HomeMy WebLinkAbout20110217Notice of Affiliate Transaction.pdf~~R'OUNTAIN r-- r:.
\".l t.".,~
Febru 17,2011 iU\ \ fEB \ 1 M'\ \0: 2'3
201 Souh Main, Suite 2300
Salt Lake City, Utah 84111
VI OVERNIGHT DELIVERY
Idaho Public Utilities Commssion
472 West Washigton
Boise, ID 83702-5983
Attention: Jean D. Jewell
Commssion Secreta
Re: PacifiCorp Notice of Afliate Transaction
Case No. P AC-E-05-8
Dear Ms. Jewell:
Ths letter will serve as notice pursuat to Commtment I 17(2), incorporated in the
Idaho Public Utilities Commssion Order No. 29973 issued Februar 13,200, as supplemented
by Order No. 29998 March 14, 2006, in the above-referenced proceeding, approving the
acquisition ofPacifiCorp by MidAerican Energy Holdings Company ("MEHC"), of an afliate
interest traction. Rocky Mountan Power hereby submits an origial and 7 copies of an
emailed quote from Perki Power for replacement pars to be shipped from the Company to
MidAerican Energy Company (MC) and PacifiCorp. PacifiCorp is a wholly-owned
subsidiar of MidAerican Energy Holdings Company (MHC). MEC is reguated investor-
owned utilty company providing retal electrc and natu gas service in Iowa, South Dakota
and Ilinois, and is also wholly-owned subsidiar of MEHC. Therefore, MEC is an afliate of
PacifiCorp. A copy of the emailed quote is included as Attchment A.
On Febru 1, 2011, durg a routine maintenance outage at the Company's Dave
Johnton Plant, it was discovered that two oil coolers used to maita the atomizers for unt
thee were daaged and needed repai before the unt could be brought back into service. The
Company uses the atomizers as emissions control devices. Oil coolers are a critical component to
the operation of the atomizers, without which PacifiCorp would be unable to meet ai quality
reguations.
The Company did not have in inventory the necessar pars to replace the daaged oil
coolers and contacted several vendors to determne availabilty. None of the vendors held the oil
coolers in stock, but could have them available in 12-15 days. The Company contacted MEC's
Walter Scott plant in Council Bluff, Iowa regarding the oil cooler. MEC had two oil coolers
available. To avoid a lengty and costly outage of the 220 megawatt unt, the Company accepted
delivery via courer of two oil coolers from MEC. The Company was able to replace the oil
cooler and ret Dave Johnton Unit 3 to serce withn 24 hour of the outage.
Idao Public Utilties Commssion
Febru 17,2011
Page 2
The Company will order five oil coolers from a vendor at $493 eah and will send two to
MEC to replac those supplied for the repai to the Dave Johnston plant. The Company estimates
that the outage, which lasted approximately 16.5 hour, at Dave Johnston unt thee cost
$104,000. A 12-15 day outae would have cost signficantly more. Accepting replacement oil
coolers from MEC served the public interest by ensurg that the Company repaired the Dave
Johnston plant in a timely maner, by mizing costs associated with prolonged outages, and
by ensurng the Company meets applicable air quality reguations.
Please contact Danel Solander, 801-220-4014 or Daniel.solanden'$pacificorp.com if you have
any questions.
Sincerely,
/) // l ;4/~)r l'fr"I,;v/ ~/ (/~.....
Vkr vr7 T 5 IJet1ey K. Larsen
Vice President, Regulation
Enclosures
Page 1 of3
From:
Sent:
To:
Subject:
Sweets, Justin
Tuesday, February 08, 201112:00 PM
Reid, Michael
FW: Bowman coolers
Michael,
Here is the running email that Alan Dugan had with Randy at Perkins Power. Let me know if there is any other
way that I can help.
Thanks,
Justin Sweets
Pacificorp
Dave Johnston Power Plant
Maintenance Supervisor
PH: 307-995-5090
Fax: 307-995~5022
Email: iustin.swe~ts~çifçQrp.com
from: Dugan, Alan
Sent: Tuesay, February 01, 2011 3:06 PM
To: Sweets, Justin
Cc: Tripp, Rick; Swain, Tim; Harris, Cole; Parker, Richard
SUbjec: Bowman colers
Justin,
Here is the contact information for the coolers. I understand that Rick would like to have 5 of them, two to
replace the ones from Walter Scott, two to repair the frozen ones, and one spare.
Thanks,~
Compliance Manager
Phone: (307) 995-5046
Fax: (307) 995-5025
E-mail: alan.dugan~~g~jfi~orp.com
~=-
"1/ what you did yesterday seems big, you haven't done anything today." Lou Holtz
file://S:\SHAD\FILINGS\ID\2005 ID Dockets & Filings\ID PAC-E-05-08\ID PAC-E-O... 2/16/2011
Page 2 of3
From: Randy Tanner (mailto:randyt~rkinspower.coJDJ
Sent: Tuesay, February 01,201112:15 PM
To: Dugan, Alan
Subjec: RE: BOWMAN END CAPS
Alan your cost for EC160-1425-5 $493.00 EACH inbound freight $450.00 for all 4 and the lead time would be 12
to 15 days from date of order Regards Randy
From: Dugan, Alan (mailtQ;l\lg!1!DY9gn(gP~ciftÇorp,.çomJ
Sent: Tuesday, Februaiy 01, 2011 12:37 PM
To: Randy Tanner
Subjec: RE: BOWMAN END CAPS
Randy,
How much and how long to get four (4) complete assemblies? EC160-1425-5
Thanks,~
Compliance Manager
Phone: (307) 995-5046
Fax: (307) 995-5025
E-mail: glgn._Qyggn~Cl~ifiçorp.com
~=-
"If what you did yesterday seems big, you haven 't done anything today." Lou Holtz
from: Randy Tanner ÚliltQ~rgJlQ-Y(gpgrkinsgQwercon:J
Sent: Tuesay, February 01, 2011 9:28 AM
To: Dugan, Alan
SUbjec: BOWMAN END CAPS
Alan the end caps you are looking for is part number
EC3-1040CI YOUR COST $34.12 EACH plus FREIGHT
and the seals AN12NT YOUR COST $2.27 EACH
Lead time from Bowman is 5 TO 10 Days from date of order
and if you would like to order these i can email you a Credit Card information sheet
and if you have any questions please call
Thanks
Randy Tanner
Part Manager
Perkins Power Corp.
Phone:904-278-9919
Fax:904-278-8088
fie://S:\SHAD\FILINGS\ID\2005 ID Dockets & Filings\ID PAC-E-05-08\ID PAC-E-O... 2/16/2011
Page 3 of3
Email:randyt(gperkinspower.com
fie://S:\SHAD\FILINGS\ID\2005 ID Dockets & Filngs\ID PAC-E-05-08\ID PAC-E-O... 2/16/2011