
I
o
=ot
oU
x
oU
o
o
=
==o
=ot
ou
3
=ouo+o
=
E6*sx:EEDD;:
:HxXXE:BE$$E;
t
*l!rI
Ix!9root
nEEERHcio
ExEE
iYoOHO9P
qq9oao6ONN000rl,
mm6di d; rimoro60m
\qdlG66ororod d N
qqomog)oo
o(,c, ct
aa
o! otoo
rl
oottr6GoodGt
iir6 6oadit
.B .s' fi:a8;rs8_ 9:EEE€E:E E b b ErOOFFF.FFdNd d t lt :r*&E ts c !t
=='EEE'eotE=l88==Er
re * )e lelHF6=.NO6:_Nros?
I
!xxxXromt?-lFBHE;
)
Fot-
U
c
Ur
J
FoF
(J
A
uE
3
co
ou
-9
IoCLoU
6c.9oo
6
I
t
I
I
I
I
I
I
!
I
I
qqa@oonOoo600
d! ol Fl60momrorono
FFHut ili c;60FNNTI
tsF6idqtsdooo
6ou!ss#
9rx6l$r;'
Sr
=rErE 'Er
'= olE!,iE'ts !t'B t,pEt
coaooc,
^qE6H()e-E
;a6gEEtrEa.oFF
a=
oeoo|9&
utco
PIE+tgllt
=tD
EH
gd5t r
EEE
CLE ()'oUa
EfrE
ij9
EN,9 FjEN'io
tro!o
lrr
fio\N
-'- c;c!Ec,fr"-.*
-.: G, !r,$-6A. t?
Xe
oao
=o!U8cU
Xu
OAoq
o?EE3
Js
=bg?
64
.l
ou(J g
J
=tr=tri
'S9ifJo
=H
x
co
o0
-9
:qooo(J
6c.9o
E6
3
a.9
6I
_9a
lla6odu
6co
uo
6
EEEsEIhhhcio:
xx*€E:$$$gE:
XXXX*rooooo-ooooor !
xlRre* xlqcqqqrooooo.ooooddddHl
I
I
I
I
t
I
I
I
I
I
qqqooEroo6
6Amdi di diro@roooo
d? G! n:
666roro@
tqarq
grooroom
gqqooo
>.
€l9r
-fSrnl1r
Er'[r
Er!rgr
Er
f,r
EtFr
xom\6EE'Ed!*gE.;;cclrqEE
-'=oo
=EFF=EE*Esd=i>;'E*GO.=CooEi:ltt6ZF
c
-96
!f
mlt6o
=goat
oooIr*oia
t\o
ilr!
z
o,laooo(J&tI]h
Eqcl qio'=8.(66! rtEt
6-H ()
oUh8f;fr3t,.-e/,
lj:.ZoENtgnsEN.Eo
;o'og
frr
mO\GtJ-dqEoB- E;-.!i'$5a. -
=
(,
oootFoia
a\o
&
1I]
dz
c)l.ooo
UdE]rI.
8xrIltNNI
I
x*ld! dlttsF.
GU
E= c
$l E
U
c
IJg
J
FoF
U
4
()c
J
FoF
U
G
(Jq
==U
3
=
o
=of
6B
=
GroJ
ru
=
Ec
.9uo.=6
=
co
6q
-ea
'troCLo(J6c
-ooo.!o
qql8tr66.
!
oolci cil
I
q6!ooloo
H -!
ErtrEr-r5rdirq J.
L) strii >rEf;,
6Er
= clEEr#trt9riEr
-€' ei
EE:
Xss:Nci d;
HEEiFEE;
6686mtsl\xG66
xxxXGNNYui ..i Gi I6sf<t=
xxxxxiele:aqqqqeorroooooool
Ixxx**>e*tooooo00.eiciciddctd'ooooo00ldHdddd
oc;o6
eooro
qort
colomoo
ctro@
d! d'! d!oo6roroooom
h+cg.idir;Pd60=nmm;i
qgcqoooo
6criC.id;d;PNOO=noo=
I
I
I
--!toold6-Lddtq\\-o o € 6 nlEEEE SS,,!{qi *s:E=6:=';66Pyr9oEE.EE'Erj3E.=EEEb.brgE.E.Eb.E:IITEgP!i E g'3
EEEE;EEI fi
tttc
_9+,oPailt
=ta
Eqa :ti
E6l,5t rrEf
CLH ()'oUo
5E€,=iid
lj9
6..let{EN'=r
eoE()
TL
cao\NJ-cio!Ect
fro. I
'$-Bo1 -
=
(,
=ot
6r
3
=oUot
o3
8Xc.!mo6d
xx\qli)d!tO
qqoooon6
qqooooo4
ociqdori
CooiEH
gqoooo6d
qqoo()nN+
f^lo>lt!.60'O mrdiE:6-
6 -ac G.
= Erd : El.=P.E,H
!oat2P! E'IEL=l 6E E €,?EE=to
=ri:.(,z,6Fr6
oo?c-otat
I\o
Ird
ctz
Dlio
o
U&r!f:.
Euo.'=qd
5',, I
eEf
a-H ool)o4& I
j tL*
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.4
Pagelofll
Version 0.0.1
EXHIBIT D
Monthly Transmission Facilities O& M Charge; Monthly Substation O&M Charge;
Monthly Common Equipment Charge
l. Interpretation: Cooperation.
(a) Capitalized terms not defined in this Exhibit D are defined in
Article I of this Agreement.
(b) The Parties shall cooperate as necessary to update this Exhibit
D in the event that FERC formula rate filing references change over time.
Monthly Transmission Facilities O&M Charee.
(a) The Monthly Transmission Facilities O&M Charge for each
Transmission Segment each month during the Term shall be equal to: (i) the product of:
(A) the Acquisition Cost of the Transmission Segment as of such month; and (B) the O&M
Expense Factor as of such month; divided by (ii) twelve (12).
(b) Beginning the first month after the Effective Date and each
month thereafter throughout the Term, pursuant to Section 4.7 of this Agreement, each
Operator shall invoice the Non-Operating Owner for its Pro Rata Share (based on its
Ownership Interest in the Transmission Segment) of the Monthly Transmission Facilities
O&M Charge with respect to each Transmission Segment for which it is responsible. The
invoice shall show the total Monthly Transmission Facilities O&M Charge with respect to
each Transmission Segment for which it is responsible as well as each Owner's Pro Rata
Share (based on its respective Ownership Interest in the Transmission Segment).
3. Monthly Substation O&M Charee.
(a) The Monthly Substation O&M Charge for each Substation each month
during the Term shall be calculated as follows:
(i) If the description of any Substation Segment in such Substation
on Exhibit C indicates that any Substation Segment contains Line Terminal Equipment,
then the Monthly Substation O&M Charge for such Substation shall be calculated as the
sum of the following:
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21 .4
Page2ofll
Version 0.0.1
(A) For each Substation Segment in the Substation, the
portion of the Monthly Substation O&M Charge for the Line Terminal Equipment in each
such Substation Segment shall be equal to: (1) the product of: (x) the Acquisition Cost of
the Line Terminal Equipment in each such Substation Segment as of such month; and (y)
the O&M Expense Factor as of such month; divided by (2) twelve (12); and
(B) The portion of the Monthly Substation O&M Charge
for the Substation Bus Equipment in the Substation shall be equal to: (l) the product of: (x)
the Acquisition Cost of the Substation Bus Equipment of such Substation as of such month;
and (y) the O&M Expense Factor as of such month; divided by (2) twelve (12)..
(ii) If the description of the Substation Segments in the Substation
on Exhibit C does not indicate that any of the Substation Segments contain Line Terminal
Equipment, then the Monthly Substation O&M Charge for such Substation shall be equal
to: (A) the product of: (l) the Acquisition Cost of the Substation Bus Equipment of such
Substation as of such month; and (2) the O&M Expense Factor as of such month; divided
by (B) twelve (12).
(b) Beginning the first month after the Effective Date and each month
thereafter throughout the Term, pursuant to Section 4.7 of this Agreement, each Operator
shall invoice the Non-Operating Owner for its Pro Rata Share of the Monthly Substation
O&M Charge with respect to each Substation it is responsible for as follows.
(i) For any Monthly Substation O&M Charge calculated pursuant
to Section 3(aXi), the Non-Operating Owner's Pro Rata Share of the Monthly O&M
Substation Charge shall equal the sum of:
(A) For each portion of the Monthly Substation O&M
Charge calculated pursuant to Section 3(aXiXA), with respect to each Substation Segment,
the Non-Operating Owner's Pro Rata Share shall be based on its Ownership Interest in
each Substation Segment in such Substation; and.
(B) For the portion of the Monthly Substation O&M
Charge calculated pursuant to Section 3(aXiXB), the Non-Operating Owner's Pro Rata
Share shall be based on the applicable Substation O&M Allocation.
(iD For any Monthly Substation O&M Charge calculated pursuant
to Section 3(aXii), the Non-Operating Owner's Pro Rata Share shall be based on the
applicable Substation O&M Allocation.
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.4
Page3ofll
Version 0.0.1
4. Monthly Common Equipment Charee.
(a) The Monthly Common Equipment Charge for the Common
Equipment at each Substation each month during the Term shall be equal to: (i) the sum of
the Return on Capital, the Recovery of Capital, the State and Federal Income Taxes, the
Local Properfy Tar<es and the Transmission O&M Expense, in each case, with respect to
the Common Equipment; divided by (ii) twelve (12).
(b) Beginning the first month following the Effective Date and each
month thereafter throughout the Term, pursuant to Section 4.7 of this Agreement, each
Operator shall invoice the Non-Operating Owner for its Pro Rata Share (based on its
Common Equipment Allocation Factor in the Substation) of the Monthly Common
Equipment Charge with respect to each Substation for which it is responsible. The invoice
shall show the total Monthly Common Equipment Charge with respect to each Substation
for which it is responsible as well as each Owner's Pro Rata Share (based on its respective
Common Equipment Allocation Factor in the Substation).
5. Annual Adjustment. The following terms shall be adjusted each June (in the
case of PacifiCorp) and each October (in the case of Idaho Power) following the Effective
Date by the Operator responsible for the Transmission Segment, the Substation Segment or
the Common Equipment, as appropriate, as follows (collectively, the "Annual
Adjustment"):
(a) the Acquisition Cost of the Common Equipment, the Acquisition Cost
of the Line Terminal Equipment, the Acquisition Cost of the Substation Bus Equipment,
the Acquisition Cost of the Substation Segment, the Acquisition Cost of the Transmission
Segment, and Net Book Value, all of which shall: (i) exclude any costs included in CWIP;
(ii) not be reduced for accumulated depreciation (except for Net Book Value); and (iii) be
adjusted as follows:
(l) Increased to reflect the cost ofcapital upgrades to such
Transmission Segment, Substation Segment or Common Equipment placed in service
during the months since the Effective Date or the last date of the immediate, prior annual
adjustment; and
(2) Decreased to reflect the cost of equipment comprising such
Transmission Segment, Substation Segment or Common Equipment which has been retired
Effective: October 30, 2015
Filed on : October 30, 2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.2 r.4
Page4ofll
Version 0.0.1
(and no longer placed in service) during the months since the Effective Date or the date of
the immediate, prior annual adjustment.
(b) The following factors from each Party's annual rate filing:
(i) Return on Capital;
(ii) Recovery of Capital;
(iii) State and Federal Income Taxes;(iv) Local Property Taxes;(v) Accumulated Deferred Income Taxes:
(l) Account 190;
(2) Account 281;
(3) Account 282;
(4) Account 283;
(vi) Transmission Net Property, Plant & Equipment; and(vii) Transmission Plant in Service.
Each of the Annual Adjustments shall be reasonably determined by the Operator
responsible for such Transmission Segment, Substation Segment or Common Equipment.
6. Definitions.
"Accumulated Deferred Income Taxes" means:
(A) In respect of the Common Equipment at each Substation owned by Idaho
Power, an amount equal to the sum of Sections (AXl) and (AX2) below:
(1) Account 282based on the product of:
(a) Transmission-related Account 282 is the product of:
(i) Total Account 282 (ldaho Power Rate Filing - Schedule
l, Line 4); and
(ii) the sum of (l) Transmission Plant Allocator (Idatro
Power Rate Filing - Schedule l, Line 8) and (2) General
& Intangible Plant Allocator (Idaho Power Rate Filing -
Schedule l, Line 47); and
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERI 5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.4
Page5ofll
Version 0.0.1
(b) The quotient of:
(i) Net Book Value of the Common Equipment; and
(ii) Transmission Rate Base (Idaho Power Rate Filino -
Rate Calculation, Line 20).
(2) Accounts 281,283 and 190 based onthe product of:
(a) Transmission related Accounts 281,283 and 190 is the product
of:
(i) Total Accounts 281,283 and 190 (Idaho Power Rate
Filing - Schedule 1, Lines 3, 5 and 6); and
(ii) The sum of (1) Transmission Plant Allocator (Idaho
Power Rate Filing - Schedule 1, Line 8) and (2) General
& Intangible Plant Allocator (Idaho Power Rate Filing -
Schedule l, Line 47); and
(b) The quotient of:
(i) The Acquisition Cost of the Common Equipment, and
(ii) Acquisition Value of Transmission Plant, Property and
Equipment (Idaho Power Rate Filing - Rate Calculation,
the sum of Lines I through 8).
(B) In respect of the Common Equipment at each Substation owned by
PacifiCorp, an amount equal to the sum of Sections (BXl) and GX2) below:
(1) Account 282based on the product of:
(a) Transmission-related Account 282 is the product of:
(i) Account 282 (PacifrCorp Rate Filing, Attachment 1A,
Line 1); and
(ii) The Allocator (PacifiCorp Rate Filing, Attachment 1A,
Line 6); and
(b) The quotient of:
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
I. r58.21.4
Page6ofll
Version 0.0.1
(aa) The Net Book Value of the Common Equipment; and
(bb) Total Net Property, Plant & Equipment (PacifiCorp Rate
Filing, Line32).
(2) Accounts 281,283 and 190 based on the product of:
(a) Transmission-related Accounts 281,283 and 190 is the product
of:
(i) The sum of Accounts 281, 283 and 190 (PacifiCorp Rate
Filing, Attachment 1A, Lines 2,3 and 4); and
(ii) The Allocator (PacifiCorp Rate Filing, Attachment lA,
Line 6); and
(b) The quotient ofi
(aa) the Acquisition Cost of the Common Equipment; and
(bb) Total Plant in Rate Base (PacifiCorp Rate Filing, Line
24).
"Acquisition Cost of the Line Terminal Equipment" means, in respect of a Substation
Segment, the cost of the Line Terminal Equipment in the Substation Segment as initially
determined on the Effective Date and set forth on Exhibit F. as the same may be adjusted
from time to time by the Annual Adjustment.
"Acquisition Cost of the Substation Bus Equipment" means, in respect of a Substation, the
cost of the Substation Bus Equipment in the Substation as initially determined on the
Effective Date and set forth on Exhibit F, as the same may be adjusted from time to time by
the Annual Adjustment.
"Acquisition Cost of " means, in respect of a Substation, the cost of
the Substation Segment as initially determined on the Effective Date and set forth on
Exhibit F, as the same may be adjusted from time to time by the Annual Adjustment.
"Acquisition Cost of the Transmission Segment" means, in respect of each Transmission
Segment, the cost of the Transmission Segment as initially determined on the Effective
Date and set forth on Exhibit F, as the same may be adjusted from time to time by the
Annual Adjustment; plevlded, however, that (i) in the case of the Antelope-Goshen
Transmission Segment, the Acquisition Cost of the Transmission Segment shall be reduced
by 44.44% to account for the fact that only approximately 25 miles of the approximately
FERC DocketNo. ERr5-683-00r
?ffi,:f;3:[i::rr3,,13it,
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.4
PageTofll
Version 0.0.1
45-mile Antelope-Goshen Transmission Segment is jointly-owned Transmission Facilities
and (ii) in the case of the American Fall - Malad Transmission Segment, the Acquisition
Cost of the Transmission Segment shall be reduced by 57.28% to account for the fact that
only approximately 29 miles of the approximately 68-mile American Fall - Malad
Transmission Segment is jointly-owned Transmission Facilities.
"Acquisition Cost of 'means, in respect of Common Equipment in
a Substation, the cost to the Owner of such Common Equipment as initially determined on
the Effective Date and set forth on Exhibit F, as the same may be adjusted from time to
time by the Annual Adjustment.
"Annual Adjustment" is dehned in Section 5 of this Exhibit D.
"Common Equipment Allocation Factor" means, in respect of each Substation and each
Owner, the Substation O&M Allocation for such Substation and such Owner, provided that
prior to the Effective Date the Parties shall work together to determine whether an
alternative allocation factor should be used for purposes of allocating the Monthly
Common Equipment Charge as between the Owners.
66CWTP" means Construction Work in Progress.
"Idaho Power Rate Filing - Rate Calculation" means the rate calculation tab of Idatro
Power's current year annual FERC formula rate filing.
"Idaho Power Rate Filine - Schedule 1" means the schedule I tab of Idaho Power's current
yeax annual FERC formula rate filing.
"Line Terminal Equipment" means all series capacitors, shunt reactors and phase shifters
and all other equipment that the Parties mutually agree is "Line Terminal Equipment." All
Line Terminal Equipment which is part of a Substation Segment on the Effective Date,
sorted by Substation Segment, is identified on Exhibit F.
"Local Property Ta><es" means, in respect of the Common Equipment at each Substation,
an amount equal to the product of:
(A) The Acquisition Cost of the Common Equipment; and
(B) The Property Tax Rate for the State of Idaho.
Effective: October 30, 2015
Filed on : October 30, 2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.4
PageSofll
Version 0.0.1
"Net BoG Value" means, in respect of the Common Equipment at each Substation, an
amount equal to:
(A) The Acquisition Cost of the Common Equipment;
(B) Less. the Accumulated Depreciation.
"O&M Expense Factor" means, in respect of each Operator, an amount equal to the
quotient of:
(A) The Total Transmission O&M Expense of the Operator; and
(B) The Transmission Plant in Service of the Operator.
"PacifiCorp Rate Filing" means PacifiCorp's current year formula rate true-up.
"B4[9.@" means, in respect of the Common Equipment at each Substation, an amount
equal to:
(A) The Net Book Value;
(B) Less, the Accumulated Deferred Income Ta<es.
"Recovery of Capital" means, in respect of the Common Equipment at each Substation, an
amount equal to the product of:
(A) The Acquisition Cost of the Common Equipment; and
(B) The FERC approved depreciation rate for Account 353 Transmission Plant
Substation Equipment.
"Refurn_gn_eapital" means :
(A) In respect of the Common Equipment at each Substation owned by Idaho
Power, an amount equal to the product of:
(l) The Rate Base; and
(2) The Rate of Return (Idaho Power annual FERC Formula Rate Filing,
Rate Calculation, Line 23).
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.r58.21.4
Page9ofll
Version 0.0.1
(B) In respect of the Common Equipment at each Substation owned by
PacifiCorp, an amount equal to the product of:
(1) the Rate Base; and
(2) the Rate of Return (PacifiCorp annual True-Up Rate Filing, Schedule
l,Line 126).
"State and Federal Income Taxes" means:
(A) In respect of the Common Equipment at each Substation owned by Idaho
Power, an amount equal to the product of:
(1) the Rate Base; and
(2) the Composite Income Tax (Federal and State) (Idaho Power annual
FERC Formula Rate Filing, Rate Calculation,Lne 24).
(B) In respect of the Common Equipment at each Substation owned by
PacifiCorp, an amount equal to the product of:
the Rate Base; and
the Composite lncome Tar (Federal and State) Factor, which shall be
equal to the product of:
(a) the weighted cost of preferred and common (PacifiCorp annual
True-Up Rate Filing, Schedule 1, Lines 124 and 125); and
(b) the income ta>< factor (PacifiCorp annual True-Up Rate Filing,
Schedule l, Line 132).
"Substation Bus Equipment" means all equipment necessary to support the operation of the
substation bus, including foundations, lally columns, bus conductor, fittings, circuit
breakers, air break switches, shunt capacitor banks, potential transformers, current
transformers, ground switches and enclosures attached to or associated with the bus. All
Substation Bus Equipment which is part of a Substation Segment on the Effective Date,
sorted by Substation Segment, is identified on Exhibit F.
Effective: October 30, 2015
Filed on : October 30,2015
(1)
Q)
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.4
Page l0 ofll
Version 0.0.1
"Substation O&M Allocation" means, with respect to each Substation, the "Substation
O&M Allocation" set forth in Exhibit C, as the same may be amended from time to time
pursuant to Section 3.3(b) of this Agreement.
"Substation Segments" means, with respect to a Substation, the Substation Segments which
are listed on specific rows under the Substation on Exhibit C.
"Total Transmission O&M Expense" means:
(A) In respect of Idaho Power, the amount calculated as follows based on items
identified in Idaho Power's annual FERC Formula Rate Filing:
(1) the Transmission O&M Expense (Idaho Power annual FERC Formula
Rate Filing, Rate Calculation, Line 33);
(2) less. Account 561 (Load Dispatching) (Idaho Power annual FERC
Formula Rate Filing, Rate Calculation, Line 34);
(3) less. Account 565 (Transmission of Electricity By Others) (Idaho
Power annual FERC Formula Rate Filing, Rate Calculation, Line 35);
and
(4) fu, O&M Expense: A&G (Idaho Power annual FERC Formula Rate
Filing, Rate Calculation, Line 36).
A sample calculation of Idaho Power's Total Transmission O&M Expense
based on Idaho Power's 2013 FERC Formula Rate Filing is attached hereto
as Attachment I for information purposes only.
(B) In respect of PacifiCorp, the amount calculated as follows based on items
identified in PacifiCorp's annual FERC Formula True-Up Rate Filing:
(l) the Transmission O&M Expense (PacifiCorp annual True-Up Rate
Filing, Schedule 1, Line 53);
(2) less, Cost of Providing Ancillary Services Accounts 561.0-5
(PacifiCorp annual True-Up Rate Filing, Schedule l,Line 54);
(3) less, Account 565 (PacifiCorp annual True-Up Rate Filing, Schedule
l, Line 55);
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.4
Page ll ofll
Version 0.0.1
(4) fu, A&G Expense Allocated to Transmission (PacifiCorp annual
True-Up Rate Filing, Schedule 1, Line 66);
(5) plgg Accounts 928 and 930.1 - Transmission Related @acifiCorp
annual True-Up Rate Filing, Schedule 1, Line 69); and
(6) plus. A&G Directly Assigned to Transmission (PacifiCorp annual
True-Up Rate Filing, Schedule l,Lne74).
A sample calculation of PacifiCorp's Total Transmission O&M Expense
based on PacifiCorp's 2013 FERC True-Up Rate Filing is attached hereto as
Attachment 2 for information purposes only.
"Transmission O&M Expense" means, in respect of the Common Equipment at each
Substation, an amount equal to the product of:
(A) the Acquisition Cost of the Common Equipment; and
(B) the O&M Expense Factor.
"Transmission Plant in Service" means:
(A) in respect of Idaho Power, the amount calculated as follows based on items
identified in Idatro Power's annual FERC Formula Rate Filing:
(1) the Transmission Plant in Service (Idaho Power Rate Filing - Rate
Calculation, Line 1);
(2) less, Generator Step-Up Facilities (Idaho Power Rate Filing - Rate
Calculation Line 2); and
(3) less, Large Generator Interconnects (Idaho Power Rate Filing - Rate
Calculation, Line 3).
(B) in respect of PacifiCorp, the amount calculated as follows based on items
identified in PacifiCorp's annual FERC Formula True-Up Rate Filing:
(l) the Average Transmission Plant in Service (PacifiCorp Rate Filing,
Line l5).
Effective: October 30, 2015
Filed on : October 30, 2015
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.t58.21.5
Page I of2
Version 0.0.1
Effective: October 30, 2015
Filed on : October 30,2015
EXHIBIT E
Department of Energy Equipment Located in the Antelope Substation
Oil Circuit Breaker B103. Govt. Prop. No. 85420
Westinghouse Type BM-4B, De-ion Grid Oil Circuit Breaker.
Acquired 1957, Moved from TRA 1981.
Serial No. l-71-578-8
Rated Voltage 138 kV
Rate Amps 1200 A
Impulse kV 650kV
Intemrpting MVA 3500 MVA
810 gallons of oil per tank
weight 39,500lbs.
Oil Circuit Breaker B164. Bus Tie Breaker
Westinghouse Type 16GM31.5, Acquired 1982.
Serial No. l-38Y5468
Rated Voltage 169kV
Impulse kV 750kV
Short Circuit Amps 31,500 A
l3l5 Gallons of oil per tank
weight 54,000lbs.
Circuit Switcher 165,4.. Govt. Prop. No. 83712
S&C Circuit Switcher/Ivlark V, Acquired 1982.
Catalog No. 157320-
Serial No. 8l-31857
kV Nominal 16l kV
Marimum Design Voltage 169 kV
BIL 75OKV
Amps, Continuous 1200 A
Amps, RMS Symmetrical Fault, Closing, 30 duty cycle 30,000
S&C Operator, Type CS-IA
Operator Voltage 125 V DC
Catalog No. 38846R3-BBIIPW
Serial No. 181400
l.
2.
3.
FERC Docket No. ERl5-683-001
Idaho Power Company
FERC Electric Tariff
Rate Schedules
4. Circuit Switcher 1624. Acquired 1982
S& C Circuit Switcher/lVlark V
Serial No. 81-31735
Same information as item 3 above
S&C Operator Type CS-IA
Serial No. 81-31735
1.158.21.5
Page2 of2
Version 0.0.1
5. Transformer. Govt. Prop. No. 5-220" Ac$ired 1957.
161 kv/138 kv
Feeds #1 Antelope-Scoville Tie Line
Westinghouse
137,600lbs
Serial No. 6534543
55 MVA, OA
73-l/3 MVA, FOA, with fans on both sets of fins
(3 fans are already on I set of fins)
gl-213 MVA, FOA, with 3'd stage cooling (additionof 2 oil pumps, one pump is
already installed).
Y-Y auto transformer with delta tertiary
Includes no-load tap changer, 5 steps, for voltages from 16905 volts to 152950.
Tap lever is locked on step 3.
% Z -1.5% at 55 MVA. 161 kV/138 kV
6. Transformer. Govt. Prop. No. 5-587. Acquired 1982
16l kv/l38kv
Feeds #2 Antelope-Scoville Tie Line
General Electric
Serial No. Ml01875
167,000 lbs.
55 MVA, O(A)
73.3 MVA, FA
91.6 MVA, FOA, 55o C, has I set of fins with oil pump and 3 fans and oil.
102.7 MVA, FOA, 65 o C, expansion tank on top, Y-Y auto transformer with delta
tertiary. lncludes no-load tap changers, 5 steps for voltages from 109050 volts to
152950 volts. Tape lever is locked on step 3.
YoZvolts- 1.47 at 55 MVA, 16l kv/l38 kV
7. Ouindar Transfer Trip Conffol System
QP-11/l2s
(Aerojet Nuclear Co. E-45408C-3)
Effective: October 30, 2015
Filed on : October 30, 2015
FERC Docket No. ERl5-683-001
!j9
6NrE F-hN'=o
1
oEo=TL
o
=o
Jooo
oz
EEE3Eo>EFO=cd
6NNc,rol
.co9
-E>(J
orsl
t
cts H
-ooot E Ec,S'sE eq
o<tNd;@a
3e
EE
=FU;u.=
O=E6cob<(J
=EE.3Eo>EFO^-d(:
oNh
odmd!N
.gog
E>IJ
(rrF.Nui6
-E =-oq C,
3 E 5e,S.58
E
o
N
st6
ofo
co
'.i
l6
oc3o
'6
.94LJg<oac]c
6cooj
<f
czolEO
3
oo
+NN
x(J
d
:Roq
<f
aUr
>RNq6<l
.=OE;-oj:E coo>*96
oG
Ot
(o
@@.n
ssE gtr iiEe<>(J
o
EGr=
:EA-- o>ssFe6E
6d')
66€..i
co
6
!f
ocl!Eo
Go
.g6
u
=6
oo6
oz
_cEEEo>F'gg
66
F.'FN
.co9@JL6
-E>u
NNtsr
e6ccd
-oo o
€ E EoSFb5 {!oE g
6N@.46.!
jjEEis
=?E;u,=
O'=E6CUE<U
oEE3Eo>EFO=EU
o
o4<fN.iq
.go9
e>o
o
r
.E 5
-ooo*EEoS*,!a
E
nno.
Norj
o:o
c.9.:.3fg0
iioc
=o
c'6
oiUE<@rc3o
C
F
(rl
ods4
oF.o!o
6@
doN
tso9oo.:N
.sEuPdo
3o
o
o)r
@6N+'NN0
6sio!o
o
oo
No.,1
Foo
xU
o
xEAco
}Rtsqo<l
xmdl
x
NdiN
aUc
x
Fo
x
oc,<l
teNq
@@
xoFutN
E-s3;iEOE:
.o '6
oo(
t
FoNuio(o
n
oof
uFq
ts
o6o.iNoci
_o
oi6U>EPooE6(Jt
uuc
Ec
no!4od4
ctlq a ooqNco
.. 6EOn'6zX
E gE
':og
F6o6
o€6or
fuAE
fts
Foa
E4ul66ulN
c.9
G
!:
fo
ooNooI@c
f
EO
@
ooooc
:
aO
am
oo
-9oc
o
omNooI@c:<o
.9
G
3f
oq
O6
EO<F
\O(\INjthi
".! o=€- -ho:- oO.Y'(l 6*o
u)
u)::EEcEQ.A
X.ErrldC)
ooat-.
,\o
dH
ciz
q).Y()
n
U&r!IL
Cc(6+.io.'itr(n
Uoo
o-=}UE3trt^t\aEf;€:tLd.
of
6
xoo6
oz
zEE8Eo>EFO^-dd
€4qN@oq
.c_o!UUJc?e>u
46
uiOt
P6ccd
-ooof;EEoS*.58
E
o$ts6Nj
Ec
asa-,s.0
-2O'=
E6co6<(J
zEEqEo>E*&5
N1€6.l
oq
trf_E>U.E
8N$'ts
uqccd
-ooo*EEoSF o'= S1(Ju ci
NN.n.!
N
of
6
c.9E.9f6
ir'o
=o
.Eo
.oE(Jg<o4q3o
oo
oiN@
oEoPao
=o
r@NdN
ri
xU
)e
d]
N
xU&
>etsocits
EEgE
@cooF-
r@6oi
6.i
c9.-=OC99>60lqQ{
oco<l
E C,I
3EE
oq&<tq1
N
c@EUo
c.o
6
!l
fo
<fm
@p
-go:o
o2G
ooo
@z
_cEEEo>EFO=dd
Nn
dn
6i
.coqMJ
P>U
oNolo
CE :
-ooo3 E E e,S-sE
E
otsdlr<fN
^i
3eis=-,s.E
-2O'=EoEr(J
EE Eo>E*&E
oqNo\N
oO@f
ESU.E
o6o.i
cE :
E E H.^EF-rd off- g-
Nrfh
o@.n
=C
Ec
..,:E
toclc
c!
oZlJg<oec 3o
@@q
€dt
@ordNo
roq
N<fcN
6Nhoo\
roNdo
ui
.9I\)!4ac]c
6
.non
N
+tsd;N@
cC
C
c
G
6
o
dtor
f;
I
ct\N
x(J
d
sNalNts
x
oqor
xtsqoo
xNq
NN
L)e
soq
NN
;Rrno
x
d!
sCC
6
c
-'6oo- o!E C.9O>-.96
@d
rq
<l
d!
N6q
4
N
No
.i@odi
q
G
oo6
G
NNo.
€.F
-@ot4>c-9i!(J{
ora4rq
oaqiNN
No
..i@o6
F
6Cc
c(
ooN
@
tA,d'= -O-!lEN_ o>f; 5Etrog
@NaN@Nci
otsdtsdl
o
n
.ion+
<ftsc;oqosf
c.o
6
If
66
Sr.EE]'EoOU
9-.=cJO
&.oEf'I:o6u
l6i(,a
LCo:@-!!='tr86@
coEoE-@q<q>bUOG.=
do
c
.o
o
!l
O6!9'6'ao6F
::@>=
6N,9 rj;'i ..r
o.
o
[L
o:€3 E*
"' o: oU E-'<.E 3EHQ oF c! 063
: o @,-ECC=.s : o;+ he?: ii-: < cs9 F OmE Er"E Fg*> -<^-
= 9 >IE i H;o c @!<-ooztJ-q 9cEt E9r6sOOc 6 o.YE E.e EocPooJ o c:OAE EE =>g I c EHs rP.g 3M^-lO01.= -=oii H;€:o oco.Y E J OE> = o u-Eo ? q ";o-. -Y + 3*- >7!6: E.E>,t+ qo:
d6E?6oL o x+o 0 P.=m6 @ =-Y LEE iiE So@ H ii=Ed -p.Io-g @ o *'=g }cE62 oE=0^e of o.2= o LstoP
=€ * l5E: ;::33 Ef g
c o =- -i; iE EOt !3v
== .:-tr3E 3E Eoo EEei n c.q'=-q: t:69n 9 6o-o€os
EA E E E.s6- E F g
1:=o>,i; l.s dEfl" :.H:Eq oii"E6 E€ 3U> 5:E9d o<?E? EHHEE EcESE €;€vL 6'= -ic :i.=tc.9 You.g
9t 5€ =;E E.=t:6 =cGEts o.9qd> = i!:aE = a @dZ u! --{s Bga: -P Fo*iOF tr.C E
?q nEo
:-._E {;E6 + 3E e6=o-E
F fl .JE EE E=e @=
.: -q'Y!A HEEG Oe:
oooItr-O
I\o
drI]
z
o-\zoo
H
UdHtL
CL6qr
tr(B
U(JogE€5oc)
a-r o
-r\a4d Isrrl 6
@ao
oo6
oz
oEE3Eo>F*P8
r
F.'N@
.coq@-ci
t2U
Nondslr
e6
-66 o€EEoS*53
E
oro'6oq
N
5E
EEa-,s.Ec';O'=
EOcob<(J
oEsuEo>,*9,!
rN
oi<fq
<lq
.coo@l:;(J
6N\o6r
-66 o
€ E 5e,S*.EF
E
oo
oGC
o:6
co
:E5
iioc3o
c'o
.9EU9<EOC
3o
h
diNe
N
o;oq
N
\i
uio$d
6
C
6
o
=HE
3o
€@sl+slq
o@nr'N@
o
onqNNt:N
}R(J
G
xo
6+
xoc;r
xqoo
xUr
x
I
4
xr
oi
}Rooc;
!oECE9:o te
d.=o
o
@r@\
o
NmoqN
tu!6oqo
@Ndqr
-aoE@:>es(Jt
o o
€
r
C
@o
d
o'
E ra,3!;R
EEE
o
@
t-'@rdi
o
N
oqN
€+
..i
so€ui
od
co
o
!l
fd
nsf
Eoo@
*
idac
OE?o!F
oE6)
Nlt
i6]Eo=OE+b3F-Po
^C@J
c
.9
o
!:
@6ooEOF
\O C.l C.li(FA6l e.{
dN:ho=
- b0,=.CgO
Eo
ii \o>=EN
r.9 FJEN'ia.
1
oE*
o:6
oo6
oz
-EEEEo>EFO:cd
ooM]
e>(J.9
PNccd
-oo oe E E ^.q:o c avoF ts'= {3UE' 9
EEE3Eo>EFO=dd
.5oqMJ
-P>
P4ccH
-oooI E E e,S-,5 1 S-i
N6oq
\@
EcA
o
@rqNNqo
Ee
ES=-;.o
E'';O=E6cob<(J
6oo!
N
ooIe6
@
ri.6o6N.
o-o
coE.!!lo
-6oc3o
'6
.st(,g<oCE3o
6o+odlr6
Iooo'+$.
ts€q
oo
ci
oc-c :c
oo'N
d
r
oiGo
oootoN6i
:RU
e
xNcr$
s4
q;r
xuo
x@
o_1
N
x
o)
c
-'6 p6- o!E trts93'=OoG
@ol
uiorui
tsr
Ei
asl
NNn
N
ciN
.coPouo lE{SU
o o C
EGil+'= -o:EN
E5E
6onno\o
FNNd
+
dtsq
N
o'N
c
.oo
of
fro
oo
o;uc.E
oI
oEFo
i>
3o=uo >E6.='EoE
96o!JF
c.o
6
!l
o3Ua6
E6
-q6IF
olo
ooo
oz
pFE.3 Eo>E*&5
@dN
oN
oo'
.=oOMl
-E>L)
€q
N<f
.E 5
-ooo€EEoS*,53
E
c
vo
C
5EE=ESa-r:
c'GO=EOco5<U
coE
EoU
EE.$o>FOe
tc
o((c
c
ooUfEE<zU
c
CC
-oo6cgo E ov'68
6@..1orNo
ofo
c.oE,2lo
iioc3o
C'o
oZug<occ3o
o4o
o!
N
oo6oio@6
stifq
<fq
o
oi
@<i
.9EugCO-tr3o
dE sfq€r@
t(@r.'oqN
>RU
o
$<,
c
x
oi€
$
o
x(J4
s@q\i
xrqo
}Roul
c
- 6rd- o!E Ctsg]
oG
$FNdiNNoi
o
V
d(
@@u'lNo
.i
oNNNro'
.g:ooU>
6Ot6ut
NqO<lt
NNo'4N.i
ots
4
Nr\Nq
i:(3ra
!ENi o^\6 cu
E3E
o€oqoNe6
oor
@'Nq
@
oF:
.i
o
+€q
6
c.o
6
!f
f6
<f
coEo(,
:o
@
coE
o(,
o{.p6OSc6tco@q
3F(,E
!o
oFcoE
o(9
ol(
o
o
az
-gEEEo>E*p5
.goq
:>U
o6
a.,iorlN0
c
enccd
-o@ os E E ^.qo tr OvO*EE $
o6
.,i.!N
6e
.isa-6:U.Y
E:Ecf
6<U
EE E*#s
.co@@l
e>(J
r
qio@.n
o
eOccH
-ooosEE-.q.o E ovo*58
S
r
od@€ri
old
c.9.c.9fo
ijoC;o
.co
o
=(Jg<odc]o
€rc6oI
sNN€'
oai
oo
oi
.n
.9ccrEsg
3o
sr
oN@
o<t<foior.n
ouitss-
xU
4
>R
cir
nqor
x(Jc
;s6q
N
xqq
N
.c
- O!o-o:E C#31
0G
o
<i-imq
+
t:
m\
$
u;
oq
Be:
-E<>U
o o
tGr=9=F- o>6 cLE3:
oq
€q
\
o\N
$
ri
@ui
co
6
!f
OJbo6Oo6dc2.o
=ooa
oo
oiCA=E9q-=foOu
co
6
oa
9!
foOF
\o \o a.l
-'! o6le^'od c.t :NO:
- O0.='(do*o
It.-
I\o
E]
C,z
C)l4()oaU&rI]
L,,/ O o
}UU
o-rl oo(JaEl9
ij \o>=
6Nt9 rjEN'=o
:
*tL
o:(
cc&
qz
EE Eo>EFg6
6ou'l
Fq
6
.go9
-E>(J
otoN+oo
P666 o
3 E Ee,S*58
E
ltoa
A
So
iEl-6!uY
5.6<=:otso6<(J
=E E
EE5
oc6(q
G
.co9cE
_E>(J
so
oioro
P4_s6 3
3 E E oS*58
E
ooolNts
c;
o
=o
c.o2_2lq
iioc3o
'6
.eE
<orc)o
s
N
dt
d
h
rioo
No6+nq
Nrq
@6d,l
6
.9E(JgGO-c 3o
oroq
@6r'
ooarl
o
j6@
@@qoN
q;
xU
L
x<les
}Roq
€
}R
ogoF
xUC
;R@
rin
x
d
xr
ciN
c
-'6oG- o
ig]'';o
ot
oqN\o
o
@
r
Fooui
@o
4@r
@
-q
@(!p>c oo o
a€l=!oX
- o>* itFoc
oqN\
t
Gr
roq4
dlA
@6
ui@N
@
E
EC
4
f6
+m
tsoo
=
coE3E
rErboFqo
.C -CYJ
f
l3Ec,=rEtooFO@
.c .E
co
o
!l
P5r2OG
YF
o:
C
cce
o2
EE Eo>tr*8,5
oe
c
.Eoq
e>(J
No
eocci
-o@os E E ^.qb E a9o-sE E
N6Nd€
jj6e
-i93-g:s-Y
6.ec)
6<U
-" 5g.E Eo>tr*&E
6r46om
.coq
c;
_E>U
Orro
e6cci
-oo og E E ^.q.o c o9oF:'= o,59 H
tsq
N4@
o:6
C
E.9f5
.5qc3o
C'o
.9E
<@rc
=o
@o
d;N6
€$q
o<f
$
6diNo
.9Eu{eP
=o
(
io
@tsolo
N
o
o
6
s()
r
iRoo$o
x$.!
N@
x(Jg
xC >eorN
c
-6r6- o!E Cts93'';o
oe
(
G
E
q(
or6r'@N.i
-L
QGP>G;
L){
o C
afe'd'=-OYEN-i o-\ESHFoq
$<i
@'
@
E
E
oN4
ts'on
c
.o
o
l
=6
@
co
o
o
rE
ob
.99 r-do.Cc.-o-
br
'f6
c
.o
G
3f
go
oc.:o
@J
o
ooCO
oz
oEE.3Eo>E*8.!
oq
N
.co9
-E>IJ
ooq
ehccd
-o@o3 E E a,SFE= {1uEcid
ff
EE
4Sa-6:u.Y
34E6CUE<L)
_c
EEEo>F*e,g +o
,g
-E>U
oo
P4E5 3
EEEOS*58 3
rFq
o
@f6
co
'.i:6
iioc3o
c,o
o
=(Jf<o4C]o
o\oN
o
=uEoO
3o
o$nnN
;RQ
xo\NN
;R(Jo
xNntsN
.E_ OEE-0tEE#gi't(JoG
o
F:rN
-u.=5o6@:>c-q'@(Jt
o
E@3
3Eg
m@
F.'tsN
a
G
E
e3
EE
E!
\o \o c.l
-'! o6l v;dc.:r)o=
- bO.='(ioko
Il'-
I\o
q
ciz
()ilo
n
(-)dIrlIL
dfr
O.3
o-=}UU
a-r (J
^rrA4d I
:,tLd
i,i I
ENPFj:61IIJ _
:o
o
f&
qfo
o6
oz.
rE.s.u Eo>tr*&,5
osN..io
d<,
oOUf
6>
U.E
@q
No0
.-c g
-oo o€EloS',!E $
o
oNqo
6EiE5-6:u.=
=:oEocob<U
-c-YO.g.U Eo>F*e,9
N
o
Fa@
disl
.Eoq&J
-E>U
Ntts
o
.E 3
-o@o€EEeS*54 3
oNui@odi$
qIo
c.9!.2lo
iioEBo
.co
.9Euf<ooc
3c
@
ul
qo
<f16ot:
@
<l<tqioNct
o
d@o.f'
.oEuEeO-c 3o
o6N
-i
c.!
F
a{'@rei
6tr.nor
a{'
otsr'lr
Nd
xU
C
:RNn6o
}R
ogoN
}R
eots
:RIJo
x@
+
}Rr
aiN
xN
oiN
C'6oE; goo>-.35
od
6Nd:
oaq
6
r6
.ir<f.o
ts6
rq
Ol
coo6uiNod
-oo'6@>CPGOt6ut
o a o o
,. hE@rn
UEN
= 9o-q -a;oo
oN
d;6oq6o
Fa
.iN<f.o
N6
.jrno
{oc
tG(
coE6
!f
J6
4
=f
l:oo4
Gdc
LEg.E€r'ro6qi.3:>flq6o$do
oNC
Ho .oE-.EUOE6=5>rE:qho$40
c
.o
6
!l
)6
AEoodF
o
6
o
6
@z
oE3gEo>trF96
6N6lrndlo
.coO@l
e>tJ
@<f
oi€4N
PNcc d
-ooosEE-.q.o g ovo*.99
E
NNNci@ts60
6ei9a-r:u.=-vO=E6<ob<(J
E.3 E*P,i
No\oo\
.coq
-E>U
N
r
oi
u!N
.E =-ooo€E5oS*8F
=-
oNol
@6Noi
@l6
c.o:.9l6
iioq
3o
.c
oE()P<oCE3o
6N@cioo.i
rq
@a
o
d:
r
qo@N
6Ot@.io\@
NN\o
N
diq
.9EofdO
-c lo
r
d]
q
4
o
aio
.1sf 6irsf
nc6<f\
Foq
Noc@
x(J
L
:R6 xNoqoN
x
u!o
x
ho
s
dl
@
xUd
xNeo@
xo
dir
ann
@
xoa<f@
xrq
@
.COE;-oi:! coo>'.96ot
Naqo
.1r
oodo@
rN6r-'ost
@Nn..i
ts
$\@qa
o
N
6io6rN
.s3OG@>CP60E6(J{
ohR,o o o hdl
sf
NooqoNN
E@li'6aX
E gE
ioo
N
6+o
N'
oq
@oo
NNnt'st
@
ul
N
N
6d]
od]6
@
ol
mN
NN
g
.o6
!:
f6
4
.goop
oc
=too.cY
co'o .9OFEi
=P
ltEobqo.=
c.'og
arEO
=C>:
N1t
EGbE6.:*E'6 .oo-pP>i
oo6Eqo-!Eef;!!
co,F
6
!l
.gO6
-*6
=8
\o\oN
-'! cia.l e --:4i +:rro:
- bO.Y'doEo
It'-
I\o
rrl
ciz
()jao
o
Udt!
cd (i
tr(B
5',, 3
}UB
o-H ooQo€*gYLe,
ad \o.:5ENrg FiE.'
:
o)
of
6
oo6
oz
rES.EEo>tr*g.g
@
oo'eq
N
s9c;
-3>o.g
ooo+
cc_oo€EEoFofuE'
om
d;6q
i;5ec=asa-,S.e
o=Edcob<o
c
E
Eo(J
EEEo>FOd
oho
F.'tsq
o:o
,c
oucoEU
N
ui
CC_oo€EEoFolus-
o€\NNot
@l6
c.9la.:!
=6
ii@c3o
c'o
cZug<qec;c
r6
<f
NN6.
N@
<f
@or
.9toI43
3c
ts@q
@o
n€n
sf
c
d6r
}RU
C
>Ro.!
o
xrno
;etJ4
soact
;R
€dt
.qOEE; Poo>*.36
od
tsm
oi
<f
radl$nq
o(
o
.=goo@>CPooE6u{
@o60
c ((
E crE'6zX
I o^\
EB=.
to
c
N6
$nq
N
tsdo
N
c.9o
f
omNs6
=g
@3
oc
=-c .igEE..EH;lo
=,s3
!6oGF=E
=*'83
=e
of6
oo6
oz
_cE3Eo>tr*P,3
c(r6
C
oqp:€s(J.E
o
y6ccioo o
€ E EoS*EE
E
A(
F6
c
5eisa-6:u,=
-eO=
Eocob<(J
EE Eo>tFq:dd
oq
4@
.i
.Eoq
-E>U
tsNN
eocc i
-oo o.s E E ^.S.b E ovo*58 $
Ntsr+@
.i
o
E
c.9!.9l
I
iioC3o
.co
.9Eug<o4tr
=o
o((
G
(IrcE
ul€o
$'
.95crEq0
-c 3o
r
cts
€GIFdq
m
d;o€+
xU
o
}Ronci6
x
ogoN
xUg
x$ao
iRF
oi
.EOEE; goo>"tooG
o
U;otul
ts
4
h'on
g
ul
Nooai
_o
oEU>CPoo<ou{
q o q
Eo3
UTN
EEg
@r
+oulr
6
ro
-+-
OlN6
oooi
Eo
o
!l
oc
ol
=6E?9ot<fFO
c
o
E
@o
EF
ocY
__9
EoocF
@f6
oo6
oz
_c!q3Eo>trFg6
N€<f.6o@.i
sg
_E>(J.s
6NOrN@
ehE6 3
€ E EeeqFof :lugo
o
ui
@
i;Ee
.g;a-6:U.Y
5:=E6EA5<(J
-trEEEo>E*p5
osfd
NN
.=oqCE
-E>U
a
..i@
e6ccd
-oooe E E ^.qb c evoFb= aUE- 9
$No
8'N
..i
ol6
c.o.=
.gDl
iioc3o
E'o
.etL'g<occ ;o
s6@r
4
Zr.l ErO-c
=o
6
U.l
@6N
:F()
4
xNeo6
>RUC
x6oc,
c'5=
oo>t.qa
oG
N@6$or.j
.=go6@>ce6OE6(Ji
rrro
E
E9H
EEg
@
@+ndlN
c.9
o
!a
e
o6
SPLoo >-cE2Etoa 30
\o \o c.l-i(F-ic.l eA
odr,:noX
- b0.='Gl 6
-o
It-r
I\o
&trl
ciz
C),rlo
o
Udtrl
(BL
tr(n
L.,' 9 O
}UU
o-H ool)a4d I
eLd.
ij9
6NrErJEN.;
c)
f!
It.O
I\o
&rI]
C'z
or4o
oU
E]E.
'=
o
=o4o469.oouo69f'trs
40,EOC66@OE
60EG
t?6EA5
-aEp9
PE}Fo>>=
=4h6ts>Io-EEtEB
oo-aEg
6dooEE
'-o.:+3L
x!o.=.9xtUPc
'-EoofE'6't>opE-
aio
=Oc>o?'cA'Eo
CP6O
@E.gF
ofoo6qo@S3>:t'-->o
sg(r=.e3o4e;'go'-c
E5o>
e9
EU9di
=.sxEH:d-=o36Eqo
!.6qu>o6246o6€E!6-o E
o'5E
o
qo
.9
oE3oo
4
6ooqoq
N
c
\c
oq
or
<fo
Ncoov':
6
€orciNoq
N
o
o6d!
Nslq
{oocN@oqNI
dN\
m@d
(f,qo@o')oni
tsu']u
orotsoo
o
cstrl
O
NNqNNh
d;
No
@'N(or
soro'oqoN
oq
4mU.l<i
66Nd$q4
6oodio
o;
.gc
oc3o(Jc
Noq
6o0
N
!'lNts
oo{qtoo
d;
NNn'l
<tmno
ooCF
N
rodiNo
NN
N@Na
oo<t
<f@
cGqc(
mdlo@erO
N6st
o
6*
.n
+.
o<tr
noFi
(
GF
$No'
Oo'N
N
a,io.{r
6ts@0q
oo\6N
^i
o6oj€N
@'
x(J
r
;R6e@o
*xnu-14
x6u!
6
:Rm
dN
xoco
}R$.!
6
xoq
6
s
cdF
oq
6ts
xs..!No
oor
*
6c;ts
}FooN
adoq
@N
soq
@
}R66ctts
:RmeoF
xr
ai
x(JG
:RNqm
xtsod€
x
G
x
<tI@
x6oq
N
qoo
xarr
x
d?6
s
o
xnq
N
x@rrm
sr
o;N
xr
oi
xN
oiN
Eed
diN
x
F
:Rts
6iN
xr
oiN
€o+
qE
En
.qE
B6
EoF
66Nd
N
^i
oq6
Gr
(
mo
tNr:n
do
dq
q6do
no@N
@or+.
o4
NNd:ooq
d
6n
6odN
Nqro6
<toq
Nq€
or
uioq
N
N
noo
dN
@@erqoN
@ts6l
oqo
@Nrio<t
@0
to
@
F.'
V(
f(
V
q
_(,
sgc6E(J
GcC FN.n
a
olNN
6Co
G o
N€NI
n
Nooi
44
@n
dtr
o6
o o!sfo
a
d:
(n4
@\@o
.i
c rqo c G(
c
Noq o
@ooq66
E9o3ooqto
:H
fierF
otsn
\N6
(rlN6
@'o
o@
oi$qo
o
FE
t
No
ct
@.
o
coN
Nn.iN
c
f N@oio4qto
€+
C,mol
6ro
or6rsf
o.!t
dl
F.
rq
fo(
6
@<f.<t
@'N
@@eron6Ng
r
cff
Gs,
EnoEfu
o<fod
F'4
o€oiN.!
4
c@
Euo
co'6
.9
E
g6
F
6m
ecooos
=Ig
d
c6
oE
6
*
o
Ioo
-9oc
6<t
It
a'6qp
opoot
to
od
nsf
N+
.goo
=
@
=-gqE
soo6
@
ooooc
IgoE
o(9
o
o.g
o
6
o
F
=I
o(,
.E6
@
co
o
o
IcoE
oi9
tccc!
IcoE
c(,!
o
GJ
o
E
EJ
I
o3qc'=EoI
oc)
@
6
couooo
o
=I
@,q.,
Eo-
o
GJ
oEEf
Ioq
a
E
codoo
oE63
@
o(,
.cao
I
o
o
o
6sf
cot
o(,
ouE
6
.E
<l
+
=ood
I
odp
6
.E
6<i
NIt
f
lood
I
ouE
d
E
n<f
'oop
roo
.EY
ccv
C
q
E.Z
EoI
I
,9cc
=
hst
tE@
o@I
!loo4
6
Eooc
I
l
=oo4
o
NocoU
lI
Ic
o
=-eo
=
\o \o a.t
-'t cia-l e,iod\o:no=i bo.='cda*o
6+jo.'EECE
lY' 6L'OO
9E€>oo
or oo(Ja4e I
:tL&
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.7
Page I of4
Version 0.0.2
DGIIBIT G
Joint Ownership Transmission Loss Calculation and Allocation Methodology
PacifiCorp and Idatro Power agree that as joint Owners of certain Transmission Facilities,
defined in this Agreement, the companies shall calculate, allocate and settle the electric
losses associated with these Transmission Facilities in accordance with this Exhibit.
Collection for Losses:
This Exhibit G does not affect PacifiCorp's and Idaho Power's respective OATT-based
losses methodologies. PacifiCorp and Idaho Power shall continue to collect for electric
losses in accordance with their OATTs.
Calculation of the Ouantity of Losses:
The quantity of losses for each jointly-owned transmission line or transformer will be
calcuiated by implementing an I2R calculation based on measurements at one end of each
transmission asset using existing metering equipment and assumed series resistance for
each asset. The calculations and selection of inputs, such as which line or transformer
terminal is metered, which quantities are used (amps or MVA/voltage), and what resistance
values for each transmission element are used, will be agreed upon by each Party. In the
case ofjointly-owned transformers, a constant core loss value agreed upon by each Party
shall be included in the calculation. The metering devices used to provide the inputs to the
loss calculations may or may not be revenue quality. A metering device calibration process
and schedule shall be agreed upon between the Parties. The Party responsible for the
calculation of losses for each jointly-owned asset is described in Table l, below.
Calculations are to be developed for all hours each calendar month and results are to be
shared with the other Party no later than the 7e working day of the following month.
Allocation of Losses:
The quantity of electric losses on each jointly-owned transmission line or transformer shall
be allocated between each Party consistent with each Party's asset ownership percentage.
Losses for each asset will be calculated for each hour and multiplied by the asset
Ownership Interest of each Party. Losses will be totaled on a monthly basis differentiating
between on-peak hours and off-peak hours. The Idatro Power portion of losses for all
assets located within a PacifiCorp Balancing Area will be summed and owed to PacifiCorp.
The PacifiCorp portion of losses for all assets located within the Idaho Power Balancing
Area will be summed and owed to Idaho Power. Table l, below, defines the Balancing
Area of each asset, the Party measuring the losses for the asset, and each Party's
Ownership Interest.
Effective: October 30, 2015
Filed on : October 30,2015
FERC Docket No. ERl6-210-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.7
Page 2 of 4
Version 0.0.2
Return of Losses to PacifiCorp[
Other than losses for the Jim Bridger generator main step-up transformers (which are
described below), for each calendar month, if the losses owed to PacifiCorp are greater
than the losses owed to Idaho Power, Idatro Power will choose to settle either financially or
physically. If settled financially,Idatro Power's will settle financially with PacifiCorp in
accordance with PacifiCorp loss return business practice. If settled physically, Idaho
Power will return losses to PacifiCorp. Losses to be returned are the amount owed from
Idaho Power to PacifiCorp less the amount owed from PacifiCorp to Idaho Power. The
loss return period will begin on the 15ft of the next month and will continue until the 15ft
one month later. On-peak losses for the month will be evenly distibuted across all on-
peak hours in the loss return period and off-peak losses for the month will be evenly
distributed across all off-peak hours in the loss return period.
Return of Losses to Idaho Power:
For each calendar month, if the losses owed to Idaho Power are greater than the losses
owed to PacifiCorp, PacifiCorp will settle flrnancially with Idaho Power in accordance with
Idaho Power's loss return business practice. Losses to be settled financially are the amount
owed from PacifiCorp to Idatro Power less the amount owed from Idaho Power to
PacifiCorp.
Table 1r3
" ln the event of a conflict between the percentage of asset Ownership lnterest set forth in columns (3) and (4) of this table and those set forth in
Exhibit C for such asset, the Parties agree that the percentage of asset Ownership lnterest set forth in Exhibit C shall control.
Effective: October 30, 2015
Filed on : October 30,2015
(1)(2)(3)(4)
Asset
Asset
Balancing
Area
Party
Asset Loss
Calculation
Performed
By
IPC Loss
Allocation
(Asset
Ownership
Interest)
PAC Loss
Allocation
(Asset
Ownership
Interest
Kinport-Midpoint 345kV Line IPC IPC 73.2%26.8%
Borah-Adelaide Tap (Borah-
Adelaide-Midpoint #1 345kV
Line)
IPC
IPC 64.4%35.60/0
Adelaide-Adelaide Tap (Borah-
Adelaide-Midpoint # 1 345kV
Line)
TPC
IPC 64.4%3s.6%
FERC Docket No. ERl6-210-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.7
Page 3 of4
Version 0.0.2
Effective: October 30, 2015
Filed on : October 30,2015
Midpoint-Adelaide Tap (Borah-
Adelaide-Midpoint #l 345kV
Line)
IPC
IPC 64.4%35.6%
Boralr-Adelaide#2 3 4 5 kV Line IPC IPC 64.4%35.6%
Adelaide-Midpoint#2 345kV Line TPC IPC 64.4%3s.6%
Midpoint 5 00/345kV Transformer PAC IPC 63.7%36.3%
Midpoint-Hemingway 500kV Line PAC TPC 37.0%63.0%
Hemingway-Summer Lake 500kV
Line PAC PAC 22.0%78.0%
American Falls-Arbon Valley
(American Falls-Malad 138kV
Line)PAC IPC 3.6Yo 96.4%
Hurricane-Walla Walla 23 OkV
Line PAC PAC 40.8%59.2%
Goshen 345 / l6lkV Transformer# I PAC PAC s.6%94.4%
Goshen 345 I I 6lkV Transforme#2 PAC PAC s.6%94.4%
Goshen-Haven Tap (Goshen-
Antelope l6lkv Line)PAC PAC 21.9%78.1o/o
Antelope 23 0 / I 6lkV Transformer PAC PAC 26.8%73.2%
Antelope 161/l38kV
Transformer#1 PAC PAC 66.7%33.3%
Antelope l6lll38kV
Transformer#2 PAC PAC 66.7%33.3%
Antelope-Scoville#l I 38kV Line PAC PAC tt.s%88.5%
Antelope-S coville#2 1 3 8kV Line PAC PAC tt.5%88.s%
Goshen-Jefferson I 6 I kV Line PAC PAC 37.8%62.2%
Jefferson-Big Grassy 161kV Line PAC PAC 37.8%62.2%
Jefferson 16lkv Phase Shifting
Transformer PAC PAC 37.8%62.2%
Bridger-Three Mile Knoll 345kV
Line PAC PAC 29.2%70.8%
Goshen-Three Mile Knoll 345kV
Line PAC PAC 29.2%70.8%
Bridger-Populus# I 345kV Line PAC PAC 29.2%70.8%
Bridger-Populus#2 345kV Line PAC PAC 29.2%70.8%
Populus-Boratr# I 345kV Line PAC PAC 29.2%70.8%
FERC Docket No. ERl6-210-000
ldaho Power Company
FERC Electric Tariff
Rate Schedules
1.158.21.7
Page 4 of4
Version 0.0.2
Populus-Kinport 345kV Line PAC PAC 29.2%70.8%
Goshen-Kinport 345kV Line PAC PAC t8.3%81.7%
Jim Bridger Generator Main Step-up Transformer Losses:
Losses on the Jim Bridger generator main step-up ffansformers shall be allocated each hour
between Idaho Power and PacifiCorp based on each Party's pro rata share of Jim Bridger
project net generation for such hour. The calculation of such losses shall be in accordance
with the following:
1) Jim Bridger #l generator main step-up transformer loss :
((Jim Bridger #l generation)2 x (4.4 x 10-u)) + 0.3 MWh
2) Jim Bridger #2 generator main step-up transformer loss:
((Jim Bridger #2 generation)2 x (4.4x l0-, + 0.3 MWh
3) Jim Bridger #3 generator main step-up transformer loss :
((Jim Bridger #3 generation)2 x (4.4x 10-u)) + 0.3 MWh
4) Jim Bridger #4 generator main step-up transformer loss:
((Jim Bridger #4 generation)2 x (4.4x 10-u) + 0.3 MWh
Jim Bridger main step-up transformer loss: Jim Bridger #1 step-up transformer loss + Jim
Bridger #2 step-up transformer loss + Jim Bridger #3 step-up transformer loss + Jim
Bridger #4 step-up transformer loss.
Idaho Power's share of Jim Bridger main step-up transformer losses shall be physically
retumed to PacifiCorp. Such losses shall be scheduled to PacifiCorp 168 hours after the
hour in which such obligation for losses was incurred.
Effective: October 30, 20 1 5
Filed on : October 30, 2015
FERC Docket No. ERl6-210-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
1.1s8.21.8
Page I ofl
Version 0.0.2
Effective: October 30, 2015
Filed on : October 30,2015
scrrEDULE 13.1(0
Idaho Power Governmental Authorizations
l. Federal Power Act, Section 203 Approval
2. Federal Power Act, Section 205 Approval
3. Approval of the transaction by the ldaho Public Utilities Commission
4. Approval of the transaction by the Oregon Public Utility Commission
FERC Docket No. ERI 6-210-000
Idaho Power Company
FERC Electric Tariff
Rate Schedules
L 1s8.21.9
Page I ofl
Version 0.0.0
Effective: October 30, 2015
Filed on : October 30, 2015
scrrEDULE 13.2(f)
Pacifi Corp Govemmental Authorizationsl. Federal Power Act, Section 203 Approval
2. Federal Power Act, Section 205 Approval
3. Approval of the transaction by the Califomia Public Utilities Commission4. Approval of the transaction by the ldaho Fublic Utilities Commission
5. Approval ofthe transaction by the Oregon Public Utility Commission
6. Approval of the transaction by the Utah Public Service Commission
7. Approval of the transaction by the Washington Utilities and Transportation Commission8. Approval of the transaction by the Wyoming Public Service Commission
FERC Docket No. ERl6-210-000