HomeMy WebLinkAbout20050118Widmer Direct.pdfBEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE
APPLICATION OF PACIFICORP DBA
UTAH POWER & LIGHT COMPANY
FOR APPROVAL OF CHANGES TO ITS
ELECTRIC SERVICE SCHEDULES
CASE NO. PAC-O5-
) Direct Testimony of Mark T. Widmer
ACIFICORP
CASE NO. PAC-05-
January 2005
Please state your name, business address and present position with
PacifiCorp (the Company).
My name is Mark T. Widmer, my business address is 825 N.E. Multnomah, Suite
800, Portland, Oregon 97232, and my present position is Director, Regulation.
Qualifications
Briefly describe your education and business experience.
I received an undergraduate degree in Business Administration from Oregon State
University. I have worked for PacifiCorp since 1980 and have held various
positions in the power supply and regulatory areas. I was promoted to my present
position in September 2004.
Please describe your current duties.
I am responsible for the coordination and preparation of net power cost and
related analyses used in retail price filings. In addition, I represent the Company
on power resource and other various issues with intervenor and regulatory groups
associated with the six state regulatory commissions to whose jurisdiction we are
subject.
Summary of Testimony
Will you please summarize your testimony?
I present the results of the production cost model study for the twelve-month test
period ended March 31 , 2004 with known and measurable changes as discussed in
my testimony. I describe the Company s production cost model, the Generation
and Regulation Initiatives Decision Tools (GRID) model, which is used to
calculate net power costs. I provide information on how input data is normalized
Widmer, Di -
PacifiCorp
in GRID and the rationale for doing so. I describe hydro modeling associated with
the VISTA hydro model. Finally, I describe the Aquila Hydro hedge and the
Company s proposed method of including the associated costs and benefits in
rates.
Net Power Cost Results
What are the net power cost results?
Normalized net power costs are approximately $644.5 million. In comparison
actual results for the twelve-month period ending September 2004 are
approximately $726 million.
How does this compare with the level presented to the Commission in the
Company s last semi-annual filing?
Proposed net power costs are approximately $2.5 million higher than the $642
million included in the Company s last semi-annual report for FY 2004. The
difference is related to information updates that have become available since the
semi -annual was filed.
How is the Company handling the Currant Creek plant?
The Company has contracted for the construction of the Currant Creek plant and
expects the plant to be available in its simple cycle combustion turbine
configuration in July 2005. For purposes of this filing, the Company has assumed
that the plant is available and provides benefits to rate payers during the entire test
period because it will be in service when rates go into effect.
Widmer, Di - 2
PacifiCorp
Determination of Net Power Cost
Please explain net power costs.
Net power costs are defined as the sum of fuel expenses, wholesale purchase
expenses and wheeling expenses, less wholesale sales revenue.
Are the proposed net power costs which you are sponsoring developed with
the same production dispatch model used in the preparation of the semi-
annual reports that are filed with the Commission?
Yes.
Please explain how the Company calculated net power costs.
Net power costs were calculated for an historical test period based on normalized
data using the GRID model. For each hour in the period the model simulates the
operation of the power supply portion of the Company under a variety of stream
flow conditions. The results obtained from the various stream flow conditions are
averaged and the appropriate cost data is applied to determine an expected net
power cost under normal stream flow and weather conditions for the test period.
Please explain how GRID calculates future net power costs.
The development of expected net power costs begins with the selection of a test
period. This filing is an historical normalized test period. I have divided the
description of the power cost model into three sections, which follow below:
The model used to calculate net power costs.
The model inputs.
The model output.
Widmer, Di - 3
PacifiCorp
The GRID Model
Please describe the GRID model.
The GRID model is the Company s hourly production dispatch model, which the
Company uses to calculate net power costs. It is a server-based application that
uses the following high-level technical architecture to calculate net power costs:
An Oracle-based data repository for storage of all inputs
A Java-based software engine for algorithm and optimization
processIng,
Outputs that are exported in Excel readable format, and
A web browser-based user interface.
Based on requests by regulatory staffs and intervenors, the Company provides the
model on a stand-alone personal computer.
Please describe the methodology employed to calculate net power costs in this
docket.
Net power costs are calculated hourly using the GRID model. The general steps
are as follows:
1. Determine the input information for the calculation, including retail load
wholesale contracts, market prices, thermal and hydro generation capability,
fuel costs, transmission capability and expenses
2. The model calculates the following pre-dispatch information:
Thermal availability
Thermal commitment
Hydro shaping and dispatch
Widmer, Di - 4
PacifiCorp
Energy take of long term firm contracts
Energy take of short term firm contracts
Reserve requirement and allocation between hydro and thermal
resources
3. The model determines the following information in the Dispatch
(optimization) logic, based on resources, including contracts, from the pre-
dispatch logic:
Optimal thermal generation levels, and fuel expenses
Expenses (revenues) from firm purchase (sales) contracts
System balancing market purchases and sales necessary to balance and
optimize the system and net power costs taking into account the
constraints of the Company s system
Expenses for purchasing additional transmission capability
4. Model outputs are used to calculate net power costs on a total Company basis
incorporating expenses (revenues) of purchase (sales) contracts that are
independent of dispatched contracts, which are determined in step 3.
The main processors of the GRID model are steps 2 and 3.
Please describe in general terms, the purposes of the Pre-dispatch and
Dispatch processes.
The Dispatch logic is a linear program (LP) optimization module, which
determines how the available thermal resources should be dispatched given load
requirements, transmission constraints and market conditions, and whether market
purchases (sales) should be made to balance the system. In addition, if market
Widmer, Di - 5
PacifiCorp
conditions allow, market purchases may be used to displace more expensive
thermal generation. At the same time, market sales may be made either from
excess resources or market purchases if it is economical to do so under market and
transmission constraints.
Does the Pre-dispatch logic provide thermal availability and system energy
requirements for the Dispatch logic?
Yes. Pre-dispatch, which occurs before the Dispatch logic, calculates the
availability of thermal generation, dispatches hydro generation, schedules firm
wholesale contracts, and determines the reserve requirement of the Company
system. In my following testimony, I'll describe each of the calculations in more
detail.
Generation Resources in Pre-Dispatch
Please describe how the GRID model determines thermal availability and
commitment.
The Pre-dispatch logic reads the input regarding thermal generation by unit, such
as nameplate capacity, normalized outage and maintenance schedules, and
calculates the available capacity of each unit for each hour. The model then
determines the hourly commitment status of thermal units based on planned
outage schedules, and a comparison of operating cost vs. market price if the unit is
capable of cycling up or down in a short period of time. The commitment status of
a unit indicates whether it is economical to bring that unit online in that particular
hour. The availability of thermal units and their commitment status are used in
the Dispatch logic to determine how much may be generated each hour by each
Widmer, Di - 6
PacifiCorp
unit.
How does the model shape and dispatch hydro generation?
In the Pre-dispatch logic, the Company s available hydro generation from each
non-run of river project is shaped and dispatched by hour within each month in
order to maximize usage during peak load hours. The monthly shape of a non-run
of river project is based on the hourly retail load and market prices in a month
and incorporates minimum and maximum flow for the project to account for
environmental constraints. The dispatch of the generation is flat in all hours of
the month for run of river projects. The hourly dispatched hydro generation is
used in the Dispatch logic to determine energy requirements for thermal
generation and system balancing transactions.
Wholesale Contracts in Pre-Dispatch
Does the model distinguish between short-term firm and long-term firm
wholesale contracts in the Pre-dispatch logic?
Yes. Short-term firm contracts are block energy transactions with standard terms
and a term of one year or less in length. In contrast, many of the Company s long-
term firm and intermediate-term firm contracts have non-standard terms that
provide different levels of flexibility. For modeling purposes, long-term firm
contracts are categorized as one of the following archetypes based on contract
terms:
Energy Limited (shape to price or load): The energy take of these
contracts have minimum and maximum load factors. The complexities
can include shaping (hourly, annual), exchange agreements, and call/put
Widmer, Di - 7
PacifiCorp
optionality.
Generator Flat: The energy take of these contracts is tied to specific
generators and is the same in all hours, which takes into consideration
plant down time. There is no optionality in these contracts.
Flat (or Fixed): These contracts have a fixed energy take in all hours of a
period.
Complex: The energy take of one component of a complex contract is tied
to the energy take of another component in the contract or the load and
resource balances of the contract counter party.
Contracted Reserves: These contracts do not take energy. The available
capacity is used in the operating reserve calculation.
No-Energy: These contracts are place holders for capturing fixed cost.
They do not take energy.
In the Pre-dispatch logic, long term firm purchase and sales contracts are
dispatched per the specific algorithms designed for their archetype.
Are there any exceptions regarding the procedures just discussed for
dispatch of short-term firm or long-term firm contracts?
Yes. Whether a wholesale contract is identified as long-term firm is entirely based
on the length of its term. Consistent with previous treatment, the Company
identifies contracts whose term is greater than one year by name. Short-term firm
contracts are grouped by delivery point. If a short-term firm contract has flexibility
as described for long-term firm contracts, it will be dispatched using the
appropriate archetype and listed individually with the long-term contracts. Hourly
Widmer, Di - 8
PacifiCorp
contract energy dispatch is used in the Dispatch logic to determine the
requirements for thermal generation and system balancing transactions.
Reserve Requirement in Pre-Dispatch
Please describe the reserve requirement for the Company s system.
The North American Electric Reliability Council (NERC) requires all companies
with generation to carry operating reserves to meet its most severe single
contingency (MSSC) or 5 percent for operating hydro and wind resources and 7
percent for operating thermal resources, whichever is greater. A minimum of one-
half of these reserves must be spinning. Spinning reserves are units that are under
control of the control area. The remainder (ready reserves) must be available
within a 10-minute period. NERC and the Western Electricity Coordinating
Council (WECC) require companies with generation to carry spinning reserves to
protect the WECC system from cascading loss of generation or transmission lines,
uncontrolled separation and interruption of customer service.
How does the model implement the operating reserve requirement?
The model calculates operating reserve requirements (both spinning and ready) for
the Company s East and West control areas, plus regulating margin that is added to
spinning reserve requirement. The total operating reserve requirement is 5 percent
of dispatched hydro and wind, plus 7 percent of committed available thermal
resources for the hour, which includes both Company-owned resources and long
term firm purchase and sales contracts that contribute to the reserve requirement.
Spinning reserve is one half of the total reserve requirement. In GRID, regulating
margin is added to the spinning reserve requirement. Regulating margin is the
Widmer, Di - 9
PacifiCorp
same in nature as spinning reserve but it is used for following changes in net
system load within the hour.
How does the model satisfy reserve requirements?
Reserves are met first with unused hydro capability then by backing down thermal
units on a descending variable cost basis. Spinning reserve is satisfied before the
ready reserve requirement. For each control area, spinning reserve requirement is
fulfilled using hydro resources and thermal units that are equipped with governor
control. The ready reserve requirement is met using purchase contracts for
operating reserves, uncommitted quick start units, the remaining unused hydro
capability, and by backing down thermal units. The allocated hourly operating
reserve requirement to the generating units is used in the Dispatch logic to
determine the energy available from the resources and the level of the system
balancing market transactions.
What is an "uncommitted quick start unit"
As noted above, ready reserves must be available within a 10-minute period. A
quick start unit is a unit that can be synchronized with the transmission grid and
can be at capacity within the 10-minute requirement. If a gas supply is available
and the units are not otherwise dispatched, the Gadsby CT units and the leased
West Valley units meet this requirement.
Are the operating reserves for the two control areas independent of each
other?
Yes, with one exception. The dynamic overlay component of the Revised
Transmission Services Agreement with Idaho Power allows the Company to
Widmer, Di - 10
PacifiCorp
utilize the reserve capability of the Company s west side hydro system in the east
side control area. Up to 100 MW of east control area spinning reserves can be
met from resources in the west control area.
What is the impact of reserve requirement on resource generating
capability?
There is no impact on hydro generation, since the amount of reserves allocated to
hydro resources are based on the difference between their maximum dependable
capability and the dispatched energy. However, if a thermal unit is designated to
hold reserves, its hourly generation will be limited to no more than its capability
minus the amount of reserves it is holding.
Model Inputs
Please explain the inputs that go into the model.
As mentioned above, inputs used in GRID include retail loads, thermal plant data
hydroelectric generation data, firm wholesale sales, firm wholesale purchases
firm wheeling expenses, system balancing wholesale sales and purchase market
data, and transmission constraints.
Please describe the retail load that is used in the model.
The retail load represents the historical normalized hourly firm retail load that the
Company served within all of its jurisdictions for the twelve-month period ending
March 31 , 2004 (FY 2004). These loads are modeled based on the location of the
load and transmission constraints between generation resources to load centers.
Please describe the thermal plant inputs.
The amount of energy available from each thermal unit and the unit cost of the
Widmer, Di -
PacifiCorp
energy are needed to calculate net power costs. To determine the amount of
energy available, the Company averages four years of historical outage rates and
maintenance for each unit. The heat rate for each unit is determined by using a
four-year average of historical burn rate data. By using four-year averages to
calculate outages, maintenance and heat rate data, annual fluctuations in unit
operation and performance are smoothed. The 48-month period ending March
2004 is used in this filing. Other thermal plant data include unit capacity,
minimum generation level, minimum up/down time, fuel cost, and startup cost.
The four-year average approach has been used for over 10 years.
Are there any exceptions to the four-year averge calculation?
Yes. Some plants have not been in service for the entire four year period. For
those plants, the Company uses the manufacturer s expected value for the missing
months to produce a weighted average value of the known and theoretical rates.
Please describe the hydroelectric generation input data.
As stated earlier, the Company has a new source for its hydro data. The Company
is using 19 sets of expected generation from the VISTA hydro model rather than
using the 50 years of adjusted actual stream flows.
In previous GRID studies, hydroelectric generation was normalized by using
historical water data. Is that still true with the VISTA model?
Yes. The period of historical data varies by plant. As explained later in my
testimony, the Mid-Columbia projects are 60 adjusted water years beginning with
water year 1928/29. The Company s large plant data begins in the 1958-1963
range. The Company s small plant data begins in the 1978-1989 range.
Widmer, Di - 12
PacifiCorp
Does the Company use other hydro generation inputs?
Yes. Other parameters for the hydro generation logic include the maximum
capability, the minimum run requirements, shaping capability, and reserve
carrying capability of the projects.
Please describe the input data for firm wholesale sales and purchases.
The data for firm wholesale sales and purchases are based on contracts to which
the Company is a party. Each contract specifies the basis of quantity and price.
The contract may specify an exact quantity of capacity and energy or a range
bounded by a maximum and minimum amount, or it may be based on the actual
operation of a specific facility. Prices may also be specifically stated, may refer to
a rate schedule, a market index such as California Oregon Border (COB), Mid
Columbia (Mid C) or Palo Verde (PV), or may be based on some type of formula.
The long-term firm contracts are modeled individually, and the short-term firm
contracts are grouped based on general delivery points. The long-term contracts
are dispatched against the hourly market prices so that they are optimized from the
point of view of the holder of the call/put.
Please describe the input data for wheeling expenses and transmission
capability.
The data for firm wheeling is based on contracts to which the Company is a party.
The firm transmission rights modeled in GRID are developed from the
Company s OASIS for summer/winter postings. The limited additional
transmission rights that the Company may have access to are based on the
experience of the Company s Commercial and Trading Department.
Widmer, Di -
PacifiCorp
Please describe the system balancing wholesale sales and purchase input
assumptions.
The GRID model uses four wholesale markets to balance and optimize the system.
The four markets are at Mid Columbia, COB, SP15 and Palo Verde (Desert
Southwest), where the model makes both system balancing sales and purchases if it
is economical to do so under constraints. The input data regarding wholesale
markets include market price and market size.
What market prices are used in the net power cost calculation?
The market prices for the system balancing wholesale sales and purchases at Mid
Columbia, COB, SP15 and Palo Verde (DSW) are the Company s monthly
forward price curves for the period April 2004 through March 2005 shaped into
hourly prices. The market price hourly scalars are developed by the Company
Commercial and Trading Department based on historical hourly data since April
1996. Separate scalars are developed for on-peak and off-peak periods and for
different market hubs to correspond to the categories of the monthly forward
prices. Before the determination of the scalar, the historical hourly data are
adjusted to synchronize the weekdays, weekends and holidays, and to remove
extreme high and low historical prices. As such, the scalars represent the
expected relative hourly price to the average price forecast for a month. The
hourly prices for the test period are then calculated as the product of the scalar for
the hour and the corresponding monthly price.
Widmer, Di - 14
PacifiCorp
Normalization
Please explain what is meant by normalization and how it applies to the
production cost model used in this case.
Normalization is the process of modifying actual test year data by removing
known abnormalities and making adjustments for known changes. Normalization
produces test year results that are representative of expected conditions. The
following are examples of the normalization of actual test period results:
1. Owned and purchased hydroelectric generation is normalized by running the
production cost model for each of the 19 different sets of hydro generation.
The resultant 19 sets of thermal generation, system balancing sales and
purchases, and hydroelectric generation are then averaged. As previously
explained, normalized thermal availability is based on a four-year average.
2. Wholesale market prices are adjusted to reflect expected prices during the
normalized period.
3. Long-term firm wholesale sales and purchase contracts are redispatched based
on the normalized wholesale market prices and known changes in the
contracts.
4. Wheeling expense is adjusted for known contractual changes.
5. System load net of special sales is adjusted to reflect loads that would have
occurred under normal temperature conditions.
Widmer, Di -
PacifiCorp
You stated that hydroelectric generation is normalized by using historical
water data. Please explain why the regulatory Commissions and the utilities
of the Pacific Northwest have adopted the use of production cost studies that
employ historical water conditions for normalization.
In any hydroelectric-oriented utility system, water supply is one of the major
variables affecting power supply. The operation of the thermal electric resources
both within and outside the Pacific Northwest, is directly affected by water
conditions within the Pacific Northwest. During periods when the stream flows are
at their lowest, it is necessary for utilities to operate their thermal electric resources
at a higher level or purchase more from the market, thereby experiencing relatively
high operating expenses. Conversely, under conditions of high stream flows,
excess hydroelectric production may be used to reduce generation at the more
expensive thermal electric plants, which in turn results in lower operating expenses
for some utilities and an increase in the revenues of other utilities, or any
combination thereof. No one water condition can be used to simulate all the
variables that are met under normal operating conditions. Utilities and regulatory
commissions, therefore, have adopted production cost analysis that simulates the
operation of the entire system using historical water conditions, as being
representative of what can reasonably be expected to occur.
VISTA Model
Is the Company switching to the VISTA Model for hydro generation
normalization as a result of concerns raised by regulators?
Yes. During the Oregon UE-147 settlement discussions, Oregon staff expressed
Widmer, Di - 16
PacifiCorp
concern over the vintage of the 50-year hydro data. In addressing the hydro issue
the Company agreed to prepare a proposed methodology that captures the current
hydro capability.
Are there additional reasons for the Company to change to the VISTA
model?
Yes. As far back as the mid-1970's, PacifiCorp and other utilities in the
Northwest have used regional historical stream flow records provided by the
Bonneville Power Administration (BP A) to normalize expected hydro generation.
BPA adjusted the historical stream flow data for changes in the river system (e.
new projects), the license requirements (e.g. fish flush), and the environment (e.
more surface runoff). The Company started with 40 years of adjusted historical
data (water-years 1929 to 1968). In the mid-1980's BPA added a block often
years to the adjusted numbers.
In the 1990', when BPA was mandated to be more competitive, BPA
stopped sharing and/or preparing the regional information. The only information
available was the data made public during the BP A rate case process. Without
BP A maintaining the regional hydro information, the hydro data used in prior
general rate cases are growing stale.
For Company-owned projects, the Company has been using the 50 water-
year set of hydro generation based on a BP A West Group Forecast Regulation
(circa 1986). For the Mid-Columbia projects, the Company has been using data
from the 1999 BPA White Book generation forecast for water-years 1929 to 1978.
In 2003, the Company used hydro generation developed by the VISTA
Widmer, Di - 17
PacifiCorp
model in its Integrated Resource Plan (IRP). Starting in spring 2004, the
Company is using the VISTA model to develop hydro generation for its short term
planning.
Based on the need for more current hydro information, the Company
experience with the VISTA model, and the Oregon UE-147 stipulation, the
Company is proposing to use the VISTA model in general rate cases.
Please describe the VISTA model.
The Company uses the VISTA Decision Support System (DSS) developed by
Synexus Global of Niagara Falls, Canada as its hydro optimization model. The
VIST A model is designed to maximize the value of the hydroelectric resources by
optimizing the operation of hydroelectric facilities against a projected stream of
market prices. VIST A uses an hourly linear program to define the system
configuration and the environmental, political, and biological requirements for
that system. The physical project data, constraint description, and historical
stream flows used in the VISTA model in the preparation of hydro generation
proposed for use in this filing are exactly the same data used by the Company
Operations Planning Group and in the Company s Integrated Resource Planning
process.
Do other utilities use the VISTA DSS model?
The VISTA DSS model is used by a growing number of other energy companies
including the Bonneville Power Administration.
Please describe the VISTA model inputs.
The VIST A input data come from a variety of sources characterized into three
Widmer, Di - 18
PacifiCorp
groups - Company-owned plants without operable storage, Company-owned plants
with operable storage, and Mid-Columbia contracts.
The Company owns a large number of small hydroelectric plants scattered
across its system. These projects have no appreciable storage ponds and are
operated as Run-of-River projects, i., flow in equals flow out. For these plants
normalized generation" is based on a statistical evaluation of historical
generation adjusted for scheduled maintenance.
The Company s larger projects (Lewis River, Klamath River, and Umpqua
River) have a range of possible generation that can be modified operationally by
effective use of storage reservoirs. For these projects, the Company feeds the
historical stream-flow data through its optimization model, VISTA, to create a set
of generation possibilities that reflect the current capability of the physical plant
the operating requirements of the current license agreements, as well as the
current energy market price projections.
For the Lewis and Klamath Rivers , the stream flows used as inputs to the
VIST A model are the flows that have been recorded by the Company at each of
the projects. In most cases the flows, using a very simple continuity of water
equation where Inflow = Outflow + Change in Storage, are used to develop
generation levels.
For the Umpqua River, the inflow data was reconstructed by piecing
together a variety of historical data sources. The USGS gauge data at Copeland
(the outflow of the entire project) was used to true up the previously recorded
flows developed using the continuity equation described above.
Widmer, Di - 19
PacifiCorp
The Company s Mid-Columbia energy is determined by using VISTA to
optimize the operations of the of the six hydro electric facilities below Chief
Joseph under 60 years of "modified" stream-flow conditions. The modified hydro
flows are the flows developed as the "PNCA Headwater Payments Regulation
2002" file, also known as "The 2002 60 year Reg" file, completed in February
2003 for hydro conditions that actually occurred for the period 1928 through
1988. Thus the inflows to the Mid-Columbia projects are the result of extensive
modeling that reflects the current operations and constraints of the Columbia
River. These stream flow data are the most current information available to the
Company and serve as an input to the VISTA model. As in the case of the
Company s large plants, the energy production resulting from the set of stream
flows is analyzed statistically to produce a set of probability curves or exceedence
levels for each group/week.
In the above processes, VISTA works on five groups of hours within a
week. The results are defined as exceedence level statistics for each week. The
weekly data is aggregated to the monthly level for use in GRID.
Is the input of hydro generation located outside of the Northwest modeled in
the same manner as the Pacific Northwest hydro generation?
Yes. Using the VISTA model, the input of hydro generation located in Utah and
Southeast Idaho are now calculated in the same manner as the Pacific Northwest
hydro generation.
Please describe the VISTA model's output.
The VISTA model calculates the probability of achieving a level of generation.
Widmer, Di - 20
Pacifi Corp
The model output is expressed in terms of "exceedence" levels. Each exceedence
level represents the probability of generation exceeding a given level of
generation. These probabilities can also be thought of as percentiles. The
Company is using 19 sets of expected generation from the VISTA model rather
than using the 50 water years of adjusted actual previously employed. The 19 sets
of generation consist of the 5th percentile through the 95th percentile in increments
of 5 percent. The wettest year is the 5th percentile and the 95th percentile is the
driest. The normalized net power costs are the average of the 19 net power cost
studies using the 19 "exceedence level" sets of hydro generation.
Does using the VISTA model cause an increase in NPC?
No. Net power costs are lower as a result of adopting the VISTA model.
Model Outputs
What variables are calculated from the production cost study?
These variables are:
Dispatch of firm wholesale sales and purchase contracts;
Dispatch of hydroelectric generation;
Reserve requirement, both spinning and ready;
Allocation of reserve requirement to generating units;
The amount of thermal generation required; and
System balancing wholesale sales and purchases.
What reports does the study produce using the GRID model?
The major output from the GRID model is the Net Power Cost report. Additional
data for more detailed analyses are also available, and the format can be specified
Widmer, Di - 21
PacifiCorp
as hourly, daily, monthly, annually and by heavy load hours and light load hours.
Do you believe that the GRID model appropriately reflects the operation of
the Company s system?
Yes. The GRID model appropriately simulates the operation of the Company
system over a variety of streamflow conditions consistent with operating
constraints and requirements.
Please describe Exhibit No. 10.
This Exhibit is a schedule of the Company s major sources of energy supply by
major source of supply, expressed in average megawatts owned and contracted for
by the Company to meet system load requirements, for the test period. The total
shown on line 11 represents the total usage of resources during the test period to
serve system load. Line 12 consists of wholesales sales made to neighboring
utilities within the Pacific Northwest, the Pacific Southwest, and the Desert
Southwest as calculated from the production cost model study. Line 13 represents
the Company s System Load net of special sales.
Please describe Exhibit No. 11.
This Exhibit lists the major sources of future peak generation capability for the
Company s winter and summer peak loads and the Company s energy load for the
test period.
Aquila Hydro Hedges
Please explain your recommendation for the Aquila Hydro Hedge payment
received by the Company.
To mitigate the negative effects of annual fluctuations of hydro conditions upon net
Widmer, Di - 22
PacifiCorp
power costs, the Company has entered into a contract (the "Aquila Hydro Hedge
with Aquila Risk Management Corporation (" Aquila ) that provides some
financial protection when stream flow levels are low. The cost of the Aquila
Hydro Hedge, $1.75 million on a total Company basis, is included in net power
costs. The financial contract is structured as a collar, whereby PacifiCorp makes a
payment to Aquila if stream flows are above a certain level (when power prices
would tend to be low), and Aquila makes a payment to PacifiCorp if stream flows
are below a certain level (when power prices would tend to be high). The Aquila
Hydro Hedge is measured on a quarterly and October to September contract year
basis. Any payments will be made on a quarterly basis based on actual stream
flows for that quarter. Any payments made or received are held on the Company
balance sheet until a final determination for the contract year. The Company
proposes these revenues and costs should be passed to customers through a
balancing account.
Should this treatment also apply to the Constellation Temperature Hedge?
Yes.
Does this conclude your direct testimony?
Yes.
Widmer, Di - 23
Pacifi Corp