HomeMy WebLinkAbout20090617notice_of_application.pdfOffice of the Secretary
Service Date
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
June 17 2009
IN THE MATTER OF THE APPLICATION
OF P ACIFICORP DBA ROCKY MOUNTAIN
POWER FOR APPROV AL OF A POWER
PURCHASE AGREEMENT BETWEEN
ACIFICORP AND LOWER VALLEY
ENERGY, INc.
CASE NO. PAC-O9-
NOTICE OF APPLICATION
NOTICE OF
MODIFIED PROCEDURE
NOTICE OF
COMMENT/PROTEST DEADLINE
NOTICE OF APPLICATION
YOU ARE HEREBY NOTIFIED that on May 28 , 2009, PacifiCorp dba Rocky
Mountain Power (PacifiCorp; Company) filed an Application with the Idaho Public Utilities
Commission (Commission) requesting approval of a May 22, 2009 Power Purchase Agreement
(Agreement) between PacifiCorp and Lower Valley Energy, Inc. (Lower Valley).
Lower Valley intends to construct, own, operate and maintain a run-of-river
hydroelectric generating facility for the generation of electric power located in or near the town
of Afton, Lincoln County, Wyoming, with an expected nameplate capacity rating of 940-
kilowatts (the Facility). The project is located on Swift Creek in Lincoln County, Wyoming,
partially within the Bridger-Teton National Forest at approximately 420 43' north and 1100 54'
west. The Facility will be a qualified small power production facility (QF) under the applicable
provisions of the Public Utilities Regulatory Policy Act of 1978 (PURPA).
The Agreement between PacifiCorp and Lower Valley is for a three-year term
expiring May 1 2012. Agreement ~ 2.1. Under terms of the Agreement (~ 5.1) PacifiCorp
will pay Lower Valley non-levelized, conforming energy or non-conforming energy
purchase prices for capacity and energy adjusted for seasonality and on-peak/off-peak hours
in accordance with Commission Order No. 30480.
The Swift Creek facility is interconnected to Lower Valley s electrical system and
Lower Valley will transmit net output to PacifiCorp at the Goshen Substation in Idaho by
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICE OF COMMENT/PROTEST DEADLINE
way of transmission facilities operated by Bonneville Power Administration (BP A). Lower
Valley will acquire and pay for a transmission services agreement to schedule and deliver the
power to PacifiCorp and PacifiCorp intends to accept scheduled firm delivery by way of
BPA of Lower Valley s net output.
The total nameplate capacity of the Swift Creek facility is 940 kilowatts. Lower
Valley will be required to provide data on the Facility that PacifiCorp will use to determine
whether under normal and/or average conditions: (1) the feasibility that Facility net energy will
equal or exceed 4 696 298 kWh in each full calendar year for the full term ofthe Agreement; and
(2) the likelihood that the Facility, under average design conditions, will generate at no more
than 10 MW in any calendar month. Agreement ~ 7. Should the Facility exceed 10 average MW
on a monthly basis, PacifiCorp will accept the energy (Inadvertent Energy) that does not exceed
the maximum capacity amount, but will not purchase or pay for this Inadvertent Energy.
Agreement ~ 5.3. Lower Valley has elected June 1 , 2009 as the commercial operation date for
the Swift Creek Facility. Agreement ~ 2.2.5. Staff is informed that Lower Valley is currently
serving Swift Creek output into its own load and will continue to do so until the Agreement is
approved.
PacifiCorp requests that the Commission approve the Power Purchase Agreement
without change or condition. The Company also requests that the Commission declare that the
prices for energy and capacity are just and reasonable, in the public interest, and that the costs
incurred by PacifiCorp for purchasing capacity and energy from Lower Valley are legitimate
expenses, all of which the Commission will allow PacifiCorp to recover in rates in Idaho in the
event other jurisdictions deny recovery of their proportionate share of said expenses.
YOU ARE FURTHER NOTIFIED that the Commission has reviewed the filings of
record in Case No. P AC-09-05. The Commission has preliminarily found that the public
interest in this matter may not require a hearing to consider the issues presented and that issues
raised by the Company s filing may be processed under Modified Procedure , by written
submission rather than by hearing. Reference Commission Rules of Procedure IDAP A
31.01.01.201-204.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICE OF COMMENT/PROTEST DEADLINE
YOU ARE FURTHER NOTIFIED that the deadline for filing written comments or
protests with respect to PacifiCorp s Application and the use of Modified Procedure in Case No.
P AC-09-05 is Thursday, July 9, 2009.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are
received within the deadline, the Commission may consider the matter on its merits and may
enter its Order without a formal hearing. If comments or protests are filed within the deadline
the Commission will consider them and in its discretion may set the matter for hearing or may
decide the matter and issue its Order based on the written positions before it. Reference IDAP A
31.01.01.204.
YOU ARE FURTHER NOTIFIED that written comments concerning Case No. PAC-
09-05 should be mailed to the Commission and the Company at the addresses reflected below.
Commission Secretary Bruce Griswold, Director
Idaho Public Utilities Commission Short- Term OriginationPO Box 83720 PacifiCorp
Boise, ID 83720-0074 825 NW Multnomah, Suite 600
Portland, OR 97232
E-mail: bruce.griswold~pacificorp.comStreet Address for Express Mail:
472 W. Washington Street
Boise, ID 83702-5918
Daniel E. Solander
Ted Weston
Rocky Mountain Power
201 S. Main, Suite 2300
Salt Lake City, UT 84111
E-mail: daniel.solander~pacificorp.com
ted. weston~pacificorp.com
All comments should contain the case caption and case number shown on the first page of this
document. Persons desiring to submit comments via e-mail may do so by accessing the
Commission s home page located at www.puc.idaho.gov Click on the "Comments and
Questions" icon and complete the comment form using the case number as it appears on the front
of this document. These comments must also be sent to PacifiCorp at the e-mail addresses listed
above.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are
received within the time limit set, the Commission will consider this matter on its merits and
enter its Order without a formal hearing. If written comments are received within the time limit
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICE OF COMMENT/PROTEST DEADLINE
set, the Commission will consider them, and in its discretion, may set the same for formal
hearing.
YOU ARE FURTHER NOTIFIED that the Application in Case No. P AC-09-
may be viewed at www.puc.idaho.gov by clicking on "File Room" and "Electric Cases " or can
be viewed during regular business hours at the Idaho Public Utilities Commission, 472 West
Washington Street, Boise, Idaho and at the Idaho offices of PacifiCorp dba Rocky Mountain
Power.
DATED at Boise, Idaho this -th day of June 2009.
/tNCommission Secretary
blsfN:PAC-09-05 sw
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICE OF COMMENT/PROTEST DEADLINE