Loading...
HomeMy WebLinkAbout20041129Decision Memo.pdfDECISION MEMORANDUM TO:COMMISSIONER KJELLANDER COMMISSIONER SMITH COMMISSIONER HANSEN COMMISSION SECRETARY LEGAL WORKING FILE FROM:RICK STERLING DATE:NOVEMBER 26, 2004 RE:UPDATE TO THE PURP A AVOIDED COST RATES TO INCORPORATE NEW FUEL PRICES AND NEW UTILITY COSTS OF CAPITAL CASE NOS. A VU-04-, IPC-04-25 AND P AC-04- Three recent events have triggered consideration of computation of new PURP avoided cost rates-the conclusion of general rate cases for Idaho Power and A vista, and the release of a new natural gas price forecast by the Northwest Power and Conservation Council (NPCC) The conclusion of a general rate case affects avoided cost rates because cost of capital figures are used in avoided cost computations in accordance with the approved methodology. Staff believes that the appropriate time to incorporate new cost of capital figures is following a general rate case. A Final Order in Idaho Power s general rate case was issued on May 25 , 2004 (Order No. 29505) and a Reconsideration Order was issued on September 28 2004 (Order No. 29601). A Final Order in Avista s general rate case was issued on October 8 2004 (Order No. 29602). On Friday, September 24 2004, the Northwest Power and Conservation Council released a new natural gas price forecast. Because the new forecast was released at about the same time as the Idaho Power and Avista rate cases were concluded, Staff believes both the new cost of capital figures and the new natural gas prices should be incorporated in the computation of new avoided cost rates. Staff is not proposing to revise the cost of capital figures used for PacifiCorp. 1 The Northwest Power Planning Council (NWPPC) is now known as the Northwest Power and Conservation Council (NPCC). DECISION MEMORANDUM - 1 -NOVEMBER 26, 2004 The practice of updating avoided cost rates due to new fuel price forecasts can be traced to Order No. 29124. In that Order, the Commission adopted a fuel price forecast from the draft Fifth Northwest Conservation and Electric Power Plan, April 25, 2002 of the Northwest Power Planning Council (NWPPC) as a reasonable method for calculating a starting gas price in the avoided cost methodology. The Commission stated that "natural gas prices can be updated when a new NWPPC forecast become available." Order No. 29124 at 10. The Commission has since approved updated gas prices based on an April 22, 2003 NWPPC forecast in December 2003. Order No. 29391. The new rates computed using the Council's September 24 2004 natural gas price forecast and Idaho Power s and Avista s revised costs of capital are approximately 5 mills/kWh higher than the rates currently in effect for all three utilities. A copy of the revised fuel price forecast, computation of starting year gas price and escalation rate, and Staff computation of the resultant avoided cost rates was provided to PacifiCorp, Idaho Power and Avista for their review. In its review of the draft rate computations, Idaho Power pointed out to Staff that an updated general inflation rate of 2.9% had been used in the spreadsheet that calculates the initial gas price and the gas price escalation rate. Idaho Power contends that updating the general inflation rate is outside the scope of the fuel price and cost of capital changes outlined by the Commission in establishing these dockets. Moreover, the general inflation rate is also one of many other variables used in the avoided cost spreadsheet, yet none of those other variables are being updated in these proceedings. Staff agrees with Idaho Power that the general inflation rate should not have been changed. PacifiCorp in its comments concurs. Staff has re-computed the avoided cost rates using a general inflation rate of 2.7%, which was used previously and as established in Order No. 29124. No other errors or corrections were identified or recommended by any of the utilities following their reviews. COMMISSION DECISION Pursuant to Commission approved avoided cost methodology (Order No. 29124) natural gas prices are to be updated when a new Northwest Power & Conservation Council forecast becomes available. The medium fuel price forecast prepared by the Northwest Power & Conservation Council has changed. The resultant change in avoided cost rates is a simple DECISION MEMORANDUM - 2-NOVEMBER 26 , 2004 arithmetic calculation. The new forecast includes a new starting gas price and fuel escalation rate. Pursuant to Order No. 29628, the Commission also ordered that the new avoided cost computations incorporate the new cost of capital figures recently established for Idaho Power and A vista in their respective rate cases. The new cost of capital figures have been incorporated in the computation of the attached rates. Staff recommends that the Commission approve the Staff calculated changes in the avoided cost rates for Idaho Power, Avista and PacifiCorp for an effective date of December 1 2004. udmemos/avoidedcost dm2 DECISION MEMORANDUM - 3 -NOVEMBER 26, 2004 AVISTA UTILITIES AVOIDED COST RATES FOR NON-FUELED PROJECTS SMALLER THAN TEN MEGAWA ITS December 2004 mills/kWh ~ruEW;E&Ii"' . , .;o" ..;, \i"i, , . ',.,' '. . ~!it~iQ~i:J;~EXiE'IZE '::d;::;~i:(,,\,;:vh.. ON-L/NE YEAR CONTRACT NON-LEVEL/ZED200420052006200720082009YEARRATES 50.21 51.52.53.54.56.2004 50.50.51.53.54.55.56.2005 51.51.52.48 53.54.56.57.48 2006 52.51.53.54.55.49 56.58.2007 53.52.53.54.56.57.58.2008 54.52.54.55.56.57.59.2009 56.2553.54.55.57.58.46 59.2010 57.53.55.56.57.59.60.2011 58.54.55.56.58.59.60.2012 60.54.56.57.58.60.61.43 2013 61.55.29 56.57.59.60.61.2014 63.55.57.58.59.61.62.45 2015 64.4856.57.4 7 58.60.61.62.2016 65.56.57.59.60.61.63.42 2017 67.4857.58.59.61.62.45 63.2018 69.57.42 58.60.61.47 62.64.2019 70.57.59.60.61.63.64.2020 72.58.59.60.62.63.65.2021 73.58.59.61.62.64.65.2022 75. 58.60.61.63.64.66.2023 77. 2024 79. 2025 80. 2026 82. 2027 84. 2028 86. 2029 88. AVISTA UTILITIES AVOIDED COST RATES FOR FUELED PROJECTS SMALLER THAN TEN MEGAWATTS December 2004 mills/kWh ~;~&~~~~~~:!~~" ON-LINE YEAR CONTRACT NON-LEVELIZED 2004 2005 200(;)2007 2008 2009 YEAR RATES . 14.14.14.14.15.15.2004 14. 14.14.47 14.15.15.15.2005 14. 14.14.14.15.15.16.2006 14. 14.45 14.15.15.47 15.16.2007 14. 14.14.15.27 15.15.16.2008 15. 14.15.15.42 15.16.16.2009 15. 14.15.15.15.16.16.2010 16. 15.15.15.16.16.45 16.2011 16.41 15.15.15.16.16.16.2012 16. 15.15.15.16.16.17.2013 17. 15.41 15.16.16.16.17.2014 17. 15.15.16.26 16.17.17.41 2015 17. 15.16.16.16.17.17.2016 18. 15.16.16.16.17.28 17.2017 18. 15.16.16.17.17.41 17.2018 19.25 16.16.16.17.17.17.2019 19. 17 .16.16.49 16.17.17.18.2020 20. 16.22 16.16.17.17.18.2021 20. 16.16.17.17.48 17.18.29 2022 21. 16.43 16.17.17.17.18.41 2023 21. 2024 22. 2025 22. 2026 23. 2027 23. 2028 24. 2029 24. EFFECTIVE DATE 12/1/2004 ADJUSTABLE COMPONENT 36.21 The total avoided cost rate in each year is the sum of the adjustable component and the fixed component from either of the tables above. Example 1. A 20-year levefized contract with a 2005 on-line date would receive the following rates: Years Rate 16.80 + 36.42 16.80 + Adjustable component in each year Example 2. A 4-year non-Ievelized contract with a 2005 on-line date would receive the following rates: Years Rate 14.32 + 36.42 14.65 + Adjustable component in year 2006 14.98 + Adjustable component in year 2007 15.33 + Adjustable component in year 2008 IDAHO POWER COMPANY AVOIDED COST RATES FOR NON-FUELED PROJECTS SMALLER THAN TEN MEGAWATTS December 2004 mills/kWh ON-L/NE YEAR CONTRACT NON-LEVEL/ZED200420052006200720082009YEARRATES 49.50.51.52.53.55.2004 49. 49.50.52.53.54.55.2005 50.50.51.45 52.53.55.56.2006 51.50 .50.52.53.54.42 55.56.2007 52.51.52.53.54.56.25 57.2008 53.51.53.54.29 55.56.82 -58.2009 55.52.53.54.56.57.58.2010 56.4152.54.55.56.57.5927 2011 57.53.54.55.57.58.47 59.2012 59. 53.55.56.57.59.60.2013 60.40 54.55.56.58.59.60.2014 61. 54.56.57.58.60.61.44 2015 63. 55.56.57.59.60.61.2016 64. 55.57.58.59.61.62.46 2017 66. 56.57.48 58.60.61.62.2018 67. 56.57.59.60.62.63.45 2019 69.26 57.58.59.61.62.49 63.2020 70. 57.4 7 58.60.61.62.64.40 2021 72.49 57.59.21 60.61.63.40 64.2022 74.58.59.60.62.40 63.65.2023 75. 2024 77. 2025 79.41 2026 81. 2027 83. 2028 85. 2029 87. " , IDAHO POWER COMPANY AVOIDED COST RATES FOR FUELED PROJECTS SMALLER THAN TEN MEGAWATTS December 2004 mills/kWh ;;; ~j~~~~!~~1 ~~~;: ON-LINE YEAR 2004 2005 2006 2007 2008 2009 13.13.13.13.14.14. 13.13.45 13.14.14.40 14. 13.29 13.13.14.23 14.14. 13.43 13.14.14.14.15. 13.13.14.20 14.14.15. 13.14.14.14.15.15. 13.14.14.49 14.15.15. 13.14.14.14.15.15. 14.14.43 14.15.15.46 15. 14.23 14.14.15.15.15. 14.14.15.15.1"5.16. 14.49 14.82-15.15.15.16. 14.14.15.15.16.16. 14.15.15.42 15.16.16. 14.15.15.15.16.28 16. 14.15.15.16.16.40 16. 15.15.43 15.16.16.16. 15.15.15.16.27 16.17. 15.15.16.16.16.17. 15.41 15.16.16.16.17. EFFECTIVE DATE 12/1/2004 !~,~;~~.~~~~~!~~:p CONTRACT YEAR NON-LEVELIZED RATES 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 13. 13. 13. 13. 14.24 14. 14. 15. 15. 15. 16. 16. 17. 17. 17. 18. 18. 19.19 - 19. 20. 20.56 21. 21. 22. 22. 23. ADJUSTABLE COMPONENT 36.21 The total avoided cost rate in each year is the sum of the adjustable component and the fixed component from either of the tablesabove. Example 1. A 20-year levelized contract with a 2005 on-line date would receive the following rates: Years Rate 15.76 + 36.42 15.76 + Adjustable component in each year Example 2. A 4-year non-Ievelized contract with a 2005 on-line date would receive the following rates: Years Rate - 13.30 + 36.42 13.61 + Adjustable component in year 2006 13.92 + Adjustable component in year 2007 14.24 + Adjustable component in year 2008 PACIFICORP AVOIDED COST RATES FOR NON-FUELED PROJECTS SMALLER THAN TEN MEGAWATTS December 2004 mills/kWh ."..~~! :~:~:1~~~~, ~'~" . ON-L/NE YEAR CONTRACT NON-LEVELIZED200420052006200720082009YEARRATES 50.51.41 52.53.55.56.2004 50.2550.51.53.54.55.56.2005 51.4151.52.53.54.56.23 57.2006 .52.51.53.54.55.56.58.2007 53.52.53.54.56.57.58.2008 55.52.54.55.56.57.59.2009 56.53.54.55;57.58.46 59.2010 57.53.55.56.57.58.60.2011 58.54.55.56.58.59.60.2012 60.54.56.57.58.60.61.2013 61.55.56.49 57.59.60.48 61.2014 63.55.56.58.24 59.60.62.2015 64.56.57.58.60.61.40 62.2016 66.56.47 57.59.60.45 61.63.2017 67.56.58.59.60.62.63.2018 69.57.58.59.61.62.64.2019 70.57.58.60.61.63.64.2020 72.57.59.28 60.62.63.46 64.2021 73. . 58.59.60.62.40 63.65.2022 75.58.59.61.62.64.65.2023 77.42 2024 79. 2025 81. 2026 82. 2027 84. 2028 86. 2029 88. PACIFICORP AVOIDED COST RATES FOR FUELED PROJECTS SMALLER THAN TEN MEGAWATTS December 2004 mills/kWh ;+i ~;~~~~~~~!~~;~~ ' ~LEEV;E;li1Z~' ;' '/~;"' ",?jW"C);';)"\'\)t; ON-LINE YEAR 2004 2005 2006 2007 2008 2009 14.14.14.15.15.15. 14.14.14.15.15.15. 14.14.15.15.15.16.14.49 14.15.15.15.16. 14.14.15.15.16.16.40 '14.15.15.46 15.16.16. 14.15.26 15.15.16.16. 15.15.15.16.16.48 16. 15.15.15.16.16.17. 1 0 15.15.16.16.16.17.15.43 15.16.16.16.17. 15.15.16.16.17.17.42 15.16.16.16.17.17. 15.16.16.16.17.17. 15.16.16.17.17.40 17. 15.16.16.17.17.17. 16.16.46 16.17.23 17.18. 16.16.16.17.17.18. 16.28 16.17.17.43 17.18. 16.16.17.17.17.18. EFFECTIVE DATE 12/1/2004 CONTRACT YEAR NON-LEVEL/ZED RATES 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027' 2028 2029 14. 14. 14. 15. 15. 15. 16. 16.46 16. 17.23 17. 18. 18.45 18. 19. 19. 20. 20. 21. 21. 22. 22. 23. 23. 24. 24. ADJUSTABLE COMPONENT 36. The total avoided cost rate in each year is the sum of the adjustable component and the fixed component from either of the tablesabove. Example 1. A 20-year levelized contract with a 2005 on-line date would receive the following rates: Years Rate 16.75 + 36.42 16.75 + Adjustable component in each year Example 2. A 4-year non-Ievefized contract with a 2005 on-fine date would receive the fofJowing rates: Years Rate 14.36 + 36.42 14.69 + Adjustable component in year 2006 15.03 + Adjustable component in year 2007 15.38 + Adjustable component in year 2008