Loading...
HomeMy WebLinkAbout20120514Request for Responses.pdfSTATE OF IDAHO OFFICE OF THE ATTORNEY GENERAL LAWRENCE G. WASDEN RECEIVD 2012 MAY 114 PM 3:1414 iDAHO hJBL UTILITIES CGM1SiON May 14, 2012 Avista Corporation Michael Andrea Avista Utilities 1411 E. Mission P0 Box 3727 Spokane, WA 99220-3727 Rocky Mountain Power Mark Moench Daniel Solander Ted Weston PacifiCorp dba Rocky Mountain Power One Utah Center 201 S. Main Street, Suite 2300 Salt Lake City, UT 84111 Idaho Power Company Donovan E. Walker Idaho Power Company P0 Box 70 Boise, ID 83707-007 Clint Kalich Avista Utilities 1411 E. Mission P0 Box 3727 Spokane, WA 99220-3727 Greg Duvall Hui Shu Laren Hale PacifiCorp dba Rocky Mountain Power 825 NE Multnomah Street Portland, OR 97232 Randy Aliphin Idaho Power Company P0 Box 70 Boise, ID 83707-0070 Re: Case Nos. GNR-E-12-02; PAC-E-12-09 The Idaho Public Utilities Commission in Order No. 28708, Case No. GNR-E-99-1, established a methodology for the annual adjustable rate portion of avoided costs for those QF contracts using, variable costs associated with Colstrip, a coal-fired generating facility in southeast Montana. For those QF contracts with Colstrip-related fuel costs and variable O&M, future Colstrip variable cost adjustments are to be calculated by using FERC Form 1 Colstrip Unit Coal Costs per megawatt hour (MWh) and adding $2.00IMWh (the average variable O&M cost of Colstrip plus 200/MWh for generation taxes plus a five percent (5%) adjustment for line loss). As computed by Commission Staff the Colstrip related adjustable rate will change from 11.38 mill/kWh to 14.80 mill/kWh. The same calculated rate revision under the avoided cost methodology is used by Avista, PacifiCorp dba Rocky Mountain Power and Idaho Power Company. This change in the variable rate affects existing contracts under the previous SAR methodology. Contracts & Administrative Law Division, Idaho Public Utilities Commission P.O. Box 83720, Boise, Idaho 83720-0074, Telephone: (208) 334-0300, FAX: (208) 3343762, E-mail: tpuc@puc.state.id.us Located at 472 West Washington St., Boise, Idaho 83702 May 14, 2012 Page 2 The adjustable portion of the avoided cost rates under the Sumas-based methodology is based on annual average gas prices indexed at Sumas, Washington. As reported by Avista, the indexed gas prices have decreased by $0.39/MIvIBtu. The approved gas price of $4.99IMMBtu plus the $0.39/MMBtu decrease results in a gas price of $4.60/MMBtu for the 2012-2013 year. This equates to a SAR fuel cost of 32.66 mill/kWh as used in the model. In accordance with Order No. 29316, the adjustable portion of the avoided cost rate for PacifiCorp contracts with 1992 amendments has also been recomputed. Beginning on July 1, 2003, the adjustable portion for these contracts was ordered to be equal to the average cost of fuel for the Carbon, Hale, Naughton Huntington and Hunter generating plants, including a variable O&M component of $1.51 but exclusive of generation taxes and a line loss adjustment. The variable energy rate applicable to deliveries commencing July 1, 2012 extending through June 30, 2013 has been computed to be $1 8.52/MWh, an increase from $16.42 last year. Accompanying this letter are worksheets showing the computation of the revised adjustable rates for the various affected contracts. If after reviewing the revisions, you accept them as accurate please indicate your approval by letter (or other filing) directed to the Commission in the reserved case docket numbers identified above. The case heading for the generic adjustment, Case No. GNR-E- 12-02, will read as follows: IN THE MATTER OF THE ANNUAL REVISION AND UPDATED CALCULATION OF THE ADJUSTABLE PORTION OF THE AVOIDED COST RATE(S) FOR EXISTING PURPA CONTRACTS FOR AVISTA CORPORATION DBA AVISTA UTILITIES, FOR IDAHO POWER COMPANY, AND FOR PACIFICORP DBA ROCKY MOUNTAIN POWER. The case heading in the PacifiCorp case for PacifiCorp QF contracts with 1992 Amendment language, Case No. PAC-E-12-09, is as follows: IN THE MATTER OF THE ANNUAL REVISION OF QF VARIABLE ENERGY PRICES N ACCORDANCE WITH TERMS OF THE 1992 AMENDMENTS TO POWER PURCHASE AGREEMENTS BETWEEN IDAHO QFS AND PAC1FICORP. Please file your respective responses with the Commission on or prior to May 25, 2012. Thank you for your cooperation. Please feel free to contact Rick Sterling if you have any questions. Sincerely, le~ ~- a . qz'3'4~ Kristine A. Sasser Deputy Attorney General Enclosures b1s/L:GNR-E-12-02_PAC-E-12-09 avoided cost COLSTRIP ADJUSTABLE RATE CALCULATION For Period 7/1/12-6/30/13 Colstrip Fuel Cost from Avista FERC Form I for CY 2010 line 12 Net Generation (kwh) 1,432,719,000 line 20 Fuel $18,339,428 Fuel cost per kwh $0.012800 Fuel Cost per MWh $12.8004 Variable O&M, Gen. Tax, 5% line loss per MWh $2.0000 Total Colstrip Adjustable Rate $14.8004 Reference GNR-E-99-1 O.N. 28708 4117/2001 Colstrip_1 2-1 3.xls Average Gas Prices at Sumas, Washington from Inside FERC publication ($IMMBtu) Calculating the 2012-2013 Avoided Cost Adjustable Rate 2010 2011 Jan $6.49 $4.19 Feb $5.51 $4.11 Mar $4.78 $3.82 Apr $3.98 $4.04 May $3.97 $3.99 Jun $3.75 $4.03 July $4.06 $4.00 Aug $3.80 $3.97 Sep $3.11 $3.72 Oct $3.66 $3.70 Nov $3.75 $3.66 Dec $4.98 $3.93 Average $4.32 $3.93 Actual Annual Adjustment: $4.99 - ($4.32-$3.93) = $4.60 Note: $2.80IMMBtu = 2000-01 Approved Rate $4.82/MMBtu = 2001-02 Approved Rate $5.23/MMBtu = 2002-03 Approved Rate $3.33/MMBtu = 2003-04 Approved Rate $5.3 1/MMBtu = 2004-05 Approved Rate $5.92/MMBtu = 2005-06 Approved Rate $7.80/MMBtu = 2006-07 Approved Rate $6.94/MMBtu = 2007-08 Approved Rate $7.18/MMBtu = 2008-09 Approved Rate $9.00/MMBtu = 2009-10 Approved Rate $4.62/MMBtu = 2010-11 Approved Rate $4.99/MMBtu = 2011-12 Approved Rate PaciflCorp Total Variable Energy Rate for 201212013 Carbon Naughton Huntington Hunter Totals Fuel Cost ($) $20,346,469 $ 101,169,233 $94,465,053 $ 121,472,568 $337,453,323 2011 FERC FORM I - Page 402 Line 20 Generation (MWH) 1,332,218 5,102,251 5,961,371 7,445,083 19,840,923 2011 FERC FORM 1 - Page 402 Line 12 Average Fuel Cost ($/MWH) $ 17.01 /MWH Variable O&M $ 1.51 /MWH Total Variable Energy Rate for 2012/2013 $ 18.52 /MWH For deliveries commencing July 1, 2012 extending through June 30, 2013 12 PacifiCorp/QFs contracts with approved 1992 amendment language