HomeMy WebLinkAbout20120510Annual Revision of QF Variable Prices.pdfROCKY MOUNTAIN a i-ivvrc
A DIViSION OF PACIFICORP 201 South Main, Suite 2300
May 10, 2012 201? MAY 10 AIIItJ:05 Salt Lake City, Utah 84lll
VIA OVERJJIGHTDELIVERY UTILITIES COMMSSON
Idaho Public Utilities Commission
472 W. Washington
Boise, ID 83702
Attention: Jean Jewell
Commission Secretary
RE: ANNUAL NOTICE OF REVISION OF QF VARIABLE ENERGY PRICES
Dear Ms. Jewell,
In compliance with IPUC Order No. 29316, Rocky Mountain Power, a division of PacifiCorp, is
providing the updated QF variable energy price in accordance with the terms of the 1992
amendments to Idaho QF power purchase agreements.
The variable energy rate applicable to deliveries commencing July 1, 2012 extending through
June 30, 2013 shall be $1 8.52/MWH. The calculation is attached, together with the relevant
pages from the Company's FERC Form 1 for year/period ending 201 l/Q4.
If you have any questions, please feel free to call or email Brian Dickman, Manager Net Power
Costs, at (503) 813-6484 or Brian.Dickman@PacifiCorp.com
Sincerely,
4-
L Low
effrey K. arsen
Vice President, Regulation & Government Affairs
PacifiCorp
Total Variable Energy Rate
for 2012/2013
Carbon Naughton Huntington Hunter Totals
Fuel Cost ($) $20,346,469 $ 101,169,233 $ 94,465,053 $ 121,472,568 $337,453,323
2011 FERC FORM 1 - Page 402 Line 20
Generation (MWH) 1,332,218 5 102 251 5,961,371 7445 083 19,840 923
2011 FERC FORM I - Page 4O2 Line 12
Average Fuel Cost ($/MWH) $ 17.01 /MWH
Variable O&M $ 1.51 /MWH
Total Variable Energy Rate for 2012 /2013 $ 18.52 /MWH
For deliveries commencing July 1, 2012 extending through June 30, 2013
12 PacifiCorp/QFs contracts with approved 1992 amendment language
Name of Respondent
PacifiCoip
This Report Is: (1)JAn Original
(2)0A Resubmission
Date of Report
(Mo, Da, Yr)
04/1812012
Year/Period of Report
End 2011/04
STEAM-ELECTRIC GENERATING PLANT STATISTICS (Large Plants)
1. Report data for plant in Service only. 2. Large plants are steam plants with installed capacity (name plate rating) of 25,000 Kw or more. Report in
this page gas-turbine and internal combustion plants of 10,000 Kw or more, and nuclear plants. 3. Indicate by a footnote any plant leased or operated
as a joint facility. 4. If not peak demand for 60 minutes is not available, give data which Is available, specifying period. 5. If any employees attend
more than one plant, report on line 11 the approximate average number of employees assignable to each plant. 6. If gas is used and purchased on a
therm basis report the Btu content or the gas and the quantity of fuel burned converted to Mct. 7. Quantities of fuel burned (Line 38) and average cost
per unit of fuel burned (Line 41) must be consistent with charges to expense accounts 501 and 547 (Line 42)as show on Line 20. 8. If more than one
fuel is burned in a plant furnish only the composite heat rate for all fuels burned.
Line
No.
-
Item
(a)
Plant
Name: Carbon
(b)
Plant
Name: Cholla
(C)
1 Kind of Plant (Internal Comb, Gas Turb, Nuclear Steam Steam
2 Type of Constr (Conventional, Outdoor. Boiler, etc) Outdoor Boiler Full Outdoor
3 Year Originally Constructed 1954 1981
4 Year Last Unit was Installed 1957 1981
5 Total Installed Cap (Max Gen Name Plate Ratings-MW) 188.60 414.00
6 Net Peak Demand on Plant - MW (60 minutes) 176 386
7 Plant Hours Connected to Load 8160 8150
8 Net Continuous Plant Capability (Megawatts) 0
9 When Not Limited by Condenser Water 172 395
10 When Limited by Condenser Water 0 0
11 Average Number of Employees 69 0
12 Net Generation Exclusive of Plant Use KWh $IMQQT, 2686370000
13 1 Cost of Plant: Land and Land Rights 956546 2468743
141 Structures and Improvements 15338483 59823657
15 Equipment Costs 103948678 482802607
16 Asset Retirement Costs 6676303 39000
17 Total Cost 126920010 525134007
18 Cost per KW of Installed Capacity (line 17/5) Including 672.9587 1268.4396
19 Production Expenses: Oper, Supv, & Engr 44274 2321461
20 Fuel X46I69 54754988
21 Coolants and Water (Nuclear Plants Only) 0 - 0
22 Steam Expenses 1629639 8463931
23 Steam From Other Sources 0 0
24 Steam Transferred (Cr) 0 0
25 1 Electric Expenses 2111880 1143719
261 Misc Steam (or Nuclear) Power Expenses 4213408 1678311
271 Rents 0 823
281 Allowances 0 0
29 Maintenance Supervision and Engineering 0 2009197
30 Maintenance of Structures 325434 645306
31 Mainteiance of Boiler (or reactor) Plant 2483678 4986755
32 Maintenance of Electric Plant 623477 692107
33 Maintenance of Misc Steam (or Nuclear) Plant 274457 2069412
34 Total Production Expenses 32052716 78765810
35 Expenses per Net KWh 0.0241 0.0293
36 Fuel: Kind (Coal, Gas, Oil, or Nuclear) Coal Oil Composite Coal Oil Composite
37 Unit (Coal-tons/OiI-barrellGas-mcf/Nuclear-indicate) Tons Barrels Tons Barrels
38 Quantity(Units)of Fuel Burned 622119 946 0 1525966 1358 0
39 Avg Heat Cont - Fuel Burned (btullndicate if nuclear) 11896 138000 0 9255 130677 0
40 Avg Cost of Fuel/unit, as Delvd f.o.b. during year 31.638 127.607 0.000 34.339 68.717 0.000
41 Average Cost of Fuel per Unit Burned 32.511 127.607 0.000 35.821 68.717 0.000
42 Average Cost of Fuel Burned per Million BTU 1.366 22.016 1.374 1.935 12.521 1.938
43 Average Cost of Fuel Burned per KWh Net Gen 0.016 0.000 0.015 0.020 0.000 10.020
44 Average BTU per KWh Net Generation 11110.245 4.117 11114.362 10506.464 2.772 110509.236
FERC FORM NO.1 (REV. 12-03) Page 402
Name of Respondent
PacifiCorp
This Rport Is:
(1)[JAn Original
(2)[]A Resubmission
Date of Report
(Mo, Da, Yr)
0411812012
Year/Period of Report
End of 201 1/Q4
STEAM-ELECTRIC GENERATING PLANT STATISTICS (Large Plants) (Continued)
1. Report data for plant In Service only. 2. Large plants are steam plants with installed capacity (name plate rating) of 25,000 Kw or more. Report in
this page gas-turbine and internal combustion plants of 10,000 Kw or more, and nuclear plants. 3. Indicate by a footnote any plant leased or operated
as a Joint facility. 4. If net peak demand for 60 minutes is not available, give data which is available, specifying period. 5. If any employees attend
more than one plant, report online lithe approximate average number of employees assignable to each plant. 6. If gas is used and purchased on a
therm basis report the Btu content or the gas and the quantity of fuel burned converted to Mci. 7. Quantities of fuel burned (Line 38) and average cost
per unit of fuel burned (Line 41) must be consistent with charges to expense accounts 501 and 547 (Line 42) as show on Line 20. 8. If more than one
fuel is burned in a plant furnish only the composite heat rate for all fuels burned.
Line
No.
-
Item
(a)
Plant
Name; Huntington
(b)
Plant
Name: Jim Bridger
(C)
1 Kind of Plant (Internal Comb, Gas Turb, Nuclear Steam Steam
2 Type of Constr (Conventional, Outdoor, Boiler, sic) Outdoor Boiler Semi-Outdoor
3 Year Originally Constructed 1974 - 1974
4 Year Last Unit was Installed 1977 1979
_5 Total Installed Gap (Max Gen Name Plate Ratings-MW) 996.00 1545.10
6 1 Net Peak Demand on Plant - MW (60 minutes) 934 1421
7 Plant Hours Connected to Load 8276 8760
8 Net Continuous Plant Capability (Megawatts) 0 0
9 When Not Limited by Condenser Water 909 1412
10 When Limited by Condenser Water 0 0
11 Average Number of Employees 163 331
12 Net Generation, Exclusive of Plant Use - KWh 5961371000 8905672000
13 Cost of Plant; Land and Land Rights 2386782 1161925
14 Structures and Improvements 115439586 140256251
15 Equipment Costs 698035416 912532257
16 Asset Retirement Costs 1320578 5049812
17 Total Cost 817182362 1059000045
18 Cost per NW of Installed Capacity (line 1715) Including 820.4642 685.3926
19 Production Expenses: Oper,Supv, & Engr 13687 15431407
20 Fuel 94465053 205181742
21 Coolants and Water (Nuclear Plants Only) 0 0
22 Steam Expenses 7704010 3732333
23 Steam From Other Sources 0 0
24 Steam Transferred (Cr) 0 0
25 Electric Expenses 0 15495
26 Misc Steam (or Nuclear) Power Expenses 12330552 -12200227
27 Rents 1000 227829
28 Allowances (1 0
29 1 Maintenance Supervision and Engineering 1299908 430025
30 Maintenance of Structures 2441557 8264038
31 Maintenance of Boiler (or reactor) Plant 12135022 25851801
32 Maintenance of Electric Plant 3934986 8293459
33 Maintenance of Misc Steam (or Nuclear) Plant 1148487 3573047
34 Total Production Expenses 135472262 258800949
35 Expenses per Net kWh 0.0227 0.0291
36 Fuel: Kind (Coal, Gas, Oil, or Nuclear) Coal Oil Composite Coal Oil Composite
37 Unit (Coal-tons/Oil-barrellGas-mcf/Nuclear-indicate) Tons Barrels Tons Barrels
38 Quantify (Units) of Fuel Burned 2457036 14459 0 4987635 - 19395 0
39 Avg Heat Cont - Fuel Burned (btu/indicate If nuclear) 11682 138000 0 9209 138000 0
40 Avg Cost of Fuel/unit, as Delvdf.o.b. during year 35.048 135.969 0.000 38.257 117.187 0.000
41 Average Cost of Fuel per Unit Burned 37.647 135.969 10.000 40.682 117.187 0.000
42 Average Cost of Fuel Burned per Million BTU 1:611 23.459 1.643 2.209 20.219 2.231
43 Average Cost of Fuel Burned per KWh Net Gen 0.016 0.000 0.016 0.023 0.000 10.023
44 Average BTU per KWh Net Generation 9629.811 14.058 9643.869 10315.263 12.622 10327.885
FERC FORM NO.1 (REV. 1203) Page 402.2
Name of Respondent
PactflCOrp
This Report Is:
(1)[JAn Original
(2)0A Resubmission
Date of Report (Mo, Da, Yr)
04/18/2012
Year/Period of Report
End of 2011/Q4
STEAM-ELECTRIC GENERATING PLANT STATISTICS (Large Plants)(Continueq)
9. Items under Cost of Plant are based on U, S. of A. Accounts. Production expenses do not include Purchased Power, System Control and Load
Dispatching, and Other Expenses Classified as Other Power Supply Expenses. 10. For IC and GT plants, report Operating Expenses, Account Nos.
547 and 549 on Line 25 "Electric Expenses,' and Maintenance Account Nos. 553 and 554 on Line 32, "Maintenance of Electric Plant." Indicate plants
designed for peak load service. Designate automatically operated plants. 11. For a plant equipped with combinations of fossil fuel steam, nuclear
steam, hydro, internal combustion or gas-turbine equipment, report each as a separate plant. However, if a gas-turbine unit functions in a combined
cycle operation with a conventional steam unit, include the gas-turbine with the steam plant. 12. If a nuclear power generating plant, briefly explain by
footnote (a) accounting method for cost of power generated including any excess costs attributed to research and development; (b) types of cost units
used for the various components of fuel cost; and (c) any other informative data concerning plant type fuel used, fuel enrichment type and quantity for the
report period and other physical and operating characteristics of plant.
Plant
Name: Hunter Unit No. 2
(d)
Plant
Name: Hunter Unit No.3
(e)
Plant
Name: Hunter - Total Plant
(f)
Line
No.
Steam Steam Steam 1
Outdoor Boiler Outdoor Boiler Outdoor Boiler 2
1980 1983 1978 3
1980 1983 1983 4
294.50 495.60 1247.80 5
280 461 1149 6
6932 7880 8740 7
0 0
269 460 1147 9
0 0 0
0 0 21311
1613030000 2986883000 744..83000 12
9688975 10275401 29653351 13
51994484 91277571 206441852 14
239881036 410640791 921260382 15
431476 431476 1294428 16
301775971 512625239 1158656013 17
1024.7062 1034.3528 928.5591 18
59 101 252 19
25913796 49631646 1214288 20
0 0 0 21
2014131 3311933 8392153 22
0 0 0 231
0 0 024
0 0 0 25
-1773864 2579207 3221994 26
2341 3673 9352 27
0 0 0 28
0 0 0 29
2232392 2136616 6548370 30
8996195 9448392 24041399 31
4119736 1794468 7285598 32
164934 412053 782471 33
41669720 69318089 171754157 34
0.0258
Coal Oil Composite
0.0232
Coal Oil Composite
0.0231
Coal Oil Composite
35
36
Tons Barrels Tons Barrels Tons Barrels 37
713870 3562 0 1343957 14267 0 3335592 21983 0 38
11577 138000 0 11413 138000 0 11516 138000 0 39
0.000 0.000 0.000 0.000 0.000 0.000 38.413 136.519 0.000 40
35.619 0.000 0.000 35.484 0.000 0.000 35.518 136.519 10.000 41
1.538 23.562 1.566 1.555 23.494 1.614 1.542 1.579 42
0.016 0.000 0.016 0.016 0.001 0.017 0.016
n23.554
0.016 43
10246.984 12.799 10259.783 10270.174 27.686 10297.860 10318.684 10335.782 44
FERC FORM NO.1 (REV. 12-03) Page 403.1
Name of Respondent
PacifiCorp
This Report Is:
(1)[]An Original
(2)0A Resubmission
Date of Report
(Mo, Da, Yr)
0411812012
Year/Period of Report
End of 2011/04
STEAM-ELECTRIC GENERATING PLANT STATISTICS (Large Plànts)(Continued)
9. Items under Cost of Plant are based on U. S. of A. Accounts. Production expenses do not include Purchased Power, System Control and Load
Dispatching, and Other Expenses Classified as Other Power Supply Expenses. 10. For IC and GT plants, report Operating Expenses, Account Nos.
547 and 549 on Line 25 "Electric Expenses," and Maintenance Account Nos. 553 and 554 on Line 32, "Maintenance of Electric Plant." Indicate plants
designed for peak load service. Designate automatically operated plants. 11. For a plant equipped with combinations of fossil fuel steam, nuclear
steam, hydra, internal combustion or gas-turbine equipment, report each as a separate plant. However, if a gas-turbine unit functions in a combined
cycle operation with a conventional steam unit, include the gas-turbine with the steam plant. 12. If a nuclear power generating plant, briefly explain by
footnote (a) accounting method for cost of power generated including any excess costs attributed to research and development; (b) types of cost units
used for the various components of fuel cost; and (c) any other informative data concerning plant type fuel used, fuel enrichment type and quantity for the
report period and other physical and operafin characteristics of plant. -
Plant
Name: Naughton
(d)
Plant
Name: Wyodak
(e)
Plant.
Name: Gadsby Steam
(f)
Line
No.
-
Steam Steam . Steam 1
Outdoor Boiler . Conventional Outdoor 2
1963 1978 1951 3
.1971 1978 1955 4
707.20 289.70 . 251.60 5
710 279 196 6
8760 6079 1228 7
0 0 8
700 268 231 9
0 0 0 _10
146 65 . 34 11
1i25I000 1457709000 69094000 12
1094739 210526 1252090 13
70184754 50872324 15095198 14
545628764 . 391262775 64530281 15
14207864 . 490453 587008 16
631116121 442836078 81464577 17
892.4153 1528.6023 . 323.7861 18
89488 302145 45847 19
77-1 15125638 . 9413917 20
0 0 021
4470634 13169 0 22
0 0 . 023
0 0 0 24
11279 0 0 25
13043071 4158309 3660485 26
1243 5701 0 27
0 0 0 281
1343942 0 0 29
1286755 . . 412626 257733 30
10693418 . . 8086379 904380 31
3658603 4195535 1260907 32
1616276 238999 305328 33
137383942 32538501 15848597 34
0.0269
Coal Gas Composite
0.0223
Coal Oil Composite
0.2294 35
Gas
Tons MCF Tons Barrels MCF 37
2761016 134829 0 1163685 11714 0 1111436 0 0 38
9755 1030 0 7789 138000 0 1029 0 0 39
36.236 8.667 0.000 12.284 131.751 0.000 8.470 0.000 0.000 40
36.219 0.000 11.672 131.751 10.000 8.470 10.000 10.000 41
1.857 8.418 1.873 0.749 22.731 0.831 8.229 0.000 10.000 42
0.020 0.000 0.020 0.009 0.001 0.010 0.136 0.000 0.000 43
10557.037 27.209 10584.246 12435.966 46.577 12482.543 16556.749 0.000 10.000 44
FERC FORM NO.1 (REV. 12-03) Page 403.2