Loading...
HomeMy WebLinkAbout20050531Woodbury Letter.pdfE CEJVED STATE OF IDAHO (2) 20U5 MAY 3 f PM 2: 25 .. ' 1- IDAHO PUBLICU i ftlTIES COMMISSION OFFICE OF THE ATTORNEY GENERAL LAWRENCE G. WASDEN May 31 , 2005 Blair Strong Paine, Hamblen, et al 717 W. Sprague Avenue, Suite 1200 Spokane, WA 99201-3505 Clint Kalich A vista Utilities 1411 E. Mission PO Box 3727 Spokane, W A 99220-3727 . James C. Paine James Fell Stoel Rives LLP 900 SW Fifth Avenue, Suite 2600 Portland, OR 97204 Mark Widmer PacifiCorp 825 NE Multnomah Street Portland, OR 97232 Barton L. Kline Idaho Power Company PO Box 70 Boise, ID 83707-007 RE:Case Nos. GNR-O5-1; PAC-O5- The Idaho Public Utilities Commission in Order No. 28708, Case No. GNR-99-, established a methodology for the annual adjustable rate portion of avoided costs for those QF contracts using, variable costs associated with Colstrip, a coal-fired generating facility in southeast Montana. For, those QF contracts with Colstrip-related fuel costs and variable O&M, future Colstrip variable cost adjustments are to be calculated by using FERC Form 1 Colstrip Unit Coal Costs per megawatt hour (MWh) and adding $2.00/MWh (the average variable O&M cost of Colstrip plus 20~/MWh for generation taxes plus a five percent (50/0) adjustment for line loss). As computed by Commission Staff the Colstrip related adjustable rate will change from 8. mill/kWh to 8.87 mill/kWh. The same calculated rate revision under the avoided cost methodology is used by A vista, PacifiCorp dba UP&L and Idaho Power Company. This change in the variable rate affects existing contracts under the previous SAR methodology. The adjustable portion of the avoided cost rates under the Sumas-based methodology -is based on annual average gas prices indexed at Sumas, Washington. As reported by Avista, the indexed gas prices have increased by $0.61/mmbtu. The approved gas price of $5.31/mmbtu plus the $0.61/mmbtu increase results in a gas price of $5.92/mmbtu for the 2005-2006 year. This equates to a SAR fuel cost of 43.51 mill/kWh as used in the model. Contracts & Administrative Law Division, Idaho Public Utilities Commission O. Box 83720, Boise, Idaho 83720-0074, Telephone: (208) 334-0300, FAX: (208) 334-3762, E-mail: Ipuc~puc.state.id. Located at 472 West Washington St., Boise, Idaho 83702 May 31 , 2005 Page 2 In accordance with Order No. 29316, the adjustable portion of the avoided cost rate for PacifiCorp contracts with 1992 amendments has also been recomputed. Beginning on July 1 2003 , the adjustable portion for these contracts was ordered to be equal to the average cost of fuel for the Carbon, Hale, Naughton Huntington and' Hunter generating plans, including a variable O&M component of $1.51 but exclusive of generation taxes and a line loss adjustment. The variable energy rate applicable to deliveries commencing July 1 , 2005 extending through June 30, 2006 has been computed by PacifiCorp to be $11.55/MWh, an increase from $10.52 last year. Accompanying this letter are worksheets showing the computation of the revised adjustable rates for the various affected contracts. If after reviewing the revisions, you accept them as accurate please indicate your approval by letter (or other filing) directed to the Commission in the reserved case docket numbers identified above. The case heading for the generic adjustment Case No. GNR-05-, will read as follows: IN THE MATTER OF THE ANNUAL REVISION AND UPDA TED CALCULATION OF THE ADJUSTABLE PORTION OF THE AVOIDED COST RA TE(S) FOR EXISTING PURP A CONTRACTS FOR A VISTA CORPORATION DBA VISTA UTILITIES FOR IDAHO POWER COMPANY, AND FOR P ACIFICORP DBA UTAH POWER & LIGHT COMP ANY. The case heading in the PacifiCorp case for PacifiCorp QF contracts with 1992 Amendment language, Case No. P AC-05-, is as follows: IN THE MATTER OF THE ANNUAL REVISION OF QF VARIABLE ENERGY PRICES IN ACCORDANCE WITH TERMS OF THE 1992 AMENDMENTS TO POWER PURCHASE AGREEMENTS BETWEEN IDAHO QFS AND PACIFICORP. Please file your respective responses with the Commission on or prior to June 17 2005. Thank you for your cooperation. Please feel free to. contact me or Rick Sterling if you have any questions. Scott D. Woodbury Deputy Attorney General (208) 334-0320 Enclosures blslL:GNREO501 PACEO506 sw COLSTRIP ADJUSTABLE RATE CALCULATION For Period 7/1/05-6/30/06 Colstrip Fuel Cost from Avista FERC Form 1 for CY 2004 line 12 line 20 Net Generation (kwh) Fuel Fuel cost per kwh Fuel Cost per MWh Variable O&M , Gen. Tax, 5% line loss per MWh Total Colstrip Adjustable Rate Reference GNR-99-N. 28708 4/17/2001 604 774 000 $11 022 574 $0.006869 $6.8686 $2.0000 $8.8686 Average Gas Prices at Sumas, Washington from Inside FERC publication ($/MMBtu) Calculating the 2005-2006 A voided Cost Adjustable Rate 2003 2004 Jan $4.44 $5. Feb $4.$5. Mar $7.32 $4.4 2 Apr $4.$4. May $4.$5. Jun $4.$5. July $4.$5.20 Aug $3.$5. Sep $4.$4. Oct $4.$4. Nov $4.$7.27 Dec $4.$6. Average $4.66 $5. Actual Annual Adjustment: $5.31 - ($4.66 - $5.27) = Note: $2.00/MMBtu = 1997-98 Approved Rate $2.35/MMBtu = 1998-99 Approved Rate $2.26/MMBtu = 1999-00 Approved Rate $2.80/MMBtu = 2000-01 Approved Rate $4.82/MMBtu = 2001-02 Approved Rate $5.23/MMBtu = 2002-03 Approved Rate $3.33/MMBtu = 2003-04 Approved Rate $5.31/MMBtu = 2004-05 Approved Rate Carbon t"aCITI\"orp Total Variable Energy Rate for 2005 2006 Naughton Huntington Hunter Totals Fuel Cost ($) $11,442 174 $60,497 565 $63 752 592 $77 145.4;52 $'212 837 783 FERC FORM 1 - Page 402 Line 20 Generation (MWH) FERC FORM 1 - Page 402 Line 12 Average Fuel Cost ($/MWH) Variable O&M IPUC Order 28709 135 083 245,831 388 634 Total Variable Energy Rate for 2005 2006 Ijh Id AC June 2005 - Update Variable Coal Energy Rate.xls (2005) 8,437 874 21,207,422 10.04 IMWH 51 IMWH 11.55 IMWH 5/20/2005 10:42