HomeMy WebLinkAboutFinal Approved Tariffs.pdf‘ROCKY MOUNTAIN
POWER
A OIVISON OF PACIFICORP
I.P.U.C.No.1 Fourth Revision of Sheet No.B.3
Canceling Third Revision of Sheet No.B.3
ELECTRIC SERVICE SCHEDULES -Continued
Schedule Sheet
No.Class of Service No.
135 Net Metering Service 135.1 —135.3
155 Agricultural Energy Services -Optional for Qualifying Customers 155.1 —155.6
191 Customer Efficiency Services Rate Adjustment 191
300 Regulation Charges 300.1 —300.4
400 Special Contract 400.1
401 Special Contract 401.1
Schedule numbers not listed are not currently used.
*These schedules are not available to new customers or premises.
Submitted Under Case No.PAC-E-l3-10
ISSUED:May 24,2013 EFFECTIVE:iJ L,ILll
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
Aug. 15, 2013 Aug. 15, 2013
Per O.N. 32879
Jean D. Jewell Secretary
ROCKY MOUNTAIN
POWER
A DIVISION OF PACIFICORP
First Revision of Sheet No.155.4
I.P.U.C.No.1 Canceling Original Sheet No.155.4
AGRICULTURAL ENERGY SERVICES SCHEDULE NO.155 (Continued)
DEFINITIONS:(Continued)
Retrofit:Changes,modifications or additions to systems or equipment serving
existing acreage or loads.
INCENTIVES FOR EEMS:
Energy Efficiency Incentives:Program Administrator or Company shall
establish procedures and requirements for providing Energy Efficiency Incentives
to Customers which shall be posted on the Company web site.Energy Efficiency
Incentives include amounts available according to the energy,demand and cost
formula listed below.All proposed Energy Efficiency Projects are subject to
Program Administrator or Company approval prior to offering an Energy
Efficiency Incentive Agreement or Application.Program Administrator or
Company will establish Energy Efficiency Project approval criteria and post the
criteria on the Company web site.
Energy Efficiency Incentives made available for installation of EEMs pursuant to
an Energy Efficiency Incentive Agreement or Application shall be the lesser of
the sum of (a)and (b)OR (c):
(a)$0.12 /kWh for the Annual kWh savings as determined using Program
Administrator or Company provided or approved engineering analysis;
(b)$50/kW for Average Monthly On Peak kW savings determined using
Program Administrator or Company provided or approved engineering
analysis.
(c)50%of the EEM Cost as determined by the Program Administrator or
Company.
(Continued)
Submitted Under Case No.PAC-E-13-lO
ISSUED:May 24,2013 EFFECTIVE:L1
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
Aug. 15, 2013 Aug. 15, 2013
Per O.N. 32879
Jean D. Jewell Secretary
‘ROCKY M UNTAIN
POWER
A DIVISION OF PACIFICORP
First Revision of Sheet No.155.6
LP.U.C.No.1 Canceling Original Sheet No.155.6
AGRICULTURAL ENERGY SERVICES SCHEDULE NO.155 (Continued)
PROVISIONS OF SERVICE:(Continued)
(2)EEM Inspection
Program Administrator or Company may inspect any EEMs which are
funded by or installed under this program.Satisfactory inspection by
Program Administrator or Company will be required prior to receiving
Energy Efficiency Incentives specified in the Energy Efficiency Incentive
Agreement or approved Application.
(3)Measure Performance Verification/Evaluation
Program Administrator andlor Company may verify or evaluate the energy
savings of installed Energy Efficiency Measures specified in the Energy
Efficiency Incentive Agreement or approved Application.This
verification may include a telephone survey,site visit,review of system
operating characteristics,and pre-and post-installation of monitoring
equipment as necessary to quantify actual energy savings.
(4)Energy Efficiency Incentives will not be made available to induce fuel
switching by Customer.
ELECTRIC SERVICE REGULATIONS:Service under this Schedule is subject to
the General Rules and Regulations contained in the tariff of which this Schedule is a part,and to
those prescribed by regulatory authorities.
Submitted Under Case No.PAC-E-13-lO
ISSUED:May 24,2013 EFFECTIVE:_1 -,
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
Aug. 15, 2013 Aug. 15, 2013
Per O.N. 32879
Jean D. Jewell Secretary
‘ROCKY MdUNTAIN
POWER
A DIVISION OF PACIFICOAP
I.P.U.C.No.1 Original Sheet No.155.7
AGRICULTURAL ENERGY SERVICES SCHEDULE NO.155 (Continued)
Submitted Under Advice Letter No.06-06
Category
Pivot Span Low
Pressure Drains
I ith
Sprinkler Pressure
Regulators
Existing pivot low pressure
drains
Sprinkler Package
Existing sprinkler
regulators
pressure
Existing sprinkler package
with design flow 8.5
pmJacre
Sprinkler
Customer
incentive
New low pressure drain replacement parts or $4/each
entire drain assemblil
New sprinkler pressure
same or lower outlet desil
New sprinkler package with
7.5 gpmlacre
Dual sprinkler]
sprinkler package
Existing sprinkler package
with a design flow 7.5
Notes for Table 1:
1).All sprinklers on a center pivot must be
maximum 170 heads per center pivot.3).
new sprinkler package and are not eligibi
sprinkler packages installed on linear or
2).Minimum 80 heads
are considered part ofthe
;,pressure regulators and
for incentives.
ISSUED:August 14,2006 EFFECTWE:September 15,2006
‘ROCKY MOUNTAIN
POWER
A DIVISION OF PACIFICORP
I.P.U.C.No.1 Thid-Fourth_Revision of Sheet No.B.3
____________
Canceling Seeo4-Third_Revision of Sheet No.B.3
ELECTRIC SERVICE SCHEDULES -Continued
Schedule Sheet
No.Class of Service No.
135 Net Metering Service 135.1—135.3
155 Agricultural Energy Services -Optional for Qualifying Customers 155.1 —155.67
191 Customer Efficiency Services Rate Adjustment 191
300 Regulation Charges 300.1 —300.4
400 Special Contract 400.1
401 Special Contract 401.1
Schedule numbers not listed are not currently used.
*These schedules are not available to new customers or premises.
Submitted Under Case No.PAC-E-14-O-73.10
ISSUED:Deeembef-2-7491-OMay 24.2013 EFFECTIVE:Deeember-2E4O4-0July 15,2013
ROCKY MOUNTAIN
POWER
A DIVISION OF PACIFICORP
First Revision of Sheet No.155.4
LP.U.C.No.1 Cancelin2 Original Sheet No.155.4 6.69”
AGRICULTURAL ENERGY SERVICES SCHEDULE NO.155 (Continued)
DEFINITIONS:(Continued)
Retrofit:Changes,modifications or additions to systems or equipment serving
existing acreage or loads.
INCENTIVES FOR EEMS:
Nezle exchange:Program Administrator or Company shall establish procedures
and requirements for a nozzle exchange program allowing Customer to exchange
axisting nozzles,gasket and drains for appropriately sized new and like
quiprnent.Nozzle exchange procedures.and requirements will be posted on the
Company “veb site.Equipment installed on pivot or linear,’Iateral systems will not
bfiibi-fbr Energy Efficiency incentives under the Nozzle exchange portion of
—,.-..,
based on the Energy Efficiency Incentives energy,demand and cost formula
Energy Efficiency Incentives:Program Administrator or Company shall
establish procedures and requirements for providing Energy Efficiency Incentives
to Customers which shall be posted on the Company web site.Energy Efficiency
Incentives include amounts I4ated-4—4able—l-a —a+mts-avaiIable according to
the energy,demand and cost formula listed below.All proposed Energy
Efficiency Projects are subject to Program Administrator or Company approval
prior to offering an Energy Efficiency Incentive Agreement or Application.
Program Administrator or Company will establish Energy Efficiency Project
approval criteria and post the criteria on the Company web site.
Efficiency Incentives made available for installation of EEMs pursuant to an
Energy Efficiency Incentive Agreement or Application shall be shall—be-the lesser
ofthe sum of(a)and (b)OR (c):
(a)$012 /kWh for the Annual kWh savings as determined using Program
Administrator or Company provided or approved engineering analysis;
(b)$50/kW for Average Monthly On Peak kW savings determined using
Program Administrator or Company provided or approved engineering
analysis.
(c)50%of the EEM Cost as determined by the Program Administrator or
Company.
(Continued)
Submitted Under A e-Case better-No.04.0PAC-E-13-l0
ISSUED:August 14.2006May 24.2013 EFFECTIVE:September-l-&
2tIO6July 15.2013
‘ROCKY MOUNTAIN
POWER
A OMSIONOF PACIFICORP
First Revision of Sheet No.155.6 Formatted:Tab stops:631,Right +Not at
1.P.U.C.No.1 Canceling Original Sheet No.155.6 L669
AGRICULTURAL ENERGY SERVICES SCHEDULE NO.155 (Continued)
PROVISIONS OF SERVICE:(Continued)
(2)EEM Inspection
Program Administrator or Company may inspect any EEMs which are
funded by or installed under this program.Satisfactory inspection by
Program Administrator or Company will be required prior to receiving
Energy Efficiency Incentives specified in the Energy Efficiency Incentive
Agreement or approved Application.
(3)Measure Performance Verification/Evaluation
Program Administrator andlor Company may verif’or evaluate the energy
savings of installed Energy Efficiency Measures specified in the Energy
Efficiency Incentive Agreement or approved Application.nozzlel or
equipment received aa part of the Nozzle Exchange.andior improved
eeqpent—operatien.This verification may include a telephone survey,
site visit,review of system operating characteristics,and pre-and post-
installation of monitoring equipment as necessary to quantif’actual energy
savings.
(4)Energy Efficiency Incentives will not be made available to induce fuel
switching by Customer.
ELECTRIC SERVICE REGULATIONS:Service under this Schedule is subject to
the General Rules and Regulations contained in the tariffof which this Schedule is a part,and to
those prescribed by regulatory authorities.
(Continued)
Submitted Under Advice Letter Case No.06-(36PAC-E-13-l0
ISSUED:Auguat ii,200éMay 24.2013 EFFECTIVE:-September 15,
2046july 15,2013