Loading...
HomeMy WebLinkAbout20160219IPC Redacted Compliance Filing.pdf3Iffi*. An IDACORP CompanvRECEIVED 2016f[B !9 PH 3:31 ,, ",ii, t'ii#fi *nl8u, o* JULIA A. HILTON Senior Counsel ihilton@idahooower.com February 19, 2016 VIA HAND DELIVERY Jean D. Jewell, Secretary ldaho Public Utilities Commission 47 2 W est Wash in gton Street Boise, ldaho 83702 Re: Case Nos. IPC-E-14-41and PAC-E-14-11 Exchange of Certain Transmission Assets - ldaho Power Company's Order No. 33313 Compliance Filing and Request for Verification of Regulatory Accounting Dear Ms. Jewel!: Enclosed for filing in the above matters please find an original and seven (7) copies of ldaho Power Company's Redacted Order No. 33313 Compliance Filing and Req uest for Verifi cation of Reg u latory Accou nti ng. Also enclosed are an origina! and seven (7) copies each of confidential pages 11-15 of and confidential Attachment 3 to ldaho Power Company's Order No. 33313 Compliance Filing. Please handle the confidential information in accordance with the Protective Agreement executed in this matter. JAH:csb Enclosures '1221 W. ldaho 5t. (83702) PO. Box 70 Boise. lD 83707 Very truly yours, JULIA A. HILTON (lSB No. 7740) ldaho Power Company 1221West ldaho Street (83702') P.O. Box 70 Boise, ldaho 83707 Telephone: (208) 388-6117 Facsimile: (208) 388-6936 i h i lton@ idahopower. com Attorney for ldaho Power Company IN THE MATTER OF THE APPLICATION OF PACIFICORP DBA ROCKY MOUNTAIN POWER AND IDAHO POWER COMPANY FOR AN ORDER AUTHORIZING THE EXCHANGE OF CERTAIN TRANSMISSION ASSETS RECEIVED 20t6 i:[B il , ii CASE NOS. IPC-E-1441 PAC-E-14-11 IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING 19 PH 3:31 ''1 i'tr i'll Ir'\i ..J r' J fi L- l!, :r {;t'r},1ln{lssl0N BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION ldaho Power Company ("ldaho Power" or "Company") hereby respectfully submits to the Idaho Public Utilities Commission ("Commission"), in compliance with Order No. 33313, final documents pertaining to the exchange of certain transmission assets with PacifiCorp dlbla Rocky Mountain Power and Pacific Power (collectively referred to as "PacifiCorp"). ln addition, the Company seeks Commission verification that its regulatory accounting meets the requirements of the Commission's June 5, 2015, Order No. 33313. IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 1 I. INTRODUCTION Over the past 40 years, PacifiCorp and Idaho Power (together, the "Parties" or singularly, "Party") entered into numerous agreements ("Legacy Agreements") through which the Jim Bridger power plant and associated transmission assets were owned and operated. On October 24, 2014, the Parties entered into a Joint Purchase and Sale Agreement (.JPSA") and Joint Ownership and Operating Agreement ('JOOA") to reallocate their respective ownership interests to meet their respective load service obligations and improve operational efficiency, replacing the Legacy Agreements. On December 19, 2014, the Parties filed a joint application asking the Commission to approve the exchange of certain transmission assets. On June 5, 2015, the Commission approved the Parties' request in Order No. 33313. Following this approval and other necessary regulatory approvals in other jurisdictions, the transaction closed on October 30, 2015. II. FINAL ASSET EXCHANGE DOCUMENTS ln Order No. 33313, the Commission approved the Parties' request to exchange certain transmission assets subject to conditions regarding the financial benefits of the exchange and reporting requirements. Those conditions included a Commission directive to file fina! documents pertaining to the asset exchange, with: . Documents related to the true-up at closing; o The finaljournal entries; o The updated list of the Parties' common equipment; o The Parties' common transmission line loss methodology, once completed; and . For ldaho Power, a yearly report beginning within the first year after closing showing changes in transmission revenues. Order No. 33313 at 14. IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING .2 Pursuant to the JPSA, the value of all assets exchanged at closing are based on December 31, 2014, net book values. The net book value true-up will occur no later than 180 days after closing, or April 27,2016. This net book value true-up will include all ldaho Power planned improvements or ldaho Power extraordinary items placed in service between January 1,2015, and closing, or October 30, 2015. Because the true- up values will not be finalized until April 2016, the documents related to the true-up, including final journal entries, are not included in this compliance filing but will be filed no later than May 31,2016, in accordance with Order No. 33313. ln this filing, ldaho Power has included the initialjournal entries based on closing values, an updated list of the Parties' common equipment, the Parties' line loss methodology, and ldaho Power's annual report showing changes in transmission revenues. More information on each of the fina! document categories is contained below. The lnitial Joumal Entries. ldaho Power's initial journal entries are provided as Attachment 1 to this filing and are based on closing values as of December 31, 2014. The Company will file the final journal entries, including true-up amounts, on or before May 31 ,2016. The Updated List of ldaho Powefs Common Equipment. Upon closing of the transaction, the Parties executed an amended and restated JOOA with an effective date of October 30, 2015 ("Amended and Restated JOOA"), which is attached hereto as Attachment 2. The Amended and Restated JOOA contains a Description of ldaho Power Common Equipment in Exhibit B, beginning on page 79. The updated list of ldaho Power common equipment includes equipment that was placed in service between the date the original JOOA was executed, October 24,2014, and December 31,2014. It also removed duplicate entries and items mistakenly identified as jointly IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 3 owned but re-labeled as common equipment and vice versa. Exhibit B to the Amended and Restated JOOA will be updated to reflect any ldaho Power common equipment placed in or removed from service between January 1,2015, and October 30, 2015, in connection with the true-up adjustment. The Company will provide an updated list of Idaho Power's common equipment once the true-up has been finalized. The Parties' Common Transmission Line Loss Methodoloqv. The Parties' Transmission Loss Calculation and Allocation Methodology ("Loss Methodology") is attached as Exhibit G to the Amended and Restated JOOA, beginning on page 145. ln accordance with Section 9.5 of the original JOOA, the Parties agreed upon a Loss Methodology which provides for a "true-up" between the Parties for their respective Open Access Transmission Tariff ("OATT")-based electric losses on transmission service scheduled pursuant to one Party's OATT for service in the other Party's balancing authority area effective October 30, 2015. The Parties' Loss Methodology was accepted by the Federal Energy Regulatory Commission ("FERC") on December 22, 2015, in Docket No. ER16-210-000 and is detailed in Exhibit G of the Amended and Restated JOOA. ldaho Powels Yearlv Report Showinq Chanoes in Transmission Revenues. ln recognition of the impact the asset exchange will have on ldaho Power's transmission revenues, the Commission directed the Company (1) to establish a regulatory deferral account for transmission revenues resulting specifically from the transaction and its resulting change in ldaho Power's OATT rate and (2) to provide annual reports detailing the revenues creating the deferra! and the deferral balance. Order No. 33313 at 13-14. A copy of ldaho Power's first annual report showing both the actual changes in transmission revenues resulting from the asset exchange between the Parties as well IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 4 as a forecast of changes over the next four years is provided in confidential Attachment 3 to this filing. The following three sections describe: (1) the impact of FERC's denial of ldaho Power's request for authorization to make a one-time "known and measureable" adjustment to the transmission formula rate to immediately reflect the load divisor impacts of the asset exchange; (2) the method by which the Company proposes to quantify changes in transmission revenues in compliance with Order No. 33313 and the resulting deferral balance for year-end 2015; and (3) the Company's forecast of year- end deferral balances for the years 2016 through 2019. III. IDAHO POWER'S FERC FILING REQUESTING A ONE.TIME ADJUSTMENT TO THE TRANSMISSION FORMULA RATE Idaho Power's transmission formula rate for transmission service provided under its OATT is determined using a historic period, which is the most recent calendar year ending December 31. The transmission formula rate is updated annually and in effect for the following October 1 through September 30 time period. ln order to minimize regulatory lag associated with changes resulting from the asset exchange, on July 28, 2015, in Docket No. ER15-2292-000, ldaho Power petitioned FERC for authorization to apply a one-time "known and measureable" adjustment to the contract demand input in its transmission formula rate load divisor. The load divisor is based on a rolling 12-month average of the transmission system peak, including the contract demands associated with the now terminated Legacy Agreements. ldaho Power petitioned FERC asserting that the adjustment was necessary so that ldaho Power's transmission formula rate would reflect actual contract demands on ldaho Power's transmission system. This adjustment would have resulted in an increase in the transmission formula rate charged to all ldaho Power transmission customers taking OATT service effective IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 5 October 30, 2015. Absent this adjustment to the contract demand input of the transmission formula rate load divisor, the contract demand associated with the Legacy Agreements would not be completely eliminated from the load divisor until October 1, 2017. The methodology used by the Company to determine its annual total transmission revenue requirement and resulting transmission formula rate is set forth in Attachment H to ldaho Power's OATT. The annual total transmission revenue requirement is based on a historical period, using actual costs from the previous calendar year for almost all inputs. All long-term, firm demands on ldaho Power's transmission system, including the contract demand under the Legacy Agreements, are included as an input to variable E in the load divisor of the transmission formula rate calculation. Variable E is the average of ldaho Power's historical 12 monthly coincident peak metered load of ldaho Power's native load and network transmission customers and the long-term, firm reservations of point-to-point ('PTP") transmission customers. Throughout the FERC case (Docket No. ER15-2292-000), ldaho Power asserted that the input for the contract demand associated with the Legacy Agreements must be set to zero megawatts ('MW") so that the resulting rate reflects the actual contracted demands upon ldaho Power's transmission system. lnterventions and protests were filed by Bonneville Power Administration, the City of Seattle, and Northwest & lntermountain Power Producers Coalition ("lntervenors"). Intervenors argued that ldaho Power should not be able to deviate from its historic rate design by altering one input to the formula. Despite the Company's best efforts to persuade FERC to allow a one-time adjustment to the transmission formula rate calculation, FERC ultimately declined to IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 6 authorize such an adjustment in its Order issued on November 19, 2015.1 FERC's Order stated that ldaho Power's backward-looking formula rate did not allow for a one- time adjustment to the contract demand input. Because load divisor amounts are based on the average of ldaho Power's historical demands for the previous calendar year, FERC's order will delay the full realization of increased OATT-related revenues resulting from termination of the Legacy Agreements until October 1,2017. IV. IDAHO POWER'S YEARLY REPORT SHOWING CHANGES lN TRANSMISSION REVENUES: 2015 ACTUALS ln Order No. 33313, the Commission recognized that the termination of the Legacy Agreements will eliminate the contract demands associated with the agreements from ldaho Power's transmission formula rate divisor over time, increasing the rate charged to the Company's transmission customers. The increase in ldaho Power's transmission formula rate will lead to higher transmission revenues into the future, which will serve as a revenue credit to retail customer rates, ultimately reducing retail customer revenue requirement amounts. Because the test-year level of transmission revenues are set in a general rate case and ldaho Power's retail customers would not see the benefits of the increase in transmission revenues until the Company files its next genera! rate case, the Commission directed ldaho Power to establish a regulatory deferral account to track changes in transmission revenues resulting specifically from the transaction and its resulting change in the OATT rate. Order No.33313 at 13. FERC's OATT Rate Order prevents a change in the transmission formula rate charged to customers for PTP service during the October 1, 2015, through September 30, 2016, period. However, ldaho Power experienced immediate changes in other ' ldaho Power Co., 153 FERC 1161,212 (2015) ('OATT Rate Orde/'). IDAHO POWER COMPANY'S REDAGTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 7 transmission revenues beginning in November 2015: Transmission Facilities revenues, Long-term PTP Transmission Service revenues, and Network Transmission Service revenues. The Company has computed the revenues in each of these categories with and without an asset exchange scenario to quantify changes to transmission revenues associated with the transaction. The 2015 amounts are based on actuals for November 1, 2015, through December 31, 2015, the two months since closing of the transaction. lncluded as confidential Attachment 3 to this filing is a copy of ldaho Power's yearly report titled "Ghanges in Transmission Revenues Resulting from the Asset Exchange." Column B of the report reflects 2015 changes in transmission revenues that are a result of the asset exchange with PacifiCorp. Termination of the Legacy Agreements resulted in an overall reduction to ldaho Power's transmission facilities billings of $2.3 million for the November 1,2015, through December 31, 2015, time period. The $2.3 million reduction reflects the combination of a (1) $t million decrease related to the termination of 250 MW of transmission service associated with the Interconnection and Transmission Service Agreement ("!TSA"), a (2) $t.5 million decrease in transmission facilities revenues due to the termination of three of the Legacy Agreements, the Restated and Amended Transmission Facilities Agreement ("p,q1p4"), the Restated Transmission Service Agreement ("RTSA"), and the Hemingway Joint Ownership and Operating Agreement ("Hemingway JOOA"), and a (3) $136,000 net increase associated with billings for common facilities under the Amended and Restated JOOA. The net of these changes are reflected on the Net Change in Transmission Facilities Revenues, Line 4 of the yearly report. The transaction also resulted in an increase of approximately $1.2 million during the November 1, 2015, through December 31, 2015, time period primarily due to IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 8 PacifiCorp's new OATT service, 310 MW of long-term, firm PTP transmission service, as can be seen on Line 7, Net Change in Long-Term PTP revenues. ln addition to setting the PTP rate, the transmission formula rate determines the annual and monthly network transmission revenue requirement amount. This amount is recovered from ldaho Power's network transmission customers on a monthly basis based on their respective load ratio shares of ldaho Power's transmission system peak. The Company's transmission system peak used to compute a network customer's monthly charge is the rolling 12-month average of the previous 12 calendar months' transmission system peaks; i.e., the transmission system peak used in November 2015 is the average of the transmission system peaks of December 2014 through November 2015. The termination of the Legacy Agreements resulted in a net decrease of ldaho Power's transmission system peak of over 1,000 MW beginning in November 2015, thereby increasing network customers' load ratio share; higher load ratio share amounts applied to equal revenue requirement amounts increase the amount network customers pay ldaho Power. The Company's network customers will see an increase in their load ratio share again in December 2015 as another month of a lower transmission system peak resulting from the termination of the Legacy Agreements is incorporated into the rolling 12-month average used for billing purposes. For the time period November 1, 2015, through December 31, 2015, ldaho Power calculated an increase of $45,000 as a result of the increase in revenues from the Company's network transmission customers. This change is shown on Line 8, Network Transmission Service revenues. The full impact of the asset exchange will not be reflected in the transmission formula rate until October 1, 2017, creating a delay in the realization of increased PTP IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 9 transmission service revenues, even though some changes in transmission revenues became effective upon execution of the asset exchange. The net transmission revenue change during 2015 was a decrease of approximately $1.1 million, meaning ldaho Power recovered less transmission revenue in 2015 as a result of the asset exchange, creating a temporary regulatory liability balance. Although FERC's OATT Rate Order will result in fewer transmission revenue benefits than were presented in the origina! Application in Case No. IPC-E-14-41, the asset exchange remains a positive net beneficial transaction on a present value revenue requirement basis. V. IDAHO POWER'S YEARLY REPORT SHOWING CHANGES IN TRANSMISSION REVENUES: 2016-2019 FOREGAST ldaho Power anticipates that the revenue delay related to FERC's OATT Rate Order wil! result in negative cumulative differences in total transmission revenue over the next three years before turning positive in the fourth year. To illustrate the point at which the Company anticipates the account balance will transition to a regulatory asset, ldaho Power has forecasted changes in transmission revenues over the 2016 through 2019 time period using the tracking methodology described in Section IV above. The forecast is intended to demonstrate the change over time as the deferral transitions from a receivable to a payable. Based on this forecast, ldaho Power anticipates 2018 will be the first year any changes in transmission revenues resulting from the asset exchange will be net positive when compared to a scenario without an asset exchange, with 2019 the year the cumulative account balance changes to a regulatory asset. The following discussion presents the Company's forecasting methodology in detail. ln addition to the three revenue categories discussed above, Transmission Facilities revenues, Long-term PTP Transmission Service revenues, and Network Transmission Service revenues, the Company will experience changes in Short-Term IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 1O and Non-Firm PTP Transmission Service revenues once the transmission formula rate begins to incorporate effects of the asset exchange in its inputs. Due to FERC's OATT Rate Order denying ldaho Power's request to make a one-time adjustment to reflect the transaction in the load denominator of the transmission formula rate, ldaho Power is able to forecast with more certainty changes to the transmission formula rate and project future regulatory deferral amounts. To estimate changes in transmission revenues, ldaho Power forecasted future transmission formula rate amounts under an asset exchange scenario and without an asset exchange scenario using the following assumptions: . Nominal, historical-based growth of certain transmission revenue requirement components; . An average 1.2 percent groMh in ldaho Power's native load based on the growth assumption used in the Company's 2015 lntegrated Resource Plan ("lRP"). o Wheeling revenue credit amounts based on a three-year historical average. The asset exchange scenario incorporates the additional revenues ldaho Power wi!! receive for billing of the common facilities under the JOOA. o Additional assumptions for the scenario with the asset exchange are: The elimination of 1,836 MW of contract demands associated with the Legacy Agreements effective November 1,2015; and The addition of PacifiCorp's 310 MW of long-term, firm PTP transmission service effective November 1, 2015. The following table summarizes the forecasted OATT PTP rate under each scenario: IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 11 OATT Formula Rate ($/kW per year) Oct 2015 - Sept 2016 Oct 2016 - Sept 2017 Oct2017 - Sept 2018 Oct 2018 - Sept 2019 Oct 2019 - Sept 2020 Oct 2020 - Sept 2021 With Asset Exchange $23.43 $I $I $I $I $I Without Asset Exchange $23.43 $I $I $I $I $I Transmission Facilities Revenues. Under the asset exchange scenario, facilities revenues during 2016 through 2019 will continue to be Iess than would exist without the asset exchange due to the termination of the ITSA, RATFA, RTSA and the Hemingway JOOA. Because services provided under the ITSA were considered to be "OATT-like" and priced as such, revenues received under the ITSA fluctuated with changes in the transmission formula rate. The transaction will result in a decrease in revenues recorded in FERC Account 454 associated with the lrsA of $I in 2016 and up to $I in 2019. ln addition, the asset exchange will reduce FERC Account 454 revenues by an additional $9.0 million per year over the same time period due to the termination of the RATFA, RTSA, and the Hemingway JOOA. Because billing under the RATFA, RTSA, and the Hemingway JOOA was based on year-end asset values, it would be difficult to forecast revenues for future periods. lnstead, when analyzing an asset exchange scenario as compared to a scenario without an asset exchange, ldaho Power computed what 2016 amounts would have been and held those constant for the remaining years. Finally, the asset exchange will result in an increase in facilities revenues due to the billing of common facilities under the Amended and Restated JOOA. The net difference of amounts owed between the Parties will be approximately $815,000. Similar to other facilities revenues, billing of the common facilities is based on asset values and challenging to forecast so ldaho Power has held 2016 amounts continuous for 2017, 2018, and 2019. The total forecasted net change in Transmission Facilities revenues for 2016 through 2019 can be seen on Line 4, Columns C through F of the yearly report. IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 12 Lono-term PTP Transmission Seruice Revenues. To model changes in long- term, firm PTP transmission revenues, ldaho Power applied the transmission formula rate calculated under both the asset exchange scenario and the scenario without the asset exchange to current long-term, firm PTP transmission reservations, excluding ldaho Power merchant reservations. The total reservation amounts under each scenario were applied to the forecasted transmission formula rates, resulting expected increase in FERC Account 456 revenues in 2016 of $I as a result of the asset exchange. As shown on Line 7 of Attachment 3, long-term PTP revenues in 2017,2018, and 2019 are estimated to increas" $I, $f, and $I I, respectively. Network Transmission Seruice Revenues. As described previously, the transmission formula rate also determines the annual and monthly network transmission revenue requirement amount. To estimate the impact to network transmission service revenues, the Company first estimated the transmission system peak as the rolling 12-month average of the transmission system peak is used to compute a network transmission customer's monthly charge. The Company's native load was grown at 1.2 percent on a monthly basis based on Idaho Power's 2015 IRP growth assumption and existing long-term PTP transmission service reservations were added, including ldaho Power merchant reservations and the new longterm PTP transmission service reservation of 100 MW beginning July 2016, to compute ldaho Power's total monthly transmission system peak. As a result of the asset exchange, PacifiCorp executed 310 MW of new long-term PTP transmission service reservations in November 2015, and these reservations were added to the transmission system peak loads under the asset exchange scenario. IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 13 Next, each network transmission customer's load ratio share was computed based on the percentage of its demand as compared to the monthly transmission system peak amounts under each scenario. The monthly load ratio share was then applied to the monthly network transmission revenue requirement amount to estimate the network transmission service revenues during the 2016 through 2019 time period. Execution of the asset exchange and the resulting impacts on amounts charged to network transmission customers is estimated to increase FERC Account 456 network transmission system revenues of $I to $I annually through 2019, as reflected on Line 8, Column C through F of Attachment 3. Short-Term/Non-Firm Transmission Seruice Revenues. Because the transmission formula rate that went into effect October 1,2015, was based on calendar year 2014 data and FERC denied the Company's request to make a one-time adjustment to the transmission formula rate load divisor upon closing of the transaction, the asset exchange did not impact the transmission formula rate charged to customers taking short-term, non-firm PTP transmission service in 2015 or revenues received from shortterm or non-firm transmission service in 2015. Changes in short-term and non- firm revenues are expected beginning October 1,2016, when effects of the asset exchange begin to be incorporated into the transmission formula rate for PTP service. To estimate the change, ldaho Power used an average of the previous three calendar year's historical loads for short-term and non-firm transmission service and applied those loads to the transmission formula rate under the asset exchange scenario and without the asset exchange. Line 9, Columns C through F of Attachment 3 presents the variance for 2016 through 2019, starting with an additional $I and growing to approximat"ry $I by 2019. IDAHO POWER COMPANY'S REDAGTED ORDER NO. 33313 COMPLIANCE FILING AND REOUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 14 2016-2019 Chanqes in Transmission Seruice Revenues. Although ldaho Power anticipates a decrease in transmission facilities revenues, the Company expects the increase in long-term PTP transmission service revenues, network transmission service revenues, and short-term and non-firm PTP transmission service revenues will surpass the decrease by year 2019. The following chart summarizes ldaho Power's forecasted changes in transmission service revenues by year as a result of the asset exchange that would be tracked for future recovery or credit: VI. VERIFICATION OF IDAHO POWER'S REGULATORY ACCOUNTING In Order No. 33313, the Commission directed the Company to establish a regulatory deferral account for transmission revenues resulting specifically from the transaction and its resulting change in the OATT rates and to provide annual reports of the revenues going into the deferral account and the deferral balance. Order No. 33313 at 14. As shown above, absent the deferral, the financial impact to the Company resulting from the decrease in transmission revenues the first few years is significant and, consequently, it is important that the Company confirm it correctly calculated deferral amounts to be recovered from, or credited to, customers in a future rate proceeding. Therefore, ldaho Power seeks Commission verification that its regulatory accounting meets the requirements of the Commission's June 5, 2015, Order No. IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 15 Revenue Category 2015 (ml 2016 {m)2017 lml 2018 (m)2019 (m) Facilities Revenues ($2.s+1 ($I)($I)($I)($I) Long-Term PTP Transmission Service $1.21 $I $I $I $I Network Transmission Service s0.05 $I $I $I $I Short-Term/Non-Firm Transmission Service $0.00 $r $I $I $r Total Change in Transmission Service Revenues ($1.08)($I)($r)$I $I Cumulative Change in Transmission Service Revenues ($1.08)($I)($I)($I)$rI 33313. Specifically, ldaho Power requests Commission acknowledgement that Company has correctly computed the deferra! balance tor 2015 and should use same methodology for computing future deferral balances. VII. COMMUNICATIONS Communications and service of pleadings, with reference to this request verification should be sent to the following: the the for 1221West ldaho Street (83702) 1221West ldaho Street (83702) Julia A. Hilton ldaho Power Company P.O. Box 70 Boise, ldaho 83707 i h i lton@ idahopower. com dockets@d ahopower. com Tim Tatum ldaho Power Company P.O. Box 70 Boise, ldaho 83707 ttatum@ idahopower. com DATED at Boise, ldaho, this 19th day of February 2016. IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 16 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on the 19th day of February 2016 I served a true and correct copy of IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING upon the following named parties by the method indicated below, and addressed to the following: Commission Staff Daphne Huang Deputy Attorney General ldaho Public Utilities Commission 472 West Washington (83702) P.O. Box 83720 Boise, ldaho 83720-007 4 PacifiCorp Daniel E. Solander Yvonne R. Hogle Rocky Mountain Power 201 South Main Street, Suite 2400 Salt Lake City, Utah 84111 Industrial Customers of ldaho Power Peter J. Richardson RICHARDSON ADAMS, PLLC 515 North 27th Street(83702) P.O. Box 7218 Boise, ldaho 83707 Dr. Don Reading 6070 Hill Road Boise, ldaho 83703 X Hand Delivered U.S. Mail Overnight Mail FAXX Email daphne.huang@puc.idaho.gov Hand DeliveredX U.S. Mail _Overnight Mail FAXX Email dan iel. solander@pacificorp. com Yvon ne. hoq le@ pacificorp. com Hand DeliveredX U.S. Mail _Overnight Mai! FAX Email peter@ richardsonadams.com Hand Delivered U.S. Mail Overnight Mail FAX Email dreadinq@mindsprinq.com IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 17 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NOS. IPC-E -1441and PAC-E -14-11 ATTACHMENT 1 IDAHO POWER COMPANY CLOSING JOURNAL ENTRIES Closing joumal entries to exchange undivided ownership interests in equipment between PacifiCorp and Idaho Power Company to provide the parties with transmission capacity that better aligts with the current configuration of the parties respective transmission systems. FERC Account Descriotion t02 108 l0r l3l t02 Electric Plant Purchased or Sold Accumulated Provision for Depreciation of Electric Plant Electric Plant in Service 7'o clossifu the exchange ofthe undivided ownership inleresl in assets to PacifCorpfrom h:leclric Plant in Senice to FER(I accounl ! I 02 - Eleclric Plan, Purchased or Sold in accordance wi,h I I CF R, Part l0l, Electric Planl lnstmction 5. Cash Electric Plan Purchased or Sold 7'o record cash payment from PocifiCorpfor the dffiring values resultingJion lhe netling of the uchange prices. Construction Work in Progress Accounts Payable To record trqnsaction costs as ofNovember 30, 2015 incurred by ldaho Power blacilitale lhe exchonge ofundivided ownership inlerest in assets with PacrfiCorp. Electric Plant in Service Accumulated Provision for Depreciation of Electric Plant Electric Plant Purchased or Sold To clear I;ERC accounl r 102 - Elecltic Planl Purchased or Sold to l)lectric Plant in Seruice and Accumuloted Provisionlor Deprectationfor the value ofthe undivided ownership interest in assets received from Pacrfi (lorp. Other Accounts Receivable Accumulated Provision for Depreciation of Electric Plant Electric Plant Purchased or Sold 'l'o record o receiyablefor the cash payment duefrom Paci/icorp that is a result ofan error in lhe computolion of lhe undivided ownership interest in assets received from Poctf()orp. Current Income Tax - Operating Income Income Taxes Accrued Accumulated Deferred Income Taxes - Operating Property Deferred Income Tax Credit - Operating Income 'l'o record currenl and deferued tuesfor the undivided ownership inlerest received in ossels exc ha nged w i t h P ac tfi C o rp. Accumulated Deferred Income Taxes - Operating Property Deferred Income Tax Credit - Other lncome & Deductions To record lhe reversl ofthe acrumulated deferred income lu balancefor nethod life dilkrences on the assets relinquished to PacifiCorp. Deferred Income Tax - Other Income & Deductions Accumulated Deferred Income Taxes - Other Property 7'o establish the acumulated deferred income t6 balance (non-rate base offsetting) Ior the tu basis dtfference on the replacemenl property receivedfrom Pacifi(orp. Debit 43,657,292 20,503,743 l 59,538 868,s23 73,390,985 3,090 5,1 03,0 1 5 4.550.527 5.706,53 l 5,706,53 I Credit 64, I 6 1,035 l 59,538 868,523 29,89s,539 43.495.445 781 2,309 s,t03,015 4,550,527 5,706,s31 107 232 l0l 108 102 143 108 102 409. I 236 282.1 4l l.l 282.t 411.2 410.2 282.1 The amounls shown ore based on closing values and are as ol December 3 l, 20 I 4. These amounts are subject to a tme-up adjustment within I 80 doys after the closing of the exchange. Finqljournql entries will he filed after thal has occurred. 5,706,53 I BEFORE THE IDAHO PUBLIC UTILITIES GOMMISSION CASE NOS. IPC-E -1441and PAC-E -14-11 ATTAGHMENT 2 EXECUTION VERSION JOINT OWNERSHIP AND OPERATING AGREEMENT BETWEEN IDAHO POWER COMPANY AND PACIFICORP DATED OCTOBER 30,2015 ARTICLE I l.l 1.2 ARTICLE II 2.1 2.2 2.3 2.4 ARTICLE III 3.1 3.2 ^^J.J 3.4 3.5 3.6 3.7 3.8 3.9 ARTICLE IV 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 EXECUTION VERSION TABLE OF CONTENTS DEFINITIONS; RULES OF INTERPRETATION ............2 Definitions ...............2 Rules of Construction Term......... Termination Effect of Termination............. ..................... I I TRANSMISSION FACILITIES OWNERSHIP INTERESTS ........12 Ownership Interests .................12 Capacity Allocations ................12 Adjustment of Capacity Allocations and Ownership Interests............................ l3 Qualified Owner....... ................ 15 No Right to Use ....................... 15 Payments ............... 15 Waiver of Partition Rights ....... 15 Nonexclusive License to Enter and Use Real Property....................................... l6 Access to Antelope Substation for Idaho Power Maintenance of Department of Energy Facilities ................. 18 OPERATOR OF TRANSMISSION FACILITIES ............... ........... I8 Appointment of Operator............... ............. 18 Authority of Operator .............. l8 Delegation of Responsibilities .................... 19 Govemmental Authorizations......... ............ 19 Audit .....................20 Insurance... .............21 Invoices .................21 Disputed Amounts ...................22 Assistance .............22 Remedies.. ARTICLE V OPERATION AND MATNTENANCE OF TRANSMISSION FACILITIES ................ ............23 JOINT OWNERSHIP AND OPERATING AGREEMENT -l- 5.1 5.2 5.3 ARTICLE VI 6.1 6.2 ARTICLE VII 7.1 7.2 7.3 7.4 7.5 ARTICLE EXECUTION VERSION Compliance; Standard of Work ...................23 Operation and Maintenance; Outages and Outage Coordination; Capital Upgrades and Improvements ......................23 Requests for Generation or Transmission Interconnection Service...... ...............25 TRANSMISSION FACILITIES CAPITAL UPGRADES PROPOSED BY AN OWNER............... ..............26 Capital Upgrades... ....................26 McNary Transmission Project ....................28 PHYSICAL DAMAGE TO TRANSMISSION FACILITIES; CoNDEMNATION...... ........... 28 Rebuilding Damaged Facilities.................. 28 Decision not to Rebuild ...........29 Purchase of Ownership Interest ..................30 Cooperation Condemnation............. .............. 30 VIII RETIREMENT AND DECOMMISSIONING OF TRANSMISSION 30 FACTLITIES ................ .......... 3l 8.1 Decision to Retire Transmission Facilities ....................31 8.2 Costs of Decommissioning ......31 8.3 Purchase of Ownership Interest ................... 3l 8.4 Cooperation................ ..............32 ARTICLE IX TRANSMISSION SYSTEM BOUNDARTES............ .....................32 9.1 Points of Interconnection; Points of Balancing Authority Area Adjacency........32 9.2 E-Tags ...................32 9.3 Dynamic Transfer Capability Rights ..........31 9.4 Jim Bridger Pseudo Tie............. ..................33 9.5 Electric Losses ......32 9.6 Jim Bridger Project Generation RAS........... ..................33 ARTICLE X TRANSMISSION SYSTEMS OPERATION AND MATNTENANCE ..............32 10.1 Service Conditions ...................32 10.2 Survival .................34 ARTICLE XI FORCE MAJEURE .................35 I l.l Force Majeure Defined .............35 JOINT OWNERSHIP AND OPERATING AGREEMENT -tl- EXECWION VERSION ll.2 Effect of Force Majeure ...........35 ARTICLE XII EVENTS OF DEFAULT .......36 l2.l Event of Default.. .....................36 12.2 Cure by Non-Defaulting Party ....................36 12.3 Remedies.. .............37 ARTICLE XIII REPRESENTATIONS AND WARRANTIES............ ..................37 l3.l Representations and Warranties of Idaho Power........ ......................37 13.2 Representations and Warranties of PacifiCorp............... ..................38 ARTICLE XIV INDEMNIFICATION........... ...................38 l4.l Indemnities ............38 14.2 Notice and Participation.......... ....................39 14.3 Net Amount................. .............40 14.4 No Release of Insurers ............. 40 14.5 Mitigation. .............41 14.6 Assertion of Claims... ...............41 14.7 Survival of Ob1igation................ .................4l 14.8 Limitation on Liability .............41 ARTICLE XV PROPRIETARY TNFORMATION......... .....................4I l5.l Disclosure of Proprietary Information Prohibited.............. ..............41 15.2 Disclosure by Representatives ....................42 15.3 Permitted Disclosures ..............42 15.4 Injunctive Re1ief......... ..............42 15.5 Publicity ................42 15.6 Proprietary Information Defined...... ...........43 15.7 Survival .................43 ARTICLE XVI TAXES................ ..................43 16.l No Partnership ............ .............43 16.2 761 Election ................ .............43 16.3 Responsibility for Taxes ..........44 16.4 Indemnification............. ...........44 16.5 Determination of Depreciation and Other Matters ........44 ARTICLE XVrr DrSPUTES........ ...................44 l7.l Exclusive Procedure.. ...............44 JOINT OWNERSHIP AND OPERATING AGREEMENT -t ll- EXECUTION VERSION 17.2 Dispute Notices...... ..................47 17.3 Informal Dispute Resolution. ......................47 17.4 Submission of Dispute to FERC or Approved Courts 17.5 Continued Performance .................47 ARTICLE XVII ASSIGNMENT.......... .........48 l8.l Prohibited Transfers and Assignments ........ 48 18.2 Permitted Assignments and Transfers .........48 18.3 FERC Approval 49 47 Exhibit A Exhibit B Exhibit C Exhibit D Exhibit E Description of PacifiCorp Common Equipment Description of Idaho Power Common Equipment Ownership Interests; Directional Capacity Allocations; Directional Capacity Allocation Percentages Monthly Transmission Facilities O&M Charge; Monthly Substation O&M Charge; Monthly Common Equipment Charge Department of Energy Equipment Located in the Antelope Substation JOINT OWNERSHIP AND OPERATING AGREEMENT -lv- EXECWION VERSION Exhibit F Acquisition Costs Exhibit G Joint Ownership Transmission Loss Calculation and Allocation Methodology SCHEDULES Schedule l3.l(0 Idaho Power Governmental Authorizations Schedulel3.2(D PacifiCorpGovernmentalAuthorizations JOINT OWNERSHIP AND OPERATING AGREEMENT EXECUTION VERSION JOINT OWNERSHIP AND OPERATING AGREEMENT This Joint Ownership and Operating Agreement, dated as of October 30, 2015, is between PacifiCorp, an Oregon corporation, ("BAgifieplp"), and Idaho Power, an Idaho corporation ("ldaho Power"). Each of PacifiCorp and ldaho Power are sometimes hereinafter referred to individually as "!grty" and collectively as "@". RECITALS: WHEREAS, Idaho Power is a transmission provider which owns, controls and operates, or in certain cases only operates, equipment for the transmission of electric power and energy located in Idaho, Oregon, Washington and Wyoming (the "ldaho Power Transmission Svstem"); WHEREAS, Idaho Power uses the Idaho Power Transmission System, its distribution system and its generation resources to provide retail and wholesale electric services, and is the NERC recognized Balancing Authority Operator of one Balancing Authority Area; WHEREAS, PacifiCorp is a transmission provider which owns, control and operates, or in certain cases only operates, equipment for the transmission of electric power and energy located in Idaho, Oregon, Washington and Wyoming (the "PacifiCorp Transmission System"); WHEREAS, PacifiCorp uses the PacifiCorp Transmission System, its distribution system and its generation resources to provide retail and wholesale electric services, and is the NERC recognized Balancing Authority Operator of two Balancing Authority Areas (PACW and PACE); WHEREAS, the Idaho Power Transmission System and the PacifiCorp Transmission System interconnect at the Points of Interconnection and the Idaho Power and PacifiCorp Balancing Authority Areas are considered Adjacent Balancing Authority Areas at the Points of Balancing Authority Area Adjacency; WHEREAS, the Idaho Power Transmission System and the PacifiCorp Transmission System include certain equipment for the transmission of electric power and energy located in Idaho and Wyoming that are jointly owned and were operated pursuant to certain legacy agreements between the Parties; WHEREAS, the Parties previously desired to exchange with one another certain jointly- owned and wholly-owned equipment to provide each Party with transmission capacity that better aligns with the current configuration of its Transmission System and current load service obligations, each of which had changed since the jointly-owned and wholly-owned equipment were originally constructed; WHEREAS, in order to facilitate such an exchange, the Parties previously entered into a Joint Purchase and Sale Agreement (the '.J.PM"), dated as of October 24, 2014 (the "Execution Date"), pursuant to which at the closing of the transaction contemplated by the JPSA: (i) the ownership of certain jointly-owned equipment was reallocated and the ownership of certain additional equipment was exchanged between the Parties (as further described in Exhibit C, the "Transmission Fac "); and (ii) certain legacy agreements between the Parties were terminated and the transmission service contained therein converted to OATT service; JOINT OWNERSHIP AND OPERATING AGREEMENT Page I I EXECUTION VERSION WHEREAS, PacifiCorp individually owns additional equipment that serve and are a part of the PacifiCorp Transmission System and will not be part of the Transmission Facilities, but that PacifiCorp will make available to support the operation of the Transmission Facilities (as further described in Exhibit A, the "PacifiCorp Common E '); WHEREAS, Idaho Power individually owns additional equipment that serve and are a part of the ldaho Power Transmission System and will not be part of the Transmission Facilities, but that Idaho Power will make available to support the operation of the Transmission Facilities (as further described in Exhibit B, the "ldaho Power Commo " and, together with the PacifiCorp Common Equipment, the "Common Equipment"); and WHEREAS, in connection with the JPSA, the Parties previously entered into this Joint Ownership and Operating Agreement, dated as of the Execution Date (the *2014 Agreement"), in orderto: (l) acknowledge each Party's ownership interest in the jointly-owned Transmission Facilities; (2) allocate the transmission capacity of the jointly-owned Transmission Facilities; (3) allocate operational responsibility for the Transmission Facilities as between the Parties; (4) define the responsibility of the Operators with respect to the operation and maintenance of the Transmission Facilities and Common Equipment; and (5) define the responsibilities of the Owners with respect to the operation of their Transmission Systems in relation to the other. WHEREAS, pursuant to 9.5 of the 2014 Agreement, the Parties agreed to, on or before the Effective Date, develop an OATT-based losses methodology (the "Losses Methodology"); and WHEREAS, the Parties have developed the Losses Methodology and now desire to amend and restate the 2014 Agreement in its entirety to, among other things, incorporate the Losses Methodology as Exhibit G thereto and make certain conforming revisions to Section 9.5 thereof. NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, Idaho Power and PacifiCorp agree as follows: ARTICLE I DEFINITIONS; RULES OF INTERPRETATION l.l Definitions. Unless the context otherwise requires, the following capitalized terms have the meanings given to them below: "Adjacent Balancin " has the meaning set forth in the Reliability Standards. "Affected Party" has the meaning given to such term in Section I l.l. "Affiliate" means, with respect to a Person, each other Person that, directly or indirectly, controls, is controlled by or is under common control with, such designated Person; ry4!e!l, however, that in the case of PacifiCorp, the term "Affiliate" does not include Berkshire Hathaway Inc. or any of its afliliates (other than PacifiCorp and any direct or indirect JOINT OWNERSHIP AND OPERATING AGREEMENT Pagel2 EXECUTION VERSION subsidiaries of PacifiCorp), and no provision of this Agreement shall apply to, be binding on, create any liability of, or otherwise restrict the activities of, Berkshire Hathaway Inc. or any of its affiliates (other than PacifiCorp and any direct or indirect subsidiaries of PacifiCorp). For the purposes of this definition, "control" (including with correlative meanings, the terms "con1;1qlld by" and "under common cont '), as used with respect to any Person, shall mean (a) the direct or indirect right to cast at least fifty percent (50%) of the votes exercisable at an annual general meeting (or its equivalent) of such Person or, if there are no such rights, ownership of at least fifty percent (50%) of the equity or other ownership interest in such Person, or (b) the right to direct the policies or operations of such Person. 6'AFfJDC" means allowance for funds used during construction and has the meaning set forth in l8 CFR $ I0l, Electric Plant Instructions $ l7 (2014), as amended from time-to-time. "Asreemenf'means this Joint Ownership and Operating Agreement (including all Exhibits and Schedules attached hereto), as the same may be amended and supplemented from time to time in accordance with the terms hereof. "Amendm.gnl" has the meaning given to such term in Section 6.1(aXi). "Aprygd_Courts" has the meaning given to such term in Section I7.4. "Automatic Generatio " has the meaning set forth in the Reliability Standards. "Balancing Author " means the collection of generation, transmission and loads within the metered boundaries of each Owner determined in accordance with the Reliability Standards. "@,p!" means, with respect to any Person, that such Person: (a) files a petition or otherwise commences, authorizes or acquiesces in the commencement of a proceeding or cause of action under any bankruptcy, insolvency, reorganization or similar law, or has any such petition filed or commenced against it; (b) makes an assignment or any general arrangement for the benefit of creditors; (c) otherwise becomes insolvent (however evidenced); (d) has a liquidator, administrator, receiver, trustee, conservator or similar official appointed with respect to it or any substantial portion of its property or assets; or (e) is generally unable to pay its debts as they fall due. "Busiugg5._Days" means any day except a Saturday, Sunday and any day which is a legal holiday or a day on which banking institutions in New York, New York are authorized or obligated by Governmental Requirements to close. "Capital Upgrade Notirc" has the meaning given to such term in Section 6.I (a). "-!ms,'has the meaning given to such term in Section l4.l(a). "C_lQ6ing_Date" has the meaning given to such term in the JPSA. "Code" has the meaning given to such term JOINT OWNERSHIP AND OPERATING AGREEMENT Section 16.2. Page | 3 EXECUTION VERSION "Commercially Reas ' means the level of effon that a reasonable electric utility would take in light of the then known facts and circumstances to accomplish the required action at a then commercially reasonable cost (aking into account the benefits to be gained thereby). "Common Equipmenf'has the meaning given to such term in the recitals and includes all ancillary equipment necessary to support the operation of the Substations, including land, site preparation, improvements (control building and other permanent buildings), communications equipment, control equipment, SCADA, relays, batteries, battery chargers, cable trench, cabling, local service, security equipment, fencing, yard gravel, and grounding. Each Owner's Common Equipment, sorted by Substation, on the Effective Date is identified on Exhibit A or Exhibit B. "Co41!j4gi!.gowne1,'has the meaning given to such term in Section 7.3. 66costs" means, with respect to the construction, reconstruction or upgrade of the Transmission Facilities or Common Equipment by or on behalf of the Operator responsible for such Transmission Facilities or Common Equipment pursuant to this Agreement, including capital upgrades and improvements thereto, such Operator's actual cost of: (a) preliminary surveys and investigations and property acquisitions in connection therewith; and (b) the development, design, engineering, procurement, construction, reconstruction and upgrade of such Transmission Facilities and Common Equipment, including an allowance for AFUDC and applicable overheads determined in accordance with such Operator's customary practices, as calculated in accordance with FERC's Uniform System of Accounts; provided, however, AFUDC shall be recovered by Operators, if at all, in accordance with Section 4.7(b). "DAlqgee Notice" has the meaning given to such term in Section 7.1(a). "Damgggd_Eaglliligl" has the meaning given to such term in Section 7.1(a). "@" has the meaning given to such term in Section 8.3. "Defaulting Party" has the meaning given to such term in Section l2.l . {6Delegatg" has the meaning given to such term in Section 4.3. "Directional Capaci 'has the meaning given to such term in Section 3.2(a). "Directional Capao 'has the meaning given to such term in Section 3.2(a). 6'Di!pU1g" has the meaning given to such term in Section 17.1. "Di!p1[qNo][ice" has the meaning given to such term in Section 17.2. "Dynamic Transfer Cap " means the intra-hour deviation from scheduled flow. "Effective Date" has the meaning given to such term in Section 2.1. "Elgg1[i!.gowne1,'has the meaning given to such term in Section 6.1(a). JOINT OWNERSHIP AND OPERATING AGREEMENT ,/ Page | 4 EXECUTION VERSION "Engfgy E!1grgeugy" has the meaning set forth in the applicable version of NERC Reliability Standard EOP-002, which pertains to capacity and energy emergencies. "Event o.f-Default" has the meaning given to such term in Section 12.1. 3.8ft). "Execution Date" has the meaning given to such term in the recitals. "Execu!v$)" has the meaning given to such term in Section 17.3(a). "Excluded Transmi " has the meaning given to such term in Section 66rc" means the Federal Energy Regulatory Commission. "EERe_IVlg1lhodgjggy" has the meaning given to such term in Section 4.7(b). "FERC Uniform System 'means the Uniform System of Accounts Prescribed for Public Utilities and Licensees Subject to the Jurisdiction of the Federal Power Act prescribed by FERC, and codified as of the Execution Date at l8 C.F.R. Part l0l, as the same may be amended from time to time. "Ee@' has the meaning given to such term in Section I l.l. "Good Utility Prac 'means any of the practices, methods and acts engaged in or approved by a significant portion of the electric utility industry during the relevant time period, or any of the practices, methods and acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, would have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety and expedition. Good Utility Practice is not intended to be limited to the optimum practice, method, or act to the exclusion of all others, but rather to be acceptable practices, methods, or acts generally accepted in the region, including those practices required by Federal Power Act section 21 5(a)(4), I 6 U.S.C. $ 82ao(aXa)Q0l 4). ..@,,meanSanyfederal,state,localormunicipalgovernmental body; any governmental, quasi-governmental, regulatory or administrative agency, commission, body or other authority exercising or entitled to exercise any administrative, executive, judicial, legislative, policy, regulatory or taxing authority or power, including FERC, NAESB, NERC or any regional reliability council; or any court or governmental tribunal, in each case, having jurisdiction over the Person or matter in question, including either Owner (including in its capacity as Operator) or any of its Affiliates or the ownership, use, operation and maintenance, repair and reconstruction, or retirement and decommissioning of all or a portion of the Transmission Facilities or the Common Equipment. "Governmental Authorizations" means any license, permit, order, approval, filing, waiver, exemption, variance, clearance, entitlement, allowance, franchise, or other authorization from or by a Governmental Authority that is applicable to the Person or matter in question. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 5 EXECUTION VERSION "Govemmental Requ 'means all laws, statutes, ordinances, rules, regulations, codes, and similar acts or promulgations or other legally enforceable requirements of any Governmental Authority that are applicable to the Person or matter in question. ..I.@'hasthemeaninggiventosuchterminthepreamble. "Idaho Power Common EquiDment" has the meaning given to such term in the recitals. "Idaho Power License" has the meaning given to such term in Section 3.8(aXi). "ldaho Power Real Property Rights" has the meaning given to such term in Section 3.8(aXi). "Idaho Power Sites" has the meaning given to such term in Section 3.8(aXii). "Idaho Power Transmission System" has the meaning given to such term in the recitals. "Indglqnifigd_PA4y" has the meaning given to such term in Section 14.l(a). "Indemnifying&rty" has the meaning given to such term in Section l4.l(a). "@" has the meaning given to such term in Section 5.3. "InterruDting Owner" has the meaning given to such term in Section l0.l (c). "JillBlidger Pro.i-ec1" means the four-unit Jim Bridger coal fired electric power plant and related facilities, of which Idaho Power's ownership share is l/3, and PacifiCorp's ownership share is 2/3 and which is metered at the bus bar located at the Jim Bridger Project. "Jim Brideer Project " means the gross generation output of the four Jim Bridger Project generators metered on the low side of the generator step up transformers, minus the calculated losses on the four step up transformers, minus the tertiary loads on the 345/230 kV transformers # I and #2, minus the 230134 kV transformer #5 load, as calculated below: Jim Bridger total generation - ((Jim Bridger Unitl)2 + (Jim Bridger tJnit212 + (Jim Bridger Unit3)2 + (Jim Bridger unit+)2) x(4.4 x t0-6) - 1.2-XFMRltertiary- XFMR2tertiary - XFMR5. "Jim Brideer Transmis ' means the calculated line losses on the Jim Bridger- Goshen, Jim Bridger-Populus #l and #2, Populus-Kinport, and Populus-Borah #l and #2345kV lines, and the transformer losses on the Jim Bridger 3451230 kV transformers # l, 2 and 3. "JPSA" has the meaning given to such term in the recitals. '6losses" mean any and all damages and losses, deficiencies, liabilities, taxes, obligations, penalties, judgments, settlements, claims, payments, fines, interest, costs and expenses, whether or not resulting from third party claims, including the costs and expenses of any and all actions and demands, assessments, judgments, settlements and compromises relating thereto and the costs and expenses ofattorneys', accountants', consultants' and other professionals' fees and JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 6 EXECUTION VERSION expenses incurred in the investigation or defense thereof or the enforcement of rights hereunder and costs and expenses of remediation (including, in the case of remediation, all expenses and costs associated with financial assurance); orovided, however, that in no event shall Losses include lost profits or damages and losses excluded under Section 14.8(a). "ManAgg,I" has the meaning given to such term in Section 17.3(a). "McNary Transmissio " has the meaning given to such term in Section 6.2. "McNary Transmissi " has the meaning given to such term in Section 6.2. "Monthly Common Eq 'has the meaning given to such term in Exhibit D. "Monthly Transmissi 'has the meaning given to such term in Exhibit D. "NAESB" means the North American Energy Standards Board. "Neeotiation End Ddo" has the meaning given to such term in Section 6.2. "NERC'means the North American Electric Reliability Corporation. "Non-Defaulting Party" means an Owner that is not a Defaulting Party. "Non-Operatine Olvner" means, in a given circumstance or context with respect to certain Transmission Facilities or Common Equipment, the Owner which is not also serving as the Operator in such circumstance or context with respect to such Transmission Facilities or Common Equipment. "OATT" means, with respect to each Owner, the Owner's Open Access Transmission Tariff on file with FERC. "Qperating lu4gl" means, in a given circumstance or context with respect to certain Transmission Facilities or Common Equipment, the Owner which is also serving as the Operator in such circumstance or context with respect to such Transmission Facilities or Common Equipment. "Qpe[@I" means PacifiCorp or Idaho Power, in its capacity as Operator under this Agreement. "Other Costs" has the meaning given to such term in Section 4.7(a). "Other Costs Records" has the meaning given to such term in Section 4.5. "Q\ rrler" means PacifiCorp or Idaho Power, in its capacity as an owner of Transmission Facilities or Common Equipment under this Agreement. JOINT OWNERSHIP AND OPERATING AGREEMENT Page l7 EXECUTION VERSION "Olmg$hip lnteres!" means: (a) in respect of an Owner and a Segment, the ownership interest (expressed as a percentage) of such Owner in such Segment as described in Section 3.1(a) and set forth on Exhibit C, as the same may be adjusted from time to time pursuant to Section 3.3(b); and (b) in respect of an Owner and Common Equipment, the one hundred percent (100%) ownership interest of such Owner in such Common Equipment. "P4g.ifieplp." has the meaning given to such term in the preamble. "PacifiCorp Common E " has the meaning given to such term in the recitals. "Pqp.ifieprp License" has the meaning given to such term in Section 3.8(aXii). "PacifiCorp Real Prop " has the meaning given to such term in Section 3.8(aXi). "Pacifieorp Sites" has the meaning given to such term in Section 3.8(a)(i). "PacifiCorp Transmis " has the meaning given to such term in the recitals. 56Party" and "PArtties" have the meanings given to such terms in the preamble. 6'roh!" means the specific rated electric transmission paths within the Western Interconnection that are identified in the WECC path rating catalogue and that are identified in Exhibit C, which rated paths the Parties acknowledge may be comprised of transmission line or substation equipment that are in addition to those identified on Exhibit C. 66psr56n" means an individual, partnership, corporation, limited liability company, joint venture, association, trust, unincorporated organization, Governmental Authority, or other form of entity. "Points of Balanci 'means the points at which Idaho Power's Balancing Authority Area is an Adjacent Balancing Authority Area with each of PacifiCorp's PACE and PACW Balancing Authority Areas. "Points of Intercon " means the points of interconnection between Idaho Power's Transm ission System and Pacifi Corp' s Transm ission System. "Pdo&j-ects" has the meaning given to such term in Section 5.2(e). "Pro Rata Share" or "ProBAtA_Basis" means a proportionate allocation of a quantity between the Owners that is calculated by multiplying the quantity being allocated by each Owner's Ownership Interest or Directional Capacity Allocation Percentage or other metric, as the context provides. "Proprietary Information" has the meaning given to such term in Section 15.6. "Qu4lified Owngl" means an Owner that has an OATT on file with FERC is authorized to provide transmission service on its transmission system. JOINT OWNERSHIP AND OPERATING AGREEMENT under which it Page | 8 EXECUTION VERSION "Real Property Licen " has the meaning given to such term in Section 3.8(aXii). "Real Property Riehti'has the meaning given to such term in Section 3.8(aXii). "Rgeulations" has the meaning given to such term in Section 16.2. "Reliability Stand " means the electric reliability standards approved by FERC pursuant to Federal Power Act Section 215, 16 U.S.C. $82ao(d) (2014). "Remainile Olvner" has the meaning given to such term in Section 8.3. "Rgprelentatives" means, in respect of an Owner or Operator, the directors, officers, shareholders, partners, members, employees, agents, consultants, contractors or other representatives of such Owner or Operator. "Retired Transmiss ' has the meaning given to such term in Section 8.1. "Segment" means a Substation Segment or a Transmission Segment. "S-ubslAtions" means the substations that are identified on Exhibit C. "SubllAlio!_Sssmgn!" means the Transmission Facilities that are identified on a specific row of Exhibit C as a Substation. "Transmission Se ent" means the Transmission Facilities that are identified on a specific row of Exhibit C as a transmission line. "@'has the meaning given to such term in Section 16.4. "Tax Indemnitee Party" has the meaning given to such term in Section 16.4. 6'Taxes" has the meaning given to such term in Section 16.3. 6(Term" has the meaning given to such term in Section 2.2. "Terminated Transmiss " has the meaning given to such term in Section 2.3(a\. "Total Directional C " has the meaning given to such term in Section 3.2(a). "Transfer" has the meaning given to such term in Section 18.1. "Transfleree" has the meaning given to such term in Section 15.1. 'oTransferor" has the meaning given to such term in Section 15.1. "Transmission Fac 'has the meaning given to such term in the recitals. "Transmission Fac " means, in respect of each Operator, each agreement, instrument or other contract relating to or in connection with the Transmission Facilities or Common Equipment it is responsible for, that such Operator enters into pursuant to this JOINT OWNERSHIP AND OPERATING AGREEMENT Page 19 EXECWION VERSION Agreement and, in respect of the Prior Projects, that the Operating Owner entered into prior to the Effective Date; but does not include transmission service agreements. "Transmission Faci 'has the meaning given to such term in Section 3.8(aXii). "Transmission Sys 'means, in the case of PacifiCorp, the PacifiCorp Transmission System, and, in the case of Idaho Power, the Idaho Power Transmission System. "WECC" means the Westem Electricity Coordinating Council. "lJ{S S.sreemen!" has the meaning given to such term in Section 14.8(b). 1.2 Rules of Construction. The following rules of interpretation shall apply in this Agreement: (a) The masculine shall include the feminine and neuter. (b) References to "Articles," "Sections," "Exhibits" and "Schedule" shall be to articles, sections, exhibits and schedules of this Agreement. (c) The Exhibits and Schedules attached hereto are incorporated in and are intended to be a part of this Agreement. (d) This Agreement was negotiated and prepared by both Parties with the advice and participation of counsel. The Parties have agreed to the wording of this Agreement and none ofthe provisions hereofshall be construed against one Party on the ground that such Party is the author of this Agreement or any part hereof. (e) Each reference in this Agreement to any agreement or document or a portion or provision thereof shall be construed as a reference to the relevant agreement or document as amended, supplemented or otherwise modified from time to time with the written approval ofboth the Parties. (0 Each reference in this Agreement to Govemmental Requirements and to terms defined in, and other provisions of,, Governmental Requirements shall be references to the same (or a successor to the same) as amended, supplemented or otherwise modified from time to time. (g) The term "day" shall mean a calendar day, the term "month" shall mean a calendar month, and the term "year" shall mean a calendar year. Whenever an event is to be performed, a period commences or ends, or a payment is to be made on or by a particular date and the date in question falls on a day which is not a Business Day, the event shall be performed, or the payment shall be made, on the next succeeding Business Day; provided. however, that all calculations shall be made regardless of whether any given day is a Business Day and whether or not any given period ends on a Business Day. (h) Each reference in this Agreement to a Person includes its successors and permitted assigns; and each reference to a Governmental Authority includes any Governmental Authority succeeding to its functions and capacities. JOINT OWNERSHIP AND OPERATING AGREEMENT Page I l0 EXECUTION VERSION (i) In this Agreement, the words "include," "includes" and "including" are to be construed as being at all times followed by the words "without limitation." 0) The words "hereof;" "herein" and "hereunder" and words of similar import when used in this Agreement shall, unless otherwise specified, refer to this Agreement as a whole and not to any particular provision of this Agreement. ARTICLE II TERM 2.1 Effectiveness of this Aereement. This Agreement, including the Parties' rights and obligations hereunder, shall become effective, if at all, on the Closing Date (the "Effeglive Date"). For the avoidance of doubt, no aspect of this Agreement, other than this Section 2.1, shall have any effect unless and until the Effective Date occurs. If the Effective Date does not occur and the JPSA is terminated, this Agreement, including this Section 2.1, shall become void ab initio. 2.2 Term. The term Date and shall continue in full hereof. of this Agreement ("Term") shall commence upon the Effective force and effect until terminated in accordance with the provisions 2.3 Termination. (a) Subject to Section 2.4(a) and Section 2.4(b), this Agreement shall terminate solely with respect to certain Transmission Facilities and Common Equipment (each, "Terminated Transm '), and not otherwise with respect to any other Transmission Facilities or Common Equipment or other obligations hereunder, if one or more of the following events occur: (i) The Terminated Transmission Facilities are damaged and destroyed and the Owners decide not to repair or rebuild (or cannot reach agreement to repair or rebuild) them in accordance with Article VII; or (ii) The Terminated Transmission Facilities are retired and decommissioned in accordance with Article VIII. (b) Subject to Section 2.4(c), this entire Agreement shall terminate if one or more of the following events occur: (i) Mutual agreement of the Parties to terminate this Agreement; or (ii) This Agreement is terminated by exercise of remedies pursuant to Section 12.3. 2.4 Effect of Termination. If this Agreement is terminated pursuant to Section 2.3(a) with respect to any Terminated Transmission Facilities, then, except as for those provisions that are expressly intended to survive termination and, subject to Section 2.4(b) and receipt of any necessary Governmental Authorizations required by Govemmental Requirements, this Agreement shall terminate and become void and of no further force and effect, without further action by either Party solely with JOINT OWNERSHIP AND OPERATING AGREEMENT Pagelll EXECUTION VERSION respect to such Terminated Transmission Facilities, provided that neither Party shall be relieved from any of its obligations or liabilities hereunder accruing prior thereto. (a) In the event that this Agreement is terminated pursuant to Section 2.3(a) with respect to any Terminated Transmission Facilities and the Non-Operating Owner continues to own all or a portion of the Ownership Interest(s) in such Terminated Transmission Facilities, then: (i) the Operator shall, upon written notice from the Non-Operating Owner delivered to the Operator no later than fifteen (15) Business Days after termination of this Agreement solely with respect to such Terminated Transmission Facilities pursuant to Section 2.3(a), continue to perform such of its obligations and covenants in Articles VI, VII, and VIII as are set forth in the notice; (ii) such obligations and covenants, together with Articles XI, XIV, XV, XVI, XVII, and XIX (to the extent applicable to the surviving covenants and obligations), shall continue in full force and effect notwithstanding the termination of this Agreement solely with respect to such Terminated Transmission Facilities pursuant to Section 2.3(a); and (iii) the Parties shall amend this Agreement to reflect such changes to this Agreement as shall be necessary and mutually acceptable to the Parties to conform this Agreement solely as it relates to such Terminated Transmission Facilities to the surviving provisions of this Agreement in accordance with this Section 2.4(b). (b) If this Agreement is terminated pursuant to Section 2.3(b), then, except as for those provisions that are expressly intended to survive termination of this Agreement and, subject to receipt of any necessary Governmental Authorizations required by Governmental Requirements, including FERC approval, this Agreement shall terminate and become void and of no further force and effect, without further action by either Party, provided that neither Party shall be relieved from any of its obligations or liabilities hereunder accruing prior thereto. rnaxsvrssroNracfi ,lf If; slEo#rNnnssprxrnnrsrs 3.1 Ownershiplnterests. (a) Pursuant to the JPSA, as of the Closing Date: (i) the percentage of ownership in a Segment that is owned by ldaho Power is set forth in column A of Exhibit C, and the percentage of ownership in a Segment that is owned by PacifiCorp is set forth in column B of Exhibit C; and (ii) when the Owners each own a percentage of a Segment, each of the Owners own an undivided ownership interest in such Segment as tenants-in-common. (b) The Owners agree that they shall enter into such additional documentation as shall reasonably be required to document the Owners' Ownership Interests in the Transmission Facilities and any change in the Owners' Ownership Interests in the Transmission Facilities as a result of the application of Section 3.3(b), provided that in no event shall an Owner be responsible for paying any amount to the other Owner as a result of any change in any Ownership Interest in the Transmission Facilities, except as expressly provided for in this Agreement or as otherwise agreed to in writing by the Parties. Caoacitv Allocations. (a) Directional Capacitv Allocation. The Parties agree that the total directional transmission capacity in megawatts of each Segment and Path is set forth in columns E and H of Exhibit C (the "Total Directiona '), and is allocated to: (i) Idaho Power (A) as expressed in megawatts as set forth in columns C and F of Exhibit C and (B) as expressed as a 3.2 JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 12 EXECUTION VERSION percentage of the total directional transmission capacity of each Segment and Path as set forth in columns I and K of Exhibit C; and (ii) PacifiCorp (A) as expressed in megawatts as set forth in columns D and G of Exhibit C and (B) as expressed as a percentage of the total directional transmission capacity of each Segment and Path as set forth in columns J and L of Exhibit C. Each of the allocations of directionaltransmission capacity of each of the Segments and Paths to each of the Owners expressed in megawatts in Sections 3.2(aXiXA) and 3.2(aXiiXA) is herein referred to as the "Directional Capacity Allocation" and each of the allocations of directional transmission capacity of each of the Segments and Paths to each of the Owners in percentages in Sections 3.2(a)(iXB) and 3.2(d(iiXB) is herein referred to as the "Directional Capacity Allocation Percentage." (b) Scheduline Over Sesments which are Not Part of a Path. Each Owner shall have the right to post and sell its Directional Capacity Allocation over each Segment (which is not part of a Path) in accordance with its OATT, and each Owner shall schedule energy or make available for scheduling each Segment (which is not part of a Path) in each direction consistent with its applicable Directional Capacity Allocation Percentage of the Total Directional Capacity of the Segment in each direction and pursuant to Govemmental Requirements and Govemmental Authorizations; ryldgd, however, that at no time shall an Owner be entitled to post, sell, schedule or make available for scheduling more than its applicable Directional Capacity Allocation Percentage of the Total Directional Capacity of any Segment (which is not part of a Path) in any direction, unless otherwise mutually agreed to in writing by the Owners. (c) Scheduline Over Sesments which are Part of a Path. Each Owner shall have the right to post and sell its Directional Capacity Allocation over a Path in accordance with its OATT, and each Owner shall schedule energy or make available for scheduling a Path in each direction consistent with its applicable Directional Capacity Allocation Percentage of the Total Directional Capacity of the Path in each direction and pursuant to Governmental Requirements and GovernmentalAuthorizations; ry4!e![o llowevel, that at no time shall an Owner be entitled to post, sell, schedule or make available for scheduling more than its applicable Directional Capacity Allocation Percentage of the Total Directional Capacity of any Path over one or more of the Segments which are part of the Path in any direction, unless otherwise mutually agreed to in writing by the Owners. 3.3 Adjustment of Capacity Allocations and Ownership Interests. (a) Adjustment of DirectionalCapacity Allocations and Directional Capacity Allocation Percentages. (i) Each of the Owners shall be allocated their Pro Rata Share (based on their applicable Directional Capacity Allocation Percentages) of all temporary changes in the Total Directional Capacity of a Segment or Path. (ii) Permanent changes in the Total Directional Capacity of a Segment or Path occur when the first of the following occurs: (A) when the quantity and, if applicable, direction of change in Total Directional Capacity are agreed to by the Owners; or (B) when WECC or the applicable WECC committee recognizes the quantity and, if applicable, direction of change in Total DirectionalCapacity. JOINT OWNERSHIP AND OPERATING AGREEMENT Page I 13 EXECUTION VERSION (iii) Each ofthe Owners shall be allocated their Pro Rata Share (based on their applicable Directional Capacity Allocation Percentages) of any permanent decrease or permanent increase (which is not the result of a capital upgrade or which is the result of a capital upgrade that both Owners participated in on a Pro Rata Basis (in accordance with their Ownership Interests)) in the Total Directional Capacity of a Segment or Path calculated pursuant to Section 3.3(aXii). In the event of a permanent increase in the Total Directional Capacity of a Segment or Path calculated pursuant to Section 3.3(aXii), then the increase in Total Directional Capacity shall be allocated to the Owners based on their participation in the capital upgrade established pursuant to Section 6.1. (iv) In the event there is a permanent increase or decrease in the Total Directional Capacity of a Segment or Path calculated pursuant to Section 3.3(aXii), the Owners shall promptly amend the Agreement to update Exhibit C to reflect revisions in the Total Directional Capacity of the Segment or Path as well as the Directional Capacity Allocations and Directional Capacity Allocation Percentages of the Owners in the Segment or Path calculated pursuant to Sections 3.3(aXii) and 3.3(aXiii). (b) Adjustment of Ownership Interests in Segments. (i) Only permanent changes in the Total Directional Capacity of a Segment pursuant to Section 3.3(aXii) have the ability to affect the Owners' Ownership Interests in a Segment. In the event that there is a perrnanent increase or decrease in the Total Directional Capacity of a Segment in accordance with Section 3.3(aXii), then the Ownership Interest for each Owner shall be calculated on the following basis: (A) Add both of the Owner's Directional Capacity Allocations in the Segment (taking into account the Owner's Pro Rata Share of the increase or decrease determined in accordance with Section 3.3(a)); (B) Add both of the Segment's Total DirectionalCapacities (taking into account the increase or decrease of the Segment's Total Directional Capacities determined in accordance with Section 3.3(a)); and (C) Divide the sum of clause A above by the sum of clause B above to produce the Owner's revised Ownership Interest in the Segment. In the event that there is a perrnanent increase or decrease in the Total Directional Capacity of a Segment in accordance with Section 3.3(aX-ii), the Owners shall promptly amend the Agreement to update Exhibit C to reflect any revisions in the Ownership Interests of the Owners in any Segment calculated in accordance with this Section 3.3(bXi). In addition, the Owners shall promptly amend the Agreement to update Exhibit C to reflect revisions in any Substation O&M Allocation as a result of changes in the Ownership Interests of the Owners in any Substation Segment calculated in accordance with Section 3.3(bX.i). (c) Reviews. (i) Subject to Section 3.3(cXiii), the Owners shall meet periodically, but not less than every five (5) years beginning in the year 2020,to review: JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 14 (A) EXECUTION T/ERSION The Directional Capacity Allocations, the Directional Capacity Allocation Percentages and the Substation O&M Allocations set forth in Exhibit C; The formulas for adjusting Directional Capacity Allocation Percentages and Ownership Interests set forth in this Section 3.3; The definition of Pro Rata Share; The treatment of electric losses set forth in Section 9.5; The formulas describing the charges set forth in Exhibit D; and (c) (D) (E) (F) Any other provisions of this Agreement as either Party may elect. (ii) Subject to Section 3.3(cXiii), the Owners shall meet promptly and attempt to reach a mutually agreeable solution in the event that a Governmental Requirement or Governmental Authorization adversely affects: (A) the ability of an Owner to perform its obligations or exercise its rights under this Agreement; or (B) the treatment of assets of an Owner that are subject to or affected by this Agreement. (iii) In no event shallthis Agreement be amended, supplemented or otherwise modified pursuant to Sections 3.3(cXi) or 3.3(cX-ii), unless the Parties agree in writing to such amendment, supplement or modification. 3.4 Oualified Owner. Each Owner shalltake all actions required to continue to be a Qualified Owner during the Term. If at any time during the Term an Owner ceases to be a Qualified Owner, then such Owner shall immediately provide notice thereof to the other Owner and take all actions required to resume being a Qualified Owner. 3.5 No Risht to Use. For the avoidance of doubt, the provisions of this Agreement shall not confer upon either Owner the right to use or transmit energy over any transmission facilities owned by the other Owner (other than with respect to the Transmission Facilities and Paths as provided for herein). 3.6 Payments. All payments required to be made by or on behalf of the Owners under the terms of this Agreement, including payments to the Operators of the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, the Monthly Common Equipment Charge and Other Costs, shall be made to the account or accounts designated by the Owner or Operator to which the payment is owed, by wire transfer in immediately available funds in the lawful currency of the United States. 3.7 Waiver of Partition Rights. The Owners acknowledge that any exercise of the remedy of partition (whether at law or in equity) of the jointly-owned Transmission Facilities or any portion thereof would be impracticable in view ofthe purposes and requirements of this Agreement, would violate the spirit and intent of this Agreement, and would defeat the Owners' intentions and reasonable expectations as well as the consideration upon which each Owner entered into this Agreement. Accordingly, each Owner agrees that during the Term it: (a) will (B) JOINT OWNERSHIP AND OPERATING AGREEMENT Page I 15 EXECUTION VERSION not, directly or indirectly, commence, maintain, support or join in any action or proceedings of any kind to partition the jointly-owned Transmission Facilities or any portion thereof; and (b) waives, after consultation with its qualified legal counsel, any and all rights that it may have under this Agreement or Governmental Requirements (whether at law or in equity) or otherwise to commence, maintain, support or join in any such action or proceeding. Each Owner acknowledges that the other Owner has entered into and will perform the terms of this Agreement in reliance upon the other Owner's agreement and adherence to the terms ofthis Section 3.7, and would not have entered into this Agreement but for such reliance; and that it would be unjust and inequitable for any Owner to violate or to seek relief from any provision of this Section 3.7. 3.8 Nonexclusive License to Enter and Use Real Property. (a) Subject to the terms and conditions of this Agreement, including this Section 3.8: (i) PacifiCorp hereby irrevocably grants to Idaho Power a nonexclusive license (the "ldaho Power License") to use and access the real property to which Idaho Power's Ownership Interests in the Transmission Facilities are affixed (the "PacifiCom Sites"), but only to the extent of, and subject in all respects to, PacifiCorp's real property interests (including fee, rights-of-way, easements and other real property interests) and other real property rights therein (collectively, the "PacifiCorp Real Pro ") and only to the extent such Idaho Power License is permitted by the PacifiCorp Real Property Rights and Governmental Requirements; and (ii) Idaho Power hereby irrevocably grants to PacifiCorp a nonexclusivelicense(the..Pag.!fiep@,,and,togetherwiththeIdahoPowerLicense,the "Real Prooerty Licen#') to use and access the real property to which PacifiCorp's Ownership Interests in the Transmission Facilities are affixed (the "Idabo Jower Sites" and, together with the PacifiCorp Sites, the "Transmission Fac "), but only to the extent of,, and subject in all respects to, Idaho Power's real property interests (including fee, rights-of-way, easements and other real property interests) and other real property rights therein (collectively, the "ldaho Power Real Property Riehts" and, together with the PacifiCorp Real Property Rights, the "Rg4! Property Riqhts") and only to the extent such PacifiCorp License is permitted by the Idaho Power Real Property Rights and Governmental Requirements. (b) Each Real Property License will be utilized by the grantee Owner and its Representatives for the use of, and rights ofingress, egress and access to, the applicable Transmission Facilities Sites to permit the Owner and its Representatives to exercise the Owner's rights and obligations as to its Ownership Interests in the Transmission Facilities. (c) The rights of the grantee Owner and its Representatives for use oe ingress, egress and access to the applicable Transmission Facilities Sites shall be governed by this Section 3.8 during the period the Real Property License is in effect, including during any period after this Agreement has been terminated but the surviving provisions identified in Section 10.2 (including Section 3.8) remain in effect. (d) Upon the termination or expiration of this Agreement, each Real Property License may be utilized by the grantee Owner and its Representatives for the right of ingress, JOINT OWNERSHIP AND OPERATING AGREEMENT Page I 16 EXECUTION VERSION egress and access to the Transmission Facilities Sites, for the sole purpose of inspection and as provided for in Section 3.8(fl. (e) In the exercise of its rights under the Real Property License: (i) the grantee Owner and its Representatives shall not interfere with the construction, commissioning, operation and maintenance, capital upgrades and improvements to, repair and reconstruction of, and retirement and decommissioning of the Transmission Facilities (or any other equipment or facilities owned, controlled or operated by the grantor Owner on the Transmission Facilities Site) or any portion thereof by the Operator or pose a safety hazard; (ii) the grantee Owner and its Representatives shall comply with any requirements of the Real Property Rights applicable to the Transmission Facilities Sites as of the Effective Date and any other Real Property Rights arising after the Effective Date with respect to which it receives written notice; (iii) the grantee Owner shall provide reasonable prior written notice to the grantor Owner of its intent to exercise any right or privilege granted by the Real Property License; and (iv) the grantee Owner and its Representatives exercising any right or privilege under the Real Property License shall comply with the grantor Owner's or any other contractor's safety and operational procedures and security rules, provlded that such procedures and rules are in writing and are delivered to the grantee Owner in advance. For the avoidance of doubt, the Owners acknowledge that no representations or warranties are made with respect to the Transmission Facilities Sites and that the Real Property Licenses are expressly subject in all respects to all Real Property Rights applicable to the Transmission Facilities Sites. (f) Each Real Property License includes a nonexclusive right of the grantee Owner for the location of equipment in which such Owner has an Ownership Interest, together with any replacements, capital upgrades or improvements thereto, on the Transmission Facilities Sites, to be utilized by such Owner to locate such equipment on such premises, together with the right to access such equipment over and across the Transmission Facilities Sites, provided that any replacements, capital upgrades or improvements to such equipment shall be made in accordance with the provisions of this Agreement prior to its expiration or termination. (g) Each Real Property License shall terminate, in whole or in part, if and to the extent the grantee Owner no longer requires the Real Property License for the uses described in this Section 3.8, including if and to the extent such Owner no longer has an Ownership Interest in the Transmission Facilities affixed to the respective Transmission Facilities Sites, written notice of which the grantee Owner shall promptly provide to the grantor Owner. (h) If and to the extent the Real Property Licenses are not permitted by any of the Real Property Rights with respect to all or any portion of the Transmission Facilities Sites (the "Excluded Transmission Facilities Sites"), then the Parties shall cooperate in good faith to identifu and use Commercially Reasonable Efforts to implement an alternative to the Real Property Licenses with respect to the Excluded Transmission Facilities Sites in order to attempt to provide each of the Parties with the rights that they would have been provided under the Real Property Licenses with respect to the Transmission Facilities Sites; provided, however, in no event shall an Owner be required to amend, revise or modifu in any respect any of its Real Property Rights pursuant to this Section 3.8(h). JOINT OWNERSHIP AND OPERATING AGREEMENT Page I 17 EXECUTION VERSION 3.9 Access to Antelope Substation for Idaho Power Maintenance of Department of Energy Facilities. (a) PacifiCorp shall provide ldaho Power access to the Antelope Substation for the purpose of maintaining the Department of Energy equipment that is listed on Exhibit E and located in the Antelope Substation. (b) PacifiCorp shall provide ldaho Power access to the Antelope Substation control building to allow Idaho Power to perform the necessary switching to maintain the Department of Energy equipment, and to allow access to Idaho Power's SCADA, communication, telemetry and metering equipment. Idaho Power shall provide PacifiCorp advance notice of its desire to gain access to the control building. ARTICLE IV OPERATOR OF TRANSMISSION FACILITIES Appointment of Operator. (a) The Owners hereby appoint the Party set forth in column M of Exhibit C as the Operator of each of the Transmission Facilities associated with the Party's name on Exhibit C, and the Party hereby accepts appointment, to serve as the Operator and to perform the other covenants and obligations of the Operator expressly set forth in this Agreement, in accordance with the terms and conditions of this Agreement. (b) Each of the Owners hereby authorizes the Operators to utilize its Common Equipment and wholly-owned Transmission Facilities to support the operation of the Transmission Facilities in accordance with the terms of this Agreement. (c) Notwithstanding anything to the contrary contained in this Agreement or Govemmental Requirements, the Owners agree that the Operators shall have no obligations, responsibilities or duties to the Owners other than as are expressly provided for in this Agreement. 4.2 Authority of Operator. (a) Subject to the limitations set forth in Articles IV-VIII, each Operator shall be responsible in all respects for the Transmission Facilities and Common Equipment for which it is the Operator in accordance with the terms and conditions of this Agreement. Without limiting the foregoing, each Operator shall supervise and perform, or cause to be supervised and performed, the physical operation and maintenance of, interconnection to, design of, capital upgrades and improvements to, repair and reconstruction of, security of, outage restoration of, and retirement and decommissioning of, the Transmission Facilities and Common Equipment it is responsible for in accordance with this Article IV and Articles V-VIIL In the performance of its obligations under this Agreement, each Operator shall have authority, subject to the other terms of this Article IV and Articles V-lX, to take any or all of the actions it reasonably determines are necessary to perform its obligations under this Agreement. (b) The Owners and the Operators agree that title to all capital upgrades and improvements to the Segments and Common Equipment constructed by or on behalf of the 4.1 JOINT OWNERSHIP AND OPERATING AGREEMENT Page I 18 EXECUTION VERSION Operators pursuant to Articles V and VI shall vest with the Owner or Owners of such Segments or Common Equipment in accordance with their respective Ownership Interests in such Segments or Common Equipment, and, in the case ofjointly-owned Segments, shall be jointly owned by the Owners as tenants-in-common in accordance with their respective Ownership Interests in the jointly-owned Segments. (c) Each Operator will exercise or enforce all of the benefits, rights and remedies under the Transmission Facilities Contracts for the benefit of the Owners without adverse distinction between the Owners. In furtherance and not in limitation of the immediately preceding sentence, and except as otherwise provided in Section 9.5 with respect to electric losses, each Operator agrees to transfer, assign, distribute, pay over or otherwise make available to the Non-Operating Owner, the Non-Operating Owner's Pro Rata Share (based on its respective Ownership Interest(s), if any) of any payments or proceeds obtained pursuant to any Transmission Facilities Contract. Notwithstanding anything to the contrary contained in this Agreement, the Owners agree that only the Operators shall be entitled to exercise or enforce the benefits, rights and remedies under the Transmission Facilities Contracts. 4.3 Delegation of Responsibilities. An Operator may, in its sole and absolute discretion, utilize its employees and supervisory personnel, and any independent technical advisors, consultants, contractors and agents which it may select, as may be required to perform its obligations (each, a "Delesate"). Notwithstanding any such delegation, the Operator shall remain responsible and liable for all of its delegated obligations in accordance with the terms of this Agreement. 4.4 Governmental Authorizations. (a) Each Operator is authorized to prepare and submit to all appropriate Govemmental Authorities the necessary reports, applications, plans, specifications and other documents to procure all Governmental Authorizations required to perform its obligations under this Agreement with respect to the Transmission Facilities and Common Equipment it is responsible for or to comply with Governmental Requirements, ry!1[e!l that the Operator shall consult with the Non-Operating Owner prior to the submission of any such reports, application, plans, specification and other documents to the extent to which they relate to any jointly-owned Transmission Facilities. To the extent permitted by Governmental Requirements, each Operator shall use Commercially Reasonable Efforts to obtain and structure all Government Authorizations for which it applies after the Effective Date in such a way as to recognize each Owner's applicable Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)), if any, as contemplated by this Agreement. Notwithstanding anything to the contrary in this Agreement, except as set forth in Section 5.1(b), nothing in this Section 4.4 shall obligate an Operator to prepare and submit to appropriate Governmental Authorities any reports, applications, plans, specifications and other documents to procure any Govemmental Authorizations required by the Owners in connection with their ownership of an Ownership Interest in the Transmission Facilities or the Common Equipment or the recovery of any costs and expenses in connection therewith. (b) To the extent that an Operator cannot obtain a Governmental Authorization pursuant to Section 4.4(a) on behalf of one or both of the Owners, each such Owner shall: (i) be responsible for preparing and submitting to the appropriate Governmental Authority the necessary reports, applications, plans, specifications and other documents to JOINT OWNERSHIP AND OPERATING AGREEMENT Page I 19 EXECUTION VERSION procure such Governmental Authorization; and (ii) exercise all Commercially Reasonable Efforts to obtain such Governmental Authorization. Unless and until the Owner or Owners are able to obtain such Governmental Authorizations, the Operator shall not perform or continue to perform any of the obligations requiring such Governmental Authorizations if to do so would result in the Owner or Owners or the Operator being in violation of Governmental Requirements or Governmental Authorizations. (c) Each Owner shall, at its own cost: (i) reasonably cooperate and support the Operators in obtaining any Governmental Authorizations required pursuant to Section 4.4(a); and (ii) reasonably respond to inquiries or requests issued to it by any Governmental Authorities in respect of such Governmental Authorizations; provided, however, that an Owner shall not be obligated pursuant to this Section 4.4(c) to disclose Proprietary Information except to the extent that it is otherwise required to disclose such Proprietary Information: (A) by Governmental Requirements; (B) by any Govemmental Authority; or (C) pursuant to the express terms of this Agreement. 4.5 Audit. Each Non-Operating Owner may, at its cost, at any time during normal business hours and with reasonable prior notice of not less than thirty (30) Business Days, but not more often than once in any twelve (12) month period, inspect and audit the books and records of the Operator and any of its Affiliates and Delegates (and the Operator shall secure such rights for the Non-Operating Owner from its Affiliates and Delegates) involved in the provision of services pursuant to this Agreement ("Other Costs Records"), to the extent reasonably relating to the determination of Monthly Transmission Facilities O&M Charges, Monthly Substation O&M Charges, Monthly Common Equipment Charges, and Other Costs for which the Non-Operating Owner is liable under this Agreement as shown on an invoice provided to the Non-Operating Owner pursuant to Section 4.7 within eighteen (18) months prior to the date of the audit notice. Each Operator shall, and shall cause any of its relevant Affiliates and Delegates, to keep and maintain all such Other Costs Records to the extent reasonably relating to the determination of Monthly Transmission Facilities O&M Charges, Monthly Substation O&M Charges, Monthly Common Equipment Charges, and Other Costs for which the Non-Operating Owner is liable under this Agreement and make such Other Costs Records available to the Non- Operating Owner in accordance with the terms of this Agreement. If any audit discloses that, during such eighteen (18) month period, an overpayment or underpayment of Monthly Transmission Facilities O&M Charges, Monthly Substation O&M Charges, Monthly Common Equipment Charges or Other Costs has been made by the Non-Operating Owner or the amount of any Monthly Transmission Facilities O&M Charges, Monthly Substation O&M Charges, Monthly Common Equipment Charges, or Other Costs allocated to the Non-Operating Owner in an invoice is incorrect, then such overpayment, underpayment or incorrect amount shall be resolved pursuant to Section 4.8. The Non-Operating Owner requesting the audit shall reimburse one hundred percent (100%) of all reasonable costs and expenses (including internalcosts and expenses) incurred by or on behalf of the Operator and any of its Affiliates and Delegates in complying with the provisions of this Section 4.6, provided that the Non-Operating Owner shall not be required to reimburse any such costs if the audit determines that the Non-Operating Owner has made more than Twenty-Five Thousand Dollars (525,000) in overpayments of Monthly Transmission Facilities O&M Charges, Monthly Substation O&M Charges, Monthly Common Equipment Charges, or Other Costs or more than Twenty-Five Thousand Dollars ($25,000) in Monthly Transmission Facilities O&M Charges, Monthly Substation O&M Charges, Monthly Common Equipment Charges, or Other Costs have been incorrectly allocated to the Owner. JOINT OWNERSHIP AND OPERATING AGREEMENT Page 120 EXECUTION VERSION 4.6 Insurance. (a) Owner Insurance. Each Owner shall be responsible for obtaining and maintaining during the Term insurance covering its respective legal liabilities related to its Ownership Interests in the Transmission Facilities and Common Equipment. Insurance required by this Section 4.6(a) will be placed with appropriate carriers and in amounts in accordance with Good Utility Practice and Govemmental Requirements. (b) Property Insurance. Each Operator, on behalf of the Owners and any other named insureds or loss payees, will, with respect to Substations and equipment therein that is included as part of the jointly-owned Transmission Facilities it is responsible for: (i) determine the appropriate property insurance coverages, minimum amounts, self-insured amounts, deductibles and other insurance policy terms which shall be reasonable and customary for similarly situated utilities; (ii) obtain and maintain such property insurance during the Term; and (iii) be solely responsible for pursuing claims and/or negotiating settlements in respect of claims under such insurance coverages. The Operators shall be compensated for the costs of obtaining and maintaining such insurance (including any premiums, taxes and fees, but excluding deductibles, self-insurance or non-insured costs) through the Monthly Substation O&M Charge. Subject to Article VII, each Owner shall be responsible for its Pro Rata Share (based on its applicable Ownership Interest(s)) of any deductibles, self-insurance and non-insured costs, all of which shall be Other Costs. The Operators shall not be obligated to obtain or maintain any other insurance by or on behalf of the Owners with respect to the Transmission Facilities or Common Equipment for which they are responsible. 4.7 Invoices. (a) Each Non-Operating Owner shall pay the respective Operator the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, and the Monthly Common Equipment Charge calculated in accordance with Exhibit D as compensation for the Operator's services under this Agreement. In addition, each Owner shall be responsible for its Pro Rata Share (based on its applicable Ownership Interest(s)) of costs incurred by or on behalf of the Operators pursuant to the terms of this Agreement, including Sections 4.2(a),4.4(a),4.6. 5.2, 6.1, Ll, 7 .5, 8.2 and 16.3 (collectively, the "Other Costs"). In the event that an Operator incurs, or reasonably expects to incur, significant Other Costs in excess of One Hundred Thousand Dollars ($100,000), the Operator shall immediately notify the Owners in writing of such Other Costs. (b) Within thirty (30) days after the end of the first full calendar month during the Term, and within thirty (30) days after the end of each month thereafter during the Term, each Operator will deliver to the Non-Operating Owner an invoice which will show the total amount and each Owner's Pro Rata Share (based on its Ownership Interests) of the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge and the Monthly Common Equipment Charge determined in accordance with the terms and conditions of this Agreement. For purposes of clarity, the first such invoices will include amounts owed for the first full month and any partial month that precedes it during the Term. Within thirty (30) days after the end of the first calendar quarter first occurring during the Term (i.e., within 30 days of the first March 3l st, June 30th, September 30th, or December 3l't during the Term), and within thirty (30) days after the end of each calendar quarter thereafter during the Term, each Operator will deliver to the Non-Operating Owner an invoice which will show the total amount and each Owner's Pro Rata Share (based on its Ownership lnterests) of Other Costs determined in JOINT OWNERSHIP AND OPERATING AGREEMENT Pagel2l EXECUTION VERSION accordance with the terms and conditions of this Agreement;plq.y.ided, however, that Other Costs associated with capital upgrades and improvements to, or repair and reconstruction of, Transmission Facilities: (a) shall not include AFUDC, provided, that the first Other Costs invoice may include accrued AFUDC on Prior Projects up to the Effective Date; and (b) that are a Substation Segment shall be invoiced using estimated Other Costs, provided that each Operator shall provide a final invoice showing a true-up of estimated Other Costs compared to actual Other Costs after the upgrade, improvement, repair or reconstruction is placed into service;. The Non-Operating Owner shall pay its Pro Rata Share (based on its Ownership lnterests) of the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, the Monthly Common Equipment Charge and the Other Costs shown on the invoice no later than thirty (30) days after the date of the invoice. Any payment past due will accrue interest, per annum, calculated in accordance with the methodology specified for interest in the FERC regulations at l8 C.F.R. $ 35.19a(a)(2)(iii) (the "FERC Methodoloey"). The failure by an Operator to timely deliver an invoice shall not relieve the Non-Operating Owner of its payment obligation in respect of its share of the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, the Monthly Common Equipment Charge and Other Costs as shown on such invoice, or release the Operating Owner of its responsibility for such invoice. 4.8 Disputed Amounts. If any Non-Operating Owner disputes any portion of any amount specified in an invoice delivered by an Operator pursuant to Section 4.7, the Non- Operating Owner shall pay its total amount of the invoice when due, and, if actually known at the time by the Non-Operating Owner, identify the disputed amount and state that the disputed amount is being paid under protest. Any disputed amount shall be resolved pursuant to the provisions of Article XVII. If it is determined pursuant to Article XVII that an overpayment or underpayment has been made by the Non-Operating Owner or the amount of any Monthly Transmission Facilities O&M Charge, Monthly Substation O&M Charge, Monthly Common Equipment Charge, or Other Costs allocated to the Non-Operating Owner on an invoice is incorrect, then: (i) in the case of any overpayment by the Non-Operating Owner, the Operator shall promptly return the amount of the overpayment (or credit the amount of the overpayment on the next invoice) to the Non-Operating Owner; (ii) in the case of an underpayment by the Non-Operating Owneq the Non-Operating Owner shall promptly pay the amount of the underpayment to the Operator (for the benefit of the Operating Owner), otherwise, the Operator shall charge the Non-Operating Owner for the underpayment on the next invoice; and (iii) in the case of an incorrect allocation of Other Costs to an Owner, the allocations of Other Costs on the next invoice shall be adjusted to correct for such incorrect allocation, in each case, together with interest for the period from the date of overpayment, underpayment or incorrect allocation until such amount has been paid or credited against a future invoice calculated in the manner prescribed for calculating interest on refunds under the FERC Methodology. 4.9 Assistance. Each Non-Operating Owner shall cooperate with the Operator promptly, as and when reasonably requested by the Operator, to assist the Operator in the performance of its duties, responsibilities and obligations under this Agreement, including executing and delivering from time to time such additional documents, certificates or instruments, and taking such additional actions, as may be reasonably requested by the Operator. Each Non-Operating Owner shall bear its own costs for providing such cooperation and assistance as requested by the Operator unless the Owners agree otherwise in writing. JOINT OWNERSHIP AND OPERATING AGREEMENT Page 122 EXECUTION VERSION 4.10 Remedies. (a) Notwithstanding any provision to the contrary contained in this Agreement, the Operators shall have no liability to the respective Non-Operating Owners in connection with the performance of their covenants and obligations under this Agreement, except as provided in this Section 4.10 and Section l4.l(c). The Non-Operating Owners agree that they have a duty to mitigate any damages and shall use Commercially Reasonable Efforts to minimize any damages they may incur as a result of an Operator's failure to perform or breach of any of its covenants or obligations under this Agreement. (b) The Owners and Operators acknowledge that the obligations and covenants performed by the Operators hereunder are unique and that the Non-Operating Owners will be irreparably injured should such obligations and covenants not be performed in accordance with the terms and conditions of this Agreement. Consequently, the Non-Operating Owners will not have an adequate remedy at law if the Operators shall fail to perform their obligations and covenants hereunder. The Non-Operating Owners shall have the right, in addition to any other remedy available under this Agreement, to specific performance of the Operators' obligations and covenants hereunder, and the Owners and Operators agree not to take a position in any proceeding arising out of this Agreement to the effect that the Non-Operating Owners have an adequate remedy at law. ARTICLE V OPERATION AND MAINTENANCE OF TRANSMISSION FACILITIES 5.1 Compliance: Standard of Work. (a) The Operator shall perform its obligations set forth in this Agreement: (i) without adverse distinction between the Owners; and (ii) in accordance with Good Utility Practice, Governmental Requirements, Governmental Authorizations and Reliability Standards. (b) Without limiting the generality of Section 5.1(a), each Operator shall comply with Govemmental Requirements and Reliability Standards applicable to an owner and an operator of the Transmission Facilities and Common Equipment for which it is responsible, regardless of whether any such Transmission Facilities and Common Equipment are solely owned by the Operating Owner orjointly owned by the Parties. 5.2 Operation and Maintenance: Outaees and Outaee Coordination: Capital Upgrades and lmprovements. (a) Each Operator shall operate and maintain the Transmission Facilities and Common Equipment for which it is responsible in accordance with Good Utility Practice, Govemmental Requirements, Governmental Authorizations and Reliability Standards. (b) Each Operator shall provide wriften notice of planned outages associated with the Transmission Facilities, Common Equipment and Paths for which it is responsible to the Non-Operating Owner's outage coordinator as soon as outage schedules are known, but no later than the later of the period specified in the Operating Owner's OATT or the Northwest Power Pool Processes document dated May 2014, as it is amended from time-to-time, regarding outage coordination and shall, subject to Good Utility Practice, Govemmental Requirements, Governmental Authorizations and Reliability Standards, accommodate reasonable requests of the JOINT OWNERSHIP AND OPERATING AGREEMENT Pagel23 EXECUTION VERSION Non-Operating Owner to change the date or period of the planned outage. Each Operator shall promptly notify the Non-Operating Owner's outage coordinator of any event or circumstance that results in a partial or total reduction of the transmission capacity of a Segment or Path set forth in Exhibit C, and shall use Commercially Reasonable Efforts to diligently: (i) coordinate operations during such event or circumstance; (ii) coordinate the restoration of the transmission capacity of such Segment from such event or circumstance with the Non-Operating Owner; and (iii) perform the actions necessary to restore the transmission capacity of such Segment or Path and otherwise recover from the event or circumstance. Notwithstanding any provision to the contrary contained in this Agreement, the Owners shall be allocated their share of a temporary reduction in the transmission capacity of the Transmission Facilities and the Paths pursuant to Section 3.3(aXi), and shall be allocated their share of a permanent reduction in transmission capacity of the Transmission Facilities and the Paths pursuant to Sections 3.3(aXii) and 3.3(a)(iii). The Operator's outage coordinator shall accommodate reasonable requests of the Non-Operating Owner's outage coordinator, and Non-Operating Owner's outage coordinator shall accommodate reasonable requests of the Operator's outage coordinator, in the event of an actual or potential Energy Emergency to take extraordinary steps to protect reliability. (c) Each Operator shall make maintenance renewals and replacements to the Transmission Facilities and Common Equipment it is responsible for: (i) the costs of which are recordable as an operation and maintenance expense under the FERC Uniform System of Accounts; and (ii) that are necessary for the operation of the Transmission Facilities and Common Equipment in accordance with Good Utility Practice, Governmental Requirements, Governmental Authorizations and Reliability Standards. Such maintenance renewals and replacements to the Transmission Facilities are included in the services for which the Operator is compensated by the Monthly Transmission Facilities O&M Charge. The Operator shall not separately invoice the Owners for the costs of such maintenance renewals and replacements to the Transmission Facilities and Common Equipment. Notwithstanding anything to the contrary contained in this Agreement, any maintenance renewals and replacements made pursuant to this Section 6.1(c) to Transmission Facilities shall be Transmission Facilities for purposes of this Agreement, and any maintenance renewals and replacements made pursuant to this Section 6.1(c) to Common Equipment shall be Common Equipment for purposes of this Agreement. (d) Each Operator shall make capital upgrades and improvements to the Transmission Facilities and Common Equipment it is responsible for: (i) the costs of which are recordable as capital expenditures under the FERC Uniform System of Accounts; and (ii) which are necessary for the operation of the Transmission Facilities and Common Equipment in accordance with Good Utility Practice, Governmental Requirements, Governmental Authorizations and Reliability Standards. The Operator shall consult with the Non-Operating Owner and receive prior approval, such approval not to be unreasonably withheld, delayed or conditioned, with respect to any capital upgrade or improvement for which the Non-Operating Owner shall have financial responsibility under this Agreement and which Operator reasonably expects to incur total project costs that exceed Five Hundred Thousand Dollars ($500,000). The Owners shall be responsible for their Pro Rata Share (based on their respective Ownership Interests, if any, in the Transmission Facilities and Common Equipment being upgraded or improved) of any Costs incurred by or on behalf of the Operator in making such capital upgrades or improvements. Such capital upgrades and improvements to the Transmission Facilities and Common Equipment are included in the services for which the Operator is compensated by the Other Costs charge. Notwithstanding anything to the contrary contained in this Agreement, any JOINT OWNERSHIP AND OPERATING AGREEMENT Page 124 EXECUTION VERSION capital upgrades and improvements made pursuant to this Section 6.1(d) to the Transmission Facilities shall be considered Transmission Facilities for purposes of this Agreement, and any capital upgrades and improvements made pursuant to this Section 6.1(d) to Common Equipment shall be considered Common Equipment for purposes of this Agreement. (e) Each Operator shall assume responsibility for completion of "Idaho Power Extraordinary ltems," "PacifiCorp Extraordinary Items," "ldaho Power Planned Improvements," "PacifiCorp Planned Improvements" and completion of a "Casualty Loss" as each is defined in the JPSA (collectively, the "Pdodlqi_gglg"), underway on the Effective Date on Segments for which it is responsible in accordance with the terms and conditions of this Agreement, and such capital upgrades, improvements, repairs or reconstruction shall not be subject to approval of the Non-Operating Owner. Such Prior Projects are included in the services for which the Operator is compensated by the Other Costs charge. The Owners shall be responsible for their Pro Rata Share (based on their respective Ownership Interests in the Segment being upgraded, improved, repaired or reconstructed) of any Costs incurred by or on behalf of: (i) the Prior Project's Owner prior to the Effective Date; and (ii) the Operator commencing on the Effective Date through the completion of such capital upgrades, improvements, repairs or reconstruction. Notwithstanding anything to the contrary contained in this Agreement, any capital upgrades and improvements made pursuant to this Section 6.1(e) to the Transmission Facilities shall be considered Transmission Facilities for purposes of this Agreement. Insurance proceeds received by a Party related to the Prior Projects, shall be forwarded to the Operator, less an amount equal to that expended by the Party on the Prior Projects up to the Effective Date and not reflected in Net Book Value on the Effective Date. The Operator shall apply such proceeds (up to each Owner's Pro Rata Share (based on its respective Ownership Interest(s) in the Segment being upgraded, improved, repaired or reconstructed)) to the completion of the Prior Projects, and return to the Owners their Pro Rata Share (based on their respective Ownership Interest(s) in the Segment being upgraded, improved, repaired or reconstructed) ofany excess insurance proceeds. 5.3 Requests for Generation or Transmission Interconnection Service. The Owners acknowledge and agree that all requests for interconnection to any of the jointly-owned Transmission Facilities must be coordinated with the Operator responsible for such Transmission Facilities and processed in a manner consistent with the Owner's OATT pursuant to which the request was made ("Interconnection O ') and any Governmental Requirements. An Interconnection Owner in receipt of a request for interconnection with any jointly-owned Transmission Facilities will promptly notifu the responsible Operator and the other Owner, and thereafter the Owners and the Operator will coordinate and cooperate to process the interconnection request. The Operator will coordinate and conduct any studies required to determine the impact of the interconnection request on the jointly-owned Transmission Facilities and other affected systems, including the Owners' Transmission Systems, in accordance with the Interconnection Owner's OATT and any Governmental Requirements. The Operator will notifu the Owners and such affected systems of all meetings held with the entity requesting an interconnection. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 25 EXECUTION VERSION ,*on.rrrrrro,* "o.rrrrrr, "o*lfl"r'*%1lrr, **o*or, u" on o*nr* 6.1 Capital Upsrades. (a) At any time during the Term, an Owner ("Electing Owner") may elect to make a capital upgrade or improvement to the Transmission Facilities, provided that in no event shall an Electing Owner be entitled to make a capital upgrade or improvement to any Transmission Facilities that reasonably would be expected to have a material adverse effect on the other Owner's ownership, use or enjoyment of its Ownership Interest(s) in such Transmission Facilities (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) as contemplated in this Agreement. An Electing Owner shall provide the other Owner no less than sixty (60) days' prior written notice of its election, together with reasonable details about the proposed upgrade or improvement to the Transmission Facilities (each, a "Capital Upgrade Notice"). Within sixty (60) days of receipt of the Capital Upgrade Notice, the other Owner may notify the Electing Owner in writing that it elects to participate in the capital upgrade or improvement to the Transmission Facilities. (i) If the other Owner delivers notice to the Electing Owner within the sixty (60) day period that it elects to participate in the capital upgrade or improvement to the Transmission Facilities, then the Owners shall meet and agree on: (A) the final scope of the capital upgrade or improvement; (B) the allocation of increased transmission capacity, if any, associated with such capital upgrade and improvement between the Owners, including any change in the Owners' Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s) which shall be determined in accordance with Section 3.3; (C) any change in each Owner's Ownership Interest with respect to such Transmission Facilities and any applicable Substation O&M Allocation which shall be determined in accordance with Section 3.3; (D) each Owner's share of the costs of such upgrade or improvement (which shallbe based on the Owners' respective Ownership Interests in the Transmission Facilities); (E) any change in the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, or the Monthly Common Equipment Charge, if any; and (F) such other matters as the Owners may agree upon, all of which shall be memorialized in an amendment to this Agreement executed by the Owners, including any amendments to the Exhibits hereto which shall be effbctive as set forth in Section 6.1(b) (the "Amendment"); provided, however, that any failure of the Owners to agree on any of the matters specified in subparts (A) through (F) above shall be resolved pursuant to the provisions of Article XVII. Notwithstanding any provisions to the contrary in this Agreement, an Owner shall not be prohibited from making a capital upgrade or improvement to the Transmission Facilities pursuant to this Section 6.1(a) because the Owners failto agree on any of the matters specified in subparts (A) through (F) of the immediately preceding sentence, and any such disagreement shall be resolved pursuant to Article XVII. (ii) If the other Owner elects not to participate in the capital upgrade or improvement to the Transmission Facilities (or fails to deliver a notice to the Electing Owner within the sixty (60) day period), then the Electing Owner may proceed with the capital upgrade or improvement, plqviided that the Electing Owner shall coordinate with the Operator responsible for the applicable Transmission Facilities on the final scope of the capital upgrade or improvement. JOINT OWNERSHIP AND OPERATINC AGREEMENT Page 126 EXECUTION VERSION (b) The applicable Operator shall design, permit, construct, install and commission any upgrades or improvements to the Transmission Facilities provided for in Section 6.1(aXi) in accordance with the Amendment or, if applicable, any resolution pursuant to Article XVII, and otherwise in accordance with Good Utility Practice, Governmental Requirements and Governmental Authorizations. The Owners shall be responsible, based on the Amendment or, if applicable, any resolution pursuant to Article XVII, for all of the Costs incurred by or on behalf of the Operator in connection with such capital upgrade or improvement to the Transmission Facilities. Effective as of the date of successful commissioning of such capital upgrade or improvement, wriffen notice of which the Operator shall provide to the Owners, the Owners' Ownership Interests, Directional Capacity Allocation Percentages and Directional Capacity Allocations in respect of such Transmission Facilities any applicable Substation O&M Allocation shall be adjusted, if at all, in accordance with the Amendment or, if applicable, any resolution pursuant to Article XVII, and the Owners shall memorialize any revised Ownership Interests, Directional Capacity Allocation Percentages, Directional Capacity Allocations and applicable Substation O&M Allocation in a revised Exhibit C which shall be effective as of the date of successful commissioning of such upgrade or improvement. Notwithstanding anything to the contrary contained in this Agreement, any capital upgrades or improvements provided for in this Section 6.lLb) shall be Transmission Facilities for purposes of this Agreement. (c) The applicable Operator shall design, permit, construct, install and commission any upgrades or improvements to the Transmission Facilities provided for in Section 6.1(aXii) in accordance with the final scope of the capital upgrade or improvement established by the Electing Owner pursuant to Section 6.1(aXii), and otherwise in accordance with Good Utility Practice, Governmental Requirements and Governmental Authorizations. The Electing Owner shall be responsible for all of the Costs incurred by or on behalf of the Operator in connection with such capital upgrade or improvement to the Transmission Facilities and title to such capital upgrades or improvement shall vest solely with the Electing Owner. Effective as of the date of successful commissioning of such capital upgrade or improvement, written notice of which the Operator shall provide to the Owners: (i) the Owners' Ownership Interests, Directional Capacity Allocation Percentages and Directional Capacity Allocations in respect of such Transmission Facilities and any applicable Substation O&M Allocation shall be adjusted, if at all, in accordance with Section 3.3; and (ii) the Operator shall operate and maintain such capital upgrade or improvement in accordance with Section 6.1(a). In addition, the Owners shall meet and agree on: (A) the allocation of increased transmission capacity, if any, associated with such capital upgrade and improvement between the Owners, including any change in the Owners' Directional Capacity Allocation Percentages and Directional Capacity Allocations which shall be determined in accordance with Section 3.3; (B) any change in the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, or the Monthly Common Equipment Charge, if any; and (C) such other matters as the Owners may agree upon, all of which shall be memorialized in an amendment to this Agreement executed by the Owners, including any amendments to the Exhibits hereto which shall be effective as of the date of successful commissioning of such upgrade or improvement; Eqviidgd, however, that any failure of the Owners to agree on any of the matters specified in subparts (A) through (C) above shall be resolved pursuant to the provisions of Article XVII. Notwithstanding anything to the contrary contained in this Agreement, any capital upgrades or improvements provided for in this Section 6.1(c) shall be Transmission Facilities for purposes of this Agreement. JOINT OWNERSHIP AND OPERATING AGREEMENT Pagel2T EXECUTION VERSION (d) Notwithstanding anything to the contrary contained herein, the provisions of this Section 6.1 shall not apply to capital upgrades or improvements made by an Operator pursuant to Section 6.1(c) which are necessary for the operation of the Transmission Facilities in accordance with Good Utility Practice or required by Governmental Requirements or Governmental Authorizations, which shall be governed by the provisions of Section 5.1(d). (e) Each Owner shall provide the applicable Operator prompt written notice of any request pursuant to its OATT from a customer to provide additional transmission capacity that will require one or more capital upgrades or improvements to any of the Transmission Facilities. If capital upgrades or improvements are required in accordance with such Owner's OATT, then such capital upgrades and improvements shall be made by the Operator in accordance with the provisions of Section 6.1(a) and Section 6.1(b). 6.2 McNary Transmission Proiect. Within thirty (30) days after the earlier of the date on which: (a) Idaho Power notifies PacifiCorp in writing that it desires to proceed with negotiations regarding the development, construction, operation and joint ownership of a new transmission line from McNary-Walulla-Walla Walla with capacity to be determined based on future studies and needs (the "McNary Transmission Project"); or (b) PacifiCorp notifies Idaho Power that it plans to proceed with all or a part of the McNary Transmission Project, the Parties will meet and negotiate in good faith to reach agreement on the definitive terms and conditions of construction, ownership and operation agreements for the McNary Transmission Project (the "McNary Transmission Project Agreements") pursuant to which the Parties will develop, design, engineer, procure, construct, test, commission, operate and jointly own the McNary Transmission Project. Any such negotiations shall automatically terminate if the Parties fail to reach agreement on the definitive terms and conditions of the McNary Transmission Project Agreements within ninety (90) days of receipt of the earlier of the notice in Section 6.2(a) and Section 6.2(b) (the "Negotiations End Date"). The Parties will attempt, to the greatest extent possible, to base the Parties' rights, duties, obligations, liabilities and remedies under the McNary Transmission Project Agreements on the Parties' rights, duties, obligations, liabilities and remedies under this Agreement; provided that the Parties agree that PacifiCorp shall be the operator of and responsible for the design, engineering, procurement, construction, testing and commissioning of the McNary Transmission Project under any McNary Transmission Project Agreements and that the terms and conditions associated with PacifiCorp's responsibilities as operator shall be definitively negotiated as part of any McNary Transmission Project Agreements. If the Parties fail to reach agreement by the Negotiations End Date on the definitive terms and conditions of the McNary Transmission Project Agreements pursuant to this Section 6.2,then PacifiCorp may proceed or not proceed with the McNary Transmission Project and ldaho Power will have no further right to participate with PacifiCorp in the development, construction, operation and joint ownership of the McNary Transmission Project. ARTICLE VII PHYSICAL DAMAGE TO TRANSMISSION FACILITIES: CONDEMNATION 7.1 RebuildineDamagedFacilities. (a) If any of the Transmission Facilities or Common Equipment are materially damaged or destroyed (the "D4!04ggd_EagiliIigq"), then within thirty (30) days of the date the damage or destruction occurred, the Operator responsible for such Transmission Facilities and Common Equipment shall deliver to the Owners a written notice (the "Damage Notice") of the Operator's good faith reasonable estimate of the cost to repair or rebuild the Damaged Facilities. JOINT OWNERSHIP AND OPERATINC AGREEMENT Page 128 EXECUTION VERSION If the Damaged Facilities consist of Transmission Facilities that are jointly owned by the Owners and the Damage Notice indicates that the total project cost to repair or rebuild the Damaged Facilities is estimated to be Five Million Dollars ($5,000,000) or more, inclusive of insurance proceeds, then the Owners will determine whether the Damaged Facilities will be repaired or rebuilt within thirty (30) days of the date of the Damage Notice. (ii) If the Damaged Facilities consist of Transmission Facilities that are jointly owned and the Damage Notice indicates that the total project cost to repair or rebuild the Damaged Facilities is estimated to be less than Five Million Dollars ($5,000,000), inclusive of insurance proceeds, then, the Operator will determine in accordance with Good Utility Practice whether the Damaged Facilities will be repaired or rebuilt and provide notice thereof to the Owners within thirty (30) days of the date of the Damage Notice. (iii) If the Damaged Facilities consist of an Owner's wholly-owned Transmission Facilities or Common Equipment, then, the Owner will determine in accordance with Good Utility Practice whether the Damaged Facilities will be repaired or rebuilt and provide notice thereof to the Operator within thirty (30) days of the date of the Damage Notice. (b) If the Owners, the Operator, or the Owner determines pursuant to Sections 7.1(a)(i), 7.1(a)(ii), or 7.1 (aXiii), respectively, to repair or rebuild the Damaged Facilities, then the Owners will, upon receipt of any insurance proceeds paid in connection with such Damaged Facilities, apply such proceeds (up to each Owner's Pro Rata Share (based on its respective Ownership Interest(s), if any, in the Damaged Facilities) in the amount to be paid) to the repair and reconstruction of the Damaged Facilities which will be carried out by the Operator. The Operator will be responsible for obtaining any necessary Governmental Authorizations to repair or rebuild the Damaged Facilities and determining the manner in which to repair and reconstruct the Damaged Facilities (including the equipment to be used). Each Owner shall reasonably cooperate with and support the Operator in obtaining any such Governmental Authorizations in accordance with Section 4.4(c). The Operator will cause such repairs or reconstruction to be made so that the Damaged Facilities will be repaired and restored to substantially the same general condition, character and use as existed prior to such damage or destruction. Ifthe cost ofsuch repairs or reconstruction exceeds the insurance proceeds required to be applied to the repair or reconstruction pursuant to this Section 7.1, then the Owners shall pay, in accordance with their applicable Ownership lnterests, if any, the shortfall amount. 7.2 Decision not to Rebuild. If the Owners, the Operator, or the Owner determines pursuant to Sections 7.1(aXi), Z_lGX!i), or 7.1(a)(iii), respectively, not to repair or rebuild the Damaged Facilities (or cannot reach agreement to repair or rebuild the Damaged Facilities), then, in each case: (a) each Owner shall: (i) be entitled to retain any insurance proceeds received pursuant to insurance maintained by it with respect to the Damaged Facilities; (ii) receive its Pro Rata Share (based on its respective Ownership Interest(s), if any, in the Damaged Facilities) of any revenues from the salvage or sale of the Damaged Facilities; and (iii) pay its Pro Rata Share (based on its respective Ownership Interest(s), if any, in the Damaged Facilities) of any costs of removal of parts and equipment from the Damaged Facilities; (b) the Operator shall pay to the Owners their Pro Rata Share (based on their respective Ownership Interest(s), if any, in the Damaged Facilities) of any insurance proceeds received from any property insurance obtained by the Operator pursuant to Section 4.6(b); and (c) subject to Section 7.3, this Agreement shall terminate pursuant to Section 2.3(a) solely with respect to such Damaged Facilities. JOINT OWNERSHIP AND OPERATING AGREEMENT Pagel29 EXECUTION VERSION 7.3 Purchase of Ownership Interest. If the Owners, the Operator, or the Owner determines pursuant to Sections 7.1(a)(i), 7.1(aXii), or 7.1(aXiii), respectively, not to repair or rebuild the Damaged Facilities (or cannot reach agreement to repair or rebuild the Damaged Facilities) and, in each case, one Owner desires to repair or rebuild the Damaged Facilities (the "Con!inui4g_Qw49l"), then the Continuing Owner shall have the option to purchase all of the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) of the other Owner in the Damaged Facilities. In order to exercise its option to purchase all of the Ownership tnterest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) of the other Owner in the Damaged Facilities, the Continuing Owner must give written notice thereof to the other Owner within thirty (30) days of the Owners' or Operator's determination pursuant to Section 7.I not to repair or rebuild the Damaged Facilities. The Owners shall enter into such documentation as the Continuing Owner shall reasonably request to document the purchase and sale of all of the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) ofthe other Owner in the Damaged Facilities, provided that the purchase price of the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) of the other Owner shall be equal to the other Owner's Pro Rata Share (based on its respective Ownership Interest(s) in the Damaged Facilities) ofthe salvage value of the Damaged Facilities. 7.4 Cooperation. If the Continuing Owner seeks to repair or rebuild the Damaged Facilities purchased from the other Owner pursuant to Section 7.3, then, at the Continuing Owner's request and expense, the other Owner and the responsible Operator (if the Continuing Owner is not the responsible Operator) will, for a reasonable period of time, cooperate with and use Commercially Reasonable Efforts to assist the Continuing Owner in the repair or rebuilding of the Damaged Facilities. This Section 7.4 shall survive the expiration or termination of this Agreement pursuant to Section 2.3(a) solely with respect to such Damaged Facilities. 7.5 Condemnation. If there occurs a loss of title to, or ownership of, or use and possession of all or any portion of any of the Transmission Facilities or Common Equipment as the result of the exercise of the right of condemnation or eminent domain by or on behalf of any Governmental Authority, then the Operator responsible for such Transmission Facilities or Common Equipment will promptly give notice thereof to the Owners, which notice shall generally describe the nature and extent of such condemnation or eminent domain proceedings (including any negotiations in connection with such proceedings). The Operator shall, in consultation with the Owners, use Commercially Reasonable Efforts to resist the loss of title to, or ownership of or use and possession of, all or any portion of any of the Transmission Facilities or Common Equipment through condemnation or eminent domain. If, as a result of condemnation or eminent domain, the Owners shall lose title to, or ownership of, or use and possession ol all or any portion of any of the Transmission Facilities or Common Equipment, the Owners shall determine, by mutual agreement, whether: (a) the relevant portion of the Transmission Facilities or Common Equipment is no longer useful for the transmission of electric power and should be retired and decommissioned, in which case the provisions of Article VIII shall control; (b) the relevant portion of the Transmission Facilities or Common Equipment should be replaced or modified, in which case the Owners will, upon receipt of any awards paid in connection with such condemnation or eminent domain, apply such awards to the replacement or modification of the Transmission Facilities or Common Equipment which will be carried out JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 30 EXECUTION VERSION by the Operator responsible for such Transmission Facilities or Common Equipment. The Operator will, consistent with the mutual agreement of the Owners, determine the manner in which to replace or modify the Transmission Facilities or Common Equipment, and will cause such replacement and modifications to be made so that the Transmission Facilities or Common Equipment are replaced or modified in accordance with the mutual agreement of the Owners. If the cost of replacement or modification of the Transmission Facilities or Common Equipment exceeds the awards received by the Owners in connection with such condemnation or eminent domain, then the Owners shall pay their Pro Rata Share (based on their respective Ownership Interest(s), if any, in the Transmission Facilities or Common Equipment) of the shortfall amount; or (c) if the Owners do not reach mutual agreement on one of the actions provided for in Section 7.5(a) and Section 7.5(b), or on another course of action, within sixty (60) days after the date of the notice provided by the Operator to the Owners pursuant to the first sentence of this Section 7.5, then each Owner shall receive its Pro Rata Share (based on its respective Ownership Interest(s), if any, in the Transmission Facilities or Common Equipment) of all awards received by the Owners (or their Affiliates) in connection with any such condemnation or eminent domain (less the actual cost, fees and expenses incurred by the Operator in collection thereof). ARTICLE VIII RETIREMENT AND DECOMMISSIONING OF TRANSMISSION FACILITIES 8.1 Decision to Retire Transmission Facilities. The Owners will determine in accordance with the terms of this Article VIII when any of the Transmission Facilities or Common Equipment are no longer useful for the transmission of electric power and should be retired and decommissioned. If the Owners mutually agree to retire and decommission any of the Transmission Facilities or Common Equipment ("Retired Transmission Facilities"), then, subject to Section 8.2 and Section 8.3, this Agreement shall terminate pursuant to Section 2.3(a) solely with respect to such Retired Transmission Facilities. 8.2 Costs of Decommissionins. Each of the Owners shall be responsible for paying its Pro Rata Share (based on its respective Ownership Interest(s), if any, in the Retired Transmission Facilities) of the aggregate amount of all costs incurred by or on behalf of the Operator responsible for the Retired Transmission Facilities to retire permanently the Retired Transmission Facilities from service, including decommissioning, dismantling, demolishing and removal of equipment, facilities and structures, security, maintenance, disposing of debris, abandonment and all other costs incurred by or on behalf of the Operator to retire permanently the Retired Transmission Facilities from service, net of any amounts recovered in connection with the sale of any retired equipment, facilities and structures. 8.3 Purchase of Ownership Interest. Each Owner shall give written notice to the other Owner when it believes any of the Transmission Facilities or Common Equipment should be Retired Transmission Facilities (each, a "Decommissioning "). If the other Owner desires to continue the operation of such Retired Transmission Facilities (the "Re4Ainilq Owner"), then the Remaining Owner shall have the option to purchase all of the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)), if any, of the other Owner in such Retired Transmission Facilities. In order to exercise its option to purchase all of the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) of the other Owner in JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 3l EXECUTION VERSION such Retired Transmission Facilities, the Remaining Owner must give written notice thereof to the other Owner within ninety (90) days of receipt of the other Owner's Decommissioning Notice. The Owners shall enter into such documentation as the Remaining Owner shall reasonably request to document the purchase and sale of the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)), if any, of the other Owner in such Retired Transmission Facilities, provided that the purchase price of the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) of the other Owner shall be equal to the other Owner's Pro Rata Share (based on its respective Ownership Interest(s), if any, in the Retired Transmission Facilities) of the depreciated cost of the Retired Transmission Facilities. 8.4 Cooperation. If the Remaining Owner seeks to purchase and continue the operation of the Retired Transmission Facilities, then, at the Remaining Owner's request and expense, the other Owner and the responsible Operator (if the Remaining Owner is not the responsible Operator) will, for a reasonable period of time, cooperate with and use Commercially Reasonable Efforts to assist the Remaining Owner in the continued operation of the Retired Transmission Facilities. This Section 8.4 shall survive the expiration or termination of this Agreement pursuant to Section 2.3. r nax s vu s s r i$SltLIEB rlL ouxu a rur s 9.1 Points of Interconnection: Points of Balancine Authority Area Adjacency. (a) Each Owner's Transmission System, which includes the Owner's Ownership Interests in the Transmission Facilities, shall be considered interconnected at the Points of Interconnection, and the location and associated meter for each Point of Interconnection, and any other information required by Governmental Requirements to be agreed to by the Parties, shall have been mutually agreed to by the Parties in writing and included in operating procedures of the Parties on or before the Effective Date, which the Parties shall review and update annually as necessary. (b) Each Owner's Balancing Authority Area shall be considered Adjacent Balancing Authority Areas at the Points of Balancing Authority Area Adjacency, and the location and associated meter for each Point of Balancing Authority Area Adjacency, and any other information required by Governmental Requirements to be agreed to by the Parties, shall have been mutually agreed to by the Parties in writing and included in operating procedures of the Parties on or before the Effective Date, which the Parties shall review and update annually as necessary. 9.2 E-Taes. Each Party shall cause the Operator of a Path to be included on all e-Tags as a scheduling entity. 9.3 Dvnamic Transfer Capability Riehts. (a) Notwithstanding any provision of this Agreement to the contrary, Idaho Power authorizes PacifiCorp to utilize up to 400 MW of Dynamic Transfer Capability over the Idaho Power Transmission System in an east to west direction;ry!1!g1[, however, no schedule shall exceed the scheduling capability of any point of receipt and point of delivery combination. JOINT OWNERSHIP AND OPERATING AGREEMENT Pagel32 EXECWION VERSION (b) Idaho Power's grant of, and PacifiCorp's utilization of; Dynamic Transfer Capability scheduling rights pursuant to this Section 9.3 are subject to Good Utility Practice and Governmental Requirements. (c) The Dynamic Transfer Capability rights provided for in this Section 9.3 does not include the Jim Bridger pseudo-tied generation provided for in Section 9.4 and recognizes that Jim Bridger Project generation does not utilize Automatic Generation Control. If the Parties desire to utilize Automatic Generation Control for Jim Bridger Project generation in the future, it will be designed to have no impact to the Dynamic Transfer Capability or any such impact will be mutually agreed to by the Parties. 9.4 Jim Brideer Pseudo Tie. (a) Idaho Power authorizes PacifiCorp to transfer its share of the electrical output of the Jim Bridger Project from the Jim Bridger Project bus bar meter into its PACW Balancing Authority Area utilizing a pseudo-tie. (b) Idaho Power's grant of, and PacifiCorp's utilization of, the pseudo-tie are subject to Good Utility Practice and Governmental Requirements. In addition, the pseudo-tie rights provided for in this Section 9.4 may not be sold or transferred by PacifiCorp to anyone without ldaho Power's prior written consent. (c) To calculate the PacifiCorp pseudo tie, PacifiCorp shall subtract Jim Bridger Transmission Losses from PacifiCorp's share of the Jim Bridger Project Net Generation. 9.5 Electric Losses. Each Party agrees that when it is the operator of the Balancing Authority Area containing a Segment for which the other Owner is the transmission provider for the Segment, that it will: (a) provide electric energy for transmission losses as needed to keep transmission service schedules whole within its Balancing Authority Area, consistent with Governmental Requirements and Reliability Standards; and (b) provide compensation for electric losses in accordance with Exhibit G "Joint Ownership Transmission Loss Calculation and Allocation Methodology." 9.6 Jim Brideer Project Generation RAS. The Parties agree that the Jim Bridger Project shall be tripped to implement the Jim Bridger Project Generation RAS schemes according to protocols that shall have been mutually agreed to by the Parties and included in operating procedures of the Parties on or before the Effective Date, which operating procedures the Parties shall review and update annually as necessary. rnaxsvussrox svsrnr*HS#fr ox axo vrarxrrxaxcrc l0.l ServiceConditions. (a) Operation and Maintenance. Each Owner shall operate and maintain its Transmission System in a manner consistent with Good Utility Practice, Governmental Requirements, Governmental Authorizations and Reliability Standards; ry4leg[ however, that nothing in this Section l0.l(a) shall modify or amend such Party's responsibility as an Operator under this Agreement. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 33 EXECUTION VERSION (b) Additional Services. This Article X is applicable only to the physical interconnection of the Owners' Transmission Systems at the Points of Interconnection and does not obligate either Owner to receive or provide any service. Other services provided by one Owner to the other Owner shall be governed by such other agreements as the Owners may enter into from time to time. (c) Interruption of Service. The Owners shall use Commercially Reasonable Efforts, consistent with Good Utility Practice, Reliability Standards and Governmental Requirements, to provide a physical interconnection to be operated in continuous synchronization at the Points of Interconnection, provided that an Owner ("lnterruptinq Owner") may temporarily intemrpt or isolate the interconnected facilities under the following circumstances: (i) by operation of automatic equipment installed for power system protection; (ii) after consultation with the other Owner, other than in an emergency situation where consultation is not practicable, when an Owner deems it necessary for installation, maintenance, inspection, repairs or replacements of equipment on its Transmission System; (iii) at any time that, in the sole judgment of the Interrupting Owner, such action is necessary to preserve the integrity oi or to prevent or limit any instability on its Transmission System; (iv) where necessary to comply with documented directives from a Governmental Authority; (v) as a result of one or more events of Force Majeure; or (vi) where necessary to prevent: (A) death or serious injury to any person; (B) material damage or harm to any property; or (C) any material adverse effect to the security of, or damage to its Transmission System or the electric systems of others to which its Transmission System is directly connected, including the other Owner's Transmission System. An Intemrpting Owner shall use Commercially Reasonable Efforts to provide the other Owner (l) with reasonable advance notice of any planned intemrption of the interconnection facilities in accordance with the notice requirements set forth in Section 5.2(.b), and (2) with notice of any other intemrption of the interconnected facilities as soon as practicable after the interruption. If synchronous operation is interrupted, the Owners shall cooperate so as to remove the cause of such intemrption as soon as commercially practicable consistent with Good Utility Practice, Rel iability Standards and Govemmental Requirements. (d) Physical and Cyber Security. The Operators shall cooperate with the Owners in complying with any physical and cyber security or other security requirement established by Governmental Requirements or Reliability Standards applicable to the Owners and the Transmission Facilities and the Common Equipment, written notice of which the Owners shall provide to the Operators. 10.2 Survival. The provisions of this Article X, together with other provisions of this Agreement (but only to the extent applicable to the surviving provisions of this Anicle X), shall continue in full force and effect notwithstanding the termination of this Agreement, provided that in the event of termination of this Agreement, the Parties shall amend this Agreement to reflect such changes to this Agreement as shall be necessary and mutually acceptable to the Parties to conform this Agreement to the surviving provisions of this Agreement in accordance with this Section 10.2. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 34 EXECUTION VERSION ARTICLE XI FORCE MAJEURE I l.l Force Majeure Defined. For purposes of this Agreement, "@j.eure" means an event or circumstance beyond the reasonable control of and without the fault or negligence of the Party claiming Force Majeure ("Affected_P4rty"), which, despite the exercise of reasonable diligence, cannot be or be caused to be prevented, avoided or removed by such Affected Party including, to the extent satisffing the above requirements, acts of God; earthquake; abnormal weather condition; hurricane; flood; lightning; high winds; drought; peril of the sea; explosion; fire; war (declared or undeclared); military action; sabotage; riot; insurrection; civil unrest or disturbance; acts of terrorism; economic sanction or embargo; civil strike, work stoppage, slow- down, or lock-out that are of an industry or sector-wide nature and that are not directed solely or specifically at the Affected Party; the binding order of any Governmental Authority, provided that the Affected Party has in good faith reasonably contested such order; the failure to act on the part of any Governmental Authority, provided that such action has been timely requested and diligently pursued; unavailability of equipment, supplies or products, but only to the extent caused by Force Majeure; failure of equipment, provided that the equipment has been operated and maintained in accordance with Good Utility Practice; and transportation delays or accidents, but only to the extent otherwise caused by Force Majeure; provided, however, that neither insufficiency of funds, financial inability to perform nor changes in market conditions shall constitute Force Majeure. 11.2 Effect of Force Majeure. (a) If an Affected Party is rendered wholly or partly unable to perform its obligations under this Agreement or its performance is delayed because of Force Majeure, such Affected Party shall be excused from, and shall not be liable for, whatever performance it is unable to perform or delayed in performing due to the Force Majeure to the extent so affected, provided that: (i) The Affected Party, as soon as reasonably practical after the commencement of the Force Majeure, gives the other Party prompt written notice thereof, including a description of the particulars of the Force Majeure; (ii) The suspension of perforrnance is of no greater scope and of no longer duration than is required by the Force Majeure; and (iii) The Affected Party uses Commercially Reasonable Efforts to overcome and remedy its inability to perform as soon as reasonably practical after the commencement of the Force Majeure. (b) Notwithstanding anything in this Article XI to the contrary, no payment obligation arising under this Agreement prior to the date of an event of Force Majeure shall be excused by such event of Force Majeure. (c) Whenever an Affected Party is required to commence or complete any action within a specified period and is prevented or delayed by Force Majeure from commencing or completing such action within the specified period, such period shall be extended by an JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 35 EXECUTION VERSION amount equal to the duration of such event of Force Majeure occurring or continuing during such period. ARTICLE XII EVENTS OF DEFAULT l2.l Event of Default. Each of the following events shall constitute an event of default ("Event of Default") by the defaulting Party (a "Defaulting Party"): (a) The failure to make, when due, any payment required pursuant to this Agreement, if such failure is not remedied within thirty (30) days after written notice thereof from the Non-Defaulting Party; (b) Any representation or warranty made by such Defaulting Party herein is false or misleading in any material respect when made, unless: (i) the fact, circumstance or condition that is the subject of such representation or warranty is made true within thirty (30) days after notice thereof from the Non-Defaulting Party, provided that if the fact, circumstance or condition that is the subject ofsuch representation or warranty reasonably cannot be corrected within such thirty (30) day period, then the Defaulting Party shall have an additional period of time (not to exceed sixty (60) days) in which to correct the fact, circumstance or condition that is the subject ofsuch representation or warranty; and (ii) such cure removes any adverse effect on the Non-Defaulting Party of such fact, circumstance or condition being otherwise than as first represented, or such fact, circumstance or condition being otherwise than as first represented does not materially adversely affect the Non-Defaulting Party; (c) A transfer, assignment or other disposition of its interest in this Agreement or its Ownership Interests (or Directional Capacity Allocation Percentages and Directional Capacity Allocations) in the Transmission Facilities, in each case, in violation of Article XIX; (d) The failure to perform or breach of its covenants and obligations in Section 3.7; (e) The failure to be a Qualified Owner, if such failure is not remedied within thirty (30) days after written notice thereof from the Non-Defaulting Party; (f) The failure to perform or breach of any material covenant or obligation set forth in this Agreement (other than provided for in Section 12. I (a), (b), (g), (d) or (e)), if such failure is not remedied within thirty (30) days after written notice thereof from the Non- Defaulting Party, provided that if such failure or breach cannot reasonably be cured within thirty (30) days, then the Defaulting Party shall have an additional period of time (not to exceed ninety (90) days) in which to cure such failure or breach so long as the Defaulting Party commences good faith activities to cure the failure or breach during the initial 30-day cure period and continues to utilize Commercially Reasonable Efforts to effect a cure; or (g) The Defaulting Party becomes Bankrupt. 12.2 Cure by Non-Defaultins Party. If a Defaulting Party fails to cure an Event of Default, then the Non-Defaulting Party may, in its sole discretion, attempt to cure the Event of JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 36 EXECUTION VERSION Default, provided that the Defaulting Party shall reimburse the Non-Defaulting Party for all costs and expenses incurred by or on behalf of the Non-Defaulting Party pursuant to this Section 12.2. 12.3 Remedies. (a) If an Event of Default occurs and is continuing, then the Non-Defaulting Party shall be entitled to exercise any of it remedies at law or in equity, including recovery from the Defaulting Party of any damages suffered as a result of the Event of Default, subject to Section 14.8. The Non-Defaulting Party shall use Commercially Reasonable Efforts to mitigate any damages suffered as a result of the Event of Default. (b) The Parties acknowledge that the obligations and covenants performed by each Party hereunder are unique and that the Non-Defaulting Party will be irreparably injured should such obligations and covenants not be consummated in accordance with the terms and conditions of this Agreement. Consequently, the Non-Defaulting Party will not have an adequate remedy at law if the other Party shall fail to perform its obligations and covenants hereunder. The Non-Defaulting Party shall have the right, in addition to any other remedy available under this Agreement, to specific performance of the Defaulting Party's obligations and covenants hereunder, and the Parties agree not to take a position in any proceeding arising out of this Agreement to the effect that the Non-Defaulting Party has an adequate remedy at law. ARTICLE XIII REPRESENTATIONS AND WARRANTIE S l3.l Representations and Warranties of Idaho Power. Idaho Power represents and warrants to PacifiCorp as of the Execution Date as follows: (a) It is duly formed, validly existing and in good standing under the laws of the jurisdiction of its formation. (b) It has all requisite corporate power necessary to own its assets and carry on its business as now being conducted or as proposed to be conducted under this Agreement. (c) It has all necessary corporate power and authority to execute and deliver this Agreement and to perform its obligations under this Agreement, and the execution and delivery of this Agreement and the performance by it of this Agreement have been duly authorized by all necessary corporate action on its part. (d) The execution and delivery of this Agreement and the performance by it of this Agreement do not: (i) violate its organizational documents; (ii) violate any Governmental Requirements; or (iii) result in a breach of or constitute a default of any material agreement to which it is a party. (e) This Agreement has been duly and validly executed and delivered by it and constitutes its legal, valid and binding obligation enforceable against it in accordance with its terms, except as the same may be limited by bankruptcy, insolvency or other similar laws affecting creditors' rights generally and by principles of equity regardless of whether such principles are considered in a proceeding at law or in equity. JOINT OWNERSHIP AND OPERATING AGREEMENT Page 137 (0 EXECUTION VERSION Except as disclosed in Schedule l3.l(fl, all material Govemmental Authorizations required by Govemmental Requirements to have been obtained by it prior to the date hereof in connection with the due execution and delivery of this Agreement, have been duly obtained or made and are in full force and effect. (g) It is a Qualified Owner. 13.2 Representations and Warranties of PacifiCom. PacifiCorp represents and warrants to Idaho Power as of the Execution Date as follows: (a) It is duly formed, validly existing and in good standing under the laws of the jurisdiction of its formation. (b) It has all requisite corporate power necessary to own its assets and carry on its business as now being conducted or as proposed to be conducted under this Agreement. (c) It has all necessary corporate power and authority to execute and deliver this Agreement and to perform its obligations under this Agreement, and the execution and delivery of this Agreement and the performance by it of this Agreement have been duly authorized by all necessary corporate action on its part. (d) The execution and delivery of this Agreement and the performance by it of this Agreement do not: (i) violate its organizational documents; (ii) violate any Governmental Requirements; or (iii) result in a breach of or constitute a default of any material agreement to which it is a party. (e) This Agreement has been duly and validly executed and delivered by it and constitutes its legal, valid and binding obligation enforceable against it in accordance with its terms, except as the same may be limited by bankruptcy, insolvency or other similar laws affecting creditors' rights generally and by principles of equity regardless of whether such principles are considered in a proceeding at law or in equity. (f) Except as disclosed in Schedule 13.2(fl, all material Governmental Authorizations required by Governmental Requirements to have been obtained by it prior to the date hereof in connection with the due execution and delivery of this Agreement, have been duly obtained or made and are in full force and effect. (g) It is a Qualified Owner. ARTICLE XIV INDEMNIFICATION l4.l Indemnities. (a) Subject to the provisions of Section 14.3 and Section 14.8, each Owner (the "Indemnifyins Party") shall indemnify, defend and hold harmless the other Owner (the "lndemnified Party") and its Representatives, from and against any and all suits, actions, liabilities, legal proceedings, claims, demands, losses, costs and expenses of whatsoever kind or JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 38 EXECUTION VERSION character (including reasonable attomeys' fees and expenses) of third parties (collectively, "ela!nq!,"), for injury or death of persons or physical loss of or damage to property of Persons (other than the Indemnified Party and its Representatives) arising from the Indemnifying Party's (including its Representatives'): (i) gross negligence or willful misconduct in connection with the performance of this Agreement; or (ii) failure to perform a material obligation under this Agreement. (b) In addition to and not in limitation of the indemnity provided in Section l4.l(a), but subject to the provisions of Section 14.3 and Section 14.8, each Owner, as Indemnifying Pafty, shall severally and not jointly, in accordance with its applicable Ownership Interest(s), indemnify, defend and hold harmless each Operator, as Indemnified Party, and its Representatives from and against any and all Claims for injury or death of persons or physical loss of or damage to property of Persons (other than the Indemnified Party and its Representatives), or fines or penalties levied or imposed by Governmental Authorities or other Losses incurred by the Indemnified Party and its Representatives, in each case, arising under or in connection with this Agreement, including in connection with the performance by the Operator of its obligations under this Agreement, except for such Claims or fines or penalties or other Losses arising from the Operator's or its Representatives': (i) gross negligence or willful misconduct in connection with the performance of this Agreement; or (ii) failure to perform a material obligation under this Agreement. (c) Subject to the provisions of Section 14.3 and Section 14.8. each Operator, as Indemnifying Party, shall indemnify, defend and hold harmless each Owner, as Indemnified Party, and its Representatives from and against any and all Claims for injury or death of persons or physical loss of or damage to property of Persons (including the Indemnified Party and its Representatives), or fines or penalties levied or imposed by Governmental Authorities or other Losses incurred by the Indemnified Party and its Representatives, in each case, arising from the Operator's and its Representatives': (i) gross negligence or willful misconduct in connection with the performance of this Agreement; or (ii) failure to perform a material obligation under this Agreement; @.iidgd, however, in no event shall the Operator be obligated to indemnifr, defend or hold harmless an Owner and its Representatives from and against any such Claims or fines or penalties or Losses to the extent arising from such Owner's or its Representatives': (i) gross negligence or willful misconduct in connection with the performance of this Agreement; or (ii) failure to perform any material obligation under this Agreement. 14.2 Notice and Participation. (a) If an Indemnified Party intends to seek indemnification under this Article XIV with respect to any Claims, the Indemnified Party shall give the Indemnifying Party prompt written notice of such Claims upon the receipt of actual knowledge or information by the Indemnified Party of any possible Claims or of the commencement of such Claims. The Indemnifying Party shall have no liability under this Article XIV for any Claim for which such notice is not provided, but only to the extent that the failure to give such notice materially impairs the ability of the Indemnifying Party to respond to or to defend the Claim. (b) The Indemnifying Party shall have the right to assume the defense of any Claim, at its sole cost and expense, with counsel designated by the Indemnifuing Party and JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 39 EXECUTION VERSION reasonably satisfactory to the Indemnified Party; provided, however, that if the defendants in any such proceeding include both the Indemnified Party and the Indemnifying Party, and the Indemnified Party shall have reasonably concluded that there may be legal defenses available to it which are in conflict with those available to the Indemnifying Party and that such conflict materially prejudices the ability of the counsel selected by the Indemnifying Party to represent both Parties, the Indemnified Party shall have the right to select separate counsel reasonably satisfactory to the Indemnifying Party, at the Indemniffing Party's expense, to assert such legal defenses and to otherwise participate in the defense of such Claim on behalf of such Indemnified Party, and the Indemnifying Party shall be responsible for the reasonable fees and expenses of such separate counsel. (c) Should any Indemnified Party be entitled to indemnification under this Article XIV as a result of a Claim, and should the Indemnifying Party failto assume the defense of such Claim within a reasonable period of time after the Indemnified Party has provided the Indemnifying Party written notice of such Claim, the Indemnified Party may, at the expense of the Indemnifying Party, contest or, with or without the prior consent of the IndemnifyingParty, settle such Claim. (d) Except to the extent expressly provided herein, no Indemnified Party shall seffle any Claim with respect to which it has sought or is entitled to seek indemnification pursuant to this Article XIV unless: (i) it has obtained the prior written consent of the Indemnifying Party; or (ii) the Indemnifying Party has failed to assume the defense of such Claim within a reasonable period of time after the Indemnified Party has provided the Indemnifying Party written notice of such Claim. (e) Except to the extent expressly provided otherwise herein, no Indemnifying Party shall settle any Claim with respect to which it may be liable to provide indemnification pursuant to this Section without the prior written consent of the Indemnified Party; provided. however, that if the Indemnifuing Party has reached a bona fide settlement agreement with the plaintiff(s) in any such proceeding, which settlement includes a full release of the Indemnified Party for any and all liability with respect to such Claim and does not obligate the Indemnified Party to take or forbear to take any action, and the Indemnified Party does not consent to such settlement agreement, then the dollar amount specified in the settlement agreement, plus the Indemnified Party's reasonable legal fees and other costs related to the defense of the Claim paid or incurred prior to the date of such settlement agreement, shall act as an absolute maximum limit on the indemnification obligation of the Indemnifying Party with respect to the Claim, or portion thereof, that is the subject of such settlement agreement. 14.3 Net Amount. Subject to the limitation in Section 14.2(e), if applicable, in the event that an Indemnifying Party is obligated to indemniff and hold any Indemnified Party harmless under this Article XIV, the amount owing to the Indemnified Party shall be the amount of such Indemnified Party's actual Claims, fines or penalties or other Losses, as the case may be, net of any insurance or other recovery actually received by the lndemnified Party. 14.4 No Release of Insurers. The provisions of this Article XIV shall not be deemed or construed to release any insurer from its obligation to pay any insurance proceeds in accordance with the terms and conditions of valid and collectible insurance policies. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 40 EXECUTION VERSION 14.5 Mitisation. Each Indemnified Party entitled to indemnification hereunder shall use Commercially Reasonable Efforts to mitigate all Claims, fines, penalties or other Losses, as the case may be, after becoming aware of any event which could reasonably be expected to give rise to any Claims, fines, penalties or other Losses, as the case may be, that are indemnifiable or recoverable hereunder or in connection herewith. 14.6 Assertion of Claims. No Claim of any kind shall be asserted against any Owner or Operator pursuant to this Article XIV, whether arising out of contract, tort (including negligence), strict liability, or any other cause of or form of action, unless it is filed in a court of competent jurisdiction, or a demand for arbitration is made, within the applicable statute of limitations period for such Claim. 14.7 Survival of Obligation. The duty to indemnify under this Article XIV shall continue in full force and effect notwithstanding the expiration or termination of this Agreement, with respect to any Claim, fine, penalty or other Losses, as the case may be, arising out of an event or condition which occurred or existed prior to such expiration or termination. 14.8 Limitation on Liability. (a) Notwithstanding any provision in this Agreement to the contrary, neither Party shall be liable under this Agreement in any action at law or in equity, whether based on contract, tort or strict liability or otherwise, for any special, incidental, indirect, exemplary, punitive or consequential damages or losses, including any loss of revenue, income, profits or investment opportunities, loss of the use of equipment, or the cost of temporary equipment or services, provided that any fines or penalties or other Losses levied or imposed by Governmental Authorities shall not be excluded under this Section 14.8(a) as special, incidental, indirect, exemplary, punitive or consequential damages or losses. (b) Notwithstanding any provision in this Agreement to the contrary, neither Party shall be liable under this Agreement if and to the extent that the Agreement Limiting Liability Among Western Interconnected Systems executed by ldaho Power on August 5, 1985 and by PacifiCorp on August 22, 1973 (the "WIS Sereemen!") is then in effect between the Parties and expressly limits or precludes such liability. Nothing in this Agreement shall amend or otherwise affect in any way the terms and conditions of or liability of the Parties under the WIS Agreement. ARTICLE XV PROPRIETARY INFORMATION l5.l Disclosure of Proprietary Information Prohibited. Any Proprietary Information of a Party (whether in its capacity as Owner or Operator) (the "Transferor") which is disclosed to or otherwise received or obtained by the other Party (whether in its capacity as Owner or Operator) (the "Transferee") incident to this Agreement shall be held in confidence and the Transferee shall not (subject to Sections 15.2, I 5.3 and 15.5) publish or otherwise disclose any Proprietary Information of the Transferor to any Person for any reason or purpose whatsoever, or use any Proprietary Information for any purpose other than performance under this Agreement, without the prior written approval of the Transferor, which approval may be granted or withheld by the JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 41 EXECUTION VERSION Transferor in its sole discretion. Without limiting the generality of the foregoing, each Transferee shall observe at a minimum the same safeguards and precautions with regard to the Transferor's Proprietary Information which the Transferee observes with respect to its own information of the same or similar kind. 15.2 Disclosure by Representatives. Each Transferee agrees that it will make available Proprietary Information received from a Transferor to its own Representatives only on a need-to- know basis and in compliance with Govemmental Requirements, and that all Persons to whom such Proprietary Information is made available will be made aware of the confidential nature of such Proprietary Information, and will be required to agree to hold such Proprietary Information in confidence in accordance with the terms hereof and in compliance with Governmental Requirements. 15.3 Permitted Disclosures. Notwithstanding anything to the contrary contained in this Article XV: (a) A Transferee may provide any Proprietary Information to any Govemmental Authority having jurisdiction over or asserting a right to obtain such information, provided that: (i) such Governmental Authority orders that such Proprietary Information be provided; and (ii) unless prohibited from so doing by Governmental Requirements, the Transferee promptly advises the Transferor of any request for such information by such Govemmental Authority and cooperates in giving the Transferor an opportunity to present objections, requests for limitation, and/or requests for confidentiality or other restrictions on disclosure or access, to such Governmental Authority. (b) A Transferee may, to the extent required, disclose Proprietary Information to any Governmental Authority in connection with the application for any Govemmental Authorization; ry4le(lthat unless prohibited from so doing by Govemmental Requirements, the Transferee shall provide the Transferor prior written advance notice of such disclosure and the Proprietary Information that is to be disclosed. (c) A Transferee may disclose such Proprietary Information regarding the existence and terms of this Agreement as such Transferee deems necessary to enable it to comply with the Securities Exchange Act of 1934, or the rules, regulations and forms of the Securities and Exchange Commission, issued thereunder or the applicable rules of any stock exchange, or as otherwise required by Governmental Requirements. 15.4 Injunctive Relief. In the event of a breach or threatened breach of the provisions of this Article XV by any Transferee, the Transferor shall be entitled to an injunction restraining the Transferee from such breach or threatened breach. Nothing contained herein shall be construed as prohibiting the Transferor from pursuing any other remedies available at law or equity for such breach or threatened breach of this Agreement. 15.5 Publicity. Any public relations maffers, including public announcements and press releases or similar publicity, arising out of or in connection with the terms of this Agreement or the transactions contemplated herein, shall be coordinated and agreed to between the Parties prior to said announcement or release. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 42 EXECWION VERSION 15.6 Proprietary Information Defined. For purposes of this Agreement, "hp{gI4ry Information" means all information, written or oral, which has been or is disclosed by the Transferor, or by any Representative of the Transferor, or which otherwise becomes known to the Transferee, or to any Representative of such Transferee, or any other party in a confidential relationship with, the Transferee, in each case, incident to this Agreement, and which: (a) relates to matters such as patents, trade secrets, research and development activities, draft or final contracts or other business arrangements, books and records, budgets, cost estimates, pro forma calculations, engineering work product, environmental compliance, vendor lists, suppliers, manufacturing processes, energy consumption, pricing information, private processes, and other similar information, as they may exist from time to time; (b) and the Transferor expressly designates in writing to be confidential, provided that "Proprietary Informdh" shall exclude information falling into any of the following categories: (i) Information that, at the time of disclosure hereunder, is in the public domain, other than information that entered the public domain by breach of this Agreement by Transferee or any of its Representatives; (ii) Information that, after disclosure hereunder, enters the public domain, other than information that enters the public domain by breach of this Agreement by Transferee or any of its Representatives; (iiD Information, other than that obtained from third-parties, that prior to disclosure hereunder, was already in Transferee's possession, either without limitation on disclosure to others or subsequently becoming free of such limitation; (iv) Information obtained by Transferee from a third-party having an independent right to disclose the information; or (v) Information that is available through independent research without use of or access to the Proprietary Information. 15.7 Survival. The provisions of this Article XV shall continue in full force and effect during the Term and for a period of two (2) years thereafter, notwithstanding the termination of this Agreement, with respect to any Proprietary Information obtained by any Transferee prior to such termination. ARTICLE XVI TAXES l6.l No Partnership. Nothing in this Agreement shall be deemed to create or constitute a partnership, joint venture or association between the Owners. Each Owner agrees and covenants that it shall not take or omit to take any action or reporting position with any Governmental Authority contrary to this Section 16.1. 16.2 761 Election. The Owners intend that, as tenants in common and owners of undivided Ownership Interests, for United States income tax purposes the Owners shall elect in accordance with the provisions of section 761 of the Internal Revenue Code of 1986, as amended ("Code"), and the applicable income tax regulations thereunder ("Regulations"), to be excluded JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 43 EXECUTION VERSION from all of the provisions of Subchapter K of the Code upon the first occasion in which such election may be filed under these Regulations and that, if such election is not filed, this Agreement shall constitute an election under Regulations section 1.761-2(b)(2)(ii) to be excluded from allof the provisions of Subchapter K of the Code and the applicable Regulations, beginning with the first year of the creation of the tenancy in common as contemplated by this Agreement and that no Owner shall object to any such election. 16.3 Responsibility for Taxes. It is the intent of the Owners that so far as possible, each Owner shall separately report, promptly and timely file returns with respect to, be responsible for and pay all property, income, franchise, business, or other taxes or fees ("Taxes"), arising out of its Ownership Interests and the matters contemplated by this Agreement, that such Taxes shall be separately levied and assessed against each Owner severally and that each Owner shall be solely responsible for and shall pay all such Taxes so levied and assessed against it without any responsibility of the other Owner with respect thereto and without the amounts thereof being paid and apportioned between the Owners under this Agreement. To the extent that Taxes (such as property, payroll, sales and use Taxes) may be levied or assessed against the Transmission Facilities, their operation or the Owners in such a manner as to make impossible the carrying out of the foregoing provisions of this Section 16.3, then either Operator shall report, file returns with respect to and pay such Taxes and each Owner shall immediately reimburse such Operator for each such Owner's Pro Rata Share (based on its applicable Ownership Interest(s)) of such Taxes; plqv_idgd, however, that sales and use tax included in Other Costs or in the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge or the Monthly Common Equipment Charge shall be recovered by the Operator pursuant to Section 4.7. Neither Operator shall have any obligation to contest or to seek refund of such Taxes; provided, however, that each Operator may, by its personnel or counsel of its selection, pursue such administrative or court proceedings as the Operator may determine. Each Owner shall on request pay to the Operator such Owner's Pro Rata Share (based on its applicable Ownership Interest(s)) of the costs of such proceedings and shall share in any savings resulting from such proceedings in the same proportion. Each Owner agrees to cooperate with the other Owner with respect to reasonable requests for information or other matters with respect to Taxes. 16.4 Indemnification. Each Owner (the "Tax Indemnifrine Party") shall indemnifu and hold harmless the other Owner (the "Tax Indemnitee Party"), on an after-tax basis, from and against any Taxes (including any interest or penalties) imposed on such Tax Indemnitee Party or the Transmission Facilities or any part thereof, to the extent such Taxes are the responsibility of the Tax Indemnifying Party pursuant to this Article XVl. 16.5 Determination of Depreciation and Other Matters. Each Owner shall determine the basis and method it will use for purposes of depreciation and other matters where investment of the Transmission Facilities or Common Equipment is relevant. ARTICLE XVII DISPUTES 17.l Exclusive Procedure. Any dispute, controversy or claim arising out of or relating to this Agreement or the breach, interpretation, termination, performance or validity of this Agreement (each, a "Dispute") shall be resolved pursuant to the procedures of this Article XVII. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 44 EXECUTION VERSION 17.2 Dispute Notices. If a Dispute arises between the Parties, then either Party may provide written notice thereof to the other Party, including a detailed description of the subject matter of the Dispute (the "Disoute Notice"). Any Party may seek a preliminary injunction or other provisionaljudicial remedy if such action is necessary to prevent irreparable harm or preserve the status quo, in which case the Parties nonetheless will continue to pursue resolution of the Dispute pursuant to this Article XVII. 17.3 Informal Dispute Resolution. (a) The Parties shall make a good faith effort to resolve any Dispute by prompt negotiations between the Party's representative so designated in writing to the other Party (each a "MengEI"). If the Managers are not able to resolve the Dispute within thirty (30) days after the date of the Dispute Notice, then they shall refer the matter to the designated senior officers of their respective companies (the "EXggUIiySG)"), who shall have authority to settle the Dispute. If the Executives are not able to resolve the Dispute within sixty (60) days after the date of the Dispute Notice, then the Dispute shall be resolved pursuant to Section 17.4. (b) All negotiations, communications and writings exchanged between the Parties pursuant to this Article XVII shall be treated and maintained as Proprietary Information, shall be treated as compromise and settlement negotiations for purposes of the federal and state rules of evidence, and shall not be used or referred to in any subsequent adjudicatory process between the Parties, including at FERC, either with respect to the current Dispute or any future Dispute between the Parties. 17.4 Submission of Dispute to FERC or Approved Courts. If a Dispute cannot be settled amicably between the Parties pursuant to Section 17.3, then any Party may, in its sole discretion, within one (1) year after the conclusion of the time period for informal dispute resolution specified in Section 17.3, submit such Dispute (a) to FERC or (b) to the jurisdiction of the state courts situated in the State of ldaho or the United States District Court for the District of Idaho (the "Apreve1!-.1Cog45."). Each of the Parties, in its capacity as an Owner and Operator, consents to and accepts for itself and in respect of its property, generally and unconditionally, the exclusive jurisdiction of the Approved Courts and appellate courts from any appeal thereof, and irrevocably waives any objection which it may now or hereafter have to the jurisdiction of the Approved Courts. Each of the Parties, in its capacity as an Owner and Operator, further irrevocably waives, to the fullest extent permitted by law, any objection that it may now or hereafter have to the laying ofvenue ofany suit, proceeding or other action brought pursuant to this Article XVII in any of the Approved Courts, and irrevocably waives, to the fullest extent permitted by law, and agrees not to plead or claim in any such Approved Court that any suit, proceeding or other action brought therein has been brought in an inconvenient forum. 17.5 Continued Performance. During the pendency of any Dispute, each Party shall continue to perform all of its respective obligations under this Agreement. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 45 EXECUTION VERSION ARTICLE XVII ASSIGNMENT l8.l Prohibited Transfers and Assignments. Neither Party shall have the right to transfer, assign, sell or otherwise dispose of (collectively, "Transfer"), in whole or in part, its interest in this Agreement, including its rights, duties and obligations hereunder, nor to Transfer, in whole or in part, its Ownership Interests (or Directional Capacity Allocation Percentages and Directional Capacity Allocations) in the Transmission Facilities or Common Equipment, except as permitted under this Article XVIII. 18.2 Permitted Assisnments and Transfers. Subject to Section 18.3, the restrictions set forth in Section l8.l shall not restrict: (a) Dispositions and sales of equipment or facilities by either Operator incident to renewals or replacements of the Transmission Facilities or Common Equipment; (b) The right of an Owner to subject any of its Ownership Interests (or Directional Capacity Allocation Percentages and Directional Capacity Allocations) to the lien of any mortgage upon all or a portion of its own physical electric utility property or to otherwise collaterally assign its rights and obligations in this Agreement to a lender or other person providing financing to the Owner; (c) The right of an Owner to Transfer voluntarily all of its Ownership Interests (and Directional Capacity Allocation Percentages and Directional Capacity Allocations) and all of its rights and obligations in this Agreement (including as part of such Transfer, all of its rights and obligations in this Agreement as an Operator) in connection with any sale, merger or other transfer of substantially all of such Owner's electric transmission facilities as an operating entity; @lded, however, that the effectiveness of such Transfer shall be conditioned upon the transferee: (i) agreeing in writing, in form and substance reasonably satisfactory to the other Owner, to assume all of the rights and obligations of the transferring Owner (including, all of its rights and obligations in this Agreement as an Operator) as of the transfer date; and (ii) qualiffing as a Qualified Owner on the transfer date; (d) The right of an Owner to Transfer voluntarily all of its Ownership Interests (and Directional Capacity Allocation Percentages and Directional Capacity Allocations) and allof its rights and obligations in this Agreement (including as part of such Transfer, allof its rights and obligations in this Agreement as an Operator) to an Affiliate of such Owner which owns all or substantially all of the transmission facilities of such Owner; provided, however, that the effectiveness of such Transfer shall be conditioned upon the transferee: (i) agreeing in writing, in form and substance reasonably satisfactory to the other Owner, to assume all of the rights and obligations of the transferring Owner (including, all of its rights and obligations in this Agreement as an Operator) as of the transfer date; and (ii) qualifying as a Qualified Owner on the transfer date; (e) The right of any Owner to Transfer voluntarily all of its Ownership Interests (and Directional Capacity Allocation Percentages and Directional Capacity Allocations) and allof its rights and obligations in this Agreement (including as part of such Transfer, all of JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 46 EXECUTION VERSION its rights and obligations in this Agreement as an Operator) to a third party; provided that: (i) the other Owner, in its sole discretion, approves such Transfer and approves the third-party purchaser as having demonstrated that it is financially and technically capable of performing the transferring Owner's (and Operator's) obligations under this Agreement; and (ii) the other Owner is offered the right of first refusal to purchase all of such Ownership Interests (and Directional Capacity Allocation Percentages and Directional Capacity Allocatiqns) and Common Equipment and all of the transferring Owner's rights and obligations in this Agreement (including as part of such Transfer, all of its rights and obligations in this Agreement as an Operator), on terms no less favorable than those offered to such proposed third-party purchaser; provided, however, that the effectiveness of such Transfer shall be conditioned upon the third- party purchaser: (A) agreeing in writing, in form and substance reasonably satisfactory to the other Owner, to assume all of the rights and obligations of the transferring Owner (including as part of such Transfer, all of its rights and obligations in this Agreement as an Operator) as of the transfer date; and (B) qualifuing as a Qualified Owner on the transfer date; and (f) The right of an Owner to post, sell or make available for scheduling transmission capacity or schedule energy in accordance with Sections 3.2(b) and 3.2(c), unless otherwise mutually agreed to in writing in advance by the other Owner. 18.3 FERC Approval. Any Transfer pursuant to Section 18.2 that is subject to FERC approval shall not take effect until FERC has approved such Transfer and has made it effective. ARTICLE XIX MISCELLANEOUS l9.l Notices. (a) Any notice, demand, request or other communication required or permitted to be given pursuant to this Agreement shall be in writing and signed by the Owner or Operator giving such notice, demand, request or other communication and shall be hand delivered or sent by certified mail, return receipt requested, or overnight courier to the other Owner and/or Operator at the address set forth below: If to Idaho Power as Owner:Idaho Power Company l22l West Idaho Street Boise, lD 83702 Affn: Director, Load Serving Operations Telephone: 208-388-2360 Idaho Power Company l22l West Idaho Street Boise, ID 83702 Affn: Legal Department Telephone: 208-388-2300 Idaho Power Company 1221 West Idaho Street With a copy to: If to Idaho Power as Operator: JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 47 With a copy to: EXECWION VERSION Boise, lD 83702 Attn: Director, Load Serving Operations Telephone: 208-388-2360 Idaho Power Company l22l West [daho Street Boise, ID 83702 Attn: LegalDepartment Telephone: 208-388-2300 PacifiCorp 825 NE Multnomah Street, Suite 1600 Portland, OF.97232 Attn: Director, Transmission Service Telephone: 503-813-67 12 PacifiCorp 825 NE Multnomah Street, Suite 2000 Portland, OR97232 Attn: Legal Department Telephone: 503-8 I 3-5854 PacifiCorp 825 NE Multnomah Street, Suite 1600 Portland, OR97232 Attn: Director, Transmission Service Telephone: 503-813-67 12 PacifiCorp 825 NE Multnomah Street, Suite 2000 Portland, OR97232 Attn: Legal Department Telephone: 503-8 I 3-5854 If to PacifiCorp as Owner: With a copy to: If to PacifiCorp as Operator: With a copy to: (b) Each Party shall have the right to change the place to which any notice, demand, request or other communication shall be sent or delivered by similar notice sent in like manner to the other Party. The effective date of any notice, demand, request or other communication issued pursuant to this Agreement shall be when: (i) delivered to the address of the Party personally, by messenger, by a nationally or internationally recognized overnight delivery service or otherwise; or (ii) received or rejected by the Party, if sent by certified mail, return receipt requested, in each case, addressed to the Party at its address and marked to the attention of the person designated above (or to such other address or person as a Party may designate by notice to the other Party effective as of the date of receipt by the other Party). 19.2 Parties Bound. This Agreement shall be binding upon each of the Parties and their respective successors and permitted assigns. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 48 EXECUTION VERSION 19.3 Amendments. (a) Except as otherwise provided in Section 19.3(c), this Agreement may not be amended, supplemented or otherwise modified, other than pursuant to an instrument in writing executed by the Parties. (b) Absent agreement of both Parties to the proposed change and except as otherwise provided in Section 19.3(c), the standard of review for changes to this Agreement proposed by a Party, or FERC acting sua sponte, shall be the "public interest" standard of review set forth in United Gas Pipe Line Co. v. Mobile Gas Service Corp., 350 U.S. 332 (1956) and Federal Power Commission v. Sierra Pacific Power Co., 350 U.S. 348 (1956); provided that the standard of review for any modification to this Agreement requested by non-contracting third parties shall be the most stringent standard permissible under then-applicable Governmental Requirements. (c) Nothing contained in this Agreement shall be construed as affecting in any way the right of either Party to unilaterally make application to FERC under Section 205 or Section 206 of the Federal Power Act for a change in the charges set forth in this Asreement. It is the intent of the Parties that the standard of review that FERC will apply to any such unilateral application shall be the just and reasonable standard of review rather than the "public interest" standard of review. (d) An amendment that is subject to FERC approval shall not take effect until FERC has accepted such amendment for filing and has made it effective. 19.4 Waivers. No waiver by any Party of any one or more breaches or defaults by the other Party in the perforrnance of any of the provisions of this Agreement shall be construed as a waiver of any other breaches or defaults whether of a like kind or different nature. Any delay, less than any applicable statutory period of limitations, in asserting or enforcing any rights under this Agreement shall not be deemed a waiver of such rights. Failure of any Party to enforce any provisions hereof shall not be construed to waive such provision, or to affect the validity of this Agreement or any part thereof, or the right of the other Party thereafter to enforce each and every provision thereof. 19.5 Choice of Law. (a) This Agreement, the rights and obligations of the Parties under this Agreement, and any claim or controversy arising out of this Agreement (whether based on contract, tort, or any other theory), including all matters of construction, validity, effect, performance and remedies with respect to this Agreement, shall be governed by and interpreted, construed, and determined in accordance with, the laws ofthe State of Idaho (regardless of the laws that might otherwise govern under applicable principles of conflicts of law). (b) TO THE FULLEST EXTENT PERMITTED BY LAW, EACH OF THE PARTIES HERETO WAIVES ANY RIGHT IT MAY HAVE TO A TRIAL BY JURY TN RESPECT OF LITIGATION DIRECTLY OR TNDTRECTLY ARISING OUT OF, TJNDER OR TN CONNECTION WITH THIS AGREEMENT. EACH PARTY FURTHER WAIVES ANY RIGHT TO CONSOLIDATE ANY ACTION TN WHICH A JURY TRIAL HAS BEEN JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 49 EXECUTION VERSION WAIVED WITH ANY OTHER ACTION IN WHICH A JURY TRIAL CANNOT BE OR HAS NOT BEEN WAIVED. headings used only and shall Exhibit A Exhibit B Exhibit C Headings. Article and Section headings used in this Agreement (including in any Exhibits or Schedules attached hereto) are for convenience ofreference not affect the construction of this Agreement. 19.7 Relationship of Parties. The covenants, obligations, and liabilities of the Owners are intended to be several and not joint or collective, and nothing herein contained shall be construed to create an association, joint venture, trust or partnership, or to impose a trust or partnership covenant, obligation or liability on or with regard to any of the Owners. Each Owner shall be individually responsible for its own covenants, obligations and liability as herein provided. No Owner shall be under the control of, or shall be deemed to control, the other Owner. Neither Owner shall have the right or power to bind the other Owner without its express written consent. 19.8 Severability. In the event that any provision of this Agreement or the application thereof becomes or is declared by a court of competent jurisdiction to be illegal, void or unenforceable, the remainder of this Agreement will continue in full force and effect and the application of such provision to other persons or circumstances will be interpreted so as reasonably to effect the intent of the Parties. The Parties further agree to replace such illegal, void or unenforceable provision of this Agreement with a valid and enforceable provision that will achieve, to the extent possible, the economic, business and other purposes of such illegal, void or unenforceable provision. 19.9 No Third Party Beneficiaries. Nothing expressed or implied in this Agreement is intended to nor shall be construed to confer upon or give to any Person (other than the Parties) any rights or remedies under or by reason of this Agreement or any transaction contemplated herein. 19.10 Further Assurances. Each Party agrees to execute and deliver from time to time such additional documents, and take such additional actions, as may be reasonably required by the other Party to give effect to the purposes and intent hereof. 19.11 Conflict of Interest. Nothing in this Agreement shall prohibit any Party from engaging in or possessing any interest in other projects or business ventures ofany nature and description, independently or with others. 19.12 Exhibits and Schedules. The Exhibits and Schedules to this Agreement are identified as follows, and are incorporated herein by this reference: Description of PacifiCorp Common Equipment Description of Idaho Power Common Equipment Ownership Interests; Directional Capacity Allocations; Directional Capacity Allocation Percentages JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 50 Exhibit D Exhibit E Exhibit F Exhibit G EXECUTION VERSION Monthly Transmission Facilities O&M Charge; Monthly O&M Equipment Charge Department of Energy Equipment Located in the Antelope Substation Acquisition Costs Joint Ownership Transmission Loss Calculation and Allocation Methodology Schedule l3.l(0 Idaho Power Governmental Authorizations Schedule 13.2(f) PacifiCorpGovernmentalAuthorizations 19.13 Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be original, and all of which together shall constitute one agreement. Electronic transmission of any signed original document, and retransmission of any signed electronic transmission, shall be the same as delivery of an original. At the request of either Party, the other Party will confirm electronically transmitted signatures by signing an original document. 19.14 Entire Asreement. This Agreement and the Exhibits and Schedules attached hereto, and the other documents between the Parties referenced herein constitute the entire agreement between the Parties and supersede all prior agreements and understandings, whether oral and written, between the Parties with respect to the subject matter hereof. There are no oral understandings, terms or conditions and the Parties have not relied upon any representation or warranty, expressed or implied, not contained in this Agreement. ISTGNATURE PAGE FOLLOWSI JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 5l EXECUTION VERSION IN WITNESS WHEREOF, each of the Parties has caused its duly authorized representative to execute this Joint Ownership and Operating Agreement as of the date first above written. PACIFICORP, AS OWNER AND OPERATOR Name: --P -'. i /,r,'/ Title: 7 7"214i tn,"/.r;rv\ IDAHO POWER COMPANY, AS OWNER AND OPERATOR By: Name: Title: IOINT OWNERSHIP AND OPERATING AGREEMENT Pagel 52 EXECWION TlERSION IN WITNESS WHEREOF, each of the Parties has caused its duly authorized representative to execute this Joint Ownership and Operating Agreement as of the date first above written. PACIFICORP, AS OWNER AND OPERATOR By: Name: Title: IDAHO POWER COMPANY, AS OWNER AND OPERATOR By: Name: Title: Lisa Grow SVP Power Suoolv JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 52 This page left blank intentionally. EXECUTION IlERSION JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 53 EXECUTION VERSION EXHIBIT A' Description of PacifiCorp Common Equipment2 rThe information contained in this Exhibit is accurate as of December 31,2014. The Parties will update the information in this Exhibit, if necessary, to reflect any PacifiCorp Common Equipment placed in or removed from service between January 1,2015 and the Closing Date in connection with the true-up set forth in Section 2.5(d) of the JPSA. The update shall be completed within 30 days after the completion of the true-up and the updated Exhibit shall replace this Exhibit. 2 Excludes the majority of the Jim Bridger substation common equipment which are jointly owned by Idaho Power as part of previous Legacy Agreements (as defined in the JPSA). The common equipment associated with the Jim Bridger substation in this Exhibit A is 345 kV substation common equipment which Idaho Power did not participate in the construction of in the previous Legacy Agreements. Going forward, Idaho Power will continue to jointly own, and participate in the construction of, new common equipment associated with the Jim Bridger 345 kV bus. Idaho Power will participate at Idaho Power's 345 kV bus Ownership Interest. JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 54 EXECUTION VERSION Asset Asset Class Asset description 2nd Line of Description location: 013019 - Goshen Substation, lD 303350 35010 Goshen substation and Service center Bl-011 ER 85-8971 303359 3s010 Goshen substation and Service center lDBl- 0010 ER 85-318 304L29 35010 Goshen/Ridgeline/Wolverine lnterconnect tDBt-0021 DZP R I 20Os I C / OO 4 / LOO29 49 O 400s0s03 35201 CABLE TRAY CAATS# 52842 400s3163 35201 CABLE TRAY ER 85-8887 40063710 3s201 CABLE TRAY ER 85-6207 400637L7 35201 CABLE TRAY ER 8s-6999 40063744 3s201 CABLE TRAY ER 86-7028 40065335 35201 CABLE TRAY wBS TilD/2006/ CIOOL/ 700297 47,388 WOLV CRK 40063652 3s201 CONTROL BUILDING ER 85-318 40053560 35201 CONTROL BUILDING ER 85-1224 40063674 35207 CONTROL BUILDING ER 85-3370 40053685 35201 CONTROL BUILDING ER 85-3925 40063696 35201 CONTROL BUILDING ER 85-8887 40063708 3s201 CONTROL BUILDING ER 85-6053 40063657 35201 HEATER ER 85-2297 40000610 35201 ROOF CMTS# 105120 40063720 35201 ROOF ER 8s-5999 40064214 35201 ROOF - CONTROL HOUSE ER 101852 40063715 35203 EMERGENCY GENERATOR BUILDING ER 85-6999 40063746 3s203 EMERGENCY GENERATOR BUILDING ER 85-7028 40063706 35205 AIR CONDITIONER ER 85-60s3 40063716 35205 AIR CONDITIONER ER 85-5999 40072736 3s20s AIR CONDITIONER TZP R / 2008 I ClTR6/10036s43 40087985 35205 HVAC (UNIT HEATER)TZP R / 20L3 I C/rR6/1 00s0356 40063727 35205 UNIT HEATER ER 85-6999 40064178 35207 LOAD CENTER ER 85-7028 40080307 3s209 SECURITY SYSTEM w Bs rz P R/20 08 / c / oot / t003s469 40063684 3s2L3 PUMP ER 85-3926 40053589 35273 SEWER SYSTEM ER 85-5790 40063693 35273 SEWER SYSTEM ER 85-8480 40063656 35213 WELL ER 85-318 40063700 3s213 WELL ER 85-8887 40063779 35219 FOUNDATION AND SUBSTRUCTURE ER 85-6999 GENERATOR BUILDING 40047725 3s22s HOIST ER 370304 MANUAL HYDRAULIC TANK 40064863 35225 HOIST ER 85-2019 40050277 35227 CEMENT CURB rtDM/20031c(001 40092927 35227 CLEARING, GRADING & FILL MATERIAL TtD Al 20771 C1004/GOSHENSB 40000613 35227 CLEARtNG, GRAD|NG, & FtLL MATERTAL (SURF CAATS# 104348 40063691 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-7958 4006369s 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-8887 40063707 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-50s3 40063772 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-6890 40053718 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-6999 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT A Page | 55 EXECWION VERSION 40063722 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-6294 40063749 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 86-6983 4006377L 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 381099 40063781 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-5927 40065337 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF w BS Tr r D/200 6 I Cl 00L /100297 47,388 WO LV CR K 40090746 35227 CLEARING, GRADING, & FILL MATERIAL (SURF DZAF / 2073 I C/001/GOSH E N 3 40000616 3s227 FENCE CAATS# 104348 40063668 35227 FENCE ER 85-2019 40055343 35227 FENCE wBs r rDl20061 cl o0t/ !00297 4L,388 woLV cRK 400636s4 35227 FENCE & GATES ER 85-318 SHOP 4006365s 3s227 FENCE & GATES ER 85-318 40053551 35227 FENCE & GATES ER 8s-1332 40063575 35227 FENCE & GATES ER 85-3370 40063690 3s227 FENCE & GATES ER 85-5942 40063692 3s22t FENCE & GATES ER 85-7827 40063697 3s227 FENCE & GATES ER 85-8887 40063709 35227 FENCE & GATES ER 85-6053 40063773 35227 FENCE & GATES ER 381099 40053895 35227 FENCE & GATES ER 85-8513 40092924 35227 FENCE & GATES T ID AI 2OLL I CIOO4IGOSH E NSB 40063751 35227 ROADWAY ER3262748 40092949 35227 ROADWAY TtD Al 20tu C1004/GOSH EN SB 40053167 35229 FLOODLIGHT ER 85-8887 40055875 35229 FLOODLIGHT ER 85-79s9 40092940 3s229 LIGHTING FIXTURE/SYSTEM TtD Al 20771 C/004/GOSH ENSB 40077758 3s301 FIRE PROTECTION ER 8s-3388 40053182 35301 STATION SERVICE TRANSFORMER ER 85-8887 40055887 3s301 STATION SERVICE TRANSFORMER E R 85-7959 7 200 -124 / 240V 400s5316 35301 STATION SERVICE TRANSFORM ER ER 85-1332 40056968 35301 STATION SERVICE TRANSFORM ER ER 85-60s3 40057070 35301 STATION SERVICE TRANSFORMER ER 85-3370 40090753 35301 STATTON SERVTCE TRANSFORM ER 720 l24O DZAF I 20 L3 I Cl OO UGOS H E N 3 40059034 35301 STATION SERVICE TRANSFORMER 5KVA ER 394015 40063907 3s301 STATION SERVICE TRANSFORMER sKVA ER 85-8513 WEST 40011988 3s377 CABLE TRENCH CAATS# 358834 40072067 35377 CABLE TRENCH CAATS# 104348 40047968 35377 CABLE TRENCH TIDMl2002lClO7s 40047976 35317 CABLE TRENCH ER 85-8887 40049276 35317 CABLE TRENCH TIDM/2003/C lOO6lOT 40049773 3s3L7 CABLE TRENCH ER 8s-6890 4005049s 353L7 CABLE TRENCH ER 3269826 40056736 3s377 CABLE TRENCH TIDMl200slclo34 400s692s 35377 CABLE TRENCH ER 85-6053 40059027 35317 CABLE TRENCH ER 394015 40064740 35317 CABLE TRENCH ER 393983 40064166 35377 CABLE TRENCH ER 8s-6983 40064779 353\7 CABLE TRENCH ER 85-7028 40064224 35317 CABLE TRENCH ER 381099 40065336 3s3L7 CABLE TRENCH wBs r r D/200 6 I cl }oL/ L00297 4!,388 WOLV CR K JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 56 EXECUTION VERSION 40092920 35317 CABLE TRENCH TtD Al 20tu C1004/GOSH ENSB 4007207L 35317 CONDUIT CAATS# 104348 40049775 35377 CONDUIT ER 85-6890 40052035 35317 CONDUIT wBs DzPR/2005 / Cl DR4 I 70027933 40055872 35317 CONDUIT ER 85-7959 40056926 35317 CONDUIT ER 85-6053 40063854 353L7 CONDUIT ER 85-4771 40064743 35317 CONDUIT ER 393801 40064767 35317 CONDUIT ER 85-6983 400642L6 353t7 CONDUIT ER 358899 40065338 35377 CONDUIT w BS Tr r D/200 6 I Cl OO7 / LO0297 47,388 WO LV CR K 40066372 35317 CONDUIT wBs rDM/20lslcloss 40076395 35317 CONDUIT Tr D M/2005/C I O37 I 70037848 40092922 35317 CONDUIT TtD Al 20rtl c1004/Gos H E NSB 40055879 35317 GUY UNIT ER 85-7959 40057057 35319 ANNUNCTATOR EQ# 330685 ER 85-3370 161/69KV 400s6920 35319 ANNUNCIATOR EQ# 330691 ER 85-6053 345KV 40037996 3s319 DIGITAL FAULT RECORDER TIDMI!9991C/072lOL 40058183 35319 METERING PACKAGE (CTI\rr)TilD I 2006 I Cl 007 | tOO297 47 100% RE r M B INTERCNT 40092942 3s319 METERING PACKAGE (CTIVI)S/N EQ# 394727 Tto Al 20rU c1004/GosH E NSB 40092943 35319 METERING PACKAGE (CTIVT)S/N EQ# 394728 r D Al 20Lr I C 1004/G OS H E N SB 40092944 35319 METERING PACKAGE (CTI\rr)S/N EQ# 394729 TtD Al 2O7u Cloo4lGOSH E NSB 40011996 35319 RELAY AND CONTROL CAATS# 368834 40072087 35319 RELAY AND CONTROL cAATSf 105622 40036600 35319 RELAY AND CONTROL wBS DSH E/1999 I C/027 KTNPORT-GOSH EN 34s KV LNR 40047972 3s319 RELAY AND CONTROL rtoul2002lclo75 40047980 35319 RELAY AND CONTROL ER 85-8887 40049274 35319 RELAY AND CONTROL r|DMl2003lC/006/01 40050501 3s319 RELAY AND CONTROL ER 3259826 40050505 35319 RELAY AND CONTROL CAATS# 62842 400s5733 3s319 RELAY AND CONTROL wBS Tr DM/20 05 I Cl 073 I 007 40056957 35319 RELAY AND CONTROL ER 85-6053 40058182 35319 RELAY AND CONTROL TrD | 2006 / Cl OOU LOO297 47 100% RE r M B INTERCNT 400s9033 35319 REI.AY AND CONTROL ER 394015 40063866 35319 RELAY AND CONTROL ER 85-7868 40063918 3s319 RELAY AND CONTROL ER 8s-8383 40063919 35319 RELAY AND CONTROL ER 85-8217 40063948 3s319 RELAY AND CONTROL ER 85-8498 40063949 35319 RELAY AND CONTROL ER 85-8707 40053951 35319 RELAY AND CONTROL ER 85-6207 40063989 35319 RELAY AND CONTROL ER 85-6046 40064056 35319 RELAY AND CONTROL ER 85-6143 40064068 35319 RELAY AND CONTROL ER 85-6402 40064077 35319 RELAY AND CONTROL ER 85-6294 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT A Page | 57 EXECUTION VERSION 40064084 35319 RELAY AND CONTROL ER 85-6860 40064092 35319 RELAY AND CONTROL ER 85-5671 40064t22 35319 RELAY AND CONTROL ER 85-6782 40064133 3s319 REI.AY AND CONTROL ER 85-6985 40054134 3s319 RELAY AND CONTROL ER 85-9431 40064773 35319 RELAY AND CONTROL ER 85-6983 40054183 35319 RELAY AND CONTROL ER 495333 40064787 35319 RELAY AND CONTROL ER3279270 40064200 35319 RELAY AND CONTROL ER 3300340 4006420L 3s319 RELAY AND CONTROL ER 3364403 40064202 35319 RELAY AND CONTROL ER 3379906 40064203 3s319 REI.AY AND CONTROL ER3379922 40054208 35319 RELAY AND CONTROL ER32t4731 40064209 35319 RELAY AND CONTROL ER 3538196 400642LO 35319 RELAY AND CONTROL ER 3576220 400642L7 35319 REI.AY AND CONTROL ER 368702 400642L8 35319 RELAY AND CONTROL ER 368899 4006s3s5 35319 RELAY AND CONTROL wBS TilD/2006/C/ O0tl LO0297 4t,388 WOLV CRK 40070545 3s319 RELAY AND CONTROL TM G M/2005/ C I OO4 I tOO377 7 5 40077424 3s319 RELAY AND CONTROL TZPRI 2007 I CITR2I1003 132 1 40071930 3s319 RELAY AND CONTROL rzP R I 2006 / cl T R4 /10036]^244 40076404 35319 RELAY AND CONTROL T tDM / zOOs I C/03 7/1003 1848 40077955 3s319 REI.AY AND CONTROL ER 85-6990 40077956 35319 RELAY AND CONTROL ER s08929 40077957 35319 RELAY AND CONTROL ER 3358371 40077969 35319 RELAY AND CONTROL TIDMl2004lCl002l02 40078979 3s319 REI.AY AND CONTROL ER 3542123 40078980 35319 RELAY AND CONTROL ER 3664190 40078981 35319 RELAY AND CONTROL ER 3538195 40078982 35319 RELAY AND CONTROL ER 392340 40078983 35319 RELAY AND CONTROL ER 85-6860 40078984 35319 RELAY AND CONTROL ER 85-6218 40084168 35319 RELAY AND CONTROL rzP R I 2017 I c/rR U1004s 36s 40088444 3s319 RELAY AND CONTROL rzPR / 2073 I C lTRll100s060s 40092947 35319 RELAY AND CONTROL lD Al 2077 1 C1004/GOS H E NSB 400t2743 35319 SATELL|TE CLOCK EQ# 354748 CAATS# 107130 40012059 35319 SATELLITE CLOCK EQ# 354749 CAATS# 707729 40053162 3s32t AUTOMATIC TRANSFE R SWITCH ER 85-8887 40048752 35321 BATTERY AND RACK WBS TIDM/2OO3ICIO34 C&D IN 161KV YARD 40064083 3s321 BATTERY AND RACK ER 85-67259 40064093 35321 BATTERY AND RACK ER 85-6571 40064272 35321 BATTERY AND RACK ER 100669 40048153 35321 BATTERY CHARGER wBS TrDM/20O3/C/O34 LAMARCHE rN 151KV YARD 40063920 35321 BATTERY CHARGER ER 85-8677 400642L3 35321 BATTERY CHARGER ER 100669 40057255 35321 POWER PANEL ER 65-60s3 40064745 35323 GENERATOR ER 393801 40064181 3s323 GENERATOR ER 85-7028 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 58 EXECUTION VERSION 40064229 35323 GENERATOR ER 101835 40092926 35325 GROUND GRID f tD Al 20tt/ c 1004/GosH E NsB 40053169 3s32s GROUND GRID SYSTEM ER 85-8887 40055878 35325 GROUND GRID SYSTEM ER 85-7959 400s6323 35325 GROUND GRID SYSTEM ER 85-5942 40056930 3s32s GROUND GRID SYSTEM ER 85-6053 40059029 35325 GROUND GRID SYSTEM ER 394015 40063806 3s32s GROUND GRID SYSTEM ER 85-2019 40063862 35325 GROUND GRID SYSTEM ER 85-7092 40063899 3s32s GROUND GRID SYSTEM ER 85-8513 40064076 3s32s GROUND GRID SYSTEM ER 85-6294 40064094 35325 GROUND GRID SYSTEM ER 85-5571 40064723 3s32s GROUND GRID SYSTEM ER 85-6782 40064175 3532s GROUND GRID SYSTEM ER 85-6983 40065346 3s32s GROUND GRID SYSTEM wB5 Tr r D/2006/CIOOL/ 70029741,388 WOLV CRK 40076400 3s32s GROUND GRID SYSTEM T tDM I 2005 I C 103 7/1003 1848 40063808 35325 INSULATED PLATFORM 10'ER 85-2019 40063963 35325 INSULATED PLATFORM 10.ER 85-6707 40064725 35325 INSULATED PLATFORM 10'ER 85-5782 40050523 3532s INSULATED PLATFORM 14'ER 85-8696 400ss881 35325 INSULATED PLATFORM 14'ER 85-7959 400s6307 3s32s INSULATED PLATFORM 14'ER 85-1332 40056309 3s32s INSULATED PLATFORM 16'ER 85-1332 40039803 35325 INSULATED PLATFORM 4'ER327L749 40050522 35325 INSULATED PLATFORM 4'ER 8s-8695 40053L72 3s32s INSULATED PLATFORM 4'ER 85-8887 40055880 35325 INSULATED PLATFORM 4'ER 85-7959 400s6308 3s32s INSULATED PLATFORM 4'ER 85-1332 40056324 35325 INSULATED PLATFORM 4'ER 85-5942 40057063 3s32s INSULATED PLATFORM 4'ER 85-3370 40063795 35325 INSULATED PLATFORM 4'ER 85-1495 40053848 3s325 INSULATED PLATFORM 4'ER 85-3782 40063962 35325 INSULATED PLATFORM 4'ER 85-5207 40064724 3532s INSULATED PLATFORM 4'ER 85-5782 400s6932 3s32s INSULATED PLATFORM 4'& 6'ER 85-6053 40053171 35325 INSULATED PLATFORM 6'ER 85-8887 40087861 35327 ANIMIAL GUARDS TZP R I 20t3 / ClTR 1/1 0049 965 40092923 35327 CUTOUT POLYMER, 27KV 1OOA r D A/ 2otu cloo4lcosH E NsB 40092946 35327 POWER & CONTROL CABLE 'nD Al zotu cloo4lcosH E NSB 40011940 3s327 POWER AND CONTROL CABLE ER 3269826 40017992 35327 POWER AND CONTROL CABLE CAATS# 358834 40012083 3s327 POWER AND CONTROL CABLE CAATS# 705622 40036599 35327 POWER AND CONTROL CABLE CAATS# 54872 40047970 3s327 POWER AND CONTROL CABLE TIDMl2002lClO7S 40047978 3s327 POWER AND CONTROL CABLE ER 85-8887 40049277 35327 POWER AND CONTROL CABLE TtDMl2003lcl006l07 40049778 35327 POWER AND CONTROL CABLE ER 85-6890 40050504 3s327 POWER AND CONTROL CABLE CAATS# 62842 40050527 35327 POWER AND CONTROL CABLE ER 8s-8596 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 59 EXECUTION VERSION 40055732 3s327 POWER AND CONTROL CABLE wBs il DM/20 0s I cl 073 I 00L 40055885 3s327 POWER AND CONTROL CABLE ER 85-7959 400s5328 35327 POWER AND CONTROL CABLE ER 85-5942 400s5739 35327 POWER AND CONTROL CABLE TIDM12005lc/o34 40056942 35327 POWER AND CONTROL CABLE ER 85-6053 400s7068 35327 POWER AND CONTROL CABLE ER 85-3370 40059032 35327 POWER AND CONTROL CABLE ER 394015 40063853 35327 POWER AND CONTROL CABLE ER 85-4843 40063864 3s327 POWER AND CONTROL CABLE ER 85-7092 40053906 3s327 POWER AND CONTROL CABLE ER 85-8513 40053946 3s327 POWER AND CONTROL CABLE ER 85-8551 40053958 35327 POWER AND CONTROL CABLE ER 85-6207 40064075 35327 POWER AND CONTROL CABLE ER 85-5294 40064082 35327 POWER AND CONTROL CABLE ER 85-5459 40064097 35327 POWER AND CONTROL CABLE ER 85-6671 40064130 35327 POWER AND CONTROL CABLE ER 85-6782 40064146 35327 POWER AND CONTROL CABLE ER 393801 40064L77 35327 POWER AND CONTROL CABLE ER 85-6983 40064782 35327 POWER AND CONTROL CABLE ER 85-7028 40064186 35327 POWER AND CONTROL CABLE ER 503946 40064225 35327 POWER AND CONTROL CABLE ER 381099 40065355 35327 POWER AND CONTROL CABLE w BS Tr r D/200 6 I Cl OO7 h00297 47,388 WO LV CR K 40076403 35327 POWER AND CONTROL CABLE Tr DM/2005/C I O37 I 7003L848 40078985 35327 POWER AND CONTROL CABLE cAATSf 104348 40053202 35327 TERMINATOR (POTHEAD)ER 85-318 40012051 35329 LIGHTING FIXTURE/SYSTEM cAATSf 104348 400s0500 35329 LIGHTI NG FIXTURE/SYSTEM ER 3269826 40053199 3s329 LIGHTING FIXTURE/SYSTEM ER 85-318 40056315 35329 LIGHTING FIXTURE/SYSTEM ER 85-1332 400s6327 35329 LIGHTING FIXTURE/SYSTEM ER 85-5942 40056939 3s329 LIGHTING FIXTURE/SYSTEM ER 85-6053 40057057 3s329 LIGHTI NG FIXTURE/SYSTEM ER 85-3370 40063699 35329 LIGHTI NG FIXTURE/SYSTEM ER 85-8887 40063704 35329 LIGHTI NG FIXTURE/SYSTEM ER 85-6053 400638s0 3s329 LIG HTI NG FIXTURE/SYSTEM ER 85-3782 40063903 35329 LIGHTING FIXTURE/SYSTEM ER 85-8513 40063969 3s329 LIG HTING FIXTURE/SYSTEM ER 85-6207 40064131 3s329 LIGHTING FIXTURE/SYSTEM ER 85-6782 40065351 35329 LIGHTING FIXTU RE/SYSTE M wBS TilD/2006 / Cl }OL/ 700297 41,388 WOLV CRK 40064106 35341 INTERPOSITION CABINET ER 85-6807 40045527 35341 METER wBs r DM/20o3 / c/o3uo7 161 r NTERTTE SCADA tlo 40025656 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# 105656 4002s660 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# 705622 40025654 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# 105588 400s6953 35341 REMOTE TERMINAL UNIT SCADA RTU)CAATS# L6897 WIO 1247 40057945 35341 REMOTE TERMINAL UNIT SCADA RTU)ftDMl200s/clo4s 40065357 35341 REMOTE TERMINAL UNIT SCADA RTU)wBS TilD/2006/ CIOOL/ 100297 47,388 WOLV CRK 40077995 35341 REMOTE TERMINAL UNIT (SCADA RTU) UPGRADE \DM I 2OO4l C/002 lO2 WESDAC D20M E UPGRADE CARD JOINT OWNERSHIP AND OPERATING AGREEMENT_EXHIBIT A Page | 60 EXECUTION VERSION 40039996 35342 EQUIPMENT RACK/SHELF WBS TIDM/2OOO/CIRDF/07 FOR 345KV SOE 40038011 35342 SEQUENTIAL EVENT RECORDER EQ# 362693 CENGI L999 / C1063/00000001 161KV Hathaway lnstr 4003999s 35342 SEQUENTIAL EVENT RECORDER EQ# 362696 wBS TrDM/2000 I ClRDF I 0L 345KV HATHAWAY INST 40063535 36727 CLEARING, GRADING, & FILL MATERIAL (SURF ER 13-1560 GRAVEL 40063549 36207 STATION SERVICE TRANSFORMER ER 13-1550 40063540 36277 CABLE TRENCH ER 380407 40063541 36217 CONDUIT ER 380407 40063633 36279 RELAY AND CONTROL ER 1-5411 40053634 362L9 RELAY AND CONTROL ER 510214 40063647 36279 RELAY AND CONTROL ER 380407 40090729 35225 GROUND GRID DZAF I 20t3 I C/00 1 /GOSH E N 7 40063558 3622s GROUND GRID SYSTEM ER 13-1560 40063643 36225 INSULATED PLATFORM 4'ER 380407 40063644 36225 INSULATED PLATFORM 6'ER 380407 30054527 39005 BUILDING - COTTAGE ER 85-318 30059607 39011 SEWER SYSTEM ER 3325386 COTTAGE #2 30001166 39405 GENERAL MASS UNITIZATION 1998 BALANCE CONVERSION 30001158 39405 GENERAL MASS UNITIZATION 1998 BALANCE CONVERSION 30008365 39s0s GENERAL MASS UNITIZATION 1998 BALANCE CONVERSION 30008367 39505 GENERAL MASS UNITIZATION 1998 BALANCE CONVERSION 30008369 39s0s GENERAL MASS UNITIZATION 1998 BALANCE CONVERSION 3006324s 39700 cY20t2 GOSHEN SUB COMM EQU|P (C/C 13696) 30064754 39700 cy2013 GOSHEN 161SUB COMM EQUrp (C/C 13696) 30064756 39700 cY2013 GOSHEN 345 SUB COMM EQUrp (C/C 13696) 3006ss23 39700 cY20L4 GOSHEN 161COMM EQU|P (C/C 13696) 30066457 39700 cY2074 GOSHEN 151COMM EQU|P (C/C 13696) TtD Al zltu C/004/GOSH E NSB 30015435 39705 ALARM RELAY PANEL ER 100387 300s8797 39705 ALARM RELAY PANEL ER 101623 30056984 39705 AUDIO ALARM AND CONTROL-COM BUSTIBLE GAS DETECTOR ER 393827 GAS DETECTOR/MONTTOR 30048499 39705 COMM. STATION ALARM CONTROL RTU - DSX wBS TilD/2006/C/OOU L00297 4L,388 WOLV CRK 30054515 39705 COMM. STATION ALARM CONTROL RTU . DSX DZP R / 2008 I C / O02 I L003s62s 30044697 397L7 RADIO CONTROL SYSTEM*See Long Descr (Alt Cntl Ctr) CAATS# 76897 WlO 1247 30015446 39777 SCADA REMOTE RTU EQ# 33T679 CAATS# LO42I8 10046739 39774 CISCO SYSTEMS MULTI SERVICE NETWORK ROUTERS cficlzoo1lcl40sl02HW rNcL HW RAcKs & SYSTM CA 30043225 39774 DATA NETWORK CONNECTION TO CORP NETWORK DZP R I 2O0s / C I DUg I 100287 t3 30042944 39714 MODEM CAATS# 105511 30033439 397L4 MODEM - UPGRADE EQUIPMENT CAATS# 65545 300s7021 39777 FIBER OPTIC CABLE - ADSS T|DMl2004lC/002/O2 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 6l EXECUTION VERSION 300s7023 39777 FIBER OPTIC PATCH PANEL TIDM/2OO4/Cl0O2102 30048s06 39777 FIBER OPTIC TRANSMITTER/TRANSCEIVER EQ# 374045 wBS TilD/200 6/C/ OOT{ LOO297 47,388 WOLV CRK DMX 30057022 397L7 FI BER OPTIC TRANSM ITTER/TRANSCE IVER EQ# 38s788 T|DM I 2OO4 I Cl 0O2 I 02 D MX H C 30054615 39723 DIGITAL DEHYDRATOR SYSTEM DZP R / 2008 I C / 002 / 7003s62s 30054617 39723 RADrO (RF) CONSTELT-ATTON HARRTSPSTRATEX EQ# 383334 DZP R I 2008 I C / 0O2 / LOO3s62s 30015401 39726 CROSS CONNECT TREE/FRAME ER 3431160 30015437 39726 CROSS CON NECT TREE/FRAM E ER 100387 30054618 39726 EQUIPMENT RACK/SHELF DZP R I 2008 I C I 002 I 7003s62s 300s7024 39726 EQUIPMENT RACK/SHELF TIDMl2004lClOO2l02 30044598 39726 EQUIPMENT RACK/SHELF*See Long Descr (Alt Cntl Ctr) CAATS# 76897 WlO 7247 30053580 39726 TELEPHON E PROTECTOR BLOCKS ER3726213 30053681 39726 TELEPHONE PROTECTOR BLOCKS- ADDTL COSTS ER3726273 30054404 39729 DIGITAL CHANNET DZPR I 2008 I C I O02 I 70035624 300s4808 39729 DIGITAL CHANNEL TtDMl2oos I cl 037 I LOO3L848 + 10032851 30057025 39729 DIGITAL MULTIPLEX SYSTEM r'DM/2004lcloo2l02 coAsrcoM 24 sLor sHELF 30059171 39729 DIGITAL MULTIPLEX SYSTEM - ATLAS 550 & coAsTcoM TrD l2OO7 I C1001/WCGSP2DA DAF 300s4405 39729 SYNCHRONIZING STANDARD DZP R / 2008 / C / 002 /1OO3s624 300s4812 39732 PLC TRANSMITTER/RECEIVER SET EQf 385786 Tr DM/200slc I 037 I LOO3L848 30054521 39735 AC POWER TRANSFER PANEL DZP R I 2008 / C / O02 / L003s52s 30054619 39735 BATTERY AND RACK DZPR / 2008 I C / OO2 I LO03s62s 30015425 39735 BATTERY AND RACK 48VDC ER 3713880 C&D 17sA 3003302s 39735 BATTERY AND RACK EQ# 331355 CAATS# 65746 30033025 39735 BATTERY CHARGER CAATS# 65746 30048495 39735 BATTERY CHARGER 48VDC wBs Til D/2006/ Cl 007/ 700297 4L,388 WOLV CRK 300s4620 39735 BATTERY CHARGER SAGEON 161KV YARD EQ# 383338 DZPR I 2OO8 / C / OO2 / LOO3s62s 30057028 39735 GENERATOR TRANSFER PANEL DZP R I 2070 I C/D R9/10039834 30058802 39735 UNINTERRUPTIBLE POWER SU PPLY (UPS)ctrcl2006lcl4t2/210 3003303s 39738 Analoe Telemetrv Receiver wBS DSPT/1999 I Cl O22 I OLz 30043124 39738 PANEL-RELAY AND CONTROL CAATS# 101083 30015440 39738 PROTECTIVE RELAYING RECEIVER ER 100387 30057020 39738 PROTECTIVE RELAYING TERMINAL RFL 9745 EQ# 385787 T tou I zOOs I C /0 3 7/1003 1848 30075442 39738 PROTECTIVE RELAYI NG TRANSM ITTER ER 100387 30015407 39738 TELEM/FSK RECEIVER ASSEMBLY ER 3431160 3001s409 39738 TELEM/FSK TRANSM ITTER ASSEM BLY ER 3431160 30057027 39738 TELEM/TRANSMITTER OR RECEIVER TERMINAL ER3527637 2ND BUS VOLTAGE TELEMETRY POINT 30051553 39741 INTERNET PROTOCOL (IP) TELEPHON E SYSTEM ctrcl2006/c(4721270 30015421 39744 CALL SEQUENCER ER 3541547 30015413 39744 PARTY LINE SELECTOR ER 3394145 30058371 39744 TELEPHONE LINE SHARING SWITCH TIDMl2004lcloo2lo2 30048s09 39744 TELEPHONE SWITCH RS-232 wBs r r D/200 6 / cl oot / 700297 47,388 WO LV CR K JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 62 EXECUTION VERSION 300s4623 39747 (2)ANTENNA SYSTEMS - 5'ozP R I 2008 I c I o02 h0035625 30054624 39747 (2) RADOMES 5'TELGAR DZP R I 2008 I C I OO2 /1}03s62s 300s4625 39747 (2)WAVEGUIDE DZP R I 20 08 I C I OO2 I 7003 s 62s 30032828 39747 ANTENNA SYSTEM CAATS# 64872 30054627 39747 GROUNDING GRID DZP R I 2008 I C I OO2 I 7003s62s 300s462s 39747 TOWER FOUNDATTON RE-BUTLD (EQ #36249tI DZP R I 2008 I C I 002 I 7003s62s 30055188 39753 AIR CONDITIONER - FREE STANDING OUTSIDE A/C SYSTEM uP R I 2009 I C I TRg/1 0038873 30058372 397s3 UNDERGROUND ENCLOSURE - VAULT TZP R I 2009 I C lTRgl10038873 Location:068194 - Summer Lake Switchyard, OR 40048909 3s201 CABLE TRAY TSOM/2003/ClO04 400s3672 35201 DUCT ER 31-21397-184 40053667 3s309 COMPRESSOR, GAS ER 31-21397-184 40048910 35317 CABLE TRENCH TSOM/2003/C/004 40003362 35319 RELAY AND CONTROL CAATS# 60808 40003370 35319 REI.AY AND CONTROL CAATS# 62306 40003378 35319 RELAY AND CONTROL CAATS# 52305 40048914 35319 RELAY AND CONTROL TSOM12003lClO04 40070460 35319 RELAY AND CONTROL roRMl2004lcl009l01 40085750 3s319 RELAY AND CONTROL TZKLI 207u C /004/ 1004388s 40086635 35319 RELAY AND CONTROL TZBE I 2072 I C lT U2 I 10047 64L 40091006 35319 RELAY AND CONTROL DA TORE/20131C/oo1/100s1263 DA 40003374 35319 SATELLITE CLOCK CAATS# 52305 40053663 35321 BATTERY AND RACK ER 31-21397-184 #3 TCX-580 40053664 35321 BATTERY AND RACK ER 31-21397-184 #4 TCX-580 40085149 35327 BATTERY CHARGER EQf 393638 rzBE I 20L7 I C lT R5/10044938 40085148 35321 BATTERY CHARGER EQ# 393639 lzBE I 2077 I C lTRsl10044e38 40048912 35325 GROUND GRID SYSTEM TSOM/2OO3/Cl004 400033s8 35327 POWER AND CONTROL CABLE cAATSf 60808 40048913 35327 POWER AND CONTROL CABLE TSOM/2003/C/004 40053677 35327 POWER AND CONTROL CABLE ER 31-21397-184 40070459 35327 POWER AND CONTROL CABLE roRMl2004lcloo9lo7 40085749 3s327 POWER AND CONTROL CABLE TZKL I 207U C 1004/10043 88s 400264t5 35341 RELAY AND CONTROT ER 91-45604-6303 40026407 35341 REMOTE TERMINAL UNIT (sCADA RTU)ER 20286-075 40026477 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER22892-9I LANDIS & GYR 40003366 35342 EQUIPMENT RACK/SHELF CAATS# 52305 30063479 39700 cY2072 COMM EQUTPMENT lClC72723l TZKLI 2O7L / Cloo4l1004388s 30065848 39700 cY2074 SUMMER LAKE COMM EQU|P gClC L27231 30050474 39700 MODEM CAATS# 62306 30060475 39700 MODEM CAATS# 62306 300s1499 39705 REMOTE TERMINAL UNIT (SCADA RTU)TORMl2004lClO09l01 30051500 39777 FO OPTICAL/E LECTRICAL CONVERTE R TORMl2004/Cl009107 30038166 39777 SUMMER LAKE BPA SUB FO LINK REPEATER DYMEC 5844 TORM/20041C/012103 30038167 39777 SUMMER LAKE SUB SUB FIBER OPTIC CABLE (JUMPERS) TORMl2004/ClOt2l03 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 63 30019597 39723 RADIO (RF)CAATS# s9s02 30019707 39723 RADIO (RF)CAATS# 50684 C|AC 30051501 39726 EQUIPMENT RACK/SHELF TORMl2004lClOO9/07 30039314 39726 SUMMER LK COMMUNICATIONS RACK ER 45557-6301 30019711 39729 DIGITAL MULTIPLEX SYSTEM CAATS# 706747 30051502 39729 DIGITAL MULTIPLEX SYSTEM roRMl2004/c/009107 30038158 39729 SUMMER LAKE DIGITAL MUX COASTCOM UNIVERSAL 24 SLOT TORMl2004/Cl0L2l03 30038169 39729 SUMMER I.AKE DIGITL MUX CHANNEL, CoASTCOM 30011-102 TORM/2004/Cl072103 30051s04 39732 PLC TRANSMITTER/RECEIVER SET 10 WATT TORMl2004lC/009107 30039322 39732 SUMMER LK COUPLING CAPACITOR TELEMETRY EQUIP ER 51384-6570 30036712 39735 BATTERY AND RACK TSOM/2003/C/005 30019701 39735 POWER SUPPLY CAATS# 50584 C|AC 3003815s 39738 SUMMER LAKE BPA SUB RELAY/CONTROL PANEL roRM/20041c/0t2103 30038164 39738 SUMMER I.AKE MODULE REMOTE I/O SEL 2594 TONE EQUIP TORM/20041C/OLZ/03 30038163 39738 SUMMER LAKE TONE RFL 9745 RELAY RECEIV/TRANSMITTER roRMl2004/c/o72/03 30039313 39738 SUMMER LK RTU, 5100, I.ANDIS & GYR ER 45557-6301 30019699 39738 XMITTER, RECEIVER, 125 VDC, RFL 6750 CAATS# 60808 C|AC 3001969s 39747 ANTENNA SYSTEM CAATS# 59502 30019703 39747 ANTENNA SYSTEM CAATS# 50684 C|AC Location:068190 - Burns Reactive Station, OR 301722 35010 FEE LAND ER 31-16546-184 SEC 18 T225 R31E 40046458 35201 BUI LDI NGS (EXPLOSIVES STORAGE)TORM/200LlClOt7 40090025 35201 BUILDINGS (TRAILER)TZBE I 20L3 I C lTM3/100s ls2 1 40090026 35201 BUILDINGS (TRAILER)rzBE I 2073 I ClTM3/100s 1s2 1 40003444 35201 CONTROL BUILDING ER 31-16546-184 40003396 3s205 AIR CONDITIONER (EVAPORATIVE OR REFRIG.) ER 31-16546-184 4009000s 35205 HVAC (HEATER)TZBE / 20 74 / C lTR6110052 2 8 1 40003432 35207 LOAD CENTER ER 31-16546-184 40076347 35209 SECURITY SYSTEM w BS TZ BEI20O7 I Cl 0O2 I 10033499 ETC 40003420 3s213 PLUMBING SYSTEM ER 31-15546-184 40003452 3s213 WATER HEATER ER 31-15546-184 40003428 35213 WELL ER 31-16546-184 40003400 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-16546-184 40089799 35227 CLEARING, GRADING, & FILL MATERIAL (SURF TZBEl20t3lClOO2 400034s6 35227 CULVERT (FOR YARD DRAINAGE SYSTEM)ER 31-16546-184 40003408 35227 FENCE ER 31-16546-184 40065680 3s227 FENCE CAATS W/O 4870 40070759 35227 FENCE ER 31-16546-184 40070785 35227 OIL STORAGE TANK ER 31-16546-184 40072629 35227 ROADWAY, INC. CLRING, GRADING, SURFACE ER 31-16546-184 40003424 35227 SIGN ER 31-16546-184 40083194 35227 SORBWEB BERM DORE / 207L I Cl 830 / 1O04s07 3 SPCC 40003404 35227 UNDERGROUND ENCLOSURE (MANHOLE)ER 31-16546-184 EXECUTION VERSION JOINT OWNERSHIP AND OPERATING AGREEMENT-EXHIBIT A Pagel64 EXECUTION VERSION 40070760 35229 FLOODLIGHTS ER 31-15545-184 40003412 35229 LIGHTING FIXTURE/SYSTEM ER 31-15546-184 40070781 35301 STATION SERVICE TRANSFORMER ER 31-16546-184 40070773 35315 POWER FUSE MOUNTING 14.4KV ER 31-16546-184 4007075t 35317 CABLE TRENCH ER 31-15546-184 40070753 35317 CONDUIT ER 31-16546-184 40076417 35319 ANNUNCIATOR TZBE I 2007 I C lr U2 I 7003 167 4 40070750 3s319 CABINETS ER 31-16546-184 40070742 35319 OSCILLOGRAPH ER 31-323-91-5089 40003274 35319 RELAY AND CONTROL cAATSf 60585 40049782 3s319 RELAY AND CONTROL TORM/2004/Cl077 40070508 35319 RELAY AND CONTROL roRM/2OO4/C/O09l03 40076238 35319 RELAY AND CONTROL WBS TORM/2 OO4I CIOO2I 06 BRI DGE R RAS 40076478 3s319 RELAY AND CONTROL TZBE I 2007 I C lr U2 i1003t67 4 40077762 35319 RELAY AND CONTROL TZBE I 2009 I C lTR2l10039 1 78 40077976 35319 RELAY AND CONTROL wBS TZ BE/2007 I CIOOT| 70035772,70032860 40081902 3s319 RELAY AND CONTROL TZBE I 20 70 I C lT R2 I 10 0 40822 40083333 35319 RELAY AND CONTROL rzBE I 2011 I C lrR 1/10045 16 1 40040404 3s319 SATELLITE CLOCK wBs ro RM/2 00t / cl oot / 0t 40070744 35319 SATELLITE CLOCK ER 31-323-91-6089 40070746 35321 AUTOMATIC TRANSFER SWITCH ER 31-16546-184 40070747 3s321 BATTERY AND RACK ER 31-16545-184 40068811 35321 BATTERY CHARGER TORM/2005/C/014 AMERTCAN BATTERy CHARGING 40070748 35321 BATTERY CHARGER ER 31-16546-184 40070762 3s323 GENERATOR ER 31-15546-184 40070763 3532s GROUND GRID SYSTEM ER 31-15545-184 40049787 35327 POWER AND CONTROL CABLE TORMl2004lClOtT 40070774 35327 POWER AND CONTROL CABLE ER 31-16546-184 40076346 35327 POWER AND CONTROL CABLE wBs rzB E/2007 I cl 002 I 70033499 ETC 40070770 3s329 LIGHTING FIXTURE/SYSTE M ER 31-15545-184 40026395 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# 60585 40078993 35341 REMOTE TERMTNAL UNrT (SCADA RTU) EQ# 380030 T ORM / 2oo4 I Cl oo9 I 03 G E D-20 40070779 35341 SEQUENCE OF EVENTS RECORDER ER 31-16546-184 40049783 35341 SEQUENCE OF EVENTS RECORDER S/N 18891 EQ# 368602 TORMI2OO4IC/o17 HATHAWAY DFR 30062754 39700 cy2011 BURNS REACTOR COMM EQU|P (C/C L3746) 30064760 39700 cy2013 BURNS REACTOR COMM EQUIP (C/C 737451 30051600 39708 FILTER SYSTEM DZBE I 2007 I Cl 0O3 I 100317 29 TE LECT DUAL FE E D FIL 30019659 39777 MAS SCADA REMOTE RADIO CAATS# 106281 30054747 39774 DATA NETWORK ROUTER - CISCO 2811 wBs rz BEl2007 I cl oo2 / 10033499 ETC 30051601 39774 DATA SWITCH - ESS DZBE / 2007 I Cl 003 / 7003t7 28 30051602 39723 DEHYDRATOR SYSTEM DZBE I 2007 I C /003/1003 1728 300s1503 39723 RADIO (RF) TO BURNS BUTTE EQ# 377737 DZBE I 2007 I C I OO3 I 7003 77 28 30051604 39729 DIGITAL MULTIPLEX SYSTEM EQ# 377733 DZBE 12007 I Cl OO3 I 10037729 COASTCO M JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 65 EXECUTION VERSION 30051527 39732 PLC TRANSMITTER/RECEIVER SET 10 WATT roRMl2004lclo09l03 30051526 39732 PLC TRANSMITTER/RECEIVER SET 50 WATT TORM/20041C/009/03 3005160s 39735 BATTERY AND RACK, 48V EQ# 377734 DZBE 12007 I Cl 003 I 100377 29 C&D MSE N D U R 30051606 39735 BATTERY CHARGER EQ# 377739 DZBE / 2007 I Cl OO3 I LOO377 29 VALAR E 300196ss 3974\COMPUTERIZED DIAL EXCHANGE CAATS# 51698 30051607 39747 ANTENNA SYSTEM 6 FT DZBE I 2007 / C I 003 / 7003 L7 29 30051608 39747 TOWER - 30 FT DZBE / 2007 / C / 003 I tOO3 77 29 30062755 397s0 CY2O11 BURNS REACTOR MOBILE RADIO (C/C L3746l, Location: 085050 - Threemile Knoll Substation, !D 304274 3s010 FEE LAND THREEMILE KNOLL IDCB-0151 TtoM I 200s I cl o37 / L0033667 40076973 35201 CONTROL BUILDING WBS Tl DM/20 os I Cl O37 I 7003 1846 + 40077028 35201 METAL CABINET WBS Tl DM/2OO\/ C/037 I tOO3 1846 + FILING CABINE 40077040 35209 SECURITY SYSTEM EQ# 382918 WBS TIDM/20osl Cl 037 I 7003 1846 + 400770t0 35219 FOUNDATION AND SUBSTRUCTURE WBS TIDM/20051 ClO37 I t0031846 + CONTROL BUILD 40076970 35227 CEMENT CURB WBs TIDM/20O\/C/037110031846 + INSIDE SUB 40076971 35227 CLEARING, GRADING, & FILL MATERIAL (SURF WBS Tl D M/20O5 / Cl 037 I LOO3 1846 + 40083599 35227 CLEARING, GRADING, & FILL MATERIAL (SURF TZPR I 2OO9 I C/OO 1/3 M LTRAN S 40077009 35227 FENCE WBS TIDM/200s I Cl 037 I 7003 1846 + 40077038 35227 ROADWAY, INCL CLRING, GRADING, SURFACE WBS Tl DM/2OOi I Cl 037 / t003t845 + 40077042 35301 STATION SERVICE TRANSFORMER WBS TIDM/20O5/C10371tOO31846 + NO DETAIL INF 40077043 35301 STATION SERVICE TRANSFORM ER TtoM/20OslC/O37/t0O3t845 + NO lNFo IDAHO POW 40083511 35301 STATION SERVICE TRANSFORM ER TZP R I 2OO9 I C IOO U3 M LTRA N S 40076969 35377 CABLE TRENCH WBS Tl DM/200s I clo37 I 7003 1846 + 40075972 3s377 CONDUIT WBS Tl DM/200s / C/037 I 7003 1846 + 40077045 35377 STORAGE CABINET WBS TIDM/2005 I C1037 i1003 1846 + 40076947 35319 ANNUNCIATOR WBS Tl DM/2005 I clo37 I 7003 1846 + 40077008 35319 DIGITAL FAULT RECORDER EQf 383154 WBS Tl DM/20O5 / C/ 037 I t0O3 1846 + 40087925 35319 DIGITAL RELAY TRIPPING DEVICE TWyO/20t7lCl004/TMKDTG (SEL 2411) 40077029 35319 METERING PACKAGE (CTIW) 345KV WBS Tl D M/20 Os / clo37 I to13 1846 + 40078954 35319 METERING PACKAGE (CTIW) 345KV wBS Tr D M/20 0s I Cl O37 I 100334s3 40076524 35319 RELAY AND CONTROL w Bs Tr D M/20 0s / cl 037 / 70033453 40077036 3s319 RELAY AND CONTROL W BS Tl DM/2OOi I Cl 037 I to03t846 + 40077993 35319 RELAY AND CONTROL wBS TJ BM/2004 I Cl 002 I 70035564 RAS 40090247 3s319 RELAY AND CONTROL TZRB I 2074 I ClT R2 I 700s2044 40077039 35319 SATELLITE CLOCK EQ# 382426 WBS Tl D M/20 os I cl o37 / 7003 1846 + 40076948 35321 AUTOMATIC TRANSFER SWITCH WBS TIDM/20O5 I ClO37 / to03 1845 + 40076949 35321 BATTERY AND RACK EQ#376225 WBs Tl DM/20O5 / Cl 037 / 7003 1846 + 40076950 3532r BATTERY CHARGER EQ# 376224 WBS Tl DM/200s / ClO37 I 70031846 + 40077072 35323 GENERATOR WBs Tl DM/20O5 I C1037 I 7003 1846 + 40077073 35325 GROUND GRID SYSTEM WBS TIDM/2005 / C/O37 I 7OO3 1846 + 40076523 35327 POWER AND CONTROL CABLE w BS Tr DM/200s / Cl 037 /100334s3 40077033 35327 POWER AND CONTROL CABLE wBS Tl DM/20Oi / Cl 037 I L0O3 1846 + 40077992 35327 POWER AND CONTROL CABLE wBS TJ BM/2004/ Cl OO2 / 7OO35564 RAS 40077025 3s329 LIGHTING FIXTURE/SYSTE M wBS TIDM/200s I ClO37 110031845 + 40085832 35341 HMI AUTOMATION ((SOFTWARE)TZPR I 20tt I C lTR6/10045 185 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 66 EXECUTION VERSION 40077037 35341 REMOTE TERMINAL UNIT (SCADA RTU)WBS Tl DM/200s I C1037 h003 1846 + 40077047 35341 SEQUENCE OF EVENTS RECORDER WBS Tl DM/200s I C1037 / 7003 1846 + 30054302 39700 CY2O72 THREEMILE KNOLL SUB COMM EQUIP (cc 13696) 30064757 39700 CY2O13 THREEMILE KNOLL SUB COMM EQUIP (c/c 13595) 300ss318 397\4 DATA NETWORK ROUTER EQ# 382416 w BS Tr D M/20 0s I Cl 037 I L0033277 CTSCO 28LL 30055078 39774 DATA NETWORK SWITCH WBS TIDM/200s / C/O37 / t003 1846 + 30055317 39774 DATA NETWORK SWITCH wBS Tr D M/20 0s I Cl O37 I 10033277 ETHERSWITCH 30055084 397L4 MODEM WBS Tl DM/20O5 / cl o37 / 7oo3 1846 + 30055320 397t7 FIBER OPTIC CABLE - ADSS wBs fl DM/20Os / Cl 037 / 70033277 300ss321 39777 FIBER OPTIC PATCH PANELS wBs Tr DM/2005 I Cl 037 I 70033277 30055081 39777 FrBER OPTTC/TRANSMTTTER RECETVER SET EQ#382477 WBS TIDM/20oslc/037 /t0O31845 + DMx 300ss088 39720 POWER QUALITY MONITOR WBS Tl DM/200s / c/037 / !0O3 1845 + 30055080 39726 EQUIPMENT RACK/SHELF WBS TIDM/200s I C1037 i1OO3 1846 + 300ss079 39729 DIGITAL MULTIPLEX SYSTEM EQ# 382418 WBS TIDM/2005 I ClO37 I 10031845 + 1003286s 30055070 39735 BATTERY AND RACK EQ# 382414 WBS Tl D M/20os I clo37 I L003 1846 + 30055071 39735 BATTERY CHARGER EQ# 382415 WBS Tl D M/20 0s I Cl O37 I tO03 1846 + 300ss069 39738 AUDIO-TONE PROTECTIVE RELAY TERMINAL RFL 9745 WBS Tl D M/20 0s / cl o37 ho03 1846 + 30055085 39738 PANEL-RELAY AND CONTROL FOR RTU WBS Tl DM/2OOi I C1037 / 1003 1846 + 300ss090 39744 TELEPHONE LINE SHARING SWITCH WBS Tl DM/2OO1 I cl 037 / 7oo3 1846 + 300s8659 39744 TELEPHONE LINE SHARING SWITCH T JBM I 2004 I Cl 002 I LOO3ss64 30055089 39758 SYNCHRONOUS TIMER EQf 382426 WBS Tl DM/2005 I ClO37 / 7OO3 1846 + Location: 013209 - Bie Grassv Substation. lD 300955 35010 FEE LAND - BIG GRASSY IDJI.OO4O CAATS# 700974 3s0209013209 35020 ACCESS ROAD RIGHT OF WAY CAATS# 100974 40051667 35201 CABLE TRAY CAATS# 700974 40051673 35201 CONTROL BUILDING CAATS# 700974 40051699 35205 UNIT HEATER cAATSf 100974 4005L727 35279 FOUN DATION AND SUBSTRUCTU RE CAATS# 7OO974 FOR CONTROL BUILDING 4005\671 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF CAATS# 700974 40085597 35227 CLEARING, GRADING, & FILL MATERIAL (SURF TZPR{2009 I C/003/BGRASUB 40051675 35227 CULVERT (FOR YARD DRAINAGE SYSTEM)CAATS# 700974 40057677 35227 FENCE CAATS# 700974 40085599 35227 FENCE/GATE rzPR/ 2009 I c/003/BG RAS U B 40051695 35227 SIGN CAATS# 100974 40051668 35317 CABLE TRENCH CAATS# 700974 40085595 353L7 CABLE TRENCH TZPR I 2OO9 I C /OO3/BG RAS U B 40057672 353L7 CONDUIT CAATS# TOO974 40085598 35317 CONDUIT rzP R I 2009 I c/003/B G RAS U B 40051698 35317 MICROWAVE TOWER CAATS# 700974 40051660 35319 ANNUNCIATOR 12PT CAATS# 100974 40012339 35319 RELAY AND CONTROL CAATS W/O BGSY94RE 56850 400482L3 35319 RELAY AND CONTROL flDMl2003lClO30/07 40051694 35319 RELAY AND CONTROL CAATS# 100974 40081301 35319 RELAY AND CONTROL TZP R I 2009 I C I OO2 I 1.0038044 40082329 35319 RELAY AND CONTROL TZP R / 2008 I C/TR2 /1003s 80s JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT A Page | 67 EXECUTION VERSION 40085622 35319 RETAY AND CONTROL rzP R I 2009 / c/003/BG RAS U B 40090276 35319 RELAY AND CONTROL TZP R / 2073 I C lr R2 I 10049986 40051661 3s321 BATTERY AND RACK 125VDC CAATS# 700974 ALCAD 40051662 35321 BATTERY CHARGER CAATS# LOO974 25A 40051679 35325 GROUND GRID SYSTEM CAATS# L00974 4008s501 35325 GROUND GRID SYSTEM TZP R I 2009 / C/00 3/BG RAS U B 40051680 3s325 INSULATED PLATFORM 6'cAATSf !00974 40089316 35327 ANIMAL GUARDS TZP R / 2OO9 I C/003/Vr B RTN 40051692 35327 POWER AND CONTROL CABLE CAATS# 700974 40085506 35327 POWER AND CONTROL CABLE TZPRI 200s / C1003/BG RASU B 40051687 35329 LIGHTI NG FIXTURE/SYSTE M CAATS# 700974 40085505 3s329 LIGHTI NG FIXTURE/SYSTEM TZP R I 2OO9 I C IOO3lBG RAS U B 400s1685 35341 INTERPOSITION CABINET CAATS# \00974 4005169s 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# 100974 MG 30053295 39700 CY2O11 BIG GRASSY COMMUNICATION EQ (c/c 13688) TZPRI 2OO9 / ClOO3/BG RASU B 30065743 39700 cy2074 coMM EQUTPMENT (BrG GRASSY/C 13596) TZP R I 2013 / C lTR2l10049986 30015863 39705 COMM. STATION AI.ARM CONTROL RTU CAATS# 102273 30015859 39774 MODEM CAATS# LO2273 30015867 39723 RADIO (RF)CMTS# tO2273 30015875 39726 EQUIPMENT RACK/SHELF CAATS# 702273 30046440 39735 COMM BATTERY AND RACK TIDM/20051C/045 East Penn Unisy IIAGM seale 30045441 39735 COMM BATTERY CHARGER TIDM/2005/C{O46 48 volt Battery Charser Syste 30015877 39744 PARTY LINE SELECTOR CAATS# LO2273 30015879 39744 TELEPHONE LINE DATA CAATS# 702273 30015865 39747 ANTENNA SYSTEM CAATS# 702273 3001s869 39747 RADOME cAATSf 102273 30015871 39747 TOWER CAATS# 702273 30015873 39747 WAVEGUIDE CAATS# tO2273 30041045 397s3 AIR CONDTTIONER (EVAPORATTVE OR REFRIG.) T|DMl2004lC/076 Location: 064003 H urricane Substation, OR 301046 35010 FEE LAND JV 98 301047 3s010 FEE LAND ,tv 98 40001602 35201 CONTROL BUILDING ER 31-8240-183 40001511 35201 EMERGENCY LIGHTING SYSTEM ER 31-8240-183 40001638 35201 EMERGENCY LIGHTING SYSTEM ER 3145565-4110 40089325 3s205 HVAC (AIR CONDITIONER)TZW A I 2073 I C lr R6 /1O0sO607 400910s8 35205 HVAC (ArR CONDTTTONER) EQ#403884 rzww I 20 L4 I c/TR6/1 005 3 583 40001608 35205 UNIT HEATER ER 31-8240-183 40001599 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-8240-183 40001623 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-16685-183 40001629 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-15685-183 40001635 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-45565-4110 4000160s 35227 FENCE ER 31-8240-183 40059727 35227 FENCE CAATS wO 4909-40920 40001625 35227 GATE ER 31-16685-183 40059011 35227 ISOLATION LINK PANEL CAATS# 61383 JOINT OWNERSHIP AND OPERATING AGREEMENT-EXHIBIT A Page | 68 EXECUTION VERSION 40001620 3s227 LOAD CENTER ER 31-8240-183 40001677 35227 ROADWAY ER 31-8240-183 40001614 35227 SIGN ER 31-8240-183 40090549 3s227 SORBWEB BERM DORE I 20L4 I C/830/ 100s 195 I 40019081 35301 STATION SERVICE TRANSFORMER 25KVA JV 98 40019126 35377 CONDUIT ER 31-8240-183 40079242 35377 CONDUIT ER 31-45565-4110 40019286 35317 CONDUIT ER 31-52228-4310 40019102 35317 UNIT HEATER ER 31-8240-183 40079774 35319 ANNUNCIATOR ER 31-8240-183 40019150 3s319 REI.AY AND CONTROL ER 31-8240-183 400L9270 35319 RELAY AND CONTROL ER 31-45598-4077 40019302 35319 RELAY AND CONTROL ER 31-52228-4310 40079188 35319 RELAY AND CONTROL ER 31-60175 40056961 3s319 RELAY AND CONTROL . JLs METER cw Es / 20041 c I 07 L I L0026626 J LS M ETE RS 40088248 35327 BATTERY AND RACK 125VDC eq# 398360 TZW W I 2073 lClTRs/10048s84 40088249 35321 BATTERY CHARGER EQ# 4OOO34 rzww I 2073 lclTR5/10048584 40019098 35323 GENERATOR ENCLOSURE ER 31-8240-183 40079775 3s325 GROUND GRID SYSTEM ER 31-8240-183 40079189 35325 GROUND GRID SYSTEM ER 31-45565-4110 40079190 35325 GROUND GRID SYSTEM ER 31-52228-4310 40019089 35329 FLOODLIGHT ER 31-8240-183 40019085 35329 LIG HTI NG FIXTURE/SYSTEM ER 31-8240-183 40019106 35339 FIRE EXTINGUISHER ER 31-8240-183 40025848 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 3145598-4077 40058735 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# 63735163747 4002s836 35343 EQUIPMENT RACK/SHELF ER 31-45598-4077 30060500 39700 MODEM ENCLOSURE ER 31-45598-4077 30060499 39700 TRANSLATOR CABINET ER 31-45598-4077 Location: 085023 - Jefferson Substation, lD 301873 35010 JEFFERSON T6T/69 KV SUB LAND IDJI-0034 ER 85-7780 40077s67 3s201 CONTROL HOUSE ER 85-7780 40003928 3s201 ROOF CAATS #105119 40068043 35213 WELL ER 85-7780 40051981 35227 cLEARtNG, GRAD|NG, & FtLL MATERTAL (SURF ER 85-8534 40077563 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-8138 40078955 35227 FENCE ER 85-7780 INTERIOR FENCE AROUND REACTORS 40077s80 3s227 FENCE & GATES ER 85-8138 40089462 35227 TREX BERM DZP R I 20 13 I C I 7 00 I 7005 1026 40077606 3s301 STATION SERVICE TRANSFORMER ER 83-8355 40051983 3s317 CABLE TRENCH ER 85-8534 40068066 353L7 CABLE TRENCH ER 85-7780 40077566 35317 CABLE TRENCH ER 85-8138 40068067 35317 CONDUIT ER 85-7780 40077659 35377 CONDUIT ER 101131 40048224 3s319 RELAYAND CONTROL TtDMl2003lclo32/o7 400s1990 35319 REI.AY AND CONTROL ER 85-8534 40051991 35319 RELAY AND CONTROL ER 85-8534 40068035 35319 REI.AY AND CONTROL ER 85-7780 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 69 EXECUTION VERSION 40068093 3s319 RELAY AND CONTROL ER 85-7780 40077586 35319 REI.AY AND CONTROL ER 85-8138 4007760s 3s319 RELAY AND CONTROL ER 83-8355 400776L2 3s319 RELAY AND CONTROL ER 85-5403 40077629 35319 RELAY AND CONTROL ER 85-5570 40077633 35319 REI.AY AND CONTROL ER 8s-5892 & 8s-5905 40077647 35319 RELAY AND CONTROL ER 393587 40077653 35319 REI.AY AND CONTROL ER 383764 40077664 3s319 RELAY AND CONTROL ER 101131 40048363 35321 BATTERY AND RACK 125VDC wBs DzpR/2004 lcl DRs I 7002 182s C&D 40048364 35321 BATTERY CHARGER 135VDC wBs DzpR/2004 I cl DRs I 1002782s C&D 3sA 40068100 3s325 GROUND GRID SYSTEM ER 85-7780 40058101 35325 GROUND GRID SYSTEM ER 85-7780 40077s82 3s325 GROUND GRID SYSTEM ER 85-8138 40077675 3s325 INSULATED PLATFORM ER 85-6557 40068104 35325 INSULATED PLATFORM 12'ER 85-7780 40051986 35325 INSULATED PLATFORM 14'ER 85-8534 40077585 3s325 INSULATED PLATFORM 14'ER 85-8138 40051985 3s325 INSULATED PLATFORM 4'ER 85-8534 40068102 3s325 INSULATED PLATFORM 4'ER 85-7780 40077584 3532s INSULATED PLATFORM 4'ER 85-8138 40068103 3s325 INSULATED PLATFORM 6'ER 85-7780 40077589 35325 INSULATED PLATFORM 6'ER 85-8137 400s1989 35327 POWER AND CONTROL CABLE ER 85-8534 40068109 35327 POWER AND CONTROL CABLE ER 85-7780 40077590 3s327 POWER AND CONTROL CABLE ER 85-8137 40077602 35327 POWER AND CONTROL CABLE ER 83-8355 400776t8 35327 POWER AND CONTROL CABLE ER 85-5557 40068130 3s329 LIGHTING FIXTURE/SYSTEM ER 85-7780 40077601 3s329 LIGHTING FIXTURE/SYSTEM ER 83-8355 40077663 35329 LIGHTING FIXTURE/SYSTEM ER 101131 40041681 35341 REMOTE TERMTNAL UNrT (SCADA RTU)TtDMl20O2lCl009lB L&G s700 RTU Type 1A w/Atta 40051992 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 85-8534 40058887 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS #104220 40068t32 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 85-7780 40077657 3s341 REMOTE TERMINAL UNIT (SCADA RTU)ER 3346400 30054810 39700 cY2013 JEFFERSON SUB COMM EQU|P (C/C 13696) 30065819 39700 cy2014 JEFFERSON SUB COMM EQU|P (C/C 13596 300200s9 39723 DEHYDRATOR SYSTEM CAATS #106921 30020061 39723 RADIO (RF)TO MENAN BUTTE EQf 333534 ER 6-3360 30020041 39726 CROSS CON NECT TREE/FRAME ER 100388 30020035 39729 ANALOG CHANNEL ER 3429610 30020039 39729 ANALOG CHANNEL ER 3639473 30020043 39729 ANALOG CHANNEL ER 100388 30020049 39729 ANALOG CHANNEL CAATS #29638 30058717 39729 ANALOG CHANNEL ER 3394384 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 70 EXECWION VERSION 30020037 39729 ANALOG MULTIPLEX SHELF ER 3429610 300ss030 39735 BATTERY AND RACK 48V EQ# 386004 DZP R / 2009 I C / D Rs/1003 9402 3002004s 39738 PROTECTIVE RELAYI NG RECEIVER ER 100388 30020047 39738 PROTECTIVE RE LAYING TRANSM ITTER ER 100388 300200s1 39747 COMPUTERIZED DIAL EXCHANGE CAATS #103068 300200s7 39747 ANTENNA SYSTEM CAATS #106921 Location: 085025 - Antelope Substation, lD 40057027 3s201 CABLE TRAY TtDMl2005lCl077 40077623 35201 CONTROL BUILDING ER 85-8606 40064983 35201 ROOF rzP R I 2006 I C I LUz I L00297 88 40077637 3s20s AIR CONDITIONER ER 85-6998 40077632 35205 Heat Pump ER 6167 40059400 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 393041 40078957 35227 cLEARtNG, GRAD|NG, & FtLL MATERTAL (SURF w Bs rzP R/2009/c/TR 1/1003 8830 40069401 35227 FENCE & GATES ER 393041 40077624 35227 FENCE & GATES ER 85-8605 40053477 35227 RETAINING WALL ER 85-8606 40082s03 35227 ROADWAY TZP R I 2071 I Cl 7 00 / t004367 4 40082502 3s227 TREX BERM TzP R / 2OIU Cl 7 0O / t00 4367 4 spcc 40077634 35229 LIGHTING FIXTU RE/SYSTEM ER 85-8606 40077635 35229 LIGHTI NG FIXTU RE/SYSTE M ER 85-8606 40053478 35301 STATION SERVICE TRANSFORMER ER 8s-8605 GE 40053484 35301 STATION SERVICE TRANSFORMER ER 85-8606 ELEC DRY WPE 40053480 35301 STATION SERVICE TRANSFORMER sOKVA ER 85-8605 GE t4400-249 40053481 3s301 STATION SERVICE TRANSFORMER sOKVA ER 8s-8606 GE 12470-277 40053482 35301 STATION SERVICE TRANSFORMER 5OKVA ER 85-8605 WEST 40077642 35301 STATION SERVICE TRANSFORMER 5OKVA ER-85-6167 40077578 35317 CABLE TRENCH ER 85-5859 40069480 35317 CONDUIT TIDMl2004lClO04l07 40069820 35317 CONDUIT rzP R I 2007 I C lr R6 I 1003 442L 40077679 35317 CONDUIT ER 85-6859 40037997 35319 DIGITAL FAULT RECORDER DREX{Ts99lClOl2lOL 40004900 35319 OSCILLOGRAPH ER 383741 ROCHESTER SN 38960 40038465 35319 RELAY AND CONTROL CAATS #39063 WBS DSHE/19991C1064 40049109 35319 RELAY AND CONTROL wBS TrDM/20041C1018 40049275 35319 RELAY AND CONTROL TIDM/20031C{006 40055754 35319 RELAY AND CONTROL w BS Tr D M/200s I Cl 073 I 002 40066160 35319 RELAY AND CONTROL ER 85-6119 40069399 35319 REI.AYAND CONTROL ER 86-6888 40069485 35319 RELAY AND CONTROL rtDMl2004/cl004l07 40077640 35319 RELAY AND CONTROL ER 85-8550 40077643 35319 RELAY AND CONTROL ER 85-6397 40077644 3s319 RELAY AND CONTROL ER 8s-5202 40077645 35319 RELAY AND CONTROL ER 85-6673 40077647 35319 RELAY AND CONTROL ER 85-7088 40077684 35319 RELAYAND CONTROL ER 85-6859 40077708 35321 BATTERY AND RACK ER 393884 Over 100% CIAC 40077709 3532L BATTERY CHARGER ER 393884 Over 100% CIAC 40077685 3532s GROUND GRID SYSTEM ER 85-6859 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 7l EXECUTION VERSION 40077687 3s32s INSULATED PLATFORM 10'ER 85-5859 40053457 3s325 INSULATED PLATFORM 4'ER 8s-8506 40077686 35325 INSULATED PLATFORM 4'ER 85-6859 40053458 3532s INSULATED PLATFORM 6'ER 85-8606 40049274 35327 POWER AND CONTROL CABLE 10M/2003lcloo6 40053473 3s327 POWER AND CONTROL CABLE ER 8s-8506 40055753 35327 POWER AND CONTROL CABLE wBs Tr DM/200s I cl 0L3 I 002 40069484 35327 POWER AND CONTROL CABLE TtDMl2004lcloo4.l07 40077697 35327 POWER AND CONTROL CABLE ER 85-6859 40077677 35329 LIGHTING FIXTU RE/SYSTEM ER 85-58s9 40077692 3s329 LIGHTING FIXTURE/SYSTEM ER 85-6859 4002647L 3s341 INTERPOSITION CABINET ER 85-6805 40045539 35341 METER wBS Tl DM/20 03 I Cl 027 I 07 40026475 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 85-6805 LEEDS & NORTHRUP 40026479 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS #103389 LEEDS & NORTHRUP 40026483 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS #105609 HARRIS CONTROLS 40038308 35341 REMOTE TERMINAL UNIT (SCADA RTU)CMTS #101090 40077648 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 85-5797, 85-5991 40077649 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 85-803s 40078832 35341 REMOTE TERMINAL UNIT (SCADA RTU) EQ# 328118 CAATS #104205 LANDIS & GYR MODEL 5410 40038013 35341 SEQUENTIAL EVENT RECORDER cENGlt999lCl062 40026487 3s349 SATELLITE CLOCK CMTS #21206 30064767 39700 cy2013 ANTELOPE SUB COMM EQUrP (C/C 13695) 30020157 39777 FIBER OPTIC CABLE CAATS #106293 30020159 39777 FIBER OPTIC/TRANSMITTER RECEIVER SET CAATS #106293 30034104 39777 FIBER OPIC/TRANSMITTER RECEIVER SET CAATS #39063 WBS DSHE/7999/C1064 30020143 39729 ANALOG CHANNEL ER 3394350 3002014s 39729 ANALOG CHANNEL ER 353946s 30020151 39729 ANALOG CHANNEL ER 100964 30020161 39729 ANALOG CHANNEL CAATS f104205 300s8712 39729 ANALOG CHANNEL CAATS f100597 30032507 39729 ANALOG CHANNEL MODEM & TERM UNIT (ANALOG) GRANGER/TELLABS FXS - PROJECT 65543 300201ss 39729 DIGITAL MULTIPLEX SYSTEM CAATS #106293 30020149 39735 BATTERY CHARGER ER 5057 30036924 39735 COM M UN ICATIONS BATTERY BAN K TIDMl2002lC/RDF/011 30036182 39738 PROTECTIVE RELAY TERMINAL. RFL 9745 rtDMl2000lc/o73 30036183 39744 TELEPHONE LINE SIGNALLING UNIT - TELLABS 44LO TIDM/2OOOlClO73 30042062 39750 CELLULAR TELEPHONE (10761)rtDM/20041c{0L8 Location:085051 Pooulus Substation, lD 304311 35010 POPULUS SUB LAND IDBA-0015 IllDl20O7 /C/002/PSUBR Goldbers Land 304312 35010 POPULUS SUB LAND IDBA-0016 rllD 12007 I C1002/PSUBR Hatfield Land 304313 35010 POPULUS SUB LAND IDBA-0017 fllD /2OO7 I C1002/PSUBR Evans Land 400801,44 35201 CONTROL BUILDING TrD12007lcl002lPsUB 40080153 35207 METAL CABINET (FOR FIBER OPTICS)rtD12007 /c/002/PSUB 40080206 35209 SECURITY SYSTEM TrD/2007 /C/002/PSUB JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page 172 EXECUTION VERSION 40080149 35219 FOUNDATION AND SUBSTRUCTURE - CTRL BLDG rnDl2o0T lc/002/PsuB 40080742 35227 CLEARTNG, GRADTNG, & FrLL MATERTAL (SURF TrD/2007 /ClOo2lPSUB 40080147 35227 FENCE & GATES TrD12007 /C1002/PSUB 40080157 3s301 STATION SERVICE TRANSFORMER TnD12007 /C1002/PSUB 40080146 35315 DISCONNECT SWITCH 5OA 24OVAC TrDl20OT lC/002/PSUB 40080384 35317 CABLE TRENCH TttD/20071C/002/PSUB 40080143 35317 CONDUIT TrD12007lClOo2lPSUB 40080148 35317 FOUNDATION AND SUBSTRUCTURE - COMMON TrD{2OOT /C/002/PSUB 40080193 35317 FOUNDATION AND SUBSTRUCTURE - JOINTLY OWNED TilD12007 /Cloo2lPSUB 40080134 3s319 ANNUNCIATOR TIID I2OO7 I CIOO2IPSU B ROCH ESTE R 40080140 35319 CABLE TERMINATION CABINET TrD12007lcloo2lPsUB 40080145 35319 DIGITAL FAULT RECORDER T IID I2OO7 I CI OO2IPSU B ROCH ESTE R 40090423 3s319 DIGITAL FAU LT RECORDER/SYNCH ROPHASOR WECC WISP SYS T UTH I 207U C I O03 I 70047 406 40080201 3s319 METERING PACKAGE (CTIVT) 345KV T|D12007lClO02lPSUB 40080202 35319 METERING PACKAGE (CTI\rr) 345KV SPARE fltD/20071c/002/PSUB 40080155 35319 RELAY AND CONTROL TrD/20071C1O02/PSUB 40080304 3s319 RELAY AND CONTROL WBS TIID/2007/CIOO2IRAS MODIFY RAS SCHEME 40085694 35319 RELAY AND CONTROL TWY O I 2077 / C/00s/PO P DATA 40088s86 35319 RELAY AND CONTROL rzP R I 2072 I C lr R2 h004837 s 40080135 3s321 AUTOMATIC TRANSFER SWITCH TrD12007lClO02lPSUB 40080135 35321 BATTERY AND RACK 125VDC EQ# 381622 T|D12007lClO02lPSUB 40080137 3s321 BATTERY AND RACK 48VDC EQ# 381620 TnDl2007 /ClO02lPSUB 40080138 35321 BATTERY CHARGER 125VDC EQ# 381623 TilD/2OO7 /C/002/PSUB 40080139 3s321 BATTERY CHARGER 48VDC EQ# 381621 TfiO/2007 /C1002/PSUB 400801s0 35323 GENERATOR TrD12007lC/002/PSUB 40080151 3s32s GROUND GRID SYSTEM TrD12007 /ClOo2lPSUB 40080154 35327 POWER AND CONTROL CABLE TilD12007lcl002lPsUB 40086693 35327 POWER AND CONTROL CABLE TUUY O / 2071 I C/00s/PO P DATA 40080152 35341 HMt AUTOMATTON (PC, PRtNTER, SOFTWARE)TfiD/20071C1002/PSUB 40080156 35341 REMOTE TERMINAL UNIT (SCADA RTU)T|tD/20071C/Oo2lPSUB 30058656 3900s PREFAB BUILDING .2 ROOM GFRC CONCRETE 77'x24' TrD / 2OO7 I Cl OO2 I rO0347 2s 30050173 39011 SITE CLEARING TilD I 2007 I CI 002 I 100347 2s 30060174 39011 SITE GROUNDING rtD I 2007 I cI 002 I t00347 25 30059151 39700 cY2010 coMMUNTCATTON EQUTPM ENT (CC 13696) CA TrD I 2007 I Cl 002/PS U BCOM 30060197 39700 cY2010 coMMUNTCATTON EQUTPMENT (CC 13595) JO T rD / 2OO7 / C l Oo2lPS U BCO M 30064303 39700 cY2072 POPULUS SUB COMM EQUIP (CC 13595) 300s8541 3970s RTU - GE CANADA TrD I 2007 I CI OO2 I 700347 25 30058642 397t4 ROUTER - C|SCO 2811 TrD 12007 / cl 002 I 100347 2s 300s8543 39723 DEHYDRATOR SYSTEM T rD I 2007 I C I OO2 I 1003 47 2s 30058644 39723 RAD|O (RF) 11 GHZ 28DS1 TO RED ROCK EQ#XXXXXX TrD I 2007 I C/ 002 I L003 47 2s 300s864s 39726 EQUIPMENT RACK/SHELF w FUSE PANEL T rD /2007 I Cl 002 I 100347 2s JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A PagelT3 EXECUTION VERSION 300s8646 39729 DIGITAL MULTIPLEX SYSTEM COASTCOM R409 rrD /2007 I cl oo2 I 7oo347 2s 30058650 39735 AC POWER TRANSFER PANEL TrD I 2007 / Cl 002 I L0O347 2s 300s8647 39735 BATTERYAND RACK DEKA EAST PENN UNIGY il EQ#XXXXXX TilD / 2OO7 / Cl O02 / LOO347 2s 30058648 39735 BATTERY AND RACK EQ #XXXXXX TrD I 2007 I C IO02 I L00347 25 300s8649 39735 BATTERY CHARGER EQ#XXXXXX TrD I 2007 I Cl OOZ I tOO347 25 300s85s1 39735 EMERGENCY POWER GENERATOR SYSTEM ONAN 35KW TrD /2007 I Cl OO2 / 7OO347 2s 300586s2 39735 PROPANE STORAGE TANK TrD I 2007 I Cl 002 h0o347 2s 300586s4 39747 ANTENNA SYSTEM - 6'TELGAR RADOME TilD / 2007 I Cl 002 I LOO347 2s 300s8653 39747 ANTENNA SYSTEM - HP6-107-PIA EQ#XXXXXX TrD I 2007 I Cl OO2 I LO03 47 2s 300586ss 39747 TOWER SABRE S3TL 150' Eq#XXXXXX T |D 1 2007 I C I OO2 I tOO3 47 25 30058690 39747 WAVEGUIDE T|D 12007 / Cl OO2 / 700347 25 Location: 238018 - Walla Walla Substation, WA 302032 3s010 FEE LAND 1998 BALANCE CONVERSION 302033 35010 FEE LAND 1998 BALANCE CONVERSION 4000511s 35201 CONTROL BUILDING ER 31-11353-283 40006155 35201 CONTROL BUILDING ER31-L297-285 40005163 3s201 CONTROL BUILDING ER 31-3032-285 40006171 35201 CONTROL BUILDING ER 31-6625-283 40006195 35201 CONTROL BUILDING ER 31-87s9-283 40006207 35201 CONTROL BUILDING ER 31-11825-284 ADDtTtON 72'X 40' 40006243 35201 ROOF CAATS# 53365 40005159 3520s FAN SYSTEM ER 31-3726-283 40079t92 3s205 Heat Pumo rzw A I 2009 I c/TR6/1 003 9983 40006227 35205 UNIT HEATER ER 31-52545-4359 HEAT PUMP 40006191 35207 LOAD CENTER ER 31-8130-283 4000613s 35273 PUMP ER 31-11353-283 FOR WELL 40006219 3s273 WELL ER 31-11185-285 40006091 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-11353-283 40006151 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-19287-283 40005187 35227 CLEARING, GRADING, & FILL MATERIAL (SURF JV 98 40006203 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-8759-283 40006211 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER37-77074-283 4000623s 35227 CLEARING, GRADING, & FILL MATERIAL (SURF CAATS# 62049 40006143 35227 FENCE ER 31-11353-283 40005215 35227 FENCE ER3L-77074-283 40006223 35227 FENCE ER 31-51146-4283 40006231 3s227 FENCE CAATS wO 5044-42960 40006239 35227 FENCE CAATS# 62049 4000617s 35227 GATE ER 31-5525-283 40006099 35227 I.ANDSCAPING WSPRINKLING SYSTEM ER 31-11353-283 40006123 35227 LIGHTING FIXTURE/SYSTEM ER 31-11353-283 40006167 35227 LIGHTING FIXTURE/SYSTEM ER 31-5095-285 FOR CONTROL BUILDING 40006111 35227 ROADWAY ER 31-11353-283 40006183 35227 ROADWAY ER 31-662s-283 40006103 35227 SIDEWALK ER 31-11353-283 40006107 35227 SIGN ER 31-11353-283 40083979 35227 SORBWEB BERM DWAS/2 0 1 1/C I 830 / LOO4447 7 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page 174 EXECUTION VERSION 40015680 3s301 STATION SERVICE TRANSFORM ER ER 31-11353-283 15KVA & 75KVA 40015751 35301 STATION SERVICE TRANSFORM ER ER 31-113s3-283 2 25KVA s1,020.30 1 50KVA 5as 40015768 35317 CONDUIT ER 31-11353-283 40015873 35317 CONDUIT ER 31-662s-283 40015917 35317 CONDUIT ER 31-87s9-283 40015970 35317 CONDUIT ER 31-13569-283 40016031 35317 CONDUIT ER 31-17074-283 40079777 35317 CONDUIT TZW A12009 I CITR4I10038s63 BLUE MOUNTATN LINE 40016135 3s319 RELAY AND CONTROL ER 3145598-4085 40016147 3s319 RELAY AND CONTROL WEST TYPE LCB-MDAR TONE TRANSFER 40016159 35319 RELAY AND CONTROL CAATS# 61140 40016779 35319 RELAY AND CONTROL CAATS# 62199 40037827 3s319 RELAY AND CONTROL CAATS #6265s 40038965 35319 REI.AY AND CONTROL TWAM/2000/Cl006/OL 40039330 3s319 RELAY AND CONTROL twam/2000lc/004 40045019 35319 RELAY AND CONTROL TWAM/2000/Cl002/02 400s1649 3s319 RELAY AND CONTROL TMGMl200s/C/0021007 40062282 35319 RELAY AND CONTROL CAATS# 64711 40067360 3s319 REI.AY AND CONTROL w Bs rwAM/2 006 I cl 008 I 1o030393 40069514 3s319 RELAY AND CONTROL TrwA/2006/c I 002 I Lo030679 100% CrAc 40070542 35319 REI.AY AND CONTROL DZW A I 2007 I C/D R2l1003 38s0 40079277 3s319 RELAY AND CONTROL CAATS# 60177 40084368 35319 REI.AY AND CONTROL rzw A / 20L2 / c lTR2l1004608s 40084398 3s319 RELAY AND CONTROL tzw Al 20Lt I clTR2l1004ss6s 40084773 35319 RELAY AND CONTROL CWES/2008/C/OO5/GCPDWALL 40086983 35319 RELAY AND CONTROL Tzw A I 2013 I c lT R2 I 700 48488 40086984 35319 RELAY AND CONTROL rzw Al 2073 I c lT R2 I 70048604 40056959 35319 RELAY AND CONTROL - JLS METER cwEs/2004 I cloT 7/ 70026624 J LS M ETE RS 40016191 35319 RELAY, INSTRUMENT, OR DEVICE CAATS# 62199 40015195 35319 RELAY, INSTRUMENT, OR DEVICE CAATS# 62199 40016199 3s319 RELAY, INSTRUMENT, OR DEVICE CAATS# 62199 40040442 35319 SATELLITE CLOCK WBS TWAM/2 OOTI ClRDF / 70009183 ARBITER 40049636 35321 BATTERYAND RACK 125VDC DZW Al 2003 I C/D R5/10020340 C&D 40049637 35327 BATTERY CHARGER 125VDC DZW A12003 I C/DRs/10020340 LAMARCH E 40015809 35323 GENERATOR FUEL TANK ER3\-7474-285 40015772 35325 GROUND GRID SYSTEM ER 31-11353-283 40015837 35325 GROUND GRID SYSTEM ER 31-19287-283 400L5974 3s325 GROUND GRID SYSTEM ER 31-13559-283 40016035 35325 GROUND GRID SYSTEM ER3L-L7074-283 40079L79 3532s GROUND GRID SYSTEM TZW A12009 / C/TR4I10038563 BLUE MOUNTATN LINE 40015699 35327 CUTOUT ER 31-11353-283 40016063 35327 CUTOUT ER 31-19142-286 40015780 35327 POWER AND CONTROL CABLE ER 31-11353-283 4001s986 35327 POWER AND CONTROL CABLE ER 31-13s59-283 40016002 35327 POWER AND CONTROL CABLE ER3L-t4r22-283 40016051 35327 POWER AND CONTROL CABLE ER37-17074-283 40016087 35327 POWER AND CONTROL CABLE ER 31-20078-285 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 75 EXECUTION VERSION 40016107 35327 POWER AND CONTROL CABLE ER 31-3844-296 40015131 35327 POWER AND CONTROL CABLE ER 3145598-4085 40016155 3s327 POWER AND CONTROL CABLE CAATS# 61140 40037826 35327 POWER AND CONTROL CABLE CAATS #62665 40059613 35327 POWER AND CONTROL CABLE Ttw Al 2006 I cl oo2 / 10030679 100% crAc 40079180 35327 POWER AND CONTROL CABLE TZW Al 2009 / CITR4l10038s53 BLU E MOU NTA| N LINE 40015739 3s329 LIGHTI NG FIXTURE/SYSTEM ER 31-11353-283 40015845 35329 LIGHTING FIXTURE/SYSTEM ER 31-6625-283 40016018 3s329 LIGHTING FIXTURE/SYSTEM ER 31-17074-283 40075776 35339 FIRE PROTECTION SYSTEM ER 31-11353-283 40040993 35341 REMOTE TERMINAL UNIT (SCADA RTU)TW AM I 2OO2 /C/OTLI B GE HARRIS 40073835 35341 REMOTE TERMINAL UNIT (SCADA RTU)wBs DPrT/2007 I Cl 007 I 700337 83 40016139 35342 SEQUENTIAL EVENT RECORDER ER 31.45598.4085 HATHAWAY 30061183 39700 CY2OIL WALLA 2 SUB COMMUNICATION EOU|P (C/C t37491 30064194 39700 CY2O13 WALLA WALLA SUB COMM EQUIP rclc737471 30065027 39700 CY2O13 WALLA WALLA SUB COMM EQUIP (clcL3749l 30065810 39700 CYZOI4 WALLA WALLA 230 SUB COMM EQU|P (C/C 727371 30060484 39700 PLC TRANSM ITTER/RECEIVER SET cAATSf 60177 300s8938 39777 BASE STATION - TAIT TB 81OO DSYS I 2007 I C/805/PPWW23 1 30058945 39717 RADIO CONTROL - DISPATCH OUTPOST CONTROLLER DSYS/ 2OO7 | C1806/PPWW23 AWEC (A/r coNVERTER) 30058944 397L7 RADIO CONTROL SYSTEM - TAIT 1541 NODE DSYS I 2007 I C/806/P PWW2 3 30058941 39771 RADIO CONTROL SYSTEM - TAIT CMM DSYS I 2007 I C1806/PPWW23 1 CO NTRO L MODULE 300s894s 397!7 RADIO CONTROL SYSTEM - TAIT DAS DSYS|Z0O7 I C1806/PPWW23 TArr DTGTTAL AU DrO swr 30058940 39717 RADIO CONTROL SYSTEM - TAIT SMM DSYSIaOOT |C/806/PPWW231 SITE MGMT MODULES 300s8939 397LL RF COMBINER DSYS I 2OO7 / CI8O6IPPWW231 DB SPECTRA 30044266 39777 WW SUB GROUP PENDLETON RADIO CoNTROL SYS #360706 DZWW / 2002 I C I DUs I t0}r339 2 30047400 39714 csu/DSU CAATS# 64711 300s8948 39774 DATA NETWORK ROUTER - CISCO 2811 osYs / 2007 / c/806/P PWW23 300s8947 397L4 DATA NETWORK SWITCH - CISCO ETHERSWITCH osYs / 2007 I c I 806/PPWW2 3 30047401 397L4 MODEM CAATS# 64711 30044940 39774 TERMINAL CONTROLLER *see long descrip.xFR FR 3970230025620 PRJ629!7 30055181 39777 PATCH PANEL FOR FIBER-OPTICS T tw Al 2008 / cl 00s / too37 e7 4 300s4429 39723 MICROWAVE RADIO TO KENNEWICK EQ f381360 DZW Al 2008 I Cl OO2 / 70035481 - MOD A847 97 F 1- A 30040190 39723 MICROWAVE SYSTEM TO COMBINE HILLs EQ #373072 DWALl20O4lC/001/03 3004s833 39723 MW TOWER *see lons descrip.XFR fr 39702 30025618 PRJ 707223 30058950 39726 EQUIPMENT RACK/SHELF DSY S I 2007 I C I 805/ P P WW2 3 300s8942 39726 EQUIPMENT RACK/SHELF WFUSE PANEL DSYS I 2007 I C 1806/P PWW23 1 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page 176 EXECUTION VERSION 30058951 39729 DIGITAL CHANNEL DSY S I 2007 I C I 806/P PWW2 3 30055182 39729 DIGITAL M ULTIPLEX SYS-IMACS PREM ISYS CHANNEL BANK T tw Al 2008 I cl 005 / 70037 97 4 30025616 39729 DIGITAL MULTIPLEX SYSTEM CAATS 106733 30040401 39729 WALLA WALLA CHANNEL CARDS FOR PARTY LINE CONNECTN TWAM/200slc/o30 30040189 39729 WALLA WALLA SUB MULTIPLEX SYSTEM DWAv2004lc/00u03 3002s612 39732 PLC TRANSMTTTER/RECEtVE R SET CAATS 52199 300s89s2 39735 BATTERY AND RACK 48V DEKA DSY S / 2007 I C I 805/P PWW2 3 30058953 39735 BATTERY CHARGER 48VDC AMERICAN POWER DSY S / 2007 I C I 8 06/ P PWW2 3 30044944 39735 DC POWER SUPPLY PANEL *see lone descrio.xFR FR 39702 30025620 PRJ 62917 30058955 39735 EMERGENCY POWER GENERATOR SYSTEM W/SAFTEY SWITCH DSY S / 2007 I C / 806/P PWW2 3 30058954 3973s GROUNDING GRID DSYS I 2007 I C1806/PPWW23 300s89s7 39735 PROPANE STORAGE TANK DSYS / 2007 I C/806/PPWW23 30058956 3973s VOLTAGE CONVERTER DC TO DC 48-12 VDC DSY S / 2007 I C I 806/P PWW2 3 30025614 39744 TELEPHONE SWITCH CAATS 62199 300s8943 39747 ANTENNA SYSTEM - VHF FOR TAIT BASE STATION DSYS I 2007 I C1806/P PWW23 1 30040188 39747 WALLA WALLA SUB ANTENNA SYSTEM DWAU2004{C{00UO3 300s4430 39747 WALLA WALLA SUB ANTENNA SYSTEM DZW A I 2008 I C I OO2 I 7003s 48r 30040191 39747 WALLA WALLA SUB RADOME DwAu2004lCl007l03 30040192 39747 WALLA WALLA SUB WAVEGUIDE MATERIALS DWAa2004lC/00t103 30046553 39753 WALLA WALLA COMMUNICATIONS ROOM AIR CONDITIONER DWAL/2006/C lDRg I 7OO294ss location: 540065 - Jim Bridger Substation, 345kV Non-Shared 40084979 35227 CLEARING, GRADING & FILL MATERIAL TtD12007lcl002/JBsuB 40055232 3s227 FENCE rwY M I 2002 / c I 007 I 10072388 40055237 35227 ROADWAY TWY M I 2002 / C I OOt / 700L2388 40055230 35317 CABLE TRENCH TUVY M / 2002 / C / 0O1 / 70072388 40076407 35377 CONDUIT T tDM / 20Os / C I 037 / L0037847 40084980 35317 CONDUIT TrD12007 /ClOo2/JBSUB 40037972 35319 RELAY AND CONTROL CAATS #37855 40047923 35319 RELAY AND CONTROL ruvY M I 2002 I c I oo7 / 700767 83 40055236 3s319 RELAY AND CONTROL rwY M I 2002 / c I 007 I 700L2388 40055241 35319 RELAY AND CONTROL t BM I 200s I Cl 00U 10027 424 40063425 3s319 RELAY AND CONTROL CAATS# 64841 4006s263 3s319 RELAY AND CONTROL TWY M/200s/ Cl O 46 / 7OO2s37 O 40076475 35319 RELAY AND CONTROL Tr D M/2005/C I O37 / 70037847 4008498s 35319 RELAY AND CONTROL illD12007/Cl002IBSUB 40055234 35325 GROUND GRID SYSTEM TWY M I 2002 / C I OOU 700L2388 40076472 3s32s GROUND GRID SYSTEM Tr D M /200s/c I o37 I rOO37847 40084982 35325 GROUND GRID SYSTEM TrD12007lC/002rBSUB 40055235 35327 POWER AND CONTROL CABLE ruvY M I 2002 I C I OOU LOo 12388 40065262 35327 POWER AND CONTROL CABLE rvvY M / 2o0s / c I 046 / Loo2s37 o 40076474 35327 POWER AND CONTROL CABLE T tDM I 2OOs I Cl 037 / 70037847 40084984 35327 POWER AND CONTROL CABLE TrD12007lC/002lBSUB 40084986 35341 SEQUENTIAL EVENT RECORDER TrD12007lClOo2lBSUB 30061281 39700 CY2O1O JB SUM COMM EQUIP (C/C 13918) 30037769 39705 SCADA L&G TWY M I 2002 I C I OOU t00L2390 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 77 30047883 397t4 MODEM CAATS# 64841 30054817 397L7 FIBER OPTIC TRANSCEIVER/MODEM T tDM I 200s / c / o37 / L0o3t847 30037772 397L7 FI BE R OPTIC TRANSM ITTER/RECEIVER TWY M I 2002 I C I OOL / 70072390 30054816 39729 DIGITAL CHANNEL TIDM/2005 /O37 / 10037847 + 10032855 300s8805 39729 DIGITAL CHANNEL Tr D M/200s/0 37 I L0032866 30037773 39729 DIGITAL MULTIPLEXER TWY M I 2002 I C I OOL I L0O7239O 30037774 39729 DIGITAL MULTIPLEXER SH ELF TWY M I 2002 I C I OOr I LOOL2390 30047287 39729 JB SUB DIG MULT CARD FOR T1 CIRC JB TO CASPER ctrclzooslclsoLlsL 30033442 39738 AUDIO-TONE PROTECTIVE RELAYING SYSTEM CAATS #37677 30033448 39738 AUDIO.TON E PROTECTIVE RELAYING SYSTE M CAATS #378ss 30037777 39738 Telemetry Receiver TUUY M I 2002 I C I OOU !00t2390 30037770 39738 Tone Relay Equip TUVY M / 200?. I C I OO7 / 700t2390 30047884 39738 TRANSMITTER, RECEIVER, 125 VDC, RFL 5745 CAATS# 64841 300548ls 39744 COMMUNICATION CABLE >5OO FT.TtDMl2005l clo37 I 70037847 COAX FO PLC JOINT OWNERSHIP AND OPERATING AGREEMENT _EXHIBIT A Page | 78 EXECUTION VERSION EXHIBIT 83 Description of Idaho Power Common Equipment 3 The information contained in this Exhibit is accurate as of December 31,2014. The Parties will update the information in this Exhibit, if necessary, to reflect any Idaho Power Common Equipment placed in or removed from service between January l, 2015 and the Closing Date in connection with the true-up set forth in Section 2.5(d) of the JPSA. The update shall be completed within 30 days after the completion of the tme-up and the updated Exhibit shall replace this Exhibit. JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B PagelT9 EXECUTION VERSION Adelaide Transmission Station FERC Acct Adelaide Asset Descriotion Vintase 35011 LAND OWNED IN FEE TS L974 35011 PERMANENT LAND IMPROVEMENTS TS 1975 35011 PERMANENT LAND IMPROVEMENTS TS 1977 3s200 DRAINAG E SYSTEMS.CULVERTS, ETC L976 35200 YARD SURFACING - GRAVEL, ETC.1976 35200 YARD SURFACING . GRAVEL, ETC.L977 35200 ENGR, SURVEYING OR CONSULTING 7976 35200 PERIMETER FENCE & GATES 7977 3s200 WATER WELL PUMP 7977 35200 SEPTIC TANK & CESSPOOL 7977 3s200 SEWER LINE 1977 35200 LIGHT LOWERING DEVICE & LIGHT 7977 3s200 LIGHT MAST 1977 35200 FOUNDATION - STATION BUILDING 1977 35200 COMPLETE STATION BUILDING t977 3s200 BUILDING PLUMBING SYSTEM 7977 3s200 BUILDING HVAC SYSTEM 7977 3s200 BUI LDING ELECTRICAL SYSTE M t977 35200 BUILDING ELECTRICAL SYSTEM t977 35200 D.C. EMERGENCY FIXTURE L977 35200 BUILDING ELECTRICAL SYSTEM 1977 35200 BUILDING ELECTRICAL SYSTEM 7977 3s200 LOCAL SERVICE FND t977 3s200 FOUNDATION - COMM UNICATION r977 35200 EQUIPMENT PAD 1977 35200 LIGHTING MAST FND 7977 3s200 CONCRETE SURFACE TRENCH WLIDS L977 35200 CONDUIT & FITTINGS UNDERGROUND L977 35200 CONDUIT & FITTINGS UNDERGROUND 1995 35200 UNIWALKS t977 35200 LOCAL SERVICE STRUCTURE 1977 35200 METAL STRUCT - COMMUNICATION L977 3s200 15KV BUS SUP, CT, PT, MISC STR 1977 35300 CABLE TRAY AND ACCESSORIES 7977 3s300 CABLE TRAY AND ACCESSORIES 1995 3s300 INSULATORS - PIN OR POST 1977 3s300 1/8'' X 1" FLAT BAR COPPER 1977 3s300 CONTROL WIRE - LOW VOLTAGE 1977 35300 #18 - #19 CONTROL WtRE 1995 3s300 f18 - #19 CONTROL WtRE 1980 35300 #18 - #19 CONTROL WrRE 1991 35300 #18 - #19 CONTROL WtRE 1993 3s300 #18 - #19 CONTROL WtRE 1995 3s300 #L8 - #79 CONTROL WIRE 1995 35300 #18 - #19 CONTROL WrRE 1996 3s300 #18 - #19 CONTROL WtRt 1980 3s300 #18 - #19 CONTROL WtRE 1993 35300 #18 - #19 CONTROL WtRE 1995 3s300 #18 - #19 CONTROL WtRE 1995 35300 fi14 - #t6 coNTROL WtRt 1995 35300 fr74 - #76 CONTROL WrRE 1993 3s300 #L4 - fiI6 CONTROL WIRE 7977 35300 #L4 . #16 CONTROL WIRE 1977 3s300 #14 - #76 CONTROL WtRE 1980 35300 #14 - #76 CONTROL WtRE 1996 35300 #74 - #76 CONTROL W|RE 1995 3s300 #74 -#L6 CONTROL WtRt 7977 3s300 fi74 - *76 CONTROL WtRE 1980 3s300 #14 - #16 CONTROL WtRt 1991 3s300 #t0 - #72 CoNTROL W|RE 1995 35300 #LO - #L2 CONTROL WIRE 1991 3s300 *70 - #72 CONTROL WrRE 1993 3s300 #10 - f12 CONTROL WtRE 1995 35300 #t0 - #t2 coNTRoL wtRE 7977 3s300 #LO.#I2 CONTROL WIRE 1995 35300 #70 - #72 CONTROL WtRE 1991 35300 #70 - #72 CONTROL WrRE 1995 3s300 #TO - #T2 CONTROL WIRE 1995 35300 #LO - #12 CONTROL WIRE 1995 35300 *10 - #L2 CONTROL WIRE 1977 35300 #7 -#9 CONTROLWIRE 1977 35300 #7 -*9 CONTROLWIRE L977 35300 #7 . *9 CONTROL WIRE 1980 3s300 #7 - #9 CONTROL WIRE 7977 35300 #7 - #9 CONTROL WIRE L977 35300 #I - fi6 CONTROL WIRE 7977 35300 #T - #6 CONTROL WIRE 7977 3s300 #L - #6 CONTROL WIRE 7977 3s300 #7. #6 CONTROL WIRE 1977 3s300 #1 - #6 CONTROL WIRE L977 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Page | 80 3s300 #7 - #6 CONTROL WIRE 1995 35300 4/0 coPPER CONTROL WrRE 7977 3s300 350 MCM ALUM CONTROL WIRE 7977 35300 350 MCM COPPER CONTROL WIRE 7977 35300 5OO MCM COPPER CONTROL WIRE 7977 35300 COMPOSITE CABLE - LOW VOLTAGE 1995 3s300 GROUNDING AND FITTINGS 1995 35300 #5 COPPER GROUND L977 3s300 #6 COPPER GROUND MAT 7977 35300 #5 COPPER GROUND MAT 1995 35300 7/15 COPPER GROUND t977 3s300 2/O COPPER GROUND 7977 35300 250 MCM COPPER GROUND t977 35300 CONDUIT & FITTINGS ABOVE GROUN 1995 35300 CONDUIT & FITTINGS ABOVE GROUN 1995 35300 CONDUIT & FITTINGS ABOVE GROUN t977 35300 CONDUIT & FITTINGS ABOVE GROUN 1977 3s300 CONDUIT & FITTINGS ABOVE GROUN 1977 3s300 CONDUIT & FITTINGS ABOVE GROUN 1995 3s300 CONDUIT & FITTINGS ABOVE GROUN 7977 3s300 CONDUIT & FITTINGS ABOVE GROUN L977 35300 2" - 3-L/2" CONDU|T 1995 3s300 2" -3-U2" CONDUTT 7977 35300 2" - 3-7/2" CONDUtT 7977 3s300 5'' CONDUIT 1977 3s300 SMALL ELECTRICAL ENCLOSURE 1995 3s300 SMALL ELECTRICAL ENCLOSURE 7977 35300 5OKVA LOCAL SERVICE XFMR 1977 3s300 167-499KVA LOCAL SERVICE XFMR 1977 35300 SWITCH - POWER FUSE 1977 3s300 CONTROL RACK/PANEL FRAME 1977 3s300 CONTROL RACK/PAN EL FRAM E 7977 35300 CONTROL RACK/PAN EL FRAM E 1977 35300 CONTROL RACK/PAN EL FRAM E t977 35300 CONTROL RACK/PANEL FRAME 1977 35300 CONTROL RACK/PANEL FRAME 1991 3s300 CONTROL RACK/PANEL FRAM E 1995 35300 CONTROL RACK/PANEL FRAM E 1995 3s300 CONTROL RACK/PANEL FRAME 1995 35300 CONTROL RACK/PAN EL FRAM E 7977 3s300 CONTROL RACK/PAN EL FRAM E 7977 EXECUTION VERSION 35300 CONTROL RACK/PANEL FRAM E L977 35300 PROTECTION EQUIPMENT 1996 35300 CONTROL COMPUTER & PERIPHERALS 1995 3s300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 3s300 METERING EQUIPMENT 1993 3s300 METERING EQUIPMENT 1995 35300 CONTROL EQUIPMENT 1977 3s300 CONTROL EQUIPMENT L977 35300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1965 35300 CONTROL EQUIPMENT 7977 3s300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1965 3s300 CONTROL EQUIPMENT 7977 35300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT t977 3s300 CONTROL EQUIPMENT 1977 35300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1995 35300 CONTROL EQUIPMENT 1995 3s300 CONTROL EQUIPMENT 1995 3s300 SCADA EQUIPMENT 1991 35300 COMM RACK/PANEL FRAME 7977 3s300 COMM RACK/PANEL FRAME L977 35300 COMMUNICATIONS EQUIP 1977 35300 AUXILIARY LOAD CENTER 1977 35300 LOAD CENTER, AC 7977 3s300 LOAD CENTER, DC 1995 35300 10 - 40 AMP CIR BRKR 1991 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 8l 3s300 10 - 40 AMP CIR BRKR 1995 35300 TRANSFER SWITCH 1977 35300 ALARM SYSTE MS-WIRED CIRCUITS 7992 35300 BOX, CABINET OR PANEL 1995 3s300 OTHER METERING EQUIPMENT 1995 3s300 OTHER METERING EQUIPMENT 1995 35300 MISC OFFICE FURNITURE L975 35300 CHAIR 7952 35300 CHAIR 1953 3s300 CHAIR 7964 3s300 DESK 1931 35300 DESK 1950 3s300 DESK 1951 35300 DESK 7977 3s300 FILE CABINET 7977 35300 TABLE 1952 35300 TABLE 7954 3s300 COMPUTER AND PERIPHERALS 1991 35300 PRINTER 1991 39720 MICROWAVE, ANTENNA 1999 39720 MICROWAVE, ANTENNA 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 35300 #18 - #19 CONTROL WlRt 1999 35300 #74 -*76 CONTROL WIRE 1999 35300 #to - #t2 coNTRoL wlRt 1999 35200 SMOKE DETECTOR 200t 35300 METER 1999 39720 MICROWAVE, EQUIPMENT 2000 39720 MICROWAVE, ANTENNA 2000 39720 M tcRowAVE, STRUCT(POLES&FlX)1998 39720 M tcRowAVE, STRUCT(POLES&FlX)1998 35200 BUILDING HVAC SYSTEM 2004 3s300 AUXILIARY LOAD CENTER 2004 3s300 130 VOLT BATTERY CHARGER 2003 EXECUTION VERSION 35300 130 VOLT BATTERY 2003 35300 BATTERY RACK 2003 35300 SAFETY SWITCH 2003 35300 PROTECTION EQUIPMENT 2005 3s200 SITE PREPARATION & IMPROVEMENT 2005 3s200 SUPERSTRUCTURE ROOF 2005 3s300 CONTROL RACK/PAN EL FRAM E 2006 35300 DISTANCE / FAULT LOCATOR 2005 35300 coMMUN|CAT|ONS EQUTP 2006 35200 CONDUIT & FITTINGS UNDERGROUND 2006 3s300 CONTROL WIRE - LOW VOLTAGE 2006 35300 COAXIAL CABLE 2006 35300 GROUNDING AND FITTINGS 2005 35300 CONDUIT & FITTINGS ABOVE GROUN 2006 35300 SMALL E LECTRICAL ENCLOSU RE 2006 3s300 CONTROL RACK/PAN EL FRAM E 2006 3s300 CONTROL RACK/PANEL FRAME 2006 35300 CONTROL RACK/PAN EL FRAM E 2006 3s300 CONTROL RACK/PANEL FRAM E 2006 3s300 CONTROL RACK/PAN EL FRAM E 2006 35300 PROTECTION EQUIPMENT 2006 3s300 PROTECTION EQUIPMENT 2006 3s300 PROTECTION EQUIPMENT 2006 35300 CONTROL EQUIPMENT 2005 35300 CONTROL EQUIPMENT 2005 35300 CONTROL EQUIPMENT 2006 3s300 CONTROL EQUIPMENT 2006 35300 AI.ARM/MON ITORING EQUIPME NT 2006 35300 AI.ARM/MONITORI NG EQUIPMENT 2005 3s300 ALARM/MONITORING EQUIPMENT 2006 3s300 SCADA RACK/PANEL FRAME 2005 3s300 SCADA RACK/PANEL FRAME 2006 3s300 SCADA EQUIPMENT 2006 3s300 SCADA COMPUTER AND PERIPHERALS 2006 39740 FIBER, MISC EQUIPMENT 2007 39740 FIBER, MISC EQUIPMENT 2007 39740 FIBER, CARD SHELF 2007 39740 FIBER, CARD SHELF 2007 39740 FIBER, CARD UNIT 2007 39740 FIBER, CARD UNIT 2007 39740 FIBER, WIRE/CABLE 2007 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Page | 82 39740 FIBER. WIRE/CABLE 2007 35300 ALARM/MONITORING EQUIPMENT 2008 39120 NETWORK EQ 2009 39120 NETWORK EQ 2009 35300 CONTROL WIRE - LOW VOLTAGE 2009 3s300 COAXIAL CABLE 2009 35300 GROUNDING AND FITTINGS 2009 3s300 CONDUIT & FITTINGS ABOVE GROUN 2009 3s200 CONDUIT & FITTINGS UNDERGROUND 2008 35300 CONTROL WIRE - LOW VOLTAGE 2008 35300 CONTROL RACK/PAN EL FRAM E 2008 3s300 CONTROL RACK/PANEL FRAME 2008 3s300 CONTROL RACK/PANEL FRAME 2008 35300 CONTROL RACK/PAN EL FRAM E 2008 35300 CONTROL RACK/PANEL FRAM E 2008 3s300 CONTROL RACK/PANEL FRAM E 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 3s300 coMMUN|CAT|ONS EQUTP 2008 3s300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 39500 OTHER LAB/RESEARCH EQUIPMENT 2009 39500 OTHER LAB/RESEARCH EQUIPMENT 2009 3s300 CONTROL WIRE - LOW VOLTAGE 20t2 3s300 CONTROL RACK/PAN E L FRAM E 20L2 35300 PROTECTION EQUIPMENT 20L2 3s300 PROTECTION EQUIPMENT 2072 35300 CONTROL RACK/PANEL FRAME 2008 3s300 CONTROL RACK/PANEL FRAM E 2008 35300 CONTROL RACK/PAN EL FRAM E 2008 3s300 CONTROL RACK/PAN EL FRAM E 2008 35300 CONTROL RACK/PAN EL FRAM E 2008 3s300 CONTROL RACK/PAN E L FRAM E 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 35300 coMMUNTCAT|ONS EQUTP 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 3s300 COMMUNICATIONS EQUIP 2008 35300 CONTROL WIRE - LOW VOLTAGE 2007 EXECUTION VERSION 3s300 CONTROL WIRE - LOW VOLTAGE 2007 35300 FIBER OPTIC CABLE 2007 3s300 FIBER OPTIC CABLE 2007 3s300 CONDUIT & FITTINGS ABOVE GROUN 2007 35300 CONDUIT & FITTINGS ABOVE GROUN 2007 3s300 COMM RACK/PANEL FRAME 2007 3s300 COMM RACK/PANEL FRAME 2007 35300 COMMUNICATIONS EQUIP 2007 35300 COMMUNICATIONS EQUIP 2007 3s300 48 VOLT BATTERY CHARGER 2007 35300 48 VOLT BATTERY CHARGER 2007 35300 48 VOLT BATTERY 2007 3s300 48 VOLT BATTERY 2007 3s300 BATTERY RACK 2007 35300 BATTERY RACK 2007 35300 TRANSFER SWITCH 2007 3s300 TRANSFER SWITCH 2007 35300 METERING EQUIPMENT 2012 3s300 COMMUNICATIONS EQUIP 2012 35300 SCADA EQUIPMENT 2073 35300 SCADA EQUIPMENT 2013 3s300 ALARM/MONITORING EQU I PMENT 2074 35200 WOOD POLE - MISC 2074 3s300 CONTROL WIRE - LOW VOLTAGE 20t4 35300 FIBER OPTIC CABLE 20L4 3s300 CONDUIT & FITTINGS ABOVE GROUN 2014 35300 COMM RACK/PANEL FRAME 2074 35300 COMMUNICATIONS EQUIP 2074 3s300 BUILDING SECURITY SYSTEM 2014 35300 CONTROL WIRE - LOW VOLTAGE 2074 3s300 CONTROL RACK/PAN EL FRAM E 2014 3s300 PROTECTION EQUIPMENT 20L4 35300 COMMUNICATIONS EQUIP 2074 35300 CONTROL WIRE - LOW VOLTAGE 7977 3s300 CONTROL WIRE - LOW VOLTAGE 7977 35300 CONTROL RACK/PANEL FRAM E 7977 35300 CONTROL EQUIPMENT 1965 35300 CONTROL EQUIPMENT 7977 3s300 CONTROL EQUIPMENT 1980 35300 COMMUNICATIONS EQUIP 1977 3s300 PROTECTION EQUIPMENT 2074 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 83 Borah Transmission Station FERC Acct Borah Asset Description Vintage 35011 LAND OWNED IN FEE TS 7972 35011 LAND OWNED IN FEE TS 1983 35011 PERMANENT LAND IMPROVEMENTS TS L975 35011 PERMANENT LAND IMPROVEMENTS TS 1983 3s200 YARD SURFACING - GRAVEL, ETC.t975 35200 YARD SURFACING - GRAVEL, ETC.1982 3s200 YARD SURFACING - GMVEL, ETC.1983 3s200 SITE EXCAVATION t972 3s200 SITE EXCAVATION 1983 35200 ENGR, SURVEYING OR CONSULTING L972 35200 ENGR, SURVEYING OR CONSULTING 1983 35200 ROAD EXCAVATION 1972 35200 ROAD EXCAVATION 1983 35200 PERIMETER FENCE & GATES L975 3s200 PERIMETER FENCE & GATES L982 3s200 PERIMETER FENCE & GATES 1983 3s200 WATER WELL PUMP 1975 3s200 WATER WELL PUMP 1983 35200 WATER SYSTEM L975 35200 WATER SYSTEM 1983 35200 WATER WELL 1975 35200 WATER WELL 1983 35200 SEPTIC TANK & CESSPOOL 1975 3s200 SEPTIC TANK & CESSPOOL 1983 35200 SEWAGE DRAIN SYSTEM 1975 35200 SEWAGE DRAIN SYSTEM 1983 3s200 SEWER LINE 7975 3s200 OIL CATCH BASIN t975 35200 LIGHT LOWERING DEVICE 1975 3s200 LIGHT LOWERING DEVICE 1983 35200 LIGHT MAST L975 3s200 LIGHT MAST 1983 3s200 LIGHT MAST, LOWER DEVICE & LIG 1977 3s200 LIGHT MAST. LOWER DEVICE & LIG 1983 35200 FOUNDATION - STATION BUILDING L975 35200 FOUNDATION - STATION BUILDING 1983 35200 COMPLETE STATION BUILDING 7975 35200 COMPLETE STATION BUILDING 1983 3s200 BUILDING PLUM BING SYSTEM 1975 EXECWION VERSION 35200 BUILDING PLUMBING SYSTEM 1983 35200 BUILDING HVAC SYSTEM 1983 3s200 ArR CONDTTTONERS &/OR COOLERS 1983 35200 EXHAUST FANS & DUCT 1983 35200 HUMIDIFIER 1983 3s200 BUILDING ELECTRICAL SYSTEM t975 3s200 BUILDING ELECTRICAL SYSTEM 1983 35200 BUILDING ELECTRICAL SYSTEM 1975 3s200 BUILDING ELECTRICAL SYSTEM 1983 35200 BUILDING ELECTRICAL SYSTE M !975 3s200 BUILDING ELECTRICAL SYSTEM 1983 35200 BUILDING ELECTRICAL SYSTEM t975 3s200 BUILDING ELECTRICAL SYSTEM 1983 35200 AIR COMPRESSOR FND t975 35200 FOUNDATION - COMM UNICATION 7975 35200 EQUIPMENT PAD L975 35200 LIGHTING MAST FND 7975 3s200 LIGHTING MAST FND 7977 35200 LIGHTING MAST FND 1983 3s200 TUNNELs t975 3s200 TUNNELS 1983 35200 CONCRETE ABOVE GROUND CABLEWAY 1975 3s200 CONCRETE SURFACE TRENCH WLIDS 7975 35200 CONCRETE SURFACE TRENCH WLIDS L982 35200 CONCRETE SURFACE TRENCH WLIDS 1983 3s200 CONDUIT & FITTINGS UNDERGROUND 7975 3s200 CONDUIT & FITTINGS UNDERGROUND t979 35200 CONDUIT & FITTINGS UNDERGROUND 1983 35200 TREAD PLATES 1982 35200 TREAD PLATES 1983 35200 UNIWALKS 1975 3s200 UNIWALKS 1983 3s200 METAL STRUCT - COMMUNICATION 7975 3s200 HEATERS L975 3s200 HEATERS 1983 35200 LIGHTING 7975 3s200 LIGHTING 1983 3s200 WELL HOUSE (INACTIVE)t975 35200 WELL HOUSE (INACTIVE)1983 3s200 TOOL SHED, MAINT BLDG, ETC L975 3s200 TOOL SHED, MAINT BLDG, ETC 1983 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 84 EXECWION VERSION 35300 CABLE TRAY AND ACCESSORIES 1975 3s300 CABLE TRAY AND ACCESSORIES 1983 35300 15KV POWER CABLE 7975 3s300 15KV POWER CABLE 1975 35300 15KV POWER CABLE 1983 35300 CONTROL WIRE - LOW VOLTAGE 1985 3s300 CONTROL WIRE - LOW VOLTAGE 1991 35300 CONTROL WIRE - LOW VOLTAGE 1993 35300 CONTROL WIRE - LOW VOLTAGE 1995 35300 CONTROL WIRE - LOW VOLTAGE 7975 3s300 CONTROL WIRE . LOW VOLTAGE 1975 3s300 #18 - S19 CONTROL WtRE 199s 35300 #18 - #19 CONTROL WtRE L982 3s300 #18 - #19 CONTROL WrRt 1983 35300 #18 - #19 CONTROL WtRE 1985 35300 f18 - #19 CONTROL WtRE 1991 3s300 #18 - #19 CONTROL WrRE 1995 3s300 #18 - #19 CONTROL WIRE 1996 35300 #18 - #19 CONTROL WtRt 7997 35300 #18 - f19 CONTROL WtRE 7982 3s300 f18 - #19 CONTROL WtRE 1983 3s300 #18 - #19 CONTROL WrRr 1985 35300 #18 - #19 CONTROL WtRE 1995 35300 #18 - #19 CONTROL WrRE 7977 35300 #18 - #19 CONTROL WrRE 7977 35300 #18 - #19 CONTROL WtRE 7982 3s300 #18 - #19 CONTROL WtRE 1983 3s300 #18 - #19 CONTROL WtRE 1985 35300 #18 - #19 CONTROL WtRE 1993 3s300 #18 - #19 CONTROL WrRE 1995 35300 #18 - #19 CONTROL WtRE 1977 35300 #14 - #16 coNTROL WtRE L979 3s300 #74 - #76 CONTROL WtRE 1995 35300 #14 - #16 CONTROL WtRE t975 3s300 fr74 - #t6 CONTROL WrRE 7982 35300 #74 - #76 CONTROL W|RE 1983 3s300 #14 - #16 CoNTROL WrRE 1993 35300 #t4 - #76 CONTROL WtRE 1995 35300 frL4 - #16 CONTROL WIRE 7975 35300 #74 - #L6 CONTROL WtRr 1975 35300 #74 - #76 CONTROL WtRE t975 3s300 #74 - #76 CONTROL W|RE 1985 35300 fi14 - #16 CoNTROL WtRt 1991 3s300 #74 - #76 CONTROL WrRE t975 35300 #t4 - #16 coNTROL WtRt 1982 3s300 #I4 -#L6 CONTROL WIRE 1983 35300 COAXIAL CABLE 1982 35300 COAXIAL CABLE 1982 3s300 COAXIAL CABLE 1983 35300 #t0 - #12 coNTRoL wtRE t982 35300 #10 - #12 CONTROL WrRE 1983 35300 *70 - #L2 CONTROL WIRE 1985 3s300 #10 - #72 CONTROL W|RE 1985 35300 #10 - #12 coNTRoL wtRE 1991 35300 #70 - #72 CONTROL WtRE 1993 3s300 fito - #t2 coNTRoL wtRE 1995 35300 #10 - #12 CONTROL WtRt 1995 35300 fr70 - #T2 CONTROL WIRE 1980 3s300 fr10 - #72 coNTROL WtRE 1981 35300 #70 - #72 CONTROL WrRr 7982 35300 #t0 - *72 coNTROL WrRE 1983 35300 tto - #t2 coNTRoL wtRE 1995 35300 *70 - *12 CoNTROL WtRt t975 35300 #70 - #12 CONTROL WrRE 1975 3s300 #to - #12 coNTRoL wtRE t982 35300 #lo - #72 coNTROL WtRE 1983 35300 #70 - *12 CONTROL WtRE 1985 3s300 #10 - #12 coNTROL WtRE 1991 35300 #10 - #72 coNTROL WtRE 1993 3s300 #10 - #\2 CONTROL WIRE 1995 35300 #LO - #12 CONTROL WIRE 1996 35300 #70 - *72 CONTROL WtRE 1981 3s300 #lo - #12 coNTRoL wtRE 1984 35300 #70 - #72 CONTROL WtRE 1987 35300 #t0 - *t2 coNTRoL wlRE 1995 35300 #IO - #L2 CONTROL WIRE t979 35300 #to - #72 CoNTROL W|RE 7975 35300 frto - #12 coNTRoL wtRE 7975 35300 fr10 - #72 coNTROL WtRE 7975 35300 frLO - #L2 CONTROL WIRE 1981 35300 #70 - #72 CONTROL WlRt 7982 3s300 #10 - #12 CONTROL WtRE 1983 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 85 3s300 #LO - #I2 CONTROL WIRE 1991 3s300 #70 - #L2 CONTROL WIRE 1995 3s300 #70 - #I2 CONTROL WIRE 1975 35300 #7 - #9 CONTROL WIRE t975 35300 #7 - #9 CONTROL WIRE 7975 35300 #7 -#9 CONTROLWIRE 1977 35300 #7 -#9 CONTROLWIRE 1980 35300 #7.#9 CONTROLWIRE 1982 3s300 #7 -#9 CONTROLWTRE 1983 3s300 #L-#6 CONTROL WIRE 198s 35300 fi7 - #6 CONTROL WIRE L975 35300 #1 - #6 CONTROL WIRE 1975 3s300 #1 - #6 CONTROL WIRE 1975 3s300 #1 - #6 CONTROL WIRE 7942 3s300 #1 - #6 CONTROL WIRE 1983 35300 #L -#6 CONTROL WIRE 1995 35300 #L-#6 CONTROL WIRE L982 3s300 #1 - #6 CONTROL WIRE 1983 3s300 #1 - #6 CONTROL WIRE 1995 35300 f1 - S6 CONTROL WIRE L975 35300 #1 - f6 CONTROL WIRE 1982 3s300 #1 - #6 CONTROL WIRE 1983 35300 frI -#6 CONTROL WIRE 7982 35300 fiL -#6 CONTROL WIRE 1983 35300 #1- #6 CONTROL WIRE 1995 35300 #1- #5 CONTROL WIRE 7975 3s300 1/O COPPER CONTROL WIRE t975 35300 2/0 coPPER CONTROL WrRE 1982 35300 2/0 coPPER CONTROL WIRE 1983 35300 5OO MCM ALUM CONTROL WIRE r975 3s300 1/0 ALUM CONTROL WrRE 7975 3s300 GROUNDING AND FITTINGS 7982 35300 GROUNDING AND FITTINGS 1983 3s300 GROUNDING AND FITTINGS 7975 35300 GROUNDING AND FITTINGS 1982 35300 GROUNDING AND FITTINGS 1983 35300 f4 COPPER GROUND 7975 35300 #4 COPPER GROUND 1983 3s300 #6 COPPER GROUND MAT r975 35300 #6 COPPER GROUND MAT 1982 3s300 #6 COPPER GROUND MAT 1983 EXECWION VERSION 35300 7/16 COPPER GROUND 7975 35300 7/16 COPPER GROUND 7982 35300 7/16 COPPER GROUND 1983 35300 2/O COPPER GROUND 7975 35300 2/O COPPER GROUND t979 35300 2/O COPPER GROUND t982 35300 2/O COPPER GROUND 1983 35300 250 MCM COPPER GROUND L975 3s300 250 MCM COPPER GROUND t979 3s300 250 MCM COPPER GROUND 1980 3s300 250 MCM COPPER GROUND 7982 35300 250 MCM COPPER GROUND 1983 35300 5OO MCM COPPER GROUND 1975 35300 5OO MCM COPPER GROUND 1983 35300 CONDUIT & FITTINGS ABOVE GROUN 1977 3s300 CONDUIT & FITTINGS ABOVE GROUN t975 3s300 CONDUIT & FITTINGS ABOVE GROUN t975 35300 CONDUIT & FITTINGS ABOVE GROUN 1975 3s300 CONDUIT & FITTINGS ABOVE GROUN t982 35300 CONDUIT & FITTINGS ABOVE GROUN 1983 35300 CONDUIT & FITTINGS ABOVE GROUN 7975 35300 CONDUIT & FITTINGS ABOVE GROUN L982 3s300 CONDUIT & FITTINGS ABOVE GROUN 1983 35300 CONDUIT & FITTINGS ABOVE GROUN 7975 35300 CONDUIT & FITTINGS ABOVE GROUN 1975 35300 CONDUIT & FITTINGS ABOVE GROUN 1981 3s300 CONDUIT & FITTINGS ABOVE GROUN 1975 35300 2" -3-712" CONDUTT 7975 35300 2" -3-7/2" CONDUTT t975 35300 2" -3-t12" CONDU|T 1981 3s300 2" - 3-112" CONDU|T 1982 3s300 2" - 3-712" CONDUtT 1983 35300 2" - 3-7/2" CONDU|T L975 3s300 2" - 3-7/2" CONDUtr 1981 35300 2" -3-712" CONDUTT L982 35300 2" -3-t12" CONDUTT 1983 35300 2" -3-L/2" CONDUTT L975 35300 2" -3-7/2" CONDUTT 7982 3s300 2" - 3-7/2" CONDUIT 1983 35300 4'' CONDUIT 1975 35300 4" CONDUIT 7979 JOINT OWNERSHIP AND OPERATING AGREEMENT-EXHIBIT B Page | 86 35300 4" CONDUIT t982 3s300 4,,CONDUIT 1983 35300 4'' CONDUIT 1982 3s300 4,'CONDUIT 1983 35300 5'' CONDUIT 7982 35300 5'' CONDUIT 1983 35300 SMALL ELECTRICAL ENCLOSU RE t975 3s300 SMALL ELECTRICAL ENCLOSURE 1981 35300 SMALL E LECTRICAL ENCLOSU RE 7982 35300 SMALL E LECTRICAL ENCLOSU RE 1983 3s300 15-49KVA LOCAL SERVICE XFMR 1975 35300 15-49KVA LOCAL SERVICE XFMR r975 3s300 15-49KVA LOCAL SERVICE XFMR t975 3s300 15-49KVA LOCAL SERVICE XFMR 1982 3s300 15-49KVA LOCAL SERVICE XFMR 1983 35300 SWITCH - POWER FUSE L975 35300 CONTROL RACK/PAN EL FRAM E 7975 3s300 CONTROL RACK/PANEL FRAME 1983 35300 CONTROL RACK/PANEL FRAME 7975 35300 CONTROL RACK/PAN EL FRAM E 1996 35300 CONTROL RACK/PANEL FRAME 7975 3s300 CONTROL RACK/PANEL FRAME 1975 35300 CONTROL RACK/PANEL FRAM E 1983 3s300 CONTROL RACK/PANEL FRAM E 1985 35300 CONTROL RACK/PANEL FRAME 1985 35300 CONTROL RACK/PAN EL FRAM E 7975 35300 CONTROL RACK/PANEL FRAM E 7975 3s300 CONTROL RACK/PANEL FRAME 1975 35300 CONTROL RACK/PANEL FRAME 7975 3s300 CONTROL RACK/PANEL FRAME 1975 35300 CONTROL RACK/PANEL FRAME 1991 35300 CONTROL RACK/PAN EL FRAM E 1995 35300 CONTROL RACK/PAN EL FRAM E 1995 35300 CONTROL RACK/PAN E L FRAM E 1995 3s300 CONTROL RACK/PANEL FRAME t975 35300 CONTROL COMPUTER & PERIPHERALS 1995 35300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 EXECUTION VERSION 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1996 35300 PROTECTION EQUIPMENT 1991 35300 PROTECTION EQUIPMENT 1991 35300 METERING EQUIPMENT 7982 3s300 METERING EQUIPMENT 1983 35300 CONTROL COMPUTER & PERIPHERALS 1996 35300 ALARM/MONITORING EQUIPMENT L975 3s300 METERING EQUIPMENT 1982 35300 METERING EQUIPMENT 1983 3s300 CONTROL COMPUTER & PERIPHERAL5 1995 35300 METERING EQUIPMENT 1993 3s300 CONTROL EQUIPMENT 1996 35300 CONTROL EQUIPMENT 7974 3s300 CONTROL EQUIPMENT 7975 3s300 CONTROL EQUIPMENT 7975 35300 CONTROL EQUIPMENT 7975 35300 CONTROL EQUIPMENT 1975 35300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT 7975 3s300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT 7975 35300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1983 3s300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT 1975 3s300 CONTROL EQUIPMENT t977 35300 CONTROL EQUIPMENT 1985 3s300 CONTROL EQUIPMENT t975 35300 CONTROL EOUIPMENT L977 35300 CONTROL EQUIPMENT L982 3s300 CONTROL EQUIPMENT 1983 3s300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT 1981 35300 CONTROL EQUIPMENT 1984 3s300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT 7987 3s300 CONTROL EQUIPMENT 7975 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 87 EXECWION VERSION 35300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT 1991 3s300 CONTROL EQUIPMENT 1995 35300 CONTROL EQUIPMENT 1995 35300 CONTROL EQUIPMENT 1995 3s300 CONTROL EQUIPMENT 1995 3s300 CONTROL EQUIPMENT 1996 35300 SCADA RACK/PANEL FRAME L975 35300 SCADA RACK/PANEL FRAME 1983 35300 SCADA RACK/PANEL FRAME 7975 35300 SCADA RACK/PANEL FRAME 1983 35300 SCADA RACK/PANEL FRAME 1975 3s300 SCADA RACK/PANEL FRAME 1983 35300 SCADA RACK/PANEL FRAME 1985 3s300 SCADA EQUIPMENT 1976 3s300 SCADA EQUIPMENT 1983 35300 SCADA EQUIPMENT t976 35300 SCADA EQUIPMENT 1983 35300 SCADA EQUIPMENT t976 3s300 SCADA EQUIPMENT 1983 35300 SCADA EQUIPMENT 1985 3s300 YARD LOCAL SERV OR LOAD CENTER 1975 35300 48 VOLT BATTERY CHARGER 1982 35300 48 VOLT BATTERY CHARGER 1983 35300 48 VOLT BATTERY 7982 35300 48 VOLT BATTERY 1983 35300 BATTERY RACK 7975 3s300 BATTERY RACK 1982 35300 BATTERY RACK 1983 3s300 LOAD CENTER, AC 1975 3s300 LOAD CENTER, AC 7975 3s300 LOAD CENTER, AC 7982 3s300 LOAD CENTER, AC 1983 35300 LOAD CENTER, DC L975 35300 LOAD CENTER, DC t982 3s300 LOAD CENTER, DC 1983 35300 10 - 40 AMP CIR BRKR 1995 35300 VOLTAGE ALARM 7975 3s300 VOLTAGE ALARM 1983 35300 AUXILIARY POWER XFMR 1PH 7975 35300 AUXILIARY POWER XFMR 1PH 1983 35300 25KVA 1 PH XFMR 1975 35300 25KVA 1 PH XFMR 1983 35300 sOKVA 1 PH XFMR 7975 3s300 sOKVA 1 PH XFMR 1983 3s300 75KVA 3 PH XFMR t975 35300 75KVA 3 PH XFMR 1983 35300 112KVA 3 PH XFMR L975 35300 112KVA 3 PH XFMR 1983 35300 sOOKVA 3 PH XFMR 7975 3s300 sOOKVA 3 PH XFMR 1983 35300 lKVA 480/240-120 VOLT XFMR 7975 3s300 TKVA 4801240-120 VOLT XFMR 1983 3s300 OTHER METERING EQUIPMENT 1982 3s300 OTHER METERING EQUIPMENT 1983 3s300 MISC OFFICE FURNITURE 7979 3s300 MISC OFFICE FURNITURE 1983 35300 CHAIR 1975 3s300 CHAIR 1983 35300 DESK 7975 3s300 DESK 1983 3s300 FILE CABINET 1975 3s300 FILE CABINET L979 35300 FILE CABINET 1983 35300 PRINT HOLDER t975 35300 PRINT HOLDER 1983 35300 TABLE 1956 35300 TABLE 1983 35300 COM PUTER AND PERIPHERALS 1992 35300 INTERCOM SYSTEM 7975 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD SHELF 1999 39720 MICROWAVE, CARD SHELF 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 JOINT OWNERSHIP AND OPERATINC AGREEMENT - EXHIBIT B Page | 88 EXECUTION VERSION 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 3s300 #18 - #19 CONTROL WtRE 1999 35300 CONTROL RACK/PANEL FRAME 1999 3s300 CONTROL COMPUTER & PERIPHERALS 1999 35200 EQUIPMENT PAD 1999 35300 15KV POWER CABLE 1999 35300 #18 - #19 CONTROL WtRE 1999 3s300 #70 - #72 CONTROL WtRt 1999 35300 2" _3_u2" CONDUTT 1999 35300 4" CONDUIT 1999 35300 AUXILLARY GENERATOR 1999 35300 #74 - #L6 CONTROL WIRE 1999 35300 CONTROL RACK/PANEL FRAME 1999 35300 CONTROL RACK/PANEL FRAME 1999 3s300 ALARM/MONITORING EQUIPMENT 1999 35300 ALARM/MONITORING EQUIPMENT 1999 3s300 CONTROL COMPUTER & PERIPHERALS 1999 35300 CONTROL WIRE - LOW VOLTAGE 1999 3s300 #18 - #19 CONTROL WtRE 1999 35300 #74 - #16 CONTROL WtRt 1999 35300 #70 - #L2 CONTROL WrRt 1999 35300 PROTECTION EQUIPMENT 1999 39720 MICROWAVE, BATTERY 1999 39720 MICROWAVE, BATTERY 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 35300 130 VOLT BATTERY CHARGER 2000 35300 130 VOLT BATTERY 2000 35300 BATTERY RACK 2000 3s300 SAFEW SWITCH 2000 39720 M rcRowAVE, STRUCT(POLES&FtX)1998 39720 M ICROWAVE, STRUCT(POLES&FIX)1998 39720 MICROWAVE, PANEL UNIT 1998 39720 MICROWAVE, PANEL UNIT 1998 3s200 COMPLETE STATION BUILDING 2007 3s200 SMOKE DETECTOR 2001 35300 METERING EQUIPMENT 1999 3s300 METERING EQUIPMENT 1999 3s300 METERING EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 2000 35300 CONTROL RACK/PANEL FRAME 1998 3s300 ALARM/MONITORING EQU I PMENT 1998 3s200 CONDUIT & FITTINGS UNDERGROUND 2003 35300 CONTROL WIRE - LOW VOLTAGE 2003 3s300 CONTROL RACK/PAN EL FRAM E 2003 35300 CONTROL RACK/PAN E L FRAM E 2003 35300 PROTECTION EQUIPMENT 2003 3s300 MDF BOARD FOR COMMUNICATIONS 2003 3s300 COMMUNICATIONS EQUIP 2003 35300 COMMUNICATIONS EQUIP 2003 35300 COMMUNICATIONS EQUIP 2003 3s300 AUXILIARY LOAD CENTER 2003 35300 CONTACTOR 2003 35300 COMMUNICATIONS EQUIP 2004 35300 COMMUNICATIONS EQUIP 2004 3s300 CONTROL WIRE - LOW VOLTAGE 2004 39720 MICROWAVE, EQUIPMENT 2004 3s300 PROTECTION EQUIPMENT 200s 35300 DISTANCE / FAULT LOCATOR 2005 3s300 COMMUNICATIONS EQUIP 2007 3s300 COMMUNICATIONS EQUIP 2007 35200 CONCRETE SURFACE TRENCH WLIDS 2007 3s300 BARRIER - FENCE, EQUIP PROT 2007 3s300 GRATING 2007 3s300 CONTROL WIRE . LOW VOLTAGE 2007 35300 CONTROL RACK/PAN EL FRAM E 2007 3s300 PROTECTION EQUIPMENT 2007 35300 SCADA RACK/PANEL FRAME 2007 35300 SCADA RACK/PANEL FRAME 2007 35300 SCADA RACK/PANEL FRAME 2007 3s300 SCADA EQUIPMENT 2007 3s300 SCADA EQUIPMENT 2007 3s300 SCADA COMPUTER AND PERIPHERALS 2007 35300 AUXILIARY POWER XFMR 3 PH 2007 35300 AI.ARM/MON ITORI NG EQUIPMENT 2008 3s300 CONTROL RACK/PANEL FRAM E 2007 35300 CONTROL RACK/PANEL FRAME 2007 35300 PROTECTION EQUIPMENT 2007 3s300 PROTECTION EQUIPMENT 2007 39740 FIBER, MISC EQUIPMENT 2008 39740 FIBER, CARD SHELF 2008 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT Page | 89 39740 FIBER, CARD UNIT 2008 39740 FIBER, WIRE/CABLE 2008 35200 CONDUIT & FITTINGS UNDERGROUND 2007 3s300 CONTROL WIRE - LOW VOLTAGE 2007 35300 GROUNDING AND FITTINGS 2007 35300 COMM RACK/PANEL FRAME 2007 35300 COMM RACK/PANEL FRAME 2007 3s300 COMM RACIVPANEL FMME 2007 35300 YARD LOCAL SERV OR LOAD CENTER 2007 39120 NETWORK EQ 2009 39120 NETWORK EQ 2009 3s300 CONTROL WIRE - LOW VOLTAGE 2008 35300 CONTROL WIRE - LOW VOLTAGE 2008 3s300 FIBER OPTIC CABLE 2008 35300 FIBER OPTIC CABLE 2008 3s300 CONDUIT & FITTINGS ABOVE GROUN 2008 35300 CONDUIT & FITTINGS ABOVE GROUN 2008 35300 CONTROL RACK/PANEL FRAME 2008 35300 CONTROL RACK/PAN EL FRAM E 2008 35300 CONTROL RACK/PANEL FRAM E 2008 3s300 CONTROL RACK/PANEL FRAM E 2008 35300 PROTECTION EQUIPMENT 2008 35300 PROTECTION EQUIPMENT 2008 35300 PROTECTION EQUIPMENT 2008 35300 PROTECTION EQUIPMENT 2008 3s300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 39720 MICROWAVE, BATTERY 2009 39720 M ICROWAVE, BATTERY CHARGER 2009 39720 MICROWAVE, EQUIPMENT 2009 35300 COMM RACK/PANEL FRAME 2009 35300 COMMUNICATIONS EQUIP 2009 35300 CONTROL WIRE - LOW VOLTAGE 2009 35300 CONDUIT & FITTINGS ABOVE GROUN 2009 35300 AUXILIARY LOAD CENTER 2009 35200 BUILDING HVAC SYSTEM 2009 35200 BUILDING HVAC SYSTEM 2010 35300 CONTROL WIRE - LOW VOLTAGE 207L 3s300 GROUNDING AND FITTINGS 2077 EXECWION VERSION 3s300 TARGE ELECTRICAL ENCLOSURE 2077 35300 COMPOSITE CABLE - LOW VOLTAGE 2010 35300 coMMUNtCATtONS EQUTP 2010 3s300 COMMUNICATIONS EQUIP 20tL 3s300 CONTROL WIRE - LOW VOLTAGE 2072 3s300 CONTROL WIRE - LOW VOLTAGE 2012 35300 COMM RACK/PANEL FRAME 2072 35300 COMM RACK/PANEL FRAME 2072 3s300 COMMUNICATIONS EQUIP 20L2 3s300 COMMUNICATIONS EQUIP 2072 35300 CONTROL WIRE - LOW VOLTAGE 2072 35300 CONTROL WIRE - LOW VOLTAGE 2072 35300 COMM RACK/PANEL FRAME 2072 35300 COMM RACK/PANEL FRAME 2072 35300 COMMUNICATIONS EQUIP 20L2 3s300 COMMUNICATIONS EQUIP 2072 3s300 COMMUNICATIONS EQUIP 2012 3s300 COMMUNICATIONS EQUIP 2012 3s200 CONDUIT & FITTINGS UNDERGROUND 2010 3s200 CONDUIT & FITTINGS UNDERGROUND 2010 35300 CONTROL WIRE - LOW VOLTAGE 2010 3s300 CONTROL WIRE - LOW VOLTAGE 2010 3s300 COAXIAL CABLE 2010 35300 COAXIAL CABLE 2010 35300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PANEL FRAM E 2010 35300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PAN E L FRAM E 2010 35300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PAN EL FRAME 2070 35300 PROTECTION EQUIPMENT 20LO 35300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 35300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 20to 3s300 AUXILIARY LOAD CENTER 2010 35300 AUXILIARY LOAD CENTER 2010 3s300 CONTROL WIRE - LOW VOLTAGE 2010 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 90 35300 CONTROL WIRE - LOW VOLTAGE 2010 3s300 COMPOSITE CABLE. LOW VOLTAGE 2010 35300 COMPOSITE CABLE - LOW VOLTAGE 2010 35300 COAXIAL CABLE 2010 3s300 COAXIAL CABLE 2010 35300 CONTROL RACK/PAN E L FRAM E 2010 3s300 CONTROL RACK/PANEL FRAM E 2070 3s300 CONTROL RACK/PANEL FRAM E 2010 35300 CONTROL RACK/PANEL FRAM E 2010 35300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PAN EL FRAM E 2070 3s300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PAN E L FRAM E 20to 35300 CONTROL RACK/PAN EL FRAM E 2070 3s300 CONTROL RACK/PANEL FRAM E 20t0 35300 CONTROL RACK/PANEL FRAM E 2010 35300 CONTROL RACK/PAN EL FRAM E 2070 35300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2070 3s300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 35300 CONTROL EQUIPMENT 20L0 35300 CONTROL EQUIPMENT 2070 35300 COMMUNICATIONS EQUIP 2070 35300 coMMUNtCATtONS EQUTP 2070 35300 PROTECTION EQUIPMENT 2072 35300 CONTROL WIRE - LOW VOLTAGE 2072 3s300 GROUNDING AND FITTINGS 2072 35300 CONDUIT & FITTINGS ABOVE GROUN 2072 3s300 I.ARGE ELECTRICAL ENCLOSURE 2072 35300 YARD LOCAL SERV OR LOAD CENTER 2072 35300 CONTROL WIRE - LOW VOLTAGE 2008 3s300 CONTROL WIRE - LOW VOLTAGE 2008 35300 FIBER OPTIC CABLE 2008 3s300 FIBER OPTIC CABLE 2008 3s300 CONDUIT & FITTINGS ABOVE GROUN 2008 35300 CONDUIT & FITTINGS ABOVE GROUN 2008 3s300 CONTROL RACK/PAN E L FRAM E 2008 35300 CONTROL RACK/PANEL FRAME 2008 EXECUTION VERSION 35300 CONTROL RACK/PANEL FRAM E 2008 35300 CONTROL RACK/PAN EL FRAM E 2008 35300 PROTECTION EQUIPMENT 2008 3s300 PROTECTION EQUIPMENT 2008 35300 PROTECTION EQUIPMENT 2008 35300 PROTECTION EQUIPMENT 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 3s300 COMMUNICATIONS EQUIP 2007 35300 COMMUNICATIONS EQUIP 2007 3s300 METERING EQUIPMENT 2072 35200 CONCRETE SURFACE TRENCH W/LIDS 2013 3s300 STN POWER CABLE AND FITTINGS 2073 36600 PAD-3PH SECT ENCLOSURE- PRIMAR 2073 35600 VAULT BASE SECTION 2013 35500 VAULT TOP SECTION 2013 36600 CON DUIT DUST-DIRECT BURIAL-PRI 2013 36700 UG CONDUCTOR-PRIMARY 15KV 20L3 36700 SECT ENCLOSURE 3PH - PRIMARY 2073 3s300 GROUNDING AND FITTINGS 2073 39720 M ICROWAVE, STRUCT(POLES&FIX)2012 39720 MICROWAVE, EQUIPMENT 2072 39720 MICROWAVE, WIRE/CABLE 2072 35200 FOUNDATION - COMMUNICATION 20t2 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 9l Hemingway Transmission Station FERC Acct Hemingwav Asset Description Vintage 35011 LAND OWNED IN FEE TS 2008 35300 COMMUNICATIONS EQUIP 20LL 35200 SITE PREPARATION & IMPROVEMENT 2010 35200 PERIMETER FENCE & GATES 2010 3s200 WATER SYSTEM 20to 35200 WATER WELL 2070 3s200 COMPLETE SEPTIC SYSTEM 2070 35200 YARD LIGHT SYSTEM 20LO 35200 FOUNDATION - STATION BUILDING 2010 35200 COMPLETE STATION BUILDING 2010 35200 BUILDING PLUMBING SYSTEM 2010 35200 BUILDING HVAC SYSTEM 2010 3s200 BUILDI NG ELECTRICAL SYSTEM 2010 3s200 BUILDING FIRE PROTECTION 2010 35200 FOUNDATION . STRUCTURE 2070 3s200 FOUNDATION - OTHER EQUIPMENT 2010 3s200 CONCRETE SURFACE TRENCH W/LIDS 2010 35200 CONDUIT & FITTINGS UNDERGROUND 2010 35200 METAL STRUCT - OTHER SUPPORT 2010 3s200 METAL STRUCT - EQUIPMENT 2010 35200 WOOD POLE - MISC 2070 35300 CABLE TRAY AND ACCESSORIES 20to 35300 CABLE TRAY AND ACCESSORIES 20LO 3s300 CABLE TRAY AND ACCESSORIES 20L0 3s300 CABLE TRAY AND ACCESSORIES 2010 35300 CABLE TRAY AND ACCESSORIES 2010 3s300 CABLE TRAY AND ACCESSORIES 2070 35300 CABLE TRAY AND ACCESSORIES 2070 3s300 CABLE TRAY AND ACCESSORIES 2010 35300 CABLE TRAY AND ACCESSORIES 2070 3s300 INSULATORS. PIN OR POST 20to 3s300 BUS - RIGID WITH FITTINGS 2010 3s300 STN POWER CABLE AND FITTINGS 2010 3s300 STN POWER CABLE AND FITTINGS 2010 35300 CONTROL WIRE - LOW VOLTAGE 2010 3s300 CONTROL WIRE - LOW VOLTAGE 2070 3s300 COAXIAL CABLE 2010 3s300 FIBER OPTIC CABLE 2010 3s300 GROUNDING AND FITTINGS 20to EXECUTION VERSION 3s300 75KVA LOCAL SERVICE XFMR 2010 3s300 5OO-1499KVA LOCAL SERVICE XFMR 20to 35300 SWITCH - POWER FUSE 2070 3s300 CONTROL RACK/PANEL FRAME 2070 3s300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PANEL FRAME 2070 35300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PANEL FRAM E 2010 3s300 CONTROL RACK/PANEL FRAM E 2010 3s300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PAN EL FRAM E 2070 3s300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PANEL FRAME 20LO 3s300 CONTROL RACK/PANEL FRAM E 2010 35300 CONTROL RACK/PANEL FRAM E 2010 3s300 CONTROL RACK/PANEL FRAM E 2010 35300 CONTROL RACK/PAN EL FRAME 2010 35300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PANEL FRAM E 2070 3s300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PAN EL FRAME 2010 3s300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PAN Et FRAM E 2070 35300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PANEL FRAM E 2010 35300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PAN EL FRAME 2070 3s300 CONTROL RACK/PANEL FRAME 2070 35300 PROTECTION EQUIPMENT 20ro 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page 192 3s300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2070 3s300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 35300 CONTROL EQUIPMENT 2010 35300 CONTROL EQUIPMENT 2010 3s300 METERING EQUIPMENT 2070 3s300 ALARM/MONITORING EQU I PMENT 2010 35300 SCADA RACK/PANEL FRAME 2010 3s300 SCADA RACK/PANEL FRAME 2010 3s300 SCADA RACK/PANEL FRAME 2010 3s300 SCADA RACK/PANEL FRAME 2010 35300 SCADA RACK/PANEL FRAME 2010 3s300 SCADA EQUIPMENT 2010 3s300 SCADA EQUIPMENT 2010 35300 SCADA EQUIPMENT 2010 3s300 SCADA EQUIPMENT 20\o 35300 SCADA EQUIPMENT 2010 35300 COMM RACK/PANEL FRAME 2010 3s300 COMM RACK/PANEL FRAME 2010 35300 COMM RACK/PANEL FRAME 2010 35300 COMM RACK/PANEL FRAME 2010 3s300 COMM RACK/PANEL FRAME 2070 3s300 COMM RACK/PANEL FRAME 2070 3s300 COMM RACK/PANEL FRAME 2010 35300 COMM RACK/PANEL FRAME 2070 35300 DISTANCE / FAULT LOCATOR 2070 35300 COMMUNICATIONS EQUIP 2010 35300 coMMUNTCATTONS EQUrP 2070 3s300 COMMUNICATIONS EQUIP 20LO 3s300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2010 3s300 YARD LOCAL SERV OR LOAD CENTER 2010 35300 48 VOLT BATTERY CHARGER 2010 3s300 48 VOLT BATTERY CHARGER 2010 EXECUTION VERSION 35300 130 VOLT BATTERY CHARGER 2070 35300 48 VOLT BATTERY 2010 35300 130 VOLT BATTERY 2010 3s300 BATTERY RACK 2010 3s300 TRANSFER SWITCH 2010 35300 BUILDING SECURIW SYSTEM 2010 3s300 BUILDING SECURIW SYSTEM 2010 35300 BOX, CABINET OR PANEL 2010 35300 MISC OFFICE FURNITURE 2010 3s300 MISC OFFICE EQUIPMENT 2010 35300 COMMUNICATIONS EQUIP 2077 35200 WOOD POLE - MISC 2073 35300 CONTROL WIRE - LOW VOLTAGE 2073 35300 FIBER OPTIC CABLE 2013 3s300 GROUNDING AND FITTINGS 2073 3s300 CONDUIT & FITTINGS ABOVE GROUN 2013 3s300 COMM RACK/PANEL FRAME 2013 3s300 COMM RACK/PANEL FRAME 2013 35300 COMMUNICATIONS EQUIP 2013 35300 BUILDING SECURITY SYSTEM 2073 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 93 Kinport Transmission Station FERC Acct Kinoort Asset Description Vintage 35011 LAND OWNED IN FEE TS 7970 35011 LAND OWNED IN FEE TS 7972 35011 I.AND OWNED IN FEE T5 t976 35200 RETAINING WALLS t972 35200 SITE PREPARATION & IMPROVEMENT L972 35200 DRAINAGE SYSTEMS-CULVERTS, ETC t972 35200 YARD SURFACING - GRAVEL, ETC.1972 35200 YARD SURFACING - GRAVEL, ETC.7976 35200 YARD SURFACING - GRAVEL, ETC.7979 3s200 SITE EXCAVATION 7972 35200 BLACKTOP 7972 35200 GRAVEL 1972 3s200 GRAVEL 7976 3s200 CULVERTS 1972 3s200 ROAD EXCAVATION 1972 35200 ROAD REGRADING t984 35200 CONCRETE WALK 1980 3s200 PERIMETER FENCE & GATES 7976 3s200 PERIMETER FENCE & GATES 7992 35200 WATER WELL PUMP t976 3s200 WATER SYSTEM 7976 35200 WATER WELL 1976 35200 COMPLETE SEPTIC SYSTEM t976 35200 WATER STORAGE RESERVOIR t976 3s200 YARD LIGHT SYSTEM 1976 3s200 YARD LIGHT SYSTEM 1980 35200 YARD LIGHT SYSTEM 1992 35200 YARD LIGHT SYSTEM 1976 3s200 YARD LIGHT SYSTEM 1980 3s200 YARD LIGHT SYSTEM 7976 35200 LIGHT STANDARD L976 35200 LIGHT STANDARD L992 3s200 FOUNDATION - CONDENSER BLDG 1980 35200 FOUNDATION - STATION BUILDING 7976 3s200 COMPLETE STATION BUILDING 1976 3s200 COMPLETE STATION BUILDING 1980 35200 COMPLETE CONDENSER CNTRL BLDG 1980 35200 COMPLETE CONDENSER CNTRL BLDG 1980 35200 PIPING FOR PLUMBING L976 EXECUTION VERSION 3s200 SHOWER \976 3s200 WATER HEATER 7976 35200 BUILDING HVAC SYSTEM 7976 3s200 HEATER & AIR CONDITIONER COMBI 1980 35200 HEATER & AIR CONDITIONER COMBI 1980 35200 AIR CONDITIONER TRANSFORMER 1980 35200 BUILDI NG ELECTRICAL SYSTE M 7976 3s200 BUILDING ELECTRICAL SYSTE M 7976 3s200 BUILDING LIGHT FIXTURE 1980 3s200 BUILDING ELECTRICAL SYSTEM 1980 35200 BUILDING ELECTRICAL SYSTEM L976 35200 BUI LDING ELECTRICAL SYSTEM 1980 3s200 D.C. EMERGENCY FIXTURE 7975 3s200 BUILDING ELECTRICAL SYSTEM 7976 3s200 CATWALK FND 7976 35200 FOUNDATION - COMM UNICATION 7976 3s200 COMMUNICATION BOX FND 1976 3s200 EQUIPMENT PAD 1980 35200 OUTDOOR CABINET FND 1993 35200 FOUNDATION - METAL CI.AD L976 3s200 LIGHTING MAST FND 1992 35200 TUNNELS t976 35200 CONCRETE ABOVE GROUND CABLEWAY 7976 3s200 CONCRETE SURFACE TRENCH WLIDS t976 3s200 CONCRETE SURFACE TRENCH WLIDS 1981 3s200 CONCRETE SURFACE TRENCH WLIDS 7992 35200 CONDUIT & FITTINGS UNDERGROUND 7979 35200 CONDUIT & FITTINGS UNDERGROUND 1980 35200 CONDUIT UNDER GROUND CABLEWAY 1981 35200 CONDUIT & FITTINGS UNDERGROUND 1981 3s200 UNIWALKS 1976 35200 CONCRETE MANHOLE WCOVER 1981 35200 CONCRETE MANHOLE W/COVER 7992 3s200 CABLE RISER SUPPORT 7976 3s200 CATWALK STRUCTURE 1976 35200 METAL STRUCT - COMMUNICATION 7976 3s200 STATIC BAR SUPPORT STRUCTURE 7976 35200 WELL HOUSE (INACTIVE)7976 3s200 TOOL SHED, MAINT BLDG, ETC 1976 35200 HEATERS L976 3s200 LIGHTING L975 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 94 3s200 PLUMBING 7976 35300 BARRIER - FIRE, SWITCHING, ETC 7976 3s300 HANDRAIL 7976 3s300 GRATING t976 35300 CABLE TRAY AND ACCESSORIES 1976 35300 2/0 AWG CONDUCTOR COPPER 1985 3s300 250 MCM CONDUCTOR COPPER 1981 35300 266.8 MCM CONDUCTOR ALUMINUM 7976 3s300 336.4 MCM CONDUCTOR ALUMINUM 7976 3s300 397.5 MCM CONDUCTOR ALUMINUM t976 35300 15KV POWER CABLE 7976 3s300 15KV POWER CABLE 7976 35300 15KV POWER CABLE 1980 3s300 15KV POWER CABLE 1976 35300 CONTROL WIRE - LOW VOLTAGE r976 3s300 CONTROL WIRE - LOW VOLTAGE 1976 35300 #18 - #19 CONTROL WrRE 1991 35300 #18 - #19 CONTROL WrRr 1995 35300 #18 - #19 CONTROL WtRE 7976 3s300 #18 - #19 CONTROL WtRt 1980 35300 #18 - #19 CONTROL WtRt 1981 3s300 #18 - #19 CONTROL WtRE 1986 35300 #18 - #19 CONTROL WrRE 1990 3s300 #18 - #19 CONTROL WrRr 1991 3s300 #18 - #19 CONTROL WtRE 7992 3s300 #18 - #19 CONTROL W|RE 1993 3s300 #18 - #19 CONTROL WtRE 1995 3s300 f18 - f19 CONTROL WrRE 1996 35300 #18 - #19 CONTROL WtRt 1997 3s300 #18 - f19 CONTROL WtRE 1980 35300 #18 - #19 CONTROL WrRE 7992 35300 #18 - #19 CONTROL WtRE 1976 3s300 #18 - #19 CONTROL WtRE 7979 3s300 #18 - #19 CONTROL WtRE 1981 35300 #18 - #19 CONTROL WtRE 1991 3s300 #18 - #19 CONTROL WtRE 7992 3s300 #18 - #19 CONTROL WtRE 1976 3s300 #18 - #19 CONTROL WrRE t979 35300 #18 - #19 CONTROL WtRE 7982 3s300 #14 - #16 CONTROL WtRE r976 35300 #74 - #76 CONTROL WtRE t979 EXECUTION VERSION 35300 #14 - #16 CONTROL WtRE 1981 3s300 #74 - #76 CONTROL WlRt 1996 35300 #14 - #16 CONTROL WtRE 1992 35300 #74 - #76 CONTROL WrRr 1976 3s300 #14 - #76 CONTROL WtRE 7979 35300 #74 - #76 CONTROL WtRt 1991 35300 #74 - #16 CONTROL WtRt 1992 3s300 #14 - #76 CONTROL WtRE 1993 35300 #74 - #76 CONTROL WtRt 1980 35300 #t4 - #t6 coNTROL WrRE 1980 3s300 #14 - #t6 CONTROL WtRt 1993 35300 #T4 - #16 CONTROL WIRE 1996 35300 #74 - #76 CONTROL WrRE 1990 35300 i74 - #76 CONTROL WIRE 1980 35300 fi74 - #16 CONTROL WrRE 1981 35300 #74 - #76 CONTROL WtRE 1991 35300 #t4 - #76 CONTROL WtRE t976 3s300 #14 - #16 CONTROL WtRE 1980 3s300 fi74 - #76 CONTROL WtRE 1981 35300 #14 - #16 CONTROL WtRt 1990 35300 COAXIAL CABLE 1976 35300 fi70 - #72 CONTROL WrRE t976 3s300 #70 - #72 CONTROL WtRE 1980 3s300 #to - #t2 coNTRoL wrRt 1981 35300 frto - #72 CoNTROL WtRE 1992 35300 #10 - #t2 coNTRoL wrRE 1996 35300 #70 - #12 coNTROL WtRt 1980 35300 #to - #72 coNTROL WrRE 1980 3s300 #70 - #72 CONTROL WtRt 1990 35300 #70 - fi72 CONTROL WtRE 1991 3s300 #LO - #72 CONTROL WIRE 7992 3s300 #to - #12 coNTRoL wtRt 1995 3s300 #10 - #L2 CONTROL WIRE 7979 35300 #70 - #72 CONTROL WtRE 1980 3s300 #70 - #72 CONTROL WtRE 1995 35300 #70 - #72 CONTROL WtRE 7976 35300 #70 - #72 CONTROL WtRE 1980 35300 #70 - #L2 CONTROL WIRE 1981 3s300 #70 - *72 CONTROL WtRE 1981 35300 f10 - #12 CONTROL WtRE 1991 3s300 #70 - #72 CONTROL WtRE 1992 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Page | 95 3s300 frto - #L2 coNTROL WlRr 1996 35300 #10 - #72 CONTROL WIRE 1980 35300 #70 - #72 CONTROL WIRE 1992 3s300 fr70 - #72 CONTROL WtRE 1976 35300 #IO - #L2 CONTROL WIRE 7992 35300 #70 - #72 CONTROL WrRE 1980 35300 #to - #72 coNTROL WrRE 1981 3s300 #70 - #t2 coNTROL WtRE 1984 35300 #LO - #L2 CONTROL WIRE 7987 3s300 #70 - #T2 CONTROL WIRE 1995 3s300 #70 - #72 CONTROL WtRE L979 35300 #70 - #t2 CoNTROL WtRE L976 35300 #10 - #L2 CONTROL WIRE 1983 3s300 #IO - #T2 CONTROL WIRE 1991 35300 #70 - #72 CONTROL WtRE L992 35300 #to - #72 CoNTROL WtRE 1995 3s300 #10 - #L2 CONTROL WIRE 1995 35300 #LO - #L2 CONTROL WIRE L975 35300 #70 - #72 CONTROL WrRE 1981 35300 fito - #12 CoNTROL WrRE 1981 35300 #70 - #L2 CONTROL WIRE t976 3s300 frLO - #L2 CONTROL WIRE 1981 35300 #7 -#9 CONTROLWIRE 1981 3s300 #7 - *9 CONTROL WIRE 7976 35300 #7 - #9 CONTROL WIRE 1979 35300 #7 - #9 CONTROL WIRE 1983 35300 #7 -fi9 CONTROLWIRE t976 3s300 #7 -#9 CONTROLWIRE 1980 35300 #7 -#9 CONTROLWIRE 1983 3s300 #7 - #9 CONTROL WIRE 1981 35300 #7 - #9 CONTROL WIRE 1980 35300 #1- #6 CONTROL WIRE 7992 35300 fiT - #6 CONTROL WIRE L976 35300 f1 - #6 CONTROL WIRE 1981 3s300 #1- #6 CONTROL WIRE 1980 35300 #L - #6 CONTROL WIRE 1980 35300 #1 - #6 CONTROL WIRE L976 3s300 f1 - f6 CONTROL WIRE 1976 35300 S1 - #6 CONTROL WIRE 1976 3s300 #1 - #6 CONTROL WIRE 7992 35300 #L - #6 CONTROL WIRE 7976 EXECUTION VERSION 35300 #I - #6 CONTROL WIRE 7979 35300 #1 - #6 CONTROL WIRE 7992 35300 UO ALUM CONTROL WIRE 1980 35300 2/O COPPER CONTROL WIRE L976 35300 250 MCM ALUM CONTROL WIRE 7976 3s300 250 MCM ALUM CONTROL WIRE 1976 3s300 350 MCM COPPER CONTROL WIRE 1976 35300 350 MCM COPPER CONTROL WIRE L976 35300 350 MCM COPPER CONTROL WIRE 1980 3s300 350 MCM COPPER CONTROL WIRE 1980 3s300 5OO MCM ALUM CONTROT WIRE L975 35300 750 MCM COPPER CONTROL WIRE 1980 3s300 1OOO MCM COPPER CONTROL WIRE 1980 3s300 1/O ALUM CONTROL WIRE 1980 3s300 COMPOSITE CABLE . LOW VOLTAGE 1995 35300 COMPOSITE CABLE - LOW VOLTAGE 1996 3s300 GROUNDING AND FITTINGS 1992 35300 GROUNDING AND FITTINGS t976 3s300 #6 COPPER GROUND MAT 7976 35300 #6 COPPER GROUND MAT 1980 35300 f6 COPPER GROUND MAT t992 35300 #7 COPPER GROUND t976 35300 7/15 COPPER GROUND 7976 3s300 7/16 COPPER GROUND 1992 35300 2/O COPPER GROUND 1976 35300 2/O COPPER GROUND t979 3s300 2/O COPPER GROUND 1980 3s300 2/O COPPER GROUND 1981 35300 2/O COPPER GROUND 1984 35300 2/O COPPER GROUND 1985 35300 2/O COPPER GROUND 7987 35300 2/O COPPER GROUND 1992 3s300 4/O ALUMINUM GROUND 7976 35300 250 MCM COPPER GROUND L976 3s300 250 MCM COPPER GROUND r979 35300 250 MCM COPPER GROUND 1980 3s300 250 MCM COPPER GROUND 1981 3s300 250 MCM COPPER GROUND L992 35300 5OO MCM COPPER GROUND 7976 35300 5OO MCM COPPER GROUND 1980 3s300 CONDUIT & FITTINGS ABOVE GROUN 7976 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 96 35300 CONDUIT & FITTINGS ABOVE GROUN 1979 3s300 CONDUIT & FITTINGS ABOVE GROUN 1976 35300 CONDUIT & FITTINGS ABOVE GROUN 7976 35300 CONDUIT & FITTINGS ABOVE GROUN 7992 3s300 CONDUIT & FITTINGS ABOVE GROUN 7976 35300 CONDUIT & FITTINGS ABOVE GROUN 7976 3s300 CONDUIT & FITTINGS ABOVE GROUN t976 35300 CONDUIT & FITTINGS ABOVE GROUN 1979 35300 CONDUIT & FITTINGS ABOVE GROUN 1981 35300 CONDUIT & FITTINGS ABOVE GROUN 1976 35300 CONDUIT & FITTINGS ABOVE GROUN L976 3s300 CONDUIT & FITTINGS ABOVE GROUN 1981 3s300 CONDUIT & FITTINGS ABOVE GROUN 1980 35300 CONDUIT & FITTINGS ABOVE GROUN t976 3s300 CONDUIT & FITTINGS ABOVE GROUN L976 35300 CONDUIT & FITTINGS ABOVE GROUN t979 35300 CONDUIT & FITTINGS ABOVE GROUN 1976 3s300 2" -3-u2" CONDUTT r976 3s300 2" - 3-112" CONDUTT t976 3s300 2" - 3-712" CONDUTT 7992 3s300 2" -3-L12" CONDUTT 7992 3s300 2" -3-u2" CONDUTT 7976 3s300 4'' CONDUIT 7976 35300 4'' CONDUIT L979 3s300 4,,CONDUIT 1992 3s300 4" CONDUIT 1976 3s300 5" CONDUIT L979 35300 5" CONDUIT L992 3s300 SMALL E LECTRICAL E NCLOSU RE 7992 35300 SMALL ELECTRICAL ENCLOSU RE 7976 3s300 SMALL ELECTRICAL ENCLOSU RE 1981 3s300 SMALL ELECTRICAL ENCLOSURE 1992 3s300 5OO-1499KVA LOCAL SERVICE XFMR 1980 3s300 5OO-1499KVA LOCAL SERVICE XFMR 1980 35300 UNDER 15KVA LOCAL SERVICE XFMR 7982 3s300 15-49KVA LOCAL SERVICE XFMR t976 35300 15.49KVA LOCAL SERVICE XFMR 7992 35300 167.499KVA LOCAL SERVICE XFMR 1981 3s300 5OO-1499KVA LOCAL SERVICE XFMR 7973 35300 5OO-1499KVA LOCAL SERVICE XFMR 1981 3s300 CONTROL RACK/PANEL FRAM E 7976 EXECUTION VERSION 35300 CONTROL RACK/PANEL FRAME 7976 3s300 CONTROL RACK/PAN EL FRAM E t976 35300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PANEL FRAME 1980 3s300 CONTROL RACK/PAN E L FRAM E 7976 35300 CONTROL RACK/PANEL FRAME 7976 35300 CONTROL RACK/PANEL FRAME 7976 35300 CONTROL RACK/PAN EL FRAM E 7976 35300 CONTROL RACK/PANEL FRAME 7976 35300 SWITCHBOARD RACK OR PANEL 1980 35300 CONTROL RACK/PANEL FRAME 1980 35300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PANEL FRAM E 1980 35300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PANEL FRAME 1980 35300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PAN EL FRAM E 1980 3s300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PANEL FRAM E 1980 3s300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PAN EL FRAME 1980 35300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PAN EL FRAM E 1980 35300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PAN EL FRAM E 1980 3s300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PANEL FRAME 1980 35300 CONTROL RACK/PANEL FRAME 7992 3s300 CONTROL RACK/PAN EL FRAME t976 35300 CONTROL RACK/PAN EL FRAM E 1991 3s300 CONTROL RACK/PAN EL FRAM E 1991 3s300 CONTROL RACK/PANEL FRAME 1995 3s300 CONTROL RACK/PAN EL FRAM E 1976 3s300 CONTROL RACK/PANEL FRAM E 7976 35300 CONTROL RACK/PAN EL FRAME t976 3s300 CONTROL RACK/PANEL FRAM E 1990 35300 CONTROL RACK/PANEL FRAME 1996 35300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PAN EL FRAM E 1980 35300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PAN EL FRAME 1980 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page 197 3s300 CONTROL RACK/PANEL FRAM E 7976 35300 SWITCHBOARD RACK OR PANEL 7979 3s300 CONTROL RACK/PAN E L FRAM E 1979 3s300 CONTROL RACK/PAN EL FRAM E 1992 3s300 CONTROL RACK/PANEL FRAME 7976 35300 CONTROT RACK/PAN EL FRAM E 1976 35300 PROTECTION EQUIPMENT 7992 3s300 CONTROL COMPUTER & PERIPHERALS 1996 35300 PROTECTION EQUIPMENT 1996 35300 PROTECTION EQUIPMENT 1996 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1981 3s300 PROTECTION EQUIPMENT 1990 35300 PROTECTION EQUIPMENT 1996 35300 PROTECTION EQUIPMENT 1996 3s300 PROTECTION EQUIPMENT 7992 35300 PROTECTION EQUIPMENT 1990 35300 CONTROL COMPUTER & PERIPHERALS 1995 35300 ALARM/MONITORING EQUIPMENT 7976 3s300 METERING EQUIPMENT 1990 35300 METERING EQUIPMENT 1990 35300 ALARM/MONITORING EQUIPMENT 1986 35300 ALARM/MONITORING EQUIPMENT 1986 35300 ALARM/MONITORING EQUIPMENT 1980 3s300 ALARM/MONITORING EQUIPMENT 1980 35300 METERING EQUIPMENT 1993 35300 CONTROL EQUIPMENT 1997 3s300 CONTROL EQUIPMENT 7976 35300 CONTROL EQUIPMENT t976 35300 CONTROL EQUIPMENT L976 35300 CONTROL EQUIPMENT 7976 3s300 CONTROL EQUIPMENT L976 35300 CONTROL EQUIPMENT 1976 3s300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1983 3s300 CONTROL EQUIPMENT t972 3s300 CONTROL EQUIPMENT 7976 35300 CONTROL EQUIPMENT 1976 35300 CONTROL EQUIPMENT 1979 35300 CONTROL EQUIPMENT 1981 EXECUTION VERSION 35300 CONTROL EQUIPMENT 7984 35300 CONTROL EQUIPMENT 7987 35300 CONTROL EQUIPMENT 1981 35300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT 1986 3s300 CONTROL EQUIPMENT 1990 35300 CONTROL EQUIPMENT 1990 3s300 CONTROL EQUIPMENT 1991 35300 CONTROL EQUIPMENT 1990 35300 CONTROL EQUIPMENT 1996 35300 CONTROL EQUIPMENT 7992 35300 CONTROL EQUIPMENT 1992 3s300 CONTROL EQUIPMENT 1995 3s300 CONTROL EQUIPMENT 1996 3s300 SCADA RACK/PANEL FRAME 1991 35300 SCADA EQUIPMENT t992 35300 COMM RACK/PANEL FRAME 7976 35300 COMM RACK/PANEL FRAME t976 35300 YARD LOCAL SERV OR LOAD CENTER L976 3s300 JUNCTION BOX 1980 35300 48 VOLT BATTERY CHARGER 7997 35300 48 VOLT BATTERY 7997 3s300 LOAD CENTER, AC 7976 3s300 LOAD CENTER. AC 1980 35300 LOAD CENTER, DC L976 3s300 LOAD CENTER, DC 1992 3s300 10.40 AMP CIR BRKR 7992 3s300 41- 1OO AMP CIR BRKR 1992 35300 3 POLE DISCONNECT L976 3s300 3 POLE DISCONNECT 1980 35300 3 POLE DISCONNECT 1997 35300 CONTACTOR 7976 3s300 VOLTAGE ALARM t976 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Page | 98 35300 AUXILIARY POWER XFMR 1PH L976 35300 1OOKVA 1 PH XFMR 1976 3s300 AUXILIARY POWER XFMR 3 PH 7976 3s300 sOOKVA 3 PH XFMR 7976 35300 45KV 480 VOLT XFMR L976 35300 3OKV 480 VOLT XFMR t976 3s300 EVENTS RECORDER (INACTIVE)t982 3s300 ALARM SYSTEMS-WIRED CIRCUITS 7992 35300 SPECIAL METERING COMPUTER 7976 3s300 MISC OFFICE FURNITURE 1989 35300 MISC OFFICE FURNITURE 1982 35300 MISC OFFICE FURNITURE t982 3s300 CHAIR 1976 3s300 CHAIR 1981 35300 DESK r976 3s300 DESK 1952 3s300 DESK 1953 35300 DESK 1980 3s300 FILE CABINET 1979 3s300 FILE CABINET 1976 3s300 FILE CABINET 7979 35300 FILE CABINET 1980 35300 DRAFTING TABLE 7947 35300 DRAFTING TABLE 1950 3s300 TABLE L976 3s300 TABLE 1949 35300 COMPUTER AND PERIPHERALS 1995 3s300 COMPUTER AND PERIPHERALS 1995 35300 COMPUTER AND PERIPHERALS 1992 35300 INTERCOM SYSTEM L975 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, CARD SHELF 1999 39720 MICROWAVE, CARD SHELF 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 35300 #18 - #19 CONTROL WtRE 1999 35300 CONTROL RACK/PANEL FRAME 1999 3s300 CONTROL COMPUTER & PERIPHERALS 1999 EXECUTION VERSION 35300 #74 - #L6 CONTROL WIRE 1999 35300 CONTROL RACK/PAN EL FRAM E 1999 3s300 AI-ARM/MONITORING EQU I PMENT 1999 3s300 CONTROL COMPUTER & PERIPHERALS 1999 35200 EQUIPMENT PAD 1999 35200 CONDUIT & FITTINGS UNDERGROUND 1999 3s300 15KV POWER CABLE 1999 3s300 AUXILLARY GENERATOR 1999 35300 #18 - #19 CONTROL WtRE 1999 3s300 #L4.#16 CONTROL WIRE 1999 35300 *70 - #L2 CONTROL WtRE 1999 3s300 CONTROL RACK/PAN EL FRAM E 1999 3s300 PROTECTION EQUIPMENT 1999 . 3s300 ALARM/MONITORING EQUIPMENT 1999 35300 SAFETY SWITCH 1999 39720 M ICROWAVE, STRUCT(POLES&FIX)1998 39720 M rcRowAVE, STRUCT( POLES&FtX)1998 39720 MICROWAVE, RADIO 2000 3s200 COMPLETE STATION BUILDING 2001 3s200 SMOKE DETECTOR 2007 3s300 METERING EQUIPMENT 1999 35300 METERING EQUIPMENT 1999 3s300 METERING EQUIPMENT 1999 35300 ALARM/MONITORING EQUIPMENT 1999 3s300 COMMUNICATIONS EQUIP 2002 3s300 COMMUNICATIONS EQUIP 2002 35300 COMMUNICATIONS EQUIP 2002 35300 SWITCHBOARD RACK OR PANEL 2007 3s300 CONTROL RACK/PANEL FRAME 2007 35300 ALARM/MONITORING EQUIPMENT 2001 35300 ALARM/MONITORING EQUIPMENT 2001 35300 CONTROL RACK/PANEL FRAME 1998 3s300 CONTROL RACK/PAN EL FRAM E 1998 3s300 PROTECTION EQUIPMENT 1998 3s300 PROTECTION EQUIPMENT 1998 35300 CONTROL RACK/PANEL FRAM E 2001 3s300 CONTROL RACK/PANEL FRAME 2001 35300 PROTECTION EQUIPMENT 200t 3s300 ALARM/MONITORING EQU I PMENT 2001 35300 CONTROL RACK/PANEL FRAM E 2001 35300 CONTROL RACK/PAN EL FRAM E 2001 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Page | 99 35300 PROTECTION EQUIPMENT 2001 35300 PROTECTION EQUIPMENT 2001 3s300 #18 - #19 CONTROL WIRE 2001 35300 #10 - f12 CONTROL WIRE 2001 3s300 CONTROL RACK/PANEL FRAM E 2001 3s300 PROTECTION EQUIPMENT 2001 35300 PROTECTION EQUIPMENT 2001 35300 PROTECTION EQUIPMENT 2001 35300 CONTROL EQUIPMENT 2001 397L0 TELEPHONE, CARD UNIT 2001 3s300 CONTROL RACK/PAN EL FRAM E 2004 35300 PROTECTION EQUIPMENT 2004 3s300 CABLE TRAY AND ACCESSORIES 2004 35300 CONTROL WIRE - LOW VOLTAGE 2004 3s300 METERING EQUIPMENT 2004 35300 AUXILIARY LOAD CENTER 2004 39720 MICROWAVE, CARD SHELF 2004 39720 MICROWAVE, CARD UNIT 2004 39720 MICROWAVE, EQUIPMENT 2004 39740 FIBER, MISC EQUIPMENT 2004 3s300 CONTROL RACK/PAN EL FRAM E 2005 3s300 CONTROL RACK/PANEL FRAME 2005 35300 PROTECTION EQUIPMENT 200s 35300 PROTECTION EQUIPMENT 2005 3s300 130 VOLT BATTERY CHARGER 2006 35300 130 VOLT BATTERY 2006 3s300 BATTERY RACK 2006 35300 SAFETY SWITCH 2006 35300 130 VOLT BATTERY CHARGER 2006 3s300 SAFETY SWITCH 2006 3s300 MISC TEST EQUIPMENT 2007 3s300 MISC TEST EQUIPMENT 2007 35300 MISC TEST EQUIPMENT 2007 3s300 CABLE TRAY AND ACCESSORIES 2007 35300 CABLE TRAY AND ACCESSORIES 2007 3s300 CONTROL RACK/PAN EL FRAM E 2007 35300 CONTROL RACK/PAN EL FRAM E 2007 35300 CONTROL RACK/PANEL FRAME 2007 3s300 CONTROL RACK/PANEL FRAM E 2007 35300 PROTECTION EQUIPMENT 2007 35300 PROTECTION EQUIPMENT 2007 EXECUTION VERSION 35300 SCADA RACK/PANEL FRAME 2007 3s300 SCADA RACK/PANEL FRAME 2007 35300 SCADA EQUIPMENT 2007 3s300 SCADA EQUIPMENT 2007 3s300 SCADA COMPUTER AND PERIPHERALS 2007 3s300 SCADA COMPUTER AND PERIPHERALS 2007 39720 MICROWAVE, BATTERY 2007 39730 BASE STATION, MISC EQUIPMENT 2007 35300 AI.ARM/MON ITORING EQU I PMENT 2008 35200 METAL STRUCT - COMMUNICATION 2007 3s200 CONDUIT & FITTINGS UNDERGROUND 2007 3s300 CONTROL WIRE - LOW VOLTAGE 2007 3s200 BUILDING HVAC SYSTEM 2009 35200 FOUNDATION - OTHER EQUIPMENT 2008 35200 CONDUIT & FITTINGS UNDERGROUND 2008 3s300 CONTROL WIRE . LOW VOLTAGE 2008 35300 GROUNDING AND FITTINGS 2008 35300 CONTROL RACK/PAN EL FRAM E 2008 3s300 CONTROL RACK/PAN EL FRAM E 2008 3s300 CONTROL RACK/PANEL FRAME 2008 35300 PROTECTION EQUIPMENT 2008 35300 CONTROL EQUIPMENT 2008 3s300 COMMUNICATIONS EQUIP 2008 39740 FIBER, MISC EQUIPMENT 2009 35300 CONTROL WIRE - LOW VOLTAGE 2008 35300 CONTROL WIRE . LOW VOLTAGE 2008 35300 CONTROL EQUIPMENT 2008 3s300 CONTROL EQUIPMENT 2008 35300 CONTROL EQUIPMENT 2008 35300 CONTROL EQUIPMENT 2008 3s300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 3s300 COMM RACK/PANEL FRAME 2009 3s300 COMMUNICATIONS EQUIP 2009 35300 CONTROL WIRE - LOW VOLTAGE 2009 3s300 CONDUIT & FITTINGS ABOVE GROUN 2009 35300 130 VOLT BATTERY 2009 35300 BATTERY RACK 2009 3s300 PROTECTION EQUIPMENT 2009 3s300 PROTECTION EQUIPMENT 2009 35300 COMM RACK/PANEL FMME 2009 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 100 3s300 COMM RACK/PANEL FRAME 2009 3s300 COMM RACK/PANEL FRAME 2009 3s300 COMM RACK/PANEL FMME 2009 3s300 COMMUNICATIONS EQUIP 2009 35300 COMMUNICATIONS EQUIP 2009 35300 COMMUNICATIONS EQUIP 2009 35300 COMMUNICATIONS EQUIP 2009 39720 MICROWAVE, RADIO 207L 39720 MICROWAVE, ANTENNA 2071 3s300 COMMUNICATIONS EQUIP 2077 39720 MICROWAVE, RADIO 2077 39720 MICROWAVE, RADIO 2077 39720 MICROWAVE, ANTENNA 2077 39720 MICROWAVE, ANTENNA 2017 39720 MICROWAVE, WIRE/CABLE 20LL 39720 MICROWAVE, WIRE/CABLE 207L 35300 CONTROL WIRE - LOW VOLTAGE 2077 35300 CONDUIT & FITTINGS ABOVE GROUN 2077 35300 I.ARGE ELECTRICAL ENCLOSURE 2077 35300 CONTROL WIRE - LOW VOLTAGE 2010 35300 CONTROL WIRE - LOW VOLTAGE 20to 3s300 COMPOSITE CABLE - LOW VOLTAGE 2010 35300 COMPOSITE CABLE - LOW VOLTAGE 2070 3s300 COAXIAL CABLE 2070 35300 COAXIAL CABLE 2010 35300 CONTROL RACK/PANEL FRAM E 2070 35300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PANEL FRAME 2010 3s300 PROTECTION EQUIPMENT 2070 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 35300 SCADA EQUIPMENT 2010 3s300 SCADA EQUIPMENT 2070 3s300 SCADA EQUIPMENT 2010 3s300 SCADA EQUIPMENT 2010 EXECUTION VERSION 3s300 SCADA EQUIPMENT 2010 3s300 SCADA EQUIPMENT 2010 3s300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 2010 35300 AUXILIARY LOAD CENTER 2010 3s300 AUXILIARY LOAD CENTER 2010 35300 METERING EQUIPMENT 2072 35300 CONTROL WIRE - LOW VOLTAGE 2008 3s300 CONTROL WIRE - LOW VOLTAGE 2008 3s300 CONTROL EQUIPMENT 2008 35300 CONTROL EQUIPMENT 2008 3s300 CONTROL EQUIPMENT 2008 3s300 CONTROL EQUIPMENT 2008 3s300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 3s300 COMMUNICATIONS EQUIP 2002 35300 CONTROL WIRE - LOW VOLTAGE 2073 35300 TRANSFER SWITCH 2013 3s200 CONDUIT & FITTINGS UNDERGROUND 20t3 3s300 CONTROL WIRE . LOW VOLTAGE 20L3 3s300 GROUNDING AND FITTINGS 2073 35200 SITE PREPARATION & IMPROVEMENT 2073 3s200 YARD LIGHT SYSTEM 2013 35200 CONDUIT & FITTINGS UNDERGROUND 2013 3s300 CONTROL WIRE . LOW VOLTAGE 2073 3s300 COAXIAL CABLE 2013 35300 FIBER OPTIC CABLE 2013 3s300 GROUNDING AND FITTINGS 2073 35300 SMALL ELECTRICAL ENCLOSURE 2013 3s300 sOKVA LOCAL SERVICE XFMR 2013 35300 SWITCH . POWER FUSE 20L3 35300 CONTROL RACK/PAN EL FRAM E 2013 3s300 CONTROL RACK/PAN EL FRAM E 2013 3s300 CONTROL RACK/PAN EL FRAM E 2013 35300 CONTROL RACK/PANEL FRAME 2013 3s300 CONTROL RACK/PANEL FRAME 2013 3s300 CONTROL RACK/PAN EL FRAM E 2013 3s300 CONTROL RACK/PANEL FRAME 2013 35300 CONTROL RACK/PANEL FRAME 2013 3s300 CONTROL RACK/PANEL FRAME 20L3 35300 PROTECTION EQUIPMENT 2073 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Page | 101 EXECUTION VERSION 35300 PROTECTION EQUIPMENT 2073 3s300 PROTECTION EQUIPMENT 2013 3s300 PROTECTION EQUIPMENT 2013 35300 CONTROL EQUIPMENT 2013 3s300 CONTROL EQUIPMENT 2073 3s300 CONTROL EQUIPMENT 2013 3s300 METERING EQUIPMENT 2013 35300 METERING EQUIPMENT 2013 3s300 ALARM/MONITORING EQU IPMENT 20t3 3s300 SCADA EQUIPMENT 2073 35300 COMM RACK/PANEL FRAME 20L3 35300 COMMUNICATIONS EQUIP 2073 3s300 48 VOLT BATTERY CHARGER 2013 3s300 BATTERY RACK 2013 3s300 AUXILIARY LOAD CENTER 2073 3s300 IRANSFER SWITCH 2073 35200 SUPERSTRUCTURE ROOF 20t3 35200 COMPLETE CONDENSER CNTRL BLDG 2013 3s200 BUILDING HVAC SYSTEM 20t3 35200 BUILDI NG ELECTRICAL SYSTEM 2013 35200 CONCRETE SURFACE TRENCH WLIDS 2013 35300 CONTROL WIRE - LOW VOLTAGE 2074 3s300 COAXIAL CABLE 20\4 35300 COMM RACK/PANEL FRAME 20L4 35300 COMMUNICATIONS EQUIP 20L4 3s300 COAXIAL CABLE t976 3s300 PROTECTION EQUIPMENT 1998 35300 PROTECTION EQUIPMENT 1998 35300 COMM RACK/PANEL FRAME 7976 35200 CONDUIT & FITTINGS UNDERGROUND 2074 3s300 CONTROL WIRE - LOW VOLTAGE 2014 3s300 GROUNDING AND FITTINGS 20L4 3s300 CONDUIT & FITTINGS ABOVE GROUN 2074 35300 CONTROL EQUIPMENT 2074 35300 SCADA EQUIPMENT 20L4 35300 CONTROL EQUIPMENT 1991 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Page | 102 Midpoint Transmission Station FERC Acct Midpoint Asset Description Vintase 35200 YARD SURFACING - GRAVEL, ETC.1988 39740 FIBER. WIRE/CABLE 2009 35011 LAND OWNED IN FEE TS 1965 35011 I.AND OWNED IN FEE TS L976 35011 LAND OWNED IN FEE TS 1980 35011 LAND OWNED IN FEE TS 1988 35011 PERMANENT I.AND IMPROVEMENTS TS 1966 35011 PERMANENT LAND IMPROVEMENTS TS 7976 35011 PERMANENT LAND IMPROVEMENTS TS 1980 35200 DRAINAGE SYSTEMS-CULVERTS, ETC 1988 3s200 YARD SURFACING - GRAVEI- ETC.1955 3s200 YARD SURFACING - GRAVEL, ETC.1966 35200 YARD SURFACING - GRAVEL, ETC.7977 35200 YARD SURFACING . GRAVEL, ETC.1980 3s200 YARD SURFACING - GRAVET ETC.1981 3s200 PARKING CHOCKS 1988 35200 MANHOLES & GRATES 1988 3s200 DRAIN ROCK 1980 35200 PERIMETER FENCE & GATES 196s 3s200 PERIMETER FENCE & GATES 1966 3s200 PERIMETER FENCE & GATES 7977 35200 PERIMETER FENCE & GATES 1980 35200 PERIMETER FENCE & GATES 1981 3s200 PERIMETER FENCE & GATES 1983 3s200 PERIMETER FENCE & GATES 1988 35200 WATER WELL PUMP 7977 35200 WATER WELL PUMP 1988 3s200 WATER SYSTEM 1988 35200 WATER WELL L977 3s200 WATER WELL 1988 35200 COMPLETE SEPTIC SYSTEM 1988 35200 YARD LIGHT SYSTEM 1965 35200 YARD LIGHT SYSTEM 1966 35200 YARD LIGHT SYSTEM 7977 3s200 YARD LIGHT SYSTEM 1981 35200 YARD LIGHT SYSTEM 1988 35200 LIGHT STANDARD 1965 3s200 LIGHT STANDARD 1966 35200 FOUNDATION - STATION BUILDING 1965 EXECUTION VERSION 3s200 FOUNDATION . STATION BUILDING 1983 3s200 FOUNDATION - STATION BUILDING 1988 3s200 COMPLETE STATION BUILDING 1965 35200 COMPLETE STATION BUILDING 1983 3s200 COMPLETE STATION BUILDING 1983 3s200 COMPLETE STATION BUILDING 1983 35200 COMPLETE STATION BUILDING 1988 35200 EYE WASH STATION 1983 3s200 EYE WASH STATION 1988 35200 WATER HEATER 1988 35200 BUILDING HVAC SYSTEM 1988 3s200 EXHAUST FANS & DUCT 1965 35200 EXHAUST FANS & DUCT 1988 35200 HEATER & AIR CONDITIONER COMBI L992 3s200 BUILDING ELECTRICAL SYSTEM 1983 35200 BUILDING ELECTRICAL SYSTEM 1988 35200 BUILDING ELECTRICAL SYSTEM 1980 3s200 JUNCTION BOX MEDIUM OR I-ARGE 1983 3s200 BUILDING ELECTRICAL SYSTEM 1980 35200 BUI LDING ELECTRICAL SYSTEM 1983 35200 BUILDI NG ELECTRICAL SYSTE M 1988 3s200 D.C. EMERGENCY FIXTURE 1983 35200 BUILDING ELECTRICAL SYSTEM 1983 3s200 BUILDING ELECTRICAL SYSTEM 1988 35200 LOCAL SERVICE FND 1980 35200 LOCAL SERVICE TRANSFORMER FND 1988 3s200 AIR COMPRESSOR FND 1976 35200 345KV XFMR, REG, REACTOR FND 1983 3s200 AIR COMPRESSOR FND 1966 3s200 CULVERTS 1981 35200 EQUIPMENT PAD 1988 35200 OUTDOOR CABINET FND 1988 35200 MISCELLANEOUS BUILDING FND 1965 35200 SPILL GAP SUPPORT FND 1988 3s200 LIGHTING MAST FND 1965 35200 LIGHTING MAST FND 1966 35200 YARD MONUMENT MARK (INACTIVE)1965 3s200 YARD MONUMENT MARK (INACNVE)1956 35200 CONCRETE SURFACE TRENCH WLIDS L976 3s200 CONCRETE SURFACE TRENCH WLIDS 1988 3s200 CONCRETE SURFACE TRENCH WLIDS 1988 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 103 3s200 CONCRETE SURFACE TRENCH WLIDS 1955 3s200 CONCRETE SURFACE TRENCH WLIDS 1956 3s200 CONCRETE SURFACE TRENCH WLIDS t976 3s200 CONCRETE SURFACE TRENCH WLIDS 1980 35200 CONCRETE SURFACE TRENCH WLIDS 1981 35200 CONCRETE UNDER GROUND CABLEWAY 1981 35200 CONDUIT & FITTINGS UNDERGROUND 1968 35200 CONDUIT & FITTINGS UNDERGROUND t976 3s200 CONDUIT & FITTINGS UNDERGROUND 1979 35200 CONDUIT & FITTINGS UNDERGROUND 1980 35200 CROSSOVER TRENCH 1981 3s200 TREAD PLATES 1981 3s200 CONCRETE MANHOLE WCOVER 1965 35200 LOCAL SERVICE STRUCTURE 1980 3s200 LOCAL SERVICE STRUCTURE 1988 3s200 OUTDOOR CABINET SUP STR 1988 35200 SPILL GAP SUPPORT STRUCTURE 1988 3s200 TOOL SHED, MAINT BLDG, ETC 1965 3s200 TOOL SHED, MAINT BLDG, ETC L976 3s200 TOOL SHED, MAINT BLDG, ETC 1988 3s300 BARRIER - FIRE, SWITCHING, ETC 1988 35300 CABLE TRAY AND ACCESSORIES 1983 3s300 4-7KV PIN/POST INSULATORS 7976 35300 3/8 STATIC WIRE 1964 3s300 3/8 STATIC WIRE 1965 35300 250 MCM CONDUCTOR COPPER 7976 35300 250 MCM CONDUCTOR COPPER 1988 3s300 350 MCM CONDUCTOR COPPER 1983 3s300 8 SHIELD, 7 STRAND ALUM 1981 35300 3" - 3-3/4" ALUM TUBE 1983 35300 15KV POWER CABLE 1983 35300 CONTROL WIRE - LOW VOLTAGE 7976 35300 CONTROL WIRE - LOW VOLTAGE 7976 35300 CONTROL WIRE - LOW VOLTAGE 1993 3s300 CONTROL WIRE - LOW VOLTAGE 1995 35300 #18 - #19 CONTROL W|RE 1995 35300 #18 - f19 CONTROL WtRE 1976 35300 #18 - #19 CONTROL WtRE 1988 3s300 #18 - #19 CONTROL WrRE 1989 35300 #18 - #19 CONTROL WIRE 7976 35300 f18 - #19 CONTROL WrRE 1981 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B EXECUTION VERSION 35300 #18 - #19 CONTROL WtRE 1983 35300 #18 - #19 CONTROL WtRE 1989 35300 #18 - #19 CONTROL WIRE 1990 35300 #18 - #19 CONTROL WtRE t992 3s300 #18 - #19 CONTROL W|RE 1994 35300 #18 - S19 CONTROL WtRE 1995 35300 #18 - f19 CONTROL WtRt 1996 35300 #18 - #19 CONTROL WtRE 1980 35300 #18 - #19 CONTROL WtRt 1981 3s300 f18 - #19 CONTROL WrRE 1983 3s300 #18 - #19 CONTROL WrRE 1989 35300 #18 - #19 CONTROL WtRE 1990 35300 #18 - #19 CONTROL WtRE 1993 35300 f18 - #19 CONTROL WtRE 1995 3s300 #18 - f19 CONTROL WtRE 1996 3s300 #18 - #19 CONTROL WtRE L979 35300 #18 - #19 CONTROL WtRE 1980 35300 s18 - #19 CONTROL WtRE 1981 35300 #18 - f19 CONTROL WtRE 1983 35300 #18 - #19 CONTROL WIRE 1990 35300 f18 - #19 CONTROL WIRE 1993 3s300 #18 - #19 CONTROL WtRE L994 3s300 #18 - #19 CONTROL WrRE 1995 35300 f18 - #19 CONTROL WtRE 7979 35300 #18 - #19 CONTROL WtRE 1980 35300 #74 - #t6 CONTROL WtRE L979 3s300 #t4 - #16 coNTROL WtRE 1980 3s300 #74 - #16 CONTROL WrRE 1981 35300 #14 - #16 coNTROL WtRE 1989 3s300 #74 - #76 CONTROL WrRE 1980 3s300 #L4 -#L6 CONTROL WIRE 1993 3s300 *74 - #L6 CONTROL WIRE 1983 35300 #14 - #16 CoNTROL WrRE 1989 3s300 frL4 - #T6 CONTROL WIRE 1993 35300 #L4 - #L6 CONTROL WIRt 199s 3s300 fi74 - *76 CONTROL WIRE 1996 35300 #14. #L6 CONTROL WIRE t976 35300 #L4 - #16 CONTROL WIRE 7976 35300 #74 - #76 CONTROL WtRE 1965 35300 #74 - #76 CONTROL WtRt 1965 3s300 #14 - #!6 CONTROL WrRE 1980 Page | 104 35300 #74 - #16 CONTROL WrRE 1981 35300 #14 - #15 CONTROL WtRE 1983 3s300 #14 - f16 CONTROL WtRE 1989 35300 #74 - #76 CONTROL WtRE 7976 35300 #74 - #76 CONTROL WtRE 1980 35300 COAXIAL CABLE 1965 3s300 COAXIAL CABLE 1980 35300 COAXIAL CABLE 1981 35300 #70 - fi72 CONTROL WtRE 1988 35300 #t0 - #72 CoNTROL WtRE 1983 35300 #70 - #72 CONTROL WtRE 1988 35300 #to - #12 coNTRoL wrRE 1989 3s300 #70 - #72 CONTROL W|RE 7992 3s300 fiIO. #L2 CONTROL WIRE 1995 3s300 fito - #72 CoNTROL WtRE 1989 35300 #70 - #72 CONTROL W|RE 1993 3s300 #70 - #72 CONTROL WtRE 1995 35300 #10 - #12 CONTROL WrRE 1996 3s300 fito - #72 coNTROL WIRE 1965 35300 fito - #72 CoNTROL WrRE 1965 3s300 #!o - #72 CONTROL WtRE 1966 35300 #10 - #72 CoNTROL WtRE 7979 35300 #10 - #12 CONTROL WtRE 1980 35300 #7O. #L2 CONTROL WIRE 1981 3s300 fi70 - #L2 CONTROL WIRE 1983 3s300 #70 - #72 CONTROL WtRE 1989 3s300 fi70 - #12 CONTROL WtRE 1995 35300 #70 - #72 CONTROL WtRE 1988 35300 #70 - #12 CoNTROL WrRE 1979 3s300 #1O. #L2 CONTROL WIRE 1981 35300 #70 - #72 CONTROL W|RE 1983 35300 #70 - #72 CONTROL WtRE 1988 3s300 #10 - #72 CoNTROL WtRE 1989 3s300 fito - #12 coNTRoL wrRE 1980 35300 #70 - #72 CONTROL W|RE 1983 3s300 fito - #72 coNTROL WtRE 1988 35300 #70 - #72 CONTROL WtRE 1989 35300 #70 - #12 CoNTROL WtRE 1990 35300 #10 - #12 coNTRoL wtRE 1995 3s300 #10 - #72 CONTROL W|RE 1996 35300 #TO - #L2 CONTROL WIRE 1981 EXECUTION VERSION 35300 #70 - #t2 coNTROL WtRE t976 3s300 #TO - #L2 CONTROL WIRE t976 35300 #10 - #12 CONTROL WrRE 1980 3s300 #7O - #L2 CONTROL WIRE 1988 3s300 #70 - #r2 coNTROL WtRE 1980 3s300 #7 -#9 CONTROL WIRE 1965 35300 fil - #9 CONTROL WIRE 1955 3s300 #7 -#9 CONTROLWIRE 1966 35300 #7 - #9 CONTROL WIRE 1979 3s300 #7 - #9 CONTROL WIRE 1988 3s300 #7 -#9 CONTROLWIRE 1988 35300 #7 - #9 CONTROL WIRE 1988 3s300 #7 - #9 CONTROL WIRE 1988 35300 #7 - #9 CONTROL WIRE 1966 3s300 #7 -#9 CONTROL WIRE 1980 3s300 #7 -#9 CONTROLWIRE 1981 3s300 #7.#9 CONTROLWIRE 1965 3s300 fi7 -#9 CONTROLWIRE 7966 35300 #7 -#9 CONTROLWIRE 1980 35300 #7 -#9 CONTROLWIRE 1981 35300 #7 -#9 CONTROLWIRE 1965 35300 #7 -#9 CONTROLWIRE 1988 3s300 fi7 - #9 CONTROL WIRE 1965 3s300 #1 - #5 CONTROL WIRE 1988 35300 #1 - f5 CONTROL WtRE t992 35300 #7 -i6 CONTROL WIRE 1995 35300 #1 - #6 CONTROL WIRE 1981 3s300 f1 - #6 CONTROL WIRE 1983 35300 #t - #6 CONTROL WIRE 7976 35300 f1- #6 CONTROL WIRE 1980 3s300 f1 - #6 CONTROL WIRE 1983 3s300 #7 - #6 CONTROL WIRE L976 35300 #7 - #6 CONTROL WIRE 1981 35300 #I - #6 CONTROL WIRE 1988 3s300 #1 - #6 CONTROL WIRE 1983 35300 #I - #6 CONTROL WIRE L977 3s300 #L - #6 CONTROL WIRE 1955 35300 #I - #6 CONTROL WIRE 1966 3s300 #1 . #6 CONTROL WIRE 1968 35300 #L. #6 CONTROL WIRE 1976 3s300 #1 - f5 CONTROL WIRE 1981 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Page | 105 35300 fl - #6 CONTROL WIRE 1988 35300 #1 - #6 CONTROL WIRE 7992 3s300 #1 - #6 CONTROL WIRE 1983 35300 1/O ALUM CONTROL WIRE 7976 35300 1/O ALUM CONTROL WIRE 1980 3s300 UO ALUM CONTROL WIRE 1988 35300 UO COPPER CONTROL WIRE 1988 35300 1/0 coPPER CONTROL WrRE 1995 35300 2/O COPPER CONTROL WIRE 1965 35300 2/0 coPPER CONTROL WrRE 1983 3s300 2/0 coPPER CONTROL WrRE 1988 35300 3/O COPPER CONTROL WIRE 1988 3s300 4/0 coPPER CONTROL WrRE 1988 35300 250 MCM COPPER CONTROL WIRE 1988 35300 350 MCM ALUM CONTROL WIRE 1976 3s300 350 MCM COPPER CONTROL WIRE 1983 35300 5OO MCM COPPER CONTROL WIRE 1983 35300 5OO MCM ALUM CONTROL WIRE 1965 3s300 COMPOSITE CABLE - LOW VOLTAGE 1988 35300 COAXIAL CABLE 1988 35300 COMPOSITE CABLE - LOW VOLTAGE 1995 35300 COMPOSITE CABLE - LOW VOLTAGE 1996 3s300 #1 COPPER GROUND 1955 35300 GROUNDING AND FITTINGS 1980 35300 GROUNDING AND FITTINGS 1981 35300 GROUNDING AND FITTINGS L976 3s300 GROUNDING AND FITTINGS 1996 3s300 GROUNDING AND FITTINGS 1965 35300 GROUNDING AND FITTINGS 1966 3s300 GROUNDING AND FITTINGS t976 3s300 #6 COPPER GROUND 1976 3s300 #5 COPPER GROUND L976 3s300 #6 COPPER GROUND 1981 35300 #6 COPPER GROUND MAT 1976 35300 #6 COPPER GROUND MAT 7979 35300 #6 COPPER GROUND MAT 1980 3s300 #6 COPPER GROUND MAT 1981 35300 #6 COPPER GROUND MAT 1988 35300 #6 COPPER GROUND MAT 1989 35300 1/4 COPPER GROUND 1980 3s300 7/15 COPPER GROUND 7976 35300 7/16 COPPER GROUND 1980 35300 7/16 COPPER GROUND 1981 3s300 9/16 COPPER GROUND 1988 3s300 1/O COPPER GROUND 1988 35300 2/O COPPER GROUND 1955 35300 2/O COPPER GROUND 1965 35300 2/O COPPER GROUND 7976 3s300 2/O COPPER GROUND 7979 3s300 2/O COPPER GROUND 1980 3s300 2/O COPPER GROUND 1981 35300 2/O COPPER GROUND 1989 3s300 4/O COPPER GROUND 1988 35300 4/O ALUMINUM GROUND 1966 3s300 250 MCM COPPER GROUND 196s 3s300 250 MCM COPPER GROUND L972 35300 250 MCM COPPER GROUND 7976 35300 250 MCM COPPER GROUND L979 3s300 250 MCM COPPER GROUND 1980 3s300 250 MCM COPPER GROUND 1981 3s300 250 MCM COPPER GROUND 1983 35300 250 MCM COPPER GROUND 1989 3s300 350 MCM COPPER GROUND 1983 35300 5OO MCM COPPER GROUND 1965 35300 5OO MCM COPPER GROUND 1965 35300 5OO MCM COPPER GROUND 1983 35300 5OO MCM COPPER GROUND 1988 35300 CONDUIT & FITTINGS ABOVE GROUN 1966 35300 CONDUIT & FITTINGS ABOVE GROUN t976 35300 CONDUIT & FITTINGS ABOVE GROUN 1981 3s300 CONDUIT & FITTINGS ABOVE GROUN 1983 35300 CONDUIT & FITTINGS ABOVE GROUN 1988 3s300 CONDUIT & FITTINGS ABOVE GROUN 1988 35300 CONDUIT & FITTINGS ABOVE GROUN 1988 35300 CONDUIT & FITTINGS ABOVE GROUN 1966 35300 CONDUIT & FITTINGS ABOVE GROUN 1976 35300 CONDUIT & FITTINGS ABOVE GROUN 1981 35300 CONDUIT & FITTINGS ABOVE GROUN 1988 35300 CONDUIT & FITTINGS ABOVE GROUN 1965 35300 CONDUIT & FITTINGS ABOVE GROUN 1983 3s300 CONDUIT & FITTINGS ABOVE GROUN 1965 35300 CONDUIT & FITTINGS ABOVE GROUN 1976 EXECUTION VERSION Page I r06JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B 3s300 CONDUIT & FITTINGS ABOVE GROUN 1980 35300 CONDUIT & FITTINGS ABOVE GROUN 1988 35300 CONDUIT & FITTINGS ABOVE GROUN 1966 3s300 CONDUIT & FITTINGS ABOVE GROUN t976 3s300 CONDUIT & FITTINGS ABOVE GROUN 7976 35300 CONDUIT & FITTINGS ABOVE GROUN 1980 35300 CONDUIT & FITTINGS ABOVE GROUN 1980 3s300 CONDUIT & FITTINGS ABOVE GROUN 1981 35300 CONDUIT & FITTINGS ABOVE GROUN 1988 35300 2" -3-u2" CONDUTT L976 3s300 2" -3-u2" CONDUTT 1980 3s300 2" -3-112" CONDUTT 1981 35300 2" - 3-t12" CONDUTT 1988 35300 2" - 3-t/2" CONDUTT 1980 3s300 2" -3-t12" CONDUTT 1965 35300 2" - 3-L/2" CONDUTT 1988 35300 2" -3-t12" CONDUTT 1955 3s300 2" - 3-L12" CONDU|T 7976 35300 2" -3-112" CONDUTT 1988 35300 2" - 3-L12" CONDUIT 1976 3s300 2" -3-L/2" CONDUIT 1980 3s300 2" - 3-712" CONDUTT 1981 35300 2" -3-u2" CONDUTT 1983 3s300 2" -3-7/2" CONDUTT 1980 35300 2" - 3-t/2" CONDUTT 1981 3s300 2" - 3-L12" CONDUTT 1983 35300 2" - 3-L12" CONDUTT 1988 3s300 4" CONDUIT 1965 35300 4" CONDUIT L976 3s300 4'' CONDUIT L979 35300 4,,CONDUIT 1980 35300 4'' CONDUIT 1981 35300 4'' CONDUIT 1989 3s300 4'' CONDUIT 1980 35300 4,.CONDUIT 1989 35300 5,'CONDUIT 1965 35300 5" CONDUIT 1981 3s300 6'' CONDUIT 1988 35300 SMALL ELECTRICAL ENCLOSURE 1988 3s300 SMALL ELECTRICAL ENCLOSURE 1988 3s300 SMALL E LECTRICAL ENCLOSU RE 1988 EXECUTION VERSION 3s300 SMALL E LECTRICAL E NCLOSU RE 1988 35300 SMALL ELECTRICAL ENCLOSURE 1976 3s300 SMALL ELECTRICAL ENCLOSU RE 1980 35300 SMALL ELECTRICAL ENCLOSU RE 1981 35300 SMALL ELECTRICAL ENCLOSU RE 1983 35300 25KVA 34KV GRND XFMR 1988 3s300 UNDER 15KVA LOCAL SERVICE XFMR 1980 35300 UNDER 15KVA LOCAL SERVICE XFMR 1988 35300 75KVA LOCAL SERVICE XFMR 1983 3s300 1OO-166KVA LOCAL SERVICE XFMR 1983 3s300 1OO-156KVA LOCAL SERVICE XFMR 1988 35300 157-499KVA LOCAL SERVICE XFMR 1981 3s300 35KV OR LESS 1 PH REGULATOR 1988 3s300 35KV OR LESS 1 PH REGULATOR 1988 35300 35KV OR LESS 1 PH REGUI.ATOR 1991 3s300 35KV OR LESS 1 PH REGULATOR 1988 3s300 35KV OR LESS 1 PH REGULATOR 1988 35300 CONTROL RACK/PANEL FRAME 7976 3s300 CONTROL RACK/PANEL FRAME 1989 3s300 CONTROL RACK/PANEL FRAME 1965 35300 CONTROL RACK/PANEL FRAME 1955 35300 CONTROL RACK/PAN EL FRAM E 1965 3s300 CONTROL RACK/PAN EL FRAM E 1995 35300 CONTROL RACK/PAN EL FRAME 1988 3s300 CONTROL RACK/PAN EL FRAM E 1988 35300 CONTROL RACK/PAN EL FRAM E 1988 3s300 CONTROL RACK/PAN EL FRAM E 1988 35300 CONTROL RACK/PANEL FRAM E 1965 3s300 CONTROL RACK/PAN EL FRAM E 1976 35300 CONTROL RACK/PANEL FRAME L976 3s300 CONTROL RACK/PAN EL FRAM E t976 35300 CONTROL RACK/PAN EL FRAME 1976 3s300 CONTROL RACK/PAN EL FRAM E 1980 3s300 CONTROL RACK/PANEL FRAM E 1983 35300 CONTROL RACK/PAN EL FRAM E 1983 3s300 CONTROL RACK/PAN EL FRAM E 1989 35300 CONTROL RACK/PAN EL FRAM E 1989 35300 CONTROL RACK/PAN E L FRAM E 1989 3s300 CONTROL RACK/PANEL FRAME 1995 35300 CONTROL RACK/PANEL FRAME 1995 35300 CONTROL RACK/PANEL FRAME 1996 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Page | 107 3s300 CONTROL RACK/PANEL FRAME 1988 35300 CONTROL RACK/PAN EL FRAM E 1993 3s300 CONTROL RACK/PANEL FRAM E 1993 3s300 CONTROL RACK/PANEL FRAM E 1955 35300 CONTROL RACK/PANEL FRAME L976 3s300 CONTROL RACK/PAN EL FRAM E 1996 35300 CONTROL RACK/PAN EL FRAM E 1996 35300 CONTROL RACK/PAN EL FRAM E 7976 35300 CONTROL RACK/PANEL FRAME 1988 35300 CONTROL RACK/PAN EL FRAM E 1988 3s300 PROTECTION EQUIPMENT 1988 35300 PROTECTION EQUIPMENT 1988 35300 PROTECTION EQUIPMENT 1988 35300 PROTECTION EQUIPMENT 1981 3s300 PROTECTION EQUIPMENT 1981 35300 PROTECTION EQUIPMENT 1989 35300 PROTECTION EQUIPMENT 1981 3s300 PROTECTION EQUIPMENT 1981 3s300 PROTECTION EQUIPMENT 1981 35300 PROTECTION EQUIPMENT 1981 35300 CONTROL COMPUTER & PERIPHERALS 1996 3s300 CONTROL COMPUTER & PERIPHERALS 1995 35300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1996 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1996 35300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1981 3s300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENl 1995 3s300 PROTECTION EQUIPMENT 1996 35300 PROTECTION EQUIPMENT 1996 3s300 PROTECTION EQUIPMENT 1988 35300 PROTECTION EQUIPMENT L994 35300 ALARM/MONITORING EQUIPM ENT 7994 35300 ALARM/MONITORING EQUIPMENT 1993 3s300 AI.ARM/MONITORI NG EQU I PMENT 1981 3s300 ALARM/MON ITORING EQU IPMENT 7994 EXECUTION VERSION 35300 ALARM/MONTTORT NG EQUTPME NT 1994 3s300 ALARM/MONITORING EQUIPMENT 1989 3s300 CONTROL COMPUTER & PERIPHERALS 1989 35300 CONTROL COMPUTER & PERIPHERALS 1989 35300 PROTECTION EQUIPMENT 1989 35300 PROTECTION EQUIPMENT 1989 35300 PROTECTION EQUIPMENT 1989 35300 PROTECTION EQUIPMENT 1989 35300 METERING EQUIPMENT 1993 3s300 METERING EQUIPMENT 1993 3s300 CONTROL EQUIPMENT 1982 35300 CONTROL EQUIPMENT 1984 35300 CONTROL EQUIPMENT 1983 35300 CONTROL EQUIPMENT 1955 3s300 CONTROL EQUIPMENT 7976 3s300 CONTROL EQUIPMENT 1965 35300 CONTROL EQUIPMENT 1976 3s300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1965 35300 CONTROL EQUIPMENT L976 35300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1981 35300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT t976 35300 CONTROL EQUIPMENT L979 3s300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1981 35300 CONTROL EQUIPMENT 1976 35300 CONTROL EQUIPMENT 7976 3s300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1981 3s300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1983 3s300 CONTROL EQUIPMENT 1984 35300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT 1983 3s300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT 1988 35300 CONTROL EQUIPMENT 1988 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Page | 108 EXECUTION VERSION 35300 CONTROL EQUIPMENT 1988 3s300 CONTROL EQUIPMENT 1988 35300 CONTROL EQUIPMENT 1988 3s300 CONTROL EQUIPMENT 1989 35300 CONTROL EQUIPMENT 1989 35300 CONTROL EQUIPMENT 1989 35300 CONTROL EQUIPMENT 1989 3s300 CONTROL EQUIPMENT 1996 35300 CONTROL EQUIPMENT 1993 3s300 CONTROL EQUIPMENT 1993 3s300 CONTROL EQUIPMENT 1995 35300 CONTROL EQUIPMENT 1995 35300 CONTROL EQUIPMENT 1996 35300 CONTROL EQUIPMENT 1996 3s300 CONTROL EQUIPMENT 1996 3s300 CONTROL EQUIPMENT 1989 35300 CONTROL EQUIPMENT 1985 3s300 CONTROL EQUIPMENT 1985 35300 SCADA RACK/PANEL FRAME 1981 35300 SCADA RACK/PANEL FRAME 1990 35300 SCADA EQUIPMENT 1991 35300 SCADA EQUIPMENT 1990 35300 COMMUNICATIONS EQUIP 1965 35300 COMMUNICATIONS EQUIP 1983 3s300 COMMUNICATIONS EQUIP 1984 35300 OIL STORAGE TANKS 1988 3s300 YARD LOCAL SERV OR LOAD CENTER 1966 35300 YARD LOCAL SERV OR LOAD CENTER 1983 3s300 YARD LOCAL SERV OR LOAD CENTER 1988 35300 LOAD CENTER, AC 1976 3s300 LOAD CENTER, AC 1980 3s300 LOAD CENTER, AC 1981 35300 LOAD CENTER, AC 1983 35300 LOAD CENTER, AC 1988 35300 LOAD CENTER, DC 1965 35300 LOAD CENTER, DC t976 35300 LOAD CENTER, DC 7979 35300 LOAD CENTER. DC 1981 3s300 LOAD CENTER, DC 1983 3s300 LOAD CENTER, DC 1995 35300 10.40 AMP CIR BRKR 1989 3s300 10 - 40 AMP CIR BRKR 1995 35300 41 - 1OO AMP CIR BRKR 7992 3s300 3 POLE DISCONNECT 1988 35300 TRANSFER SWITCH 1988 35300 TRANSFER SWITCH 1990 3s300 ALARM SYSTEMS-WI RE D CI RCUITS 7992 3s300 MISC OFFICE FURNITURE 1958 35300 MISC OFFICE FURNITURE 1938 35300 MISC OFFICE FURNITURE 1981 3s300 MISC OFFICE FURNITURE 1981 35300 cRT / MONTTOR 1954 35300 CHAIR 7976 3s300 CHAIR 1955 3s300 CHAIR 1968 35300 CHAIR t974 35300 CHAIR 1974 3s300 CHAIR L975 35300 DESK 1976 3s300 DESK 1950 35300 FILE CABINET 7976 35300 FILE CABINET 1934 3s300 FILE CABINET 1966 35300 DRAFTING TABLE t975 3s300 TABLE 1938 35300 TABLE 1968 35300 HYDROGEN ANALYZER 1988 35300 LOCKER 1954 3s300 MODEM 1988 35300 VACUUM GAUGE 1988 3s300 VISE 1984 3s300 SIGN 1988 35300 COMPUTER AND PERIPHERALS 7992 35300 PRINTER 1988 35300 PRINTER 1989 3s300 PRINTER t992 35300 PRINTER t992 3s300 INTERCOM SYSTEM r976 39720 MICROWAVE, PANEL UNIT 1999 39720 MICROWAVE, PANEL UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B 39720 MICROWAVE, RADIO 1999 39720 MICROWAVE, RADIO 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 3s300 CONTROL RACK/PANEL FRAM E 1999 3s300 CONTROL COMPUTER & PERIPHERALS 1999 35200 OUTDOOR CABINET FND 1999 35300 #18 - #19 CONTROL WrRt 1999 3s300 #14 - #L5 CONTROL WIRE 1999 3s300 #LO - #L2 CONTROL WIRE 1999 3s300 #1 - #6 CONTROL WIRE 1999 3s300 f6 COPPER GROUND MAT 1999 3s300 250 MCM COPPER GROUND 1999 35300 4" CONDUIT 1999 35300 SMALL E LECTRICAL ENCLOSU RE 1999 35300 #10 - #72 CONTROL WIRE 1999 35300 ALARM/MONITORI NG EQUIPM ENT 1999 3s300 CONTROL COMPUTER & PERIPHERALS 1999 35300 CONTROL WIRE . LOW VOLTAGE 1999 35300 #18 - f19 CONTROL WrRE 1999 35300 #70 - #72 CONTROL WIRE 1999 35300 FIBER OPTIC CABLE 2001 39720 MICROWAVE, BATTERY 2000 39720 MICROWAVE, EQUIPMENT 2000 35300 CONTROL WIRE - LOW VOLTAGE 2007 35300 fi70 - #72 CONTROL WrRE 2001 35300 COAXIAL CABLE 2001 35300 FIBER OPTIC CABLE 2007 35300 COMPUTER AND PERIPHERALS 2001 3s200 COMPLETE STATION BUILDING 2001 35200 SMOKE DETECTOR 2001 3s200 CEMENT WALL (FENCE)1998 35300 CONTROL RACK/PAN EL FRAM E 1998 35300 CONTROL RACK/PAN EL FRAM E 1998 3s300 AI.ARM/MONITORING EQUIPME NT 1998 35300 ALARM/MONITORING EQUIPMENT 2002 35300 SCADA RACK/PANEL FRAME 2002 3s300 SCADA RACK/PANEL FRAME 2002 3s300 SCADA RACK/PANEL FRAME 2002 35300 SCADA RACK/PANEL FRAME 2002 35300 SCADA RACK/PANEL FRAME 2002 35300 SCADA EQUIPMENT 2002 35300 SCADA EQUIPMENT 2002 3s300 SCADA EQUIPMENT 2002 35300 2/O AWG CONDUCTOR COPPER 2002 35300 250 MCM CONDUCTOR COPPER 2002 35300 5OO MCM CONDUCTOR COPPER 2002 3s300 #18 - #19 CONTROL WtRE 2002 3s300 #L4 -#L6 CONTROL WIRE 2002 35300 #TO - #L2 CONTROL WIRE 2002 35300 #6 COPPER GROUND 2002 35300 2" - 3-112" CONDUTT 2002 35300 4" CONDUIT 2002 35300 PROTECTION EQUIPMENT 2002 3s300 PROTECTION EQUIPMENT 2004 3s300 PROTECTION EQUIPMENT 2004 35300 PROTECTION EQUIPMENT 2004 3s300 PROTECTION EQUIPMENT 2004 35300 COMMUNICATIONS EQUIP 2004 35300 COMMUNICATIONS EQUIP 2004 3s300 COMMUNICATIONS EQUIP 2004 35300 COMMUNICATIONS EQUIP 2004 3s200 CONDUIT & FITTINGS UNDERGROUND 2004 35300 CONTROL WIRE - LOW VOLTAGE 2004 3s300 GROUNDING AND FITTINGS 2004 3s300 CONTROL RACK/PAN EL FRAM E 2004 3s300 CONTROL RACK/PANEL FRAME 2004 35300 PROTECTION EQUIPMENT 2004 3s300 SCADA EQUIPMENT 2004 39720 MICROWAVE, RADIO 2005 39720 MICROWAVE, EQUIPMENT 200s 35300 SCADA EQUIPMENT 2005 35300 CONTROL WIRE - LOW VOLTAGE 200s 3s300 CONTROL EQUIPMENT 2005 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page I I l0 3s300 METERING EQUIPMENT 2005 3s300 METERING EQUIPMENT 2005 3s300 METER 2005 35300 130 VOLT BATTERY CHARGER 2004 35300 130 VOLT BATTERY 2004 3s300 BATTERY RACK 2004 35300 SAFETY SWITCH 2004 35200 WOOD POLE - COMMUNICATION 2006 35300 FIBER OPTIC CABLE 2006 35300 COMMUNICATIONS EQUIP 2005 35300 COMPUTER AND PERIPHERALS 2006 3s300 CONTROL WIRE - LOW VOLTAGE 2006 35300 CONTROL RACK/PAN EL FRAM E 2006 35300 PROTECTION EQUIPMENT 2006 35300 CONTROL EQUIPMENT 2006 3s300 CONTROL EQUIPMENT 2006 35300 130 VOLT BATTERY CHARGER 2006 35300 130 VOLT BATTERY 2006 3s300 BATTERY RACK 2006 3s300 SAFEW SWITCH 2006 3s200 CONDUIT & FITTINGS UNDERGROUND 2007 35200 CONDUIT & FITTINGS UNDERGROUND 2007 35200 WOOD POLE - COMMUNICATION 2007 35200 WOOD POLE - COMMUNICATION 2007 3s200 WOOD POLE - COMMUNICATION 2007 3s200 WOOD POLE - COMMUNICATION 2007 3s300 MISC TEST EQUIPMENT 2007 3s200 CONDUIT & FITTINGS UNDERGROUND 2006 35300 BARRIER - FENCE, EQUIP PROT 2006 3s300 CONTROL WIRE - LOW VOLTAGE 2005 35300 CONTROL RACK/PANEL FRAME 2006 35300 CONTROL RACK/PAN E L FRAM E 2006 3s300 PROTECTION EQUIPMENT 2006 3s300 SCADA RACK/PANEL FRAME 2005 35300 SCADA EQUIPMENT 2006 3s300 SCADA COMPUTER AND PERIPHERALS 2006 35300 CONTROL WIRE - LOW VOLTAGE 2006 35300 GROUNDING AND FITTINGS 2006 35300 CONTROL EQUIPMENT 2006 3s300 ALARM/MON ITORING EQU I PMENT 2007 35300 CONTROL RACK/PANEL FRAM E 2007 EXECUTION VERSION 35300 CONTROL RACK/PAN EL FRAM E 2007 35300 CONTROL RACK/PANEL FRAME 2007 35300 CONTROL RACK/PAN EL FRAM E 2007 3s300 CONTROL RACK/PAN E L FRAM E 2007 3s300 CONTROL RACK/PANEL FRAME 2007 35300 CONTROL RACK/PANEL FRAME 2007 3s300 CONTROL RACK/PANEL FRAME 2007 3s300 CONTROL RACK/PAN EL FRAM E 2007 35300 CONTROL RACK/PANEL FRAME 2007 3s300 PROTECTION EQUIPMENT 2007 3s300 PROTECTION EQUIPMENT 2007 35300 PROTECTION EQUIPMENT 2007 35300 PROTECTION EQUIPMENT 2007 35300 AI.ARM/MON ITORING EQUIPME NT 2007 3s300 AI.ARM/MON ITORI NG EQUIPMENT 2007 3s300 SCADA RACK/PANEL FRAME 2007 35300 SCADA RACK/PANEL FRAME 2007 3s300 SCADA EQUIPMENT 2007 35300 SCADA EQUIPMENT 2007 35300 SCADA COMPUTER AND PERIPHERALS 2007 35300 SCADA COMPUTER AND PERIPHERALS 2007 35300 COMM RACK/PANEL FRAME 2007 3s300 COMM RACK/PANEL FRAME 2007 3s300 COMM RACK/PANEL FRAME 2007 35300 COMM RACK/PANEL FMME 2007 35300 DISTANCE / FAULT LOCATOR 2007 35300 DISTANCE / FAULT LOCATOR 2007 35300 COMMUNICATIONS EQUIP 2007 3s300 COMMUNICATIONS EQUIP 2007 35300 COMMUNICATIONS EQUIP 2007 3s300 COMMUNICATIONS EQUIP 2007 3s300 COMMUNICATIONS EQUIP 2007 35300 COMMUNICATIONS EQUIP 2007 35300 48 VOLT BATTERY CHARGER 2007 35300 48 VOLT BATTERY CHARGER 2007 35300 48 VOLT BATTERY 2007 3s300 48 VOLT BATTERY 2007 35300 BATTERY RACK 2007 3s300 BATTERY RACK 2007 3s300 BATTERY RACK 2007 35300 BATTERY RACK 2007 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Pagel lll EXECUTION VERSION 35300 AUXILIARY LOAD CENTER 2007 35300 AUXILIARY LOAD CENTER 2007 3s300 TRANSFER SWITCH 2007 35300 TRANSFER SWITCH 2007 35200 CONDUIT & FITTINGS UNDERGROUND 2008 35300 CONTROL WIRE - LOW VOLTAGE 2008 39710 TELEPHONE, MISC EQUIPMENT 2009 39740 FIBER, MISC EQUIPMENT 2009 35300 CONTROL WIRE . LOW VOLTAGE 2009 35300 GROUNDING AND FITTINGS 2009 3s300 CONDUIT & FITTINGS ABOVE GROUN 2009 3s300 COMMUNICATIONS EQUIP 2006 35200 SUPERSTRUCTURE ROOF 2009 35300 CONTROL WIRE - LOW VOLTAGE 2009 3s300 PROTECTION EQUIPMENT 2009 3s300 CONTROL WIRE - LOW VOLTAGE 2010 35300 GROUNDING AND FITTINGS 20t0 3s300 CONDUIT & FITTINGS ABOVE GROUN 2070 35300 SMALL ELECTRICAL ENCLOSURE 2010 3s300 CONTROL WIRE - LOW VOLTAGE 2009 35300 CONDUIT & FITTINGS ABOVE GROUN 2009 3s300 SMALL E LECTRICAL ENCLOSURE 2009 35300 BUS - CONDUCTOR WITH FITTINGS 2010 35300 CONTROL WIRE - LOW VOLTAGE 2010 35300 YARD LOCAL SERV OR LOAD CENTER 2010 35300 TRANSFER SWITCH 2070 3s200 CONDUIT & FITTINGS UNDERGROUND 2009 35300 COAXIAL CABLE 2009 35300 COMM RACK/PANEL FRAME 2009 35300 COMMUNICATIONS EQUIP 2009 3s300 CONTROL WIRE - LOW VOLTAGE 20L0 35300 CONDUIT & FITTINGS ABOVE GROUN 2010 35200 CONDUIT & FITTINGS UNDERGROUND 2010 3s300 CONTROL WIRE - LOW VOLTAGE 20L0 35300 CONTROL WIRE - LOW VOLTAGE 2010 3s300 CONTROL WIRE - LOW VOLTAGE 2077 35300 COAXIAL CABLE 20tt 3s300 CONDUIT & FITTINGS ABOVE GROUN 20LL 3s300 MISC TEST EQUIPMENT 207L 35200 CONDUIT & FITTINGS UNDERGROUND 2070 35200 CONDUIT & FITTINGS UNDERGROUND 2010 35200 CONCRETE MANHOLE WCOVER 2010 35200 CONCRETE MAN HOLE W/COVER 2010 3s300 COMPOSITE CABLE - LOW VOLTAGE 2010 35300 COMPOSITE CABLE - LOW VOLTAGE 2070 35300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PANEL FRAM E 2070 3s300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PANEL FRAME 2070 3s300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PAN EL FRAME 2010 35300 CONTROL RACK/PANEL FRAME 2010 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 20to 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 35300 CONTROL COMPUTER & PERIPHERALS 2010 35300 CONTROL COMPUTER & PERIPHERALS 2010 3s300 CONTROL COMPUTER & PERIPHERALS 2010 35300 CONTROL COMPUTER & PERIPHERALS 2010 35300 CONTROL COMPUTER & PERIPHERALS 2010 35300 CONTROL COMPUTER & PERIPHERALS 2010 35300 COMMUNICATIONS EQUIP 20to 35300 COMMUNICATIONS EQUIP 20LO 3s300 COMMUNICATIONS EQUIP 2010 35300 coMMUNtCATtONS EQUrP 2010 35300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 20to 35300 coMMUNTCATTONS EQUTP 2010 3s300 COMMUNICATIONS EQUIP 2070 3s300 COMMUNICATIONS EQUIP 2010 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B 3s300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 2070 35300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 2010 35200 COMPLETE STATION BUILDING 2077 3s200 CONCRETE SURFACE TRENCH W/LIDS 2017 35300 GROUNDING AND FITTINGS 2017 3s300 CONTROL WIRE . LOW VOLTAGE 2071 3s300 SMALL ELECTRICAL ENCLOSURE 2077 35300 SWITCH - AIR BREAK OR BYPASS 2017 35300 CONTROL RACK/PANEL FRAME 207L 35300 CONTROL RACK/PANEL FRAM E 2077 3s300 CONTROL RACK/PANEL FRAM E 2077 35300 CONTROL RACK/PANEL FRAM E 2017 35300 PROTECTION EQUIPMENT 2077 35300 PROTECTION EQUIPMENT 2077 3s300 PROTECTION EQUIPMENT 20t7 35300 COMMUNICATIONS EQUIP 2011 35300 COMMUNICATIONS EQUIP 20L7 35300 CONTROL WIRE - LOW VOLTAGE 2077 3s300 CONTROL RACK/PANEL FRAME 2077 3s300 PROTECTION EQUIPMENT 20L7 3s300 COMMUNICATIONS EQUIP 20tt 35300 COMMUNICATIONS EQUIP 2077 35300 COMMUNICATIONS EQUIP 2077 39720 MICROWAVE, EQUIPMENT 2070 39720 MICROWAVE, WIRE/CABLE 2010 35300 CONTROL WIRE - LOW VOLTAGE 2072 3s300 COMM RACK/PANEL FRAME 20L2 35300 COMMUNICATIONS EQUIP 2072 3s300 CONTROL WIRE - LOW VOLTAGE 20L2 3s300 FIBER OPTIC CABLE 2072 35300 CONDUIT & FITTINGS ABOVE GROUN 2072 3s300 SCADA EQUIPMENT 2012 35300 PROTECTION EQUIPMENT 2072 3s300 MISC TEST EQUIPMENT 20LL 3s300 PROTECTION EQUIPMENT 20L2 35300 PROTECTION EQUIPMENT 2072 3s300 COMMUNICATIONS EQUIP 2072 35300 COMMUNICATIONS EQUIP 2012 EXECUTION VERSION 35300 PROTECTION EQUIPMENT 2004 35300 PROTECTION EQUIPMENT 2004 35300 PROTECTION EQUIPMENT 2004 35300 PROTECTION EQUIPMENT 2004 35300 coMMUNtCATtONS EQUTP 2004 35300 COMMUNICATIONS EQUIP 2004 3s300 COMMUNICATIONS EQUIP 2004 3s300 COMMUNICATIONS EQUIP 2004 35200 CONDUIT & FITTINGS UNDERGROUND 2010 3s200 CONDUIT & FITTINGS UNDERGROUND 2070 3s200 CONCRETE MANHOLE WCOVER 2010 35200 CONCRETE MANHOLE W/COVER 2070 35300 COMPOSITE CABLE - LOW VOLTAGE 2010 35300 COMPOSITE CABLE - LOW VOLTAGE 2070 35300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PAN EL FRAM E 20LO 35300 CONTROL RACK/PAN EL FRAM E 20LO 35300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PANEL FRAM E 2070 3s300 CONTROL RACK/PAN EL FRAM E 20to 3s300 CONTROL RACK/PANEL FRAME 2070 35300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PANEL FRAM E 2010 3s300 CONTROL RACK/PANEL FRAM E 2070 3s300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 20to 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 35300 CONTROL COMPUTER & PERIPHERAL5 2010 3s300 CONTROL COMPUTER & PERIPHERALS 2010 35300 CONTROL COMPUTER & PERIPHERALS 20to 35300 CONTROL COMPUTER & PERIPHERALS 2010 3s300 CONTROL COMPUTER & PERIPHERALS 20L0 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 113 3s300 CONTROL COMPUTER & PERIPHERALS 2010 35300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2070 35300 COMMUNICATIONS EQUIP 2070 3s300 COMMUNICATIONS EQUIP 20LO 3s300 COMMUNICATIONS EQUIP 20L0 35300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 20L0 35300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 2070 35300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2070 35300 COMMUNICATIONS EQUIP 2010 3s300 coMMUNTCAT|ONS EQUIP 2010 35200 CONDUIT & FITTINGS UNDERGROUND 2007 35200 CONDUIT & FITTINGS UNDERGROUND 2007 35200 CONCRETE MANHOLE WCOVER 2007 3s200 CONCRETE MANHOLE W/COVER 2007 3s200 WOOD POLE - COMMUNICATION 2007 3s200 WOOD POLE . COMMUNICATION 2007 35200 WOOD POLE - COMMUNICATION 2007 35200 WOOD POLE - COMMUNICATION 2007 35300 COMMUNICATIONS EQUIP 2007 3s300 COMMUNICATIONS EQUIP 2007 3s300 CONTROL WIRE - LOW VOLTAGE 2072 3s300 CONTROL RACK/PAN EL FRAM E 2072 35300 PROTECTION EQUIPMENT 2012 35300 METERING EQUIPMENT 20L2 35200 CONCRETE SURFACE TRENCH WLIDS 20L3 35200 CONDUIT & FITTINGS UNDERGROUND 2013 35300 CONTROL WIRE - LOW VOLTAGE 2073 35300 GROUNDING AND FITTINGS 2013 35300 UNDER 15KVA LOCAL SERVICE XFMR 2013 35200 SITE PREPAMTION & IMPROVEMENT 2073 35200 YARD LIGHT SYSTEM 20t3 35200 CONCRETE SURFACE TRENCH WLIDS 2013 3s300 CONTROL WIRE - LOW VOLTAGE 2073 35300 GROUNDING AND FITTINGS 2073 3s300 AUXILIARY LOAD CENTER 2013 35300 AUXILIARY POWER XFMR 3 PH 2073 EXECUTION VERSION 3s200 CONDUIT & FITTINGS UNDERGROUND 20rt 3s300 CONTROL WIRE - LOW VOLTAGE 207L 35300 GROUNDING AND FITTINGS 2077 35200 SITE PREPARATION & IMPROVEMENT 2073 3s200 CONDUIT & FITTINGS UNDERGROUND 2013 3s300 CONTROL WIRE - LOW VOLTAGE 20L3 3s300 CONTROL RACK/PANEL FRAM E 2013 35300 CONTROL RACK/PAN EL FRAM E 2073 35300 YARD LOCAL SERV OR LOAD CENTER 2013 35300 CONTROL WIRE - LOW VOLTAGE 2013 3s300 CONTROL WIRE - LOW VOLTAGE 2013 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page I I 14 !coo60oo;Ur o' :;a bI)6d:Ac-6 @c.E tr'ao6 6oNj q! Eo oos@fo E o.c oE .c6 ,c@EEc6o Goooo ofc{:co =;:EFEE ;X +li,2 o=grzrElO r'l !&'a 'h o( .azEi:t-'6<Edo oj IrJs.co. 9a a@6H-ss 4oc\u 9o. s'€ HA bdor=.z'- zt6>@ Q-SEAE*vo.Et- PtZoFo{ tr- du iir = ;(J6GU- xuEtU o :,1 U;' J F>o o =Ho4 o-(J d J =b>F 6UU6s o =u 4 }R c.o G Ia .€ oro(J Ec.o o.!o 3 a.o 6 l: 6o6(J'6co .go E$E IRcoo co cqoooo6rc i'l dl \\@a@@NN qeoooosf$ \\oo d: dl €@ 6<l t+tOtAQ -!oY@ lflfqooo4 C c,o .9 E coF f foo4 o o = F (,) 4 UG J FoF L) 4 U4 x o =o oU }R oU o o = = o =o ou = ouo o = x E.9 ooo .i:u6o6(J Ec.9uo i5 = =coEo oa .€ ooo(J 6c.9 o i5 x>Rxltsrrldddla@ol Ixxxl di d; di!66ml X :R >R!NNNIoi oi oilNNNI Ixxxl09 e eiooo!dNNI ooo!ddd!oool@€61 Idl "t "llmmml 4hhl Ir-- \ \l@ @ @r@@@:d N Nl qcc!ooo!oool$ <t $l I\\\t@ @ @r I Immmldi d; dilarc@l J FoFF U =dU(,oao >t Hiol*l{l =rdr 1tblul =i ?€n:s+ olTf60Oo(rd 00u@E!'= 'tr60 ts q n< s ts i\t\rb(-)I r{'i t,C)Ebo4(s oL)tr()J oftv() o(na(!- O (s 9t o C)LOrc ,a!Lco .Y!Prl-r €*i(JX9rrl ( '.r>. L)(da.odt) !uo oc)ti Oo a aC)liC) q< aL0) vlo = c, .9vl.2 EUtco \o CJo0 CBA. uo4a<l-is C\F,:bUF{=xki I (!, x-U b4zo 5ul4o- :P:JU 34o o EEsz =b EtOU 64 E l3E =5>FE 3o(J 64 tE9r-l iR c.9 Eg -9 #o6oo(J Ec.F o.:o = C.9o oa 26aoU'6c.ooo i5 xx44s<tNN xxul 46nNts qc $$ gqr++ qqoo cq <f <t qc ooddoc) @ o 19 .={6 Eo o o @ co o o goE o(, = o =o or = oU o3 = c .o6 o @oG(J 6c.o o i5 >e@6isl xq N6 X>R}RqoqoqmNr<l 66 xxxR r! .,{ONNb$$ xssoooc,cio q9qmooMNNo@@ dl d? .? o@@ .1 dl d?oonN@@stNN q ts 6N eooo cts@$ 4qq NOO ooocrctd 4na NO66mm o 6oooo3J FoFFU =- do6 iiolIitlol ;ipl!l tiolb!dl sf lt !'6nostE;>.c ,1.o*o.=E-q =€t+OCOQ.=oY6 Q =F Xrrl lFzE] tr.lEl&o () ZF &tll o Az A ,radrrlz oFZ 1A0,tr tr .9vl.2 EUItr.! F U L (Jo U 4 (JC J Fo5F O rt+=of ouu L J F =9 +Ho4,'q3(rq x 03o og x ou o @3 a c.9 G o :oooU6g .9 @ i5 = c.o 6 o .G @ooL)tc .o o i5 qoo@ coo@ qo qoo coo@ co c.o .2 E c@ F o N ou =o E c.9tooUo o N oG o .goG oU =6 I r-r Ed =ot6cr@rU- X(Jg{ oUo !!p5- F-o5t- +xo.l 6-u d F =9 +?o4 io =(J 4 x E .o o -9 ooo(J 6c.o Io i5 = q .oo -9 .e oaoU Ec.9 o.:o x trir xolrN xd] o x\6 q @ o \NrO d! o .9 .9 EcoFtooq =oE o(, nstotooc =c@E o(, O0EE5 E$E fi;E 3E? =cio udOdoI:I ELo x :E 1 F-6u : -@4 ='=@ j: oEn @ hoUN .= :'o-cEEi C 5E 3o:NE uiXuo'L.c N !.c ;;E@ooou@!oc otLo6= orE Oo.ti; E@o P.c .E -E;; ;f,: .E.cE o66:!! o.Y P.=ri!c66L',=cJoiLgoi:!906 6 =h EeE)=g"E Eg ee. s B _ile HP.:= a@ F> o? 6! o.=roPt _.o o! 96l3i o.c = !0"6 E>.=J O !qo: h6 = ; EE;E?: > E y H _$;; =o'i.9 o =lEFo'T.:e+!. x =-L-drrrE K9 } TE *F F IL-6-=,7€l e =J f !9 o M.c.=-COO O IIJ'=Euoi,\*r:* 6. E$EE 2cOoc-:LE oi E Eits<J!:A -P---^/EgPE<ilTEET8lo:5oh!,,E 6o- E >^o =n o >+aE e e siYt,EEp.4btqiHE+fi.si#3 E 5 3 EilI q u I p'9EioE>qe=Eee= EEEEE'r E+ a cEOEEOEOE+ vloE tro vl.2 E1Atro ts 4 A< FErA ts !,\ b,,!bUklx (J, 6ufl<tid =otAuo4U_ duESuo *o ;o J F =9 o =Hodf 6-u d =b>F ,I t-rr<E4j o =L)L x c.o o -9 .t o oU '?6 C.o o i5 E.o .9 Eg6 Fco o(J e E 4<l o4s @ co! o(9 du64 3o ;UO4U duH<Hcu ot9l u ;o J F =p o =Voo +:. 6uu o J =b ,Suif +5o =u r }R c.9 @ o a v 6oGU'6c ,o o i5 = =co o oa: 6ooL)6c .o o i5 xe 6 x\@ d 4 octoo oci coo qoo6 qOots c.o .9 E c6 F 63u .EE0- c'oo = ooo 63u .E Eof tr'6oP x a =o 6u >R EU o o = = 0B o ou = oU o o = >R c.oo o : ooo(J Ec.o o i5 = c.9 6 o : oo6U'6c.9uo i5 >R >R.l dl60 oq\ oo Co EH Co EH qq qqo6ho6m qoQdi =r qqo66N o ;i!cHt^iJoLCo6F.9Ft @=ag.=q:fls =4( s ts FrbU Hrd x o3o @q x oUo o = ==E .9oIo .E oro(J Gc.9uo.=ct !e.L' Ecz o EL,fro- teEL,t<6a o Eii(J6rz J =fE r tsozL)gfs lOL'0t )}F E =o ..?xTct2E co'6 ,.2E cd F CoooE + _gE4cI o E o@ o ors om g -eooc =3orgI o E UF !a x rIJ IFzr! rI]Elil(, t)zF il ETaro z A U)&r4z oFzo vloE Eoti.g EtDtrlEF ts hn<Ns.z \JN= U Fr))a Y I (, c, ct (J Fg Xr! IFzt! ElIr.l& (, ZF dr! ooz g adr!z F Zo E .9 o.:Eoco.>co ,Eo! o E6c.E oF o E o c6 Fo o uD= og rE9Pt[,l',.Gt a; vlz du;<or =otfiU6OU UEfu oJgHs ) TF,o o .. =Yoe i @u(J q g'- =troUU+3 o3qrg x c FGoa ! ooo(J Ec.o o.:o = c.o6 o ! 6qd(J Ec.o o.=o x:Rxx\.1 aa@N<l<f@roo $6s6nlriui X;RNOoi..iro {xRd qqqqo@60on$$co ct <f <f dldlqqmoo6m@Nd60<i<f \\ooHHsK qqooon\io \\@NdNo6 d; dioo g .96 !f 6r+ coE ou) ^-t>>iltra:loolldr n4lS$r66!v vt9eri! it tti E 6 6lo -= .=lF_EEiE=ssi -q E P Ei =E E E!o o b bio o E c!: c o 6lEYtsFI oa0 A XNEEidEi6Ploo@=l IxHHxi6 m rI6 6 d GO.66dLJUt<E#'o6 OJobi5;' 3'*u .0=66 -e;ud6aiu s =b =;=guEi GE* -E '! cr o6Jo<3=hE>trCPe36t+u -!i:46.1 xxxEioi oi oi PlNNr=l I$$$Eioooj:N N N cccoooooo@€€ d'l dl dl 600 \\\G@@@ @ oNNN qqcoooooo$$$ \r)\@@@ d? dl dl @ooco iPta.=l E Ctc:.E e E!E'rEEi Eo @ _= FlFEELi< EEEbi 9o M _= FlFEEL;<b E .b Pi 4p*E:E! 36 = c 7i<E .EEI H k q n< s ts\t\ Ust}l a^l 0.)bI) v,tro o vttt =ttl ssEEEEs$EEEEHExxIxxEEEEEEEEEESE;;lddHddddddd-'dl xxx:RxxxlRxxxxxxEEi@@ooqqqooooo-ocidid ui c; ci d d ci d d o d d S d = =iXXXXXXXIeSXXpQeqqsqqqeqciiAxoooooooooooi--ooooooooooo:,ood d d d d H H d d d d xxxax:RxxxxxXEEqqCqqqqoooo--:.i.io o ci ct cj ci ci ci ct cj ct { = = .g oo.r!XLJ EBdcd_oAr+E;6<r 5- 6;u Sfiz # ?codei33o-uas o<3= 56>F o6 EE 3o .i. o3cr4 qqqeoooo +\fdd eqoefiO-imNN)<<ts<l qCqo KK Rct qqooori Qo EB oqdioo ????ss i:=;;t'rliriirififio@ldddd@sfl\\\\\\!n-ui.id-d-H-lstto@qql6 6 d d d i ::;=;; 6 , r*tr+r!+.El;'a.EEE F-; E iE.E.E.E.E.E bEE E_i EEEEEEEIEEE=sst;i Io@ooo@Ft.l;hg=gg{Eg! ;EEEEEE,EEEi=58.EEEi ;EEEEEEg:EEE,hfeExi :itststsiE63o-A,ie<gUEl= co.=o ! = o coE o(, xcoo xco >R (J o =o U(J6O@- Xue{oU o nu<L5- =b>F o>U OL T @u(J g J =b fit.litr o =t,l g x co{=6 o ! @aGU6co{: @ i5 =g .9 GIoa oaoL) 6c.o o.!o coo qoo oci qo qoo ocio tro o of oo q 6 oo6oci26,c E oF o3@c E0- o f6 ooh O =E X tr.l IFzEl r!trl&o o ZF &r!o. oz a. U)&rrlz oF Zo ts \_)4o< s ts \F\ (-) st'l N o50 CB= I (j, UFo Xr! IFzt! rr)14il zF HAooz a&rrlzBoFz lntro lE 1ll tn a L' 6 o =o 6U >R oUo o = = o =o 6U = ou o o = >R c.o6 -9 P @o@U6g .o o i5 = c.o6 oa Ho6qo(J 6aoEo.!a 3xciqoo xtsCooo HxEx;E H€xRg; qor{' q <f co q $ q 4 qoo c.o E !f o 6 Uin l6 @ riol6r Ei Eiql Ei brFl Ei 6tr F6-Eu'=FEbe #eg'o x o =o 6U ;R oU o o = = o =o 6U 3 oU o o = = .9 6 o .:06o@U6co.:q.:o :R>R:RXXqqqqeooooooooood d d H d xxxxxqqqqqooooo :RXXfrfrqqcXXEEE 6SsEERRctc,o cc** qc eqoo qq {t qq6n qq 66oo co.F o !l 6 o o o ol6r Ei Ei EibrFl Ei EI2t6tEI :oo,P@=\cdhoo3 6d d-+6 cG.=LE6=cEOE b EIade >S E'-i;o-L oE-! XMil6(,6dF U d (Ja U C (Jl J =E=troBustt GU(J G =b>F ,Su6i<+o =L)4 x o =o ou x 6U o o = !R c.9o oa f 6q6(J'6c.9 o i5 3 =c .o G o =2 @o6()'6c.9 oo.=o xoc;o }Rqo xcoo xqo ;Rqoo >Rqo xNd }Roq o coo6 eoo qo co44 qoo qo{ co 6 !f oo 0 6) o.cE O6FC>=6Eag asI2 =cqq s ts |\F\ Uski a.lN ;bo6p- :RXXXX60000cidciocioooood d H d H :RXXA>eqqqqqoooooi- 6q.6 @du E3 d 66 .JJ@aEgE =E>trS;=a co4.9 .i 3E6q(J 8=,q3 bEieS (rEI fo;o =t.l C €XSXXscqqcioooo =oooo d d - SxxxxooooSciocici q @o q @o 6t I Iolrilrl I>>!t!lo6l@@r =ool,': 6 6iNN!9--l.odNb*1tq66 =.s.qG-ccC^'a.EP6EE ic'=cFFe;EEb beiP.b E EE.&:I€€ =EE*E6r>'}-r-F E.oo !f o ! 6 =s6 = xuf<tia3o BU6dU_ 6(JEfUotE9 J =h=tro?Hoo oULI d J ib>F ,TU9dto3cro a c.o GUoa: @oGU Ec .o o.!o = c.o G s 2 GqdU6q F o.:o xSxiqqqroOorooo: I Ixx}Rtqcqtoool xxx diciP E{E 6@ qq €@oo qc 6@oo ooci ct qco@oo qc NN qqnnNN co 6 !l omNoc@o'= 5- E FCEsLO.oF,c -qo =E1: SE 8l EI9l.:tFIEIFl EI 5rPI6ttrr o lo o6N @co.9 ar 5'iR u:E fE=60 -efi..,l1,8 s @6U;E sE6E:ohE#E =F=E3=? EOd.ofgE (J E;FEEXo*q o =u d NEExiREETi ISEE$iXdcjFi ,! Ei I Ei 6+N dqN co tidl@l SI 3i EI6lC:EEEi gEEEPI fr.:o.@L;<Et:Pi }o o E cl 6*-'EE€i eEEEEi soi<FlN UFtr X rr.1 IFzt! r!rI]d, ozF &El oz a&r!z oFzo 1^tro o lilt =tl k ha<Ns. ts :\t*r5(.) FL)xki E (.:, - o UFa X IFz rI.] rrlsl o oz F H ooz a&r!z oFz ]Atro o ]ilt =tn a.l ooo6 5f =o fiu6dU_ X1.1ESU o ..5E9 =* J 3o =Fo -. =Y6ot @o(J g J 3F =troUU.ef o3uL )R c .9 6uo EuoqEU6c.ou@.!o 3 c.9 G oa =GoGu'6 oT @ i5 xxxxE6EE3333gEEE HH$$s6EEnSBSc,octo NNXNEEEERRRREEEE $$S$BEEsRRRRctcicic; oooocidctoooooo66€ mommdi d; di diomm6n6n6 r:\\\@@oo@@@@NNNN ecaqoooooooo \\t\@@ood i d dommm dl d! d) dlmmmmaa€o 6E.c .EEE 66gg =cc:'==HN =tsFft+EiTEEAFFX:FdNEE!+tLB<E-9Sol!!!--!oooov6660 ooUUo6oodG ii oadoo60U(J .o .o o@ 6E.c .=EEo0FFiNIt lt oau@EE'r '=oo 5'E u:H S.E=60 -9* u1,! c oO-6o6 uHt r OO UJUbEg E s =b3; =g ?3i 4 E*33 uAL OJo<6\ Lo5 oE> F .=dE+ (Js9 fO +:.o =t.l o xbR;ex6666di di di di6moo xxlRxrtstsFdddci@@@@ Cq\riooN)i6 il O :ld d d ImmNoldi d; $ cil\f si o ol I INNhdldEid.il66@@l I I I I^^t>>i oo!m6l @@i --ldNt* +i 66dNcc**='== = E tst g3 P b Er g'EEttl to olPPEE! ;ooBBi >o o o oi -,3EEi E x()ES =o+i ;(JOeu ^uEfUotnu;s J =b>F o -. =Y5o.i ou(J a =H aqUgr *:,o =r..l 4 x .9 G o ll NooUEcoEo i5 = c .o o -9 oooU6c .9 o.:o XxxxiYN66lQ di d; dil HNool I6$*{ii6@@!N@@l etN<fNJs3i; qN@gHB co,F G 35 @ o =6 t dn@ a-SERg 6'6 ._E .CEE6scoo'=FFEgLOOPEESBB:h66EE(9FF E aaEs tso!..b,,rbU Hhj= \f,al o50d6-L' A (Jg L' & uc Js =bio ..=x54? ouLt -G J >F or(J9fno3ur 3 c.oou -9 2qGooU 6C.9uo i5 o t.9 6 ! =6 omNE(,c 'oU4 UFo XH IFzru E]r4il() (,zt- &r!o"oaz A u)&rI]z oFzo ?,^c.9 o vtg =ttl xxxxxxxx*EEEEEeEEE SH$EEESf;HSgBcicictBBB B =o =o? Gu 3 =6uo I AJ = x c.oo0oa .t ooGIJ Ec.9 o i5 :Rx*XXXxxieNdNYYtiNFtsRRREEESsg EE$EEE$$SRRRdcicigSS qcqo(roooosi !i tl \\\ro6r5 o6m n! d: d':o60ooo6 355q6q(9(,(9E e?t;;;H-cBBBiiiE99q.qq.q.q.q.;996666hhaEEs*ss$s = GEii$s*s*s dd6600hEE.c.E.=.c.=.= ':.E.=EEEEEEEEEEEP#PgPgEhhEEEEEC =2eEEbbbbil:6666o?:cccEcc-E Bo e e g g g g FTTFFFFFF o.l obo6 q tr< Fq\ on:F\ Ut.l =kl I (9 UFo XE] IFzIrl r! 14& (,zF dF]p.o Az rJiU)&rI]z oF Z o =o 6u :R oU o o3 = o =o @U = Gu o o = s tr .o o I .t oooo'6coFo i5 = c.ooUo a: Go@(Jtc.o o i5 $$SEEih;hcicji I NXXEEid^i^iQPl<t<t$==l xiRxxlRcqqqqooooo :RERXX>Rcqqqqoooooooooo qqqo6€N N N@o@ di d; di60@ ri ui r;@o@N N N nnaooo qqcooo qaR 600 o f6 r+m I Iri 3l*i ai!l EiElbrFl Ei EI2t6ttrr t! @6i\nEEcd E6o #6trE!CELc-oo'=EFFooN;EF*7 =N!:>:6# oo=lYo6z> x€*sxsEnn; HxXX€sE+SE x o =o Gr }R oU @3 >R c.oo oa I ooo(J 6c .o o.=o = o =o oU = o = = c 'a6 oa Eaoqoo6c.o o {EEsEREdoc; *x865:Hooo:Joooorrtdd qqqo@oONN6@@ o? d! dloomo@@n60 rmo@dsio@@NNN qaao60ooost66 r6qqioom 6a<qI 6 mL:,t 6 6m 6 coEo ! = n<l 36 o6 @ lo 6{ I I I I I I eiolti HI =tgl.=tElbrFl Ei EI HiEI Co oo&i dCoo.at 6O.oEOE oo66CC '='=ttF> =iooooFFFFdNdNttttIt i+ ff'66SfooooE!33== >R o =o or x @u o o = = a =o oU 3 oUo o = x c .9 Ga3 EUEa6o c.E oo i5 B c.o o I .t 6ooUiiq .o o i5 EEExI N 6 6 ilN@+"1 IHHSEiildiuiPlNmh:l S{EEHRdct SSEE,::oooljoo cqaoom400o@e .! dl d-ro!moo60ono \\n6@OooNNN$ cqul@od40No+6 NN ^iuiCNdoe6 mmQdidin@oi; tr.o 6 o5 <t o lo 6 ?iolti sl =t Ei brFl Ei EI?tatEI o od: oa 8.9 6g_6;6c.EtrT ;OFl:F a!otfo6oEoo=(j,dz o lico l! tlt =tn \o C-l ()bo(€ E qE F.ls, ts i\t\{ U= Fr))akl g, I o (J OFg XE] IFzlrl I!El oz F I! o z EU) r!z oFz 1Atro o vl.Cl =tl U =4 =utJ g (J =LU =.-l 4 F =9 o =Hodt o-(J g F =9 H<or o3u L x go o o .: ooo(J 6c.o o.=o = c.o o o .1n oooQ 6C.o o.!6 xx\\NNrN :RX NNNN ooci cioo40 cqooor oroo ooci ci sf <f oooooonn oooct qqoooo <oooh'6 .E E 0F o E o co F o G@ei oUooU o'-o E.c EoF o;Uc EoI HxEi 'i=QlN"=t s5 ? -O.E=oooi <.eE F =9 =gH=oL.o .:, 6GE-L) g= Eq> 3T?6BrCU€+g;U5gd E>.9fis+ ?.!odot o3crg ooci c,oo46 qqooooo6 ctqdo Qo EH ccoooo@H qcooo6r<l EEiEE Ei fiL o Fl 9P! Ei EaE€i =E E Ei 8z6Fl 6 tiio ol-qi:-8!6l XU o =o ;U64q >qu 6Oouo hUod =- x c .o 6 o < 2 @ooUEa ,o o.!6 E$$EXEE6NN:dAAtohvts SXNEHEEd^i 6i PNPPhsl<f=d== *:R:RXXXIR6000000ctciociocici xxxxxxxooooooociddcicioooooooooidididd F =9 o =Yod +5 @uo o FB9 6 .! o4 o =u L = c .o G o E oo6L)EcoEo i5 +@oQdiaicie6NN=o@o: 66m9didiriQ@@@xm6m= dmmoddri oN @ @ d<tNN<t 6{qQ.idiriPNooH6Om= ccqqoooo 6<sQ.ididiPNOO::40m;j c.o6 3: nsf 'oop tt! JoommLNNo\coofi06PEEs 33 =aodEfniE$ =5Ae EE 668 =qqc.=EFEE=EEEfltrE=O.otsooFFoooFFPO=9FiN!i:i:rtt 9>,9€3ti?-:22- b b =ts e eY66-oFF o l6 o$ EXECWION VERSION EXHIBIT D Monthly Transmission Facilities O& M Charge; Monthly Substation O&M Charge; Monthly Common Equipment Charge l. Interpretation: Cooperation. (a) Capitalized terms not defined in this Exhibit D are defined in Article I of this Agreement. (b) The Parties shall cooperate as necessary to update this Exhibit D in the event that FERC formula rate filing references change over time. 2. Monthly Transmission Facilities O&M Charee. (a) The Monthly Transmission Facilities O&M Charge for each Transmission Segment each month during the Term shall be equal to: (i) the product of: (A) the Acquisition Cost of the Transmission Segment as of such month; and (B) the O&M Expense Factor as of such month; divided by (ii) twelve (12). (b) Beginning the first month after the Effective Date and each month thereafter throughout the Term, pursuant to Section 4.7 of this Agreement, each Operator shall invoice the Non-Operating Owner for its Pro Rata Share (based on its Ownership Interest in the Transmission Segment) of the Monthly Transmission Facilities O&M Charge with respect to each Transmission Segment for which it is responsible. The invoice shall show the total Monthly Transmission Facilities O&M Charge with respect to each Transmission Segment for which it is responsible as well as each Owner's Pro Rata Share (based on its respective Ownership Interest in the Transmission Segment). 3. Monthly Substation O&M Charee. (a) The Monthly Substation O&M Charge for each Substation each month during the Term shall be calculated as follows: (i) If the description of any Substation Segment in such Substation on Exhibit C indicates that any Substation Segment contains Line Terminal Equipment, then the Monthly Substation O&M Charge for such Substation shall be calculated as the sum of the following: (A) For each Substation Segment in the Substation, the portion of the Monthly Substation O&M Charge for the Line Terminal Equipment in each such Substation Segment shall be equal to: (l) the product of: (x) the Acquisition Cost of the Line Terminal Equipment in each such Substation Segment as of such month; and (y) the O&M Expense Factor as of such month; divided bV Q) twelve (12); and JOINT OWNERSHIP AND OPERATING AGREEMENT-EXHIBIT D Page | 127 EXECUTION VERSION (B) The portion of the Monthly Substation O&M Charge for the Substation Bus Equipment in the Substation shall be equal to: (1) the product of: (x) the Acquisition Cost of the Substation Bus Equipment of such Substation as of such month; and (y) the O&M Expense Factor as of such month; divided by (2) twelve (12).. (ii) If the description of the Substation Segments in the Substation on Exhibit C does not indicate that any of the Substation Segments contain Line Terminal Equipment, then the Monthly Substation O&M Charge for such Substation shall be equal to: (A) the product of: (l) the Acquisition Cost of the Substation Bus Equipment of such Substation as of such month; and (2) the O&M Expense Factor as of such month; divided by (B) twelve (12). (b) Beginning the first month after the Effective Date and each month thereafter throughout the Term, pursuant to Section 4.7 of this Agreement, each Operator shall invoice the Non-Operating Owner for its Pro Rata Share of the Monthly Substation O&M Charge with respect to each Substation it is responsible for as follows. (i) For any Monthly Substation O&M Charge calculated pursuant to Section 3(a)(i), the Non-Operating Owner's Pro Rata Share of the Monthly O&M Substation Charge shall equal the sum of: (A) For each portion of the Monthly Substation O&M Charge calculated pursuant to Section 3(aXiXA), with respect to each Substation Segment, the Non-Operating Owner's Pro Rata Share shall be based on its Ownership Interest in each Substation Segment in such Substation; and. (B) For the portion of the Monthly Substation O&M Charge calculated pursuant to Section 3(aXiXB), the Non-Operating Owner's Pro Rata Share shall be based on the applicable Substation O&M Allocation. (ii) For any Monthly Substation O&M Charge calculated pursuant to Section 3(aXii). the Non-Operating Owner's Pro Rata Share shall be based on the applicable Substation O&M Allocation. 4. Monthly Common Equipment Charge. (a) The Monthly Common Equipment Charge for the Common Equipment at each Substation each month during the Term shall be equal to: (i) the sum of the Return on Capital, the Recovery of Capital, the State and Federal Income Taxes, the Local Property Taxes and the Transmission O&M Expense, in each case, with respect to the Common Equipment; divided by (ii) twelve (12). (b) Beginning the first month following the Effective Date and each month thereafter throughout the Term, pursuant to Section 4.7 of this Agreement, each Operator shall invoice the Non-Operating Owner for its Pro Rata Share (based on its Common Equipment JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT D Page | 128 EXECWION VERSION Allocation Factor in the Substation) of the Monthly Common Equipment Charge with respect to each Substation for which it is responsible. The invoice shall show the total Monthly Common Equipment Charge with respect to each Substation for which it is responsible as well as each Owner's Pro Rata Share (based on its respective Common Equipment Allocation Factor in the Substation). 5. Annual Adjustment. The following terms shall be adjusted each June (in the case of PacifiCorp) and each October (in the case of Idaho Power) following the Effective Date by the Operator responsible for the Transmission Segment, the Substation Segment or the Common Equipment, as appropriate, as follows (collectively, the "AnnuA!_Adj-ustmenl'): (a) the Acquisition Cost of the Common Equipment, the Acquisition Cost of the Line Terminal Equipment, the Acquisition Cost of the Substation Bus Equipment, the Acquisition Cost of the Substation Segment, the Acquisition Cost of the Transmission Segment, and Net Book Value, all of which shall: (i) exclude any costs included in CWIP; (ii) not be reduced for accumulated depreciation (except for Net Book Value); and (iii) be adjusted as follows: (l) Increased to reflect the cost ofcapital upgrades to such Transmission Segment, Substation Segment or Common Equipment placed in service during the months since the Effective Date or the last date of the immediate, prior annual adjustment; and (2) Decreased to reflect the cost of equipment comprising such Transmission Segment, Substation Segment or Common Equipment which has been retired (and no longer placed in service) during the months since the Effective Date or the date of the immediate, prior annual adjustment. o)The (i) (ii) (ii i) (iv) (v) (vi) (vii) following factors from each Party's annual rate filing: Return on Capital; Recovery of Capital; State and Federal Income Taxes; Local Property Taxes; Accumulated Defened Income Taxes: (l) Account 190; (2) Account 281; (3) Account2S2; (4) Account 283; Transmission Net Property, Plant & Equipment; and Transmission Plant in Service. Each of the Annual Adjustments shall be reasonably determined by the Operator responsible for such Transmission Segment, Substation Segment or Common Equipment. JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT D Pagel 129 EXECWION VERSION 6. Definitions. tt 'means: (A) In respect of the Common Equipment at each Substation owned by ldaho Power, an amount equal to the sum of Sections (AXl) and (AX2) below: (l) Account 282based on the product of: (a) Transmission-related Account 282 is the product of: (D Total Account2S2 (Idaho Power Rate Filing - Schedule l, Line 4); and (ii) the sum of (l) Transmission Plant Allocator (ldaho Power Rate Filing - Schedule l, Line 8) and (2) General & Intangible Plant Allocator (ldaho Power Rate Filing - Schedule l, Line 47);and (b) The quotient of, (i) Net Book Value of the Common Equipment; and (iD Transmission Rate Base (ldaho Power Rate Filing - Rate Calculation, Line 20). (2) Accounts 281,283 and 190 based on the product of: (a) Transmission related Accounts 281,283 and 190 is the product of, (i) Total Accounts 281, 283 and 190 (Idaho Power Rate Filing - Schedule l, Lines 3, 5 and 6); and (ii) The sum of (l) Transmission Plant Allocator (Idaho Power Rate Filing - Schedule l, Line 8) and (2) General & Intangible Plant Allocator (ldaho Power Rate Filing - Schedule l, Line 47);and, (b) The quotient of, (i) The Acquisition Cost of the Common Equipment, and (ii) Acquisition Value of Transmission Plant, Property and Equipment (Idaho Power Rate Filing - Rate Calculation, the sum oflines 1 through 8). (B) In respect of the Common Equipment at each Substation owned by PacifiCorp, oil amount equal to the sum of Sections (BXl) and (BX2) below: (l) Account 282based on the product of: (a) Transmission-related Account 282 is the product of: JOINT OWNERSHIP AND OPERATING AGREEMENT_EXHIBIT D Page | 130 EXECUTION VERSION (i) Account 282 (PacifrCorp Rate Filing, Attachment lA, Line 1); and (ii) The Allocator (PacifiCorp Rate Filing, Attachment lA, Line 6); and (b) The quotient of: (aa) The Net Book Value of the Common Equipment; and (bb) Total Net Property, Plant & Equipment (PacifiCorp Rate Filing, Line 32). Accounts 281,283 and 190 based on the product ofl (a) Transmission-related Accounts 281,283 and 190 is the product of: (i) The sum of Accounts 281, 283 and 190 (PacifiCorp Rate Filing, Attachment lA, Lines 2,3 and 4); and (ii) The Allocator (PacifiCorp Rate Filing, Attachment lA, Line 6); and (b) The quotient of; (aa) the Acquisition Cost of the Common Equipment; and (bb) Total Plant in Rate Base (PacifiCorp Rate Filing, Line24). "Acquisition Cost " means, in respect of a Substation Segment, the cost of the Line Terminal Equipment in the Substation Segment as initially determined on the Effective Date and set fonh on Exhibit F, as the same may be adjusted from time to time by the Annual Adjustment. "Acquisition Cost 'means, in respect of a Substation, the cost of the Substation Bus Equipment in the Substation as initially determined on the Effective Date and set forth on Exhibit F, as the same may be adjusted from time to time by the Annual Adjustment. "Acquisition Cost o 'means, in respect of a Substation, the cost of the Substation Segment as initially determined on the Effective Date and set forth on Exhibit F, as the same may be adjusted from time to time by the Annual Adjustment. "Acquisition Cost " means, in respect of each Transmission Segment, the cost of the Transmission Segment as initially determined on the Effective Date and set forth on Exhibit F. as the same may be adjusted from time to time by the Annual Adjustment; provided, however, that (i) in the case of the Antelope-Goshen Transmission Segment, the Acquisition Cost of the Transmission Segment shall be reduced by 44.44% to account for the fact that only approximately 25 miles of the approximately 45-mile Antelope-Goshen Transmission Segment is jointly-owned Transmission Facilities and (ii) in the case of the (2) JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT D Page I EXECWION VERSION American Fall - Malad Transmission Segment, the Acquisition Cost of the Transmission Segment shall be reduced by 57.28o/o to account for the fact that only approximately 29 miles of the approximately 68-mile American Fall - Malad Transmission Segment is jointly-owned Transmission Facilities. "Acquisition Cost " means, in respect of Common Equipment in a Substation, the cost to the Owner of such Common Equipment as initially determined on the Effective Date and set forth on Exhibit F, as the same may be adjusted from time to time by the Annual Adjustment. "Annual Adjustment" is defined in Section 5 of this Exhibit D. "Common Equipment " means, in respect of each Substation and each Owner, the Substation O&M Allocation for such Substation and such Owner, provided that prior to the Effective Date the Parties shall work together to determine whether an alternative allocation factor should be used for purposes of allocating the Monthly Common Equipment Charge as between the Owners. (6C\ /rIP" means Construction Work in Progress. "ldaho Power Rate Filing - Rate Calculation" means the rate calculation tab of Idaho Power's current year annual FERC formula rate filing. "ldaho Power Rate Fil@'means the schedule 1 tab of Idaho Power's current year annual FERC formula rate filing. "Line Terminal Equipment" means all series capacitors, shunt reactors and phase shifters and all other equipment that the Parties mutually agree is "Line Terminal Equipment." All Line Terminal Equipment which is part of a Substation Segment on the Effective Date, sorted by Substation Segment, is identified on Exhibit F. "Local Property Taxes" means, in respect of the Common Equipment at each Substation, an amount equal to the product of: (A) The Acquisition Cost ofthe Common Equipment; and (B) The Property Tax Rate for the State of ldaho. "Net Book Value" means, in respect of the Common Equipment at each Substation, an amount equal to: (A) (B) The Acquisition Cost of the Common Equipment; Less, the Accumulated Depreciation. JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT D Page | 132 EXECUTION VERSION "O&M Expense Factof'means, in respect of each Operator, an amount equal to the quotient of: (A) The Total Transmission O&M Expense of the Operator; and (B) The Transmission Plant in Service of the Operator. "PacifiCorp Rate Filine" means PacifiCorp's current year formula rate true-up. "Rate Base" means, in respect of the Common Equipment at each Substation, an amount equal to: (A) The Net Book Value; (B) Less, the Accumulated Deferred Income Taxes. "Bggovgly_gf C@1" means, in respect of the Common Equipment at each Substation, an amount equal to the product of: (A) The Acquisition Cost of the Common Equipment; and (B) The FERC approved depreciation rate for Account 353 Transmission Plant Substation Equipment. "Rglqrn on C.4plIA!" means: (A) In respect of the Common Equipment at each Substation owned by Idaho Power, an amount equal to the product of: (l) The Rate Base; and (2) The Rate of Return (ldaho Power annual FERC Formula Rate Filing, Rate Calculation, Line 23). (B) In respect of the Common Equipment at each Substation owned by PacifiCorp, iill amount equal to the product of: (l) the Rate Base; and (2) the Rate of Return (PacifiCorp annual True-Up Rate Filing, Schedule l, Line 126). "State and Federal Inc 'means: (A) In respect of the Common Equipment at each Substation owned by Idaho Power, an amount equal to the product of: (l) the Rate Base; and (2) the Composite Income Tax (Federal and State) (Idaho Power annual FERC Formula Rate Filing, Rate Calculation,Line24). JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT D Page | 133 EXECUTION VERSION In respect ofthe Common Equipment at each Substation owned by PacifiCorp, BII amount equal to the product of: (1) the Rate Base; and (2) the Composite Income Tax (Federal and State) Factor, which shall be equal to the product ofl (a) the weighted cost of preferred and common @acifiCorp annual True-Up Rate Filing, Schedule l, Lines 124 and 125); and (b) the income tax factor (PacifiCorp annual True-Up Rate Filing, Schedule l, Line 132). "Substation Bus Equipment" means all equipment necessary to support the operation of the substation bus, including foundations, lally columns, bus conductor, fittings, circuit breakers, air break switches, shunt capacitor banks, potential transformers, current transformers, ground switches and enclosures attached to or associated with the bus. All Substation Bus Equipment which is part of a Substation Segment on the Effective Date, sorted by Substation Segment, is identified on Exhibit F. "Substation O&M Allffi'means, with respect to each Substation, the "Substation O&M Allocation" set forth in Exhibit C, as the same may be amended from time to time pursuant to Section 3.3(b) of this Agreement. "Substation Segments" means, with respect to a Substation, the Substation Segments which are listed on specific rows under the Substation on Exhibit C. "Total Transmissio " means: (A) In respect of ldaho Power, the amount calculated as follows based on items identified in Idaho Power's annual FERC Formula Rate Filing: the Transmission O&M Expense (Idaho Power annual FERC Formula Rate Filing, Rate Calculation, Line 33); less. Account 561 (Load Dispatching) (ldaho Power annual FERC Formula Rate Filing, Rate Calculation, Line 34); less, Account 565 (Transmission of Electricity By Others) (ldaho Power annual FERC Formula Rate Filing, Rate Calculation, Line 35); and plus, O&M Expense: A&G (ldaho Power annual FERC Formula Rate Filing, Rate Calculation, Line 36). (B) (l) (2) (3) (4) JOINT OWNERSHIP AND OPERATING AGREEMENT- EXHIBIT D Page | 134 EXECUTION VERSION A sample calculation of Idaho Power's Total Transmission O&M Expense based on Idaho Power's 2013 FERC Formula Rate Filing is attached hereto as Attachment I for information purposes only. (B) In respect of PacifiCorp, the amount calculated as follows based on items identified in PacifiCorp's annual FERC Formula True-Up Rate Filing: (l) the Transmission O&M Expense (PacifiCorp annual True-Up Rate Filing, Schedule l, Line 53); (2) less, Cost of Providing Ancillary Services Accounts 561.0-5 (PacifiCorp annual True-Up Rate Filing, Schedule l, Line 54); (3) less. Account 565 (PacifiCorp annual True-Up Rate Filing, Schedule l, Line 55); (4) plus, A&G Expense Allocated to Transmission (PacifiCorp annualTrue- Up Rate Filing, Schedule l, Line 66); (5) p!us, Accounts 928 and 930.1 - Transmission Related (PacifiCorp annual True-Up Rate Filing, Schedule l, Line 69); and (6) plus, A&G Directly Assigned to Transmission (PacifiCorp annual True- Up Rate Filing, Schedule l,Line74). A sample calculation of PacifiCorp's Total Transmission O&M Expense based on PacifiCorp's 2013 FERC True-Up Rate Filing is attached hereto as Attachment 2 for information purposes only. "Transmission O&M Ex " means, in respect of the Common Equipment at each Substation, an amount equal to the product of: (A) the Acquisition Cost of the Common Equipment; and (B) the O&M Expense Factor. "Transmission Plant 'means: (A) in respect of Idaho Power, the amount calculated as follows based on items identified in Idaho Power's annual FERC Formula Rate Filing: (l) the Transmission Plant in Service (Idaho Power Rate Filing - Rate Calculation, Line I ); (2) Iess, Generator Step-Up Facilities (ldaho Power Rate Filing - Rate Calculation Line 2); and (3) less, Large Generator Interconnects (ldaho Power Rate Filing - Rate Calculation, Line 3). JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT D Page | 135 EXECWION T/ERSION (B) in respect of PacifiCorp, the amount calculated as follows based on items identified in PacifiCorp's annual FERC Formula True-Up Rate Filing: (l) the Average Transmission Plant in Service (PacifiCorp Rate Filing, Line 1 s). JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT D Page | 136 EXECUTION VERSION EXHIBIT E Department of Energy Equipment Located in the Antelope Substation Oil Circuit Breaker 8103. Govt. Prop. No. 85420 Westinghouse Type BM-4B, De-ion Grid Oil Circuit Breaker. Acquired 1957, Moved from TRA 1981. Serial No. l-71-578-B Rated Voltage 138 kV Rate Amps 1200 A Impulse kV 650kV Intemrpting MVA 3500 MVA 810 gallons of oil per tank weight 39,500Ibs. Oil Circuit Breaker 8164. Bus Tie Breaker Westinghouse Type l6GM3l.5, Acquired 1982. Serial No. l-38Y5468 Rated Voltage l69kv Impulse kV 750kV Short Circuit Amps 31,500 A l3l5 Gallons of oil per tank weight 54,000 lbs. Circuit Switcher 1654.. Govt. Prop. No. 83712 S&C Circuit Switcher/lVlark V, Acquired 1982. Catalog No. 157320- Serial No. 8l -31857 kVNominal l6l kV Maximum Design Voltage 169 kV BIL 75OKV Amps, Continuous 1200 A Amps, RMS Symmetrical Fault, Closing, 30 duty cycle 30,000 S&C Operator, Type CS-IA Operator Voltage 125 V DC Catalog No. 38846R3-BBHPW Serial No. 181400 l. 2. 3. JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT E Page | 137 EXECUTION VERSION 4. Circuit Switcher 1624. Acquired 1982 S& C Circuit Switcher/lt4ark V Serial No. 81-31735 Same information as item 3 above S&C Operator Type CS-IA Serial No. 8l-31735 5. Transformer. Govt. Prop. No. 5-220. Acquired 1957. 161 kv/138 kv Feeds #l Antelope-Scoville Tie Line Westinghouse 137,600 lbs Serial No. 6534543 55 MVA, OA 73-ll3 MVA, FOA, with fans on both sets of fins (3 fans are already on I set of fins) 9l-2/3 MVA, FOA, with 3'd stage cooling (addition of 2 oil pumps, one pump is already installed). Y-Y auto transformer with delta tertiary Includes no-load tap changer, 5 steps, for voltages from 16905 volts to 152950. Tap lever is locked on step 3. %Z -1.5o/o at 55 MVA. 16l kV/138 kV 6. Transformer. Govt. Prop. No. 5-587. Acquired 1982 161 kv/r38kv Feeds #2 Antelope-Scoville Tie Line General Electric Serial No. Ml01875 167,000 lbs. 55 MVA, O(A) 73.3 MVA, FA 91.6 MVA, FOA, 55o C, has I set of fins with oil pump and 3 fans and oil. 102.7 MVA, FOA, 65 o C, expansion tank on top, Y-Y auto transformer with delta tertiary. Includes no- load tap changers, 5 steps for voltages from 109050 volts to 152950 volts. Tape lever is locked on step J. o/ozvolts- 1.47 at 55 MVA, 161 kv/l38 kV 7. Ouindar Transfer Trip Control System QP-11/12s (Aerojet Nuclear Co. E-45408C-3) JOINT OWNERSHIP AND OPERATING AGREEMENT -EXHIBIT E Page | 138 o\c.l obl)G! t\ =g XE] IFzrI] E]rrl&() ZF &E]A.o !z I adE]7 oF Zo .cEtOEE@ s€ogfJd,P =EPE -PE!o==oo $= .oo c9toocto eo8E oo 9e*:@oEto>EOSE'-- o:o€.c :;'=TEOcd -O6EEo60EoL3o_ EO.-tooS@e€6O!f9ort =Fi+@iEOoJCsoo-E d5o-Nb iEmB e:+bEUu-o.=3r eE''l9o6C3g$o6E :o€<{gr5 '=Et,i;.Er5E E=C<u'6 qr .9t-ioo..ur uc- @o'b EE=9 i:ho€..i6C EeAEE! u=FoxN OU v) 6 :.U ;io rLt t,x'=r!B o:o oo6 oz ccooEEcc OlUC oi<fNd@q ofo coE.9:o f6t>oJE o.! ?,:d oa66o.i(.i oE>qrLdc@=da(JIc ooqroq NN.i gcocEEcc 8E oqo<fr! <fq co 6 of ocfEco $voo6q .so d6d o E ooro oz ECooEEco 8E u6G(6 o!o coE.2lou >o?.coXiE E;;ooNEU oNci@ ctoN6 iEt.couGbEs<E.3 ;oodiu Neoo o;o 6 )c6Ou- g*<.E@loo saosteoN fc6oH? E-o5oodU uioN.j<f fc60ut trs<.Eil@o N o;o.! Nsfq 3c60u>Eoa o-a5oo d) N h6ioN lc6oU- F4<-a*ojmo No)ro riN.,{ 2'6ou>Eo5. o-ofmodr o oiq N ECooEEco 8E nnno@ ariar.i c.o 6 ol ooooc o:o oo6 @z ccooEEE.9OlUO mq oaro\ oa6 coE.9ao f62>orEqlo -.6Yu4 o ct t 3r>qJEho+=od(Jue q t Ccn CEooEEcc 8E C 6 co 6 of c =j cT o<l C'hI)d ILF c0 X IFzr! HE]/, (, ZF &rrlp.ooz *EU)&rI]z oF Zo = E Hi EEoO OEJA '5o90 6u i! re;€ 5 - d6 Eta 9e e b s iE = -m F o !Es iEEE? ;3*i! E:lP- o$b q€ EmFgi Sgd Q t >E*tt ,-iF"-'H g$oo:: oorqE t4gE u I oo E E CL+; E 3 EE!tu rEsoo EoErc os E* E E.EeE E c 6E;8 E.,3bE i .sEI = E =.e;:*' o9l ^60 .eiiF C c EEE:Ou.=E = o -fo>uff>!o.: E-oE g !! qd OO! 6@c tr I c-: E E :E>HE g oEfi ;eE;.+ qs;;t E3€i q ; Bis? 6=qlo EtrY.- -' dG+Ei Bt6Ezo xt :.9-u-! YcE* ic E E =Plll!o(!E.E.oAUFo c = c 62 E E E E# E{;= g+E I E.;6 >F $Ei:-gE9e:ilEE-qnCfI8;.i Hfli E E ! *:Eq€X=*-. .E.* re Ei- 5 Hseg€couicgLPPt.,!:E5bE.s=!EFOo., I3EEEHU U@OFEoo<o6U oa d oo6 oz ccooEEEO 8E ro]ots a,i .i o =o c.oE.9lo EEJEu.9<fqoU o +FN+hoa; gE '-E - .=odJ -o c,<isfa;o\ 56E>otFo;o.= .. dYU4 ociq orf. N Er>qvEooo'=6d(JU4 ooq N dN6 cc9,9TEEC 8E N N dt€oq N co o !a .o G ouootztofo66 s C cc4 c2 c?9dEEE.9o=(JoU 6c@F r-'$.{ N ofo tro .i =oU4 Hq-oE coo0-EE xE3\U E(Ju4 Nul Nnh 6 d soE-gs;E I6= Eo5tro ^vfol* A!U EU O !us'ts oq6oNuiFOi do.E=ssiEa o= ta-: E.eoforG OqJ E!8E- 6Nui6 o\f f >o!c no 6l.. Exuc Nq 6 @oor-' E:>q!Eno+'=m;(Ju4 sto+q 6@Fl N ccooEEco 8E <tN6i+ -io@. co 6 !f >= +EmfLO@Up*P 6J -AEC =o o =( ccc o ccooEEco 8E o@ c,otscio@.N c C c .9.t.! E NliTErE =.9ofooOUL)O<.EOJ od] @<t .iu6 ra6C =o 3fiuqd.! oqo H!tElE =.sofo6orL)O<.ECJ <t cNoo;oo c,i *bqc =A 8-Euqd-! dio\'.NN60 J6y>oxcoh QEa oo+6qoNoq o f6E>qrt40+'=m;(Ju d 6N+o6+tto! ctooEEE.s8E rqoo6 o;tooq c .o o of to oc0 s obI)fr!A c C ccd c2 ccooEEEOolUO n o hoi dl @ o =t c .9.t.! E 6Ef \OEs!.E 3 Es<F4 oqN dl oq . o:@EosbEh-8.!SE;(JILd' or.l m os'o =6t>i!c 6.:d:u,F c 6 $Nq d 3oE>q!tdc6'=dE(Jrg oqsoq n lot>6!E m:?fc qmo uin ts' f6z>qrtncsi '=mEUTg $oqnnst+oN.i CEooEE<o 8E @qooNuirNo q E,9 6 !l coo'',9 €g6.=cofE"3P I(, EA E.F to XrI] IFzr! trlrq o ozF dF]A.o Az A U)&Elz oFzo o t oo6 oz ccooEEco OfuE NN ^ioN u;@ o =o E.9:.9:go >=Bbcq(9.9 _!! =@di(Jo<cr= aN*aho<t >agaoF6.e.e3@uL)Oec-= F(Foi f6ts>o!F E3 ?E4 mo) 6o d;N6 =oE>q!tio@=d;(Jr4 o@ Nq o CCooEEcc8i \6 @ .no6 c E( t n o@ @ co o o @f G oo6 oz EEooEEcc 8E 6qNmu'! st ol6 c.9E.2:o fo!>dJqoIm.=df.. EYrr Nq m\oN Ez>9!Eoom=N;UUc oo oi<fstnNq CEooEEco 8E sq @Ftoo 0 c.oo !f oU o Noco.9>irl6-6 ofE oo6 oz gEooEEcq OfUE OtqnNqNNqe ofo c,o2.9lo oec@E!EOE=E;e.9?584 oqona@<ta 9oEEcoE= Ef@o HJ.E o6 GiNaoeo l61.>o:EHO6f ?Ed N\6oqm€dlr foEiEoq6d(Ju4 Gccch r( ccooEEco 3E \6q @6oq N c .s( +n 63Ec'=Eo- q) o0do. 8eo=rSz ccooEEcoolUOu ccFFF dGFG of6 go :E 6o 8eEnd.o(Jl ou F( c GG d-=>qJEooo'=od(Jud o6 6 G E,E=i.s3E GuC 3rE Y:.=EE Gu ocv EEP6JdU N'=f*E oqN <qo@N Ec(!oo6.5 EoJ ou N'5o*E U N\oonNN<. EEg6J Aui=<rEeu \o e r ECooob.= E6Jou !'54+O_U <lolNoN+ q >t 9rEo6.9(Jl<odu o .i cn@dl >ira66Ctf:oo.:EE q CEo F ccooEEcoo=UO NNo;@olo ..1o coEG 3: .EccE g ( cce cz cc EEEO 8E \6o didd] \f oI G co :Efou oc'3veE =t5. _9ofCOUu 4 ..1s@q sfq @c =Eo.=o:rE(Jud 6i d1 6(o @c3y bPtE6Oo'=(93(Ju d Nc! €d!6oo oc=EEO9E6YEE(Jqg eNo.1 f@v>ovEqlo ?Ed oqoo disf o f6Z>qJEno<=m6(Jug d! N<t€ro F cZooEEco 8E @@oi@q N d co.F o o = EoocY ILF E Xt! IFzrI] r!El vF dr!o. oz A adE]z oF Zo @f6 ooo 02 ccooEEco OJUO @a o r; @.i o:o c .9:.9!(, >? -otsPEn6.gU]<r4u m oioo Gioo ari >:!dOoCO5:o6.:EE od'lo66ctnN CEooEEco 8E @4 NoctN .n E.9 o !f 46 E @ E 23 o 6J o-EiEolo o =o ooo oz ccooEEEO (JE At c cFcc o =o Eo :!!f5 ltLOcoco@- cE- L.-N Q6 1r'=uod.E<rd c( 6(cE &-0CocO@:9.9No6*fE-E CA Co t6f l6!>blcn!+.= H'iG rl uEc foE>qJE60<=oi(Jug NNdt6\ Nui ccooEEtroOlUE o E Ec Eo G !f cce ro+ oo0cto- IL =c0 XH IFzE]2F]E]do OvF r',HAooz A aill!z>oFz ofo oo6 oz ccooEEtro 8E o!oN ri@o.,i 0:6 co :Eloo oaCO3EE9+6 ?eG= sg NoqmNoo OEEO6E.:E lr+U(J0GCJ o+6 ct + )62>o:co:o.=NJ.. gxrd rI€N ci<fd! = _.@E?Eoo6'=NdUUC ec c(o ccooEEco Of(]E qts6ts.iNo! q go o o o Nso =-eo = o:o ooco oz ECooEEco 8E s6c,N@ NN ci o o =o co :Efou oE bc@E!o 6E(Jr d qe ca€oFce @cJc EP EO'= '=OE(Juo Foqo6 N.Ndl l6 li>o hOS.= .. EYrd € 'jq 6 € 5@Z?E60t=oE(J@d r+ h<l dF\+.i ccooEEEAO=(J€ oF{NNtssod! c.9 o !J tcv s Eoo !F +s obo(to. ILF ca XE] IFzI! 2rI] rI.] o oz F E]A.ooz a&t!z> Fz :: 3 Hss d .i Ery H E9p> - E c@>-.S8 E Pu.:.=3 EbE E E rE [E sexlo= ,i s cBs" H rEtn E?*=t E9is3 E9 9i6 E E€=s8 SE;T+ Ee eE P qnlE6 .: .E P=-E o6.=6P E E E *E €Eoi9 EEE Ui =6!pE.= Eo.:h.ll E66I.==[€.e E IEeE; I:E;T EE3!f ; =EEE E EHEE =oc90 Ese h: E?E*E .go'-J IB9;E ?.H,EE H;#ii a E EEH FI O.= c c-lo.st +[€q.E Ee: i H E, .R=! flEE,5H EE:f;EgE:S;9E.: €I€EfEfc=+: o c =:-EE E9 TE EEEflfIE 3:EEiiE 8E[E*f:s Hi s! s EE6-=EEE9o=.1 060Q EiXEEE$€ =- S-f, g.f =c oo c o c ,OddO=OU9 Xi= 3r q ooooo L o Uo Ud (Jo L d U d (J a U c o GJ oE Ef I o;u.E oI UL (J 4 U o (J o L) C U a La (J4 U G U 4 () 4 co.; '=o6!oo c oFG F G {(6 co <tqoo oi<tq oe or<tr@+.n r C G Rra oi@ rqN ul NN 6oi uiN rqoNeo!o46 oao<f o' ordNo oo)<ttsq N<f NncioN+ dlr oaor6uio6ui o cu{{ ( cGllcF c( rNr o6oGisl (o<t oi@..!ood] @g r6a,istq6 ts oaoNN 0 Eo EUo c.9 .9 E EG F Jo ec -9o OJE =II6u Eoo o E om * o I @oooc 6<t it c'o op op6 o! Eooa n<l d+ .Eoo ==op GoE =oo6 @ ooI@c Ic@=o(, o d(, .g6 coc o(9 d@ co o o Icos ou o<t tootr =IcoE o(9 qc @o coc0 o oEo! I o;d .E E0- o s o E E = IoE o @ cob(oo ocoE o o(9 .go Ico o o n* CoE o(, od! 6 E n<i +:lood I or! 6 E ostmNIt:)oo4 I @dE o E 6 .sooE toqc = oo o]E.s E@- I c'oo3 4{ *EG oco I f looo J6<i too .EY I f:ooC o Nocoq l- I -cG3G G = EXHIBIT G Joint Ownership Transmission Loss Calculation and Allocation Methodology PacifiCorp and Idaho Power agree that as joint Owners of certain Transmission Facilities, defined in this Agreement, the companies shall calculate, allocate and settle the electric losses associated with these Transmission Facilities in accordance with this Exhibit. Collection for Losses: This Exhibit G does not affect PacifiCorp's and Idaho Power's respective OATT-based losses methodologies. PacifiCorp and Idaho Power shall continue to collect for electric losses in accordance with their OATTs. Calculation of the Ouantity of Losses: The quantity of losses for each jointly-owned transmission line or transformer will be calculated by implementing an I'R calculation based on measurements at one end of each transmission asset using existing metering equipment and assumed series resistance for each asset. The calculations and selection of inputs, such as which line or transformer terminal is metered, which quantities are used (amps or MVA/voltage), and what resistance values for each transmission element are used, will be agreed upon by each Party. In the case ofjointly-owned transformers, a constant core loss value agreed upon by each Party shall be included in the calculation. The metering devices used to provide the inputs to the loss calculations may or may not be revenue quality. A metering device calibration process and schedule shall be agreed upon between the Parties. The Party responsible for the calculation of losses for each jointly-owned asset is described in Table l, below. Calculations are to be developed for all hours each calendar month and results are to be shared with the other Party no later than the 7th working day of the following month. Allocation of Losses: The quantity of electric losses on each jointly-owned transmission line or transformer shall be allocated between each Party consistent with each Party's asset ownership percentage. Losses for each asset will be calculated for each hour and multiplied by the asset Ownership Interest of each Party. Losses will be totaled on a monthly basis differentiating between on-peak hours and off-peak hours. The Idaho Power portion of losses for all assets located within a PacifiCorp Balancing Area will be summed and owed to PacifiCorp. The PacifiCorp portion of losses for all assets located within the Idaho Power Balancing Area will be summed and owed to Idaho Power. Table l, below, defines the Balancing Area of each asset, the Party measuring the losses for the asset, and each Party's Ownership Interest. Return of Losses to PacifiCorp: Other than losses for the Jim Bridger generator main step-up transformers (which are described below), for each calendar month, if the losses owed to PacifiCorp are greater than the losses owed to ldaho Power, Idaho Power will choose to settle either financially or physically. If settled JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT G Page | 145 financially, Idaho Power's will settle financially with PacifiCorp in accordance with PacifiCorp loss return business practice. If settled physically, Idaho Power will return losses to PacifiCorp. Losses to be returned are the amount owed from Idaho Power to PacifiCorp less the amount owed from PacifiCorp to Idaho Power. The loss return period will begin on the l5th of the next month and will continue until the 15fr one month later. On-peak losses for the month will be evenly distributed across all on-peak hours in the loss retum period and off-peak losses for the month will be evenly distributed across all off-peak hours in the loss retum period. Return of Losses to ldaho Power: For each calendar month, if the losses owed to ldaho Power are greater than the losses owed to PacifiCorp, PacifiCorp will settle financially with Idaho Power in accordance with Idaho Power's loss return business practice. Losses to be settled financially are the amount owed from PacifiCorp to Idaho Power less the amount owed from ldaho Power to PacifiCorp. Table 113 13 tn the event of a conflict between the percentage of asset Ownership lnterest set forth in columns (3) and (4) of this table and those set forth in Exhibit C for such asset, the Parties agree that the percentage of asset Ownership lnterest set forth in Exhibit C shall control. (1)Q)(3)(4) Asset Asset Balancing Area Partv Asset Loss Calculation Performed Bv IPC Loss Allocation (Asset Ownership Interest) PAC Loss Allocation (Asset Ownership Interest Kinport-Midnoint 345kV Line IPC IPC 73.2Yo 26.8% Borah-Adelaide Tap (Borah- Adelaide-Midpoint #l 345kV Line) IPC IPC 64.4%35.60/o Adelaide-Adelaide Tap (Borah- Adelaide-Midpoint #l 345kV Line) IPC IPC 64.4Yo 35.6% Midpoint-Adelaide Tap (Borah- Adelaide-Midpoint #l 345kV Line) IPC IPC 64.4Yo 35.60/o Borah-Adel aide#2 345kV Line IPC TPC 64.4%35.6% Adelaide-Midnoint#2 345kV Line IPC IPC 64.4Yo 35.6Yo M idooint 5 00/3 45kV Transformer PAC IPC 63.7%36.3% Midpoint-Heminsway 500kV Line PAC IPC 37.0%63.00 Hemingway-Summer Lake 500kV Line PAC PAC 22.0%78.0% American Falls-Arbon Valley (American Falls-Malad l38kV Line)PAC IPC 3.6Yo 96.4% Hurricane-Walla Walla 230kV Line PAC PAC 40.8Y"59.zYo JOINT OWNERSHIP AND OPERATINC AGREEMENT - EXHIBIT G Page | 146 Goshen 3 45 / I 6lkV Transformer# I PAC PAC 5.6%94.4% Goshen 3 45 / I 6lkV Transforme#2 PAC PAC 5.6%94/% Goshen-Haven Tap (Goshen- Antelope l6lkV Line)PAC PAC 2l.9Yo 78.1% Antelope 2301 I 6lkV Transformer PAC PAC 26.8o/o 73.2% Antelone I 6 I /l 38kV Transforme# I PAC PAC 66.7Yo 33.3Yo Antelope I 6 I /l 38kV Transforme#2 PAC PAC 66.7%33.3% Antelooe-Scoville#l l38kV Line PAC PAC n.s%88.s% Antelope-Scoville#2 I 38kV Line PAC PAC n.5%88.5% Goshen-Jefferson I 6 lkV Line PAC PAC 37.8%62.2o/o Jefferson-Bis Grassy l6lkV Line PAC PAC 37.8Yo 62.2% Jefferson l6lkV Phase Shifting Transformer PAC PAC 37.8%62.2% Bridger-Three Mile Knoll 345kV Line PAC PAC 29.zYo 70.8% Goshen-Three Mile Knoll 345kV Line PAC PAC 29.2v,70.8o/o Bridser-Ponulus# I 345kV Line PAC PAC 29.2%70.8o/o Bridser-Pooulus#2 345kV Line PAC PAC 29.2%70.8% Populus-Borah# I 345kV Line PAC PAC 29.2o/o 70.8% Ponulus-Kinnort 345kV Line PAC PAC 29.2%703% Goshen-Kinoort 345kV Line PAC PAC l8.3Yo 81.7o/o Jim Bridger Generator Main Step-up Transformer Losses: Losses on the Jim Bridger generator main step-up transformers shall be allocated each hour between Idaho Power and PacifiCorp based on each Party's pro rata share of Jim Bridger project net generation for such hour. The calculation of such losses shall be in accordance with the following: Jim Bridger #l generator main step-up transformer loss : ((Jim Bridger #l generation)2 x (4.4 x lO-!1 + 0.3 MWh Jim Bridger #2 generator main step-up transformer loss : ((Jim Bridger #2 generation)2 x (4.4 x l0-6;; + 0.3 MWh Jim Bridger #3 generator main step-up transformer loss: ((Jim Bridger #3 generation)2 x (4.4 x lO-)1 + 0.3 MWh l) 2) 3) JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT G Page | 147 4) Jim Bridger #4 generator main step-up transformer loss : ((Jim Bridger #4 generation)2 x (4.4 x tO-6;; + 0.3 MWh Jim Bridger main step-up transformer loss : Jim Bridger #l step-up transformer loss * Jim Bridger #2 step-up transformer loss * Jim Bridger #3 step-up transformer loss * Jim Bridger #4 step-up transformer loss. Idaho Power's share of Jim Bridger main step-up transformer losses shall be physically returned to PacifiCorp. Such losses shall be scheduled to PacifiCorp 168 hours after the hour in which such obligation for losses was incurred. JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT G Page | 148 EXECWION VERSION SCHEDULE 13.1(0 Idaho Power Governmental Authorizations l. Federal Power Act, Section 203 Approval 2. Federal Power Act, Section 205 Approval 3. Approval of the transaction by the Idaho Public Utilities Commission 4. Approval of the transaction by the Oregon Public Utility Commission JOrNT OWNERSHTP AND OPERATING AGREEMENT - SCHEDULE l3.l(f)Page | 149 EXECUTION VERSION SCHEDULE 13.2(f) PacifiCorp Governmental Authorizations l. Federal Power Act, Section 203 Approval 2. Federal Power Act, Section 205 Approval 3. Approval of the transaction by the California Public Utilities Commission 4. Approval of the transaction by the Idaho Public Utilities Commission 5. Approval ofthe transaction by the Oregon Public Utility Commission 6. Approval of the transaction by the Utah Public Service Commission 7. Approval of the transaction by the Washington Utilities and Transportation Commission 8. Approval of the transaction by the Wyoming Public Service Commission JOINT OWNERSHTP AND OPERATING AGREEMENT - SCHEDULE 13.2(0 Page | 150 BEFORE THE IDAHO PUBLIG UTILITIES COMMISSION CASE NOS. IPC-E-1441 and PAC-E-14-11 ATTACHMENT 3 THIS ATTAGHMENT IS CONFIDENTIAL AND WI LL BE PROVIDED TO THOSE PARTIES THAT HAVE SIGNED THE PROTECTIVE AGREEMENT IN THIS MATTER