HomeMy WebLinkAbout20050525Annual revision.pdf;t~:j EO i.i
825 E. Multnomah
Portland, Oregon 97232
(503) 813-5000
i",...
, ., .....
. PACIFICORP ?GG5IUiY 2 3 t~i'110: i 6
PACIFIC POWER UTAH POWER
;. '
.. i "
,JTIL\Ti LS CUt', !S~')IOli
PAc - 1= -
()
May 23, 2005
Idaho Public Utilities Commission
472 W. Washington
Boise, ill 83702
RE: Annual Notice of Revision ofQF Variable Energy Prices
In compliance with IPUC Order No. 29316, PacifiCorp is providing the updated QF variable
energy price in accordance with the terms of the 1992 amendments to Idaho QF power purchase
agreements.
The variable energy rate applicable to deliveries commencing July 1 2005 extending through
June 30, 2006 shall be $11.55/MWH. The calculation and associated FERC Form 1 back-up
detail is attached.
If you have any questions please feel tree to call or email me at (503) 813-5541 or
Mark. Widmer~Pacifi Corp. com.
Sincerely,
li
(' ,
1 /
1j;f, /1/1(
/ '
tiftt.C-t,Vi/
(- "":/
'V
+1111/I.fjfar 1 mer
Director, Regulation
PacifiCorp
Total Variable Energy Rate
for 2005 2006
Carbon Naughton Huntington Hunter Totals
Fuel Cost ($) $11,442,174 $60,497 565 $63 752,592 $77 145,452 $212 837 783
FERC FORM 1 - Page 402 Line 20
Generation (MWH)
FERC FORM 1 - Page 402 Line 12
135,083 245 831 388,634 8,437 874 207,422
Variable O&M
IPUC Order 28709
51 IMWH
Average Fuel Cost ($/MWH)10.04 IMWH
Total Variable Energy Rate for 2005 2006 11.55 IMWH
Ijh Id AC June 2005 - Update Variable Coal Energy Rate.xls (2005)5/20/2005 10:42
T" ~rt Is: Date of Report
( ~
An Original (Mo, Da, Yr)
(2) D A Resubmission 04/25/2005
STEAM-ELECTRIC GENERATING PLANT STATISTICS (Large Plants)
1. Report data for plant in Service only. 2. Large plants are steam plants with installed capacity (name plate rating) of 25,000 Kw or more. Report in
this page gas-turbine and internal combustion plants of 10,000 Kw or more, and nuclear plants. 3. Indicate by a footnote any plant leased or operated
as a joint facility. 4. If net peak demand for 60 minutes is not available, give data which is available, specifying period. 5. If any employees attend
more than one plant, report on line 11 the approximate average number of employees assignable to each plant. 6. If gas is used and purchased on a
therm basis report the Btu content or the gas and the quantity of fuel burned converted to Mct. 7. Quantities of fuel bumed (Line 38) and average cost
per unit of fuel burned (LIne 41) must be consistent with charges to expense accounts 501 and 547 (Line 42) as show on Line 20. 8. If more than one
fuel is bumed in a plant fumish only the composite heat rate for all fuels burned.
Name of Respondent
PacifiCorp
Line
No.
Item Plant
Name: Carbon
(a)(b)
1 Kind of Plant (Internal Comb, Gas Turb, Nuclear
2 Type of Constr (Conventional, Outdoor, Boiler, etc)
3 Year Originally Constructed
4 Year Last Unit was Installed
5 Total Installed Cap (Max Gen Name Plate Ratings-MW)
6 Net Peak Demand on Plant - MW (60 minutes)
7 Plant Hours Connected to Load
8 Net Continuous Plant Capability (Megawatts)
9 When Not Limited by Condenser Water
10 When Limited by Condenser Water
11 Average Number of Employees
12 Net Generation, Exclusive of Plant Use - KWh
13 Cost of Plant: Land and Land Rights
14 Structures and Improvements
15 Equipment Costs
16 Asset Retirement Costs
17 Total Cost
18 Cost per KW of Installed Capacity (line 17/5) Including
19 Production Expenses: Oper, Supv, & Engr
I 20 Fuel
21 Coolants and Water (Nuclear Plants Only)
22 Steam Expenses
23 Steam From Other Sources
. 24 Steam Transferred (Cr)
I 25 Electric ~xpenses
26 Misc Steam (or Nuclear) Power Expenses
27 Rents ( '
28 Allowances
29 Maintemince Supervision and Engineering
30 Maintenance of Structures
31 Maintenance of Boiler (or reactor) Plant
32 Maintenance of Electric Plant
33 Maintenance of Misc Steam (or Nuclear) Plant
34 Total Production Expenses
35 Expenses per Net KWh
36 Fuel: Kind (Coal, Gas, Oil, or Nuclear)
37 Unit (Coal-tons/Oil-barreVGas-mcflNuclear-indicate)
38 Quantity (Units) of Fuel Burned
39 Avg Heat Cont - Fuel Burned (btulindicate if nuclear)
40 Avg Cost of Fuel/unit, as Delvd to.b. during year
41 Average Cost of Fuel per Unit Burned
42 Average Cost of Fuel Burned per Million BTU
43 Average Cost of Fuel Burned per KWh Net Gen
44 Average BTU per KWh Net Generation
Coal
Tons
559628
11841
19.951
20.114
849
010
11675.587
Oil
Barrels
3564
140000
52.190
52.190
876
000
18.465
ERC FORM NO.1 (REV. 12-03)Page 402
YearlPeriod of Report
End of 2004/04
Plant
N am e :~~~JI~
:;:~!)
~fi~,t~~:~:~i ;!1r11i0J:i11! !':...~i~~~l(Steam Steam
Outdoor Boiler Full Outdoor1954 19811957 1981
188.64 414.174 3808772 6914172 38071 /'
1135083000 2329937000956546 123155711578139 4628168673322778 323871764
85857463 371385007
455.1392 897.0652133906 1411609
11442174 40557766682262 2136057
917382 10584485311683 64198940453 26492
2380460492808 7816624292805 76720092548794 2723384506026 225432126368293 616441970232 0.0265
Composite Coal Oil CompositeTons Barrels
000
000
862
010
11694.051
1293004
9761
30.347
31.182
597
017
10833.782
4929
136800
48.552
48.552
450
000
12,155
000
000
605
017
10845.937
Name of Respondent This Wrt Is:Date of Report Year/P-eriod of Report
PacifiCorp (1) An Original ')a, Yr)2004lQ4(2)D A Resubmission /2005 End of
STEAM-ELECTRIC GENERATING PLANT STATISTICS (Large Plants)(Continued)
9. Items under Cost of Plant are based on U. S. of A. Accounts. Production expenses do not Include Purchased Power, System Control and Load
Dispatching, and Other Expenses Classified as Other Power Supply Expenses.10. For IC and GT plants, report Operating Expenses, Account Nos.
547 and 549 on Line 25 NElectric Expenses,R and Maintenance Account Nos. 553 and 554 on Line 32, RMaintenance of Electric Plant." Indicate plants
designed for peak load service. Designate automatically operated plants.11. For a plant equipped with combinations of fossil fuel steam, nuclear
steam, hydro, intemal combustion or gas-turbine equipment, report each as a separate plant. However, if a gas-turbine unit functions in a combined
cycle operation with a conventional steam unit, include the gas-turbine with the steam plant.12. If a nuclear power generating plant, briefly explain by
footnote (a) accounting method for cost of power generated including any excess costs attributed to research and development; (b) types of cost units
used for the various components of fuel cost; and (c) any other informative data conceming plant type fuel used, fuel enrichment type and quantity for the
report period and other physical and operating characteristics of plant.
Plant Plant Plant Line
Name: Naughton Name:Name:Gadsby Steam Plant No.
(d)(1)
Steam Steam Steam
Outdoor Boiler Conventional Outdoor
1963 1978 1951
1971 1978 1955
707.289.251.
705 278 216
8784 8140 961
700 268 235
143
----
5245831000 2153135000 66586000
1243566 210526 1259170
57155058 48377029 13811541
289661534 250111165 55921836
3578619
351638777 298698720 70992547
497.2268 1031.4182 282.1195
237513
---
3001485 27872
60497565 13659494 1676796
7449228
12975
4389599 719752 4160091
584478 7096 5928
2333073 5902
908142 420801 107246
6910552 4658589 903378
927977 1290171 1621966
766138 607475 254339
85017240 24370765 8757616
0162 0113 1315
Coal Gas Composite Coal Oil Composite Gas
Tons MCF Tons Barrels MCF
2809373 137410 1615197 7001 935228
9898 1060 8019 140000 1050
21.498 000 000 283 48.046 000 000 000 000
21.425 241 000 249 48.046 000 793 000 000
088 114 085 514 171 527 708 000 000
011 000 011 006 000 006 025 000 000
10601.301 27.771 10629.073 12031.073 19.119 12050.191 14747.019 000 000
FERC FORM NO.1 (REV. 12-03)Page 403.
~arne of Respondent Thi 'Jort Is:Date of Report Year/Period of Report
;)acifiCorp
(1)~ An Original (Mo, Da, Yr)2004/04
(2)D A Resubmlssion 04/25/2005 End of
STEAM-ELECTRIC GENERATING PLANT STATISTICS (Large Plants) (Continued)
. Report data for plant in Service only.2. Large plants are steam plants with installed capacity (name plate rating) of 25,000 Kw or more. Report in
,is page gas-turbine and internal combustion plants of 10,000 Kw or more, and nuclear plants.3. Indicate by a footnote any plant leased or operated
IS a joint facility.4. If net peak demand for 60 minutes is not available, give data which is available, specifying period.5. If any employees attend
nore than one plant, report on line 11 the approximate average number of employees assignable to each plant.6. If gas is used and purchased on a
herm basis report the Btu content or the gas and the quantity of fuel burned converted to Mct.7. Quantities of fuel burned (Line 38) and average cost
ler unit of fuel bumed (Line 41) must be consistent with charges to expense accounts 501 and 547 (Line 42) as show on Line 20.8. If more than one
uel is burned in a plant furnish only the composite heat rate for all fuels burned.
-ine Item Plant
No.Name: Huntington Name:
(a)(b)
Kind of Plant (Internal Comb, Gas Turb, Nuclear Steam Steam
Type of Constr (Conventional, Outdoor, Boiler, etc)Outdoor Boiler Semi-Outdoor
Year Originally Constructed 1974 1974
Year Last Unit was Installed 1977 1979
Total Installed Cap (Max Gen Name Plate Ratings-MW)996.1541.
Net Peak Demand on Plant - MW (60 minutes)907 1391
Plant Hours Connected to Load 8629 8784
Net Continuous Plant Capability (Megawatts)
When Not Limited by Condenser Water 895 1413
When Limited by Condenser Water
Average Number of Employees 164 348
Net Generation, Exclusive of Plant Use - KWh 6388634000 V'"9820371000
Cost of Plant: Land and Land Rights 2405337 1161925
Structures and Improvements 99455311 133679404
Equipment Costs 339245256 711525469
Asset Retirement Costs 652406 9787188
Total Cost 441758310 856153986
Cost per KW of Installed Capacity (line 17/5) Including 443.5324 555.5473
Production Expenses: Oper, Supv, & Engr 29644
...,./'
12667637
Fuel 63752592 120577 466
Coolants and Water (Nuclear Plants Only)
Steam Expenses 8464770 536259
Steam From Other Sources
Steam Transferred (Cr)
Electric Expenses
Misc Steam (or Nuclear) Power Expenses 6527143 -9323909
Rents 890671 452888
Allowances
Maintenance Supervision and Engineering 781611 1323097
Maintenance of Structures 1231569 6104073
Maintenance of Boiler (or reactor) Plant 7970197 24371327
Maintenance of Electric Plant 2539773 9045648
Maintenance of Misc Steam (or Nuclear) Plant 1095126 1717677
Total Production Expenses 93283096 167472163
Expenses per Net KWh 0146 0171
Fuel: Kind (Coal, Gas, Oil, or Nuclear)Coal Oil Composite Coal Oil Composite
Unit (Coal-tons/Oil-barreI/Gas-mcf/N uclear-indicate)Tons Barrels Tons Barrels
Quantity (Units) of Fuel Burned 2888019 18285 5522362 34064
Avg Heat Cont - Fuel Bumed (btulindicate if nuclear)11179 140000 9352 140000
Avg Cost of FueVunit, as Delvd f.b. during year 21 .889 52.126 000 21.778 51.108 000
Average Cost of Fuel per Unit Bumed 21.745 52.126 000 21.519 51.108 000
Average Cost of Fuel Burned per Million BTU 973 865 986 151 692 165
Average Cost of Fuel Burned per KWh Net Gen 010 000 010 012 000 012
Average BTU per KWh Net Generation 10107.496 16.830 10124.325 10517.954 20.396 10538.350
=ERC FORM NO.1 (REV. 12-03)Page 402.
Name of Respondent This ~ort Is:Date of Report YearlPeriod of Report
PacifiCorp (1) An Original (~' la, Yr)2004/04(2)0 A Resubmission 2005 End of
STEAM-ELECTRIC GENERATING PLANT STATISTICS (Large Plants) (Continued)
9. Items under Cost of Plant are based on U. S. of A. Accounts. Production expenses do not include Purchased Power, System Control and Load
Dispatching, and Other Expenses Classified as Other Power Supply Expenses.10. For IC and GT plants, report Operating Expenses, Account Nos.
547 and 549 on Line 25 "Electric Expenses " and Maintenance Account Nos. 553 and 554 on Line 32
, "
Maintenance of Electric Plant. H Indicate plants
designed for peak load service. Designate automatically operated plants.11. For a plant equipped with combinations of fossil fuel steam, nuclear
steam, hydro, intemal combustion or gas-turbine equipment, report each as a separate plant. However, if a gas-turbine unit functions in a combined
cycle operation with a conventional steam unit, include the gas-turbine with the steam plant.12. If a nuclear power generating plant, briefly explain by
footnote (a) accounting method for cost of power generated including any excess costs attributed to research and development; (b) types of cost units
used for the various components of fuel cost; and (c) any other informative data conceming plant type fuel used, fuel enrichment type and quantity for the
report period and other physical and operating characteristics of plant.
~~:e::::r::::.Plant Plant Line
Name:Hunter Unit No.Name:No.
(e)
Steam Steam Steam
Outdoor Boiler Outdoor Boiler Outdoor Boiler
1980 1983 1978
1980 1983 1983
285.495.1223.
268 468 1256
8299 8469 8784
259 460 1122
----
220
2010041000 3575290000 8437874000
9626532 10233162 29486226
49803203 88931493 199338088
142213710 375949702 739508344
1571858 1571858 4715575
203215303 476686215 973048233
713.0362 961.8366 795.2339
126116 126116
..--
378348
18564845 32098512 77145452
3112262 3782881 0368382
147392 147392 442176
2194293 1998056 1370754
13683 17561 55584
1809906 1718934 5282046
3177022 5410664 13253766
629626 945171 2596350
102754 139028 364234
25489313 46384315 111257092
0127 0130 0132
Coal Oil Coal Oil Composite Coal Oil Composite
Tons Barrels Tons Barrels Tons Barrels
952672 2175 1651452 10010 3949930 18139
11289 140000 11282 140000 11322 140000
19.294 48.175 000 19.294 48.175 000 19.294 48.175 000
19.372 48.175 000 19.151 48.175 000 19.310 48.175 000
858 546 863 849 009 860 853 193 862
009 000 009 009 000 009 009 000 009
10700.987 363 10707.350 10422.475 16.463 10438.938 10600.054 12.641 10612.694
FERC FORM NO.1 (REV. 12-03)Page 403.