Loading...
HomeMy WebLinkAboutFinal Approved Tariffs.pdf‘ROCKY MOUNTAIN POWER A OIVISON OF PACIFICORP I.P.U.C.No.1 Fourth Revision of Sheet No.B.3 Canceling Third Revision of Sheet No.B.3 ELECTRIC SERVICE SCHEDULES -Continued Schedule Sheet No.Class of Service No. 135 Net Metering Service 135.1 —135.3 155 Agricultural Energy Services -Optional for Qualifying Customers 155.1 —155.6 191 Customer Efficiency Services Rate Adjustment 191 300 Regulation Charges 300.1 —300.4 400 Special Contract 400.1 401 Special Contract 401.1 Schedule numbers not listed are not currently used. *These schedules are not available to new customers or premises. Submitted Under Case No.PAC-E-l3-10 ISSUED:May 24,2013 EFFECTIVE:iJ L,ILll IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Aug. 15, 2013 Aug. 15, 2013 Per O.N. 32879 Jean D. Jewell Secretary ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP First Revision of Sheet No.155.4 I.P.U.C.No.1 Canceling Original Sheet No.155.4 AGRICULTURAL ENERGY SERVICES SCHEDULE NO.155 (Continued) DEFINITIONS:(Continued) Retrofit:Changes,modifications or additions to systems or equipment serving existing acreage or loads. INCENTIVES FOR EEMS: Energy Efficiency Incentives:Program Administrator or Company shall establish procedures and requirements for providing Energy Efficiency Incentives to Customers which shall be posted on the Company web site.Energy Efficiency Incentives include amounts available according to the energy,demand and cost formula listed below.All proposed Energy Efficiency Projects are subject to Program Administrator or Company approval prior to offering an Energy Efficiency Incentive Agreement or Application.Program Administrator or Company will establish Energy Efficiency Project approval criteria and post the criteria on the Company web site. Energy Efficiency Incentives made available for installation of EEMs pursuant to an Energy Efficiency Incentive Agreement or Application shall be the lesser of the sum of (a)and (b)OR (c): (a)$0.12 /kWh for the Annual kWh savings as determined using Program Administrator or Company provided or approved engineering analysis; (b)$50/kW for Average Monthly On Peak kW savings determined using Program Administrator or Company provided or approved engineering analysis. (c)50%of the EEM Cost as determined by the Program Administrator or Company. (Continued) Submitted Under Case No.PAC-E-13-lO ISSUED:May 24,2013 EFFECTIVE:L1 IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Aug. 15, 2013 Aug. 15, 2013 Per O.N. 32879 Jean D. Jewell Secretary ‘ROCKY M UNTAIN POWER A DIVISION OF PACIFICORP First Revision of Sheet No.155.6 LP.U.C.No.1 Canceling Original Sheet No.155.6 AGRICULTURAL ENERGY SERVICES SCHEDULE NO.155 (Continued) PROVISIONS OF SERVICE:(Continued) (2)EEM Inspection Program Administrator or Company may inspect any EEMs which are funded by or installed under this program.Satisfactory inspection by Program Administrator or Company will be required prior to receiving Energy Efficiency Incentives specified in the Energy Efficiency Incentive Agreement or approved Application. (3)Measure Performance Verification/Evaluation Program Administrator andlor Company may verify or evaluate the energy savings of installed Energy Efficiency Measures specified in the Energy Efficiency Incentive Agreement or approved Application.This verification may include a telephone survey,site visit,review of system operating characteristics,and pre-and post-installation of monitoring equipment as necessary to quantify actual energy savings. (4)Energy Efficiency Incentives will not be made available to induce fuel switching by Customer. ELECTRIC SERVICE REGULATIONS:Service under this Schedule is subject to the General Rules and Regulations contained in the tariff of which this Schedule is a part,and to those prescribed by regulatory authorities. Submitted Under Case No.PAC-E-13-lO ISSUED:May 24,2013 EFFECTIVE:_1 -, IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Aug. 15, 2013 Aug. 15, 2013 Per O.N. 32879 Jean D. Jewell Secretary ‘ROCKY MdUNTAIN POWER A DIVISION OF PACIFICOAP I.P.U.C.No.1 Original Sheet No.155.7 AGRICULTURAL ENERGY SERVICES SCHEDULE NO.155 (Continued) Submitted Under Advice Letter No.06-06 Category Pivot Span Low Pressure Drains I ith Sprinkler Pressure Regulators Existing pivot low pressure drains Sprinkler Package Existing sprinkler regulators pressure Existing sprinkler package with design flow 8.5 pmJacre Sprinkler Customer incentive New low pressure drain replacement parts or $4/each entire drain assemblil New sprinkler pressure same or lower outlet desil New sprinkler package with 7.5 gpmlacre Dual sprinkler] sprinkler package Existing sprinkler package with a design flow 7.5 Notes for Table 1: 1).All sprinklers on a center pivot must be maximum 170 heads per center pivot.3). new sprinkler package and are not eligibi sprinkler packages installed on linear or 2).Minimum 80 heads are considered part ofthe ;,pressure regulators and for incentives. ISSUED:August 14,2006 EFFECTWE:September 15,2006 ‘ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP I.P.U.C.No.1 Thid-Fourth_Revision of Sheet No.B.3 ____________ Canceling Seeo4-Third_Revision of Sheet No.B.3 ELECTRIC SERVICE SCHEDULES -Continued Schedule Sheet No.Class of Service No. 135 Net Metering Service 135.1—135.3 155 Agricultural Energy Services -Optional for Qualifying Customers 155.1 —155.67 191 Customer Efficiency Services Rate Adjustment 191 300 Regulation Charges 300.1 —300.4 400 Special Contract 400.1 401 Special Contract 401.1 Schedule numbers not listed are not currently used. *These schedules are not available to new customers or premises. Submitted Under Case No.PAC-E-14-O-73.10 ISSUED:Deeembef-2-7491-OMay 24.2013 EFFECTIVE:Deeember-2E4O4-0July 15,2013 ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP First Revision of Sheet No.155.4 LP.U.C.No.1 Cancelin2 Original Sheet No.155.4 6.69” AGRICULTURAL ENERGY SERVICES SCHEDULE NO.155 (Continued) DEFINITIONS:(Continued) Retrofit:Changes,modifications or additions to systems or equipment serving existing acreage or loads. INCENTIVES FOR EEMS: Nezle exchange:Program Administrator or Company shall establish procedures and requirements for a nozzle exchange program allowing Customer to exchange axisting nozzles,gasket and drains for appropriately sized new and like quiprnent.Nozzle exchange procedures.and requirements will be posted on the Company “veb site.Equipment installed on pivot or linear,’Iateral systems will not bfiibi-fbr Energy Efficiency incentives under the Nozzle exchange portion of —,.-.., based on the Energy Efficiency Incentives energy,demand and cost formula Energy Efficiency Incentives:Program Administrator or Company shall establish procedures and requirements for providing Energy Efficiency Incentives to Customers which shall be posted on the Company web site.Energy Efficiency Incentives include amounts I4ated-4—4able—l-a —a+mts-avaiIable according to the energy,demand and cost formula listed below.All proposed Energy Efficiency Projects are subject to Program Administrator or Company approval prior to offering an Energy Efficiency Incentive Agreement or Application. Program Administrator or Company will establish Energy Efficiency Project approval criteria and post the criteria on the Company web site. Efficiency Incentives made available for installation of EEMs pursuant to an Energy Efficiency Incentive Agreement or Application shall be shall—be-the lesser ofthe sum of(a)and (b)OR (c): (a)$012 /kWh for the Annual kWh savings as determined using Program Administrator or Company provided or approved engineering analysis; (b)$50/kW for Average Monthly On Peak kW savings determined using Program Administrator or Company provided or approved engineering analysis. (c)50%of the EEM Cost as determined by the Program Administrator or Company. (Continued) Submitted Under A e-Case better-No.04.0PAC-E-13-l0 ISSUED:August 14.2006May 24.2013 EFFECTIVE:September-l-& 2tIO6July 15.2013 ‘ROCKY MOUNTAIN POWER A OMSIONOF PACIFICORP First Revision of Sheet No.155.6 Formatted:Tab stops:631,Right +Not at 1.P.U.C.No.1 Canceling Original Sheet No.155.6 L669 AGRICULTURAL ENERGY SERVICES SCHEDULE NO.155 (Continued) PROVISIONS OF SERVICE:(Continued) (2)EEM Inspection Program Administrator or Company may inspect any EEMs which are funded by or installed under this program.Satisfactory inspection by Program Administrator or Company will be required prior to receiving Energy Efficiency Incentives specified in the Energy Efficiency Incentive Agreement or approved Application. (3)Measure Performance Verification/Evaluation Program Administrator andlor Company may verif’or evaluate the energy savings of installed Energy Efficiency Measures specified in the Energy Efficiency Incentive Agreement or approved Application.nozzlel or equipment received aa part of the Nozzle Exchange.andior improved eeqpent—operatien.This verification may include a telephone survey, site visit,review of system operating characteristics,and pre-and post- installation of monitoring equipment as necessary to quantif’actual energy savings. (4)Energy Efficiency Incentives will not be made available to induce fuel switching by Customer. ELECTRIC SERVICE REGULATIONS:Service under this Schedule is subject to the General Rules and Regulations contained in the tariffof which this Schedule is a part,and to those prescribed by regulatory authorities. (Continued) Submitted Under Advice Letter Case No.06-(36PAC-E-13-l0 ISSUED:Auguat ii,200éMay 24.2013 EFFECTIVE:-September 15, 2046july 15,2013