Loading...
HomeMy WebLinkAboutFinal Approved Tariff.pdfROCKY MOUNTAIN 4 POWER A ON)SION Of PICORP I.P.U.C.No.1 Second Revision of Sheet No.94.1 Cancelling First Revision of Sheet No.94.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.94 STATE OF IDAHO Energy Cost Adjustment AVAILABILITY:At any point on the Company’s interconnected system. APPLICATION:This Schedule shall be applicable to all retail tariff Customers taking service under the Company’s electric service schedules. ENERGY COST ADJUSTMENT:The Energy Cost Adjustment is calculated to collect the accumulated difference between total Company Base Net Power Cost and total Company Actual Net Power Cost calculated on a cents per kWh basis. MONTHLY BILL:In addition to the Monthly Charges contained in the Customer’s applicable schedule,all monthly bills shall have applied the following cents per kilowatt-hour rate by delivery voltage. Schedule 1 Schedule 6 Schedule 6A Schedule 7 Schedule 7A Schedule 9 Schedule 10 Schedule 11 Schedule 12 Schedule 19 Schedule 23 Schedule 23A Schedule 24 Schedule 35 Schedule 35A Schedule 36 Schedule 400 Schedule 401 Submitted Under Case No. Secondary 0.569OperkWh 0.5690 per kWh 0.5690 per kWh 0.5690 per kWh 0.5690 per kWh 0.5690 per kWh 0.5690 per kWh 0.5690 per kWh 0.5690 per kWh 0.5690 per kWh 0.5690 per kWh 0.5690 per kWh 0.5690 per kWh 0.5690 per kWh 0.5690 per kwh PAC-E-12-03 Delivery Voltage Primary 0.5500 per kWh 0.5500 per kWh 0.5500 per kWh 0.5500 per kWh 0.5500 per kWh 0.5500 per kWh 0.5500 per kWh Transmission 0.S3SØperkWh 0.1750 per kWh 0.1640 per kWh ISSUED:February 1,2012 EFFECTWE:April 1,2012 IDAHO PUBLIC UTILITIES COMMISSION Approved Effective March 30, 2012 April 1, 2012 Per O.N. 32507 Jean D. Jewell Secretary