Loading...
HomeMy WebLinkAbout20140822Hymas Direct.pdfflEflil-rr r'^ 'trL-l.rIl1"''. ?0tti AU6 ?2 At{ t0, t2 I.liiH , '..;t-rl lLtTiti'-iC,,'ll;f i,t;i i. BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER FOR AUTHORITY TO CAI\CEL ELECTRIC SERVICE SCHEDULES tts,t2s,AND 155 AND REPLACE WITH NEW SCHEDULE 140 WITH CHAI\IGES. CASE NO. PAC-E.14.08 Testimony of Kathryn C. Hymas ROCKY MOUNTAIN POWER CASE NO. PAC-E-14-08 August 2014 I Introduction 2 Q. Please state your name and business address. 3 A. My name is Kathryn C. Hymas, and my business address is 201 South Main, 4 Suite 2400, Salt Lake City, Utah 841 1 l. 5 Q. By whom are you employed and in what position? 6 A. I am currently employed as the Vice President of Rocky Mountain Power Finance 7 and Demand-Side Management ("DSM") for PacifiCorp dba Rocky Mountain 8 Power ("the Company"). 9 Q. Please describe the responsibilities of your current position. l0 A. I am responsible for demand-side management for Rocky Mountain Power and I I for Pacific Power. This includes, the planning, development, design, approval and 12 implementation of programs designed to reduce energy consumption through 13 energy efficiency and behavioral changes and to reduce consumption during peak 14 periods of usage through load control. I am also responsible for finance functions 15 for Rocky Mountain Power. l6 Qualifications 17 a. Please describe your background. l8 A. I received a Master of Accountancy from Brigham Young University in 1979 and 19 a Bachelor of Science degree in Accounting from Brigham Young University in 20 1978. In addition to my formal education, I have also attended various 2l educational, professional, and electric industry-related seminars. 22 a. What is the purpose of your testimony? 23 A. The purpose of my testimony is to describe the proposed changes to the Hymas, Di- I Rocky Mountain Power I 2 J 4 5 6 7 8 9 t0 ll 12 13 t4 l5 t6 t7 l8 t9 20 2t 22 a. A. Company's energy efficiency programs for business customers and explain why the Company is proposing these changes. What is the purpose of the current programs and who is eligible to participate? Currently there are three programs for business customers: FinAnswer Express (Schedule I l5), Energy FinAnswer (Schedule 125) and Irrigation Energy Savers (Schedule 155). The programs are intended to maximize the efficient utilization of the electricity requirements of new and existing loads in nonresidential facilities through the installation of energy efficiency measures. Schedule l0 customers are eligible for Irrigation Energy Savers (Schedule 155). Commercial and industrial customers on Schedules 6, 6,4, 7, 7 A, 9, 12, 19, 23, 23A, 24,35, 35A and dairy barns served under the Company's residential rate schedules are eligible for Energy FinAnswer' lschedule 125) and FinAnswer Express (Schedule 115). Overview of Business Customer Energy Efficiency Program Changes a. Please provide a high level overview of the changes that you are proposing to the business customer's energy efficiency programs. A. The Company proposes that the following changes be made to the tariffs: (l) consolidate the three non-residential energy efficiency programs into one new program called wattsmart Business2 with changes and with a tariff similar to Schedule ll5; (2) update incentive levels; (3) expand the program to include energy management services and incentives; (4) update and expand the prescriptive incentive offer; and (5) include a new offer for small businesses. I Subject to a 20,000 minimum square footage requirement for existing commercial facilities. ' Schedule 140 is titled Non-Residential Energy Efficiency; the program name is wattsmart Business. Hymas, Di- 2 Rocky Mountain Power I 2 aJ 4 5 6 7 8 9 10 ll 12 t3 t4 l5 t6 t7 l8 l9 20 2t 22 Z) a. A. Please explain why the changes are proposed. The changes are proposed to increase program participation; streamline program delivery for the customer and the Company; increase the comprehensiveness of the program to reach beyond a capital equipment focus; update the program to align with current codes, standards, third party specifications and market data; and increase small business customer participation. These programs have been operating successfully for many years. As part of continuous improvement, the Company has identified the following improvement areas: o Streamline the program for customers - Under the current structure, customer projects may move from Energy FinAnswer to FinAnswer Express (or vice versa) based on changes in project scope, timelines and/or economics. This creates complexity for the customer that can impede participation. By consolidating the programs into one program, there is no need for the customer to sign new program paperwork in the event the project scope evolves during the course of the project. Schedule l0 irrigation customers would be eligible for incentives listed in the prescriptive incentive tables (e.g. green motor rewind measure). Also, by consolidating the programs, customers with both irrigation and commercial/industrial accounts would have a single energy efficiency program for all oftheir non-residential accounts. . Update incentives Updating incentives is expected to increase participation whi le maintaining program cost-effectiveness. Hymas, Di- 3 Rocky Mountain Power I o Expand the program to include energy management - The Company's 2 current program offerings in Idaho focus on capital based projects. 3 Expanding the program to include energy management, savings from 4 improved operations, maintenance and management practices would allow 5 customers lacking capital to participate. 6 o Update and expand the prescriptive incentives - The Company's current 7 program (FinAnswer Express) includes prescriptive offers where 8 incentives are paid for typical/common energy efficiency upgrades based 9 on unit counts such as $/lamp or $/horsepower. Prescriptive programs of l0 this nature periodically require updates to maintain alignment with energy I I code, standards, third party specifications and market data which change 12 over time. They also expanded periodically to include new measures ready 13 for a prescriptive/ streamlined approach. This filing in addition to l4 consolidating the Company's current prescriptive program within the l5 wattsmart business program will make those required changes. 16 o Add an offer specific to small business - The Company's current program 17 offerings can be improved to be more attractive to small business l8 customers and increase participation by this hard-to-reach segment by 19 expanding program services and incentives specifically targeting these 20 customers. 2l Program consolidation 22 a. Please provide detail on the program consolidation changes. 23 A. The changes include several updates to the program structures and incentive Hymas, Di- 4 Rocky Mountain Power 1 2 aJ levels in order to increase the acquisition of energy efficiency savings and to streamline participation for customers. The proposed changes to the current program structure and incentive levels are provided in Table l. Hymas, Di- 5 Rocky Mountain Power able I - Summarv of C Current program Proposed for Schedule 140 Comments Schedule 125 - Energy FinAnswer Incentive: $0.12lkWh + $s0/kw Incentive: $0.15/kwh Simplifu incentive for customers. Increases total incentive by an estimated ZlYo and forecasted savings by 7% when combined with adjustment of project cost caD- Incentives capped at 50% of eligible project costs Increase cap to 70% of eligible project costs Customer pays for commissioning Program funds Savings Verification Decreases customer complexity and improves controls related to performance verifi cation. Commercialand Industrial have different program elieibilitv Commercialand Industrialhave same program elisibilitv Simplify offer and expand eligibility to increase participation. New Construction Design Assistance Discontinue unique incentive Low participation and offer not moving the market. Design Honorarium Discontinue incentive Low participation and offer not moving the market. Design Incentive Discontinue incentive Low participation and offer not movins the market. Minimum 20,000 SF of existing commercial space to be elisible Remove minimum space requirement Hard to quantify, removing will simplifu delivery and increase participation. Custom incentives available for listed measures Listed measures paid at listed amounts. Simplify process so that the incentive listed is always the incentive paid. Allow prescriptive and custom measures to be included in sinsle oroiect. Schedule 115 - FinAnswer Express Incentives capped at 50% of eligible project costs for lighting retrofits and custom measures Increase cap to 70% of eligible project costs Increases incentives for participation. Schedule 155 - Irrigation Energy Savers Incentive: $0.I2lkWh + $s0/kw Incentive: $0.1s/kwh Simpli! incentive for customers. Increases total incentive by an estimated 27o/o and forecasted savings by TYowhen combined with adjustment of proiect cost caD. Incentives capped at 50% of eligible project costs Increase captoT0Yo of eligible project costs Schedule 140 - New Offerings in consolidated tariff nla Add energy project manager co-funding. $0.025/kWh of program savings See "energy project manager" discussion below nla Expand offering to include integration of energy management into business practices. Incentive of $0.02lkWh annual enerqy savinqs. Increases savings and utilizes monitoring to identify savings. See "energy management'o discussion below. nla Use modification procedure approved in Order 32594 for information contained in Exhibit No. 1 - Idaho Incentive Tables and Information See "Flexible tariff' discussion below. I Energy Project Manager Co-funding 2 Q. What is energy project manager co-funding? 3 A. Energy Project Manager co-funding is designed to help customers pursue energy 4 opportunities more consistently and create a culture of energy efficiency at their 5 facilities by providing co-funding for a staff or contractor position to identify and 6 manage energy projects. Co-funding will be performance based and is contingent Hymas, Di- 6 Rocky Mountain Power I 2 J 4 5 6 7 8 9 l0 1l 12 l3 t4 t5 l6 17 l8 l9 20 21 22 a. A. upon a customer's identification of and planning to meet a specific energy savings goal3 over a prescribed timeframe; typically l2-18 months. What savings count toward the customer's energy savings goal? Only savings reported through Schedule 140 will count toward achieving the kWh savings goal. If the customer meets these verified goals as outlined in a savings plan, co-funding continues. If milestones and savings goals are missed, co- funding will be suspended and/or terminated and repayment of unearned co- funding will be required. What is the anticipated role of the energy project manager? The Energy Project Manager is to serve as the primary contact for implementation of energy efficiency projects at a customer site. The Energy Project Manager will be an employee or direct contractor of the customer and not an employee or contractor of Rocky Mountain Power. The Energy Project Manager must be a specific person and not a pool of labor without an individual role. How is the energy project manager salary determined? Subject to approval by the Company, it is the customer's choice regarding the compensation paid to the Energy Project Manager and the co-funding cannot exceed the lesser of(l) the pay and overhead for the assigned individual or (2) the amount listed in Table I for completed projects. Documentation of pay and overhead costs are required as part of the co-funding agreement. The Energy Project Manager co-funding is based solely on electrical energy efficiency or energy management savings. t The Company will post the minimum energy savings goal on its website. The minimum may be revised ifneeded. Hymas, Di- 7 Rocky Mountain Power a. A. a. A. I 2 J 4 5 6 7 8 9 t0 ll t2 l3 t4 l5 t6 t7 l8 19 20 2t 22 a. A. How are energy savings from projects receiving energy project manager co- funding accounted for? The Company assumed no additional savings would be directly attributable to the addition of energy project manager co-funding in the analysis in Exhibit No. 2, only the cost of the addition of co-funding was added. While the Company believes the availability of co-funding will increase project activity and add to program savings over time, the Company utilized the most conservative assumption in this analysis to eliminate the possibility of double counting energy savings. Energy management a. What is energy management? A. Energy Management is a system of practices that creates reliable and persistent electric energy savings through improved operations and maintenance, and management practices at customer sites. Unlike typical energy efficiency projects, energy management projects may require little to no capital investment by customers to achieve sustainable savings at their facilities. What is the Energy Management offering? The Energy Management offering is designed to complement program offerings for capital improvements and the new Energy Project Manager co-funding. Designed with the customer in mind, Energy Management will offer multiple levels of engagement: Strategic Energy Management, Persistent Commissioning, Industrial Re-commissioning, and Re-commissioning. The level of engagement Hymas, Di- 8 Rocky Mountain Power a. A. I 2 J 4 5 6 7 8 9 l0 ll t2 l3 t4 l5 16 l7 l8 l9 20 21 22 23 a. A. will be in direct response to the customer's specific needs and their commitment to a process that can extend from 12-24 months. The Energy Management offering provides a systematic approach to integrating energy management into an organizations business practices. Monitoring of building systems and industrial process controls is used to identify and quantifu energy savings. What is the estimated savings per customer through energy management? The Company has identified an average potential of three percent energy savings per customer site (with usage of at least 500,000 kWh) through improved energy management practices. Measurement of savings is site and process specific, generally consisting of the establishment of an operational baseline and savings measurements through either continuous monitoring of operational data, or at specific intervals during the Company's energy management engagement with the customer. What is the assumed measure life for energy management? The incentive level and program design was modeled with a savings persistence of three years in recognition of the nature of how the savings are derived i.e. from changes in operational, maintenance, and management practices as opposed to less variable capital improvements. How did the Company ensure energy management savings were differentiated from capital project savings? The energy management savings assumption included in this application is based on a third party assessment of energy management opportunities for each state Hymas, Di- 9 Rocky Mountain Power a. A. o. A. I 2 J 4 5 6 7 8 9 l0 il t2 l3 t4 l5 l6 t7 l8 l9 20 2t 22 23 24 25 26 a. A. where the Company is responsible for delivering programs. The assessment specifically separated energy management savings from capital equipment project savings to ensure savings are not double within the Company's projections and economic assessment provided as Exhibit No. 2. Flexible tariff a. A. What is the structure for the proposed Schedule 140 program and tariff? Schedule 140 will utilize the modification procedure established with the approval of Case No. PAC-E-12-09 by the Idaho Public Utilities Commission for Schedule r 15. How did the Company describe the program change process in Case No. PAC-E-12-094? The Company stated: "future changes to Program detailss will be managed as follows:o Similar to the filing process, the Company will provide information on any proposed changes to Program details to Commission staff and allow for a reasonable period of time for staff to comment on the proposed changes.o Once Commission staff comments, if any, are resolved the final set of changes will be clearly posted on the website with at least 45 days advance notice.o After the 45 day noticing period the changes would then be in effect." What are the components of Schedule 140? If approved, Schedule 140 will consist of the tariff (Exhibit No. 4) that contains general information on the program with more detailed program specifics such as qualifying equipment and incentives posted to the Company website. The information proposed to be posted to the website is provided in Exhibit No. l: o The flow chart documenting the process is provided as Exhibit No. 3 to this application.t Program details are provided in Exhibit No. I to this application. Hymas, Di- l0 Rocky Mountain Power a. A. 1 Idaho Incentive Tables and Information. Subsequent changes to this information 2 will follow the program change process described above. 3 Update and Expand the Prescriptive Incentive Offer 4 a. What is the purpose of the updates to the prescriptive offer? 5 A. The changes are intended to align the program with changes to codes, standards, 6 third party specifications and new market data and increase the 7 comprehensiveness of the program while maintaining or improving cost 8 effectiveness. 9 Q. What is the scope of the updates to the prescriptive offer? l0 A. The proposed changes include updates for existing measures currently in ll FinAnswer Express (Schedule ll5) incentive tables as well as to add new 12 measures. Further details on the proposed changes to the prescriptive offer are 13 included as Exhibit No. 5 to this filing. 14 a. How were the changes identified? 15 A. The changes were informed by a review of applicable codes and standards, third 16 party specifications such as Consortium for Energy Efficiency ("CEE") and 17 ENERGY STAR, past program participation, and vendor feedback. This type of 18 review is completed on a periodic basis to keep existing program measures 19 current and to add new measures as appropriate in order to maintain program 20 relevancy and overall comprehensiveness. The last comprehensive review 2l informed program changes to Schedule I 15 (FinAnswer Express) that were 22 approved effective July 14,2012. nymas, ul- I I Rocky Mountain Power I 2 J 4 5 6 7 8 9 l0 11 12 t3 l4 l5 l6 t7 18 t9 20 2t 22 23 A. a. A. Impact of Codes and Standards a. When did the Company adjust the baseline for linear fluorescent lighting retrofits? On January 1,2014, the Company adjusted the baseline for fluorescent lighting retrofits from an energy saving T12 lamp and energy efficient magnetic ballast configuration to a 32W T8 lamp and electronic ballast configuration. Why was the lighting baseline change made and was it included in the cost- effectiveness analysis? The lighting baseline change was made to maintain alignment with changes in federal lighting equipment efficacy standards. These types of baseline adjustments help ensure the Company does not pay more than is necessary when helping facilitate customer lighting improvements. The lighting baseline change does not remove incentives for lighting system retrofits, but does change the baseline usage assumption from which program savings and incentives are calculated. The change is incorporated into the cost-effectiveness analysis provided in Exhibit No. 2 as an increase in the utility cost of savings acquisition when compared to prior years. New Offer for Small Businesses a. What is the small business offer? A. The small business offer is aligned with a best-practice approach used by many other utilities (listed in Table 2, below) utilizing a pool of Company-approved and managed contractors to work directly with small/medium business customers to identify energy-efficiency upgrades, estimate savings and incentives, and install Hymas, Di- l2 Rocky Mountain Power I 2 3 4 5 6 7 8 9 high-efficiency equipment. Participating customers utilizing an approved contractor will be eligible for an enhanced incentive offer targeted at 80 percent of the project cost. To reduce the customer's out-of-pocket expenses and minimize cash flow impacts, the customer can assign the incentive to the contractor who will then apply it as an up-front reduction to the overall project invoice/cost. Participating contractors will complete and submit the required incentive application and documentation to the Company for payment of the incentive amount that was assigned to them by the customer. Further details on the small business offer are included as Exhibit 6 to this filing. Table 2 - Similar Offers from Other Utilities MEH,.Right Lights Small and Mid-Sized Business O+Express Solutions Demand < 100 kW + schools -islEaoJIF Business Solutions Small Business Program < 145,000 kwh/yr H Snison Small Business Direct lnstall Lighting Program < 350 kW Direct lnstall Small and Mid-Sized Business !mro Complete Energy Solutions Up to 299 kW / mo nationalgridDIFEdB{r\' Small Business Services program s300kW / month 3rm Small Business Energy Advantage Avg peak demand l0 kw - 200 kw e xri-Small Business Energy Solutions < 200 kW / month ffi Smart Energy Savers <60 kW / mo @ xaenugy Small Business Lighting < 400 Kw What customers are eligible for the small business offer? Customers receiving electric service in Idaho on Rate Schedule 23 &23A. Hymas, Di- 13 Rocky Mountain Power l0 a. ll A. I Q. Are there other eligibility criteria for the small business offer? 2 A. Additional eligibility criteria may be added (e.g. square footage, operating hours, 3 kwh usage) to align with savings targets, incentive budgets, and cost 4 effectiveness requirements and will be posted on the Company website. 5 Q. What measures will be included in the offer initially? 6 A. Initially, the measure list will be focused on high-efficacy fluorescent lighting 7 technologies, occupancy controls, and LED recessed downlights and exit signs. 8 These measures are most frequently found in small/medium businesses, as shown 9 in Table 3 in Exhibit No. 6. Measures not included in the small business customer l0 incentive table will be incentivized at the standard incentive rates offered for l1 those measures in the wattsmart business program. 12 a. How much are the incentives be determined and controlled? 13 A. The Company is proposing to define the incentives for this offer on a measure- 14 specific basis targeted to cover 80 percent of the customer cost. Incentives will be l5 capped at 80 percent to ensure a minimum customer "co-pay" of 20 percent. 16 a. How will the incentives be set? 17 A. Incentives will initially be determined relative to market costs collected from the l8 contractor application process used to select and approve contractors and will not l9 exceed the maximum incentive values in Schedule 140. The incentive table will 20 be posted on the Company's website. 21 Transition from Current Programs to Wattsmart Business 22 a. How will the Company transition projects currently in progress? 23 A. In the event the Commission approves the Company's request, customers with Hymas, Di- l4 Rocky Mountain Power I Incentive Agreements issued between the date of this filing and the effective date 2 approved by the Commission will receive final project incentive(s) under the new 3 tariff unless their project would have received a higher incentive amount under 4 the existing version of the program. Customers with Incentive Agreements in 5 place priorto this filing will receive incentives consistent with the version of the 6 program at the time the agreement was issued. 7 Q. Are there any other changes proposed? 8 A. In addition to the changes I have outlined, the Company is proposing other minor 9 administrative changes to language. l0 Cost-Effectiveness I I O. How was cost effectiveness assessed? l2 A. The Company utilized the five standard tests for economic analysis of demand 13 side management measure /programs. These tests are the same ones used by the 14 Company in prior program filings and annual performance reporting. Using the 15 standard tests, the impacts of the proposed changes were assessed in a series of 16 steps described below. The first step was to develop a forecast of expected 17 participation, savings, and costs absent any program changes from all three ofthe 18 current business programs. This same look is provided in the Company's annual 19 reports as the Commercial and Industrial Portfolio and forms the "business-as- 20 usual" case. The business-as-usual case covers three years: 2015-2017 and 21 utilizes net-to-gross, realization rates, and measure life values utilized in or 22 derived from the values used in the 2013 Idaho annual report. The next step was 23 to assess the cost-effectiveness of each of the proposed program changes or new Hymas, Di- l5 Rocky Mountain Power I 2 J 4 5 6 7 8 9 t0 ll t2 l3 t4 l5 16 t7 18 t9 20 2t 22 23 a. A. measures in cases where the changes or additions were likely to have a material impact on program cost-effectiveness. Inputs for measure costs, measure life, realization rates, and net-to-gross ratio are specific to each of the measures. The impacts of changes or new measures were also assessed over three years to align with the business-as-usual case. The final step in the assessment was to add the benefits and costs of each change to the benefits and costs of the business-as- usual case. This provides a before and after comparison of the aggregate impact of the changes as well as illustrating the likely contribution from each of the changes. Results are provided by individual year and for all three years combined in Exhibit No. 2. What discount rates did the company use for the cost effectiveness analysis? The Company utilized the Weighted Average Cost of Capital ("WACC") as the discount rate for the five standard tests. This approach is consistent with prior Company reporting and the Company understands it is consistent with Avista Corporation's approach in ldaho. The Company understands this is slightly different than Idaho Power which derives a different rate for the Participant Cost Test ("PCT"). The Company also reviewed Appendix N of the 6th Power Plan which documents underlying derivations used to arrive at the 6th Power Plan discount rate. While Appendix N uses October 2009 data it did provide a useful context and data source to compare to the Company's rate. The Capital Asset Pricing Model used in Department of Energy calculations is considered a good proxy for business customer investment decisions and the rate ranges from 7.3 percent to 7.5 percent. Since this application assesses the economics of changes to Hymas, Di- l6 Rocky Mountain Power I 2 3 4 5 6 7 8 9 l0 ll t2 l3 l4 15 l6 t7 t8 t9 20 2l a. A. a business customer program and the Department of Energy ("DOE") rate is close to the Company's WACC rate of 6.88 percent, the Company chose to utilize the WACC rate for alltests for this application. Are all the new measures or additions costs effective? Ten of the thirteen new measures or changes are cost effective from the PacifiCorp Total Resource Cost ("PTRC"), Total Resource Costs ("TRC") and Utility Cost Test ("UCT") perspectives on a standalone basis. Two of the changes; both tied to increasing incentives, do not pass the UCT on a standalone basis. These results are more indicative of the challenges in modeling the cost effectiveness of those changes rather than their possible contribution to program performance. Increasing the incentive is forecasted to generate additional savings, however, the increased incentives has to be paid to all participants, not just the ones who generate added savings. Since the increased incentives is available to all participants, the utility costs of this measure include incentives paid to participants whose savings are already reflected in the business-as-usual case. As a consequence, the increased incentive costs for this measure are disproportionately higher than the incremental savings and results in a UCT less than 1.0. The Energy Management offer passes the UCT, but not the PTRC or TRC. These results are driven primarily by some uncertainty surrounding customer costs for implementation. Individual results for each change or measure are provided in Exhibit No. 2. Hymas, Di- l7 Rocky Mountain Power I 2 J 4 5 6 7 8 9 a. A. Is the new program, (the combination of business as usual case and all the changes) cost-effective? Yes, see the cost-effectiveness analysis in Exhibit No. 2 supporting my testimony. The cost effectiveness of the new program includes the impacts of adding the three non-cost effective measures, ten measures that are cost effective on a stand- alone basis and the additional program portfolio costs for energy project manager co-funding. Does this conclude your testimony? Yes. a. A. Hymas, Di- l8 Rocky Mountain Power Case No. PAC-E-14-08 Exhibit No. I Witness: Kathryn C. Hymas BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION ROCKY MOUNTAIN POWER Exhibit Accompanying Testimony of Kathryn C. Hymas Idaho Incentive Tables with Changes Marked August 2014 Rocky Mountain Power Exhibit No. 1 Page 1 of 30 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas Exhibit I ldaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Rocky Mountain Power Exhibit No. 1 Page 2 of 30 Case No. PAC-E-14-08 \Mtness: Kathryn C. Hymas Idaho @on-Residential Enerw Efficiencv This document includes the following three sections:o Definitions of terms used in Schedule ll*l,p and other program documentso Incentives - General Informationo Incentive tables DEFINITIONS: Customer: Any party who has applied for, been accepted and receives service at the real property, or is the electricity user at the real property. Energy Efficiency Incentive: Payments of money made by Company to Owner or Customer forinstallationofanEnergyEfficiencyMeasurepursuanttoan@Energy Efficiency Incentive @or approved Energy Efficiency Incentive Application. Energy Efficiency Incentive : An trgfe€m€nt @ Company and acknowledged by Owner or Customer and4ennpanye+a eemparyprovidingforCompanytofurnishEnergyEfficiencyIncentives@ . Incentive Application: An application submiffed by Owner or Customer to Compan), for Energv Efliciencv or Enerpy Management Incentives. Energy Efficiency Measure (EEM): A permanently installed measure which can improve the efficiency of the Customer's electric energy use. Energy Efficiency Measure (EEM) Cost: New Construction/Major Renovation: EEM Cost is the total installed cost of energy efficiency equipment or system minus the cost of the code compliance/common practice equipment or system. Retrofit: EEM Cost is the total installed cost of the energy efficiency equipment or modification. In the case of New Construction, Major Renovation and Retrofits, EEM Costs shall mean the Owner or Customer's reasonable costs incurred (net of any discounts, rebates or incentives other than Energy Efficiency Incentives from the Company, or other consideration that reduces the final actual EEM Cost incurred by the Owner or Customer) to purchase and install EEMs at the Owner's or Customer's facility. If the owner or customer installs the EEM then the cost of installation shall be equal to the Owner's or Customer's actual labor costs for such installation. ldaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Page 2 o1 Rocky Mountain Power Exhibit No. 1 Page 3 of 30 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Energy Efficiency Project: One or more EEM(s) at a Non-residential Facilityr with similar one year payback limitations (below) covered by one Energy Efficiency Incentive lgreementOffef Letter. Energy Efficiency Project Cost: The sum of EEM Costs for one or more EEM(s) with similar one year payback limitations (see below) covered by one Energy Efficiency Incentive @. Energ.y Manaeement Offer Letter: An offer made by Comoany and acknowledeed bv Owner or Customer and Company oroviding for Company to furnish Energy Management Incentives for an Energy Management Project. Eners.v Manaeement Incentive: Pavments of money made by Company to Owner or Customer for implementation of an Enerq.v Management Measure oursuant to an executed Energlv Management Offer Letter. Enerw Manasement Measure (EMM): an operational imorovement which. when implemented in an eligible facilitv. result in electric savings compared to current operations as determined b), Company. Enerqv Manasement Proiect: One or more EMM(s) at a Non-residential FaciliW covered by one Enersv Manasement Offer Letter. Enerqv Proiect Manaser: an emplovee or direct contractor of the Customer who will manage electrical eners.v efficiency projgcts that deliver savings toward the Customer/Owner's enerry savings goal. Enerqv Proiect Manaser Co-fundins: funding towards the Enerev Proiect Manaeer asreed upon full value salary that is solely attributable to electrical energy efficiency work. iF+ Major Renovation: A change in facility use type or where the existing system will not meet Owner/Customer projected requirements within existing facility square footage. Mixed Use: Buildings served by a residential rate schedule and a rate schedule listed under ApplicableinIdahoSchedulel40shallbeeligibleforservicesunder@ provided the Energy Efficiency Project meets the definition of New Construction or where the Company adjusts the baseline energy consumption and costs. New construction: A newly constructed facility or newly constructed square footage added to an existing facility. I Measures at multiole Non-residential Facilities mav be included in one Offer Letter for convenience: however. oroject incentive caps (if any) are applied per individual Non-residential Faciliw. Idaho wattsmart Business (Schedule I 40) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Page 3 o1 Rocky Mountain Power Exhibit No. 'l Page 4 of 30 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas Owner: The person who has both legal and beneficial title to the real property, and is the mortgager under a duly recorded mortgage of real property, the trustor under a duly recorded deed of trust. Retrofit: Changes, modifications or additions to systems or equipment in existing facility square footage. Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Page 4 o1 Rocky Mountain Power Exhibit No. 1 Page 5 of 30 Case No. PAC-E-14-08 \Mtness: Kathryn C. Hymas INCENTIVES - GENERAL INFORMATION Incentives for Measures Listed in the Incentive Tables Per unit incentives are listed in the program incentives tables for specific Energy Efficiency Measures (EEMs) and are subject to the incentive caps below. Incentives are subject to change and current incentives can be found on the ldaho energy efficiency program section of the Company website. Custom Incentives EEMs not listed in the prescriotive incentive tables (tvpical upgrades) may be eligible for a eus+emAstom Energy Efficiency Incentive. The Company will complete an analysis of the EEM Cost and electric energy savings and determine whether to offer a custom Energy EfficiencyIncentiveandtheEnergyEfficiencyIncentiveamount.@ en€rgy+a+i etectrlc savinss res an gnersv Efficiencv Enerw management incentives Non-Capital. improvements to operations and maintenance within a qualiffing facility may be eligible for an Energy Management Incentive. Company will partner with Customer to complete an analysis of the electric enerKv savings of potential energy management measures and determine whether to offer an Energ.v Management Incentive and the incentive amount. Enersv proiect manaser co-funding The Company ma), fund an additional $0.025 per kWh of verified wattsmart Business annual energy savinss. up to 100 percent of the Energy Project Manaeer's salarv. Salary is based on a letter from the Customer/Owner's human resources or accounting department stating the base annual salary and an aopropriate overhead percentage. and subject to approval by Company. Baseline adjustments fhe basetine wattaqe thelesserof a) Wattaqe of existins b) Wattase of deemed ba available on the ldah Comoanv mav aOiust use and eouipment iug energv efficiencv mea enersv cnde rlnes nnt annlv ldaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective luly 14,2012 Page 5 o1 Rocky Mountain Power Exhibit No. 1 Page 6 of 30 Case No. PAC-E-I4-08 Vvitness: Kathryn C. Hymas 2 The Customer or Owner may receive onl), one financial incentive from Company per measure. Financial incentives include energy efficiency incentive payments and enersy manasement payments. Enersy Project Manaser Co- atordper- s The I year simple payback cap means incentives will not be available to reduce the simple pavback of a project below one year. If reouired. individual measure incentives will be adjusted downward pro-rata so the proiect has a simple payback after incentives of one year. 6 Project Cost and l-Year Simple Payback Caps do not appl), to New Construction and Major Renovation proiects that are subject to state energy code. Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective luly 14,2012 Incentive +ereemmOffer. Al ing-an enersv Efficiencv lnc ,d\pplication. Compa INCENTIVES:2.3 Catesorv Incentive Percent Proiect Cost Caoa l-Year Simple Powlronlr (-on fn Other Limitations Proiects Prescriotive Incentives (Typical Upgrades) Lishtine - Retrofit See incentive lists 70o/o Yes See incentive lists Liehtine - New Construction/ Maior Renovation None No Motors None No HVAC None No Buildine Envelooe None No Food Service None No Apoliances None No Office None No Farm and Dairy 70o/o Yes Compressed Air 70%Yes Wastewater and other Refriseration 70o/o Yes Enhanced Incentives for Small Businesses Determined by Compan), with not- to-exceed amounts as shown in Table t2 80o/o No Available to all Schedule 23 and 23A customers meetine small business criteria on Company website. Oualiftine .nrrinment mrrcl hr installed b), an approved :ontractor/vendor Custom Non-Lishtine Incentives for oualiftine measures not on the orescriotive list-6 $0.15 per annual kWh savinss 70o/o Yes N/A Enersv Manasement $0.02 per kWh N/A No N/A Rocky Mountain Power Exhibit No. 1 Page 7 of 30 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas I The I year simple paybask eep means EnergfEffieieney Ineentives rvill net be available te reduee the simple iy€s rvill be ^4iusteC dewnrvarC pre rata se the Energy Bffieieney Prqieet has a simplepayboek after ineen+ives ef ene )€af€f-mefe: ;en M ffi ives fteetrie sni'inB @il'le= ire 7 Customers mav aggregate accounts to achieve minimum requirements. Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective luly 14,2012 neeasu+eea*ego+y @W ee:o @@ Proi€€ts+ tiehtiae#t w Yos j€+ Renravatiea N€flo Ne Moters None Alo HVAE AI6ao Lb B'rii.ldinp.Er+rr€]€ne II€ne Lle Fee*Seryiee Llene Ab Asolianees ll€no Ne effiee}AIes€Llo aoelisn€€e Llene lle E)airv/Ferm Eeuinment N€ne Ne €emprxsed-{i+Lbne Ne @ivinft eus+em{neen+ir*e None No Ineen+ive 5M Y€s Page 7 o1 Rocky Mountain Power Exhibit No. 1 Page 8 of 30 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas @ is the.lcs€€{.€f c) d) m€rl+eqpi Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 ncentives for retrofits Measure Catesorv Elisibilitv Requirements Incentive T8 Fluorescent Premium CEE T8 4' CEE Oualified Hieh Performanc€ Lamp and CEE Oualified Ballast included on qualified list4:€EE list $73/Lamp 4' CEE Oualified Reduced Wattase Lamo and CEE Oualified Ballas included on oualified list $5/Lamo Premium Delamp 4' CEE Qualified Reduced Wattage or High Performance Lamp and CEE Qualified Ballast. Must remove one or more lamps. To delamp en*gn existing fixture, the lamp and all corresponding sockets must be permanently disabled. $2|ll-amp Removed Relamp Lamp wattage reduction > 3 Wafts, No ballast retrofit $&35!Lamp High Bay Fixture with less than six (6) lamps: 4'CEE Oualified Hieh Perfonnanc.e Lamp. Must rcplac€ Tl2HOny'HO. Incandesc€nt or HID.4'€E Iaeaadeseex*+#D $2elE/Lamp Fixture with six (6) or more lamps: 4'CEE Oualified Hieh Performance Lamp. Must reolace TI2HO/VHO- Incandescent or HID $12ll-amo Continuous Operation 4' CEE Qualified Reduced Wattage or High Performance Lamp and CEE Qualified Ballast included on qualified bdlas#list installed in a continuous operation application $2OlLamp T5 Fluorescent Standard 4' Nominal Lamp < 28 Watts, Ballast Factor < 1.0 $5/Lamp Relamp Lamp waffage reduction > 3 Watts, No ballast retrofit $0*51/Lamo High Bay Fixture with less than six (6) lamos: 4' T5HO Lamo. Must reolace TI2HOAy'HO. Incandescent or HID.4 Nmiml High OrrtnrtLnm $2elE/Lamp Fixture with six (6) or more lamps: 4' T5HO Lamp. Must renlace Tt 2HOlVt{O- Incandescent or fIIfF.$12ll-amo Continuous Operation 4'Nominal High Output Lamp installed in a continuous operation application $2OlLamp Cold Cathode Screw-in Lamp All wattages $5/Lamp Compact Fluorescent Lamp (CFL) Sere*in-l,amp +Urra*ag€s{S€€+l€+e+)$2+ame Hardwired Fixture All wattages $5/Fixture Ceramic Metal Halide (CMH)CMH Fixture All wattageg $35/Fixture Pulse Start Metal Halide (PSMH) PSMH Fixture Wattases > 500W $60/Fixture Electronic Ballast Must be used in place of or replace a magnetic ballasl $20lBallast lnduction Induction Fixture All wattages, New fixtures only $l?575lFixture LED Integral Screw- in Lamo LED must be listed on qualified equipment list $10/Lamp Recessed Downlisht LED must be listed on qualified equipment list $10/Fixture eu*CeerArea ond *soa*ayOtnet LED LED must be listed on qualified equipment list $0.15/kWh annual enerqY savines$100,1kr€ Rocky Mountain Power Exhibit No. 1 Page I of 30 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Page 9 o1 Rocky Mountain Power Exhibit No. 1 Page 10 of 30 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Pa*ing€arage $+00lFixure +tigh{adJ,erv Esr.$JeelFi*erre Lichting Custom Not listed above $0.15&Wh annual energv savinss Notes for lighting retrofit incentives: l. To be eligible for the incentives listed, the new lighting system must use less energy than the existing lighting system replaced or the baseline lighting system as determined by the Company.L2. Incentives are capped available to reduce the Energy Efliciency Project simple payback below one year. Enerey Efficiency Project Costs are subject to Comoany approval . . 4. Incentives for T8 Premium Delamps may not be combined with other linear fluorescent or fixture incentives. Complete fixture removals are not eligible.5. Incentives for T8 and T5 Fluorescent Relamps may not be combined with other fluorescent lamp or fixture incentives and will only be paid once per facility. 6. Qualified equipment lists referenced in the table are posted on the ldaho energy efficiency program section of the Company's website. 7, The ineentive fer Serc BF : Ballast Factor CEE: Consortium for Energy Efficiency CFL: Compact Fluorescent Lamp CMH: Ceramic Metal Halide HID: High Intensity Discharge (e.9. Mercury Vapor, High Pressure Sodium, Metal Halide) HO = High Output LED = Light-Emitting Diode PSMH = Pulse-Start Metal Halide VHO = Very High Output Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 lamp linear Page 10 r Measure Category Elipibilifv Reouirements Incentive Lighting Control Occupancy Control PIR, Dual Tech, or Integral Sensor $-0.30/Watt conholledT5lSense f Daylighting Control Must contol interior fxtures with Continuous. Steooed or Bi-level ballast or automated control that dims 50%o or mor€ of the fixtuE in rcsponse to daylight.Iffi thet dirne 509'o er mele ef the fxere in respense te de+tigh* $0.3,UWatt controlledT5lSense f Advanced Daylighting Control Must incorporate both an occupancy sensor and daylighting sensor operating as part ofthe same control sequence in the same interior space. $O38/Watt controlled*50 Simfiing+ollas*ing €ontref $+#Bellast Non-General Illuminance Exit Sign LED or photoluminescent replacing incandescent or fluorescent $ I 5/Sien LED Message Center Sign LED replacing existing incandescent signage $S/Lamo LED Channel Letter Sign LED replacing existing neon or fluorescent signage $5/Linear Foot LED Marquee/Cabinet Sisn LED replacing existing fluorescent signage $5/Linear Foot Liqhtins Custom Not listed above $0.15/kWh annual enerov savings Rocky Mountain Power Exhibit No. 1 Page 1'l of 30 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas Incentives for lighting controls and non-general illuminance (retrofit only) Notes for retrofit lighting controls and non-general illuminance incentives l. To be eligible for the incentives listed, the new lighting system must use less energy than the existing lighting system replaced or the baseline lighting system as determined by the Company. 2. Incentives axe capped at S$ppercent of Energy Efficiency Project Costs and incentives will not be available to reduce the Energy Efficiency Project simple payback below one year._E3gIgy-Effic.ien9y Project Costs are subject to Company approval. 3. Incentives for Advanced Daylighting Controls may not be combined with other occupancy control or daylighting control incentives. 4. Watt controlled refers to the total wattaee of liCfiting fixtures down circuit from the control. PIR: Passive Infrared Dual Tech : Sensors combining ultrasonic and passive infrared LED : Light-emitting Diode Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the cunent FinAnswer Express program which was effective July 14,2012 Page ll r lncentives for new construction/ma ior renovation Measure Category Elisibilitv Reouirements Incentive lnterior Lighting Lighting and Lighting Control l. The total connected interior lighting power for New Constructior/Major Renovation projects must be at least l0% lower than the interior lighting power allowance calculated under the applicable version of the state energy code. For New Construction/Major Renovation projects not included in the state energy code, the total connected lighting power must be I 0olo lower than common practice as determined by the Company. 2. Energy savings is subject to approval by the Comoanv. $0.08/kwh annual energy savings Exterior Lighting Induction Fixture All Wattages, New Fixtures Only $Jl5Effixture LED Outdoor Pole/Roadway. decorativel,E]OntCeer A*ee*nd*oadrva+ <75W: LED must be listed on qualified fi*firre equipment list $Je0Effixture A'.+,I^ar Dala/Dnazl S200W: LED must be listed on oualified eouioment list $100/fixture >200W: LED must be listed on oualified eouioment list $400/fixture LED Canopv/Soffit LED must be listed on qualified equioment list $125/fixture LED Wall Packs <50 Watts: LED must be listed on oualified eouioment list $50/fxtwe >50 Watts: LED must be listed on qualified equioment list $75lfixture LED Flood Liehts <luu watts: LEL, must be llsted on oualllled earrinment lisf $75lfxture 2100 Watts: LED must be listed on oualified eouioment list $150/fxture CFL Wall Pack All Wattages, Hardwire Fixtures Only $3O/Fixture Lighting Control Occupancv control which must conhol a linear fluorescent. induction. or LED lxturelategrd fluereseenE hrduetien; er tED fxture, Seneor must be ffi $O3OAUafi controlled 75ls€i{€r Custom Not listed above s0.08/kwh annual energy savinss Rocky Mountain Power Exhibit No. 1 Page 12 of 30 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas CFL = Compact Fluorescent Lamp LED = LightEmitting Diode Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective JuJy 14,2012 Page 12 r Incentives for Motors Eouinment TYoe Size Categorv Sub-Category Minimum Efficiency Reouirement Customer Incentive Electronically Commutated Motor < I horsepower Refrigeration aoolication $0.50/watt HVAC aoolication $50/horsepower Variable-Frequency Drives (HVAC fans and oumos) < 100 horsepower HVAC fans and pumps See Note 2 $65/horsepower Green Motor Rewinds > l5 and < 5,000 hp Must meet GMPG Standards $ l/horsepower Refer to Note 3 Rocky Mountain Power Exhibit No. 1 Page 13 of 30 Case No. PAC-E-14-08 Vvilness: Kathryn C. Hymas Notes for motor incentives: l. Equipment that meets or exceeds the efficiency requirements listed for the equipment category in the above table may qualiry for the listed incentive. 2. Throttling or bypass devices, such as inlet vanes, bypass dampers, three-way valves, or throttling valves must be removed or perrnanently disabled to qualify for HVAC fan or pump VFD incentives. VFDs required by or used to comply with the applicable version of the Idaho energy code are not eligible for incentives. Savings will only be realized for installations where a variable load is present. 3. For Green Motor Rewinds, the participating electric motor service center is paid $2/horsepower for eligible Green Motor Rewinds. A minimum of $llhorsepower is paid by the service center to the Customer as a credit on the motor rewind invoice. The balance is retained by the service center. Green Motor Rewind motors that are installed or placed in inventory may qualifu for an incentive. l, Ineentives are net evaileble ferNetienel Eleetrieel Menufaeturers rtsseeietien (NEMr\) ECM = Electronically Commutated Motor GMPG: Green Motors Practices Group HVAC : Heating, Ventilation and Air-Conditioning lftrtktn VFD = Variable-Frequency Drive ldaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Page 13 r Rocky Mountain Power Exhibit No. 1 Page 14 of 30 Case No. PAC-E-14-08 Vvilness: Kathryn C. Hymas Incentives for HVAC equipment Minimum Efficiency Requirement & Customer fncenliwe Eouioment Tvne Size Catcsorv Sub-Catesorv $25/ton $50/ton $75/ton Unitary Commercial Air Conditioners, Air- Cooled (€eeling*4ede) < 65,000 Btu/hr (single phase) Split system and single package CEE Tier I CEE Tier 2All equipment sizes (three phase) Split system and single package Unitary Commercial Air Conditioners, Water and Evaporatively' Cooled All equipment sizes Split system and single package CEE Tier I Packaged Terminal Air Conditioners (PTAC)(I@€€oting [4ode) S 8,000 Btu/-hr Single package I2.2 EER > 8,000 Btu/hr and < 10,500 Btu/hr Single package I I.9 EER > 10,500 Bhr/k and < 13,500 Btu/hr Single package IO.7 EER > 13,500 Bhr/hr Single package 9.9 EER Packaged Terminal Heat Pumps (PTHP) (Heating & Cooling Mode) < 8,000 Btu/hr Single package 12.2 EER and 3.4 COP > 8,000 Btu/hr and < I0,500 Btu/hr Single package I 1.5 EER and 3.3 COP Z 10,500 Btu/hr and < 13,500 Btu/hr Single package 10.7 EER and 3.r coP > 13,500 Btr/hr Single package 9.8 EER and 3.0 coP Heat Pumps, Air- Cooled (Cooling Mode) < 65,000 Btulhr (single & three nhase) Split system and single package CEE Tier I CEE Tier 2 > 65,000 Btr:/hr (three phase) Split system and single package CEE Tier I Heat Pumps, Air- Cooled (Heating Mode) - See Note 3 < 65,000 Bh:/hr (single & three nhase) Split system and single package CEE Tier I CEE Tier 2 > 65,000 Btu/hr (three phase) 47'F db/43'F wb outdoor air I 7"F db/l 5'F wb outdoor air Heat Pumps, Water- Source (Cooling Mode) < 135,000 Btr/hr 86oF Entering Water CEE Tier I Heat Pumps, Water- Source (Heating Mode) - See Note 3 < 135,000 Btu/hr 68oF Entering Water CEE Tier I VRF Air-Cooled Heat Pumps (Cooline Mode) All Equipment Sizes Multisplit System or Multisplit Svstem with Heat Recoverv CEE Tier I Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Page 14 r Rocky Mountain Power Exhibit No. 'l Page 15 of 30 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas VRF Air-Cooled Heat Pumos (Heatine Mode) See Note 3 All Eouioment Sizes Multisolit Svstem or Multisolit Svstem with Heat Recovery (See note 3) CEE Tier I VRF Warcr-Cooled Heat Pumns (Coolinc Mode) < 135.000 Btu/hr Multisplit System or Multisolit System with Heat Recoverv CEE Tier I VRF Water-Cooled Heat Pumos (Heating Mode) See Note 3 < 135.000 Btu/hr Multisplit System or Multisplit System with Heat Recoverv /See noie 1\ CEE Tier I Heat Pumps, Ground- Source or Groundwater- Source (Heating & Cooling Mode) - See Note 3 All sizes 77"F Entering Water ENERGY STAR Qualified Ground-Source or Groundwater-Source Heat Pump Loop All sizes $25lton Notes for HVAC incentives:l. Equipment that meets or exceeds the efficiency requirements listed for the size category in the above table may qualify for the listed incentive. Equipment must meet all listed efficiency requirements to qualify for the listed incentives. 2. PTHPs can replace electric resistive heating, which must be removed. 3. Incentives for heat pumps are available per ton of cooling capacity ONLY. No incentives are paid per ton of heating capacity. Heat pumps must meet both the cooling mode and heating mode efficiency requirements to qualifu for per ton cooling efficiency incentives. 4. Equipment size categories are specified in terms of net cooling capacity at AHRI standard conditions as determined by AHRI Standard 2101240 for units <65,000 Btu/hr, AHRI Standard 3401360 for units >65,000 Btu/hr, an+AHRI Standard 310/380 for PTAC and PTHP units. and AHRI Standard 1230 for VRF systems. 5. Ground and Water Source Heat Pumps must meet or exceed listed efficiency requirements when rated in accordance with ISO-13256-l to qualify for the listed incentive. 6. Units rated only with an IPLV may qualit/ for the listed incentives if the value meets or exceeds the minimum IPLV established as part of the Consortium for Energy Efficiency Commercial Unitary Air-Conditioning and Heat Pump specification effective January 16,2009. 7. Efficiency requirements align with the Unitary Air-Conditioning and Heat Pump Specification maintained by the Consortium for Energy Efficiency for equipment with heating sections other than electric resistance. CEE minimum efficiency requirements are listed on the Company website. AHRI : Air-Conditioning, Heating and Refrigeration Institute CEE: Consortium for Energy Efficiency COP: Coefficient of Performance EER: Energy Efficiency Ratio HSPF: Heating Seasonal Performance Factor Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective luly 14,2012 Rocky Mountain Power Exhibit No. 1 Page 16 of 30 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas HVAC : Heating, Ventilation and Air-Conditioning IEER: Integrated Energy Efficiency Ratio IPLV: Integrated Part Load Value PTAC : Packaged Terminal Air Conditioner PTHP: Packaged Terminal Heat Pump SEER: Seasonal Energy Efficiency Ratio VRF = Variable Refrigerant Flow tives for other HVAC UI Notes for other HVAC equipment incentives: 1. Equipment that meets or exceeds the efficiency requirements listed for the equipment category in the above table may qualify for the listed incentive. 2'Incentivesarepaidat$0.{3]!kWhannualenergysavings@ . IDEC energy and{eman*savings are subject to approval by the Company. 3.Incentivespaidat$0.*2]!kWhannualenergysavings ss,yin€s. Chiller energy andiemen*savings are subject to approval by the Company. ldaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 ncen r Equipment Type Size Category lub-Category Minimum Efficiency Requirement Customer Incentive Evaoorative Coolins All )irect or Indirect EO.O6/ISR CFM Indirect-Direct Evaporative Cooling (IDEC) All sizes Applicable system components must exceed minimum efficiencies required by energy code [0.15/kwh annual zlglgv syi4-s$el}kWh mfl*fenergy-so+ings |t50&W (See note 2) lhillers All except chillers intended for backup service only ie#e+S9rvi!&pri mari ly occupant :omfort cooling loads (no more than l0%o for process cooling loads) Must exceed minimum efficiencies required energy code. tU.l5/kwh annual ]nerg.v ;avines$'+.-[}kl#h $seAdv See Note 3 Room Air Conditioner Residential (used in a business) iee Home Energy Savings program See Home Energy Savings program See Note 5 )651366 Day Programmablt rr Occuoancy-based Ihermostat All sizes in portable classrooms with mechanical coolins Musl be installed in portable :lassroom unoccupied during ;ummer months 165 1366 day thermostatic rr occupancy-based rethack cnnnhilitv ll5O/thermostat )ccupancy Based PTHP/PTAC control All sizes with no prior occupancy based control See note 5!150/controller Evaporative Pre-cooler ior sinele air-cooled packaeed 'ooftoo or matched split svstem Minimum performance :fficiency of 75%o. [7Slron of atfncher lRetrofit Onlv):ooline capacitv ;ondensers onlv.Must have enthalpv :ontrols to control pre- ;ooler ooeration. Water ;upplv must have :hemical or mechanical water treatment. Rocky Mountain Power Exhibit No. 1 Page 17 of 30 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas 4. Controller units must include an occupancy-s€f,sor:basec! conllrol and include the capability to set back the zone temperature during extended unoccupied periods and set up the temperature once the zone is occupied. 5. Refer to Company's Home Energy Savings program for efficiency requirements and incentives for listed residential appliances used in a business. CFM = Cubic Feet per Minute HVAC : Heating, Ventilating and Air-Conditioning IDEC : Indirect-Direct Evaporative Cooling PTAC = Packaged Terminal Air Conditioner PTHP: Packaged Terminal Heat Pump ldaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Page l7 r Rocky Mountain Power Exhibit No. 1 Page 18 of 30 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Incentives for building envelope (Retrofit) Equioment Tvpe Category Minimum E{Iiciencv Reouirement Customer Innenlive Cool Roof ENERGY STAR Qualified $0. I 0/square foot Roof/Attic Insulation Minimum increment of R- l0 insulation added $0.09/square foot Wall Insulation Minimum increment of R-10 insulation added $0.07/square foot Windows (See notes 3, 4) site-builr U-Factor < 0.30 and SHGC S 0.33 (glazing only rating) $0.35/square foot Assembly U-Factor < 0.30 and SHGC < 0.33 (entire window assembly rating) $0.35/square foot Window Film Existing windows See Note 5 su.l)/t(wh annual energv savinss (See Note 5) Notes for building envelope incentives (retrofit):l. Equipment that meets or exceeds the efficiency requirements listed for the equipment category in the above table may qualifu for the listed incentive. 2. Building must be conditioned with mechanical cooling to be eligible for envelope incentives. 3. Energy performance of window assemblies and glazing products must be rated in accordance with NFRC. Site- built metal window systems must include a thermal break within the frame or other appropriate NFRC certification to qualift for incentives. Skylights are not eligible to receive incentives. 4. Window square footage is determined by the dimensions of the entire window assembly, not just the window glass. 5. Incentives for window film are calculated based on film specifications and window orientation at $0.{+.!l/kwh annual energy savings. Energy savings subject to approval by the Company. NFRC : National Fenestration Rating Council SHGC : Solar Heat Gain Coefficient Idaho wattsmart Business (Schedule 140) - Filed August 2014 Page 18 r Proposed changes are marked relative to the current FinAnswer Express program which was effective luly 14,2012 Rocky Mountain Power Exhibit No. 1 Page 19 of 30 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Incentives for bu ild in g envelope (New Construction/lVlajor Renovation) Eouinment Tvne Catesory Minimum Efficiencv Reouirement Customer Incentive Cool Roof ENERGY STAR Qualified $0. I 0/square foot Roof/Attic Insulation Minimum increment of R-5 insulation above code (See Note 5) $0.09/square foot Wall Insulation Minimum increment of R-3.7 continuous insulation above code (See Note 5) $0.07lsquare foot Windows (See Notes 3, 4) Site-built U-Factor S 0.30 and SHGC S 0.33 (glazing only rating) S0.35/square foot Assembly U-Factor < 0.30 and SHGC S 0.33 (entire window assembly rating) $0.35/square foot Notes for building envelope incentives for New Construction/lVlajor Renovation projects: l. Equipment that meets or exceeds the efficiency requirements listed for the equipment category in the above table may qualifu for the listed incentive. 2. Building must be conditioned with mechanical cooling to be eligible for envelope incentives. 3. Energy performance of window assemblies and glazing products must be rated in accordance with NFRC. Site- built metal window systems must include a thermal break within the frame or other appropriate NFRC certification to qualifo for incentives. Skylights are not eligible to receive incentives. 4. Window square footage is determined by the dimensions of the entire window assembly, not just the window glass. 5. Compliance with the minimum efficiency requirements of roof/attic and wall Insulation measures may be demonstrated with equivalent U-factors and are subject Company approval. NFRC: National Fenestration Rating Council SHGC: Solar Heat Gain Coefficient Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Page 19 r Rocky Mountain Power Exhibit No. 1 Page 20 of 30 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas lncentives for food service equipment Eouioment Tvoe Eouinment Cateporv Minimum Efliciency Reouirement Customer Incentive/f Tnit {Jsed js+*usinese See+eme+nergrSa+ings Pmm See+{ete4 Undercounter ENERGY STAR Qualified s50sl00 (@ Temlrrature models ilelectric boosters Only )(k-3) Stationary rack, single tank, door type $+00et00 Single tank conveyor $rr5001.000 Multiple tank conveyor $e'000500 Volume > 28 cu. ft. ENERGY STAR Qualified $60+400 tslecrtc lnsulateo tlololng Cabinet l3 < Volume < 28 cu. ft.$5ee300 Volume < 13 cu. ft.$4e+200 Electric Steam Cooker 3-, 4-, 5- and 6-pan or larger sizes - Tier I ENERGY STAR Qualified $?5S!30 3-, 4-, 5- and 6-pan or larger sizes - Tier 2 ENERGY STAR Oualified il Heary Load Efficiency >@Yq@ LJereJ) $84+300 Electric Convection Oven ENERGY STAII Oualifi e#70% ffi $350 Electric Griddle +ier+FNER€+€++RJioFI Oueti$ed $2se +i€*4 ENERCY STAR Tier 2 Qualified $5e150 Electric Combination Oven 6-15 pans- ENERGY STAR Oualifiedl{earfr @@ 4) $ r,000 l6 - 20 oans ENERGY STAR Oualified $27s Electric Commercial Fryer Tier I ENERGY STAR Qualified $200 Tier 2 ENERGY STAR Oualified WCooking Efficiency > 8@%,Idle Energy Rate <??3 860 Watts (Seellete-{) $300 Ice Machines (Air-Cooled Only) Tier l: Harvest rate < 500 lbs/day ENERGY STAR Qualified s6+125 Tier l: Harvest rate > 500 lbs/day $r++150 Tier 2: Harvest rate < 500 lbs/day CEE Tier 2 Qualihed $-13+210 Tier 2: Harvest rate > 500 lbs/day $265{0q Residential Refrigerator Used in a business See Home Energy Savings Prooram See Note 2 Residential Refrieerator/ Freezer Recvclins Used in a business See residential refri gerator/ freezer rccvclino nrosram See Note 3 Commercial Glass Transoarent Door Refrigerator 0 < Volume < 15 cu. ft. ENERGY STAR Qualified $]{)02t 15 < Volume < 30 cu. ft.$s50 30 < Volume < 50 cu. ft.${5e25 ldaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective Ju'ly 14,2012 Page 20 r Rocky Mountain Power Exhibit No. 1 Page 21 of 30 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Volume >50 cu. ft.$r+5125 Chest configuration $?s50 Commercial Glasa Transparent Door Freezer 0 < Volume < 15 cu. ft. ENERGY STAR Qualified $25$eo l5 < Volume < 30 cu. ft.$Lo$325 30 < Volume < 50 cu. ft.E:Se+s Volume >50 cu. ft.$100r$800 Chest configuration $100 €emmereid{eliCDeor *e*ig€ra*er 0<-Ifu{um€<*5+u* glER€Y€+ RqmHfiod $5e l+<{Ielum€-<3M $?5 30=-lldum€<{e+u*${{0 Velumo+S0+u*${+s €hes+eenf,gura+ien $+s €emmercialSeli&Deer Freezer 0 < Velume < 15 eu, ft, EIIERCY€Td.RAuefif,od ${59 +++tlelume4e+u'+$H 30+lfulume<-50+u'+$200 l*elsms+soerr.*$e0 ehest+eafiguration $J50 LED Case Lighting (Retrofit Only) LED replacing fluorescent lamp in refriserated cases. $1O/linear loot Refrigerated Case Occupancy Sensor (Rehofit Only) Installed in existing refrigerated case with LED liehtine $l/linear fool Demand Controlled Kitchen Ventilation Exhaust Hood (Retrofit Onlv) Must be installed on commercial kitchen exhaust system. Variable speed motors must be controlled to vary fan sDeed deDendins uDon kitchen $0.1s/kwh annual enerey savings (See note 4)demand. as indicated bv connected sensors. Anti-Sweat Heater Controls Retrofit Onl),) Low-Temo (Freezine) Cases Technologies that reduce enerey consumption of anti- sweat heaters based on sensinq humiditv. $20llinear foot (case length) Med-Temo (Refrigerated) Cases (case length) Notes for food service equipment incentives:l. Equipment that meets or exceeds the efficiency requirements listed for the equipment category in the above table may qualify for the listed incentive. 2. Refer to Company's Home Energy Savings program for efficiency requirements and incentives for listed residential appliances used in a business. iffi. 1, Te meet the Minimum Effieieney Requirement(s) listed; valuevmust be based en testirg in eeeerdenee with *re 3. Refer to the Compan)r's residential refriserator and freezer recycline proeram (See )ra later. refriqerator@) for requirements and incentives for listed appliance recvcline measures for residential appliances used in a business. 4. Incentives are paid at $0.15/kWh annual eners.v savinss. Demand controlled kitchen ventilation exhaust hood enersv savines subject to approval bv Company. CEE : Consortium for Energy Efficiency MDEC = Maximum Dailv Enerey Consumption V = Association of Home Anpliance Manufacturers (AHAM) Volume (cubic feet) Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Page2l r Rocky Mountain Power Exhibit No. 1 Page 22 of 30 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas Incentives for oflice equipment Eouinment Tvoe Minimum Efliciencv Reouirements Customer Incentive Network PC Power Managemenl Software l. Installed software must automatically control the power settings of networked personal computers (PC) at the server level 2. The software must manage power consumption for each individual PC 3. The software must include the capability to report energy savings results 4. lncentives are for desltop comouters only. Controlled laotop comouters are not eligible for incentives- $An per controlled PC (ur{o-+Og++* E r€rgFEtr€i€n€f Ueasure+ests) Smart Plug Strip l. Incentive applies to any plug strip that eliminates idle or stand-by power consumption ofconnected plug-load appliance through the use ofan occupancy sensor, electric load sensor, or timer. 2. Applies only to electric plug-load applications (e.g. computer monitors, desk lamps, etc.) $15/qualifoing unit Notes for office equipment incentives:l. Equipment that meets or exceeds the efficiency requirements listed for the equipment category in the above table may qualify for the listed incentive. PC : Personal Computer Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Page2? t Rocky Mountain Power Exhibit No. 1 Page 23 of 30 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas Incentives for applianees Eouinment Tvne Equioment Catesorv Minimum Elliciencv Reouirement Customer Incentive High-Effi ciency Clothes Washer Residential (used in a business)See Home Energy Savings program See Note 3 Commercial (must have electric water heating) ENERGY STAR Qualified ${5tr!00 egE+;e+lauamee $r0e Electric Water Heater Residential (used in a business)See Home Energy Savings program See Note 3 Notes for appliance incentives: l. Equipment that meets or exceeds the efficiency requirements listed for the equipment category in the above table may qualify for the listed incentive. 2. Equipment must meet the efficiency rating standard that is in effect on the date of purchase. 3. Refer to Company's Home Energy Savings program for efficiency requirements and incentives for listed residential appliances used in a business. Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Page 23 r Rocky Mountain Power Exhibit No. 1 Page 24 of 30 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas I ncentives for Incentives{epFa rm a nd Da irv daiq#fr+m+Eq u i pm en t Eouinment Tvne Eouioment Catesorv Minimum Elliciencv Reouirements Customer Incentive Automatic Milker Takeoffs (Retrofit qenly) Equipment must be able to sense milk flow and remove milker when flow reaches a pre-set level. The vacuum pump serving the affected milking units must be equipped with a VFD.+o @ffi Incentive is available for adding automatic milker takeoffs to existine milkine svstems. not for takeoffS on a brand new system where there was none before. retrcStentr. Replacement of existing automatic milker takeoffs is not eligible for this listed incentive. but may oualit for a Custom Enerev Efficiencv Incentive.ineentiveq-exeeplrvheetle @ $235 each Agricultural Engine Block Heater Timers Timer must be a Ul-listed device and rated for a minimum of l5 amps continuous duty. $10 each Hieh Efficiencv Circulating Fans (See note 2) l2-23" Diameter Fans must achieve an efficiency level of I I cftrwattl#€fi $25lfan 24-35" Diameter Fans must achieve an efficiency level of l8 cfm/wattr#a*$35/fan 36-47" Diarneter Fans must achieve an efficiency level of l8 cfm/watt*aft $50/fan >48" Diameter Fans must achieve an efficiency level of 25 cfm/wa$#aft ST5lfan Heat RecoveryReeleimers Heat rceleimerfqgevgry_Uni! must use rvas{e-heat reiected from milk cooline refrigeration systemeempresser to heat water. Customer must use electricity for water heatinsffir. $220henCenser kw$o.tgkwh annual energy savinss High-effi ciency t!ivestock {y'yaterers Must have two inches or more of insulation surrounding the inside ofthe waterer and an electric heating element. These-l@_with a heating element greater than 250 watts must have an adjustable thermostat. Non-electric waterers do not qualifr. $165 each High-_e!ffi ciency Ventilation EAqsystens (See note 2) l2-23" Diameter Fans must achieve an efficiency level of I I cfm/wrrllatt $45/fan 24-35" Diameter Fans must achieve an efficiency level of l3 cfm/Yr#att $75lfan 36-47" Diameter Fans must achieve an efficiency level of l7 cfm/wr#att $ I 25lfan >48" Diameter Fans must achieve an eflciency level of 19.5 cfm/w:rllatt $ I 50/fan Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Page24 t Rocky Mountain Power Exhibit No. 1 Page 25 of 30 Case No. PAC-E-14-08 Vvilness: Kathryn C. Hymas Milk Pre-coolers The equipment must cool milk with well_-water before it reaches the bulk cooling tank. $0.15&wh annual energy savings {SeeAIa+e-3) Programmable Ventilation Controllers The controllerequipment must conhol ventilation fans based on temperature or other applicable factors such as humidity, odor concentration, etc. $20lfan controlled Variable Frequency Drives for Dairy Vacuum Pumps (Retrofit only) ]ffD$e+qpipffi€nt must vary t$e motor speed based on target vacuumlevel.ffi @ncentive available for retrofit only (i.e. new construction and reolacement of existine VFD not elisible.)fersystems withorrt on exiating VFD. $165/hp Potato or onion storaee fan VFD Add variable freouency drive to existing or new fan in potato or onion storase. $0.r5/kwh annual energy savinqs Notes for Farm and Dairv dairyhrm-equipment incentives: l.Equipmentthatmeetsorexceedstheefficiencyrequirementsabovetable may qualiry for the listed incentive. 2. Fan performance must be rated by an independent testing body in accordance with the appropriate ANSI/AMCA standards. 3. available to reduce the Energy Efficiencv Project simple payback below one year. Enerqv savines and Enerey Efficiency Project Costs are subject to Company approval. 4. Except where noted, all equipment listed in the table lgrvitl-be eligible for incentives in both 4New €gonstruction and gRetrofit projects. AMCA : Air Movement and Control Association International, Inc. ANSI = American National Standards Institute VFD : Variable_Frequency Drive cfrn = cubic feet per minute w = watt Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Page 25 r Equipment (-nleonru Renlace with Limitations Unit Customer Incentive Low-Pressure Drop Filters Standard coalescing filter Rated low_-pressure drop filter where: L Pressure loss at rated flow is <l psi when new and <3 psi at elemenl change. 2. Particulate filtration is 1007o at >3.0 microns and99.98o/o at 0.1 to 3.0 microns, with < 5ppm liquid carryover: 3. Filter is deep-bed "mist eliminator" style, with element life > 5 years. 4. Rated capacity of filter is < 500 scfm- l. {ompressor system must be > 25 hp and < 75 hp. 2. Comoressor discharse Dressure setpoint must be reduced by 2 psi or more after installation of low pressure drop filter. scfm $&8eflscfm Receiver Capacity Addition Limited or no receiver capacity (< 2 gallons per scfm of trim compressor capacity) Total tanlt-receiver capacity after addition must be > 2 gallons per scfm oftrim compressor capacity l. Compressor system size < 75 hplE! countins backup comoressor(s).. 2. Trim compressor must use load/unload control. notsr*ithr*t inlet modulation or on/offcontrol. 3. Systems with *VFD g!)!!!pEi!s!)! or using variable displacement comoressor as trimcompressor..# trir*eenrpresser are not elisible. gal $*35e/gallon above 2 gallong pgllscfm Cvcline Refrigerated €yeling-Dryers Non-cycling refrigerated dryer Cycling refrigerated dryer l. Compressor system size < 75 hp. 2. Rated dryer capacity must be < 500 scfm. 3. Dryer must operate exclusively in cycling mode and cannot be equipped with the ability to select between cycling and non-cycling mode. 4. Refrigeration compressor must cycle offduring periods of reduced demand. scfm $2L50lscfm VFD Controlled Compressor eempressor 75+p-er sm*lerEircd speed comDtessor S75 hp VFD controlled oil-iniected screw compressor operatine in system with total compressor caDacitv S75 hp. not countine backup compressor capacitv!4S*p*@@ l. -_IS!aL_S9!0pEtsor capacitv in uperaded svstem is S75 hp. not countins backup compressor.Singl,e eper€sifl€-€empr€ssor< 15+f-. 2. {ompressor must adjust speed as primary means of capacity control. he $0.r5lkwh annual energy savings (See-aete-9 Rocky Mountain Power Exhibit No. 1 Page 26 of 30 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas Incentives for Ceompressed aAir Eq-Uipmen! Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Page 26 r 3=-eompresser-ffist-no{ use-i*lermedul*ien rvhen{emandis$elorv minimm-seeea thresh€+d-€4+h€-\lFD eospfes's€t Zero Loss Condensate Drains Fixe4+.[imer drain Zero loss condensate drain (See note 4) Drain is designed to function without release of compressed air into the atmosphere.:!ny size svstem is elieible - there is no restriction on compressor size.-(ell €cmarcss+4i?ec)= each $9!00 each Outside Air Intake Compressor drawine intake drerviag=air from compressor room Permanent ductwork between compressor air intake and o utdoorsS-75*p+empresser-rvhere @ l. Compressor system size S 75 hp. 2. Ductwork must meet manufacfurer's specifications, which may include: (a) < 0.25" W.C. pressure loss at rated flow, and (b) allow use of compressor room air during extremely cold outside air conditions. hp $G30ftrp Compressed air end use reduction Inapprooriate or ineflicient Functionallv eouivalent altematives Any size svstem is elieible - there is no $0.r5/kwh annual enerqy savingscompressed air end use or isolation valves restriction on compressor size. Rocky Mountain Power Exhibit No. 1 Page 27 of 30 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas Notes for Qeompressed cdir incentives: l.- gquipment that meet te eustemers with eempressed air sy"tem(s) eentaining eempressers with a tetal sy"tem herseperver less than er egqsl+e+5+PiFsize. 2.--gxcept for tne zero to to compressed air svstems with total comoressor caoaciB of 75 hp or less. not includinq backuo compressor capacitv that does not normallv run. ive 3.- Incentives are caooed at 70 percent ofEnerev Efliciencv Project Costs. and incentives will not be available to reduce Enersv Efficiency Proiect simole payback below one vear. Enerev savines and Enerqv Efficiencv Proiect Costs are subiect to Comoanv approval. fer VFD eertrelled eempressers are ealeuleted based en eempresser size enC ether system parameters at $0,15/kWh 4.- Zero loss condensate drains purchased as an integral part of another measure are elieible for the incentive shown above. l.ess ineen+ives, hp: horsepower ppm : parts per million ldaho wattsmart Business (Schedule 140) - Filed August 20 l4 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Page27 t Rocky Mountain Power Exhibit No. 1 Page 28 of 30 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas psi : pounds per square inch scfm : g€ubic Ffeet of air per l*nqinute at standard conditions (14.5 psia, 68oF, and 0%o relative humidity) VFD : Vvariable_-Ffrequency Dglrive Incentives for Wastewater and Other Refrieeration Enersv Efficiencv Measures Notes for other enerw efliciencv measures incentives tablel. Equioment that meets or exceeds the efliciencv reouirements above may qualifu for the listed incentive. 2. Incentives are capoed at 70 percent ofEnersy Efliciency Proiect Costs and incentives will not b€ available to reduce the Enerev Elliciencv Proiect simole pavback below one vear. Enerqv savinss and Enerev Efliciency Proiect Costs are subiect to Companv aoproval. Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective July 14,2012 Equinment Tvpe Rcplrse with Customer Inccntive Adaptive refrigeration control Conventional controls (defrost timeclock. snace thermostal evaporator fan control. ifanv. thermal expansion valve in some instances) Adaptive refriseration controller and. in some instances. electric exoansion valve $0.15/kWh annual enerqv savings Fast actins door Manually operated door. automatic door with lone cycle time. strio curtain. or entrvway with no door in refriserated/conditioned soace Fast actine door $0.15/kWh annual enersy savinss Wastewater - low nower mixer Excess aeration caoacifu Extended ranse circulator $0.15/kWh annual energv savings Rocky Mountain Power Exhibit No. 1 Page 29 of 30 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas Enhanced Incentives for Small Businesses (Retrofit onlv)t T8 Fluorescent Retrofit Oamo/Ballast) 4' CEE Oualified ReducBd Wattase Lamp and CEE Oualified Ballast included on oualified ballest list Sl40/Fixture Delamp 4' CEE Oualified Reduced Wattaee or Hich Performanc€ Lamo and CEE Oualifred Ballast. Must $120/Fixtureremove one or more lamos. To delamp an existinc fxture. the lamo and all corresoondins sockets must be oermanentlv disabled- Tl2 Conversion (Kit/Lamo/Ballas) 8' Tl2 to (2) 4' CEE Oualified Reduced Wattase or Hish Performance T8 Lamos and CEE Ouslified Bnllnst $150/Fixturc Relamp Lamp wattage reduction > 3 Watts. No ballast retrofit $15/Lamp Installed Replacement - Hieh Bay ffixture/LamplBallas0 Fixture with less than six (6) lamos: 4' CEE Oualified Hich Performance Lamo. Must reolace TI2HO/VHO Incnndesenl nr lilf)$300/Fixture Fixture with six (6) or more lamos: 4' CEE Oualified Hish Performance Lamo, Must replace Tl2HOnfHO- Incandescent or HID $35Offixture T5 Fluorescent Replacement - T5 Standard Gixture/Lamo/Ballast) 4' Nominal Lamo < 28 Watts. Ballast Factor S 1.0 $250/Fixture Relamo Lamp wattase reduction > 3 Watts. No ballast retrofit 322tLamp Installed Reolacement - Hieh Bav Gixture/Lamo/Ballas0 Fixture with less than six (6) lamos: Must replace TI2HO/VHO. Incandescent or HID $37s/Fixturc Fixture with six (6) or mor€ lamps: Must lEplace TI2HO/VHO. Incandescent or HID $45OlFixture LED ReolacemenURetrolit - Recessed Downlicht Gixture or Kit) Must replace existine incandescent or fluor€scenl LED must be listed on oualified eouipment list $150/Fixture Reolacement - Exit Siens Must reolace incandescent or fluorescent $100/Siqn Liehtine Control Wall Occupancy Sensor Retrofit PIR Dual Tech $100/Sensor Ceiline Occuoancy Sensor Retrofit PIR. Dual Tech $220lSensor Notes for enhanced incentives for small business customers:l. To be eligible for the incentives listed. the new lishtine system must use less enerey than the existine liehtine system replaced or the baseline lishtine system as determined by the Comoanv. 2. Incentives are capoed at 80 percent of Enerey Efficiency hoject Costs. Enerey Efficiency Project Costs are subject to Company approval. 3. Incentives for T8 Fluorescent Premium Delamps may not be combined with other linear fluorescent lamp or fixture incentives. Complete fixture removals are not eligible. 4. Incentives for T8 and T5 Fluorescent Relamps may not be combined with other linear fluorescent lamo or fixture incentives and will only be paid once per facilitv. 8 Incentives for measures in this table are available onlv to Small Business customers as defined in the incentives table on oase 2. e Actual incentives are subiect to chanee and will be determined bv Companv on a component level basis on no lesst ait;. Idaho wattsmart Business (Schedule 140) - Filed August 2014 Proposed changes are marked relative to the current FinAnswer Express program which was effective luly 14,2012 Rocky Mountain Pou/er Exhibit No. 1 Page 30 of 30 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas 5. Oualified equioment lists referenced in the above table are posted on the Idaho enerey efficiency prosrarn section of the Company's website. BF = Ballast Factor CEE = Consortium for Enerey Efficiency CFL = Compact Fluorescent Lamp CMH = Ceramic Metal Halide HID: Hish Intensitv Discharge (e.g. Mercury Vapor. High hessure Sodium. Metal Halide) HO = High Output LED = Lisht-Emittine Diode PSMH = Pulse-Start Metal Halide VHO: Verv Hish Ou(put Idaho wattsmart Business (Schedule 140) - Filed August 2014 Page 30 r Proposed changes are marked relative to the current FinAnswer Express program which was effective JuIy 14,2012 Case No. PAC-E-14-08 Exhibit No. 2 Witness: Kathryn C. Hymas BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION ROCKY MOUNTAIN POWER Exhibit Accompanying Testimony of Kathryn C. Hymas Idaho Three-Year Business Plan Cost Effectiveness August 2014 Rocky Mountain Power Exhibit No. 2 Page 1 of 31 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas To: From: Subject: Date: MEMORANDUM Don Jones, Jr. Brian Hedman and Byron Boyle ldaho Three-Year Business PIan Cost-Effectiveness August 8,2014 The tables below present the cost-effectiveness findings of the ldaho Three-Year Business Plan based on costs and savings estimates provided by PacifiCorp in a spreadsheet entitled "Copy of CE inputs for lD WSB filing 051914+ updates 061614+ REV 052514.xlsx"and in an email from Don Jones, Jr. on June 26, 2014. The utility discount rate is from the 2013 PacifiCorp lntegrated Resource Plan. Three-year cost-effectiveness inputs and results for the business-as-usual program, increased incentives, energy management, paying for commissioning, two commercial measure categories, six industrial measure categories, and the portfolio combined are presented in this memo. Business-as-usual includes the impacts of energy codes and lighting baseline adjustments. The Business Plan Portfolio includes the impacts of Energy Project Manager Co-funding. 1. Business Plan Portfolio 2O\5-20L7: Numbers 2 - 15 combined (Table 15) 2. Business-as-Usual 20L5-2017 (Table 19) 3. 4. 5. 6. 7. 8. 9. 10. 11. lncrease EF 2015-2017 (Table 23) lncrease Agriculture System Re-design 2Ot5-20L7 (Table 27) Energy Management Offer 2Ot5-2077 (Table 31) Pay for Commissioning 2015-2017 (Table 35) Commercial Food Service 2OL5-2077 (Table 39) Commercial HVAC 2015-2017 (Table 43) lndustrial Compressed Air 2015-2017 (Table 47) lndustrial Potato Storage Fan VFD 20L5-2077 (Table 51) I nd u st ria I Ada ptive Ref rige ratio n Cont rol 2OL5-2077 (Ta ble 5 5) Industrial Fast Acting Door 2015-2017 (Table 59) lndustrial End Use Compressed Air Reduction2Ot5-20L7 (Table 53) lndustrial Wastewater Mixing - Grid Bee 2015-2017 (Table 67) Small Business 2015-2017 (Table 71) 72. 13. 14. 15. 720 SW Washington Street Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 An Employee-Owned Company www.cadmusgroup.com Corporate Headquarters: I 00 5th Avenue, Suite I 00 Waltham, MA 02451 Voice: 617-673.7000 Fax:617 .673.7001 Rocky Mountain Povrrer Exhibit No. 2 Page 2 ot 31 Case No. PAC-E-14-08 \Mness: Kaihryn C. Hymas For alf measures, cost-effectiveness was tested using the 2013 IRP 70% load factor east system decrements. Table l lists modeling inputs. lnflatlon Ratel Future rates determined using a t.9% annual escalator. Table 2, Table 3, Table 5, Table 4, and Table 5 list the costs and incentives and Table 7, 720 5W Washington Street Suite 4oo Portland,OR 97205 Voice:503.467.7100 Fax 503.228.3696 Rocky Mountain Power Exhibit No. 2 Page 3 of 31 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Table 8, Table 9, and 720 SW Washington Street Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 Rocky Mountain Power Exhibit No. 2 Page 4 of 3'l Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas Table 10 list the annual energy savings for each measure group. The following tables present the cost effectiveness results. Table 11 presents the three year summary of the benefit cost ratios for each of the categories. Tables L2-7L present the individual cost benefit analysis for each category by year and in total. Allvalues in Tables L2-7L are shown in 2015 dollars. Table 11 provides a comparative summary of the benefit/cost ratios from the individual measure category, program, and portfolio results, from allfive test perspectives. Table 12 to Table 71 show the complete cost-effectiveness results by measure category, program, and portfolio. The combined three-year portfolio is cost-effective from alltest perspectives except the RlM. The energy management offer is the only measure not cost-effective from both the PTRC and TRC perspectives. Table 1. !D Three-Year Business Plan: Financial lnputs Future rates determined using a 1.9% annual escalator. lrrisation Energy Rate (S/kWh) - 2013 base rate Commercial Energy Rate (S/kWh) - 2013 base rate lndustrial (no lrrigation) Energy Rate (S/kWh)- 2013 base rate lndustrial (with lrrigation) Enersy Rate (S/kWh) - 2013 base rate Table 2. lD Three-Year Business Plan: Business-as-Usua! Program Costs BAU Commercial 1 s85,479 s204,256 s289,735 s604,841 2 s85,479 s204,256 s289,735 s604,841 3 s8s.479 $204,256 S289,73s s604,841 BAU lndustrial L s243,287 ss81,344 s824,632 st,72L,470 2 $243,287 s581,344 5824,632 SL,zL,47o 3 s243,287 s581,344 5824,532 sL,72L,47O lncrease EF Commercial 1 St,ttz s17,33s s18,s08 54,629 2 51,L72 s17,335 s18,508 $4,629 3 5L,L72 s17,33s s18,508 54,629 lncrease EF lndustrial 1 s3,336 S49,339 s52,676 sL3,L74 2 S3,336 S49,339 s52,676 5t3,174 3 s3,335 s49,339 s52,676 Sr:.,nq lncrease Agriculture 1 s7.9s4 s68,711 576,704 S44,116 720 SW Washington Street Suite 400 Portland, OR 97205 Voice: 503.467.71 00 Fax: 503.228.3696 Rocky Mountain Power Exhibit No. 2 Page 5 of 31 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas System Re-design Agricultural 2 s7,994 Sog,zu 576,704 s44,115 3 57,e94 s68,711 576,704 544,LL6 720 SW Washington Street Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 Rocky Mounlain Power Exhibit No. 2 Page 6 of 31 Case No. PAC-E-14-08 VMlness: Kathryn C. Hymas Energy Management Offer Commercial L s4,876 s718 s5,594 s2,581 2 Su,687 s1,588 5t3,z7s 5s,441 3 523,755 s3,071 s25,836 s10,255 Energy Management Offer lndustrial 1 S13,878 52,044 5t5,922 57,34s 2 533,262 S4,s19 537,782 s15,485 3 567,640 s8,74L s76,381 s29,188 Pay for Commissioning Commercial 1 52,134 s4,753 s6,887 StL,2o4 2 $2,134 Sq,zsg Se,ssz $LL,2o4 3 $2,L34 s4,7s3 s5,887 Sr:,zoq Pay for Commissioning lndustrial 1 $6,O74 5L3,s27 S19,5oo s31,887 2 $6,O74 s13,527 s19,500 S31,887 3 s6,074 S13,s27 S19,600 s31,887 Table 3. tD Three-Year Business Plan: Commercia! Program Costs Food Service L s3,015 (S2,055)Sg+g (s4,178) 2 Se,osz (S2,oo9)Sr,o+s (S3,953) 3 s3,682 (s471)s3,211 $6,278 HVAC 1 s2,L48 s4,595 s6,843 s19,302 2 52,253 Ss,060 S7,313 52O,258 3 Sz,ztt Ss,so3 S7,880 s21,398 720 SW Washington Street suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 Rocky Mountain Power Exhibit No. 2Page7 ol31 Case No. PAC-E-14-08 Wlness: Kathryn C. Hymas Table 4. lD Three-Year Business Plan: lndustrial Program Costs Compressed Air 7 s1,800 s3.000 s4,800 57,220 2 S1,8oo S3,ooo 54,8oo 57,220 3 $1,800 s3,ooo 54,8oo 57,220 Potato Storage Fan VFD 1 s2,790 s4,6s0 57,440 s9,900 2 s2,790 S4,6so 57,44o Sg,goo 3 52,790 S4,5so $7,440 Ss,soo Adaptive Refrigeration Control 1 52,52O s3,9oo 56,42O s9,400 2 S3,ooo Ss,7oo Ss,3oo s15,800 3 s4,140 S6,600 Sro,zao S19,ooo Fast Acting Door 1 S2,880 54,8oo s7,680 s18,000 2 s2,880 s4,8oo s7,580 s18,000 3 s2,880 s4,800 s7,680 s18,000 End Use Compressed Air Reduction 1 Ssoo s1,500 s2,400 s2,so0 2 Ssoo s1,500 s2,400 s2,500 3 Sgoo S1,soo s2,4oo s2,s00 Wastewater Mixing - Grid Bee 1 57,2OO S12,ooo S19,2oo s35,ooo 2 57,2OO s12,000 s19,200 s35,000 3 57,2oo 512,000 s19,2oo S3s,ooo Table 5. lD Three-Year Business Plan: Smal! Business Costs Small Business Table 6. lD Three-Year Business Plan: Portfolio Costs 720 SW Washington Street suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax:503.228.3696 Energy Project Manager Co-Funding Rocky Mountain Power ='[3lJ,i;iLi3t:,Xl3l Vvitness: Kathryn C. Hymas Table 7. lD Three-Year Business Plan: Annualsavings by Measure Type for Business-as-Usual Measures BAU Commercial t L,7t4,569 97o/o L,67O,892 78%t,3LL,674 11 2 L,7L4,569 97%t,670,892 78%L,3tL,6L4 11 3 L,7L4,569 97%t,670,892 78%L,3Lt,6L4 11 BAU lndustrial 1 4,979,927 97%4,755,615 78o/o 3,733,054 L7 2 4,879,927 97%4,755,6L5 78%3,733,054 11 3 4,879,927 97%4,755,6L5 78%3,733,054 11 lncrease EF Commercial 1 2L,726 83%18,033 89%16,049 15 2 2L,726 83%18,033 89Yo L6,049 15 3 2L,726 83%18,033 89%16,049 15 lncrease EF lndustrial 1 51,836 83%5L,323 89%45,678 15 2 61,836 83o/o 51,323 89%45,678 15 3 51,835 83Yo 51,323 89%45,678 15 lncrease Agriculture System Re-design 1 L33,437 L00%L33,43L 93%L24,091 7 2 133,431 L00%L33,43t 93%L24,097 7 3 133,431 LOO%133,431 93%L24,O97 7 Energy Management Offer Commercial L 3s,900 LOO%35,900 90%32,336 3 2 77,912 tN%77,9t2 90o/o 70,L78 3 3 L47,878 ro0%L47,878 90%133,198 3 Energy Management Offer lndustrial 1 L02,L77 to0%L02,L77 90%92,034 3 2 22L,749 LOO%22t,749 90%199,735 3 3 420,883 L00o/o 420,883 90%379,103 3 Pay for Commissioning Commercial 7 46,LL6 83%38,276 89To 34,066 15 2 46,LL6 83%38,276 89%34,055 15 3 46,LL6 83%38,276 89%34,066 15 Pay for Commissioning lndustrial 1 t3L,254 83o/o 108,940 89%96,957 15 2 13L,254 83%108,940 89%96,957 15 3 13L,254 83%108,940 89%96,957 15 720 5W Washington Street Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 Rocky Mountain Power Exhibit No. 2 Page 9 of 31 Case No. PAC-E-14-08 \Mtness: Kathryn C. Hymas Table 8. lD Three-Year Business Plan: Annualsavings by Measure Type for Commercial Measures Food Service 1 50,247 toL%50,749 67%34,002 L2 2 50,853 tot%5L,372 67%34,4L9 L2 3 61,368 t0L%61,982 67%4L,528 t2 HVAC L 35,802 toL%35,150 67%24,227 L2 2 37,554 LOL%37,929 67%25,413 L2 3 39,622 LOL%40,018 67%26,8L2 L2 Table 9. lD Three-Year Business Plan: AnnualSavings by lndustrial Measure Category Compressed Air 1 20,000 83%15,600 89%L4,774 15 2 20,000 83Y"16,600 89%L4,774 15 3 20,000 83%16,600 89o/o L4,774 15 Potato Storage Fan VFD L 31,000 83%25,730 89%22,900 15 2 31,000 83%25,730 89%22,900 15 3 31,000 83%25,730 89%22,900 15 Adaptive Refrigeration Control 1 28,000 83%23,240 89%20,684 15 2 40,000 83%33,200 89%29,548 15 3 46,000 83Yo 38,180 89%33,980 15 Fast Acting Door 1 32,000 83%26,560 890/,23,638 15 2 32,000 83%26,560 89%23,638 15 3 32,000 83%26,560 89%23,638 15 End Use Compressed Air Reduction 1 10,000 83%8,300 89%7,387 10 2 10,000 83o/o 8,300 89%7,387 10 3 10,000 83%8,300 89%7,387 10 Wastewater Mixing - Grid Bee 1 80,000 83%66,400 89%s9,096 15 2 80,000 83%66,400 89%59,096 15 3 80,000 83Y"66,400 89%s9,096 15 720 SW Washington Street Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 Rocky Mountain Power Exhibit No. 2 Page 10 of 31 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas The following tables present the cost effectiveness results. Table 11 presents the three year summary of the benefit cost ratios for each of the categories. Tables 12-71 present the individual cost benefit analysis for each category by year and in total. All values in Tables L2-7L are shown in 2015 dollars. t PacifiCorp is proposing increased incentives and outreach costs forthe Increase EF and Agriculture System Re- design programs. The increased incentive applies to all participants, including those whose savings is reflected in the Business-as-Usual scenario. As a consequence, the increased incentive and outreach costs are disproportionately higher than the utility specific savings on an incremental basis. This results in a UCT less than 1.0. This result is not indicative of the cost effectiveness of the programs in their entirety. 2 See footnote I 720 SW Washington Street Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 Table 10. lD Three-Year Business Plan: AnnualSavings by Small Business Table 11. !D Three-Year Business PIan: Benefit/Cost Ratios by Measure Category Business-as-Usual 1.69 L.54 2.97 0.73 2.27 lncrease EFl 2.78 2.53 0.72 0.43 6.76 Agriculture System Re-designz 1.41 t.28 0.82 0.43 3.27 Energy Management Offer 0.89 0.81 1.01 0.49 3.2L Pay for Commissioning 2.58 2.35 4.13 0.85 3.07 Commercial Food Service 10.83 9.85 15.50 o.79 0.00 Commercial HVAC r.27 1.15 2.s0 0.63 1.86 lndustrial Compressed Air L.64 L.49 2.55 0.81 2.0t lndustrial Potato Storage Fan VFD 1.80 1.63 2.55 0.81 2.27 lndustrial Adaptive Refrigeration Control 1.56 L-42 2.6s 0.83 1.85 lndustrial Fast Acting Door t.t4 1.04 2.55 0.81 L.29 lndustrial End Use Compressed Air Reduction 1.55 t.4L 1.83 0.71 2.3t lndustrial Wastewater Mixing - Grid Bee 1.40 L.28 2.55 0.81 1.55 Small Business t.24 1.13 L.23 0.s0 2.55 Business Plan Portfolio 1.61 1.46 2.37 0.69 2.?t Rocky Mountain Power Exhibit No. 2 Page 11 of 31 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas Table L2.aD Three-Year Business Plan: Portfolio Cost-Effectiveness 2015 Total Resource CostTest (PTRC) + Conservation Adder So.oso S2,520,935 54,022,318 S1,501,383 1.60 Total Resource CostTest (TRC) No Adder So.oso s2,520,935 S3,G50,G53 s1,135,718 1.45 Utility Cost Test (UCT)s0.o2e 5L,475,377 s3,6s6,6s3 s2,L81,276 2.48 Rate lmpact Test (RlM)5s,3zz,L7B S3,656,6s3 (s1,665,525)0.59 Participant Cost Test (PCT)s2,605,057 S5,867,669 53,262,6LL 2.25 Discounted Participant Payback (years)3.00 Lifecycle Revenue lmpact (s/KWh)s0.00004791 Table 13. lD Three-Year Business Plan: Portfolio Cost-Effectiveness 2016 Total Resource CostTest (PTRC) + Conservation Adder So.osz S2,665,094 54,2G9,380 S1,G04,286 1.60 Total Resource CostTest (TRC) No Adder So.osz s2,655,094 S3,881,255 s1,215,151 L.46 Utility Cost Test (UCT)So.032 S1,G55,340 S3,881,2ss 52,225,9L5 2.34 Rate lmpact Test (RlM)S5,G91,625 s3,881,255 (s1,810,370)0.68 Participant Cost Test (PCT)S2,668,565 s6,162,495 S3,493,930 2.3L Discounted Participant Payback (years)3.77 Lifecycle Revenue lmpact (s/KWh)s0.0000s009 Table 14. lD Three-Year Business Plan: Portfolio Cost-Effectiveness 2017 Total Resource Cost Test (PTRC) + Conservation Adder So.os3 $2,743,863 s4,48s,8ss 5L,142,036 1.63 Total Resource CostTest (TRC) No Adder So.oss 52,743,863 s4,078,090 5L,334,221 L.49 Utility Cost Test (UCT)So.osq St,7G6,zo5 54,078,090 S2,311,885 2.3L Rate lmpact Test (RlM)ss,932,859 54,078,090 (51,8s4,769)0.59 Participant Cost Test (PCT)52,692,444 s6,3s2,309 s3,659,855 2.36 Discounted Participant Payback (years)4.58 Lifecycle Revenue lmpact (s/KWh)s0.000049s3 720 SW Suite 400 Portland, OR 97205 Voice: 503.467.71 00 Fax: 503.228.3696 11 Rocky Mountain Power Exhibit No. 2Page 12 oI31 Case No. PAC-E-14-08 VMtness: Kathryn C. Hymas Table 15. lD Three-Year Business Plan: Portfolio Cost-Effectiveness 20t5-20t7 Total Resource CostTest (PTRC) + Conservation Adder So.os1 57,929,992 5L2,177,597 54,847,705 1.61 Total Resource CostTest (TRC) No Adder So.osr 57,929,892 S11,615,997 S3,686,10s L.46 Utility Cost Test (Ufi)So.osz 54,896,922 S11,G15,997 56,7L9,07s 2.37 Rate lmpact Test (RlM)5L6,945,562 s11,61s,997 (s5,330,665)0.69 Participant Cost Test (PCT)57,966,067 5L8,382,473 s10,416,406 2.37 Discounted Participant Payback (years)3.82 Lifecycle Revenue lmpact (s/KWh)s0.0001423s Table 16. lD Three-Year Business Plan: Business-as-Usua! Cost-Effectiveness 2015 Total Resource Cost Test (PTRC) + Conservation Adder so.04s 52,Ls4,87o 53,49s,3L2 sL,340,443 L.52 Total Resource Cost Test (TRC) No Adder s0.049 52,Ls4,870 53,L77,557 $L,O22,687 7.47 Utility Cost Test (UCT)So.02s $L,L14,3G7 53,L77,557 S2,063,190 2.85 Rate lmpact Test (RlM)s4,459,805 53,L17,ss7 .sL,292,2491 o.77 Participant Cost Test (PCT)52,325,3Lt Ss,060,153 S2,733,8s3 2.18 Discounted Participant Payback (years)3.37 Lifecycle Revenue lmpact (s/KWh)s0.00004297 Table 17. tD Three-Year Business Plan: Business-as-UsualCost-Effectiveness 2015 Total Resource CostTest (PTRC) + Conservation Adder So.oas S2,016,120 s3,409,603 S1,393,483 1.69 Total Resource CostTest (TRC) No Adder So.o+s 52,oL6,t2o s3,099,639 S1,083,s19 L.54 Utility Cost Test (UCl')So.02s 5L,o42,6L4 s3,099,539 s2,0s7,ozs 2.97 Rate lmpact Test (RlM)54,24t,649 s3,099,639 (s1,142,010)0.73 Participant Cost Test (PCT)52,L76,522 s4,810,333 S2,633,811 2.2L Discounted Participant Payback (years)4.30 Lifecycle Revenue lmpact (s/KWh)s0.00003s99 720 SW Washington Street suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 L2 Rocky Mountain Power Exhibit No. 2 Page 13 of 31 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas Table 18. lD Three-Year Business Plan: Business-as-Usual Cost-Effectiveness 2017 Total Resource CostTest (PTRC) + Conservation Adder s0.049 s1,886,305 53,346,069 s1,459,765 L.7'1 Total Resource CostTest (TRC) No Adder So.o49 s1,996,305 s3,041,891 S1,155,576 1.61 Utility Cost Test (Ufi)So.02s s97s,482 s3,041,881 s2,066,400 3.L2 Rate lmpact Test (RlM)$4,025,402 s3,041,981 (s983,521)o.76 Participant Cost Test (PCT)52,036,379 s4,s73,047 s2,s35,668 2.25 Discounted Participant Payback (years)s.23 Lifecycle Revenue lmpact (s/KWh)s0.000029s4 Table 19. tD Three-Year Business Plan: Business-as-Usual Cost-Effectiveness 2OL5-2OL7 Total Resource Cost Test (PTRC) + Conservation Adder 50.049 S6,057,295 s10,250,985 s4,193,690 1.69 Total Resource Cost Test (TRC) No Adder So.oas S6,0s7,29s 59,319,077 53,26L,782 1.54 Utility Cost Test (Ufi)s0.02s S3,132,463 $9,319,077 s5,186,614 2.97 Rate lmpact Test (RlM)SLz,73G,8sl 59,319,077 1s3,4L7,780)o.73 Participant Cost Test (PCT)56,539,212 514,443,s44 s7,904,332 2.27 Discounted Participant Payback (years)4.28 Lifecycle Revenue lmpact (s/KWh)So.ooo1o26s Table 20. lD lncrease EF Cost-Effectiveness 2015 Total Resource CostTest (PTRC) + Conservation Adder So.031 s20,353 ss4,806 s34,453 2.59 Total Resource CostTest (TRC) No Adder So.oar s20,353 549,824 s29,47].?.45 Utility Cost Test (UCT)So.rog s71,183 549,824 (s21,359)0.70 Rate lmpact Test (RlM)S118,102 549,824 (s68,278)o.42 Participant Cost Test (PCT)S17,803 S119,393 S101,s89 6.77 Discounted Participant Payback (years)0.2s Lifecycle Revenue lmpact (s/KWh)50.00000195 720 SW Washington Street suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax:503.228.3696 13 Rocky Mountain Power Exhibit No. 2Page 14 o13'l Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas Table 21..aD lngease EF Cost-Effectiveness 2016 Total Resource Cost Test (PTRC) + Conservation Adder s0.031 s19,043 552,976 S33,933 2.78 Total Resource Cost Test (TRC) No Adder So.osr s19,043 S48,160 s29,tL7 2.53 Utility Cost Test (UCT)So.rog s65,600 S48,160 (Sra,a+01 o.72 Rate lmpact Test (RlM)s111,331 s48,160 (s63,172)0.43 Participant Cost Test (PCT)s16,657 s1t2,542 s95,985 6.76 Discounted Participant Payback (years)t.25 Lifecycle Revenue lmpact (s/KWh)s0.0000017s Table 22.|D lncrease EF Cost-Effectiveness 2017 Total Resource CostTest (PTRC) + Conservation Adder so.o31 sL7,8t5 SsL,432 S33,615 2.89 Total Resource CostTest (TRC) No Adder So.osr s17,816 546,757 s28,940 2.62 Utility Cost Test (UCT)So.rog s62,3t2 s46,757 (s15,555)o.75 Rate lmpact Test (RlM)s104,9s8 546,7s7 (ss8,202)0.45 Participant Cost Test (PCT)s15,584 S106,283 Sgo,ogs 6.82 Discounted Participant Payback (years)2.25 Lifecycle Revenue lmpact (s/KWh)s0.000001ss Table 23. lD Increase EF Cost-Effectiveness 2OL5-20t7 Total Resource CostTest (PTRC) + Conservation Adder So.osr 557,2L2 SLsg,2t4 s1o2,oo2 2.78 Total Resource CostTest (TRC) No Adder so.031 5s7,zLz 5L44,740 s87,528 2.s3 Utility Cost Test (Ufi)So.rog s2oo,095 S:+q,tqo (S55,354)o.72 Rate lmpact Test (RlM)s334,392 sL44,740 (s189,651)0.43 Participant Cost Test (PCT)S5o,o44 s338,317 s288,273 6.76 Discounted Participant Payback (years)0.25 Lifecycle Revenue lmpact (s/KWh)s0.00000s06 720 SW Washington Street Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 L4 Rocky Mounlain Power Exhibit No. 2 Page 15 of 31 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas Table 24.1D lncrease Agriculture System Re-design Cost-Effectiveness 2015 Total Resource CostTest (PTRC) + Conservation Adder So.oor s49,021 s65,248 5L6,227 1.33 Total Resource Cost Test (TRC) No Adder So.051 S49,021 s59,317 s10,295 t.zt Utility Cost Test (UCT)s0.096 s76,704 ssg,gtz (s17,388)o.77 Rate lmpact Test (RlM)S145,899 s59,317 (Sae,sss1 0.41 Participant Cost Test (PCT)s44,116 st43,LL4 s98,998 3.24 Discounted Participant Payback (years)0.55 Lifecycle Revenue lmpact (s/KWh)s0.00000430 Table 25. lD lncrease Agriculture System Re-design Cost-Effectiveness 2016 Total Resource CostTest (PTRC) + Conservation Adder So.oor 545,865 564,769 s18,904 t.4L Total Resource CostTest (TRC) No Adder so.051 s45,855 Ss8,881 S13,o1G L.28 Utility Cost Test (UCI)s0.0s6 571,765 Ss8,881 (s12,88s)0.82 Rate lmpact Test (RlM)s137,735 s58,881 (s78,854)0.43 Participant Cost Test (PCT)S4L,27s sL35,222 s93,945 3.28 Discounted Participant Payback (years)1.54 Liferycle Revenue lmpact (s/KWh)s0.000003s3 Table 26.|D lncrease Agriculture System Re-design Cost-Effectiveness 2017 Total Resource CostTest (PTRC) + Conservation Adder s0.061 54z,9Lz s63,998 s21,086 L.49 Total Resource Cost Test (TRC) No Adder s0.061 542,9L2 s58,180 s15,258 1.36 Utility Cost Test (UCl')s0.096 567,L44 ss8,180 (S8,965)0.87 Rate lmpact Test (RlM)S130,039 s58,180 (s71,859)0.45 Participant Cost Test (PCT)s38,618 5L27,776 S89,1s8 3.31 Discounted Participant Payback (years)2.54 Lifecycle Revenue lmpact (s/KWh)s0.00000294 720 SW Washington Street Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 15 Rocky Mountain Power Exhibit No. 2 Page 16 of 31 Case No. PAC-E-14-08 \Mtness: Kathryn C. Hymas Table 27.lD lncrease Agriculture System Re-design Cost-Effectiveness 2OL5-20L7 Total Resource CostTest (PTRC) + Conservation Adder So.oor 5t37,798 S194,01s Ss6,216 L.4L Total Resource CostTest (TRC) No Adder So.osr sL37,798 s176,377 s38,s79 L.28 Utility Cost Test (UCT)so.0e5 s215,614 s176,377 (S39,237)0.82 Rate lmpact Test (RlM)s4t3,673 sL76,377 (s237,2951 0.43 Participant Cost Test (PCT)S124,ooe s406,111 5282,L02 3.27 Discounted Participant Payback (years)0.55 Lifecycle Revenue lmpact (s/KWh)s0.00000970 Table 28. lD Energy Management Offer Cost-Effectiveness 2015 Total Resource Cost Test (PTRC) + Conservation Adder So.ozs s27,694 525,794 (s1,900)0.93 Total Resource CostTest (TRC) No Adder s0.073 527,694 523,449 (54,24s)0.8s Utility Cost Test (UCT)so.os7 s21,s16 s23,449 s1,933 1.09 Rate lmpact Test (RlM)s46,184 523,449 lSzz,tl+1 0.51 Participant Cost Test (PCT)Sg,szs S30,148 s20,223 3.04 Discounted Participant Payback (years)0.80 Lifecycle Revenue lmpact (s/KWh)s0.00000149 Table 29. lD Energy Management Offer Cost-Effectiveness 2015 Total Resource CostTest (PTRC) + Conservation Adder So.o78 s59,690 ss3,644 (So,oao1 0.90 Total Resource CostTest (TRC) No Adder So.o78 s59,590 s48,767 (s10,923)0.82 Utility Cost Test (UCT)So.062 547,769 $48,767 Sggg L.O2 Rate lmpact Test (RlM)s98,809 s48,767 (Sso,041)0.49 Participant Cost Test (PCT)s19,579 s62,37s s42,8oo 3.19 Discounted Participant Payback (years)L.77 Lifecycle Revenue lmpact (s/KWh)So.ooooo399 720 SW Washington Street Suite 4oo Portland, OR 97205 Voice: 503.467.7100 Fax:503.228.3696 16 Rocky Mountain Power Exhibit No. 2 Page 17 ot 31 Case No. PAC-E-14-08 VMtness: Kathryn C. Hymas Table 30. lD Energy Management Offer Cost-Effectiveness 2017 Total Resource CostTest (PTRC) + Conservation Adder So.oar s111,114 s98,209 (s12,905)0.88 Total Resource CostTest (TRC) No Adder So.osr S111,114 S89,281 (s21,833)0.80 Utility Cost Test (UCI)So.066 s90,353 s89,281 (S1,072)0.99 Rate lmpact Test (RlM)5L8z,7Lz s89,281 (s93,432)0.49 Participant Cost Test (PCT)s34,s28 Su2,878 s78,350 3.27 Discounted Pa rticipant Payback (years)2.75 Lifecycle Revenue lmpact (s/KWh)s0.00000614 Table 31. lD Energy Management Offer Cost-Effectiveness 2OL5-20L7 Total Resource CostTest (PTRC) + Conservation Adder So.ozg S198,498 5177,647 (S20,851)0.89 Total Resource Cost Test (TRC) No Adder s0.079 s198,498 5L6L,497 (S37,001)0.81 Utility Cost Test (UCT)s0.053 s159,538 s16L,497 S1,860 1.01 Rate lmpact Test (RlM)s327,705 sL6L,497 (s166,207)0.49 Participant Cost Test (PCT)s64,032 s20s,40s 5L41,373 3.27 Discounted Participant Payback (years)0.80 Lifecycle Revenue lmpact ($/KWh)s0,00001093 Table 32. lD Pay for Commissioning Cost-Effectiveness 2015 Total Resource CostTest (PTRC) + Conservation Adder So.oss 546,ss8 Su6,333 559,774 2.s0 Total Resource CostTest (TRC) No Adder s0.033 s46,ss8 s10s,7s7 s59,199 2.27 UtiliW Cost Test (UCT)s0.019 526,487 S1os,7s7 s79,27O 3.99 Rate lmpact Test (RlM)5L26,O77 s105,757 (s20,320)0.84 Participant Cost Test (PCT)s43,091 s130,179 s87,088 3.02 Discounted Participant Payback (years)2.53 Lifecycle Revenue lmpact (s/KWh)s0.000000s8 720 5W Washington Street suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax:503.228.3696 77 Rocky Mountain Power Exhibit No. 2 Page 18 of 31 Case No. PAC-E-14-08 \Mtness: Kathryn C. Hymas Table 33. !D Pay for Commissioning Cost-Effectiveness 2016 Total Resource CostTest (PTRC) + Conservation Adder So.o33 S43,561 SLtz,448 s68,887 2.58 Total Resource Cost Test (TRC) No Adder so.o33 s43,s61 5Lo2,zzs Ss8,65s 2.35 Utility Cost Test (Ufi)so.01s 524,781 5t02,225 577,444 4.L3 Rate lmpact Test (RlM)s119,730 5t02,225 (s17,504)0.8s Participant Cost Test (PCT)s40,315 5123,786 s83,470 3.07 Discounted Participant Payback (years)3.48 Lifecycle Revenue lmpact (s/KWh)s0.00000048 Table 34. lD Pay for Commissioning Cost-Effectiveness2OtT Total Resource CostTest (PTRC) + Conservation Adder s0.033 s40,7s6 s109,171 s68,415 2.68 Total Resource CostTest (TRC) No Adder $o.ose s40,756 s99,245 ss8,491 2.44 Utility Cost Test (UCT)So.o19 s23,185 s99,246 s76,051 4.28 Rate lmpact Test (RlM)s113,708 599,246 (S14,462)0.87 Participant Cost Test (PCT)s37,720 5tL7,712 s79,992 3.12 Discounted Participant Payback (years)4.43 Lifecycle Revenue lmpact (s/KWh)s0.00000039 Table 35. !D Pay for Commissioning Cost-Effectiveness2OLS-2OL7 Total Resource Cost Test (PTRC) + Conservation Adder so.o33 S130,87s s337,9s2 5207,077 2.58 Total Resource Cost Test (TRC) No Adder s0.033 S130,87s 5307,229 s176,3s4 2.3s Utility Cost Test (UCI)so.o1s 574,454 5307,229 5232,77s 4.13 Rate lmpact Test (RlM)s359,515 $3O7,229 .552,2871 0.85 Participant Cost Test (PCT)Stzt,tzt 537L,576 s250,549 3.07 Discounted Participant Payback (years)3.46 Lifecycle Revenue lmpact (s/KWh)s0.00000140 720 SW Washington Street Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 18 Rocky Mountain Power Exhibit No. 2 Page 19 of 31 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Table 36. lD Commercial Food Service Cost-Effectiveness 2015 Total Resource CostTest (PTRC) + Conservation Adder s0.001 s216 szs,746 s25,530 tLg.34 Total Resource CostTest (TRC) No Adder So.oor Szre s23,405 S23,190 108.49 Utility Cost Test (UCT)so.oo3 Sg+g s23,405 s22,457 24.66 Rate lmpact Test (RlM)s29,635 s23,405 (56,229)o.79 Participant Cost Test (PCT)(S4,u8)s40,749 s44,927 0.00 Discounted Participant Payback (years)N/A Lifecycle Revenue lmpact (s/KWh)s0.00000021 Table 37. lD Commercial Food Service Cost-Effectiveness 2016 Total Resource Cost Test (PTRC) + Conservation Adder So.oo1 Sszs S2s,5oo 52s,222 67.8L Total Resource Cost Test (TRC) No Adder So.oor Sszs 523,272 522,8es 61.65 Utility Cost Test (UCf)So.oo3 Sszo 523,272 s22,296 23.85 Rate lmpact Test (RlM)s28,560 s23,272 (Ss,388)0.81 Participant Cost Test (PCT)(S3,698)s39,440 S43,138 0.00 Discounted Participant Payback (years)N/A Lifecycle Revenue lmpact (s/KWh)s0.00000017 Table 38. !D Commercial Food Service Cost-Effectiveness 2017 Total Resource CostTest (PTRC) + Conservation Adder So.ozo S6,sos s29,899 s22,994 4.33 Total Resource CostTest (TRC) No Adder So.ozo S5,eos 527,!8L s20,275 3.94 Utility Cost Test (UCT)So.oo8 S2,8u s27,tgL s24,370 9.67 Rate lmpact Test (RlM)s34,555 527,L8t ls7,47sl 0.78 Participant Cost Test (PCT)S5,496 547,L17 s41,622 8.57 Discounted Participant Payback (years)3.L7 Lifecycle Revenue lmpact (s/KWh)s0.00000022 720 SW Washington Street Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 Rocky Mountain Power Exhibit No. 2 Page 20 ot 3'l Case No. PAC-E-'14-08 Vvitness: Kathryn C. Hymas Table 39. lD Commercial Food Service Cost-Effectiveness 2OL5-2OL7 Total Resource CostTest (PTRC) + Conservation Adder s0.008 s7,498 581,244 s73,746 10.83 Total Resource CostTest (TRC) No Adder So.oos s7,498 S73,8ss s66,360 9.85 Utility Cost Test (UCT)So.oos 54,736 s73.8s9 s69,123 15.60 Rate lmpact Test (RlM)Se2,sso S73,8se (S19,092)o.79 Participant Cost Test (PCT)(s2,381)sL27,306 sL29,687 0.00 Discounted Participant Payback (years)N/A Lifecycle Revenue lmpact (s/KWh)s0.000000s7 Table 40. lD Commercial HVAC Cost-Effectiveness 2015 Total Resource CostTest (PTRC) + Conservation Adder So.oes s15,o8o S18,34s s3,264 L.22 Total Resource CostTest (TRC) No Adder So.o66 s15,080 s16,677 s1,597 L.17 UtiliW Cost Test (UCT)So.o30 s6,843 s16,677 s9,834 2.44 Rate lmpact Test (RlM)527,282 516,677 (s10,605)0.51 Participant Cost Test (PCT)S1s,3o2 S3s,2o1 S1s,8ee t.82 Discounted Participant Payback (years)4.9t Lifecycle Revenue lmpact (s/KWh)s0.0000003s Table 41. lD Commercial HVAC Cost-Effectiveness 2016 Total Resource CostTest (PTRC) + Conservation Adder So.ooo S14,807 s18,901 s4,094 L.28 Total Resource CostTest (TRC) No Adder So.oeo Sra,soz s17,183 52,376 L.L6 Utility Cost Test (UCT)So.o30 S6,842 S17,183 s10,34o 2.57 Rate lmpact Test (RlM)527,282 S17,183 (s10,100)0.63 Participant Cost Test (PCT)S18,954 $35,242 s16,288 1.86 Discounted Participant Payback (years)5.76 Lifecycle Revenue lmpact (s/KWh)s0.00000032 720 5W Washington Street Suite 4oo Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 20 Rocky Mountain Power Exhibit No. 2 Page 21 ot 31 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas Table 42.|D Commercial HVAC Cost-Effectiveness 2017 Total Resource CostTest (PTRC) + Conservation Adder s0.066 S14,631 s19,304 54,573 1.32 Total Resource CostTest (TRC) No Adder So.056 S14,631 Srz,s+g S2,918 7.20 Utility Cost Test (UCr)So.osr S6,8s8 5L7,s49 s10,5s1 2.54 Rate lmpact Test (RlM)s27,459 s17,549 (Ss,e10)0.54 Participant Cost Test (PCT)518,731 S3s,s04 sL6,773 1.90 Discounted Participant Payback (years)6.62 Lifecycle Revenue lmpact (s/KWh)s0.00000030 Table 43. lD Commercial HVAC Cost-Effectiveness 2OL5-2OL7 Total Resource CostTest (PTRC) + Conservation Adder s0.066 s44,518 Ss6,sso S12,031 L.27 Total Resource Cost Test (TRC) No Adder So.065 S44.s18 s51,409 s6,890 1.15 Utility Cost Test (UCT)So.o3o s20,s84 Ss1,4o9 s30,825 2.50 Rate lmpact Test (RlM)S82,023 Ss1,4o9 (S30,515)0.63 Participant Cost Test (PCT)s56,987 s105,947 s48,961 1.85 Discounted Participant Payback (years)5.78 Lifecycle Revenue lmpact (s/KWh)s0.00000092 Table 44. lD lndustrial Compressed Air Cost-Effectiveness 2015 Total Resource CostTest (PTRC) + Conservation Adder so.0s3 s8,226 s13,016 54,790 1.58 Total Resource CostTest (TRC) No Adder s0.0s3 58,226 s11,833 s3,507 L.44 UtiliW Cost Test (UCT)So.031 s4,800 S11,833 S7,033 2.47 Rate lmpact Test (RlM)s14,840 s11,833 (Se,ooa1 0.80 Participant Cost Test (PCT)St,zzo s14,281 s7,061 1.98 Discounted Participant Payback (years)4.45 Lifecycle Revenue lmpact (s/KWh)s0.00000009 720 SW Washington Street Suite 4oo Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 2t Rocky Mountain Power Exhibit No. 2 Page 22 ot 3'l Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas Table 45. lD lndustria! Compressed Air Cost-Effectiveness 2016 Total Resource CostTest (PTRC) + Conservation Adder So.os:s7,696 s12,s81 S4,885 1.63 Total Resource CostTest (TRC) No Adder So.os3 57,696 s11,438 53,74L L.49 Utility Cost Test (UCf)So.031 s4,491 s11,438 56,947 2.55 Rate lmpact Test (RlM)s14,063 s11,438 (s2,6261 0.81 Participant Cost Test (PCT)s5,755 s13.s62 s5,807 2.0L Discounted Participant Payback (years)5.36 Lifecycle Revenue lmpact (s/KWh)s0.00000007 Table 46. lD lndustria! Compressed Air Cost-Effectiveness2OLT Total Resource CostTest (PTRC) + Conservation Adder s0.0s3 s7,2O7 5L2,2t5 s5,014 L.70 Total Resource Cost Test (TRC) No Adder so.os3 s7,zot s11,104 s3,904 1.54 Utility Cost Test (UCr)So.osr s4,202 s11,104 s5,902 2.64 Rate lmpact Test (RlM)s13,328 s11,104 (s2,2241 0.83 Participant Cost Test (PCT)S6,320 s12,880 So,soo 2.O4 Discounted Participant Payback (years)6.27 Lifecycle Revenue lmpact (s/KWh)s0.00000006 Table 47. aD lndustrial Compressed Air Cost-Effectiveness 2OL5-2OL7 Total Resource CostTest (PTRC) + Conservation Adder s0.0s3 s23,L23 537,8t2 s14,689 L.64 Total Resource CostTest (TRC) No Adder s0.0s3 $23,L23 534,37s iLL,252 L.49 Utility Cost Test (UCT)So.031 S13,493 s34,37s s20,882 2.55 Rate lmpact Test (RlM)s42,232 S34.37s (s7,8s7)0.81 Participant Cost Test (PCT)520,295 s4O,724 520,429 2.01 Discounted Participant Payback (years)5.35 Lifecycle Revenue lmpact (s/KWh)s0.00000021 720 SW Suite 400 Portland, OR 97205 Voice: 503.467.71 00 Fax: 503.228.3696 22 Rocky Mountain Power Exhibit No. 2 Page 23 o131 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas Table 48. lD lndustrial Potato Storage Fan VFD Cost-Effectiveness 2015 Total Resource CostTest (PTRC) + Conservation Adder So.oas s11.501 s20,175 S8,s74 L.74 Total Resource CostTest (TRC) No Adder So.o48 s11,601 s18,341 s6,740 1.58 Utility Cost Test (UCT)so.031 s7,44O s18,341 s10,901 2.47 Rate lmpact Test (RlM)s23,003 s18,341 (54,662)0.80 Participant Cost Test (PCT)$9,900 522,L36 sLz,236 2.24 Discounted Participant Payback (years)3.50 Lifecycle Revenue lmpact (s/KWh)so.0oooo013 Table 49. lD lndustrial Potato Storage Fan VFD Cost-Effectiveness 2015 Total Resource CostTest (PTRC) + Conservatlon Adder So.oqs s10,854 s19,501 s8,647 1.80 Total Resource CostTest (TRC) No Adder So.oaa s10,854 sL7,728 56,874 1.63 Utility Cost Test (UCT)So.oar s5,961 sL7,728 iLO,767 2.55 Rate lmpact Test (RlM)52t,798 5L7,728 (S4,o7o)0.81 Participant Cost Test (PCT)s9,263 SzL,o22 s11,759 2.27 Discounted Participant Payback (years)4.43 Lifecycle Revenue lmpact (s/KWh)s0.00000011 Table 50. lD lndustrial Potato Storage Fan VFD Cost-Effectiveness 2017 Total Resource CostTest (PTRC) + Conservation Adder So.oqa s10,155 s18,933 58,778 1.85 Total Resource CostTest (TRC) No Adder So.oqs s10,155 SL7,zLz s7,056 1.69 Utility Cost Test (UCT)So.osr So,srs SL7,zLz s10,699 2.64 Rate lmpact Test (RlM)s20,558 5L7,2tz (.s3,4471 0.83 Participant Cost Test (PCT)s8,556 s19,964 s11,298 2.30 Discounted Participant Payback (years)s.36 Lifecycle Revenue lmpact (s/KWh)So.ooooooog 720 SW Suite 400 Portland, OR 97205 Voice: 503.467.71 00 Fax: 503.228.3696 23 Rocky Mountain Power Exhibit No. 2 Page 24 ol 31 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Table 51. lD lndustrial Potato Storage Fan VFD Cost-Effectiveness 2OL5-2OL7 Total Resource CostTest (PTRC) + Conservation Adder So.oaa s32,510 Ss8,6oe s2s.998 1.80 Total Resource CostTest (TRC) No Adder s0.048 S32,610 s53,281 s2O,67O 1.63 Utility Cost Test (Ufi)So.031 s20,914 s53,281 s32,367 2.55 Rate lmpact Test (RlM)s55,459 Ss3,281 l5L2,L79l 0.81 Participant Cost Test (PCT)s27,829 563,L22 535,293 2.27 Discounted Participant Payback (years)4.4L Lifecycle Revenue lmpact (s/KWh)s0.00000033 Table 52. ID lndustrialAdaptive Refrigeration Control Cost-Effectiveness 2015 Total Resource CostTest (PTRC) + Conservation Adder So.oso s10,885 sLB,222 s7,335 L.67 Total Resource CostTest (TRC) No Adder So.oso s10,885 s16,555 s5,680 L.52 Utility Cost Test (UCT)So.029 s6,420 s16,555 s10,146 2.58 Rate lmpact Test (RlM)520,477 s16,555 (s3,911)0.81 Participant Cost Test (PCT)s9,400 S19,694 s10,294 2.r0 Discounted Participant Payback (years)4.L7 Lifecycle Revenue lmpact (s/KWh)s0.00000011 Table 53. lD lndustrialAdaptive Refrigeration Control Cost-Effectiveness 2016 Total Resource Cost Test (PTRC) + Conservation Adder s0.0s7 s16,525 s25,153 s8,538 L.52 Total Resource Cost Test (TRC) No Adder s0.0s7 s16,525 s22,875 S6,3so 1.38 UtiliW Cost Test (UCT)s0.030 s8,701 522,87s 5L4,174 2.63 Rate lmpact Test (RlM)527,846 s22,87s (S+,szr1 0.82 Participant Cost Test (PCT)5L4,783 525,844 s12,051 1.82 Discounted Participant Payback (years)5.33 Lifecycle Revenue lmpact (s/KWh)s0.00000014 720 SW Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax:503.228.3696 24 Rocky Mountain Power Exhibit No. 2 Page 25 ol 31 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Table 54. lD lndustrialAdaptive Refrigeration Control Cost-Effectiveness 2017 Total Resource CostTest (PTRC) + Conservation Adder So.os9 5L8,427 s28,094 s9,667 1.52 Total Resource CostTest (TRC) No Adder So.osg S$,qzt s25,540 S7,113 1.39 Utility Cost Test (UCI)So.oso s9,401 s25,540 S16,138 2.72 Rate lmpact Test (RlM)S30,392 S2s,s40 (s4,852)0.84 Participant Cost Test (PCT)516,632 529,362 512,730 L.77 Discounted Participant Payback (years)7.63 Lifecycle Revenue lmpact (s/KWh)s0.00000013 Table 55. !D lndustrialAdaptive Refrigeration ControlCost-Effectiveness 2OL5-20L7 Total Resource CostTest (PTRC) + Conservation Adder so.os6 s45,837 s7t,479 525,542 1.56 Total Resource Cost Test (TRC) No Adder So.oso Sas,sgz S64,981 Srg,uq L.42 Utility Cost Test (UCT)s0.030 s24,523 s64,981 S4o.4s8 2.65 Rate lmpact Test (RlM)5ts,tu S54,981 (s13,733)0.83 Participant Cost Test (PCT)S40,81s s7s,900 s3s,08s 1.85 Discounted Participant Payback (years)6.26 Lifecycle Revenue lmpact (s/KWh)s0.00000037 Table 56. !D lndustrial Fast Acting Door Cost-Effectiveness 2015 Total Resource Cost Test (PTRC) + Conservation Adder So.o76 S18,9oo 520,826 Sr,szo 1.10 Total Resource Cost Test (TRC) No Adder so.o76 S18,soo S18,932 s32 1.00 Utility Cost Test (UCI)So.osr s7,580 s18,932 sl,t,252 2.47 Rate lmpact Test (RlM)523,745 s18,932 (54,812)0.80 Participant Cost Test (PCT)S18,ooo s22,850 s4,8s0 7.27 Discounted Participant Payback (years)9.81 Lifecycle Revenue lmpact (S/KWh)s0.00000014 720 SW Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax:503.228.3696 25 Rocky Mountain Power Exhibit No. 2 Page 26 of 31 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Table 57. !D lndustrial Fast Acting Door Cost-Effectiveness 2016 Total Resource CostTest (PTRC) + Conservation Adder So.o75 s17,683 s20,130 52,447 L,L4 Total Resource CostTest (TRC) No Adder So.076 s17,583 s18,3oo Ssrz 1.03 Utility Cost Test (UCr)So.031 s7,195 s18,300 s11,115 2.55 Rate lmpact Test (RlM)522,50L s18,3oo (s4,201)0.81 Participant Cost Test (PCT)s15,841 52L,70O s4,8s9 t.29 Discounted Participant Payback (years)10.58 Lifecycle Revenue lmpact (s/KWh)s0.00000012 Table 58. lD lndustrial Fast Acting Door Cost-Effectiveness?:OLT Total Resource Cost Test (PTRC) + Conservation Adder so.o75 s16,s44 S19,544 s2,999 1.18 Total Resource Cost Test (TRC) No Adder s0.076 s16,544 5L7,767 sL,222 L.07 Utility Cost Test (UCr)s0.031 s6,723 5L7,767 s11,044 2.64 Rate lmpact Test (RlM)52L,325 5L7,757 (S3,558)0.83 Participant Cost Test (PCT)sLs,757 s20,608 s4,8s2 1.31 Discounted Participant Payback (years)11.36 Lifecycle Revenue lmpact (s/KWh)s0.00000010 Table 59. lD lndustrial Fast Acting Door Cost-Effectiveness2OLS-20L7 Total Resource CostTest (PTRC) + Conservation Adder s0.075 Ssg,rzs s50,499 57,372 L.L4 Total Resource CostTest (TRC) No Adder s0.075 ss3,128 ss4,999 5L,872 1.04 Utility Cost Test (UCT)s0.031 s21,588 s54,999 s33,411 2.s5 Rate lmpact Test (RlM)567,s71 Ss4,999 (s12,571)0.81 Participant Cost Test (PCT)s50,598 s65,158 s14,561 1.29 Discounted Participant Payback (years)10.58 Lifecycle Revenue lmpact (s/KWh)s0.00000034 720 SW Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 26 Rocky Mountain Power Exhibit No. 2 Page 27 ot 31 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Table 60. lD Industrial End Use Compressed Air Reduction Cost-Effectiveness 2015 Total Resource CostTest (PTRC) + Conservation Adder So.os2 S3,125 Sa,osz Sr.sgz 7.49 Total Resource Cost Test (TRC) No Adder So.os2 s3,125 54,234 s1,109 1.35 Utility Cost Test (UCT)So.oqo s2,400 54,234 s1,834 L.76 Rate lmpact Test (RlM)s6,t27 s4,234 (s1,893)0.69 Participant Cost Test (PCT)S2,soo Ss,587 S3,187 2.27 Discounted Participant Payback (years)1.99 Lifecycle Revenue lmpact (s/KWh)s0.00000007 Table 51. lD lndustria! End Use Compressed Air Reduction Cost-Effectiveness 2016 Total Resource CostTest (PTRC) + Conservation Adder So.os2 52,924 54,s23 Sr,sgs 1.55 Total Resource CostTest (TRC) No Adder so.os2 s2,924 s4,tL2 s1,188 L.4t Utility Cost Test (UCT)So.o+o s2,245 54,LL2 s1,856 1.83 Rate lmpact Test (RlM)S5,799 54,LLz (s1,687)0.71 Participant Cost Test (PCT)s2,339 Ss,396 Ss,osz 2.31 Discounted Participant Payback (years)2.95 Lifecycle Revenue lmpact (s/KWh)s0.00000006 Table 62. lD Industrial End Use Compressed Air Reduction Cost-Effectiveness 2017 Total Resource Cost Test (PTRC) + Conservation Adder so.0s2 s2,736 s4,408 5L,672 1.61 Total Resource Cost Test (TRC) No Adder So.os2 52,736 s4,007 5L,272 1.46 Utility Cost Test (UCI)So.o4o 52,101 s4,oo7 S1,s05 1.91 Rate lmpact Test (RlM)s5,488 s4,007 (s1,481)0.73 Participant Cost Test (PCT)s2,1gg S5,119 s2,931 2.34 Discounted Participant Payback (years)3.92 Lifecycle Revenue lmpact (s/KWh)s0.0000000s 720 SW Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax:503.228.3696 27 Rocky Mountain Power Exhibit No. 2 Page 28 ot 31 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas Table 63. lD lndustrial End Use Compressed Air Reduction Cost-EffectivenessZ,OLS-2OLT Total Resource CostTest (PTRC) + Conservation Adder s0.0s2 s8,784 s13,s88 s4,803 1.55 Total Resource CostTest (TRC) No Adder so.os2 s8,784 S12,3s3 S3,s68 t.4L Utility Cost Test (UCT)s0.040 Sa,tqa S12,3s3 Ss,ooo 1.83 Rate lmpact Test (RlM)SL7,4L4 s12,353 (S5,061)0.7L Participant Cost Test (PCT)s7,027 st6,2O2 59,L75 2.3L Discounted Participant Payback (years)2.97 Lifecycle Revenue lmpact (s/KWh)s0.00000017 Table 64. !D lndustrialWastewater Mixing Grid Bee Cost-Effectiveness 2015 Total Resource CostTest (PTRC) + Conservation Adder so.o52 s38,3s0 s52,064 5t3,714 1.36 Total Resource CostTest (TRC) No Adder so.o52 S38,3so s47,331 S8,s81 L.23 Utility Cost Test (UCT)s0.031 S19,2oo s47,331 S28,131 2.47 Rate lmpact Test (RlM)ss9,362 s47,331 (s12,031)0.80 Participant Cost Test (PCT)s3s,ooo Ss7,t2s s22,L25 1.53 Discounted Participant Payback (years)6.33 Lifecycle Revenue lmpact (s/KWh)s0.0000003s Table 65. lD lndustrialWastewater Mixing Grid Bee Cost-Effectiveness 2016 Total Resource CostTest (PTRC) + Conservation Adder So.062 s35,881 s50,325 5L4,445 L.40 Total Resource CostTest (TRC) No Adder So.062 S3s,881 s45,750 s9,870 L.28 Utility Cost Test (UCT)So.031 s17,954 S4s,7so s27,787 2.55 Rate lmpact Test (RlM)s55,253 s4s,7s0 (Sro,soal 0.81 Participant Cost Test (PCT)532,746 5s4,249 s21,503 1.65 Discounted Participant Payback (years)7.19 Lifecycle Revenue lmpact (s/KWh)s0.00000029 720 5W suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax:503.228.3696 28 Rocky Mountain Power Exhibit No. 2 Page 29 ot 31 Case No. PAC-E-I4-08 Vvitness: Kathryn C. Hymas Table 66. lD lndustrialWastewater Mixing Grid Bee Cost-Effectiveness 2017 Total Resource CostTest (PTRC) + Conservation Adder s0.062 s33,570 s48,8s9 s1s,288 L.46 Total Resource CostTest (TRC) No Adder So.ooz S33,s70 544,4L7 iLO,847 7.32 Utility Cost Test (UCI)So.osr s16,807 544,4L7 527,6LO 2.64 Rate lmpact Test (RlM)s53,312 s44,4L7 (S8,8ss)0.83 Participant Cost Test (PCT)s30,638 s51,521 s20,883 1.58 Discounted Participant Payback (years)8.06 Lifecycle Revenue lmpact (s/KWh)s0.00000024 Table 57. lD !ndustrialWastewater Mixing Grid Bee Cost-Effectiveness 2O15-20t7 Total Resource CostTest (PTRC) + Conservation Adder s0.062 S107,801 s151,248 $43,447 1.40 Total Resource CostTest (TRC) No Adder so.062 S107,801 S137,498 s29,697 7.28 Utility Cost Test (UCT)so.o31 Ssg,gzr s137,498 s83,527 2.55 Rate lmpact Test (RlM)sL68,927 s137,498 (S31,428)0.81 Participant Cost Test (PCT)ss8,384 s162,896 s64,511 1.66 Discounted Participant Payback (years)7.18 Lifecycle Revenue lmpact (s/KWh)s0.00000084 Table 68. !D Small Business Cost-Effectiveness 2015 Total Resource CostTest (PTRC) + Conservation Adder so.o7s 591,os4 59L,774 Stzo 1.01 Total Resource CostTest (TRC) No Adder So.07e s91,0s4 s83,431 (s7,523)0.92 Utility Cost Test (UCT)So.oz+S84,387 s83,431 (5ss7)0.99 Rate lmpact Test (RlM)S18G,o4o 583,431 (S103,209)0.45 Participant Cost Test (PCT)s56,668 s156,948 s100,280 2.so Discounted Participant Payback (years)1.10 Lifecycle Revenue lmpact (s/KWh)s0.00000343 720 SW Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 29 Rocky Mountain Power Exhibit No. 2 Page 30 of 31 Case No. PAC-E-14-08 VMtness: Kathryn C. Hymas Table 69. !D Small Business Cost-Effectiveness 2016 Total Resource CostTest (PTRC) + Conservation Adder So.oos 5327,287 s399,215 571,929 1.22 Total Resource CostTest (TRC) No Adder So.oos 5327,287 5362,924 s35,637 1.11 Utility Cost Test (UCl')So.oss 5299,664 s362,924 s63,260 t.2t Rate lmpact Test (RlM)s731.388 5362,924 (s358,464)0.50 Participant Cost Test (PCT)5276,234 s700,680 ;424,446 2.54 Discounted Participant Payback (years)2.08 Lifecycle Revenue lmpact (s/KWh)s0.00001161 Table 70. lD Small Business Cost-Effectiveness 2017 Total Resource CostTest (PTRC) + Conservation Adder So.osz S491,023 s635,765 5144,742 L.29 Total Resource CostTest (TRC) No Adder So.osz s491.023 ss77,969 S86,94s 1.18 Utility Cost Test (UCT)So.osr s448.s04 5577,969 5L29,464 t.29 Rate lmpact Test (RlM)S1,125,653 s577,969 (s547,585)0.51 Participant Cost Test (PCT)s42s,L87 s1,092,537 s557,3s0 2.57 Discounted Participant Payback (years)3.06 Lifecycle Revenue lmpact (s/KWh)s0.0000164s Table 71.1D Small Business Cost-Effectiveness 2OL5-2OL7 Total Resource CostTest (PTRC) + Conservation Adder So.osg S909,364 5L,L26,756 s2t7,39L t.24 Total Resource CostTest (TRC) No Adder s0.069 s909,364 sL,024,323 Su4,959 1.13 UtiliW Cost Test (UCT)So.oos s832,ss5 5L,O24,323 s191,768 1.23 Rate lmpact Test (RlM)s2,043,690 St,oz4,3z3 (s1,019,3s7)0,50 Participant Cost Test (PCT)S768,089 S1,9G0,165 $t,tg2,o7G 2.55 Discounted Participant Payback (years)1.98 Lifecycle Revenue lmpact (s/KWh)s0.00003052 720 SW Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax:503.228.3696 30 Rocky Mountain Power Exhibit No. 2 Page 31 of 31 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas 720 SW Washington Street Suite 400 Portland, OR 97205 Voice: 503.467.7100 Fax: 503.228.3696 31 Case No. PAC-E-14-08 Exhibit No. 3 Witness: Kathryn C. Hymas BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION ROCKY MOUNTAIN POWER Exhibit Accompanying Testimony of Kathryn C. Hymas Flexible Tariff Format - Change Process - Idaho August 2014 Rocky Mountain Power Exhibit No. 3 Page '1 of '1 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Exhibit 3 Rocky Mountain Power Flexible Tariff Format - Change Process - Idaho This process applies to specific program details managed outside of the program tariffsuch as:o Incentive tables . Program definitions r General incentive information Identify need for change . Incentive amounto Elieible eouioment Prepare program change proposal . Program details with marked changes r Explanation for changes o Cost effectiveness analysis (ifchanges impact cost efTectiveness) Provide proposal, supporting documents and request comments . Provide program change proposal . Request comments fiom Commission staff o Define comment period Review proposal, provide comments Request a meeting/call to discuss the proposal (if needed) . Incorporate comments as appropriate, prepare final program details and explanation for changes o Provide response to comments to Commission staff (lf no comments or all comments have been resolved the Company will proceed with the proposed changes) Post change notice on website . Post change notice on website including final program details with marked changes and explanation for changes o Communicate changes to Commission staffand others . Changes effective 45 days from posting date o lmolement chanses Receive final changes e Lrnk to notice on the website o Final program details with changes marked and explanation for changes . Response to any comments o Eff'ective date for chanses Case No. PAC-E-14-08 Exhibit No. 4 Witness: Kathryn C. Hymas BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION ROCKY MOUNTAIN POWER Exhibit Accompanying Testimony of Kathryn C. Hymas Electric Service Schedule 140 -Non-Residential Energy Efficiency August 2014 -ROCKYMOUNTAINxcPol tER \ ADlvTSloNOf mclHOOfiP I.P.U.C. No. I Rocky Mountain Power Exhibit No. 4 Page 1 oI27 Case No. PAC-E-14-08 VMlness: Kathryn C. Hymas Eleventh Revision of Sheet No. B.2 Canceling Tenth Revision of Sheet No. B.2 Schedule No. 23 23A 24 3l 34 35 35A 36 70 71 73 94 117 118 ELECTRIC SERVICE SCHEDULES - Continued Class of Service General Service - Small Power General Service - Small Power (Residential and Farm) Interruptible Power Service Partial Requirements Service - High Voltage Pacific Northwest Electric Power Planning and Conservation Act - Residential and Farm Kilowatt-Hour Credit Optional Time-of-Day General Service - Distribution Voltage Optional Time-of-Day General Service - Distribution Voltage (Farm) Optional Time of Day Residential Service Renewable Energy Rider - Optional Energy Exchange Pilot Program Renewable Energy Rider - Optional - Bulk Purchase Option Energy Cost Adjustment Residential Refrigerator Recycling Program Home Energy Saver Incentive Program (Continued) Sheet No. 23.1-23.3 234.1-234.4 24.1 - 24.s 31.r -3r.6 34.1 - 34.3 35.r - 35.3 35A.1 -35A.4 36.1 - 36.3 70.1 - 70.4 71.1 - 71.6 73.1-73.4 94.1 tt7.t - 117.2 il8.1 - 118.2 Submitted Under Case No. PAC-E-14-08 ISSUED: August 22,2014 EFFECTM: November 1, 201 4 I.P.U.C. No. I ROCKY MOUNTAIN POWER A OMSIOT{ Of PAOTlcOnP Rocky Mountain Power Exhibit No. 4 Page 2 ol 27 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas Fifth Revision of Sheet No. B.3 Canceling Fourth Revision of Sheet No. 8.3 Schedule No. ELECTRIC SERYICE SCHEDULES - Continued Class of Service Sheet No. 135.1 - 135.3 140.1 - r40.3 l9l 300.1 - 300.4 400.1 401.1 135 Net Metering Service 140 Non-Residential Energr Efficiency l9l Customer Efficiency Services Rate Adjustment 300 Regulation Charges 400 Special Contract 401 Special Contract Schedule numbers not listed are not currently used.* These schedules are not available to new customers or premises. Submitted Under Case No. PAC-E-14-08 ISSUED: August 22,2014 EFFECTM: November l, 2014 V,ROCKYMOUNTAINYPwyER\ A uvrsoil oF PActFEonP I.P.U.C. No. I Rocky Mountain Power Exhibit No. 4 Page 3 ot 27 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Original Sheet No. 140.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 140 STATE OF IDAHO Non-Residential Energy Elficiency PURPOSE: Service under this Schedule is intended to maximize the efficient utilization of the electricity requirements of new and existing loads in Non-residential Facilities through the installation of Energy Efficiency Measures and energy management protocols. Service under this Schedule is subject to funding availability. APPLICABLE: To service under the Company's General Service Schedules 6, 6A, 7, 7 A, 9, 10,12,19,23,23A,24,35 and 35A in all territory served by the Company in the State of ldaho. This Schedule is applicable to new and existing Non-residential Facilities and dairy barns served under the Company's residential rate schedules. CUSTOMER PARTICIPATION: Customer participation is voluntary and is initiated by following the participation procedures on the ldaho energy efliciency program section of the Company website, and available to customers without online access upon request. The Company shall have the right to qualiff participants, at its discretion, based on criteria the Company considers necessary to ensure the effective operation of the measures and utility system. Criteria may include, but will not be limited to cost effectiveness. DESCRIPTION: Ongoing program to provide incentives for a variety of equipment and operational improvements intended for and located in Non-residential Facilities. Periodic program changes will be made to encourage customer participation in the program and to insure or enhance program cost-effectiveness as defined by the Company. QUALIF"YING MEASURE: Measures which when installed in an eligible facility result in verifiable electric energy efficiency improvement compared to existing equipment or baseline equipment as defined by the Company. The baseline will be determined with reference to existing equipment, applicable state or federal energy codes, industry standard practice and other relevant factors. QUALIFYING ENERGY MANAGEMENT: Operational improvements which when implemented in an eligible facility result in verifiable electric energy savings compared to standard operations as determined by the Company. (Continued) Submitted Under Case No. PAC-E-14-08 ISSUED: August 22,2014 EFFECTM: November l, 2014 V,.ROCKY MOUNTAINYTPOWER \ awrsronormqflcoRP I.P.U.C. No. I Rocky Mountain Power Exhibit No. 4 Page 4 ot 27 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Original Sheet No. 140.2 ELECTRICAL SERVICE SCHEDULE NO. 140 (Continued) PROYISIONS OF SERYICE: (l) Qualiffing equipment or services, incentive amounts and other terms and conditions will be listed on the Idaho energy efficiency program section of the Company website, and are available to customers without online access upon request. Program changes may be made by the Company with at least 45 days advanced notice. Such changes will be prominently displayed on the Idaho energy efficiency program section of the Company website and include a minimum 45 days for processing prior offers. (2) Company may elect to offer enerry efliciency measure (*EEM") incentives through different channels and at different points in the sales process other than individual Energy Efliciency Incentive Offer Letter(s) prior to EEM purchase. The differences will depend on EEM and will be consistent for all EEMs of similar type. (3) Incentives may be offered year-round or for selected time periods. (4) Equipment or services receiving an incentive under this program are not eligible for incentives under other Company programs. (5) Company will employ a variety of quality assurance techniques during the delivery of the program. They will differ by measure and may include pre- and post- installation inspections, phone surveys, and confirmation of Owner/Customer and equipment eligibility. (6) Company may verifu or evaluate the energy savings of installed measures. This verification may include a telephone survey, site visit, review of facility operation characteristics, and pre- and post-installation of monitoring equipment as necessary to quantiff actual enerry savings. (7) Energy Project Manager co-funding is available according to the terms posted on the Idaho energy efficiency program section of the Company website. (8) Incentives will not be made available for fuel switching by Owner/Customer. MNIMUM EOUIPMENT EFFICIENCY: Retrofit energy efficiency projects must meet minimum equipment efficiency levels and equipment eligibility requirements of qualiffing equipment that are listed on the Idaho energy efficiency program section of the Company website. (Continued) EFFECTM: November l, 2014 Submitted Under Case No. PAC-E-I4-08 ISSUED: August 22,2014 Rocky Mountain Power Exhibit No. 4 Page 5 ol 27 Case No. PAC-E-14-08 Wtness: Kathryn C. HymasROCKY MOUNTAIN POWER aoMsrof{of mon@at I.P.U.C. No. I Original Sheet No. 140.3 ELECTRICAL SERYICE SCI{EDULE NO. 140 (Continued) ELECTRIC SERVICE REGULATIONS: Service under this Schedule will be in accordance with the terms of the Electric Service Agreement between the Customer and the Company. The Electric Service Regulations of the Company on file with and approved by the Idaho Public Utilities Commission, including future applicable amendments, will be considered as forming a part of and incorporated in said Agreement. Submitted Under Case No. PAC-E-14-08 ISSUED: August 22,2014 EFFECTryE: November 1, 2014 -,ROCKYMOUNTAINKpowen\ aousorc;^or'coae I.P.U.C. No.1 Rocky Mountain Power Exhibit No. 4 Page 6 ol27 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas +entbplevenlL Revision of Sheet No. 8.2 Canceling Ninthl&EliLRevision of Sheet No. B.2 Schedule No. 23 234 24 3l 34 35 35A 36 70 7l 73 94 ELECTRIC SERVICE SCHEDULES - Continued Class of Seruice General Service - Small Power General Service - Small Power (Residential and Farm) Intemrptible Power Service Partial Requirements Service - High Voltage Pacific Northwest Electric Power Planning and Conservation Act - Residential and Farm Kilowatt-Hour Credit Optional Time-of-Day General Service - Distribution Voltage Optional Time-of-Day General Service - Distribution Voltage (Farm) Optional Time of Day Residential Service Renewable Enerry Rider - Optional Enerry Exchange Pilot Program Renewable Enerry Rider - Optional - Bulk Purchase Option Energr Cost Adjustment Residential Refrigerator Recycling Program Home Enerry Saver Incentive Program Sheet No. 23.1-23.3 234.1-234.4 24.1 - 24.5 3l.l -31.6 34.1-34.3 35.1 - 35.3 35A.1 -35A.4 36.1 - 36.3 70.1-70.4 7t.t -7t.6 73.1-73.4 94.1 I 15 FinAnswer Express I l5,l 115,2 n7 ll8 lt7.t - 1t7.2 ll8.l - 1r8.2 (Continued) Submitted Under ffiase No. PAC-E-14-08 ISSUED: FFECTTVE: I.P.U.C. No.1 ROCKY MOUNTAIN POITi'ER A Ovr3lon oF aAoFroofi? Rocky Mountain Power Exhibit No. 4 Page 7 ot 27 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas feu*tsElm nevision of Sheet No. B.3 Canceling Thir+FourtlL Revision of Sheet No. B.3 Schedule No. ELECTRIC SERVICE SCHEDULES - Continued Class of Service Sheet No. 135.1 - 135.3 l9l 300.1 - 300.4 400.1 401.1 140 Non-Residential Energy Efficiency 140.1 - 140.3155 rlgrieulturd Enerry Serviees eptienal fer Qudiffing eusemers 155,1 155,6 135 Net Metering Service 401 Customer Efliciency Services Rate Adjustment Regulation Charges Special Contract Special Contract l9l 300 400 Schedule numbers not listed are not currently used.* These schedules are not available to new customers or premises. Submitted Under ffiase No. PAC-E-14-08 ISSUED : MaYq,q++ p,ueust 2L20 1 a EF'F'ECTM: Aa*gustl5*el3November l. 20 I 4 ROCKY MOUNTAIN POWER ADMSION OF PAOTI@iP Rocky Mountain Power Exhibit No. 4 Page I ol27 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas LP.U.C. No. 1 Orisinal Sheet No. 140.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.14O STATE OF IDAHO Non-Residential Enerw Effi ciencv PURPOSE: Service under this Schedule is intended to maximize the efficient utilization of the electricity requirements of new and existing loads in Non-residential Facilities through the installation of Energ.v Efficiency Measures and enerey management protocols. Service under this Schedule is subject to funding availabilitv. APPLICABLE: To service under the Company's General Service Schedules 6. 64. 7. 7A. 9. 10. 12. 19. 23. 23A. 24. 35 and 35A in all territory served by the Company in the State of Idaho. This Schedule is applicable to new and existing Non-residential Facilities and dairy barns served under the Company's residential rate schedules. CUSTOMER PARTICIPATION: Customer oarticipation is voluntarv and is initiated bv followins the oarticipation procedures on the Idaho energ.v efficiency program section of the Company website. and available to customers without online access upon request. The Compan), shall have the rieht to qualifr participants. at its discretion. based on criteria the Compan), considers necessary to ensure the effective operation of the measures and utilitv system. Criteria may include. but will not be limited to cost effectiveness. DESCRIPTION: Ongoins program to provide incentives for a varietv of equipment and operational improvements intended for and located in Non-residential Facilities. Periodic orosram chanees will be made to encourage customer participation in the proeram and to insure or enhance program cost-effectiveness as defined by the Company. OUALIFYING ENERGY MANAGEMENT: Operational improvements which when implemented in an eligible facility result in verifiable electric enere.y savings compared to standard operations as determined by the Company. (Continued) Submitted Under Case No. PAC-E-14-08 ISSUED: Aueust 22.2014 EFFECTM: November 1.2014 ROCKY MOUNTAIN POWER aon,lsloilof aAcFrgoRP Rocky Mountain Power Exhibit No. 4 Page I oI27 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas ELECTRICAL SERVICE SCHEDULE NO. 140 (Continued) PROYISIONS OF SERVICE: (l) Oualitving equioment or services. incentive amounts and other terms and conditions will be listed on the Idaho energy efficiency proeram section of the Company website. and are available to customers without online access uoon request. Program changes may be made by the Company with at least 45 days advanced notice. Such changes will be prominently displayed on the Idaho energ.v efficiency proeram section of the Company website and include a minimum 45 da)rs for orocessine orior offers. (2) Company ma), elect to offer energy efficiency measure ("EEM") incentives throueh different channels and at diflerent points in the sales process other than individual Enerry Efficiency lncentive Offer Letter(s) prior to EEM purchase. The differences will depend on EEM and will be consistent for all EEMs of similar tvoe. (3) Incentives may be offered year-round or for selected time periods. (4) Equipment or services receiving an incentive under this proeram are not elisible for incentives under other Company programs. (5) Company will employ a varietv of qualitv assurance techniques during the delivery of the proeram. They will differ by measure and may include pre- and post- installation inspections. phone surveys. and confirmation of Owner/Customer and equipment eligibility. (6) Company ma), verify or evaluate the enerKv savings of installed measures. This verification may include a telephone survey. site visit. review of facilitv operation characteristics. and pre- and post-installation of monitorine equipment as necessary to quantifu actual energ.v savines. (7) Enere.v Project Manager co-funding is available according to the terms posted on the Idaho energv efficiency proeram section of the Company website. (8) Incentives will not be made available for fuel switching by Owner/Customer. MTNIMUM EOUIPMENT EFFICIENCY: Retrofit enerey efficiency projects must meet minimum equipment efficiency levels and equipment elieibility requirements of qualifring equipment that are listed on the Idaho enerw efficiency program section of the Company website. Submitted Under Case No. PAC-E-14-08 ISSUED: Aueust 22.2014 EFFECTM: November 1.2014 V,.ROCKY MOTJNTAIN(pgtirEp \ eonrsrorormcracoif, Rocky Mountain Power Exhibit No. 4 Page'lO ot 27 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas I.P.U.C. No. I Orieinal Sheet No. 140.3 ELECTRICAL SERVICE SCHEDULE NO. 140 (Continued) ELECTRIC SERYICE REGULATIONS: Service under this Schedule will be in accordance with the terms of the Electric Service Agreement between the Customer and the Compan)r. The Electric Service Resulations of the Company on file with and approved by the ldaho Public Utilities Commission. including future applicable amendments. will be considered as formine a part of and incomorated in said Agrcement. Submitted Under Case No. PAC-E-14-08 ISSUED: Aueust 22.2014 EFFECTM: November 1.2014 ROCKY MOUNTAIN POWER ADfVmOilOf R SFTCORP Rocky Mountain Power Exhibit No. 4 Page 11 ol27 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas Third Revision of Sheet No. 115.1 I.P.U.C. No. I Canceling Second Revision of Sheet No. 115.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 1I5 STATE OF IDAHO FinAnswer Express PURPOSE: Service under this Schedule is intended to lization of the electricity requirements of new and existing loads in ndustrial Facilities through the installation of Energy Efficiency subject to funding availability. APPLICABLE: To service under the 7A,9, 12, 19,23,23A,24,35 and 35A in all Idaho. This Schedule is applicable to new Facilities and dairy barns served under the CUSTOMER PARTICIP by following the participation on the Company website, and avai DESCRIPTION: services intended for program changes Company. schedules. is voluntary and is initiated efficiency program section of the General by Schedule is Schedules 6, 6A,7, in the State of and IndustrialBuildings lne access upon request. ide incentives for a variety of equipment and buildings and industrial facilities. Periodic or enhance program cost-effectiveness as defined by the NT OR SERYICES: F4uipment or services which when bligible facility result in verifiable electric energy efficiency sting equipment or baseline equipment as defined by the Company. (Continued) QU Submitted Under Case No. PAC-E-12-10 ISSUED: May 15,2012 EFFECTryE: July 14,2012 V,ROCKYMOUNTAINYpowee\ A O|VE|ON Of iAOfGORP I.P.U.C. No. I Rocky Mountain Power Exhibit No. 4 Page 12 o'f 27 Case No. PAC-E-14-08 \Mtness: Kathryn C. Hymas Second Revision of Sheet No. 115.2 Cancelinq First Revision of Sheet No. 115.2 ELECTRICAL SERVICE SCHEDULE NO. 115 (Continued) PROVISIONS OF SERYICE: (l) Qualiffing equipment or services, incentive amounts and other terms and conditions will be listed on the Idaho energy efTiciency program section of the Company website, and are available to customers without online access upon may be made by the Company with at least 45 days advanced will be prominently displayed on the Idaho energy Company website and include a minimum 45 days for (2) Company may elect to offer EEM incentives and at different points in the sales process other than indivi Incentive Agreement(s) prior to EEM purchase. The d!EEM and will be consistent for all EEMs of similar type. (3) Incentives may be offered year-rou (4) Equipment or services receiv program arE not eligible for incentives under other (5) Company may offer the Idaho energy efficiency progam section of the team members to encourage early initial Company ustomer design and plans for New C (6) Company will a viilE$of quality assurance techniques during the delivery of the ll differ by EEM and may include pre- and post- installation , and confirmation of Owner/Customer and equipment iff or evaluate the energy savings of installed EEMs. This include a telephone survey, site visit, review of facility operation and pre- and post-installation of monitoring equipment as necessary to energy savings. C SERVICE REGULATIONS Service under this Schedule will be in accordance with the terms of the Electric Service Agreement between the Customer and the Company. The Electric Service Regulations of the Company on file with and approved by the Idaho Public Utility Commission, including future applicable amendments, will be considered as forming a part of and incorporated in said Agreement. Submitted Under Case No. PAC-E-I2-10 ISSUED: May 15,2012 changes EFFECTM: July 14,2012 V,ROCKYMOUNTAINYrcrwER\ A Onnsoir oF PAOACOftP I.P.U.C. No. I Rocky Mountain Power Exhibit No. 4 Page 13 ot 27 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas First Revision of Sheet No. 125.1 Canceling Original Sheet No. 125.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.125 STATE OF IDAHO Energy FinAnswer PURPOSE: Service under this schedule is intended to max ion of lities bythe electricity requirements of new and existing loads in promoting the installation of Energy Efficiency Measures. APPLICABLE: To service under the C 12, 19,23,23A,24,35 and 35A in all territory Schedule is not applicable to existing schedule is applicable to dairy barns served footage is the total Building or Facility area DEFINITIONS: Annual kWh installation of 6, 64, 8,9, of Idaho. This square feet. This schedules. Square The annual -hour (kWh) savings resulting from enc Measures, as estimated by Company using engineering analysis) A ings: The Average Monthly kilowatt (kW) savings estimated byresultinginstallation of Energy Efliciency Measures as ing analysis as described below: Savings = (baseline average monthly kW - proposed average monthly kW = sum of the 12 Monthly Maximum kwl2, where; ly Maximum kW = highest of all 15 minute average kW (as determined ). = l5 minute average kW : sum of kWh used over 0.25 hrs/0.25 hrs from' using = (Continued) EFFECTIV : May 1,2008 Submitted Under Advice No. 08-03 ISSUED: May 15,2008 ROCKY MOUNTAIN POWER A OnnsoN oFRAOFT@iP Rocky Mountain Power Exhibit No. 4 Page 14 ot 27 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas Original Sheet No 125.2I.P.U.C. No.l ELECTRIC SERVICE SCHEDULE NO l2s-Continued DEFINITIONS: (continued) Baseline Level: Baseline Adjustments: Company may adjust consumption and costs during engineering following: energy codes, standard practice, production or facility use and equipment existing fixtures, baseline wattages Efficiency Measures in all facilities shall be or the energy efficiency combination. Commercial Building: A applicability energy of the m For Enerry equipment savings lamp Company and meets the time an Enerry Efficiency Incentive not meet the definition of an Industrial Facility. verifring and documenting that the meets the design intent andng systems has applied for, been accepted and receives , or is the electricity user at the real property. Incentive: Payment of money made by Company to for installation of an Energy Efficiency Project pursuant Energy Efliciency Incentive Agreement. Efliciency Incentive Agreement: An agreement between Owner or and Company providing for Company to furnish Energy Efficiency Schedule. (Continued) EFFECTM: May 1,2008 Submitted Under Case No. PAC-E-08-01 ISSUED: February 14, 2008 -ROCKYMOUNTAIN<PCit{ER\ A OMSTO| OF PACIFICORP I.P.U.C. No. I Rocky Mountain Power Exhibit No. 4 Page '15 ot 27 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas Original Sheet No. 125.3 ELECTRIC SERVICE SCHEDULE NO 125- Continued DEFINITIONS: (continued) Energy Efficiency Measure (EEM): Permanently installed Energy Efficiency Incentive Agreement which can improve. CustomeCs electric energy use. EEMs designed to Monthly kW must also improve the electric energy Energy Effi ciency Incentives. Enerry Efliciency Measure @EM) Cost: New construction: EEM Cost is the total equipment or system minus the cost equipment or system. Major renovation: EEM Cost equipment or system minus tb( cost equipment or system. Retrofit: EEM Cost is modification. ified in an of the verage for of the energy eflicient iance/common practice the energy efficiency equipment or Buildings and process equipment associated with (Continued) In the case of renovation and retrofits, EEM Costs shall mean the Owner or costs incurred (net of any discounts, rebates than Efficiency Incentives from the Company, or other the final actual EEM Cost incurred by the Owner or Customer) to and install EEMs at the Owner or Customer's facility. If the lls the EEM then the cost of installation shall be equal to the 's actual labor costs for such installation. Project: One or more EEM(s) covered by one Energy Efficiency Annual kWh and Average Monthly kW savings for an Energy shall be the sum of the individual EEM values. Efficiency Project Cost: Energy Efficiency Project Cost shall be the sum individual EEM costs. Industrial Facility: manufacturing. Submitted Under Case No PAC-E-08-01 ISSUED: February 14, 2008 EFFECTM: May 1,2008 VROCKYMOUNTAIN <PCTWER\ A DNlsroor OF PAOF|COftP I.P.U.C. No. I Rocky Mountain Power Exhibit No. 4 Page 16 of 27 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas Original Sheet No. 125.4 ELECTRIC SERVICE SCHEDULE NO. f25 - Continued DEFII\IITIONS: (continued) Mixed Use: Buildings served by a residential rate schedule and a under Applicable shall be eligible for services under this Energy Efficiency Project meets the definition of NewT Renovation. Nery Construction: A newly constructed footage added to an existing facility. INCENTIVES faci le listed ided the Major square Major Renovation: A change in facility use type or the system will not meet owner/customer projected requi within footage. Owner: The person who has both benefic to the real property specified in an Energy Efficiency t is the mortgagor under a duly recorded mortgage or deed of trust or a purchaser under a duly to such real property. Retrofit: Changes,systems or equipment in existing facility square footage. Supplemental and Company agreement between Owner or Customer furnish Supplemental Services with respect to Supplemental TariffSchedule. PROJECTS: tives: Energy Effrciency Incentives made by the Company pursuant to an Energy Efficiency Incentive Agreement shall lrum of (a) and (b) OR (c): Wh for the Energy Efficiency Project Annual kWh savings as ined using Company provided or approved engineering analysis; $50/kW for Energy Efliciency Project Average Monthly kW savings determined using Company provided or approved engineering analysis. 50% of the Energy Efliciency Project Cost as determined by the Company. (Continued) EFFECTM: May Submitted Under Case No. PAC-E-08-01 ISSUED: February 14, 2008 ROCKY MOUNTAIN POWER A OrUSKlir OF RA0HOoaP Rocky Mountain Power Exhibit No. 4 Page 17 ot 27 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas Original Sheet No. 125.5I.P.U.C. No.l ELECTRIC SERVICE SCHEDULE NO. f2s-Continued INCENTMS FOR ENERGY EFTICIENCY PROJECTS (continud) below.Energy Efliciency Projects are eligible for Energy Efficiency lncenti CTable 1 Plogram track Deslgn Asclstanca Standad .#i, ,,\\ ts[7 lard ProJect Scope Comprehensive System , sv*eil[7) sv.t", Type New Construction/ Major renoration Narr Construdbny'l Major renorra![1n Iru"r*#fri)/ Retrorrt Energy ode applies Yes {-,\./No Enelgy savlngs threshold Must exceed code by 10% - whole building elecUk basls dm(-):" none owner/Gusbmer Energy ,",(rrL$r" ""pc Jp,i b the Enersy Efridency Prciect 5O t)6 of proiect @st a-tn No\^3--S/Yes Yes I year simple oaYback cao ilr I\ yes Yes Yes llghUng savings cap \1t* \50%50%50% D""JA,,*f-IZ llnorarium .Vo Yes Not avaihbh llot avaihble ke ,* "" proJect size Not availabh Not available l,lot available (Continued) EFFECTM: May 1,2008 Submitted Under Case No. PAC-E-08-01 ISSUED: February 14,2008 -,ROCKYMOUNTAIN<PoIwER\ AOlvlSloilOFBOFI@fiP I.P.U.C. No.1 Rocky Mountain Power Exhibit No. 4 Page 18 ol27 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas Original Sheet No. 125.6 ELECTRIC SERVICE SCHEDULE NO. 125 - Continued INCENTMS FOR ENERGY ETTICIENCY PROJECTS: (continued) All proposed Energy Effrciency Measure costs are subject tq approval prior to offering an Energy Efiiciency Incentive Efficiency Measure costs are subject to Company review and Energy Effrciency Incentive per the terms of an Energy E Company review and approval of Energy Efficiency documentation from the Customer or Owner. For the purposes of calculating maxi lighting, electric savings nesulting from lighti from lighting controls will be considered tq savings. The ten percent whole follows: The Energy consumption by at least l0% energy consumption that wou have resulted gn shall review and Energy an resulting from equipment and 90.1 The ve only one financial incentive from the Company include Energy Efliciency lncentive payments. are available per Table I and the terms posted on the Idaho of the Company web site. (Continued) baseline and proposed Informative Appendix the applicable ldaho establish the shall be calculated as EStr re(ucllhe proposed electic energy the basfirfe level of whole building electric applicable ldaho energy code. The led using the methodology defined in or successor revision) using values from of the building permit application shall Customer Submitted Under Case No. PAC-E-08-01 ISSUED: February 14, 2008 EFFECTM: May V,ROCKYMOUNTAIN-(g;rl1Ep. \ A CXVTSTO{i| OF RAdFICOfiP LP.U.C. No. 1 Rocky Mountain Power Exhibit No. 4 Page 19 ot 27 Case No. PAC-E-I4-08 \Mtness: Kathryn C. Hymas Original Sheet No. 125.7 ELECTRIC SERVICE SCHEDULE NO. 125 - Continued PROVISIONS OF SERVICE: (l) Energy Analysis Company shall meet with Customer or Owner and any design an initial site visit/plans review to determine what EEMs may energy analysis. (2) Supplemental Senices Company may offer Supplemental Services Tariff Schedule through a Supplemental Serv shall include, but are not limited to: detailerd design, compliance documentation for green q( high Company will negotiate the amount s of the project specific basis and may perform for an in this servlces calculations or ilding standards. servlces on a llowing: installation of EEMs delivering a certain offset of a portion of the available incentive or direct (up to 100%) of the direct Company costs for the seryi (3)EEM Inspection Company will i are funded by or installed under this program. Sati pany will be required prior to receiving Energy Efficiency ified in the Energy Efficiency Incentive EEM that)EEMs as specified in the Energy Efficiency Incentive prior to receiving Energy Efficiency Incentives Efficiency lncentive Agreement. missioning Opt-Out: Required EEM Commissioning may be omitted ing adjustments. Annual kWh savings, Average Monthly kW savings EEM Costs will all be reduced by 20% and an Energy Efficiency calculated using the provisions specified under Incentives for Energy iency Projects. EEMs where the Owner or Customer has "opted--out" of EEM Commissioning and are later commissioned are not eligible for an additional Energy Efficiency Incentive after the Energy Efficiency Project Incentive is paid. lof (4) EEMs (4a) with and di (Continued) EFFECTryE: May 1,2008 Submitted Under Case No. PAC-E-08-01 ISSUED: February 14, 2008 -,,ROCKY MOUNTAIN<P(lltER\ Aon/lSONOFmOFrCOfiP I.P.U.C. No.l Rocky Mountain Power Exhibit No. 4 Page 20 of 27 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Original Sheet No. 125.8 ELECTRIC SERVICE SCHEDULE NO. 125 - Continued PROVISIONS OF SERVICE: (continued) (5) MeasurePerformanceVerification/Evaluation Company may verifu or evaluate the energy savings of i Measures specified in the Energy Efficiency Incentive may include a telephone survey, site visit, review and pre- and post-installation of monitoring actual energy savings. (6)Min imum Equipment Elliciency For Retrofit Energy Efficiency minrmum equrpment Schedule ll5 to beefficiency levels and equipment eligible for incentives available Enerry Efficiency Incen e to induce fuel switching by Owner. Design team with current incentives to a design team member ncluding architects and engineers. lncentives are available ule and include honorariums and design to encourage early initial Company consultation on rgn and plans. Honorariums will be equally available to all architects and engineers for Idaho projects within Company's limited to one honorarium per project. ives will be offered to all professionally certified architects and for Idaho projects within Company's territory. Payment of incentives to the gn team will require final construction documents include an efficient design company requirements. Incentives will be based on the square footage of (7) (8) the project and limited to one per project. (Continued) EFFECTryE: May 1,2008 Submitted Under Case No. PAC-E-08-01 ISSUED: February 14, 2008 ROCKY MOUNTAIN POWER A Dn iBror{ of ilqrcoiP Rocky Mountain Power Exhibit No. 4 Page 21 ol27 Case No. PAC-E-14-08 \Mtness: Kathryn C. Hymas Original Sheet No. 125.9LP.U.C. No.1 ELECTRIC SERVICE SCEEDULE NO. f25 - Continued PROVISIONS OF SERVICE: (continued) Additional conditions for design team incentives will be energy efliciency program section of the Company's web with 45 days notice posted on the web site. ELECTRIC SERVICE REGULATIONS: Service under this Rules and Regulations contained in the tariff of which this prescribed by regulatory authorities. Submitted Under Case No. PAC-E-08-01 ISSUED: February 14,2008 EX'F'ECTM: May l,2008 Rocky Mountain Power Exhibit No. 4 Page 22 of 27 Case No. PAC-E-14-08 Vvitness: Kathryn C. HymasROCKY MOUNTAIN POWER A DMgrOt{ oF PAOnC(nP I.P.U.C. No.1 First Revision of Sheet No. 155.1 Canceling Original Sheet No. 155.1 ROCKY MOT'NTAIN POWER AGRICULTT]RAL ENERGY SERVICES SCHEDULE NO. 155 STATE OF IDAHO Optional for Qualifying Customers PURPOSE: Service under this Schedule is intended to of the electricity requirements of new and existing loads in irrigation district pumping systems by promoting electric energy-e the installation of Energy Efliciency Measures. APPLICABLE: To service under the Power Service Schedule 10, and to any Pacific Northwest Electric Power Planning electric service on a retail schedule in all DEFINITIONS: Annual kWh installation of Drainage Pumping Load" under the .L. 96-501 and receives pany in the State of Idaho. (kwh) savings resulting from or improved equipment operation, as estimated by the or Company. Average kW Savings: The Average Monthly On Peak resulting from the installation of Energy Efficiency equipment operation as estimated by Program pany using engineering analysis as described below: A Monthly On Peak kW Savings = (baseline average monthly On Peak kW verage monthly On Peak kW), where; +jverage Monthly On Peak kW = sum of the 12 Monthly Maximum On Peak kWl12, where; (Continued) May 1,2008 Submitted Under Case No. PAC-E-08-01 ISSUED: February 14, 2008 Rocky Mountain Power Exhibit No. 4 Page 23 ol27 Case No. PAC-E-14-08 \Mtness: Kathryn C. HymasROCKY MOUNTAIN POWER A DMSloil Of TAOHCOAP LP.U.C. No.1 Original Sheet No. 155.2 AGRICULTURAL ENERGY SERVICES SCHEDULE NO. 155 (Continued) DEFINITIONS: (Continued) = Monthly Maximum On Peak kW = highest of all 15 minute average kW (as determined below) for On Peak hours. On Peak hours hours specified in the electric service schedule under which electric service. + l5 minute average kW = sum of kWh used over Baseline Adjustments: Program Administrator lne electric energy consumption and costs during any of the following: standard practice, changes in system use and equipment at the end of iqflrseful life. Customer: Any party who has hnd receives service at the real property, is the owner the electricity user at the real property. Energr Efficiency money made by Program Administrator or installation of Energy Efficiency Measures Efficiency Incentive Agreement or approved Appl : An agreement between Customer and Company providing for Program Administrator or fficiency Incentive with respect to Energy Efficiency to this tariffSchedule. Incentive Application: An application provided by the or Company, completed by the Customer and approved by inistrator or Company requesting the Program Administrator or Energy Efficiency Incentives with respect to Energy Efficiency pursuant to this Schedule. Efficiency Measure (EEM): Permanently installed measure specified in 5n Energy Efficiency Incentive Agreement or Application which can improve the efficiency of the Customer's electric energy use. Enerry (Continued) EFFECTM: September 15, 2006 Submitted Under Advice Letter No. 06-06 ISSUED: August 14,2006 Rocky Mountain Power Exhibit No. 4 Page 24 ol27 Case No. PAC-E-14-08 Vvitness: Kathryn C. HymasROCKY MOUNTAIN POWER A OMSTOT{ OF PActFTCOiP I.P.U.C. No. I Original Sheet No. 155.3 AGRICULTURAL ENERGY SERVICES SCHEDULE NO. 155 (Continued) DEFINITIONS: (Continued) Energy Efficiency Project: One or more EEM(s) covered by one Energy Efficiency Incentive Agreement or Application . Enerry Efficiency Measure (EEM) Cost: New Construction: EEM Cost is the total installed equipment or system minus the cost of the or system. Major System Upgrades: EEM Cost efficient equipment or system minus equipment or system. Retrofit: EEM Cost is the total i modification. the cost ls the In the case of New Costs shall mean the rebates or incentives Schedule or United Quality lncenti the final EEMs atofi labor costs Program Administrator: administer this Schedule. er than tes De and Retrofits, EEM incurred (net ofany discounts, Incentives available under this Agriculture (USDA) Environmental Qualified person or entity hired by the Company to (Continued) (EQrP) i or other consideration that reduces by the Customer) to purchase and install the Customer installs the EEM, then the cost to the Customer's reasonable and realistic actual irrigation piping, pumping, or system to provide irrigated acreage or loads. Upgrades: Changes, modifications or additions to existing l or equipment that involve substantial removal and replacement systems or equipment where such changes, modifications or additions :d to replace equipment at the end of its useful life, add capacity or the utilization of the acreage or loads. ihe energy Submitted Under Advice Letter No. 06-06 ISSUED: August 14,2006 EFFECTM: September 15, 2006 I.P.U.C. No. 1 ROCKY MOUNTAIN POVI'ER A OMSTot{ Or PACTFEOnP Rocky Mountain Power Exhibit No. 4 Page 25 ol 27 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas First Revision of Sheet No. 155.4 Canceling Original Sheet No. 155.4 AGRICULTURAL ENERGY SERVICES SCHEDULE NO. 155 (Continued) DEFINITIONS: (Continued) Retrofit: Changes, modifications or additions to systems or equipment serving existing acreage or loads. INCENTIVES FOR EEMS: Energy Efficiency Incentives: Program shall establish procedures and requirements for prov to Customers which shall be posted on the Incentives include amounts available accordi formula listed below. All proposed Energy Effic Program Administrator or Company Efficiency Incentive Agreement or Company will establish Energy criteria on the Company web Energy Efficiency llation of EEMs pursuant to an Energy Efficiency the sum of (a) and (b) lication shall be the lesser of (b) (c):(a) $0.12 /k the Annual savings as determined using Program Admini or approved engineering analysis; $so/kw y On Peak kW savings determined using Company provided or approved engineering as determined by the Program (Continued) , {enffi and cost iecf dre subject to ng an Energy Administrator or criteria and post the 50% Submitted Under Case No. PAC-E-13-10 ISSUED: May 24,2013 EFFECTM: August 15, 2013 Rocky Mountain Power Exhibit No. 4 Page 26 of 27 Case No. PAC-E-14-08 Wtness: Kathryn C. HymasROCKY MOUNTAIN PCIUI'ER A DMSTON Of PAOfTCOfiP LP.U.C. No.l Original Sheet No. 155.5 AGRICULTURAL ENERGY SERVICES SCHEDULE NO. 155 (Continued) INCENTMS FOR EEMS: (Continued) Energy Efficiency Incentives may be adjusted such that Customer does not receive more than 100% of EEM Costs in total incentives including i available under this Schedule and EQIP incentives. All proposed EEM Costs are subject to Program review and approval prior to offering an Energy or approving an Application. All final EEM Administrator or Company review and hn Energy Efficiency Incentive per the terms of an Energy Eflic Agreement or and approvalapproved Application. Program Admini of EEM Costs may require additional ustomer. The Customer may receive Schedule per EEM. PROVISIONS OF Incentive under this (l) shall meet with Customer and any an initial site visiUplans review to determine riate for an energy analysis. The energy ude a visual pump check, water management ing, and/or irrigation/pump system analysis. the coil[sion of the visual pump check and water management , the Customer may be asked to sign an approval to proceed to step in the program and to commit to implement operational identified in the water management consultation. If signs the approval, Customer will receive an irrigation/pump post-installation testing of installed system. Energy (Continued) EFFECTM: September 15, 2006 Submitted Under Advice Letter No. 06-06 ISSUED: August 14,2006 ROCKY MOUNTAIN POWER A OIvlSrOil Of ;AOF|COhP I.P.U.C. No.1 Rocky Mountain Power Exhibil No. 4 Page 27 ol 27 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas First Revision of Sheet No. 155.6 Canceling Original Sheet No. 155.6 AGRICULTURAL ENERGY SERVICES SCHEDULE NO. 155 (Continued) PROYISIONS OF SERYICE: (Continued) (2) EEM Inspection Program Administrator or Company may inspect any which are funded by or installed under this program. Sati ion by rvmg Agreement or approved Application. (3)Measure Performance V Program Administrator and/or Company or evllite the energy savings of installed Energy Effigi iffd in the Energy Efticiency lncentive ication. This verification may include a it, review of system operating ion of monitoring equipment as savmgs. (4)made available to induce fuel switching by ELECTRIC SE Service under this Schedule is subject to the General Rules and iffof which this Schedule is a part, and to those prescribed by Program Administrator or Company will be Energy Efliciency lncentives specified in the TIO din Submitted Under Case No. PAC-E-I3-10 ISSUED: May 24,2013 EFF'ECTM: August 15, 2013 Case No. PAC-E-14-08 Exhibit No. 5 Witness: Kathryn C. Hymas BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION ROCKY MOUNTAIN POWER Exhibit Accompanying Testimony of Kathryn C. Hymas Explanation of Typical/Prescriptive Measure Changes August 2014 Rocky Mountain Power "BlXJ,i;lLi3t1,xll8 Witness: Kathryn C. Hymas Exhibit 5 EXPLANATION OF TYPICAL/PRESCRIPTIVE MEASURE CHANGES Lighting Incentives Table I highlights the proposed lighting measure changes, including modifications to align with changes in federal lighting standards. Table 1 Retrofit Lighting Changes Exhibit 5 - Explanation of prescriptive incentive table changes - Idaho - Filed August 2014 Page I of10 Measure Chanse Reason for Change Linear Fluorescent, CEE T8 Adjust measure category name to be "CEE T8" With the removal of the Standard T8 incentive, CEE T8 high performance lamp becomes the base-level incentive offering for T8 fixtures To encourage installation of lower wattage CEE T8, a higher incentive will be offered for fixtures using CEE T8 Reduced Wattage lamns. Linear Fluorescent, T8, Relamp Increase the incentive to $1.00 per lamp. The baseline shift for linear fluorescent has taken place in part due to the prevalence of standard T8 lamps in the market. This prevalence is also a large opportunity for additional kWh savings by relamping to a lower wattage T8 Relamp incentive is targeting percentage of an elective lamp unsrade Linear Fluorescent, T8, High Bay Tier the high bay incentive based on lamp count per fixture. Recent cost analysis shows that the cost per lamp for a high-bay fixture decreases as the lamp count increases. The tiered incentive offers the appropriate incentive based on incremental costs. Linear Fluorescent, T5, Relamp Increase the incentive to $1.00 oer lamo. This increase is for consistent relamp messasins resardless of T8 or T5. Linear Fluorescent, T5, High Bay Tier the high bay incentive based on lamp count per fixture. Recent cost analysis shows that the cost per lamp for a high-bay fixture decreases as the lamp count increases. The tiered incentive offers the appropriate incentive based on incremental costs. Compact Fluorescent Lamp - screw-in lamo Remove measure from table. Measure was sunset from the program effective January l, 2014. Induction Fixture Reduce the incentive amount to $75lfixture. The reduction in incentive is in response to reduced market costs. Other LED Group all LED categories (except integral screw-in and recessed downlight) into a single category and offer incentives at a rate of $0.15 per kWh saved. The LED category is ever evolving. The technology is expanding in its uses and application. Removing defined categories and specific incentives per fixture enables the incentive to evolve with the technology and market and maintain a cost-effective result. Custom Increase incentive to $0.r5/kwh The incentive rate is aligned with the custom incentive rate of the wattsmart Business Drosram. Daylighting Control Clarify eligibility requirements. Adjust eligibility requirements to include interior fixtures with drivers (i.e. LEDs), and require at least 50% reduction in output of connected fixtures. Occupancy Control Define the incentive rate per watt controlled instead of per sensor Incentives based on controlled wattage encourage controlling more watts, rather than installing more sensors. Daylighting Control Define the incentive rate per watt controlled instead ofner sensor Advance Daylighting Control Define the incentive rate per watt controlled instead ofner sensor Dimming Ballast Remove the measure.The dimming ballast is an inherent part of the daylighting control measure. The incentive for daylighting control was established with consideration of the additional costs for dimmine ballasts. Rocky Mountain Power Exhibit No. 5 Page 2 of 10 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Table 2 highlights the proposed changes to new construction and major renovation lighting measures. Table 2 New Construction/lVlajor Renovation Lighting Measure Chanse Reason for Chanse Exterior Lighting, LED Revise the exterior LED categories to include new types of fixtures and defined wattage ranges. The new categories are aligned with the qualified list updates, current market costs, and enable most exterior LED lighting applications to be eligible for incentives. Exterior Lighting, Lighting Control Change incentive to be based on per controlled watt Incentives based on wattage controlled encourage controlling more watts, rather than instal I ing more sensors. Rocky Mountain Power "E:lJ,i":Jf3:.:,"j-13 Wtness: Kathryn C. Hymas Table 3 summarizes modifications for existing HVAC, building envelope, food service, appliances and office energy efficiency measures included in the program. Table 3 Summary of Proposed Changes to Existing HVAC, Building Envelope, Food Service, Appliances and Office Energy Efficiency Measures Measure Catesorv Measures HVAC Other HVAC Equipment and Controls Unitary commercial air conditioners and heat Dumos Update deemed costs to align with market data. PTAC/PTHP Occupancy Based Controller Revise eligibility to include door-key occupancy sensors in addition to infrared/ultrasonic sensors. Portable Classroom HVAC Control Revise eligibility to include occupancy based thermostat control in addition to 3651366 schedulins. Food Service Commercial Dishwasher Update deemed savings/costs and incentive to align with ENERGY STAR specification update and current industry standard baseline. Remove eligibi lity requirement of electrically heated DHW, but require electric booster heater to increase program participation. Savings willvary based on DHW energy source. Refrigerator/Freezer Discontinue offering incentives for solid door refrigerators/freezers. Very limited savings potential relative to industry standard baseline. Revise incentives for transparent door refrigerators/freezers based on updated cost data. Electric Insulated Holding Cabinet Adjust incentives based on revised deemed costs/savings. Electric Combination Oven Update deemed savings/costs and incentive to align with ENERGY STAR specification update (effective I I I l20l 4). Add/define size category to account for large differences in incremental costs. Electric Convection Oven Update deemed savings/costs and incentive to align with pending ENERGY STAR specification uodate (effective I I I 1201 4\. Electric Griddle Discontinue offering incentives for ENERGY STAR Tier I electric griddles. Negligible incremental cost difference and small savings between standard and ENERGY STAR Tier I qualified products. Adjust eligibility requirements to ENERGY STAR Tier 2 Rocky Mountain Power Exhibit No. 5 Page 4 of 10 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas qualified models only. Update deemed costs/savinss. Electric Steam Cooker Tier I - Update deemed costs/savings and incentive. Tier 2 - Adjust eligibility requirements and deemed savings/costs and incentive to align with revised RTF data. Electric Commercial Fryer Tier 2 - Adjust eligibility requirements and deemed savings/costs and incentive to align with revised RTF data. Air-Cooled Ice Machines Update deemed savings/costs and incentive to align with ENERGY STAR specification undate. LED Case Lighting Update deemed savings and costs to align with revised RTF data. Residential Refrigerator (used in a Business) Update eligibility/incentives and reported costs/savings to align with the Home Energy Savinss Drogram. Residential Dishwasher (used in a Business) Remove commercial in alignment with recent Home Enersv Savinss Drosram uodates. Appliances Commercial Clothes Washer Update incentives, deemed costs/savings to align with market data for ENERGY STAR qualified models. Remove incentives for CEE Tier 3 qualified models as CEE has suspended its commercial clothes washer snecifi cation. Residential Water Heater (Used in a Business) Update eligibility/incentives and reported costs/savings to align with the Home Energy Savings program.Residential Clothes Washer (Used in a Business) Office Network Power PC Management Update deemed savings and costs to align with data from NWPCC 6'h Plan RTF since RTF measure is now limited to K-12 schools. Reduce incentive to $5/pc. Update eligibility criteria to include only desktop computers for hisher savinss certaintv. Smart Plug Strip Update deemed savings and costs to align with revised data from RTF. Rocky Mountain Power ='u:xJ,i":Jf3:,:,"I3 Witness: Kathryn C. Hymas To further increase participation and the comprehensiveness of the program and streamline program administration, the Company is proposing to add new measures to existing measure categories, as detailed below in Table 4. In addition, there are new industrial/ag measures in subsequent tables. Table 4 New Measures Measure Catesorv Measure Description HVAC Variable Refrigerant Flow (VRF) Heat Pump Offer a prescriptive incentive for VRF systems, which are an increasingly requested HVAC option in small/medium commercial buildings. Align eligibility requirements with CEE high- efficiency HVAC specification and calculate savings based on building type, climate and size of svstem. Evaporative Pre-Cooling Offer a prescriptive incentive (based on air conditioning equipment size) for equipment that pre-cools air before it reaches the air conditioner condenser coil. Food Service Anti-Sweat Heater Controls (Retrofit-Only) Offer prescriptive incentives (per linear foot of refrigerated case) for anti-sweat heater controls installed in retrofit applications. Align deemed savings/costs with recently approved RTF UES data. Demand-Controlled Kitchen Ventilation (Retrofit-Only) A simplified calculator tool will be utilized to estimate savings based on kitchen operating hours, climate, and HVAC system efficiency. Incentives offered on a $lkWh saved basis. Residential Refri gerator/ Freezer Recycling Allow non-residential customers to participate in the residential refrigerator and freezer recycling program for qualifoing residential refriserators and freezers used in a business. Rocky Mountain Power Exhibit No. 5 Page 6 of '10 Case No. PAC-E-14-08 Vvitness: Kathryn C. Hymas Table 5 Farm and Dairy Measure Catesorv Description of Chanee Reason for Chanse Farm and Dairy Revise the basis for determining incentives for the heat recovery measure. The previous incentive for heat reclaim - using heat rejected from the milk refrigeration system to offset electric water heating - was calculated as $220 per condenser kW. The revised approach uses a calculator to directly calculate energy savings from pounds of milk/day, temperature d i fference s, and i nformation about the refrigeration system. Incentive rate is aligned with the custom project rate, $0.15/kWh annual savings upto70%o ofproject cost or one-year payback. This is a measure in the existing program and currentlv utilizes site soecific calculations. Revise incentive rate for milk pre-cooler measure from the previous $0.12lkwh plus $50/kW to the new custom rate of $0.15/kwh. This revision brings the incentive rate for milk pre-coolers into alignment with the standard custom rate. This is a measure in the existing program and currently utilizes site specific calculations. Add new measure: variable frequency drives for fans in potato or onion storages. Potato and onion storage fan VFDs have been eligible for custom incentives in the current programs. Key variable affecting energy consumption and available savings can be gathered. The measure is well suited to utilize a calculator to determine savings. Making potato/onion storage fan VFDs a listed measure enables rapid turnaround on the incentive process, low cost administration, and optimal participation by vendors and growers. The Regional Technical Forum (RTF) has maintained a Unit Energy Savings (UES) value (on a per horsepower basis) for this measure in the oast. Apply project level caps (percent of project costs and one-year payback) to all Farm and Dairy measures. Customer costs for Farm and Dairy measures vary. While incentives are set to be a portion of (but not exceed) the measure costs, having project cost and simple payback caps consistent with the custom project offer in the program aligns program delivery with design intent and simplifies marketing to customers and trade allies. Rocky Mountain Power Exhibit No. 5 Page 7 of 10 Case No. PAC-E-14-08 \Mtness: Kathryn C. Hymas Table 6 Compressed Air Measures Measure Category Description of Chanse Reason for Change Compressed Air Revise savings for zero loss condensate drain from 0.14590 kWh per hour ofoperation per year to 786.37 kWh/yr. Revise incentive from $90 each to $l 00 each. Using average annual system runtime to determine Unit Energy Savings is a simpler approach for this small system measure than collecting runtime for each system to calculate system-specific savings. Experience over time with the program has led to an annual average runtime close to the Department of Energy estimated average. This runtime has been used to simplify the UES value. Measure cost has increased slightly, and available savings support a slight increase in incentive to help further increase participation. Revise savings for cycling refrigerated dryer from 0.00242 kWh per scfm per hour ofoperation per year to 12.73 kWh/scfm per year. Revise incentive from $1.50/scfm to $2.00/scfm. For projects where a new dryer is installed along with a new air compressor, use the Northwest Regional Compressed Air Tool to calculate dryer savings and pay the incentive at the custom incentive rate rather than using the Unit Energy Savings kWh and incentive value. Same note as above regarding runtime and RTF Incentive slightly increased to encourage participation. Cycling dryers installed with a compressor may take advantage of the fact that the load profile for the specific installation has already been estimated. The Northwest Regional Compressed Air calculator can calculate actual dryer savings using the compressor load profile and can package the presentation of compressor and dryer economics into the same single sheet presentation for the decision maker. Hence the use of the custom approach for the dryer when purchased in conjunction with a compressor. Revise savings for receiver capacity addition measure from 0.00249 kWh per gallon per hour of operation per year to 13.10 kWh per gallon per year. Revise incentive from $1.50 per sallon to $3.00 per Same note as above regarding runtime. Incentive has been increased to encourage participation. Rocky Mountain Power Exhibit No. 5 Page I of 10 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas gallon of receiver capacity above the first 2 gallons/scfm of trim comDressor caDacitY. Revise savings for low pressure drop filter measure from 0.00129 kWh per scfm per hour of operation per year to 6.79 kwh per scfm per year. Revise incentive from $0.80 per scfm to $2.00 oer scfm. Same note as above regarding runtime. Incentive has been increased to encourage participation. Revise savings for outside air intake measure from 0.00931 kWh per hp per hour of operation per year to 48.97 kwh per hp per year. Incentive remains unchansed. Same note as above regarding runtime. Remove the constraint on the VFD compressor measure that the system be comprised of only a single operating compressor (not counting backup capacity). Allow VFD compressors to be treated as listed measures as long as the compressor receiving the incentive is installed in a system with totalcapacity of 75 hp or less, not counting backup compressor(s) that do not normallv run. Clarifies program design intent to focus on smaller systems with identifiable key variables that affect energy consumption and savings. Second machines may be in place for back-up purposes and may not materially affect available energy savings. Eliminates confusion when a customer wishes to install VFD compressor in a system with a second fixed speed compressor that operates at times to keep up plant pressure and the total system is less than75 hp in total capacity. Systems with multiple compressors can be handled through a combination of calculators and program staff engineering calculations outside of the calculator. Rocky Mountain Power Exhibit No. 5 Page 9 of 10 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas For the VFD compressor measure, remove the constraint that "compressor must not use inlet modulation when demand is below the minimum speed threshold of the VFD compressor." Aligns program eligibility with best available market information on how various manufacturers control a compressor when demand for compressed air in less than that delivered by the machine once the VFD has slowed to its minimum allowable speed. Some of these methods are more efficient than others, yet the net effect on savings is minimal given the amount of time system typically is in this operating mode. Removing the language broadens the equipment options for customers. Add compressed air end use reduction as a listed measure. Use the Northwest Regional Compressed Air Tool to estimate savings and pay at the custom rate. Inefficient uses of compressed air are very common in industry. Where functionally equivalent alternatives are available, savings can be had by undertaking small projects to make a change in the system. Examples include replacing simple blowing applications with engineered nozzles, using electric pumps in place of air operated pumps, and adding isolation valves to close off a portion of a distribution system when not operating (saving on leak load). Compressed air savings in cfm may be estimated by program staff, and the Northwest Regional Compressed Air tool may then be used to estimate savings and incentives. This approach makes such small projects feasible to administer. Apply project level caps (percent of project costs and one-year payback) to all Compressed Air projects. Customer costs for Compressed Air measures vary. While incentives are set to be a portion of (but not exceed) the measure costs, having project cost and simple payback caps consistent with the custom project offer in the program aligns program delivery with design intent and simplifies marketing to customers and trade allies. Rocky Mountain Power Exhibit No. 5 Page 10 of 10 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Table 7 Waste Water and Other Refrigeration Measure Catesorv Descrintion of chanse Reason for Change Other - Refrigeration and Wastewater Add adaptive refrigeration control measure. Use calculator to estimate savings and pay at the custom rate of $0.15/per kWh with project level caps (percent ofproject costs and one-year oavback). Adaptive refrigeration controllers replace conventional thermostat, defrost time clock and defrost termination controls in refrigerated spaces cooled by unitary systems. Projects are typically small, with savings ranging from 2,000 to 20,000 kWh per controller, depending on system size. Savings is readily determined using nameplate information and operating schedules. These opportunities are efficiently administered as a calculator-based listed measure. Add fast acting door measure. Use calculator to estimate savings and pay at the custom rate of $0.15/per kWh with project level caps (percent ofproject costs and one-year pavback). Fast acting doors replace manually operated doors, automatic doors with long cycle times, strip curtains, or entryways with no door at all in refrigerated or conditioned space. Savings is highly situation specific. A calculator-based listed measure takes into account the details of each situation, while affording an efficient administrative approach. Add low power mixer measure. Use calculator to estimate savings and pay at the custom rate of $0.15/per kWh with project level caps (percent ofproject costs and one-year navback). Low power mixers, also called extended range circulators, take the place of high powered mixers or the practice of using aeration for mixing in wastewater treatment ponds. A calculator-based approach is an effective method of generating leads and administering project using the custom incentive rate and cap. Case No. PAC-E-I4-08 Exhibit No. 6 Witness: Kathryn C. Hymas BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION ROCKY MOUNTAIN POWER Exhibit Accompanying Testimony of Kathryn C. Hymas Enhanced Offer for Small Business Customers August 2014 Rocky Mountain Power Exhibit No. 6 Page 'l of 8 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Exhibit 6 Enhanced offer for small business customers In this application the Company is also requesting to add a targeted incentive offer to capture additional savings from the harder to reach small/medium business customer segment. The initial offer will be an enhanced retrofit lighting upgrade offering. There is high market potential for energy savings from lighting upgrades in the small/medium business customer segment as evidenced by: An analysis of past program participation which showed that99o/o of small business customers (approximately 9,000 customers) have not participated in energy efficiency programs. The findings of the Company's 2013 DSM Potential Study which shows the largest savings potential of all measure categories continues to be in commercial lighting -37%of the achievable technicalpotentialacross five of six statesl served by the Company. (The Cadmus Group, lnc.,2013).2 The small business offer is designed to overcome participation barriers for small/medium business customers, as identified by the Center for Energy and Environment3: . Lack of awareness of energy-efficienc), opportunities and relative benefits in both customer-owned and leased facilities. . Lack of time and resources to investigate and implement energy efficiency improvements . Limited access to capital for energy efficiency projects Overview o-f the small business qffer As proposed, the small business offer will align with a best-practice approach used by many other utilities (listed in Table l, below) utilizing a pool of Company-approved and managed contractors to work directly with small/medium business customers to identify energy-efficiency upgrades, estimate savings and incentives, and install high-efficiency equipment. Participating customers utilizing an approved contractor will be eligible for an enhanced incentive offer targeted at80Yo ofthe project cost. To reduce the customer's out-of-pocket expenses and minimize cash flow impacts, the customer can assign the incentive to the contractor who will then apply it as an up-front reduction to the overall project cost. Participating contractors will complete and submit the required incentive application and documentation to the Company for payment of the incentive amount that was assigned to them by the customer. I Excludes Oregon 'The Cadmus Group, Inc. (2013). Assessment of Long-Term, System-Wide Potentialfor Demand-Side and Other Supplemental Resources, 20 I 3-2032 Volume L PacifiCorp. 3 Center for Energy and Environment. (n.d.). One-Stop Efliciency Shop 2000-2007. Minneapolis: Centerfor Energt and Environment. Exhibit 6 - Small Business Offer - Idaho - Filed August2014 Page 1 of8 Rocky Mountain Power Exhibit No. 6 Page 2 of 8 Case No. PAC-E-14-08 Wtness: Kathryn C. Hymas Table I - Similar Offers from Other Utilities mffiE;i.RiBht Lights Small and Mid-Sized Business O+Express Solutions Demand < 100 kW + schools --\E-UJIF Business Solutions Small Business Program < 145,000 kwh/yr m Small Business Direct lnstall Lighting Program < 350 kw gE6TS6ffi Direct lnstall Small and Mid-Sized Business lJmlo Complete Energy Solutions Up to 299 kW / mo natbnalgEkl nrffiddst Small Business Services program <300kW / month erm Small Business Energy Advantage Avg peak demand l0 kw - 200 kw e x=i-Small Business Energy Solutions < 200 kW / month ffi.Smart Energy Savers <60 kW / mo @xae,wgy-Small Business Lishtins < 400 Kw In this application, the Company is requesting approval to consolidate all non-residential programs into the wattsmart Business program. The small business offer is proposed to be added as a component of the wattsmart Business program. The existing design/infrastructure and trade ally/contractor administration team will be utilized, linking customers with the program options and contractor resources that most appropriately address their needs. Customers not eligible to receive the small business offer remain eligible to participate in all other elements of waffsmart Business including the program's other lighting offers. The Company has hired an administrator for the small business offer using a competitive RFP process. The administrator will identifu, solicit, and approve contractors to participate in the delivery of the small business offer. Selection criteria will be based on business reputation, offered lighting retrofit costs, past program participation, geographic area served, and capability to pursue projects. Preference will be given to existing local Idaho contractor businesses operating successfully for the past l2 months. Approved contractors will be required to enter into an agreement with the Company indicating they will abide by the terms and conditions of this offer and will be provided with local sales, marketing, and program training. Contractor performance will be monitored closely to ensure high customer satisfaction, accurate project information, and cost-effective savings. Exhibit 6 - Small Business Offer - Idaho - Filed August 2014 Page 2 of8 Rocky Mountain Power Exhibit No. 6 Page 3 of 8 Case No. PAC-E-14-08 VMtness: Kathryn C. Hymas Table 2 - Small/lVledium Business Barriers and Solutions Barrier Solution Lack of awareness of energy- efficiency opportunities and relative benefits in both customer-owned and leased facilities. Contractors identify upgrades and provide customers, owners and tenants with the output of a lighting tool summarizing the project economics with available incentives. Contractors explain energy and non-energy benefits. Lack of time and resources to investigate and implement energy efficiency improvements Contractors approved by the Company-hired administrator review existing lighting and provide customers with a proposal for upgraded lighting. Contractors provide completed paperwork for customer signature. Limited access to capital for energy efficiency projects Incentives are targeted to cover 80% of the implementation costs, significantly reducing the initial customer out-of-pocket expenses. Customers are expected to recoup their total out-of- pocket investment in the form of electric bill savings in as little as one vear. Customer Particioation Process The small business offer will be available to customers exclusively through approved contractors, according to the process outlined in Exhibit 6 - Small Business Offer - Idaho - Filed August2014 Page 3 of8 Rocky Mountain Power Exhibit No. 6 Page 4 of 8 Case No. PAC-E-14-08 Vvilness: Kathryn C. Hymas Figure t below. Outreach and sales effbrts of the approved contractors will be the primary means by which customers will learn about the offer, but may be supplemented by Company-led marketing efforts. Once engaged, approved contractors will work with the customer to confirm eligibility, inventory existing equipment, recommend high-efficiency upgrades, estimate the overall project cost, identify energy/cost savings, and provide available incentive calculations. Incentives are targeted to cover 80% of the overall project cost and may be credited against the overall cost quote provided to the customer as part of the contractor bid. The customer o decides whether to proceed with the projecto decides which participating vendor to work witho decides to assign the incentives to contractor (reflected as a credit on the contractor invoice to the customer) or to receive a cash incentive at project completion.o schedules the installation date with the contractor, and. pays the non-incentivized portion of the project cost directly to the contractor. Upon completion and approval of the project, the incentive is paid according to the instructions in the customer's application (either paid directly to the contractor or paid to the customer). Exhibit 6 - Small Business Offer - Idaho - Filed August 2014 Page 4 of8 Rocky Mountain Power Exhibit No. 6 Page 5 of 8 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas Figure t: Small Business Lighting Participation Process wattsmart Small Business Lighting Participation Process ,,., Optional Project Pre-approval Program Marketing and Outreach Assign lncentive to Contractor and Pay lnvoice lssue lncentive Check to Cusiomer or Contraclor (if assigned) Receive lncentive Check Eligible Customers Exhibit 6 - Small Business Offer - Idaho - Filed August20l4 Page 5 of8 Rocky Mountain Power Exhibit No. 6 Page 6 of B Case No. PAC-E-14-08 Witness: Kathryn C. Hymas To ensure the small business offer targets its intended audience. the company's small/medium business customers, eligibility will be limited as follows: r Rate Schedule 23 &23A - all customers on this rate schedule will be eligible Additional eligibility criteria may be added, (e.g. square footage. operating hours, kWh usage) to align with savings targets, incentive budgets, and cost effectiveness requirements and will be posted on the Company website. Oualil)tins Measures Initially, the measure list will be focused on high-efficacy fluorescent lighting technologies, occupancy controls, and LED recessed downlights and exit signs that are frequently found in small/medium businesses, as shown in Table 3. Measures not included in the small business customer incentive table will be incentivized at the standard rates offered in the wattsmart Business program. Table 3 - Enhanced Incentives for Small Businesses Exhibit 6 - Small Page 6 of 8 Measure Category Eligibility Rcquirements I-8 l'-luorcscenl Retrofit (Lamp/Ballast) 4" CEE Qualilied Reduced Wattage l-amp and CEE, Qualilled Ballast included on qualilred ballast list Delamp 4' CEE Qualilled Rcduced Wattage or Iligh Performance Lamp and CI-.E Qualilied Ballast. Must remove one or more Iamps. 'l'o delamp an existing fixture. the lamp and all corresoondins. sockels must be oermanentlv disabled. Tl2 Conversion (Kit/Lamp/Ballast) 8' Tl2 to (2) 4' CEI] Qualilied Reduced Wattage or High Perlbrmance l'8 l-amrrs and CEE Qualilled Ballast. Relamp Lamp rvatlage reduction ) 3 Watts. No ballast retrofit Replacement High Bay (Fixturei Lamp/Ballas r) Fixture with less than six (6) Ianrps: 4' CEE Qualified High Perlbrmance l-amo. Must replace TI2HO/VHO or HID Fixture u,ith six (6) or more lamps: 4' CEE Qualified High Performance l,amp. Must replace Tl2tlO/Vt{O. incandescent or I ll D J'5 I:luorescent Replacement - T5 Standard (Fixture/Lamp/Ballas t) 4' Nominal [,amp < 28 Watts. Ballast Factor < 1.0 Relamp [,amp wattage reduclion > 3 Watts. No ballast retrofit Replacement - High Bay ( Fixture/Lamp/Ballas r) Fixture uith less than six (6) lamps: Must replace 1'l2HO/VtlO. lncandescent or HII) Fixture rvith six (6) or more lamps: Musl replace TI2HO/VtlO or lllD l.EI) ReplacemenVRetrofit - Recessed Downlight (Fixture or Kit) Must replace existing incandescent or fluorescent. l-[:,[) must be listed on qualified equipment list Replacement - Exit Sisns Must replace incandescent or fluorescent l-ighting Control Wall Occupancl Sensor Retrofit PIR. I)ual 'Iech Ceiling Occupancl Sensor Re1rofi1 PIR. Dual Tech Business Offer - Idaho - Filed August 2014 Rocky Mountain Power Exhibit No. 6 Page 7 of 8 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas The Company will continue to review other possible qualifying measures that are found cost effective either at a program or individual project level. The Company will bring those measures forward to the Commission and into the offering as they are identified. Incentive Structure The Company is proposing to define the incentives for this offer on a measure-specific basis targeted to cover 80% of the customer cost. Incentives will initially be determined relative to market costs collected from the contractor application process used to select and approve contractors and will not exceed the maximum incentive values in Schedule 140. The incentive table will be posted on the Company's website. Incentives will be explicitly defined in the agreement made with each contractor. When the customer has opted to assign the incentive payment to the contractor, contractors will be required to pass-through the full incentive amounts as an up-front discount off the cost quote provided to participating customers through the assignment of the incentives to the contractors by the customers. Upon completion and approval of a project, the incentive will be paid by the Company directly to the contractor who was assigned the incentive or to the customer if the incentive was not assigned to the contractor. This approach significantly reduces the customer's out-of-pocket expenses, as detailed in the example project below. Figure 2 - Example Project Project Specifics are from a past wattsmart Business retrofit project: " Idaho schedule 23 customer in Shelley, IdahoEnergy Cost: $0.08788 &Wh. Demand Cost = $0.00 lkW- (42) 2-Lanp, 4' Premium T8 fixtures installed Total Proiect Cost $3-300 F.nerw Savinos /LWh/wr'l 9.532 Demand Savings ftWmonth)2.90 Electric Cost Savinss $838 Enhanced Incentive (80o/o)- $2"640 Net Customer Out-of-Pocket Cost s660 Simple Payback (Pre-Incentive)3.9 vrs Simple Payback (Post-Incentive)0.8 vrs The example shows the customer's out-of-pocket expenses reduced from $3,300 to $660 with the simple payback going from 3.9 to 0.8 years after incentives. Compare this to the same project receiving the typical wattsmart Business incentives where the customer's out-of-pocket expenses are $ I ,650 with a simple payback of 2.0 years after incentives. Taritf structure -for small business incentives Exhibit 4 includes the above Table 3 listing the qualifying measures. Although participants have the option to receive their incentive payment directly, the Company anticipates most will assign their incentive payment to the lighting contractor. The Company will have an agreement with lighting contractors that includes pricing levels. Contractors will be required to propose pricing that is consistenta with their agreement with the Company. a Note contractors will have the flexibility to account for site specific variations in their proposed pricing to customers (e.g. include costs for rental of a lift for high ceiling applications, after hours installation, etc.) Exhibit 6 - Small Business Offer - ldaho - Filed August2014 Page 7 of8 Rocky Mountain Power Exhibit No. 6 Page 8 of 8 Case No. PAC-E-14-08 Witness: Kathryn C. Hymas It is important to have the capability to adjust incentive levels in response to changing market conditions. It is the Company's intent to make adjustments to the incentive table periodically to address market conditions for lighting (changes in material costs, product availability, and price competition), ensure the customer out-of-pocket expenses are approximately 20Yo of the overall project cost, and align with savings targets, incentive budgets, and cost effectiveness requirements. When the Company needs to adjust the small business incentives, the Company will post a notice on its website announcing the coming changes. The notice will be posted at least 45 days prior to the changes taking effect. In no event will incentives exceed the not-to-exceed amounts listed in Schedule 140 without Commission approval. Oualit.v Assurance and Controls A robust quality assurance regime is planned for the small business offer, focused on the following: Contractors - Contractors will be evaluated and selected no less than annually to deliver the small business offer to customers. Each selected contractor will be required to sign an agreement with the Company outlining quality, customer service, and participation requirements. Contractor performance will be regularly monitored by the Company-hired administrator through project application review, customer satisfaction surveys, on-site inspections, office visits, and ongoing communications. Contractors not meeting or exceeding quality, customer service, project, invoicing, and other requirements will be subject to removal from participation in the small business offer. Project Review - Contractors will be conducting a site-specific assessment and calculating incentives using the Company-provided standard calculation workbook. Each project application will be examined to validate customer eligibility, review submitted costs, and confirm adherence to program policies and procedures before issuing an incentive check. Contractors are expected to provide customer pricing consistent with costs submitted during the selection process. Project costs will be closely monitored and deviations from the submitted costs will be investigated. Installation Verification - On-site inspections and customer phone calls will be performed on a sample of completed projects to confirm contractor-submitted charges, verify installation quality and reported accuracy, and solicit customer feedback of the participation process. Projected Costs and Enerw Savings The Company has set a 2014 savings goal of 133,300 kwhs. Through an analysis of the eligible customer base and the savings potential from the qualifying measures, a reasonable average savings of 3.500 - 6,800 kWh is expected per project coming from 20-40 completed projects in the remaining months of 2014. Projected costs and savings for the first three years are provided in Exhibit 2. the cost effectiveness analysis 5 Gross savings at the customer site (does not include a net-to-gross adjustment or line loss adjustment). Assumes a start date of 8lll20l4. Exhibit 6 - Small Business Offer - Idaho - Filed August 2014 Page 8 of8