HomeMy WebLinkAboutMajor Event Report.pdf May 26, 2021 Jan Noriyuki Commission Secretary Idaho Public Utilities Commission 11331 W. Chinden Blvd. Building 8 Suite 201A Boise, Idaho 83714 RE: Rocky Mountain Power Major Event Report Dear Ms. Noriyuki: Rocky Mountain Power is requesting designation of the September 7-10, 2020 outage and the consequences thereof to be classified as a major event and excluded from its performance results due to the day’s performance, which exceeded the Company’s major event threshold of 1,102,990 customer minutes lost in a 24-hour period. Attached you will find details regarding the major event including restoration resources, number of customers off supply, total customer minutes lost, as well as SAIDI, and SAIFI figures. Rocky Mountain Power will exclude outage information for this event from its network performance reporting and from customer guarantee failure payments. If you require further information regarding this report, please contact Ted Weston, Regulatory Affairs Manager at (801) 220-2963. Sincerely, Joelle Steward Vice President Regulation RECEIVED 2021May 26, PM 3:36 IDAHO PUBLIC UTILITIES COMMISSION Report to the Idaho Public Utilities Commission Electric Service Reliability – Major Event Report ID-20-3 1 of 5 REPORT TO THE IDAHO PUBLIC UTILITIES COMMISSION ELECTRIC SERVICE RELIABILITY – MAJOR EVENT REPORT ID-20-3 Event Date: Date Submitted: Primary Affected Locations: Primary Cause: Exclude From Reporting Status: Report Prepared By: Report Approved By: September 7-10, 2020 May 26, 2021 Lava Hot Springs/Preston/Rexburg/Shelley Windstorm Yes Brett Carleton/Chase Talbot Russ Updike/Dan Bodily Event Description and Restoration Summary On the afternoon of September 7, 2020, a surge of cold air from Canada unleashed damaging winds in southeastern Idaho. The temperature at 3:00 p.m. in Rexburg was 81 degrees, by 7:00 p.m. the temperature had fallen to 40 degrees. Wind gusts topped 70 mph and caused trees to fall, lines to tangle and equipment to fail. The event impacted 42,080 customers in the Rexburg, Shelley, Lava Hot Springs and Preston areas and outages lasted multiple days due to widespread damage caused by the winds. The Rexburg and Shelley operating areas experienced significant wind gusts causing lines to tangle and slap together. Because of this, crews were unable to reenergize the lines until the winds died down and the city of Rexburg was left without power. Once the winds calmed, crews began working to restore power. This took time as crews had to remove tree limbs and other debris from the lines. The Preston area saw similar damage to overhead lines caused by falling trees and flying debris. Most outages were centered in Preston and Lava Hot Springs. Resources were limited due to the Labor Day holiday and employees returning home from out of town. Local tree trimming crews were not available to assist in clearing trees and limbs from overhead lines, so tree removal was completed by line crews. Crews worked to restore customers as quickly as possible and restored the last customer midday on September 10. Overall, 133 personnel supported the restoration effort including: 40 internal personnel, 12 contract personnel and eight tree crew members. To date, there have been no company or commission customer complaints made regarding the major event. Report to the Idaho Public Utilities Commission Electric Service Reliability – Major Event Report ID-20-3 2 of 5 The graphic below displays the extent and duration of the event in the heaviest hit region. Event Outage Summary # Interruptions (sustained events) 307 Total Customer Interrupted (sustained events) 42,080 Total Customer Minutes Lost 15,749,678 State Event SAIDI Impact 188.8 minutes CAIDI 374 Major Event Start 9/7/2020 12:00 a.m. Major Event End 9/10/2020 7:46 p.m. Report to the Idaho Public Utilities Commission Electric Service Reliability – Major Event Report ID-20-3 3 of 5 Restoration Intervals Total Customer Sustained Outage Events (entire major event period)< 3 Hrs. 3 – 24 Hrs. 24 – 48 Hrs. 48+ Hrs. 42,080 10,912 29,834 1,318 16 Restoration Resources 0F1 Personnel Resources Troublemen 8 Line Crew Members 32 Substation Crew Members 8 Contract Crew Members 12 Vegetation Crew Members 8 Support Staff 5 Tree Crew 8 Foreman 9 Administrative 2 Warehousemen 5 Estimators 6 Management 30 Total 133 Materials Distribution Poles 35 Transmission Poles 6 Conductor Line (Feet) 8,424 Transformers 27 Crossarms 79 Insulators 351 Cutouts 54 Line Fuses 697 Line Splices 863 Arresters 23 1 Data provided represents specific system records for personnel, resources and costs; and is specific to the event, not inclusive of state delineation. However, additional resources whose participation was not individually captured in transaction recording systems were used during the event. Thus, the data presented here may understate the resources, including cost, involved in restoring the system. Report to the Idaho Public Utilities Commission Electric Service Reliability – Major Event Report ID-20-3 4 of 5 State Estimated Major Event Costs Estimate $ Labor Contracts Materials Overheads TOTAL Capital $83,079 $99,684 $82,527 $32,808 $298,098 Expense $212,860 $165,227 $45,287 $16,448 $439,821 Total $295,939 $264,911 $127,814 $49,256 $737,919 Major Event Declaration PacifiCorp designates these events and their consequences a major event in accordance with docket PAC-E-04-07, where the company and commission agreed that determination of major events will be made by applying IEEE standard 1366-2003 methodology (commonly referred to as the 2.5 beta method), wherein a statistical outlier of these extreme events is based on the state daily SAIDI thresholds. The company’s 2020 Idaho reliability reporting region threshold is 1,102,990 customer minutes lost (13.23 SAIDI minutes) in a 24-hour period. Report to the Idaho Public Utilities Commission Electric Service Reliability – Major Event Report ID-20-3 5 of 5 Event Details SAIDI, SAIFI, CAIDI by Reliability Reporting Region Please see the attached system-generated reports. PacifiCorp Major Event Report Customer Analysis through Sustained  Customers  Off % Sustained  Customers  Off CML Number of  Sustained  Interruptions Customer  Count < 5 min 5 min ‐  3 hrs 3 hrs ‐  24 hrs 24 hrs ‐ 48 hrs  48 hrs ‐  72 hrs 72 hrs ‐ 96 hrs 96 + hrs % Sustained  Customers  Restored in 3  Hours PS4 SAIDI SAIFI CAIDI PC PACIFICORP 42,080         2% 15,749,678    303 1,982,346     5,918      10,912  29,834      1,318    15          1            ‐         26% 7.94          0.021        374            RMP Rocky Mountain Power 42,080         4% 15,749,678    303 1,183,049     5,918      10,912  29,834      1,318    15          1            ‐         26% 13.31        0.036        374            ID Idaho 42,080         50% 15,749,678    303 83,400           5,918      10,912  29,834      1,318    15          1            ‐         26% 188.85      0.505        374            ID MONTPELIER 1,336           13% 232,138         8 10,077           1              1,240    96               ‐          ‐          ‐          ‐         93% 23.04        0.133        174            ID PRESTON 369               4% 84,126            8 8,427             ‐          133        236            ‐          ‐          ‐          ‐         36% 9.98          0.044        228            ID REXBURG 24,461         68% 7,946,896      146 36,091           651         3,412    20,901      147        1            ‐          ‐         14% 220.19      0.678        325            ID SHELLEY 15,914         57% 7,486,518      141 27,946           5,266      6,127    8,601        1,171    14          1            ‐         39% 267.89      0.569        470            *Only current event specific metric impact shown. Exempted planned outages are excluded from these values. through Date*Sustained  Customers  Off % Sustained  Customers  Off CML Number of  Sustained  Interruptions Average  Customer  Count < 5 min 5 min ‐  3 hrs 3 hrs ‐  24 hrs 24 hrs ‐ 48 hrs  48 hrs ‐  72 hrs 72 hrs ‐ 96 hrs 96 + hrs % Sustained  Customers  Restored in 3  Hours PS4 SAIDI SAIFI CAIDI 9/7/2020 34,900         42% 12,472,457    115 83,400           5,120      9,050    24,663      1,180    6            1            ‐         26% 149.55      0.418        357            9/8/2020 6,779           8% 3,184,909      127 83,400           779         1,664    4,969        137        9            ‐          ‐         25% 38.19        0.081        470            9/9/2020 295               0% 73,213            41 83,400           19           138        156           1            ‐          ‐          ‐         47% 0.88          0.004        248            9/10/2020 106               0% 19,100            20 83,400           ‐          60          46               ‐          ‐          ‐          ‐         57% 0.23          0.001        180            Data as of 2/23/2021 PacifiCorp Major Events Report  Customer Analysis* Idaho Customer Analysis Major Event Metrics ‐ metric by state customer counts Customer Interrupted by Date Customers Restored by Intervals Customers Restored by Intervals Major Event Metrics ‐  metric by operating area customer counts9/7/20 12:00 AM 9/10/20 7:46 PM 9/7/20 12:00 AM 9/10/20 7:46 PM PacifiCorp Major Event Report SSC by State Analysis Event through Month 09/01/20 through 09/30/20 YTD FY2021 01/01/20 through 09/30/20 SAIDI SAIFI CAIDI SAIDI SAIFI CAIDI SAIDI SAIFI CAIDI SAIDI SAIFI CAIDI SAIDI SAIFI CAIDI SAIDI SAIFI CAIDI PC PacifiCorp 7.94          0.020       374            ‐             ‐             ‐            8.39          0.030       326           0.45          ‐            99             15.33       0.110       134           5.17          0.070       74              RMP Rocky Mountain Power 13.31       0.040       374            ‐             ‐             ‐            14.06       0.040       326           0.75          0.010       99             25.69       0.190       134           8.67          0.120       74              ID Idaho 188.85     0.500       374            ‐             ‐             ‐            199.45     0.610       326           10.60       0.110       99             364.48     2.720       134           122.97     1.660       74              ID MONTPELIER 2.78          0.016       174            ‐             ‐             ‐            2.91          0.017       173           0.13          0.001       150           15.89       0.113       140           11.81       0.090       131            ID PRESTON 1.01          0.004       228            ‐             ‐             ‐            1.07          0.005       219           0.06          0.000       130           16.50       0.138       120           15.49       0.133       116            ID REXBURG 95.29       0.293       325            ‐             ‐             ‐            103.94     0.356       292           8.66          0.063       137           193.13     1.441       134           63.38       0.812       78              ID SHELLEY 89.77       0.191       470            ‐             ‐             ‐            91.52       0.234       392           1.76          0.043       41             138.91     1.025       135           32.24       0.624       52              ID SMITHFIELD ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            0.05          0.000       125           0.05          0.000       125            *Operating areas are calculated by the state frozen customer count metrics. Exempted planned outages are excluded from these values. Data as/of 2/23/2021 PacifiCorp Major Events Report  SSC by State Idaho Major Events Excluded*Major Events Included Major Event Excluded Major Events Included Major Events Excluded* Major Events Included 9/10/20 7:46 PM9/7/20 12:00 AM