BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
February 12, 2010
IN THE MATTER OF THE APPLICATION
OF PACIFICORP DBA ROCKY MOUNTAIN
POWER FOR AUTHORITY TO
IMPLEMENT POWER COST ADJUSTMENT
RATES FOR ELECTRIC SERVICE FROM
APRIL 1,2010 THROUGH MARCH 31, 2011 )
THROUGH THE ENERGY COST ADJUSTMENT MECHANISM
CASE NO. PAC-10-
NOTICE OF APPLICATION
NOTICE OF
MODIFIED PROCEDURE
NOTICE OF
COMMENT/PROTEST DEADLINE
NOTICE OF REPLY DEADLINE
YOU ARE HEREBY NOTIFIED that on February 1 , 2010, PacifiCorp dba Rocky
Mountain Power (PacifiCorp; Company) filed an Application with the Idaho Public Utilities
Commission (Commission) for authority to implement a power cost adjustment to rates for all
customer classes excluding tariff contract customers (Monsanto Company and Agrium, InC.
The proposed power cost adjustment is calculated pursuant to an Energy Cost Adjustment
Mechanism (ECAM) approved by the Commission on September 29 2009 in Case No. PAC-
08-, Order No. 30904. The energy cost adjustment is calculated to collect or credit the
accumulated difference between total Company base net power costs (Base NPC) collected from
Idaho customers through rates and total Company actual net power costs (Actual NPC) incurred
to serve customers in Idaho calculated on a cents-per-kilowatt-hour basis. The initial deferral
period was July 1 , 2009 through November 30, 2009. The Company is proposing to recover
approximately $2.2 million in total deferred net power costs. The energy cost adjustment is set
forth in a new electric service Schedule No. 94. The proposed effective date is April 1 , 2010.
The ECAM is designed to recover the sum of all components of net power costs as
traditionally defined in the Company s general rate cases and modeled in its production dispatch
model GRID. The mechanism addresses only power cost expenses and does not include any
I Tariff contract loads (Monsanto and Agrium) are not subject to any ECAM surcharges/credits until January 1
2011. Reference Case No. PAC-07-, Order No. 30482.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICE OF COMMENT/PROTEST DEADLINE
NOTICE OF REPLY DEADLINE
costs associated with fixed-cost recovery, i., capital investment in rate base. Specifically, base
and actual NPC will include costs typically booked to the following Federal Energy Regulatory
Commission (FERC) accounts.
Account 447 - Sales for resale, excluding on-system wholesale sales and
other revenues that are not modeled in GRID.
Account 501 - Fuel, steam generation, excluding fuel handling, start-up
fuel/gas 2 diesel fuel, residual disposal and other costs that are not modeled in
GRID.
Account 503 - Steam from other sources.
Account 547 - Fuel, other generation.
Account 555 - Purchased power, excluding BP A residential exchange credit
pass.,through, if applicable.
Account 565 - Transmission of electricity by others (wheeling).
In addition to the comparison of actual NPC to base NPC, the ECAM includes three
additional components: The load growth adjustment rate (LGAR) revenues, a credit for SO2
allowance sales, and a renewable resource adder. The ECAM also includes a symmetrical
sharing band of 90% (customers)/1 0% ( Company) that shares the NPC differential between
actual NPC and base NPC SO2 sales and LGAR revenues between the customers and the
Company.
Pursuant to the ECAM, a renewable resources adder recognizes that the Company has
made significant investments in renewable generation projects that are not yet being recovered in
Idaho rates, even though these projects provide significant benefits to customers. Specifically,
the adjustment recognizes that actual NPC were reduced by power generated from these
renewable generation projects. Pursuant to Commission Order No. 30904, the Commission
approved a renewable resource adjustment of $55 per megawatt-hour (MWh) multiplied by the
actual MWh output generated by the renewable resources that were not included in rate base in
Case No. PAC-08-07.
2 Start-up fuel is accounted for separatlely from the primary fuel for steam-powered generation plants. Start-upcosts are not accounted for separately for natural gas plants, and therefore all fue! for natural gas plants is included
in the determination of both base NPC and actual NPc.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICE OF COMMENT/PROTEST DEADLINE
NOTICE OF REPLY DEADLINE
The components making up the deferred ECAM balance are reflected in the following
table:
NPC Differential for Deferral
LGAR
SO2
Total
Customer Responsibility
Renewable Resource Adder
Interest
Total Company Recovery
$ 121 504
499 793
(120,562)
500 735
90%
350 662
811 412
022
170 096
The proposed Schedule 94 energy cost adjustment will have the following rate
impacts:
Residential Customers - an increase of 1.29%, i., approximately $0.91 per
month for the average residential home using 850 kWh per month.
Irrigation Customers (Schedule 10): 1.55% increase
General Service
Schedule 23/23A: 1.34% increase
Schedule 6/6A/8/35: 1.70% increase
Schedule 9: 2.13% increase
Schedule 19: 1.57% increase
Public Street Lighting
Schedules 717A 12: 0.46% increase
YOU ARE FURTHER NOTIFIED that the Commission has reviewed the filings of
record in Case No. PAC-IO-O1. The Commission has preliminarily found that the public
interest in this matter may not require a hearing to consider the issues presented and that issues
raised by the Company s filing may be processed under Modified Procedure , by written
submission rather than by hearing. Reference Commission Rules of Procedure IDAP A
31.01.01.201-204.
YOU ARE FURTHER NOTIFIED that the deadline for filing written comments or
protests with respect to PacifiCorp s Application and the use of Modified Procedure in Case No.
PAC-10-01 is Wednesday, March 10 2010.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICE OF COMMENT/PROTEST DEADLINE
NOTICE OF REPLY DEADLINE
YOU ARE FURTHER NOTIFIED that the deadline for filing the Company reply
to written comments or protests filed in Case No. PAC-IO-Ol is Wednesday, March 17,
2010.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are
received within the deadline, the Commission may consider the matter on its merits and may
enter its Order without a formal hearing. If comments or protests are filed within the deadline
the Commission will consider them and in its discretion may set the matter for hearing or may
decide the matter and issue its Order based on the written positions before it. Reference IDAP A
31.01.01.204.
YOU ARE FURTHER NOTIFIED that written comments concernIng Case No.
PAC-lO-Ol should be mailed to the Commission and the Company at the addresses reflected
below.
Commission Secretary
Idaho Public Utilities Commission
PO Box 83720
Boise, ID 83720-0074
Street Address for Express Mail:
Ted Weston
Idaho Regulatory Affairs Manager
Rocky Mountain Power
201 S. Main, Suite 2300
Salt Lake City, UT 84111
E-mail: ted.weston(lp,pacificorp.com
472 W. Washington Street
Boise, ID 83702-5918
Yvonne R. Hogle
Senior Counsel
Rocky Mountain Power
201 S. Main, Suite 2300
Salt Lake City, UT 84111
E-mail: Yvonne.hogle~pacificorp.com
All comments should contain the case caption and case number shown on the first page of this
document.Persons desiring to submit comments via e-mail may do so by accessing the
Commission s home page located at www.puc.idaho.gov. Click the "Comments and Questions
icon and complete the comment form using the case number as it appears on the front of this
document. These comments must also be sent to PacifiCorp at the e-mail addresses listed above.
YOU ARE FURTHER NOTIFIED that the Application in Case No. PAC-IO-
may be viewed at www.puc.idaho.gov by clicking on "File Room" and "Electric Cases " or can
be viewed during regular business hours at the Idaho Public Utilities Commission, 472 W.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICE OF COMMENT/PROTEST DEADLINE
NOTICE OF REPLY DEADLINE
Washington Street, Boise, Idaho and at the Idaho offices of PacifiCorp dba Rocky Mountain
Power, located in Rexburg, Preston, Shelley and Montpelier, Idaho.
DATED at Boise, Idaho this / J..
y-
day of February 2010.
,(2- 4. . KEMPTON, P SIDENT
-------~(~
MARSHA H. SMITH, COMMISSIONER
MACK A. REDFORD, COMMISSIONER
ATTEST:
D. Jewell
Commission Secretary
bls/O:PAC-IO-
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICE OF COMMENT/PROTEST DEADLINE
NOTICE OF REPLY DEADLINE