Loading...
HomeMy WebLinkAbout20100603Asking Responses to Calculation.pdfRECEiVED 2n\9 JUll -3 PI1 2: 39 STATE OF IDAHO . ~*tt~i¿lX~lÅ SjDN OFFICE OF THE ATTORNEY GENERALUTl LAWRENCE G. WASDEN June 3, 2010 Avista Corporation Michael Andrea A vista Utilties 141 1 E. Mission PO Box 3727 Spokane, WA 99220-3727 Clint Kalich A vista Utilities 141 1 E. Mission PO Box 3727 Spokane, WA 99220-3727 Rocky Mountain Power Mark Moench Daniel Solander Ted Weston PacifiCorp dba Rocky Mountain Power One Uta Center 201 S. Main Street, Suite 2300 Salt Lake City, UT 84111 Greg Duvall Hui Shu Laren Hale PacifiCorp dba Rocky Mountain Power 825 NE Multnomah Street Portland, OR 97232 Idaho Power Company Donovan E. Walker Idaho Power Company PO Box 70 Boise, ID 83707-007 Randy Allphin Idaho Power Company PO Box 70 Boise, ID 83707-0070 RE: Case Nos. GNR-E-IO-02; PAC-E-IO-06 The Idaho Public Utilities Commission in Order No. 28708, Case No. GNR-E-99-1, established a methodology for the annual adjustable rate portion of avoided costs for those QF contracts using, variable costs associated with Colstrip, a coal-fired generating facilty in southeast Montana. For those QF contracts with Colstrip-related fuel costs and variable O&M, future Colstrip variable cost adjustments are to be calculated by using FERC Form 1 Colstrip Unit Coal Costs per megawatt hour (MWh) and adding $2.00IMWh (the average variable O&M cost of Colstrip plus 20tlM\Vh for generation taxes plus a five percent (5%) adjustment for line loss). As computed by Commission Staff the Colstrip related adjustable rate wil change from 14.09 millkWh to 12.78 milllWh. The same calculated rate revision under the avoided cost methodology is used by A vista, PacifiCorp dba Rocky Mountain Power and Idaho Power Company. This change in the variable rate affects existing contracts under the previous SAR methodology. Contracts & Administrative Law Division, Idaho Public Utilities Commission P.O. Box 83720, Boise, Idaho 83720-0074, Telephone: (208) 334-0300, FAX: (208) 334-3762, E-mail: Ipuclipuc.state.id.us Located at 472 West Washington St., Boise, Idaho 83702 June 3, 2010 Page 2 The adjustable portion of the avoided cost rates under the Sumas-based methodology is based on annual average gas prices indexed at Sumas, Washington. As reported by A vista, the indexed gas prices have decreased by $4.38IMMBtu. The approved gas price of $9.00/MBtu plus the $4.38IMMBtu decrease results in a gas price of $4.62IMMBtu for the 2010-2011 year. . This equates to a SAR fuel cost of 32.80mil1lWh as used in the modeL. In accordance with Order No. 29316, the adjustable portion of the avoided cost rate for PacifiCorp contracts with 1992 amendments has also been recomputed; Beginning on July 1,2003, the adjustable portion for these contracts was ordered to be equal to the average cost of fuel for the Carbon, Hale, Naughton Huntington and Hunter generating plants, including a variable O&M component of $ 1.51 but exclusive of generation taxes and a line loss adjustment. The variable energy rate applicable to deliveries commencing July 1, 2009 extending through June 30, 2010 has been computed to be $ 14.53IMWh, an increase from $14.36 last year. Accompanying this letter are worksheets showing the computation of the revised adjustable rates for the various affected contracts. If after reviewing the revisions, you accept them as accurate please indicate your approval by letter (or other filing) directed to the Commission in the reserved case docket numbers identified above. The case heading for the generic adjustment, Case No. GNR-E- 1 0-02, wil read as follows: IN TH MATTER OF THE ANNAL REVISION AND UPDATED CALCULATION OF THE ADJUSTABLE PORTION OF THE A VOIDED COST RA TE(S) FOR EXISTING PURPA CONTRACTS FOR AVISTA CORPORATION DBA AVISTA UTILITIES, FOR IDAHO POWER COMPANY, AND FOR PACIFICORP DBA ROCKY MOUNTAIN POWER. The case heading in the PacifiCorp case for PacifiCorp QF contracts with i 992 Amendment language, Case No. PAC-E-I0-06, is as follows: IN THE MATTER OF THE ANNAL REVISION OF QF VARIABLE ENERGY PRICES IN ACCORDANCE WITH TERMS OF THE 1992 AMENDMENTS TO POWER PURCHASE AGREEMENTS BETWEEN IDAHO QFS AND PACIFICORP. Please fie your respective responses with the Commission on or prior to June 18, 2010. Thank you for your cooperation. Please feel free to contact me, or Rick Sterling, if you have any questions. Sincerely, Scott D. Woodbury Deputy Attorney General Enclosures blslL:GNR-E-IO-02_PAC-E-IO-06_sw _avoided cost COLSTRIP ADJUSTABLE RATE CALCULATION For Period 7/1/10-6/30/11 Colstrip Fuel Cost from Avista FERC Form 1 for CY 2009 line 12 line 20 Net Generation (kwh) Fuel Fuel cost per kwh Fuel Cost per MWh Variable O&M, Gen. Tax, 5% line loss per MWh Total Colstrip Adjustable Rate Reference GNR-E-99-1 O.N.28708 4/17/2001 Colstrip _10-11 .xls 1,277,376,000 $13,774,324 $0.010783 $10.7833 $2.0000 $12.7833 Fu e l C o s t ( $ ) FE R C F o r m 1 - P a g e 4 0 2 , l i n e 2 0 Ge n e r a t i o n ( M W h ) FE R C F o r m 1 - P a g e 4 0 2 , l i n e 1 2 Pa c i f i C o r p To t a l V a r i a b l e E n e r g y R a t e fo r 2 0 1 0 / 2 0 1 1 Ca r b o n Na u g h t o n Hu n t i n g t o n Hu n t e r To t a l s $ 19 , 6 1 2 , 9 9 4 $ 74 , 0 4 5 , 3 0 6 $ 72 , 2 2 5 , 3 5 9 $ 10 4 , 8 5 6 , 6 9 7 $ 27 0 , 7 4 0 , 3 5 6 1, 2 1 1 , 8 7 5 4, 7 5 2 , 6 3 2 6, 7 5 3 , 7 6 4 8, 0 7 1 , 1 8 2 $ 20 , 7 8 9 , 4 5 3 $ 16 . 1 8 $ 15 . 5 8 $ 10 . 6 9 $ 12 . 9 9 $ 13 . 0 2 I M W h $ 1. 5 1 I M W h $ 14 . 5 3 I M W h Av e r a g e F u e l C o s t ( $ / M W h ) Va r i a b l e O & M ¡P U C O r d e r N o . 2 8 7 0 9 To t a l V a r i a b l e E n e r g y R a t e f o r 2 0 1 0 / 2 0 1 1 Pa c i f i C o r p 1 0 - 1 1 V a r i a b l e c o s t a d j . x l s ;~E(~-E t:r Average Gas Prices at Sumas, Washington from Inside FER¿~Rililè~dJn AM 8;; j l ($rMlVIBtu) UT¡d~m1Pê~J~j:~~~I~ss ¡ON ""F_a!clllating the 2009-2010 Avoided Cost Adjustable Rate 2008 2009 Jan $7.48 $6.89 Feb $8.57 $4.80 Mar $8.46 $3.83 Apr $8.81 $3.59 May $10.17.$2.74 Jun $10.77 $2.88 July $11.69 $2.69 Aug $7.94 $3.01 Sep $6.94 $2.46 Oct $6.23 $3.87 Nov $6.28 $5.22 Dec $6.66 $5.47 Average $8.33 $3.95 Actual Anual Adjustment: $9.00 - ($8.33-$3.95) = $4.62 Note: $2.00IMtu = 1997-98 Approved Rate $2.35IMtu = 1998-99 Approved Rate $2.26IMtu = 1999-00 Approved Rate $2.80IMtu = 2000-01 Approved Rate $4.82IMtu = 2001-02 Approved Rate $5.23IMtu = 2002-03 Approved Rate $3.33IMtu = 2003-04 Approved Rate $5.31IMtu = 2004-05 Approved Rate $5.92IMtu = 2005-06 Approved Rate $7.80IMtu = 2006-07 Approved Rate $6.94IMtu = 2007-08 Approved-te $7 . 18IMtu = 2008-09 Approved Rate $9.00IMtu = 2009-10 Approved Rate