Loading...
HomeMy WebLinkAbout20111223Replacement Pages.pdf~~:OUNTAIN Rcr-E. i\/r.:r¡. ~_ t..J.c.._ ( -'1: L.~ ',,,.J iOll OEC 23 PM 2: 00 201 South Main, Suite 2300 Salt Lake Cit, Utah 84111 December 22, 2011 VI ELECTRONIC FILING AN OVERNIGHT DELIVERY Jean D. Jewell Commission Secreta Idaho Public Utilties Commssion 472 W. Washington Boise,ID 83702 Attention: Jean D. Jewell Commission Secreta RE: Case No. PAC.E.ll.12 - In the Matter of the Application ofPacifCorp dba Rocky Mountain Power for Approval of Changes to its Electric Service Schedules and Price Increase of $32.7 Milon, or Approximately 15.0 Percent -Exhibit No. 51 Replacement Page 10 of24 Accompanying Stipulation Testimony of J. Ted Weston Enclosed please find an origin and nie (9) copies of Exhbit No. 51 Replacement Page 10 of 24, Legislative Replacement Pages 24a of 24, and 24b of 24 to replace the pages filed on December 16,2011. Durng review of Exhbit 51 by Mr. Bryan Lanspery of the Commission's Engineerig Section, it was brought to the Company's attention that in Schedule 12, the 5,800 lumen HPSV paral maintenance rate was not included. Exhbit 51 Replacement Page 10, 24a, and 24b submitted in this filing corrects ths error and includes this proposed rate. Ths rate and the revenues from it were included in the rate case settlement filed in ths case, but the rate was omitted from taff Schedule 12 due to an oversight. Please contact Wiliam Griffth at (503) 813-6051 if you have any fuer questions. Very trly yours, ~~4 Rocky Mountain Power Enclosures "~ROCKY MOUNTAIN . POR A DIVISION OF PAFlCORP Rock Mountain Power Exhibit No. 51 REPlCEMENT Page 10 of 24 Case No. PAC-E-11-12 Wines: J. Ted Weston I.P.U.C. No.1 Third Revision of Sheet No. 12.3 Canceling Second Revision of Sheet No. 12.3 ELECTRIC SERVICE SCHEDULE NO. 12 . Continued MONTHLY BILL: (continued) llPresinlft So.. ..PØI MailBøc Lumen Ratiniz 5,800 9,500 27,500 50,000 Watt 70 100 250 400 Monthly kWh 28 39 96 148 Parial Maintenance Service $5.84 $7.52 $12.07 $16.26 B. Street Lighting, "Full Maitenance" HIh rrBreSøBm.- FuJ MåBteBaøce _L!lP~I! RatÏ!g _ _ _ _ _5,800 9,500 16,000 27,500 50,000 Watts 70 100 150 250 400-------------- MonthlvkWh 28 39 59 96 148 Full Maintenance Service $6.52 $8.31 $9.98 $13.08 $17.45 SPECIFICATIONS AN SERVICE FOR STREET LIGHTING WITH PARTIA AN FULL MAINTENANCE (NO NEW SERVICE): Installations must have met Company constrction stadards in place at the time of installation in order to receive "full maitenance." If Company is unable to obtain materials to perform maintenance, the street light facilties wil be deemed obsolete and must be upgraded at customer expense in order to qualify for maintenance under the Electrc Service Schedule. Street Lighting Service under "paral maintenance" includes energy, lamp and glassware renewals and cleaning of glassware. Street Lighting Service under "full maintenance" includes energy, lamp and glassware replacements and cleaning of glassware, and replacement of damaged or inoperative photocells, ballasts, staing aids, poles, mast ars and luminaires: provided, however, that any cost for materials which are over and above costs for Company's stadad materials, as determined by the Company, are not included in this Electric Service Schedule. Such extra costs shall be paid by Customer. Burning-hours oflamps wil be controlled by the Company. (Continued) Submitted Under Case No. PAC-E-11-12 ISSUED: December 22, 2011 EFFECTIV: Janua 1,2012 ,.~.ROCKY MOUNTAIN . POR A DIVISION OF PAFlRP Roc Mountain Power Exhibit No. 51 REPLACEMENT Page 24a of 24 Case No. PAC.E.11-12 Wines: J. Ted Weson I I.P,U.C. No.1 Seeood Third Revision of Sheet No. 12.3 Canceling FiSecond Reviion of Sheet No. 12.3 ELECTRIC SERVICE SCHEDULE NO. 12 - Continued MONTHLY BILL: (continued) Hi bere Soku..Par Ma.1I Lumen Ratinl!5-,800 9500 27500 50000 Watts 70 100 250 400 Monthlv kWh 28 39 96 148 Partial Maintenance Service $5.84 $7.52 $12.07 $16.26 Bigh Pressll" SodillBl Pi MeiBte.8.ee ~u.!_e~ ~t.Bi_ _9,~~Wa -l ~40~----------.. . '-''',.~9é l4Pæ MaiRteBaBee Sef\'iee $+$11.94 ~ B. Street Lightiiz "Full Maintenance" Hih P....8u-FuJMa..~. _L!l~I! RBlÏ!g _ _ _ _ _5,800 9,500 16,000 27,500 50,000 Watt 70 100 150 250 400-------------- MonthlvkWh 28 39 59 96 148 Full Maintenance $Rß Service $6.#-52 $8.~31 $9.8898 08 $17.~5 SPECIFICATIONS AND SERVICE FOR STREET LIGHTING WITH PARTIAL AN FULL MANTENANCE (NO NEW SERVICE): Installations must have met Company constrction standards in place at the time of installation in order to receive "full maintenance." If Company is unable to obtain materials to perform maintenance, the street light facilties wil be deemed obsolete and must be upgraded at customer expense in order to qualify for maintenance under the Electric Service Schedule. Street Lighting Service under "parial maintenance" includes energy, lamp and glassware renewals and cleaning of glassware. Submitted Under Order No. 39482Case No. PAC-E-11-12 ISSUED:Deeember 28, 2997 December 22, 2011 EFI "~..ROCKY MOUNTAIN . POR A DIVIION OF PAFlCORP Rock Mountain Power Exhibit No. 51 REPLACEMENT Page 24b of 24 Case No. PAC-E-11-12 \Mnes: J. Ted Weton I,P.U.C. No.1 SeeoRd Third Revision of Sheet No. 12.3 Canceling FÎSecond Revision of Sheet No. 12.3 Street Lighting Service under "full maintenance" includes energy, lamp and glassware replacements and cleaning of glassware, and replacement of daaged or inoperative photocells, ballasts, staing aids, poles, mast ars and luminaires: provided, however, that any costs for materials which are over and above costs for Company's stada materials, as determined by the Company, are not included in this Electrc Service Schedule. Such ext costs shall be paid by Customer. Burning-hour oflamps wil be controlled by the Company. (Continued) Submitted Under Oràer No. 304 82Case No. PAC-E-ll-12 ISSUED:Deeember 28, 2007 December 22, 2011 EFJ