RE: Rocky Mountain Power -July 19, 2016 Major Event Report for the outage at the
Goshen Substation.
Dear: Ms. Jewell
Rocky Mountain Power is requesting designation of the July 19, 2016 outage and the consequences
thereof to be classified as a major event and excluded from its performance results due to the day's
performance, which exceeded the Company's major event threshold of 1,114,149 customer
minutes lost in a 24-hour period.
Attached you will find details regarding the major event including restoration resources, number
of customers off supply, total customer minutes lost, as well as SAIDI, and SAIFI figures.
Rocky Mountain Power will exclude outage information for this event from its network
performance reporting and from customer guarantee failure payments.
If you require further information regarding this report, please contact Heide Caswell, Network
Performance Director, at (503) 813-6216.
Sincerely,
;{)~ A) ~ /.1,144-
Douglas N. Bennion, P.E.
Vice President
Engineering Services & Capital Investment
cc: Matt Elam, IPUC
Bev Barker, IPUC
Report to the Idaho Public Utility Commission
Electric Service Reliability -Major Event Report ID-16-2
Event Date:
Date Submitted:
Primary Affected Locations:
Primary Cause:
Exclude from Reporting Status:
Report Prepared by:
Report Approved by:
Event Description
July 19, 2016
October 5, 2016
Rexburg and Shelley
Loss of Substation
Yes
April Brewer
Heide Caswell/ Dan Bodily/ Ken Short
On July 19, 2016, the 161 kilovolt (kV) capacitor bank inside the Goshen Substation, in Shelley, Idaho,
experienced an internal fault, when two crows made contact with the capacitor bank. The capacitor
bank locked out and caught fire, subsequently causing the east and west substation busses to trip. For
the day 99% of all customers minutes lost and customers who experienced an outage were the result of
the loss of supply event.
Event Outage Summary
# Interruptions (sustained) 109
Total Customer Interrupted (sustained) 54,157
Total Customer Minutes Lost 6,655,357
State Event SAIDI Impact 86.47 Minutes
CAIDI 123
Major Event Start 7 /19/16 12:00 AM
Major Event End 7 /20/16 12:00 AM
Restoration Summary
At 4:45 pm, on July 19, 2016, a fault and subsequent fire at the Goshen substation caused a widespread
loss of supply event across in the Rexburg and Shelley operating areas, affecting 70% of Rocky Mountain
Powers customers serviced in Idaho. The fire was small and quickly extinguished on its own. Onsite crews
began isolating the capacitor bank, while dispatch assessed the impact of the outage. Once the capacitor
bank was isolated and the system configuration was reviewed, dispatch began restoring feeds.
Coordination and troubleshooting of restoration efforts also occurred with the BPA as they too have
equipment at Goshen. Failed capacitor tanks were replaced, tested, and put back into service after all
customers had been restored. An internal review of the incident has been completed and substation
system configurations have been updated in an effort to prevent similar events in the future.
1 of 3
Of the 54,157 customers who experienced a sustained interruption during this major event the original
loss of supply affected 53,955 customers, impacting 33 substations and 100 circuits. Of these customers
39,016 were restored within 2 hours, and 14,939 restored within 3 hours. No customer complaints were
filed with the company or commission regarding this outage.
Restoration Intervals
Restoration Resources
Personnel Resources
Troublemen/ Assessors 3
Substation Crewmembers 14
TOTAL 17
State Estimated Major Event Costs
Estimate$ Labor Contracts Materials Overhead Total
Capital $43,000 $0 $14,000 $4,941 $61,941
Expense $1,400 $0 $0 $0 $1,400
Total $44,400 $-$14,000 $4,941 $63,341
Major Event Declaration
PacifiCorp designates this event and the consequences thereof a major event in accordance with docket
PAC-E-04-07, where the company and commission agreed that determination of major events will be
made by applying IEEE standard 1366-2003 methodology (commonly referred to as the 2.5 beta
method), wherein a statistical outlier of these extreme events is based on the state daily SAIDI
thresholds. The 2016 Idaho reliability reporting region threshold for the company is 1,141,067 customer
minutes lost (14.82 SAIDI minutes) in a 24-hour period.
2 of 3
Event Details
Customers Out vs. Time
60,000
50,000
~ 40,000
130.000
:IC a 20.000
10,000
-Ontomert OUt
+ ,._ Customan Out
.......... tonltlonTlffle
Total Event Sustained Customer lnterruetioos: S4,1s1
Idaho Major Event
,----9"~7; _f/lH:SZ PM
54,0IO
0+------.,------..-------,-----~-----~-----...... -----...i,..-------n
7/19/1612:00AM 7/19/162:JUM 7/19/16U&AM 7/1'/167:lUM 7/19/169:JliAM 7/1'/1612-C,OPM 7/19/162:24PM 7/19/IU:.aPM 7/19/167:llPM
Concurrent Outages vs. Time
Total Event Out11es: 109
100
90 -eonawr-OUUpt
80 -•am to NonNfThrflhold
70 • ,-CNtunent ouup, I: ! 0 lllhlrn to Normal
a 60
1: 50 ~ t
j 40
30
20
10 ot==========~~s::;:;::::::=~::i::=:::;:~;::::;:::::t:==~
7/19/1612:00AM 7/19/16 2:24 AM 7/19/164:4&AM 7/19/16 7:12 AM 7/19/169:J6AM 7/19/1612.1>0 PM 7/19/162:24 PM 7/19/164:4& PM 7/19/16 7:12 PM
Customer Minutes Interrupted vs. Time (Cumulative)
J .!i ~ a
l 1t f !
I: j
::t1
Total Customer Minutes Interrupted: 6,655,357
7.000.000
6,000,000 --CMI
5,000,000 -Malor fflnt. lh"aflold
• Stort,._offlntOUt-
4.000.000 • Start Tlme of I.alt Outap
• J.._HrCMI
3,000,000
2.000.000
1,000,000
7/lt/166:SSAM
-CMI 6,655,357 r---a
7/lt/115:SZ PM
0 4------.,------,..----~---.-------,------~------.------.i.------.,--
7/19/16 12:00 AM 7 /19/16 2:24 AM 7/19/164:4&AM 7/19/167:UAM 7/19/169:36 AM 7/19/1612:00 PM 7/19/16 2:24 PM 7 /19/164:4& PM 7/19/16 7:12 PM
SAIDI, SAIFI, CAIDI by Reliability Reporting Region
Please see the attached system-generated reports.
3 of 3
Data as/of
Fiscal Year
Event Begin Date/Time
Event End Date/Time
Month Begin
Month End
Year Begin
Year End
State
Comments:
8/15/2016
FY2017
Date
07/19/201612:00:00 AM
07/20/201612:00:00 AM
Tag
7/1/2016
7/31/2016
1/1/2016
7/31/2016
Idaho
Event Begin Time
Event End Time
filed
Idaho ~~
7/l9/2016 through 7/20/2016
PacifiCorp
Major Events Report Number of
Customer Analysis* Sustained % Sustained Sustained
Customers Off Customers Off CML Interruptions
PC PACIFICO RP 54,157 3% 6,655,357 109
RMP Rockv Mountain Power 54,157 5% 6,655,357 109 I
PacifiCorp Major Event Report
Customer Analysis
Customers Restonld by ._,,,.
Customer Smln -3 hrs · 24 hrs -48hrs -72hrs -
Count <Smin 3 hrs 24hrs 48hrs 72hrs 96hrs
1,868,631 54,022 ! 135
1,097,421 54,022 135
% Sustained
Customers
Restored In 3
96+hrs Hours PS4
100%
100%
ID Idaho ·---54,157 70% 6,655,357 109_L ______ 76,971 _ _:_L 54,23.3.L _ 13.~L __ .:._J__ _-_J __ -__ L ..... .:....._l__ 100%
ID MONTPELIER 0% 1 9,753 na
ID PRESTON 1 0% 108 1 8,044 1 100%
ID REXBURG 27,744 86% 3,710,448 58 32,156 27,609 135 100%
ID SHELLEY 26,412 101% 2,944,800 49 26,229 26,412 100%
•o nly current event specific metric impact shown. Does not include values from other events which may have occurred in other regions during the same time period.
eus-r lntenupted by Date
7/19/2016 lllrough 7/20/2016 c-Restonld by lntelvals
% Sustained
Date• Number of Average Customers
Sustained % Sustained Sustained Customer Smln-3 hrs-24hrs -48 hrs -72hrs -Restored in 3
Customers Off Customers Off CML Interruptions Count <Smin 3hrs 24 hrs 48 hrs 72hrs 96hrs 96+hrs Hours PS4
7/19/2016 54,157 70% 6,655,357 109 76,971 54,022 135 100%
Data as of
8/15/2016
ID 071916 Major Event Final Report.xlsxCustomer Analysis 2
Major E-Only-
metric by operatlnl .,.. amomer counts
SAIDI SAIFI CAIDI
3.56 0.029 123
6.06 0.049 123
---· 86.~1-o.7o4.L. _____ 12.3_
0.01 0.000 108
115.39 0.863 134
112.27 1.007 111
Major Event Only -
metnc by state customer eountl
SAIDI SAIFI CAIDI
86.47 0.704 123
101512016
Idaho Event 07/19/16
Major Events Included
PacifiCorp
Major Events Report
SSC by State SAIDI SAJFI CAIDI
PC PACIFICORP 3.74 0.030 124 c-------·
----RMP Rocky Mountain Power 6.28 0.051 124
.!£_ Idaho 86.47 0.704 123
-----
ID MONTPELIER ---
ID PRESTON 0.00 0.000 108 -
ID REXBURG 48.21 0.360 134 ----
ID SHELLEY 38.26 0.343 111
ID SMITHFIELD -
through 07/20/16
PacifiCorp Major Event Report
SSC by State Analysis
Month 07/01/16 through 07/31/16
Major Event Excluded Major Events Included Major Events Excluded•
SAIDI SAlFI CAIDI SAIDI SAIFI CAIDI SAIDI SAIFI CAIDI
0.17 0.001 159 19.32 0.170 113 15.16 0.131 116
0.22 0.001 167 23.48 0.189 124 17.42 0.140 125
0.14 0.001 139 107.75 0.862 125 21.28 I 0.159 1 134 ---~ ---1.09 0.014 80 1.09 0.014 80
-1.37 0.011 125 1.37 0.011 125
64.60 0.466 139 16.40 0.106 155 ----· --40.68 0.372 109 2.42 0.028 85
---0.00 0.000 272 0.00 0.000 272
•may include other regional major event exclusions during the same period. Operating areas are calculated by the state frozen customer count metrics.
Data as/of
8/15/2016
ID 071916 Major Event Final Report.xlsxSSC by State 3
YTD mo11 01/01/16 throucti 07/31/16
Major Events Included Major E11ents Excluded•
SAIDI SAIFI CAIDI SAIDI SAIFI CAIDI
127.45 0.903 141 73.54 0.651 113
137.08 0.943 145 76.71 1 0.658 1 117
189.87 1.779 107 85.08 1 0.737 1 115
9.38 0.120 78 9.30 I 0.120 1 ~
12.55 0.132 95 12.54 0.132 I 95
103.55 0.984 105 37.97 0.294 129
I 64.06 0.539 119 24.94 0.188 1 133
0.34 0.004 94 0.34 0.004 94