Loading...
HomeMy WebLinkAboutFinal approved Tariff.pdfROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP March 31,2011 VL4 ELECTRONIC FILING Idaho Public Utilities Commission 472 West Washington Boise, ID 83702-5983 Attention: Jean D. Jewell Commission Secretary 201 South Main, Suite 2300 Salt Lake City, Utah 84111 RE: Compliance Filing -Revised Tariff Schedule 94 in Case No. PAC-E-ll-07 In compliance with Case No. PAC-E-11-07, PacifiCorp (d.b.a. Rocky Mountain Power) hereby submits for electronic filing PacifiCorp's amended tariff in legislative and regular format associated with Tariff LP.U.C. No.1 of Rocky Mountain Power applicable to electric service in the State of Idaho. The revised tariff page contained herein will become effective April 1,2011. The rates contained in the enclosed tariff page reflect the rates shown in Order No. 32216. First Revision of Sheet No. 94.1 Schedule 94 Energy Cost Adjustment Inquiries may be directed to Ted Weston, Regulatory Manager, at (801) 220-2963. VI! truly yours, l~~/#J Jeffrey K. Larsen Vice President, Regulation Enclosure RECEIVED 2011 March 31 PM 2:44 IDAHO PUBLIC UTILITIES COMMISSION ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP I.P.U.C. No.1 First Revision of Sheet No. 94.1 Cancelling Original Sheet No. 94.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 94 STATE OF IDAHO Energy Cost Adjustment AVAILABILITY: At any point on the Company's interconnected system. APPLICATION: This Schedule shall be applicable to all retail tariff Customers taking service under the Company's electric service schedules. ENERGY COST ADJUSTMENT: The Energy Cost Adjustment is calculated to collect the accumulated difference between total Company Base Net Power Cost and total Company Actual Net Power Cost calculated on a cents per kWh basis. MONTHLY BILL: In addition to the Monthly Charges contained in the Customer's applicable schedule, all monthly bills shall have applied the following cents per kilowatt-hour rate by delivery voltage. SecondillY Schedule I 0.569¢ per kWh Schedule 6 0.569¢ per kWh Schedule 6A 0.569¢ per kWh Schedule 7 0.569¢ per kWh Schedule 7A 0.569¢ per kWh Schedule 9 Schedule 10 0.569¢ per kWh Schedule 11 0.569¢ per kWh Schedule 12 0.569¢ per kWh Schedule 19 0.569¢ per kWh Schedule 23 0.569¢ per kWh Schedule 23A 0.569¢ per kWh Schedule 24 0.569¢ per kWh Schedule 35 0.569¢ per kWh Schedule 35A 0.569¢ per kWh Schedule 36 0.569¢ per kWh Submitted Under Case No. PAC-E-I1-07 ISSUED: March 31, 2011 Delivery Voltage Primary 0.550¢ per kWh 0.550¢ per kWh 0.550¢ per kWh 0.550¢ per kWh 0.550¢ per kWh 0.550¢ per kWh 0.550¢ per kWh Transmission 0.535¢ per kWh EFFECTIVE: April 1,2011 IDAHO PUBLIC UTILITIES COMMISSION Approved Effective April 1, 2011 April 1, 2011 Per O.N. 32216 Jean D. Jewell Secretary ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP I I.P.U.C. No.1 Cancelling Original Sheet No. 94.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 94 STATE OF IDAHO Energy Cost Adjustment AVAILABILITY: At any point on the Company's interconnected system. APPLICATION: This Schedule shall be applicable to all retail tariff Customers taking service under the Company's electric service schedules. ENERGY COST ADJUSTMENT: The Energy Cost Adjustment is calculated to collect the accumulated difference between total Company Base Net Power Cost and total Company Actual Net Power Cost calcuiated on a cents per kWh basis. MONTHLY BILL: In addition to the Monthly Charges contained in the Customer's applicable schedule, all monthly bills shall have applied the following cents per kilowatt-hour rate by delivery voltage. Secondary Schedule 1 O.569-WG¢ per kWh Schedule 6 O.569-WG¢ per kWh Schedule 6A O.569-WG¢ per kWh Schedule 7 O.56't-WG¢ per kWh Schedule 7A O.562.-WG¢ per kWh Schedule 9 Schedule 10 O.56!l-WG¢ per kWh Schedule 11 O.569WG¢ per kWh Schedule 12 O.569-WG¢ per kWh Schedule 19 per kWh Schedule 23 per kWh Schedule 23A O.569-WG¢ per kWh Schedule 24 O.562.-WG¢ per kWh Schedule 35 O.569-WG¢ per kWh Schedule 35A O.569-WG¢ per kWh Schedule 36 O.569-WG¢ per kWh Submitted Under Case No. PAC-E-l~1-07 ISSUED: March 2011G Delivery Voltage Primary O.550w.J.¢ per kWh O.55J2w.J.¢ per kWh O.550w.J.¢ per kWh O.550w.J.¢ per kWh O.550w.J.¢ per kWh O.55Qw.J.¢ per kWh O.55Qw.J.¢ per kWh Transmission O.535w.+¢ per kWh EFFECTIVE: April!, 2011G