HomeMy WebLinkAbout20090310Application.pdf~~æ~OUNTAIN
RECEIVED
2009 February 11 PM 4:53
IDAHO PUBLIC
UTILITIES COMMISSION
201 South Main, Suite 2300
Salt Lake City, Utah 84111
Febru 11, 2009
Ji ELECTRONIC FILING
Jea D. Jewell
Commission Secreta
Idaho Public Utilties Commission
472 W. Washington
Boise, ID 83702
PIIC-E -- 69--(
Attention:Jean D. Jewell
Commission Secretar
RE: TARIFF ADVICE 09-01 RATE SCHEDULE 72A
Rocky Mountan Power, a division ofPacifiCorp, hereby :fles Tarff Advice 09-01 to Electric
Service Schedule No. 72A - Irrgation Load Control Credit Rider Dispatch Program. Rocky
Mountain Power hereby submits for electronic filing a clean and red1ine copy of each sheet
containing proposed revisions to Schedule No. 72A. Rocky Mountan Power respectfuly
requests ths application be processed under the Commission's Modified Procedure with a
proposed effective date of March 13,2009.
Rocky Mountan Power submits the following proposed revisions to tariff sheets:
Third Revised Sheet No. 72A.l Schedule 72A Dispatchable Irrgation Load Control
Credit Rider
Third Revised Sheet No. 72A.2 Schedule 72A Dispatchable Irrgation Load Control
Credit Rider
Third Revised Sheet No. 72A.3 Schedule 72A Dispatchable Irrgation Load Control
Credit Rider
Third Revised Sheet No. 72A.4 Schedule 72A Dispatchable Irrgation Load Control
Creit Rider
Sheet No. 72A.l - Specify that preseason internet access is designed to faciltate program
testing, training, and information shang.
Sheet No. 72A.2 - Revise the languge of the load control service credit to allow the Company
the discretion of paying customers by check or to credit the customer's outstanding account
balance if one exists. Additional languge was added to specify how the demad average would
be calculated for the load control service credit if two years of usage history isn't available at a
site. This revision also corrects the notification date for the load control serice agreement from
Febru 15 to April 15. Language was added to specify that tiered program paricipation credit
was designed to encourage program paricipation.
Sheet No. 72A.3 - Revise the language on the liquidated damages section from prices actually
paid by the Company to state tht the liquidated damges are based on the day ahead on-peak
price at Four Comers as published at http://theice.com.
Idaho Public Utilties Commssion
February 11,2009
Page 2
If you have any questions please contact Ted Weston at (801) 220-2963 or email
ted. westonßYpacificorp.com.
Very trly yours,
~ l~~ML
Jeffey K. Larsen
Vice President, Reguation
Enclosurs
~~l~OUNTAIN
I.P.U.C. No.1
Third Revision of Sheet No. 72A.i
Canceling Second Revision of Sheet No. 72A.i
ROCKY MOUNTAIN POWER
ELECTRC SERVICE SCHEDULE NO. 72A
STATE OF IDAHO
Dispatchable Irrigation Load Control Credit Rider Program
PUROSE: This optional tariff allows Customers to paricipate in a dispatchable control service
interrption program in exchange for a Load Control Service Credit (LCSC). Customers participating in this
program wil be considered paricipants in the Irrgation Load Control Credit Rider program.
PARTICIPATION: Prior to paricipation, and in order to qualify under this Schedule, Customers
must execute a Load Control Service Agreement (LCSA) with the Company. Paricipants in the
dispatchable progr wil be considered progr parcipants for subsequent years unless the Customer
explicitly communicates the desire to no longer paricipate in the Load Control Credit Rider program.
APPLICABLE: To qualifying Customers served on Schedule i 0 and who have continuous access
to the Internet from May i through September i 5. Access to the internet beginning May i is required to
allow for program information sharing, training, and communication testing in advance of the control
season. In addition, Schedule i 0 Customers paricipating in the dispatchable program must:
(a) Meet minimum irrigation equipment motor load size of 30 Hp. The Company may evaluate
individual pumps or motors smaller than 30 Hp to determine if participation is cost-effective or
necessar because such pumps ar par of a larger participating system.
(b) Use advanced 2-way remote control equipment as speified by the Company to manage ALL
pumping requirements throughout the Company defined Irrigation Season (June i through
September i 5).
(c) Paricipate in Company-defined training to set up their pump sites for dispatch.
(d) Incur air time communication charges for communication trnsactions exceeding 70 per month.
Charges for communication transactions in excess of 70 per month wil be deducted from the
Customer's LCSC.
IRGATION SEASON: This rider is applicable only during the Irrigation Season from June 1 to
September 15, annually.
(Continued)
Submitted Under Advice No. 09-01
ISSUED: February i i, 2009 EFFECTIVE: March i 3, 2009
~~_~OUNTAIN
I.P.U.C. No. i
Third Revision of Sheet No. 72A.2
Canceling Second Reviion of Sheet No. 72A.2
ELECTRC SERVICE SCHEDULE NO. 72A - Continued
LOAD CONTROL SERVICE AGREEMENT: The Customer and Company wil execute a LCSA
for irrigation load contrl paricipation. The LCSA shall specify the Load Control kW amount that each of
the Customer's sites shall curail during each Dispatch Event. The agreement wil also include tyical costs
that the Customer may incur for Early Termination. Once executed, the agreement shall remain in force for
subsequent Irrigation Seasons unless explicitly canceled by the paricipating Customer. Cancellation of an
existing LCSA may occur only between September i 6 and May 30 each yea.
LOAD CONTROL SERVICE CREDIT: The LCSC for a paricipating site shall be calculated and
issued to the paricipating customer in the form of a check, or at the discretion of the Company, as a credit
against the participating site account if an outstading account balance exists at the time of the credit
issuance. The LCSC wil be issued no later than October 3 i following each irrigation season. The LCSC is
composed of a Fixed Annual Participation Credit that shall remain fixed throughout the Irrigation Season
each year. The LCSC shall be computed at the conclusion of the Irrgation Season by multiplying the Fixed
Annual Paricipation Creit times the Load Contrl kW at the Schedule i 0 metered pump site. The Load
Control kW shall be computed by taing the most recent 2-year demand (kW) average for that particular
site. In situations where the pump has been replaced and/or re-wound the kW shall be computed by taing
the manufacturer's revised nameplate Hp and converting it to the kW using stadard engineering conversion
metrics.
The Fixed Anual Paricipation Credit for 2008 and 2009 is based upon total program parcipation volumes
as defined in the table below (Paricipation Credit Schedule). The paricipation credit is increased for each
tier of progrm paricipation volume to encourge paricipation in the program.
Paricipation Credit Schedule
Program Paricipation Partcipation Credit
Volumes (MW)($/kW-vr)
Less than i 50 $23.00
i 50 to less than i 75 $26.00
i 75 or ineater $28.00
SCHEDULE:
Notification of Credit: The Company wil provide notification of the total LCSC to all eligible
Schedule 10 customers by Februar 15 each year.
Load Control Service Agreement: Concurrent with the Notification of Credit referenced above,
the Company wil provide a LCSA listing the amount of the credit the Customer wil receive for the
irrigation season if they elect to paricipate in the progr. Customers who have not previously entered into
a LCSA with the Company and who desire to paricipate in this load control progr shall sign the LCSA
and retu it to the Company by April i 5 to indicate their participation.
(Continued)
Submitted Under Advice No. 09-01
ISSUED: Febru i i, 2009 EFFECTIV: March i 3, 2009
~~i&~OUNTAIN
I.P.U.C. No.1
Third Revision of Sheet No. 72A.3
Canceling Second Revision of Sheet No. 72A.3
ELECTRC SERVICE SCHEDULE NO. 72A - Continued
DISPATCH CONDITIONS: The Company shall have the right to implement a Dispatch Event for
paricipating customers according to the following criteria:
(a) Available Dispatch Hours: 2:00 PM to 8:00 PM Mountain Daylight Savings Time
(b) Maximum Dispatch Hours: 52 hours per Irrigation Season
(c) Dispatch Duration: Not more than four hours per Dispatch Event or twelve hours per week
(d) Dispatch Event Frequency: limited to a single (I) Dispatch Event per day
(e) Dispatch Days: Monday through Friday (inclusive)
(t) Dispatch Day Exclusions: July 4 and July 24
DISPATCH COMMCA nONS: The Company wil provide day-ahead notice of intent to
dispatch as well as day-of confirmation communication prior to the dispatch event. Communications wil be
made via voice, text or email messaging depending on each Customer's communication preference.
SPECIA CONDITIONS:
Load Control kW: The Load Control kW amount for the 2007 Irrgation Season shall be computed
as follows:
1. The maximum kW for the past two (2) years (or available history) for each of the four irrigation
months shall be averaged by month (June i through September 15).
2. The average monthly values calculated in Step 1 above shall be averaged.
3. The output of Step 2 above shall be multiplied by the appropriate partcipation credit as defined
in the Paricipant Credit Schedule above.
Outages: Uncontrolled outages or other tyes of interrptions do not qualify for payment under the
taff.
Ownership of Control Equipment: The load control equipment remains the propert of the
Company. Customers may, at their discretion, purchase complementa control components that can work
with the Company's foundational control units. To the extent possible, the Company wil cooperate and
work with local equipment distributors in faciltating such additional equipment.
Communication: The Company wil pay the cost of air time communication for up to 70
transactions per month. Additional Customer communication with irrigation control equipment is permitted.
The cost of such transactions wil be the Customer's responsibilty but wil be managed through the
Company (Note: Customer air time communication costs, if any, wil be calculated as a reduction to the
LCSC).
Liquidated Damages: Custmers are permitted to 'opt-out' of five (5) Dispatch Events throughout
the Irrgation Season. Customers electing to 'opt-out' of a scheduled dispatch event may do so on the
program's web page, by contacting the program's call center, or by notifying a program field technician.
Each 'opt-out' event wil incur a cost resulting in a reduction to the Customer's LCSC. The costs wil be
calculated based on the $/M the Company otherwise has to pay for power at the time of the Dispatch
Event. Such $/MWh prices wil be provided by day ahead on-peak price as published at http://theice.com
and wil be based on the established Four Corners trading hubs.
(Continued)
Submitted Under Advice No. 09-0 i
ISSUED: Februar 11,2009 EFFECTIV: March 13, 2009
~~~OUNTAIN
I.P.U.C. No.1
Third Revision of Sheet No. 72A.4
Canceling Second Revision of Sheet No. 72A.4
ELECTRC SERVICE SCHEDULE NO. 72A - Continued
Liquidated Damages: (continued)
'Opt-outs' wil be computed at the conclusion of the irrigation seasn and wil be included as a
reduction to the LCSC payment issued to the Customer prior to October 31 each year. 'Opt-outs' beyond
those identified above are not permitted. Violation of the Liquidated Damages provision shall result in Early
Termination under the terms of Special Condition-Early Termination, forfeiture of the entire LCSC.
Liabilty: The Company is not responsible for any consequences to the participating Customer that
result from a load contrl Dispatch Event or the failure of load control equipment.
Use of Load Control Equipment: The Customer shall be required to exclusively us the 2-way
load control equipment to manage their irrigation equipment through the duration of the Irrigation Season.
Load Shifting: Customers paricipating in this program may not shift irrigation loads to other
facilties served by the Company or purchase replacement production from another facilty served by the
Company. The Company reserves the right to determine if the paricipating customer site is in violation of
Special Condition-Load Shifting. Violation of the Load Shiftng provision shall result in Early Termination
under the terms of Special Condition-Early Termination, forfeiture of the entire LCSC, and removal from
the progrm for the remainder of the Irrigation Season.
Control Equipment Damage I Sabotage: The Company reserves the right to determine if load
control devices were intentionally damaged and/or bypassed to limit load control. Violation of this clause
shall result in ealy termination under the terms of Special Condition-Early Termination, forfeiture of the
entire LCSC, and removal from the pilot program for the remainder of the Irrigation Season.
Early Termination: If the Customer is terminated from the program the Customer shall be
responsible for reimbursing the Company for costs associated with paricipation in the progr. Such costs
include, but are not limited to, direct and indirect labor costs associated with enrollng the Customer in the
program, labor costs for installng the equipment, labor to investigate intentional damage to load control
devices, removing the Customer from the program, and wil not include costs for replacement power.
Customers required to pay costs associated with early termination under terms of this Special Condition wil
be provided with a statement detailng such costs.
Free Riders: Customers may not participate in this program with accounts and meters that would
not have used power during the Irrigation Season irrespective of paricipation in the program. The Company
reserves the right to determine if the parcipating customer is in violation of the Special Condition-Free
Riders. Violation of Special Condition-Free Riders shall result in Early Termination, forfeiture of the
LCSC, and removal from the program for the remainder of the Irrigation Season.
ELECTRIC SERVICE REGULATIONS: Service under this Schedule wil be in accordance with
the terms of the Electric Service Agreement between the Customer and the Company. The Electrc Service
Regulations of the Company on fie with and approved by the Idaho Public Utilties Commission, including
future applicable amendments, wil be considered as forming a par of and incorporated in said Agreement.
Submitted Under Advice No. 09-01
ISSUED: February I i, 2009 EFFECTIVE: March 13, 2009
~~~OUNTAIN
li.p.u.C. No.1
See9RiJ Third Revision of Sheet No. 72A.i
Canceling FiSecond Revision of Sheet No. 72A.i
ROCKY MOUNAI POWER
ELECTRIC SERVICE SCHEDULE NO. 72A
STATE OF IDAHO
Dispatchable Irrigation Load Control Credit Rider Program
PUROSE: This optional tariff allows Customers to paricipate in a dispatchable control service
interruption progr in exchange for a Load Control Service Credit (LCSC). Customers paricipating in this
program wil be considered parcipants in the Irrigation Load Control Credit Rider program.
P ARTICIP ATION: Pror to paricipation, and in order to qualifY under this Schedule, Customers
must execute a Load Control Service Agreement (LCSA) with the Company. Participants in the
dispatchable program wil be considered progr participants for subsequent years unless the Customer
explicitly communicates the desire to no longer paricipate in the Load Control Credit Rider program.
APPLICABLE: To qualifying Customers served on Schedule i 0 and who have continuous access
to the Internet from May 1 through September 15. Access to the internet beginning May 1 is required to
allow for program information sharing, training, and communication testing in advance of the control
season. In addition, Schedule 10 Customers paricipating in the dispatchable program must:
(a) Meet minimum irrigation equipment motor load size of30 Hp. The Company may evaluate
individual pumps or motors smaller than 30 Hp to determine if paricipation is cost-effective or
necessary because such pumps are par of a larger paricipating system.
(b) Use advanced 2-way remote control equipment as specified by the Company to manage ALL
pumping requirements throughout the Company defined Irrigation Season (June 1 through
September 15).
(c) Paricipate in Company-defined training to set up their pump sites for dispatch.
(d) Incur air time communication charges for communication transactions exceeding 70 per month.
Charges for communication transactions in excess of 70 per month wil be deducted from the
Customer's LCSC.
IRGATION SEASON: This rider is applicable only during the Irrigation Season from June 1 to
September 15, annually.
(Continued)
Submitted Under Order No. 39482Advice No. 09-01
ISSUED: february 7, 2998February 1 i, 2009 EFFECTIV: february 15, 2908March 13,2009
~~~~OUNTAIN
i I.P.U.C. No. i
See9Rd Third Revision of Sheet No. 72A.2
Canceling FiSecond Revision of Sheet No. 72A.2
ELECTRC SERVICE SCHEDULE NO. 72A - Continued
LOAD CONTROL SERVICE AGREEMENT: The Customer and Company wil execute a LCSA
for irrigation load control paricipation. The LCSA shall specify the Load Control kW amount that each of
the Customer's sites shall curail dunng each Dispatch Event. The agreement wil also include tyical costs
that the Customer may incur for Early Termination. Once executed, the agreement shall remain in force for
subsequent Irrgation Seasons unless explicitly canceled by the parcipating Customer. Cancellation of an
existing LCSA may occur only between September i 6 and May 30 each year.
LOAD CONTROL SERVICE CREIT: The LCSC for a paricipating site shall be calculated and
issued to the participating customer in the form of a check, or at the discretion of the Company, as a credit
against the issued to tRe paricipating site account if an outstanding account balance exists at the time of the
credit issuance. The LCSC wil be issuedCustomer no later than October 31 following each irrigation season
of eadl year. The LCSC is composed of a Fixed Annual Paricipation Credit that shall remain fixed
throughout the Irrigation Season each year. The LCSC shàll be computed at the conclusion of the Irrigation
Seaon by multiplying the Fixed Annual Participation Credit times the Load Control kW at the Schedule 10
metere pump site. The Load Control kW shall be computed by taing the most recent 2-year demand (kW)
average for that paricular site. In situations where the pump has been replaced and/or re-wound the kW
shall be computed by taking the manufacturer's revised nameplate Hp and converting it to the kW using
standard engineering conversion metrics.
The Fixed Annual Paricipation Credit for 2008 and 2009 is based upon total progr paricipation volumes
as defined in the table below (Paricipation Credit Schedule). The participation credit is increased for each
tier of program participation volume to encourage participation in the program.
Participation Credit Schedule
Program Paricipation Participation Credit
Volumes (MW)($/kW-vr)
Less than 150 $23.00
150 to less than175 $26.00
175 or greater $28.00
SCHEDULE:
Notification of Credit: The Company wil provide notification of the total LCSC to all eligible
Schedule i 0 customers by Februar i 5 each year.
Load Control Servce Agreement: Concurrent with the Notification of Credit referenced above,
the Company wil provide a LCSA listing the amount of the credit the Customer wil receive for the
irrigation season if they elect to participate in the program. Customers who have not previously entered into
a LCSA with the Company and who desire to participate in this load control program shall sign the LCSA
and return it to the Company by Fe~flar April i 5 to indicate their paricipation.
(Continued)
Submitted Under Order No. 3Q482Advice No. 09-01
ISSUED: Fe~fliary 7. 2QQ8Februaiy 1 i. 2009 EFFECTI: February i 5. 2008March 13. 2009
~~OUNTAIN
I I.P.U.C. No.1
SeeoBd Third Revision of Sheet No. 72A.3
Canceling FiSecond Revision of Sheet No. 72A.3
ELECTRC SERVICE SCHEDULE NO. 72A - Continued
DISPATCH CONDITIONS: The Company shall have the right to implement a Dispatch Event for
paricipating customers according to the following criteria:
(a) Available Dispatch Hours: 2:00 PM to 8:00 PM Mountain Daylight Savings Time
(b) Maximum Dispatch Hours: 52 hours per Irrigation Season
(c) Dispatch Duration: Not more than four hours per Dispatch Event or twelve hours per week
(d) Dispatch Event Frequency: limited to a single (i) Dispatch Event per day
(e) Dispatch Days: Monday through Friday (inclusive)
(f) Dispatch Day Exclusions: July 4 and July 24
DISPATCH COMMUNICATIONS: The Company wil provide day-ahead notice of intent to
dispatch as well as day-of confirmation communication prior to the dispatch event. Communications wil be
made via voice, text or email messaging depending on each Customer's communication preference.
SPECIA CONDITIONS:
Load Control kW: The Load Contrl kW amount for the 2007 Irrigation Season shall be computed
as follows:
1. The maximum kW for the past two (2) year (or available history) for each of the four irrgation
months shall be averaged by month (June 1 through September 15).
2. The average monthly values calculated in Step 1 above shall be averaged.
3. The output of Step 2 above shall be multiplied by the appropriate parcipation credit as defined
in the Participant Credit Schedule above.
Outaes: Uncontrolled outages or other types of interrptions do not qualify for payment under the
tariff.
Ownership of Control Equipment: The load control equipment remains the propert of the
Company. Customers may, at their discretion, purchase complementa control components that can work
with the Company's foundational control units. To the extent possible, the Company wil cooperate and
work with local equipment distributors in faciltating such additional equipment.
Communication: The Company wil pay the cost of air time communication for up to 70
trsactions per month. Additional Customer communication with irrigation control equipment is permitted.
The cost of such transactions wil be the Customer's responsibilty but wil be managed through the
Company (Note: Customer air time communication costs, if any, wil be calculated as a reduction to the
LCSC).
Liquidated Damages: Custmers ar permitted to 'opt-out' of five (5) Dispatch Events throughout
the Irrigation Season. Customers electing to 'opt-out' of a scheduled dispatch event may do so on the
program's web page, by contacting the program's call center, or by notifying a program field technician.
Each oftkese 'opt-out' events wil incur a cost resulting in a reduction to the Customer's LCSC. The costs
wil be calculated based on the $/MWh the Company otherwise has to pay for power at the time of the
Dispatch Event. Such $/MWh prices wil be provided by day ahead on-peak price as published at
http://theice.comtkeCefRpan)''s CefRfRereial & Tfing organization and wil be based on the established
Four Corners and Palo VeFåe trading hubs and the priees aetuall)' flaid by tle COfRpany. 'Oflt outs' .t'iI!:e
Submitted Under Order No. 30482Advice No. 09-0 i
ISSUED: February 7, 2008February 1 i, 2009 EFFECTIV: February 15, 2008March 13,2009
~~\~~OUNTAIN
I.P.U.C. No. i
Seeond Third Revision of Sheet No. 72A.3
Canceling Fiecond Revision of Sheet No. 72A.3
computed at tHe conclusion of the irrigatioR season and will be included as a reduction to the LOSe
payment issued via ehecl( to the Customer prior to OctOBer 31 eaeh year. 'Opt outs' beyond tHose identified
above are ROt permitted. ViolatioR of tHe Liauidated Damages prevision shall result in Early TermiRatioR
under tie terms of Special Condition Early TerminatioR, ferfeitllre of the entire LCSC, aRd removal from
tHe program fer the remainder of the IrrigatioR Season.
(Continued)
Submitted Under Order No. 30482Advice No. 09-01
ISSUED: feBruary 7. 2008Februar i i. 2009 EFFCTIV: february i 5. 2008March 13. 2009
~2ll~OUNTAIN
I LP.U.C. No.1
SeeaRd Third Revision of Sheet No. 72A.4
Canceling FWSecond Revision of Sheet No. 72A.4
ELECTRIC SERVICE SCHEDULE NO. 72A - Continued
Liquidated Damages: (continued)
'Opt-outs' wil be computed at the conclusion of the irrigation season and wil be included as a
reduction to the LCSC payment issued to the Customer prior to October 31 each year. 'Opt-outs' beyond
those identified above are not permitted. Violation of the Liquidated Damages provision shall result in Early
Termination under the terms of Special Condition-Early Termination, forfeiture of the entire LCSC.
Liabilty: The Company is not responsible for any consequences to the parcipating Customer that
result from a load control Dispatch Event or the failure of load control equipment.
Use of Load Control Equipment: The Customer shall be required to exclusively use the 2-way
load control equipment to manage their irrigation equipment through the duration of the Irrigation Season.
Load Shifting: Customers paricipating in this progr may not shift irrigation loads to other
facilties served by the Company or purchase replacement production from another facilty served by the
Company. The Company reserves the right to determine if the paricipating customer site is in violation of
Special Condition-Load Shifting. Violation of the Load Shifting provision shall result in Early Termination
under the terms of Special Condition-Early Termination, forfeitue of the entire LCSC, and removal from
the program for the remainder of the Irrigation Season.
Control Equipment Damage I Sabotage: The Company reserves the right to determine if load
control devices were intentionally damaged and/or bypassed to limit load control. Violation of this clause
shall result in early termination under the terms of Special Condition-Early Termination, forfeiture of the
entire LCSC, and removal from the pilot program for the remainder of the Irrigation Season.
Early Termination: If the Customer is terminated from the program the Customer shall be
responsible for reimbursing the Company for costs associated with paricipation in the progr. Such costs
include, but are not limited to, direct and indirect labor costs associated with enrollng the Customer in the
progrm, labor costs for installng the equipment, labor to investigate intentional damage to load contrl
devices, removing the Customer from the program, and wil not include costs for replacement power.
Customers required to pay costs associated with early termination under terms of this Special Condition wil
be provided with a statement detailing such costs.
Free Riders: Customers may not paricipate in this program with accounts and meters that would
not have used power during the Irrigation Season irrespective of participation in the program. The Company
reserves the right to determine if the paricipating customer is in violation of the Special Condition-Free
Riders. Violation of Special Condition-Free Riders shall result in Early Termination, forfeiture of the
LCSC, and removal from the program for the remainder of the Irrigation Season.
ELECTRIC SERVICE REGULATIONS: Service under this Schedule wil be in accordance with
the terms ofthe Electric Service Agreement between the Customer and the Company. The Electrc Service
Regulations of the Company on fie with and approved by the Idaho Public Utilities Commission, including
future applicable amendments, wil be considered as forming a par of and incorporated in said Agreement.
Submitted Under Oreer No. 30482Advice No. 09-01
ISSUED: felmlary 7, 2008February 1 i, 2009 EFFECTIV: february 15, 2008March 13,2009