Loading...
HomeMy WebLinkAbout20120510Annual Revision of QF Variable Prices.pdfROCKY MOUNTAIN a i-ivvrc A DIViSION OF PACIFICORP 201 South Main, Suite 2300 May 10, 2012 201? MAY 10 AIIItJ:05 Salt Lake City, Utah 84lll VIA OVERJJIGHTDELIVERY UTILITIES COMMSSON Idaho Public Utilities Commission 472 W. Washington Boise, ID 83702 Attention: Jean Jewell Commission Secretary RE: ANNUAL NOTICE OF REVISION OF QF VARIABLE ENERGY PRICES Dear Ms. Jewell, In compliance with IPUC Order No. 29316, Rocky Mountain Power, a division of PacifiCorp, is providing the updated QF variable energy price in accordance with the terms of the 1992 amendments to Idaho QF power purchase agreements. The variable energy rate applicable to deliveries commencing July 1, 2012 extending through June 30, 2013 shall be $1 8.52/MWH. The calculation is attached, together with the relevant pages from the Company's FERC Form 1 for year/period ending 201 l/Q4. If you have any questions, please feel free to call or email Brian Dickman, Manager Net Power Costs, at (503) 813-6484 or Brian.Dickman@PacifiCorp.com Sincerely, 4- L Low effrey K. arsen Vice President, Regulation & Government Affairs PacifiCorp Total Variable Energy Rate for 2012/2013 Carbon Naughton Huntington Hunter Totals Fuel Cost ($) $20,346,469 $ 101,169,233 $ 94,465,053 $ 121,472,568 $337,453,323 2011 FERC FORM 1 - Page 402 Line 20 Generation (MWH) 1,332,218 5 102 251 5,961,371 7445 083 19,840 923 2011 FERC FORM I - Page 4O2 Line 12 Average Fuel Cost ($/MWH) $ 17.01 /MWH Variable O&M $ 1.51 /MWH Total Variable Energy Rate for 2012 /2013 $ 18.52 /MWH For deliveries commencing July 1, 2012 extending through June 30, 2013 12 PacifiCorp/QFs contracts with approved 1992 amendment language Name of Respondent PacifiCoip This Report Is: (1)JAn Original (2)0A Resubmission Date of Report (Mo, Da, Yr) 04/1812012 Year/Period of Report End 2011/04 STEAM-ELECTRIC GENERATING PLANT STATISTICS (Large Plants) 1. Report data for plant in Service only. 2. Large plants are steam plants with installed capacity (name plate rating) of 25,000 Kw or more. Report in this page gas-turbine and internal combustion plants of 10,000 Kw or more, and nuclear plants. 3. Indicate by a footnote any plant leased or operated as a joint facility. 4. If not peak demand for 60 minutes is not available, give data which Is available, specifying period. 5. If any employees attend more than one plant, report on line 11 the approximate average number of employees assignable to each plant. 6. If gas is used and purchased on a therm basis report the Btu content or the gas and the quantity of fuel burned converted to Mct. 7. Quantities of fuel burned (Line 38) and average cost per unit of fuel burned (Line 41) must be consistent with charges to expense accounts 501 and 547 (Line 42)as show on Line 20. 8. If more than one fuel is burned in a plant furnish only the composite heat rate for all fuels burned. Line No. - Item (a) Plant Name: Carbon (b) Plant Name: Cholla (C) 1 Kind of Plant (Internal Comb, Gas Turb, Nuclear Steam Steam 2 Type of Constr (Conventional, Outdoor. Boiler, etc) Outdoor Boiler Full Outdoor 3 Year Originally Constructed 1954 1981 4 Year Last Unit was Installed 1957 1981 5 Total Installed Cap (Max Gen Name Plate Ratings-MW) 188.60 414.00 6 Net Peak Demand on Plant - MW (60 minutes) 176 386 7 Plant Hours Connected to Load 8160 8150 8 Net Continuous Plant Capability (Megawatts) 0 9 When Not Limited by Condenser Water 172 395 10 When Limited by Condenser Water 0 0 11 Average Number of Employees 69 0 12 Net Generation Exclusive of Plant Use KWh $IMQQT, 2686370000 13 1 Cost of Plant: Land and Land Rights 956546 2468743 141 Structures and Improvements 15338483 59823657 15 Equipment Costs 103948678 482802607 16 Asset Retirement Costs 6676303 39000 17 Total Cost 126920010 525134007 18 Cost per KW of Installed Capacity (line 17/5) Including 672.9587 1268.4396 19 Production Expenses: Oper, Supv, & Engr 44274 2321461 20 Fuel X46I69 54754988 21 Coolants and Water (Nuclear Plants Only) 0 - 0 22 Steam Expenses 1629639 8463931 23 Steam From Other Sources 0 0 24 Steam Transferred (Cr) 0 0 25 1 Electric Expenses 2111880 1143719 261 Misc Steam (or Nuclear) Power Expenses 4213408 1678311 271 Rents 0 823 281 Allowances 0 0 29 Maintenance Supervision and Engineering 0 2009197 30 Maintenance of Structures 325434 645306 31 Mainteiance of Boiler (or reactor) Plant 2483678 4986755 32 Maintenance of Electric Plant 623477 692107 33 Maintenance of Misc Steam (or Nuclear) Plant 274457 2069412 34 Total Production Expenses 32052716 78765810 35 Expenses per Net KWh 0.0241 0.0293 36 Fuel: Kind (Coal, Gas, Oil, or Nuclear) Coal Oil Composite Coal Oil Composite 37 Unit (Coal-tons/OiI-barrellGas-mcf/Nuclear-indicate) Tons Barrels Tons Barrels 38 Quantity(Units)of Fuel Burned 622119 946 0 1525966 1358 0 39 Avg Heat Cont - Fuel Burned (btullndicate if nuclear) 11896 138000 0 9255 130677 0 40 Avg Cost of Fuel/unit, as Delvd f.o.b. during year 31.638 127.607 0.000 34.339 68.717 0.000 41 Average Cost of Fuel per Unit Burned 32.511 127.607 0.000 35.821 68.717 0.000 42 Average Cost of Fuel Burned per Million BTU 1.366 22.016 1.374 1.935 12.521 1.938 43 Average Cost of Fuel Burned per KWh Net Gen 0.016 0.000 0.015 0.020 0.000 10.020 44 Average BTU per KWh Net Generation 11110.245 4.117 11114.362 10506.464 2.772 110509.236 FERC FORM NO.1 (REV. 12-03) Page 402 Name of Respondent PacifiCorp This Rport Is: (1)[JAn Original (2)[]A Resubmission Date of Report (Mo, Da, Yr) 0411812012 Year/Period of Report End of 201 1/Q4 STEAM-ELECTRIC GENERATING PLANT STATISTICS (Large Plants) (Continued) 1. Report data for plant In Service only. 2. Large plants are steam plants with installed capacity (name plate rating) of 25,000 Kw or more. Report in this page gas-turbine and internal combustion plants of 10,000 Kw or more, and nuclear plants. 3. Indicate by a footnote any plant leased or operated as a Joint facility. 4. If net peak demand for 60 minutes is not available, give data which is available, specifying period. 5. If any employees attend more than one plant, report online lithe approximate average number of employees assignable to each plant. 6. If gas is used and purchased on a therm basis report the Btu content or the gas and the quantity of fuel burned converted to Mci. 7. Quantities of fuel burned (Line 38) and average cost per unit of fuel burned (Line 41) must be consistent with charges to expense accounts 501 and 547 (Line 42) as show on Line 20. 8. If more than one fuel is burned in a plant furnish only the composite heat rate for all fuels burned. Line No. - Item (a) Plant Name; Huntington (b) Plant Name: Jim Bridger (C) 1 Kind of Plant (Internal Comb, Gas Turb, Nuclear Steam Steam 2 Type of Constr (Conventional, Outdoor, Boiler, sic) Outdoor Boiler Semi-Outdoor 3 Year Originally Constructed 1974 - 1974 4 Year Last Unit was Installed 1977 1979 _5 Total Installed Gap (Max Gen Name Plate Ratings-MW) 996.00 1545.10 6 1 Net Peak Demand on Plant - MW (60 minutes) 934 1421 7 Plant Hours Connected to Load 8276 8760 8 Net Continuous Plant Capability (Megawatts) 0 0 9 When Not Limited by Condenser Water 909 1412 10 When Limited by Condenser Water 0 0 11 Average Number of Employees 163 331 12 Net Generation, Exclusive of Plant Use - KWh 5961371000 8905672000 13 Cost of Plant; Land and Land Rights 2386782 1161925 14 Structures and Improvements 115439586 140256251 15 Equipment Costs 698035416 912532257 16 Asset Retirement Costs 1320578 5049812 17 Total Cost 817182362 1059000045 18 Cost per NW of Installed Capacity (line 1715) Including 820.4642 685.3926 19 Production Expenses: Oper,Supv, & Engr 13687 15431407 20 Fuel 94465053 205181742 21 Coolants and Water (Nuclear Plants Only) 0 0 22 Steam Expenses 7704010 3732333 23 Steam From Other Sources 0 0 24 Steam Transferred (Cr) 0 0 25 Electric Expenses 0 15495 26 Misc Steam (or Nuclear) Power Expenses 12330552 -12200227 27 Rents 1000 227829 28 Allowances (1 0 29 1 Maintenance Supervision and Engineering 1299908 430025 30 Maintenance of Structures 2441557 8264038 31 Maintenance of Boiler (or reactor) Plant 12135022 25851801 32 Maintenance of Electric Plant 3934986 8293459 33 Maintenance of Misc Steam (or Nuclear) Plant 1148487 3573047 34 Total Production Expenses 135472262 258800949 35 Expenses per Net kWh 0.0227 0.0291 36 Fuel: Kind (Coal, Gas, Oil, or Nuclear) Coal Oil Composite Coal Oil Composite 37 Unit (Coal-tons/Oil-barrellGas-mcf/Nuclear-indicate) Tons Barrels Tons Barrels 38 Quantify (Units) of Fuel Burned 2457036 14459 0 4987635 - 19395 0 39 Avg Heat Cont - Fuel Burned (btu/indicate If nuclear) 11682 138000 0 9209 138000 0 40 Avg Cost of Fuel/unit, as Delvdf.o.b. during year 35.048 135.969 0.000 38.257 117.187 0.000 41 Average Cost of Fuel per Unit Burned 37.647 135.969 10.000 40.682 117.187 0.000 42 Average Cost of Fuel Burned per Million BTU 1:611 23.459 1.643 2.209 20.219 2.231 43 Average Cost of Fuel Burned per KWh Net Gen 0.016 0.000 0.016 0.023 0.000 10.023 44 Average BTU per KWh Net Generation 9629.811 14.058 9643.869 10315.263 12.622 10327.885 FERC FORM NO.1 (REV. 1203) Page 402.2 Name of Respondent PactflCOrp This Report Is: (1)[JAn Original (2)0A Resubmission Date of Report (Mo, Da, Yr) 04/18/2012 Year/Period of Report End of 2011/Q4 STEAM-ELECTRIC GENERATING PLANT STATISTICS (Large Plants)(Continueq) 9. Items under Cost of Plant are based on U, S. of A. Accounts. Production expenses do not include Purchased Power, System Control and Load Dispatching, and Other Expenses Classified as Other Power Supply Expenses. 10. For IC and GT plants, report Operating Expenses, Account Nos. 547 and 549 on Line 25 "Electric Expenses,' and Maintenance Account Nos. 553 and 554 on Line 32, "Maintenance of Electric Plant." Indicate plants designed for peak load service. Designate automatically operated plants. 11. For a plant equipped with combinations of fossil fuel steam, nuclear steam, hydro, internal combustion or gas-turbine equipment, report each as a separate plant. However, if a gas-turbine unit functions in a combined cycle operation with a conventional steam unit, include the gas-turbine with the steam plant. 12. If a nuclear power generating plant, briefly explain by footnote (a) accounting method for cost of power generated including any excess costs attributed to research and development; (b) types of cost units used for the various components of fuel cost; and (c) any other informative data concerning plant type fuel used, fuel enrichment type and quantity for the report period and other physical and operating characteristics of plant. Plant Name: Hunter Unit No. 2 (d) Plant Name: Hunter Unit No.3 (e) Plant Name: Hunter - Total Plant (f) Line No. Steam Steam Steam 1 Outdoor Boiler Outdoor Boiler Outdoor Boiler 2 1980 1983 1978 3 1980 1983 1983 4 294.50 495.60 1247.80 5 280 461 1149 6 6932 7880 8740 7 0 0 269 460 1147 9 0 0 0 0 0 21311 1613030000 2986883000 744..83000 12 9688975 10275401 29653351 13 51994484 91277571 206441852 14 239881036 410640791 921260382 15 431476 431476 1294428 16 301775971 512625239 1158656013 17 1024.7062 1034.3528 928.5591 18 59 101 252 19 25913796 49631646 1214288 20 0 0 0 21 2014131 3311933 8392153 22 0 0 0 231 0 0 024 0 0 0 25 -1773864 2579207 3221994 26 2341 3673 9352 27 0 0 0 28 0 0 0 29 2232392 2136616 6548370 30 8996195 9448392 24041399 31 4119736 1794468 7285598 32 164934 412053 782471 33 41669720 69318089 171754157 34 0.0258 Coal Oil Composite 0.0232 Coal Oil Composite 0.0231 Coal Oil Composite 35 36 Tons Barrels Tons Barrels Tons Barrels 37 713870 3562 0 1343957 14267 0 3335592 21983 0 38 11577 138000 0 11413 138000 0 11516 138000 0 39 0.000 0.000 0.000 0.000 0.000 0.000 38.413 136.519 0.000 40 35.619 0.000 0.000 35.484 0.000 0.000 35.518 136.519 10.000 41 1.538 23.562 1.566 1.555 23.494 1.614 1.542 1.579 42 0.016 0.000 0.016 0.016 0.001 0.017 0.016 n23.554 0.016 43 10246.984 12.799 10259.783 10270.174 27.686 10297.860 10318.684 10335.782 44 FERC FORM NO.1 (REV. 12-03) Page 403.1 Name of Respondent PacifiCorp This Report Is: (1)[]An Original (2)0A Resubmission Date of Report (Mo, Da, Yr) 0411812012 Year/Period of Report End of 2011/04 STEAM-ELECTRIC GENERATING PLANT STATISTICS (Large Plànts)(Continued) 9. Items under Cost of Plant are based on U. S. of A. Accounts. Production expenses do not include Purchased Power, System Control and Load Dispatching, and Other Expenses Classified as Other Power Supply Expenses. 10. For IC and GT plants, report Operating Expenses, Account Nos. 547 and 549 on Line 25 "Electric Expenses," and Maintenance Account Nos. 553 and 554 on Line 32, "Maintenance of Electric Plant." Indicate plants designed for peak load service. Designate automatically operated plants. 11. For a plant equipped with combinations of fossil fuel steam, nuclear steam, hydra, internal combustion or gas-turbine equipment, report each as a separate plant. However, if a gas-turbine unit functions in a combined cycle operation with a conventional steam unit, include the gas-turbine with the steam plant. 12. If a nuclear power generating plant, briefly explain by footnote (a) accounting method for cost of power generated including any excess costs attributed to research and development; (b) types of cost units used for the various components of fuel cost; and (c) any other informative data concerning plant type fuel used, fuel enrichment type and quantity for the report period and other physical and operafin characteristics of plant. - Plant Name: Naughton (d) Plant Name: Wyodak (e) Plant. Name: Gadsby Steam (f) Line No. - Steam Steam . Steam 1 Outdoor Boiler . Conventional Outdoor 2 1963 1978 1951 3 .1971 1978 1955 4 707.20 289.70 . 251.60 5 710 279 196 6 8760 6079 1228 7 0 0 8 700 268 231 9 0 0 0 _10 146 65 . 34 11 1i25I000 1457709000 69094000 12 1094739 210526 1252090 13 70184754 50872324 15095198 14 545628764 . 391262775 64530281 15 14207864 . 490453 587008 16 631116121 442836078 81464577 17 892.4153 1528.6023 . 323.7861 18 89488 302145 45847 19 77-1 15125638 . 9413917 20 0 0 021 4470634 13169 0 22 0 0 . 023 0 0 0 24 11279 0 0 25 13043071 4158309 3660485 26 1243 5701 0 27 0 0 0 281 1343942 0 0 29 1286755 . . 412626 257733 30 10693418 . . 8086379 904380 31 3658603 4195535 1260907 32 1616276 238999 305328 33 137383942 32538501 15848597 34 0.0269 Coal Gas Composite 0.0223 Coal Oil Composite 0.2294 35 Gas Tons MCF Tons Barrels MCF 37 2761016 134829 0 1163685 11714 0 1111436 0 0 38 9755 1030 0 7789 138000 0 1029 0 0 39 36.236 8.667 0.000 12.284 131.751 0.000 8.470 0.000 0.000 40 36.219 0.000 11.672 131.751 10.000 8.470 10.000 10.000 41 1.857 8.418 1.873 0.749 22.731 0.831 8.229 0.000 10.000 42 0.020 0.000 0.020 0.009 0.001 0.010 0.136 0.000 0.000 43 10557.037 27.209 10584.246 12435.966 46.577 12482.543 16556.749 0.000 10.000 44 FERC FORM NO.1 (REV. 12-03) Page 403.2