HomeMy WebLinkAbout20170120Major Event Report.pdfJanuary 20, 2017
VL4 OVERNIGHT DELIVERY
Diane Hanian
Commission Secretary
Idaho Public Utilities Commission
472 West Washington
Boise, Idaho 83720-5983
.ECE IVED
2017 Jp.i~ 20 A 110: 2
, -;~ .ldLIC
::'J:.t,i1SS ION
RE: Rocky Mountain Power Major Event Report
Dear: Ms. Hanian
1407 West North Temple
Salt Lake City, Utah 84 II 6
Rocky Mountain Power is requesting designation of the December 5, 2016 outage and the
consequences thereof to be classified as a major event and excluded from its performance results
due to the day's performance, which exceeded the Company's major event threshold of 1,141 ,067
customer minutes lost in a 24-hour period.
Attached you will find details regarding the major event including restoration resources, number
of customers off supply, total customer minutes lost, as well as SAIDI, and SAIFI figures.
Rocky Mountain Power will exclude outage information for this event from its network
performance reporting and from customer guarantee failure payments.
If you require further information regarding this report, please contact Heide Caswell, Network
Performance Director, at (503) 813-6216.
;:+7!~/~w
Douglas N. Bennion, P.E.
Vice President
Engineering Services & Capital Investment
cc: Matt Elam, IPUC
Bev Barker, IPUC
Report to the Idaho Public Utility Commission
Electric Service Reliability -Major Event Report ID-16-4
Event Date:
Date Submitted:
Primary Affected Locations:
Primary Cause:
Exclude from Reporting Status:
Report Prepared by:
Report Approved by:
Event Description
December 5 -6, 2016
January 20, 2017
Preston
Loss of Substation
Yes
April Brewer
Heide Caswell/ Dan Bodily/ Ken Shortt
On the evening of December 5, Rocky Mountain Power customers in Preston, Idaho, experienced an
outage resulting from a line failure which operated the protective equipment of a mobile transformer.
Attempts to close the protective equipment resulted in a series of outages over a 16 hour period. The
event affected 3,417 customers representing approximately 29% of the customers served in the Preston
operation area .
Event Outage Summary
# Interruptions (sustained events) 10
Total Customer Interrupted (sustained events) 3,417
Total Customer Minutes Lost 1,849,696
State Event SAIDI Impact 24.03 Minutes
CAIDI 541
Major Event Start 12/5/16 11:10 PM
Major Event End 12/6/16 11:10 PM
Restoration Summary
On December 5, 2016, at 11:10 pm, a circuit breaker at the Malad substation tripped open, de-energizing
two circuit feeds, affecting 2,310 customers. Crews quickly arrived at the substation to assess the cause
of the breaker trip and restore power as quickly as possible. The Malad substation transformer is being
replaced, a mobile transformer was in use while the replacement is taking place. Attempts to energize
the transformer proved unsuccessful, because the relay protection continued to operate the breaker
due to the circuit loads in combination with the use of the mobile transformer and its associated
protection equipment. Once the relay setting issue was identified the relay's settings were incrementally
adjusted and additional distribution line protection was installed to allow the relay settings to be set at
a level where the Preston load would not trip the mobile transformer's protection equipment. During
the event customers experienced several short unsuccessful restoration attempts. The extreme low
temperatures resulted in excessive startup loads (inrush current) which resulted in multiple attempts to
1 of 4
re-energize. At 3:06 pm on December 6th the final 90 customers were restored. The graphic below
displays the extent and frequency of the outages experienced in Preston for this event.
There were no company and one commission customer complaint made regarding the major event.
Customer Outage o{t Q9
Events by Restoration 0~
0 ~ 0
• Restoration Stage CSCC1508175 0
0 value= 1 0 0
• value= 2 co • Restoration St.,ge CSCC1S08185
value= 1 <9 fj ,,. • Restoration St<!lge CSCC1S08255 0 value= 1 e value= 2
• value= 3 e value= 4
~'~"'~
• Restoration St.,ge CSCC1S08243
value= 1
• Rest.oration St.,ge CSCC1508283 0
00 e value= l cP
• Restoration Stage CSCC1508311 0 e vatue: 1
2 of 4
Restoration Intervals
Restoration Resources
Personnel Resources
Internal Crewmembers 5
Borrowed Internal Crewmembers 2
Substation Crewmembers 10
TOTAL 17
State Estimated Major Event Costs
Estimate$ Labor Overhead Materials Total
Capital $24,740 $3,000 $203 $27,943
Expense $0 $0 $0 $0
Total $24,740 $3,000 $203 $27,943
Major Event Declaration
PacifiCorp designates these events and the consequences thereof a major event in accordance with Case
No. PAC-E-04-07, where the Commission ordered that the determination of major events will be made
by applying IEEE standard 1366-2003 methodology (commonly referred to as the 2.5 beta method),
wherein a statistical outlier of these extreme events is based on the state daily SAIDI thresholds. The
company's 2016 Idaho reliability reporting region threshold is 1,141,067 customer minutes lost (14.82
SAIDI minutes) in a 24-hour period.
3 of 4
Event Details
Customers Out vs. Time
2.SOO
2.000
Total Event Su5;t1ined Customer Interruptions: J,417
11/IIIH:JUM
J,W
Idaho Major Event
0-1------------------------------------------------41111 11/S/U. 11;10 PM 11/'fu; 1:M AM
Concurrent Outages vs. Time
I 1! j
-eonc., ... o.t.aaes
-RtltLlm • N«rMI nwesftOM
A ..... C,Oft(•ttnt OUtatel
O II.cum to Normal
11/6/16 3:51 /,M 111,,u. ,,u t,M 11/6/U. ., .. f,M 11/'/1' 1:M PM
Tott! Ems Out.aces· ,
0-1---------------------------------------------------J
11/S/U.11:10 PM 111,tu; 1:M AM 11/6/IJ; 3:51 AM 11/6/U. 6:U AM 11/6/1, 11:10 /,M 11/6/1' 1:M PM
Customer Minutes Interrupted vs. Time (Cumulative)
Tptjl cunomcr Mtmaa lotc:cruescst; 1,849.696
2.000.000 Z._.., CM 1...,,IIM
1 1.800,000
J 1.600.000 ~ a 1 .. 00.(XX)
l U/511,11:IDIIM
1.200,000 1l ~ 1,000,000 • ! 800,000 -~UwtCMI ; -MIJ« t.wnt nw•o1c1 j 600,000
• Start nm.of Arst OVt ... lE 400,000 • "-1 Tlffleof l.a,t Out ...
200,000 D Z .. NrCMf
o,-----------------------------------------------11/S/1'11:10 PM 11/6/1, 3:51 t,M 11/6/1, ,:22 t,M ut,tu.1:•AM U/6/1' 1:M PM
SAIDI, SAIFI, CAIDI by Reliability Reporting Region
Please see the attached system-generated reports.
4 of 4
Idaho
PacifiCorp
Major Events Report
Customer Analysis* Sustained
Customers Off
PC PACIFICO RP 3,417
RMP Rockv Mountain Power 3,417
ID Idaho 3,417
ID MONTPELIER 20
ID PRESTON 3,394 I
ID REXBURG 2 1
ID SHELLEY 1
ID SMITHFIELD
Customer Analysis
12/5/2016 through
% Sustained
PacifiCorp Major Event Report
Customer Analysis
12/6/2016
Number of
Sustained Customer Smin-
Customers Off CML Interruptions Count <Smin 3 hrs
0% 1,849,696 10 1,868,631 837
0% 1,849,696 10 1,097,421 837
4% 1,849,696 10 76,971 837
0% 3,996 2 9,753
42% 1,845,294 6 8,044 834
0% 344 1 32,156 2
0% 62 1 26,229 1
0%,
Customers Restored by Intervals
3 hrs· 24 hrs -48 hrs -72 hrs·
24hrs 48 hrs 72hrs 96 hrs
2,580
2,580 --
2,580
20 -
2,560
-
•only current event specific metric impact shown. Does not include values from other events which may have occurred in other regions during the same time period.
Customer Interrupted by Date
12/5/2016 through 12/6/2016 Customers Restored by Intervals
Date• Number of Average
Sustained % Sustained Sustained Customer 5min-3 hrs-24 hrs · 48 hrs· 72 hrs·
Customers Off Customers Off CML Interruptions Count <5 min 3 hrs 24hrs 48 hrs 72 hrs 96 hrs
12/5/2016 2,310 3% 1,728,223 2 76,971 2,310
12/6/2016 1,107 1% 121,473 8 76,971 837 270
Data as of
1/4/_2017
120516 ID Final Report numbers.xlsxCustomer Analysis
Major Ewnt Only •
metric by operatint area customer
counts
% Sustained
Customers
Restored in 3
96 + hrs Hours P54 SAIDI SAIFI CAIDI
24% 0.99 0.002 541
24% 1.69 0.003 541
24% 24.03 0.044 541
--
0% 0.41 0.002 200
-25% 229.40 0.422 544
100% 0.01 0.000 172
100% 0.00 0.000 62
Major Ewnt Only •
metric by state customer counts
% Sustained
Customers
Restored in 3
96 + hrs Hours P54 SAIDI SAIFI CAIDI
0% 22.45 0.030 748
76% 1.58 0.014 110
1/19/2017
Idaho Event 12/05/16 throu_g_h 12/06/16
PacifiCorp Major Event Report
SSC by State Analysis
Month 12/01/16 throu_g_h 12/31/16 tm> mo11 01/0j/_16 through 12/31/16
Major Events Included Major Event Excluded Major Events Included Major Events Excluded• Major Events Included Major Events Excluded•
PacifiCorp
Major Events Report
SSCb_r_State SAIDI SAIFI CAIDI SAIDI SAIFI CAIDI
PC-,PACIFICORP ----='--1.37 I 0.005 -256 o.38 1 0.004 1 108
j;;1~o·u;;-;~i~ .Power -, ~ 0.006
11D !Idaho __ -_ -1 24~ 0.045
-
ID MONTPELIER 0.05 0.000 --ID PRESTON 23.97 . 0.044 ----ID REXBURG 0.11 0.001 ~--------t ID SHELLEY 0.00 0.000 --ID SMITHFIELD l
3~ 0.36 ' 0.003 : 111 r
5371--0.11 I 0.001 , --203
t-200
544
204 ~-
85 _Q}~~· ~ 0.00 0.000
205
108
SAIDI SAIFI CAIDI SAIDI SAIFI CAIDI SAIDI SAIFI CAIDI SAIDI
26.02 [ 0.152 17~ r 9.1il _o.o_n I 119 I 215.51 ; 1.5n ' )4..!..L 119.1'.U_
18.15 0.126 144 ---'----
126.61
0.28
24.47
97.56
0.538
0.003
0.050
0.444
4.29 j_ 0.,_04.!_L
0.00 ] 0.000
235 __
106
494 t-
220
104
89
10.18 I
12.94 L
0.22
0.50
8.64
-3.58 r
o.oo.C
0.097 105 222.89 1.524
0.119 1 109 I 392.02..i_ _ 3.o4o
0.002 95 21.30
0.005 92 40.42 ------0.079 110 251.86 ----
0.033 109 78.11 -·--------0.000 89 0.3 7 J
0.235
0.248
1.905
0.647
0.004
1461 125.78 1--__.
12~t·152.~
---;f 91 20.96
163 16.44 .
132 76.13
121· 38~261
87 0.37
SAIFI CAIDI
1.08oj 110
1.124 112
1.i§.U_ 112,
~ 0.232
0.204
0.635
0.287 r
0.004-l
90
81
120
133
87
•may include other regional major event exclusions during the same period. Operating areas are calculated by the state frozen customer count metrics.
Data asLof
1L4/2011
120516 ID Final Report numbers.xlsxSSC by State 1/19/2017