PacifiCorp
Docket No. ERl 9-340-000
January 8,2019
Thomas C. Woodworth
PacifiCorp
825 N.E. Multnomah, Suite 1800
Portland, OP.97232
Reference: Project ConstructionAgreement
On November 14, 2018, PacifiCorp filed a Project Construction Agreement
(Construction Agreement) between Lower Valley Energy (LVE) and PacifiCorp.l The
Construction Agreement provides for PacifiCorp to perform, and LVE to pay for,
modifications to PacifiCorp's Threemile Knoll Substation to accommodate the
anticipated interconnection with LVE's new 138 kV transmission line, currently under
construction. The Construction Agreement is accepted, effective January 14,2019, as
requested.
The filing was noticed on November 14,2018, with comments, protests, or
interventions due on or before December 5,2018. No protests or adverse comments were
filed. Notices of intervention and unopposed timely filed motions to intervene are
granted pursuant to the operation of Rule 214 of the Commission's Rules of Practice and
Procedure (18 C.F.R. $ 385.214). Any opposed or untimely filed motion to intervene is
governed by the provisions of Rule 214.
This action does not constitute approval of any service, rate, charge, classification,
or any rule, regulation, contract, or practice affecting such rate or service provided for in
the filed documents; nor shall such action be deemed as recognition of any claimed
contractual right or obligation affecting or relating to such service or rate; and such action
is without prejudice to any findings or orders which have been or may hereafter be made
by the Commission in any proceeding now pending or hereafter instituted by or against
PacifiCorp.
I Designated by PacifiCorp as Rate Schedule No. 740
20190108-3021 FERC PDF (Unofficial) 0L/08/2019
Docket No. ER19-340-000 a
This action is taken pursuant to authority delegated to the Director, Division of
Electric Power Regulation - West, under 18 C.F.R. $ 375.307. This order constitutes
final agency action. Requests for rehearing by the Commission may be filed within 30
days of the date of issuance of this order, pursuant to 18 C.F.R. $ 385.713.
Issued by: Carlos D. Clay, Acting Director, Division of Electric Power Regulation - West