January 23, 2017
VL4 OVERNIGHT DELIVERY
Diane Hanian
Commission Secretary
Idaho Public Utilities Commission
4 72 West Washington
Boise, Idaho 83720-5983
RE CEIVED
2ul 1JA',!23 A· lQ:33
i . ' ) i: I J .l ;_ I C . , .. cc;,;.,i1s s10N
RE: Rocky Mountain Power Major Event Report
Dear: Ms. Hanian
1407West North Temple
Salt Lake City. Utah 84116
Rocky Mountain Power is requesting designation of the December 7, 2016, outage at the Rigby
Substation and the consequences thereof to be classified as a major event and excluded from its
performance results due to the day's performance, which exceeded the Company's major event
threshold of 1,141,067 customer minutes lost in a 24-hour period.
Attached you will find details regarding the major event including restoration resources, number
of customers off supply, total customer minutes lost, as well as SAIDI, and SAIFI figures.
Rocky Mountain Power will exclude outage information for this event from its network
performance reporting and from customer guarantee failure payments.
If you require further information regarding this report, please contact Heide Caswell, Network
Performance Director, at (503) 813-6216.
Sincerely,
Douglas N. Bennion, P.E.
Vice President
Engineering Services & Capital Investment
cc: Matt Elam, IPUC
Bev Barker, IPUC
Report to the Idaho Public Utility Commission
Electric Service Reliability -Major Event Report ID-16-5
Event Date:
Date Submitted:
Primary Affected Locations:
Primary Cause:
Exclude from Reporting Status:
Report Prepared by:
Report Approved by:
Event Description
December 7 -8, 2016
January 23, 2017
Rexburg
Loss of Substation
Yes
April Brewer
Heide Caswell/ Dan Bodily/ Ken Shortt
On the evening of December 7th Rocky Mountain Power customers in Rexburg, Idaho, experienced an
outage when a potential transformer {PT) at the Rigby Substation failed. The failed PT damaged the
operate bus causing several other circuit breakers in the substation to de-energize resulting in the loss
of station service power. Ultimately the event affected 17 substations that fed 46 circuits, serving 28,817
customers, for durations ranging from 2 hours 42 minutes to 5 hours 23 minutes. The loss of substation
affected approximately 86% of the customers served in the Rexburg operation area.
Event Outage Summary
# Interruptions (sustained events) 53
Total Customer Interrupted (sustained events) 28,817
Total Customer Minutes Lost 6,899,554
State Event SAIDI Impact 89.64 Minutes
CAIDI 239
Major Event Start 12/7 /16 10:07 PM
Major Event End 12/8/16 03:31 AM
Restoration Summary
At 10:07 pm, on December 7, 2016, an internal fault caused the failure of a PT in the Rigby Substation.
The arc from the failure ignited the oil in the PT. Crews worked to extinguish the fire, but the residual
heat in the PT caused the fire to reignite several times. Crews were able to isolate the operating bus and
restore power to the transfer bus. Crews then ran temporary control wire from the remaining PTs so
the rest of the breakers would function correctly. The fire department arrived on site, but due to the
location of the PT they were unable to assist. Due to the extreme temperatures and the lack of station
service power, the air line on one of the breakers froze which required the substation crew to use a
different breaker. Once power to the Rigby substation was restored efforts were focused on
systematically re-energizing specific substations and portions of line such that the substation equipment
could adjust and would not trip on overload from inrush current. At 12:50 am on December sth crews
1 of 4
begin energizing distribution circuits. By 3:31 am all customer outages had been restored . The graphic
below displays the extent and duration of outages experienced in Rexburg.
There were no company or commission customer complaints made regarding the major event.
Customer Outage
Duration (in hours)
"' Outage Duration
Duration hrs View
... Ranges:
e value = 0 e O <= value < 3
e 3 <= value < 4
0 4 <= value < 5
0 5 <= value < 6
e 6 <= value < 10000
lO 2'
Iona
Idaho Falls
Ammon
0
0
•
0
()
Squirrel
• ;i:•.
• • .. -. ,I . J .-•,, .... i· • . •
I ' •
00 oc o e o Oo
<O 0 o<P &>o f)ZI 0 0 <:P 0
go 0 o0
D 0
Oo
0 00
2 of 4
Restoration Intervals
Restoration Resources
Personnel Resources
Internal Crewmembers 6
Substation Crewmembers 7
TOTAL 13
State Estimated Major Event Costs
Estimate$ Labor Contracts Materials Overheads TOTAL
Capital $25,237 $112 $5,043 $4,724 $35,116
Expense $0 $0 $0 $0 $0
Total $25,237 $112 $5,043 $4,724 $35,116
Major Event Declaration
PacifiCorp designates these events and the consequences thereof a major event in accordance with Case
No. PAC-E-04-07, where the Commission Ordered that determination of major events will be made by
applying IEEE standard 1366-2003 methodology (commonly referred to as the 2.5 beta method),
wherein a statistical outlier of these extreme events is based on the state's daily SAIDI thresholds. The
company's 2016 Idaho reliability reporting region threshold is 1,141,067 customer minutes lost (14.82
SAIDI minutes) in a 24-hour period.
3 of 4
Event Details
Customers Out vs. Time
30,000
25,000
20.000 8
115.000
a 10.000
5.000
12/1/ll l0:15 PM
Z7,778
Total Event Sustained Customer Interruptions; 28,817
Idaho Major Event
-CUtttHMIS Chit
•'*-CulfO...,.OUt
ot------~----==_L---~---~=====---.-------------.-4a
12/7/16 U>.07 PM 12/1/16 U:31 /IM
Concurrent Outages vs. Time
so
l610:l5PM
45 '6
40
E 35
II' 30 8
1! 25 ~ § 20
15
10
12/1/16 5:19 /IM 12/1/16 7aA3 /IM 12/1/16 lD:07 AM
Tott! Evmt Ouuccs· s1
12/1/1611:31 PM 12/1/IU:55 PM
-(oncurremOutlpt
-ltelum to NonMI Tlwetholtl
a .,._co..ci.encouue-
0 fletumtoNotmll
o-l------~----~-==>---..=====~======~---1..---~---___c:=::;=
12/7/U. 10:07 PM 12/1/16 lZ:31 /IM 12/1/165:19/IM 12/1/U. 7:43 /IM
Customer Minutes Interrupted vs. Time (Cumulative)
Tat.al CuU90'.Kc Minutes lntcrruotcd· 6,a99,s54
S,000.000
1 7,000.000
l i 6.000,000 a
1 5,000.000
~ 4.000,000 . !
C 3.000.000
l 2,000.000 ::Ii
1,000.000
12n11u0:01 PM
0
12/7/1' 10:07 PM 12/1/1' 12:31 AM 12/1/1' 2:55 AM 12/1/15 5:19 AM 12/1/16 7:'5 AM
SAIDI, SAIFI, CAIDI by Reliability Reporting Region
Please see the attached system-generated reports.
12/1/16 10:07 /IM
12/1/16 10:07 AM
12/1/II, 12:31 PM 12/1/16 2:55 PM
24-Hr CMI 6,e,,,SS4
-CUffllltatfvieCMI
-MailorEvent,..,.....W
e SwtllfMefAIMOUIII•
e Swt TkM Olf lnl Out ...
8 l•HICMI
12/1/1' 12;31 PM 12/1/1' 2:55 PM
4 of 4
Idaho 12/7/2016
PacifiCorp
Major Events Report Sustained % Sustained
Customer Analysis* Customers Customers
Off Off
PC PACIFICORP 28,817 2%
RMP Rocky Mountain Power 28,817 3%
ID Idaho 28,817 37%
ID MONTPELIER 0%
ID PRESTON 0%
ID REXBURG 28,165 88%
ID SHELLEY 652 2%
ID SMITHFIELD I 0%
PacifiCorp Major Event Report
Customer Analysis
Customer Analysis
through 12/8/2016 Customers Restored by Intervals
Number of
Sustained Customer Smin-3 hrs-24 hrs-48 hrs-72 hrs -
CML Interruptions Count <Smin 3 hrs 24 hrs 48 hrs 72 hrs 96 hrs
6,899,554 53 1,868,631 160 6,652 22,165 -
6,899,554 53 1,097,421 160 6,652 I 22,165 l
6,899,554 53 76,971 160 6,652 22,165 I
-
6,844,373 49 32,156 160 6,000 22,165
55,181 4 26,229 652 i
I -
*Only current event specific metric impact shown. Does not include values from other events which may have occurred in other regions during the same time period.
Customer Interrupted by Date
12/7/2016 through 12/8/2016 Customers Restored by Intervals
Date• Sustained % Sustained Number of Average
Customers Customers Sustained Customer Smin-3 hrs -24 hrs-48 hrs-72 hrs-
Off Off CML Interruptions Count < 5 min 3 hrs 24 hrs 48 hrs 72 hrs 96 hrs
12/7/2016 27,778 36% 6,830,591 46 76,971 5,613 22,165
12/8/2016 1,039 1% 68,963 7 76,971 160 1,039 -
Data as of
1/4/2017
120716 ID Final Report numbers.xlsxCustomer Analysis
Major Event Only •
metric by operating area customer
counts
% Sustained
Customers
Restored in 3
96 + hrs Hours PS4 SAIDI SAIFI CAIDI
23% 3.69 0.015 239
23% 6.29 0.026 239
23% 89.64 0.374 239
0%
0%
-21% 212.85 0.876 243
100% 2.10 0.025 85
-
Major Event Only •
metric by state customer counts
% Sustained
Customers
Restored in 3
96 + hrs Hours PS4 SAIDI SAIFI CAIDI
20% 88.74 0.361 246
100% 0.90 0.013 66
1/20/2017
Event 12/07/16 through 12/08/16
PacifiCorp Major Event Report
SSC by State Analysis
Month 12/01/16 throu1_h 12/31/16 IVTD FY2017 01/01/16 through . 12/31/16 Idaho Major Events Included Major Event Excluded Major Events Included Major Events Excluded* Major Events Included Major Events Excluded•
PacifiCorp
Major Events Report
SSCbr_State
~,PACIFICO RP t-
SAIDI SAIFI CAIDI SAIDI SAIFI CAIDI SAIDI
4.09 I _ 0.020 _ 20q 0.40 f 0.005 r so[ __ 2i;.02 !
SAIFI CAIDI SAIDI SAIFI CAIDI SAIDI SAIFI CAIDI SAIDI SAIFI I
1.oso I 0.152 I -_l?!.J ___ ~JJ L JJ..Q.?7 I 1191 215.51 I ,l:,533 i 141 I-119.14 ... ..,_
1.124 I ~-!Rocky Mountain Power =r=·G.42! . -o:02's". 232-__ _:3 971-18.15~ D.126_=_:~piiil--0~091r=__wsl22·2.s9T 1.524 i 1461 __ 125.78 '==..;_J,_
126.6l 0-0.538J -!£._ Idaho 89.73 I 0.375 0.09 178 235 12.94 0.119 109 I 392.07 : 3.040 1 l/;7 I
0.232
0.204
n 635
07R7 I
0.004 I
ID MONTPELIER
ID PRESTON 0.09 0.0005
ID REXBURG 88.92 _9.36~--
ID SHELLEY 0.72 n nnR --I ID SMITHFIELD I
_ --_-*---'--:r= r---.,· _ "" , "" f 0.22 0.002 95 21.30 ·-0.235-: 91 20.96
182 ~ -~..!_BI_ _ -24vf ~-494 0.50 . __Q.QO~,....._. 92 >---~. ~-_ -163_ 16M
2~------+----_ ~-.£).44'!_, _220 . _ 8.64 0.079 110 ?.?!:?.§_).~· 132 76.13 ----·-·
-·---85 0.0004 0.00001 !,_. 29 4.29 0.041 _ 104 _ 3.58 0.03~ 109 ~ ~ . lD_ ~ ---:.:..+
. __ . 1 . o oo o ooo 89 o.oo 0.000 89 0.31 0.004 s1 o.37 IM
*may include other regional major event exclusions during the same period. Operating areas are calculated by the state frozen customer count metrics.
Data as/of
1/4/2017
120716 ID Final Report numbers.xlsxSSC by State 1/20/2017
CAIDI
110
112
---
112
90
81
120
133
87